GROUND FLOOR 161.60 m SECOND FLOOR 165.60 m PARKING LEVEL 158.00 m THIRD FLOOR 168.75 m FOURTH FLOOR 171.90 m FIFTH FLOOR 175.05 m MAIN ROOF 178.75 m CARE WING ROOF 175.60 m MECH. PENTHOUSE ROOF 182.25 m 3 . 5 0 m 3 . 1 5 m 0 . 5 5 m 3 . 1 5 m 3 . 1 5 m 3 . 1 5 m 4 . 0 0 m 0 . 2 6 m 3 . 3 4 m 3 . 3 4 m ENTRANCE CANOPY SIGNAGE SPANDREL GLASS PANEL- MEDIUM GREY VISION GLASS EXTENDED MULLION CAP "FIN" METAL PANEL-GREY EIFS-WARM GREY/BEIGE METAL PANEL WITH WOOD GRAIN-RED SIGNAGE CLAY BRICK- GREY GLASS BALCONY GUARDRAIL CLAY BRICK- GREY 4 . 0 0 m 3 . 6 0 m CLAY BRICK-RED 3 . 5 0 m 3 . 1 5 m 0 . 5 5 m 3 . 1 5 m 3 . 1 5 m 3 . 1 5 m EIFS-WARM GREY/BEIGE CLAY BRICK-RED METAL SCREEN 2000 POOL SLAB 156.38 m 1 . 6 2 m ESTABLISHED GRADE 158.29 2 0 . 4 6 m 2 3 . 9 6 m GROUND FLOOR 161.60 m SECOND FLOOR 165.60 m PARKING LEVEL 158.00 m THIRD FLOOR 168.75 m FOURTH FLOOR 171.90 m FIFTH FLOOR 175.05 m MAIN ROOF 178.75 m CARE WING ROOF 175.60 m MECH. PENTHOUSE ROOF 182.25 m 3 . 6 0 m 4 . 0 0 m 3 . 1 5 m 3 . 1 5 m 3 . 1 5 m 0 . 5 5 m 3 . 1 5 m 3 . 5 0 m 2 4 . 2 5 m 3 . 6 0 m 4 . 0 0 m 3 . 1 5 m 3 . 1 5 m 3 . 1 5 m 0 . 5 5 m 3 . 1 5 m 3 . 5 0 m 2 4 . 2 5 m 3 . 6 0 m 4 . 0 0 m 3 . 1 5 m 3 . 1 5 m 3 . 1 5 m 0 . 5 5 m 3 . 1 5 m 3 . 5 0 m 2 4 . 2 5 m DROP - OFF CANOPY METAL PANEL SPANDREL GLASS PANEL EIFS-WARM GREY/BEIGE GLASS BALCONY GUARDRAIL METAL PANEL-GREY EIFS-WARM GREY/BEIGE METAL PANEL-WHITE VISION GLASS SPANDREL PANEL-MEDIUM GREY METAL PANEL WITH WOOD GRAIN-RED CLAY BRICK-GREY METAL SCREEN 2000 2 0 . 7 5 m POOL SLAB 156.38 m ESTABLISHED GRADE 158.29 2 3 . 9 6 m 2 0 . 4 6 m GROUND FLOOR 161.60 m PARKING LEVEL 158.00 m 2 5 5 1 8 8 0 4 0 0 300 115 400 300 OUTDOOR PATIO CONC. RETAINING WALL REFER TO STRUCT. DWGS CONC. RETAINING WALL REFER TO STRUCT. DWGS 1400MM HIGH TEMPERED GLASS GUARD IN PRE-FINISHED ALUM. FRAME (TYP.) is a member of the IBI Group of companies DATE: ISSUE SHEET TITLE PROJECT SCALE: CHKD' BY: DRAWN BY: PROJECT NO: SHEET NUMBER PRIME CONSULTANT SUB CONSULTANT SEAL CLIENT COPYRIGHT: ISSUES ibigroup.com Any reproduction or distribution for any purpose other than authorized by IBI Group is forbidden. Written dimensions shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and IBI Group shall be informed of any variations from the dimensions and conditions shown on the drawing. Shop drawings shall be submitted to IBI Group for approval before proceeding with fabrication. IBI Group Architects (Canada) Inc. ASC (Oakville) Facility Limited Partnership 175 BLOOR ST. E. SOUTH TOWER,STE.601 TORONTO, ONTARIO NORTH As indicated 2019/07/16 ELEVATIONS 01 106131 Author SPA301 ASC OAKVILLE Checker 3000 Hospital Gate Oakville, Ontario, Canada, L6M 4H6 7th Floor - 55 St. Clair Avenue West Toronto ON M4V 2Y7 Canada tel (416) 596 - 1930 fax (416) 596 - 0644 IBI GROUP SPA301 Scale: 1 : 200 1 EAST ELEVATION SPA301 Scale: 1 : 200 2 NORTH ELEVATION MUNICIPAL FILE NUMBER: SP.# 1327.001/01 SPA301 Scale: 1 : 50 3 SECTION @ PATIO RETAINING WALL NO . DATE DESCRIPTION 1 2017/11/09 ISSUED FOR ZBA SUBMISSION 2 2018/08/17 ISSUED FOR SPC SUBMISSION 3 2019/02/08 ISSUED FOR SPC 2ND SUBMISSION 4 2019/07/16 ISSUED FOR SPA 3RD SUBMISSION

CLIENT - Oakville planning/sp-132700101... · metal panel-grey metal panel-grey spandrel glass panel-medium grey eifs-warm grey/beige clay brick-red spandrel glass panel-medium grey

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CLIENT - Oakville planning/sp-132700101... · metal panel-grey metal panel-grey spandrel glass panel-medium grey eifs-warm grey/beige clay brick-red spandrel glass panel-medium grey

GROUND FLOOR 161.60 m

SECOND FLOOR 165.60 m

PARKING LEVEL 158.00 m

THIRD FLOOR 168.75 m

FOURTH FLOOR 171.90 m

FIFTH FLOOR 175.05 m

MAIN ROOF 178.75 m

CARE WING ROOF 175.60 m

MECH. PENTHOUSE ROOF 182.25 m

3.5

0 m

3.1

5 m

0.5

5 m

3.1

5 m

3.1

5 m

3.1

5 m

4.0

0 m

0.2

6 m

3.3

4 m

3.3

4 m

ENTRANCE CANOPY

SIGNAGE

SPANDREL GLASS PANEL-MEDIUM GREY

VISION GLASS

EXTENDED MULLION CAP "FIN"

METAL PANEL-GREY

EIFS-WARM GREY/BEIGE

METAL PANEL WITH WOOD GRAIN-RED SIGNAGE

CLAY BRICK-GREY

GLASS BALCONY GUARDRAIL

CLAY BRICK-GREY

4.0

0 m

3.6

0 m

CLAY BRICK-RED

3.5

0 m

3.1

5 m

0.5

5 m

3.1

5 m

3.1

5 m

3.1

5 m

EIFS-WARM GREY/BEIGECLAY BRICK-RED

METAL SCREEN

2000

POOL SLAB 156.38 m1.6

2 m

ESTABLISHED GRADE 158.29

20.4

6 m

23.9

6 m

GROUND FLOOR 161.60 m

SECOND FLOOR 165.60 m

PARKING LEVEL 158.00 m

THIRD FLOOR 168.75 m

FOURTH FLOOR 171.90 m

FIFTH FLOOR 175.05 m

MAIN ROOF 178.75 m

CARE WING ROOF 175.60 m

MECH. PENTHOUSE ROOF 182.25 m

3.6

0 m

4.0

0 m

3.1

5 m

3.1

5 m

3.1

5 m

0.5

5 m

3.1

5 m

3.5

0 m

24.2

5 m

3.6

0 m

4.0

0 m

3.1

5 m

3.1

5 m

3.1

5 m

0.5

5 m

3.1

5 m

3.5

0 m

24.2

5 m

3.6

0 m

4.0

0 m

3.1

5 m

3.1

5 m

3.1

5 m

0.5

5 m

3.1

5 m

3.5

0 m

24.2

5 m

DROP-OFF CANOPY

METAL PANEL

SPANDREL GLASS PANEL

EIFS-WARM GREY/BEIGEGLASS BALCONY GUARDRAIL METAL PANEL-GREY

EIFS-WARM GREY/BEIGE

METAL PANEL-WHITE

VISION GLASS

SPANDREL PANEL-MEDIUM GREY

METAL PANEL WITH WOOD GRAIN-RED

CLAY BRICK-GREY

METAL SCREEN

2000

20.7

5 m

POOL SLAB 156.38 m

ESTABLISHED GRADE 158.29

23.9

6 m

20.4

6 m

GROUND FLOOR 161.60 m

PARKING LEVEL 158.00 m

2551

880

400

300115

400

300

OUTDOOR PATIO

CONC. RETAINING WALL REFER TO STRUCT. DWGS

CONC. RETAINING WALL REFER TO STRUCT. DWGS

1400MM HIGH TEMPERED GLASS GUARD IN PRE-FINISHED ALUM. FRAME (TYP.)

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBI Group is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and IBI Group shall be informed of any variations from the

dimensions and conditions shown on the drawing. Shop drawings shall be submitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

ASC (Oakville) Facility Limited Partnership

175 BLOOR ST. E. SOUTH TOWER,STE.601TORONTO, ONTARIO

NORTH

As indicated

2019/07/16

ELEVATIONS 01

106131

Author

SPA301

ASC OAKVILLE

Checker

3000 Hospital GateOakville, Ontario, Canada, L6M 4H6

7th Floor - 55 St. Clair Avenue WestToronto ON M4V 2Y7 Canadatel (416) 596-1930 fax (416) 596-0644

IBI GROUP

SPA301 Scale: 1 : 200

1 EAST ELEVATION

SPA301 Scale: 1 : 200

2 NORTH ELEVATION

MUNICIPAL FILE NUMBER:SP.# 1327.001/01

SPA301 Scale: 1 : 50

3 SECTION @ PATIO RETAINING WALL

NO. DATE DESCRIPTION

1 2017/11/09 ISSUED FOR ZBA SUBMISSION

2 2018/08/17 ISSUED FOR SPC SUBMISSION

3 2019/02/08 ISSUED FOR SPC 2ND SUBMISSION

4 2019/07/16 ISSUED FOR SPA 3RD SUBMISSION

Page 2: CLIENT - Oakville planning/sp-132700101... · metal panel-grey metal panel-grey spandrel glass panel-medium grey eifs-warm grey/beige clay brick-red spandrel glass panel-medium grey

GROUND FLOOR 161.60 m

SECOND FLOOR 165.60 m

PARKING LEVEL 158.00 m

THIRD FLOOR 168.75 m

FOURTH FLOOR 171.90 m

FIFTH FLOOR 175.05 m

MAIN ROOF 178.75 m

MECH. PENTHOUSE ROOF 182.25 m

METAL PANEL-GREY EXTENDED MULLION CAP "FIN"

VISION GLASS

SPANDREL GLASS PANEL-MEDIUM GREY

CLAY BRICK

METAL PANEL-GREY

SPANDREL GLASS PANEL

VISION GLASS

ARMOUR STONE RETAINING WALLS BEYOND CLAY BRICK-GREY

METAL PANEL-GREY

METAL PANEL WITH WOOD GRAIN-RED

GLASS BALCONY GUARDRAIL

EIFS -WARM GREY/BEIGE

METAL SCREEN

METAL PANEL-WHITE

CLAY BRICK-REDEIFS-WARM GREY/BEIGE

CLAY BRICK-RED

2000

POOL SLAB 156.38 m

ESTABLISHED GRADE 158.29

GROUND FLOOR 161.60 m

SECOND FLOOR 165.60 m

PARKING LEVEL 158.00 m

THIRD FLOOR 168.75 m

FOURTH FLOOR 171.90 m

FIFTH FLOOR 175.05 m

MAIN ROOF 178.75 m

CARE WING ROOF 175.60 m

MECH. PENTHOUSE ROOF 182.25 m

3.5

0 m

3.1

5 m

0.5

5 m

3.1

5 m

3.1

5 m

3.1

5 m

4.0

0 m

3.6

0 m

24.2

5 m

SIGNAGE

METAL PANEL-GREY

SPANDREL GLASS PANEL-MEDIUM GREYMETAL PANEL-GREY

EIFS-WARM GREY/BEIGE

CLAY BRICK-RED

SPANDREL GLASS PANEL-MEDIUM GREY

VISION GLASS

METAL SCREEN

METAL PANEL-GREY

2000

POOL SLAB 156.38 m

ESTABLISHED GRADE 158.29

is a member of the IBI Group of companies

DATE:

ISSUE

SHEET TITLE

PROJECT

SCALE:

CHKD' BY:

DRAWN BY:

PROJECT NO:

SHEET NUMBER

PRIME CONSULTANT

SUB CONSULTANT

SEAL

CLIENT

COPYRIGHT:

ISSUES

ibigroup.com

Any reproduction or distribution for any purpose other than authorized by IBI Group is forbidden. Written dimensions shall have precedence over scaled

dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job and IBI Group shall be informed of any variations from the

dimensions and conditions shown on the drawing. Shop drawings shall be submitted to IBI Group for approval before proceeding with fabrication.

IBI Group Architects (Canada) Inc.

ASC (Oakville) Facility Limited Partnership

175 BLOOR ST. E. SOUTH TOWER,STE.601TORONTO, ONTARIO

NORTH

1 : 200

2019/07/16

ELEVATIONS 02

106131

Author

SPA302

ASC OAKVILLE

Checker

3000 Hospital GateOakville, Ontario, Canada, L6M 4H6

7th Floor - 55 St. Clair Avenue WestToronto ON M4V 2Y7 Canadatel (416) 596-1930 fax (416) 596-0644

IBI GROUP

SPA302 Scale: 1 : 200

1 SOUTH ELEVATION

SPA302 Scale: 1 : 200

2 WEST ELEVATION

MUNICIPAL FILE NUMBER:SP.# 1327.001/01

NO. DATE DESCRIPTION

1 2017/11/09 ISSUED FOR ZBA SUBMISSION

2 2018/08/17 ISSUED FOR SPC SUBMISSION

3 2019/02/08 ISSUED FOR SPC 2ND SUBMISSION

4 2019/07/16 ISSUED FOR SPA 3RD SUBMISSION