10

Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural
Page 2: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural
Page 3: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

1. Mercury Drug Manila Mendoza EngineeringSlab strengthening for flexural capacity

Completed 2001

2. LRT-3 Project, Manila North Star TechnologistsColumn strengthening for additional confinement

Completed 2001

3. LRT-3 Project, Manila In-houseColumn strengthening for additional confinement

Completed 2001

4. Blumentritt Building Manila EC Structural Composites Inc.

Flexural strengthening of beams Completed 2001

5. Blumentritt Building, Manila In-houseRepair & strengthening of cantilever beams for shear capacity

Completed 2001

6. Solid Cement Corp. SCC, In-houseStrengthening columns for shear capacity in cement plant

Completed 2001

7. San Miguel Corp. La Tondena Distillery SMC, In-houseRepair, strengthening and corrosion protection of waste water pond

Completed 2001

8. Int’l. Container Terminals Inc. (ICTSI) ITCSI, In-houseCorrosion protection of steel mono-tube piles

Completed 2002

9. Jose Rizal University, Manila QCSI ConsultancyRepair and strengthening of cantilever beams for shear capacity

Completed 2002

10. Phil. National Bank Financial Center, Manila PNB, In-houseStrengthening and leak repair of FRP pipes

Completed 2002

11.Cabilawan Bridge, Antique - Asian Development Bank (ADB) Project

BCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2002

12. Sta Cruz Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2002

13. Old Cala-Cala Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2002

14. Cebu Port Authority, Cebu-City CPA, In-houseStrengthening and corrosion protection of Batter Piles

Completed 2002

15. Supreme Court of the Phils.Trans-Asia(Phils) Inc./ Pimentel and Asso.

Strengthening of cantilever beams and girders

Completed 2002

16. Phil. Ports Authority, Port of Cagayan De Oro PPA, In-houseStrengthening and corrosion protection of piles

Completed 2003

17. Cairawan Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

18. Phil. National Oil Company, Batangas PNOC, In-houseStrengthening and corrosion protection of vessel damaged beams and piles

Completed 2003

19. Tul-Ang Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

20. Dalanas Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

21. Intao Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

22. 5 storey Vitas Tondo Bldg., Manila In-house consultantRepair and strengthening of columns and beams

Completed 2003

23. Langawon Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

24. San Antonio Bridge, Antique - ADB Project BCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

25. Net 1 Center, Manila Meinhardt Phils. Inc.Repair and strengthening of slabs and beams for increase in loads

Completed 2003

26. Balabago Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI

Repair and strengthening for flexure and shear

Completed 2003

27. Vishay Phils.Inc. FTI Compounds FD Partners & CoRepair and strenghening of machine foundation

Completed 2003

28. 2 Storey Residential with attic -East Greenhills Design TechRepair and strenghening for flexural and shear

Completed 2003

P R O J E C T R E F E R E N C E

Project Description

Page 4: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

29. Manicahan Bridge, Zamboanga-ADB ProjectBCEOM /Everest/Angel Lazaro/Mansueto

Repair and strenghening for flexural and shear

Completed 2004

30. Far East Alcohol Corp. Apalit, Pampanga In-house consultantRepair and strenghening for flexural and shear

Completed 2004

31.HPN BLDG. NAVAL Station, Roxas Blvd, Pasay City

In-house consultantRepair and Strenghening of column

Completed 2004

32.Phil. Ports Authority, Port of Pulupandan Negros Occidental

PPA, In-houseStrenghening and Corrosion protection of steel piles

Completed 2004

33.Asian Montessori, San Fernando, Pampanga

In-house consultantRepair and strenghening of slabs and beams

Completed 2004

34. Nestle Philippines Cagayan De Oro EM²A Partners & CoRepair and strenghening of slabs and beams

Completed 2004

35.Pilipinas Shell Petroleum Corp., Tabangao Refinery Batangas, City

In-houseRepair And Strenghening Of Tank Support

Completed 2004

36. Wyeth Phils. Inc., Makati City TCGI EngineersRepair and strenghening of slabs and beams

Completed 2004

37. Asian Terminal Inc., Port Area, Manila In-house Strenghening and Corossion Protection Of Steel Piles

Completed 2004

38. RFM Corporation Mandaluyong City In-houseRepair and strenghening of Silo wheat Bins

Completed 2004

39.Pilipinas Shell Petroleum Corp., Tabangao Refinery Batangas, City

In-houseRepair and strengthening of Tank Support using TYFO SEH-25A

Completed 2004

40.Sixth ADB Road Project Road Improvement Composnte Contract Package 6PY-1 Patnongon- Culasi Section Antique

China State eng'g construction Corp. and BCEOM/UICI

Bridge Girder repair / strengthening usinf TYFO SEH-51

Completed 2004

41.Sixth ADB Road Project Road Improvement Composnte Contract Package 6PY-12 Culasi- Nabas Section, Antique

FF Cruz & Co., Inc. BCEOM / UICI

Bridge Girder repair/strengthening using TYFO SEH-51

Completed 2004

42. BOGO Water District Bogo, Cebu In-houseStrengthening of 600cubic meter ground Water Reservoir using TYFO SEH-51

Completed 2005

43. Konstrak International Quezon CityR.A. Tiburcio & Associates

Strengthening of Beams ( Flexural) using TYFO SEH-51 System

Completed 2005

44. Aura Builders, Quezon CityR.A. Tiburcio & Associates

Strengthening of RC Beams KOTEH Residence, Corinthian Hills using TYFO SEH-51 System

Completed 2005

45.Sabang Bridge Rehabilitation, Ibaan, Batangas City

In-houseStrengthening of Arc Bridge Colummn using TYFO SEH- 51A System

Completed 2005

46. Mall of Asia, Roxas Blvd Manila In-houseStrenghening of beam using TYFO SCH-11UP Composite System

Completed 2005

47.DAEWOO Eng'g. & Co. Ltd. Trento, Agusan Del Sur

KatahiraRepair / Strengthening of Sulibao Bridge using TYFO SCH-11 UP Composite

Completed 2005

48. Virra Mall, Greenhills San Juan, Metro ManilaG.G. Sta. Maria Contruction

Strengthening of beam using TYFO SCH-41 System

Completed 2005

49. Shell Refinery, Tabangao In-houseCorrosion protection of steel tank using TYFO S E H-55H System

Completed 2005

50. Robinson Cybergate Pioneer, Mandaluyong In-houseStrengthening of beams and slabs using TYFO SEH-51A and TYFO SCH 41

Completed 2005

51. PNOC Petrochemicals Mariveles, Bataan In-houseRepair and Restoration of Damage RC Beams using TYFO SEH 51A

Completed 2005

Page 5: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

52. Nestle Philippines, Cabuyao Laguna In-houseStrengthening of beams and columns using TYFO SEH-51A System

Completed 2005

53.Monolith Const'n Dev't Corp. SM Mall of Asia, North Parking

ESCAFlexural Strengthening of Slab using TYFO SCH 41 and TYFO SEH 51A

Completed 2005

54.FEATI Building 1, FEATI University Carlos Palanca St. Metro Manila

DCCD Engineering Corp.Shear Wall Strengthening using TYFO SEH 51A and TYFO SEH 25A

Completed 2005

55. Nestle Philippines , Inc., Cagayan De Oro City EM²A Partners & CoSlab Flexural Strengthening using TYFO SEH 51A

Completed 2005

56. Wyeth Phils. Inc, Canlubang Plant TCGI EngineersBeam Strengthening using TYFO SEH 51A

Completed 2005

57.Sixth Road Project, Bridge Component, ADB Loan No. 1473, PHI JEXIM UNITED Loan, contract package 8

Angel Lazaro and Associates Everest Int'l Consultants, Inc.

Sumlog Bridge Retrofitting (Slab Flexural Strengthening, Girder Beam/Coping Beam, Shear Flexural Strengthening) using TYFO SEH 25A, TYFO SEH 51A and TYFO SCH 41

Completed 2005

58.WHO Building, Cor. Taft Ave. and U.N. Ave. Manila.

C.C. Pabalan and Associates

Column Shear and Flexural Strengthening using TYFO SCH 11 UP and SCH 41

Completed 2005

59.Canyon Woods, Residential Resort Phase 3B, Laurel, Barangas

BBR Philippines Corp.Shear Strengthening of Columns using TYFO SEH51A

Completed 2006

60.Proposed Small Volume Solids. Mamplasan, Biňan, Laguna

R.S. Caparros & Associates

Beam and Slab Strengthening using TYFO UC Laminate

Completed 2006

61. Baliling Bridge, Sta. Fe, Nueva Vizcaya Angel Lazaro and Associates Everest Int'l Consultants, Inc.

Slab Flexural Strengthening using TYFO SEH 25A

Completed 2006

62. VSI, Residential Bldg. Ayala Alabang ESCAStrengthening of beams and slab using TYFO SCH 41

Completed 2006

63. EEI Corporation, Mamplasan Biñan LagunaRS Caparros & Associates

Strengthening of Girders using TYFO SCH 41 & SEH 51

Completed 2006

64. Bitaog Bridge, Sta. Barbara, Iloilo CityProvincial Engineers Office

Beam Shear and Flexural Enhncement using TYFO SEH51A and SCH41

Completed 2006

65. Dr. Arthur Roxas, Residence Filinvest II, Q.C. Engr. Rolexa MarzanStrengthening of beams using TYFO SCH 41

Completed 2006

66 CHI-SPA, Shangrila Plaza Hotel Pasig City OVE ARUP PhilippinesBeam Flexural Enhancement Using TYFO SCh41

Completed 2006

67.CP-2, Catarman - Calbayog via Lope de Veaga Road Samar Province

China State eng'g construction Corp. PCI/PMO-DPWH

Dizo Bridge Shear and Flexural Strengthening of girders using TYFO SEH51

Completed 2006

68. Three Storey Residentials Bldg. Antipolo CityMacro Civil & Structural Engineers

Strengthening of column and slab using TYFO SCH 41 AND SEH 51

Completed 2006

69. Ayala Greenfields, Biñan Laguna Engr. Ruth Mabilangan ( ASEP)

Strengthening of Beams & Girders

Completed 2006

70. PPA NasipitIn-House ( PPA)

Strengthening of Concrete Piles & Coping using TYFO SEH 51

Completed 2006

71.Mr. Victor Co Bldg J.D. Laurel Malacañang Corp. Metro Manila

Engr. Peter MarinasStrengthening of Stair Beams using TYFO SCH 41 & SEH51

Completed 2006

72.Liberty Flour Mills/Vinnell-Belvoir Blumentrit Mandaluyong City

Aromin Sy & AssociatesStrengthening of column and slab

Completed 2007

73. Burnham Suites Kisad Rd. Baguio City Lorenzo Dy & AssociatesStrengthening of column using TYFO SCH 41

Completed 2007

74.Repair of Wharf Underdeck Nasipit Baseport, Butuan City

In-house PPARepair / Strengthening of coping, girders and concrete piles

Completed 2007

Page 6: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

75. Eng'rs. Villar 5 Storey Res. Bldg. Baguio City Engr. Peter MarinasStrengthening of Beams using TYFO SCH 41 & SEH51 Epoxy Injection

Completed 2007

76. St. Benilde La Salle College ESCAStrengthening of Concrete Girders using TYFO SCH 41

Completed 2007

77.Valenzuela Tannery Corp. Meycauyan, Bulacan

Engr. Rey FlordelizaStrengthening of R.C. Slabs Using TYFOSEH51

Completed 2007

78. Robinson Main Bldg. Libis, Quezon CityEC Arrojado & Associates

Strengthening of R.C. Beam using SCH 41 & SEH51

Completed 2007

79.F.F. Cruz-Shimizu (JV), Batangas Port Dev. PH II

Pacific Consultant Inc.- (PPA)

Strengthening of Beams & Girders using TYFO SEH 51 & SCH 41

Completed 2007

80. Lagang HangDPWH-District Engineering Office, Abra

Strengthening of Concrete Pier, Coping & Beams using TYFO SCH 41 & TYFO SEH 51

Completed 2007

81.North Triangle (Trinoma) Commercial Center, EDSA cor North Ave. Q.C.

DCCD Engineering Corp.Beam Shear and Flexural Enhancement using TYFO SCH41

Completed 2007

82. Orani Municipal Hall, Orani, Bataan DPWH-BataanSlab & Beam Retroffitting using TYFO SCH41

Completed 2007

83. MRT Depot, north EDSA, Q.C. DCCD Column Axial Strengthenign using TYFO SEH51 & SCH41

Completed 2007

84.Kalaw Ledesma Condominium, Gamboa St., Makati City

Aromis Sy & AssociatesStrengthening of Beams using TYFO SCH 41 EPOXY INJECTION

Completed 2007

85. Ba-ay Bridge Lagangilag, AbraDPWH-District Engineering Office, Abra

Strengthening of RCDG and Pier Column using TYFO SCH 41

Completed 2007

86.De La Salle-College of St. Benilde, P. Ocampo St., Malate, Manila

ESCAStrengthening of Beams and girder using TYFO SCH41

Completed 2007

87. Ba-ay Bridge Lagangilag, AbraDPWH-District Engineering Office, Abra

Strengthening of RCDG and gier columns using TYFO SCH41 & SEH51

Completed 2007

88.LFM PROPERTIES, 19 H.V. Dela Costa, Salcedo Village Makati City

In-HouseWaterproofing/Strengthening of shear wall using TYFO SHE 25

Completed 2007

89. Lligan Cement Corp., Lligan CityGHD Clients/People Performance

Fiber Reinforcement of Packhouse Columns Using TYFO SHE51 and TYFO SCH41

Completed 2007

90.St. Scholastica College, Leon Guinto St. Malate Manila

In-HouseStrengthening at Beam/Slab using TYFO SHE51

Completed 2007

91 Philam Life Bldg. Cubao, Quezon City Aromin Sy & AssociatesStrengthening at Beam/Slab using TYFO SHE51

Completed 2007

92. SM CITY CEBU, Mabolo, Cebu CityR.S. Caparros & Associates, Monolith Construction Dev.

Stengthening of Concrete Beam Ramps using TYFO UC Composite Laminate Strips

Completed 2007

93.Ansons Emporium Corp., Makati Ave. cor North Drive, Makati City

Constech/ Aromin Sy & Associates

Retrofitting Works of Beams using TYFO SCH 41

Completed 2007

94.Warehouse Building, Meycauayan, Industrial Subdivision, Meycauayan, Bulacan

Dr. Arthur RoxasSlab Retrofitting using Carbon Fiber (TYFO SCH41)

Completed 2007

95.Republic Cement Corp., BO. Bigte Norzagaray, Bulacan

GHD Clients/People Performance

GCT Structure Retrofitting using TYFO SCH41 and SEH51

Completed 2007

96.Two (2) Storey Res., Bldg.2 Lot 15 Ayala, Hillside Estate, Old Balara Quezon City

Ubay Alcantara & Asso.Concrete Beams using TYFO SEH51 (glass fiber)

Completed 2007

97. Rex Bookstore, Dasmarinas, CaviteMacro Civil & Structural Engineers

Repair/ Strengthening of

Concrete Slabs (2nd floor)Completed 2007

98. Adora Dept. Store Greenbelt - 5, Makati CityDCCD/AROMIN SY & ASSO.

TYFO SCH System Application for Beams, Shear & Flexural Enhancement

Completed 2007

Page 7: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

99.Bangko Sentral ng Pilipinas, East Ave. Quezon City

Romualdo A. Chavez Jr. Terp.Asia Constr. Corp.

Roofdeck Slab Flexural Enhacement

Completed 2007

100. Republic Cement Plant, Norzagaray BulacanLa farge Cement Services Phils, Inc./ DCCD Engineering Corp

Retrofitting of Kiln-Cooler EP Building using TYFO glass and Carbon Fiber

Completed 2007

101.SMART TELECOMMUNICATION, PLDT Brgy. East Avenue, Quezon City

EH SISON Engineers Co.Retroffing / Strengthening of Beams & Column using TYFO SCH41 and TYFO SEH51

Completed 2008

102. Rockwell, Joya Loft Tower, Makati City HillmarcsStrengthening of Beams using Tyfo SCH41

Completed 2008

103 Dela Rosa 3-E ServicesMakati Dev't Corp./Aromin & Sy + Asso.

Retrofitting of Column using TYFO SHE System

Completed 2008

104.Clark Sub. Station, Clark Air Base, Angeles City

MGLualhati/ Ubay Alcantara

Strengthening of Concrete Beams (top&bottom) using TYFO Systems

Completed 2008

105.Ateneo Social Science Bldg. Ateneo Campus, Katipunan Q.C.

ASEC/ASAIStrengthening of Concrete Beams (top&bottom) using TYFO SCH41

Completed 2008

106.Metrobank, Tomas Mapua Papua cor Fugoso St.

Logos Const./G.E. Origenes & Associates

Retrofitting of Structural Support of Branch new site using TYFO SCH41

Completed 2008

107.Tuazon - Bldg. Retrofitting, Intramuros, Manila

BPI/ BIR/ CC Pabalan & Asso.

Retrofitting of Slabs, Beams & Columns using Glass & Carbon Fiber

Completed 2008

108.MWSI Caloocan Reservoir, 7th Ave. Caloocan City

MWSIRetrofitting Project of MWSI Reservoir - Inner Surface Application using TYFO SEH25A

Completed 2008

109. JG Summit Bldg. Ayala Ave. Makati CityDititel Mobile Phil, Inc. RS Caparros & Asso.

Retrofitting Slabs & Beams using TYFO Carbon LAMINATES

Completed 2008

110.Santiago Water District.Santiago City, Isabela

Santiago Water DistrictEngr. Albert Canete

Retrofitting of elevated concrete reservoir

Completed 2008

111.South Gate TowersMagallanes, Makati City

Alphaland Corp./ Aromin & Sy + Asso.

Retrofitting of Beams & Girders using Carbon Fiber using SCH41

Completed 2008

112.SBMA Adain Bldg.Subic Bay Freeport Zone

Pacific Consultant Inc.Strengthening of Beams using TYFO SCH41

Completed 2008

113.Liberty Flour MillsBlumentrit, Mandaluyong City Metro Manila

In-HouseRepair/ Strengthening of Silos and Wheat Bins using Tyfo SCH41 and Tyfo SHE25

Completed 2009

114.University of BaguioBaguio City

Ubay Alcantara & Associates

Strengthening of Beams & Columns using TYFO SCH41

Completed 2008

115.SME Shoppers MartCabuyao, Laguna

In-HouseRepair / Strengthening of Bems and Slab using TYFO SCH41 and TYFO SEH51

Completed 2008

116.Tondo Reservior & Pumping StationTondo, Manila

MWSI

Repair/ Strengthening/ Waterproofing of Slab and Wall using SEH25 - Inner Surface Application

Completed 2008

117.Texas InstrumentAngeles City, Clark Pampanga

A.G. Araja Construction & Dev't Corp

Repair/ Strengthening of slab & beams using SCH41

Completed 2008

118.Philippine Flour MillsHondagua, Lopez Quezon

Phil Flour Mills DCCD Engineering Corp

Retrofitting if beams & columns for 6th Storey Bldg./ Milling Area using SEH51

Completed 2008

119.Radison HotelCebu City

ESCAStructural Retrofiting using SCH41 & Epoxy Injection of Beams/ Girder

Completed 2008

Page 8: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

120. East West Bank, Fort Bonifacio, Taguig East West Bank / ASAISlab Enhancement due to additional loading

Completed 2009

121. Mandarin Square, Ongpin Binondo, Manila EEI / ASAIRetrofitting of beams, slab and shear wall using Tyfo SCH41 and Tyfo SEH 51

Completed 2009

122. Landbank Building, Roxas Boulevard, Manila G.E. Origenes & Associates

Slab Enhancement using SCH41 Carbon Fiber

Completed 2009

123. Sumlog Bridge, Cabaguio Avenue, Davao City

ALGON Engineering Construction, Corp.Builders Contractors & Gen. Merchant

Furnish and Application / Installation of TYFO Carbon Fiber for the Replacement of Deckslab, Girder and Coping Enhancement

Completed 2009

124.Manila Doctors Hospital, United Nations Ave.,Ermita Manila

Manila Doctors Retrofitting of beams using SCH41 Carbon fiber

Completed 2009

125.PHILJA Training Center, Brgy. Maitim Tagaytay City

E.M. Cuerpo Incorporated

Expansion ( Renovation & construction using SEH51 Glass fiber)

Completed 2009

126. La Fuerza, Chino Roces Avenue Makati City LA FUEZA INC.Repair/Strengthening of Slabs, Beams, Girders and Columns using SCH41 Carbon Fiber

Completed 2009

127. Batangas Fly-Over, Batangas CityF.F. Cruz & Company Inc.

Slab Panel Epoxy Injection & Glass Fiber Application, at Fly Over & Approach Slab Epoxy Injections

Completed 2009

128.Maynilad Espiritu Water Reservoir, Espiritu St., San Andres Bukid, Manila

MWSIRepair, Retrofitting and Waterproofing of the Espiritu Pumping Station & Reservoir

Completed 2009

129.Ayala Life-FGU Alabang Building, Madrigal Business Park Alabang, Muntinlupa City

Bank of Philippine Islands

Retrofitting of Beams using UC Laminated strip with SCH 41 Carbon Fiber

Completed 2009

130. Astoria Boracay, Station 1, Malay Aklan Astoria PlazaRepair/Strengthening of slab & beams using SCH41 & SEH51

Completed 2009

131. Mezza Residences, Paco, ManilaNew Golden City Builders

Strengthening of Bottom slab @Water Tank Tower 1 and 2 using SCH 41 Carbon Fiber

Completed 2009

132. Cabalan Watertank, Subic Bay, Olongapo City Subic WaterRetrofitting of Watertank using SCH 41 Carbon Fiber & SEH51 Glass Fiber

Completed 2009

133. Asia Town IT Park Cebu Cebu CityRetrofitting of Watertank using SCH41 Carbon Fiber & SEH51 Glass Fiber

Completed 2009

134.4 Columns Retrofitting Sta. Lucia East Comm'l.Co.

Sta. Lucia East Comm'l.Co.

Structural Reinforcement of Columns

Completed 2009

135. CABURLOTO SCHOOL EXTENTION J.O. Dizon & Assoc. Caburloto School Extention Completed 2009

136. MACEDA INTEGRATED SCHOOL REPAIR North Manila Eng'g District

Columns Retrofitting and Cracks Epoxy Injection

Completed 2009

137. 2 Storey Bldg. w/ Deck Repair Dr. Genesis P. RonquilloRetrofitting of Existing Two-Story Buildingwith Deck

Completed 2009

138. Bldg. C astoria Boracay Astoria Plaza Bldg. C Restoration Completed 2009

139. Repair of South Radial Gate PL1,Lamesa Dam D.M.. Consunji, Inc. Beam and Columns Retrofitting Completed 2009

140. GREEN TOP CONDOMINIUM JOC Fab. 7 Const. Corp. Elevator Core Wall Retrofitting Completed 2010

141. HYATT REGENCY HOTEL RB Sanches ConsultantRepair/ Strengthening of columns and beam using SEH51A glass fiber

Completed 2010

142. SCANDIA SUITES BLDG 2 Cathay Land Inc. Gen. Construction of 7 Storey Condominium

Completed 2010

143. EFFIE LEAŇo RES. EFFIE LEAŇoProposed 2 storey Resedintial with roofdeck

Completed 2010

Page 9: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

144. RADISSON HOTEL SM INVESTMENTConstruction of Swimming Pool, Water Features and Major earthworks

Completed 2010

145. ACACIA GROOVE HOTEL Holcim Philippines,. Inc.Strengthening of 9 Columns- Acacia Groove Hotel

Completed 2010

146. EUROTILES, INC. In-House Construction of Warehouse Completed 2010

147. PIER REHABILATATION Bj Construction & Material Supply

Strengthening of RC Piles, Beam & Slabs

Completed 2010

148. GOOD EARTH PLAZA BUILDING Aromin & Sy AssociatesRepair and Strengthening of Columns

Completed 2010

149. UNION BANK ( EDSA-PIONEER BRANCH Aromin & Sy Associates Strengthening of Cash Vault Completed 2010

150. West Tower Aromin & Sy Associates Retrofitting of Beams Completed 2010

151. Liberty Flour Mill In-House Painting of Silos Completed 2010

152. PPA Port Rehabilitation Philippine Port Authority Port Rehabilatation Completed 2010

153. Propose Additional Mezzanine Construction and Retrofitting Completed 2010

154. Astoria Plaza Gapuz Group Retrofitting of Slab at Dumpwater Area Receiving

Completed 2010

155. Gate Chateux to Miami Cathay Land Construction Completed 2010156. Bridge of Montalban CSII Construction Completed 2010

157.Restoration Work For the repair of Coping Beam located bet. Sta. 7-8NB (B16~Bay 309)

Tes Phils.Restoration Work For the repair of Coping Beam located bet. Sta. 7-8NB (B16~Bay 309)

Completed 2010

158. Renovation of Warehouse Gernandiso Lim Renovation Completed 2010

159. Unionbank Edsa Pioneer Branch Aktino Builder's Corp.Strengthening of Cash Vault @ Unionbank Edsa Pioneer Branch

Completed 2010

160. Acacia Groove Hotel Holcim Phils., Inc.Strengthening of 9 Columns - Acacia Groove Hotel

Completed 2010

161. Legazpi Village Project Makati Dev't. Corp.Retrofitting of Slab - Legazpi Village Project

Completed 2010

162. Eurotiles Warehouse Construction Eurotiles Inc. Construction Completed 2010163. Slab Retrofitting Dr.Arthus Roxas Slab Retrofitting Completed 2010

164. Phil. Flour Mills Tank Lining Phil. Flour MillsRepair and Application of Tank Lining

Completed 2010

165. Alabang Town Center VGP Limdico & AssocRetrofitting of Proposed BPI Office- Alabang Town Center

Completed 2010

166.Waterproofing of the Firewall Mabalacat Water District

Mabalacat Water DistrictSupply of Labor,Equipment & Mat'ls for the Waterproofing of the Firewall

Completed 2010

167. Phil. Flour Mills Water Proofpainting Phil. Flour MillsRepair & Epoxy Lining w/ Water Proofpainting

Completed 2010

168. Caray Caray Bridge Hi-Tri Dev't. Corp. Retrofitting of Caray Caray Bridge Completed 2010

169. BDO Avecshares Branch C.L. Garcia Const.Retrofitting of Beams of BDO Avecshares Branch

Completed 2010

170. Arellano University DCCD Eng'g. Corp. Retrofitting of Arellano University Completed 2010

171. Mill 1-3 using Elastomeric Paint Liberty Flour MillsPainting Works @ Mill 1-3 using Elastomeric Paint

Completed 2010

172. Potable Tank, Radisson HotelSM Hotels&Entertainment Corp.

Carbon Fiber & Epoxy in Potable Tank, Radisson Hotel

Completed 2010

173. Tabacalara Office @ 6th Floor LevelAlphaland Southgate Tower

Strengthening Of Beams & Slabs Tabacalara Office @ 6th Floor Level

Completed 2010

174. Eurotiles Inc. Electrical Works Eurotiles Inc.Proposed Power Feeder-Electrical Works

Completed 2010

Page 10: Client / Consultant Type of Application Status Installationrsucivilengineering.weebly.com/uploads/7/7/6/4/77644974/company... · Mendoza Engineering: Slab strengthening for flexural

Client / Consultant Type of Application Status Installation

P R O J E C T R E F E R E N C E

Project Description

175. Sumlog BridgeAlgon Eng'g. Const.,Corp.

Rehabilitation of Sumlog Bridge Completed 2010

176. Rovic TheaterGrepac Construction & Dev't. Corp.

Rovic Theater&Hotel Retrofitting Completed 2010

177. Structural Reinforcement of BeamStructural Reinforcement of Beam

Completed 2010

178. Mandarin SquareGrepac Construction & Dev't. Corp.

Mandarin Square Retrofitting Works

Completed 2010

179.Structural Retrofitting using Tyfo Fiber Wrap SystemCity Place

Megaworld Corp.Structural Strengthening of City Place @ Binondo

Completed 2010

180. Retrofitting Works Mandarin Square Jose Aliling & Associates Retrofitting Works Mandarin Square

Completed 2010

181. Strutural Of Roof Framing TSD TSD Strutural Of Roof Framing Completed 2010

182. Retrofitting works Malaybalay Road Bldg. Stratigic Alliance Holdings, Inc.

Retrofitting Works & Construction of Shearwall Bukidnon, Malaybalay Road Bldg.

Completed 2010

183.Proposed 4 Storey Residential Bldg. with Mezz.

Mr. Allan NgProposed 4 Storey Residential Bldg. with Mezz.

Completed 2010

184. Proposed Waterproofing of Firewall Mr. Loreto LimcoliocRetrofitting/Waterproofing of Firewall

Completed 2010

185. Retrofitting at File Computer AreaDiversified Technology Solutions International, Inc.

Retrofitting at File Computer Area Completed 2010

186.Painting Oof Packer Room and Quality Control Room

Liberty Flour MillsPainting Oof Packer Room and Quality Control Room

Completed 2010

187. Structural Strengthening@ Connecticut St. TSD Construction,Inc.Structural Strengthening@ 107 Connecticut St., Northeast, Greenhills, Sanjuan Manla

Completed 2010

188. Rehabilitation of Lift Station 510 SubicWater Rehabilitation of Lift Station 510 Completed 2010

189.VAG Building Renovation Structural Investigation & Evaluation

GENATO INVESTMENTS INC.

VAG Building Renovation Structural Investigation & Evaluation

Completed 2010

190.Restoration Work For the repair of Cracks on Roop Deck Beams @ Sta.1(North Ave. & Sta.3(GMA-Kamuning)

Tes Phils.

Restoration Work For the repair of Cracks on Roop Deck Beams @ Sta.1(North Ave. & Sta.3(GMA-Kamuning)

Completed 2010

191.Balara-San Juan AQ2 Transmission Main Rehabilitation Project

BSP & Company, Inc Pipe Rehabilitation Completed 2010

192.Old A.Rita Transmission Main Rehabilitation Project

BSP & Company, Inc Pipe Rehabilitation Completed 2010

193. Retrofitting Of Farmix Bldg Bulk Handlers Retrofitting Of Farmix Bdg Completed 2011

194. Retrofitting Works @ Gramercy ResidencesCentury Properties Mgmt. & Const. Corp.

Retrofitting Works @ Gramercy Residences

Completed 2011

195.Retrofitting Works@ Gramercy Columns using Steel Plates

Century Properties Mgmt. & Const. Corp.

Retrofitting Works@ Gramercy Columns using Steel Plates

Completed 2011

196.Structural Investigation & Evaluation of Left Wing Bldg. @ Cityhall Complex, Batangas City

MADRECLARA Guest Center Inc.

Structural Investigation & Evaluation

Completed 2011

197. Corrosion Prptection of Elevated Water Tank Tarlac Power Corp. Corosion Protection Completed 2011

198.Construction for the Retrofitting of Structural Member of St. La Salle Hall

De La Salle UniversityConstruction for the Retrofitting of Structural Member of St. La Salle Hall

Completed 2011

199. Retrofitting of ColumnsIKM Builders & Construction Supply

Retrofitting of Columns Completed 2011

200.Retrofitting Works and Construction of Shear Wall

Strategic Alliance Holdings,Inc.

Retrofitting Works and Construction of Shear Wall

Completed 2011