Client / Consultant Type of Application Status Installation
1. Mercury Drug Manila Mendoza EngineeringSlab strengthening for flexural capacity
Completed 2001
2. LRT-3 Project, Manila North Star TechnologistsColumn strengthening for additional confinement
Completed 2001
3. LRT-3 Project, Manila In-houseColumn strengthening for additional confinement
Completed 2001
4. Blumentritt Building Manila EC Structural Composites Inc.
Flexural strengthening of beams Completed 2001
5. Blumentritt Building, Manila In-houseRepair & strengthening of cantilever beams for shear capacity
Completed 2001
6. Solid Cement Corp. SCC, In-houseStrengthening columns for shear capacity in cement plant
Completed 2001
7. San Miguel Corp. La Tondena Distillery SMC, In-houseRepair, strengthening and corrosion protection of waste water pond
Completed 2001
8. Int’l. Container Terminals Inc. (ICTSI) ITCSI, In-houseCorrosion protection of steel mono-tube piles
Completed 2002
9. Jose Rizal University, Manila QCSI ConsultancyRepair and strengthening of cantilever beams for shear capacity
Completed 2002
10. Phil. National Bank Financial Center, Manila PNB, In-houseStrengthening and leak repair of FRP pipes
Completed 2002
11.Cabilawan Bridge, Antique - Asian Development Bank (ADB) Project
BCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2002
12. Sta Cruz Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2002
13. Old Cala-Cala Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2002
14. Cebu Port Authority, Cebu-City CPA, In-houseStrengthening and corrosion protection of Batter Piles
Completed 2002
15. Supreme Court of the Phils.Trans-Asia(Phils) Inc./ Pimentel and Asso.
Strengthening of cantilever beams and girders
Completed 2002
16. Phil. Ports Authority, Port of Cagayan De Oro PPA, In-houseStrengthening and corrosion protection of piles
Completed 2003
17. Cairawan Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
18. Phil. National Oil Company, Batangas PNOC, In-houseStrengthening and corrosion protection of vessel damaged beams and piles
Completed 2003
19. Tul-Ang Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
20. Dalanas Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
21. Intao Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
22. 5 storey Vitas Tondo Bldg., Manila In-house consultantRepair and strengthening of columns and beams
Completed 2003
23. Langawon Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
24. San Antonio Bridge, Antique - ADB Project BCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
25. Net 1 Center, Manila Meinhardt Phils. Inc.Repair and strengthening of slabs and beams for increase in loads
Completed 2003
26. Balabago Bridge, Antique - ADB ProjectBCEOM /Everest/Angel Lazaro/UICI
Repair and strengthening for flexure and shear
Completed 2003
27. Vishay Phils.Inc. FTI Compounds FD Partners & CoRepair and strenghening of machine foundation
Completed 2003
28. 2 Storey Residential with attic -East Greenhills Design TechRepair and strenghening for flexural and shear
Completed 2003
P R O J E C T R E F E R E N C E
Project Description
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
29. Manicahan Bridge, Zamboanga-ADB ProjectBCEOM /Everest/Angel Lazaro/Mansueto
Repair and strenghening for flexural and shear
Completed 2004
30. Far East Alcohol Corp. Apalit, Pampanga In-house consultantRepair and strenghening for flexural and shear
Completed 2004
31.HPN BLDG. NAVAL Station, Roxas Blvd, Pasay City
In-house consultantRepair and Strenghening of column
Completed 2004
32.Phil. Ports Authority, Port of Pulupandan Negros Occidental
PPA, In-houseStrenghening and Corrosion protection of steel piles
Completed 2004
33.Asian Montessori, San Fernando, Pampanga
In-house consultantRepair and strenghening of slabs and beams
Completed 2004
34. Nestle Philippines Cagayan De Oro EM²A Partners & CoRepair and strenghening of slabs and beams
Completed 2004
35.Pilipinas Shell Petroleum Corp., Tabangao Refinery Batangas, City
In-houseRepair And Strenghening Of Tank Support
Completed 2004
36. Wyeth Phils. Inc., Makati City TCGI EngineersRepair and strenghening of slabs and beams
Completed 2004
37. Asian Terminal Inc., Port Area, Manila In-house Strenghening and Corossion Protection Of Steel Piles
Completed 2004
38. RFM Corporation Mandaluyong City In-houseRepair and strenghening of Silo wheat Bins
Completed 2004
39.Pilipinas Shell Petroleum Corp., Tabangao Refinery Batangas, City
In-houseRepair and strengthening of Tank Support using TYFO SEH-25A
Completed 2004
40.Sixth ADB Road Project Road Improvement Composnte Contract Package 6PY-1 Patnongon- Culasi Section Antique
China State eng'g construction Corp. and BCEOM/UICI
Bridge Girder repair / strengthening usinf TYFO SEH-51
Completed 2004
41.Sixth ADB Road Project Road Improvement Composnte Contract Package 6PY-12 Culasi- Nabas Section, Antique
FF Cruz & Co., Inc. BCEOM / UICI
Bridge Girder repair/strengthening using TYFO SEH-51
Completed 2004
42. BOGO Water District Bogo, Cebu In-houseStrengthening of 600cubic meter ground Water Reservoir using TYFO SEH-51
Completed 2005
43. Konstrak International Quezon CityR.A. Tiburcio & Associates
Strengthening of Beams ( Flexural) using TYFO SEH-51 System
Completed 2005
44. Aura Builders, Quezon CityR.A. Tiburcio & Associates
Strengthening of RC Beams KOTEH Residence, Corinthian Hills using TYFO SEH-51 System
Completed 2005
45.Sabang Bridge Rehabilitation, Ibaan, Batangas City
In-houseStrengthening of Arc Bridge Colummn using TYFO SEH- 51A System
Completed 2005
46. Mall of Asia, Roxas Blvd Manila In-houseStrenghening of beam using TYFO SCH-11UP Composite System
Completed 2005
47.DAEWOO Eng'g. & Co. Ltd. Trento, Agusan Del Sur
KatahiraRepair / Strengthening of Sulibao Bridge using TYFO SCH-11 UP Composite
Completed 2005
48. Virra Mall, Greenhills San Juan, Metro ManilaG.G. Sta. Maria Contruction
Strengthening of beam using TYFO SCH-41 System
Completed 2005
49. Shell Refinery, Tabangao In-houseCorrosion protection of steel tank using TYFO S E H-55H System
Completed 2005
50. Robinson Cybergate Pioneer, Mandaluyong In-houseStrengthening of beams and slabs using TYFO SEH-51A and TYFO SCH 41
Completed 2005
51. PNOC Petrochemicals Mariveles, Bataan In-houseRepair and Restoration of Damage RC Beams using TYFO SEH 51A
Completed 2005
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
52. Nestle Philippines, Cabuyao Laguna In-houseStrengthening of beams and columns using TYFO SEH-51A System
Completed 2005
53.Monolith Const'n Dev't Corp. SM Mall of Asia, North Parking
ESCAFlexural Strengthening of Slab using TYFO SCH 41 and TYFO SEH 51A
Completed 2005
54.FEATI Building 1, FEATI University Carlos Palanca St. Metro Manila
DCCD Engineering Corp.Shear Wall Strengthening using TYFO SEH 51A and TYFO SEH 25A
Completed 2005
55. Nestle Philippines , Inc., Cagayan De Oro City EM²A Partners & CoSlab Flexural Strengthening using TYFO SEH 51A
Completed 2005
56. Wyeth Phils. Inc, Canlubang Plant TCGI EngineersBeam Strengthening using TYFO SEH 51A
Completed 2005
57.Sixth Road Project, Bridge Component, ADB Loan No. 1473, PHI JEXIM UNITED Loan, contract package 8
Angel Lazaro and Associates Everest Int'l Consultants, Inc.
Sumlog Bridge Retrofitting (Slab Flexural Strengthening, Girder Beam/Coping Beam, Shear Flexural Strengthening) using TYFO SEH 25A, TYFO SEH 51A and TYFO SCH 41
Completed 2005
58.WHO Building, Cor. Taft Ave. and U.N. Ave. Manila.
C.C. Pabalan and Associates
Column Shear and Flexural Strengthening using TYFO SCH 11 UP and SCH 41
Completed 2005
59.Canyon Woods, Residential Resort Phase 3B, Laurel, Barangas
BBR Philippines Corp.Shear Strengthening of Columns using TYFO SEH51A
Completed 2006
60.Proposed Small Volume Solids. Mamplasan, Biňan, Laguna
R.S. Caparros & Associates
Beam and Slab Strengthening using TYFO UC Laminate
Completed 2006
61. Baliling Bridge, Sta. Fe, Nueva Vizcaya Angel Lazaro and Associates Everest Int'l Consultants, Inc.
Slab Flexural Strengthening using TYFO SEH 25A
Completed 2006
62. VSI, Residential Bldg. Ayala Alabang ESCAStrengthening of beams and slab using TYFO SCH 41
Completed 2006
63. EEI Corporation, Mamplasan Biñan LagunaRS Caparros & Associates
Strengthening of Girders using TYFO SCH 41 & SEH 51
Completed 2006
64. Bitaog Bridge, Sta. Barbara, Iloilo CityProvincial Engineers Office
Beam Shear and Flexural Enhncement using TYFO SEH51A and SCH41
Completed 2006
65. Dr. Arthur Roxas, Residence Filinvest II, Q.C. Engr. Rolexa MarzanStrengthening of beams using TYFO SCH 41
Completed 2006
66 CHI-SPA, Shangrila Plaza Hotel Pasig City OVE ARUP PhilippinesBeam Flexural Enhancement Using TYFO SCh41
Completed 2006
67.CP-2, Catarman - Calbayog via Lope de Veaga Road Samar Province
China State eng'g construction Corp. PCI/PMO-DPWH
Dizo Bridge Shear and Flexural Strengthening of girders using TYFO SEH51
Completed 2006
68. Three Storey Residentials Bldg. Antipolo CityMacro Civil & Structural Engineers
Strengthening of column and slab using TYFO SCH 41 AND SEH 51
Completed 2006
69. Ayala Greenfields, Biñan Laguna Engr. Ruth Mabilangan ( ASEP)
Strengthening of Beams & Girders
Completed 2006
70. PPA NasipitIn-House ( PPA)
Strengthening of Concrete Piles & Coping using TYFO SEH 51
Completed 2006
71.Mr. Victor Co Bldg J.D. Laurel Malacañang Corp. Metro Manila
Engr. Peter MarinasStrengthening of Stair Beams using TYFO SCH 41 & SEH51
Completed 2006
72.Liberty Flour Mills/Vinnell-Belvoir Blumentrit Mandaluyong City
Aromin Sy & AssociatesStrengthening of column and slab
Completed 2007
73. Burnham Suites Kisad Rd. Baguio City Lorenzo Dy & AssociatesStrengthening of column using TYFO SCH 41
Completed 2007
74.Repair of Wharf Underdeck Nasipit Baseport, Butuan City
In-house PPARepair / Strengthening of coping, girders and concrete piles
Completed 2007
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
75. Eng'rs. Villar 5 Storey Res. Bldg. Baguio City Engr. Peter MarinasStrengthening of Beams using TYFO SCH 41 & SEH51 Epoxy Injection
Completed 2007
76. St. Benilde La Salle College ESCAStrengthening of Concrete Girders using TYFO SCH 41
Completed 2007
77.Valenzuela Tannery Corp. Meycauyan, Bulacan
Engr. Rey FlordelizaStrengthening of R.C. Slabs Using TYFOSEH51
Completed 2007
78. Robinson Main Bldg. Libis, Quezon CityEC Arrojado & Associates
Strengthening of R.C. Beam using SCH 41 & SEH51
Completed 2007
79.F.F. Cruz-Shimizu (JV), Batangas Port Dev. PH II
Pacific Consultant Inc.- (PPA)
Strengthening of Beams & Girders using TYFO SEH 51 & SCH 41
Completed 2007
80. Lagang HangDPWH-District Engineering Office, Abra
Strengthening of Concrete Pier, Coping & Beams using TYFO SCH 41 & TYFO SEH 51
Completed 2007
81.North Triangle (Trinoma) Commercial Center, EDSA cor North Ave. Q.C.
DCCD Engineering Corp.Beam Shear and Flexural Enhancement using TYFO SCH41
Completed 2007
82. Orani Municipal Hall, Orani, Bataan DPWH-BataanSlab & Beam Retroffitting using TYFO SCH41
Completed 2007
83. MRT Depot, north EDSA, Q.C. DCCD Column Axial Strengthenign using TYFO SEH51 & SCH41
Completed 2007
84.Kalaw Ledesma Condominium, Gamboa St., Makati City
Aromis Sy & AssociatesStrengthening of Beams using TYFO SCH 41 EPOXY INJECTION
Completed 2007
85. Ba-ay Bridge Lagangilag, AbraDPWH-District Engineering Office, Abra
Strengthening of RCDG and Pier Column using TYFO SCH 41
Completed 2007
86.De La Salle-College of St. Benilde, P. Ocampo St., Malate, Manila
ESCAStrengthening of Beams and girder using TYFO SCH41
Completed 2007
87. Ba-ay Bridge Lagangilag, AbraDPWH-District Engineering Office, Abra
Strengthening of RCDG and gier columns using TYFO SCH41 & SEH51
Completed 2007
88.LFM PROPERTIES, 19 H.V. Dela Costa, Salcedo Village Makati City
In-HouseWaterproofing/Strengthening of shear wall using TYFO SHE 25
Completed 2007
89. Lligan Cement Corp., Lligan CityGHD Clients/People Performance
Fiber Reinforcement of Packhouse Columns Using TYFO SHE51 and TYFO SCH41
Completed 2007
90.St. Scholastica College, Leon Guinto St. Malate Manila
In-HouseStrengthening at Beam/Slab using TYFO SHE51
Completed 2007
91 Philam Life Bldg. Cubao, Quezon City Aromin Sy & AssociatesStrengthening at Beam/Slab using TYFO SHE51
Completed 2007
92. SM CITY CEBU, Mabolo, Cebu CityR.S. Caparros & Associates, Monolith Construction Dev.
Stengthening of Concrete Beam Ramps using TYFO UC Composite Laminate Strips
Completed 2007
93.Ansons Emporium Corp., Makati Ave. cor North Drive, Makati City
Constech/ Aromin Sy & Associates
Retrofitting Works of Beams using TYFO SCH 41
Completed 2007
94.Warehouse Building, Meycauayan, Industrial Subdivision, Meycauayan, Bulacan
Dr. Arthur RoxasSlab Retrofitting using Carbon Fiber (TYFO SCH41)
Completed 2007
95.Republic Cement Corp., BO. Bigte Norzagaray, Bulacan
GHD Clients/People Performance
GCT Structure Retrofitting using TYFO SCH41 and SEH51
Completed 2007
96.Two (2) Storey Res., Bldg.2 Lot 15 Ayala, Hillside Estate, Old Balara Quezon City
Ubay Alcantara & Asso.Concrete Beams using TYFO SEH51 (glass fiber)
Completed 2007
97. Rex Bookstore, Dasmarinas, CaviteMacro Civil & Structural Engineers
Repair/ Strengthening of
Concrete Slabs (2nd floor)Completed 2007
98. Adora Dept. Store Greenbelt - 5, Makati CityDCCD/AROMIN SY & ASSO.
TYFO SCH System Application for Beams, Shear & Flexural Enhancement
Completed 2007
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
99.Bangko Sentral ng Pilipinas, East Ave. Quezon City
Romualdo A. Chavez Jr. Terp.Asia Constr. Corp.
Roofdeck Slab Flexural Enhacement
Completed 2007
100. Republic Cement Plant, Norzagaray BulacanLa farge Cement Services Phils, Inc./ DCCD Engineering Corp
Retrofitting of Kiln-Cooler EP Building using TYFO glass and Carbon Fiber
Completed 2007
101.SMART TELECOMMUNICATION, PLDT Brgy. East Avenue, Quezon City
EH SISON Engineers Co.Retroffing / Strengthening of Beams & Column using TYFO SCH41 and TYFO SEH51
Completed 2008
102. Rockwell, Joya Loft Tower, Makati City HillmarcsStrengthening of Beams using Tyfo SCH41
Completed 2008
103 Dela Rosa 3-E ServicesMakati Dev't Corp./Aromin & Sy + Asso.
Retrofitting of Column using TYFO SHE System
Completed 2008
104.Clark Sub. Station, Clark Air Base, Angeles City
MGLualhati/ Ubay Alcantara
Strengthening of Concrete Beams (top&bottom) using TYFO Systems
Completed 2008
105.Ateneo Social Science Bldg. Ateneo Campus, Katipunan Q.C.
ASEC/ASAIStrengthening of Concrete Beams (top&bottom) using TYFO SCH41
Completed 2008
106.Metrobank, Tomas Mapua Papua cor Fugoso St.
Logos Const./G.E. Origenes & Associates
Retrofitting of Structural Support of Branch new site using TYFO SCH41
Completed 2008
107.Tuazon - Bldg. Retrofitting, Intramuros, Manila
BPI/ BIR/ CC Pabalan & Asso.
Retrofitting of Slabs, Beams & Columns using Glass & Carbon Fiber
Completed 2008
108.MWSI Caloocan Reservoir, 7th Ave. Caloocan City
MWSIRetrofitting Project of MWSI Reservoir - Inner Surface Application using TYFO SEH25A
Completed 2008
109. JG Summit Bldg. Ayala Ave. Makati CityDititel Mobile Phil, Inc. RS Caparros & Asso.
Retrofitting Slabs & Beams using TYFO Carbon LAMINATES
Completed 2008
110.Santiago Water District.Santiago City, Isabela
Santiago Water DistrictEngr. Albert Canete
Retrofitting of elevated concrete reservoir
Completed 2008
111.South Gate TowersMagallanes, Makati City
Alphaland Corp./ Aromin & Sy + Asso.
Retrofitting of Beams & Girders using Carbon Fiber using SCH41
Completed 2008
112.SBMA Adain Bldg.Subic Bay Freeport Zone
Pacific Consultant Inc.Strengthening of Beams using TYFO SCH41
Completed 2008
113.Liberty Flour MillsBlumentrit, Mandaluyong City Metro Manila
In-HouseRepair/ Strengthening of Silos and Wheat Bins using Tyfo SCH41 and Tyfo SHE25
Completed 2009
114.University of BaguioBaguio City
Ubay Alcantara & Associates
Strengthening of Beams & Columns using TYFO SCH41
Completed 2008
115.SME Shoppers MartCabuyao, Laguna
In-HouseRepair / Strengthening of Bems and Slab using TYFO SCH41 and TYFO SEH51
Completed 2008
116.Tondo Reservior & Pumping StationTondo, Manila
MWSI
Repair/ Strengthening/ Waterproofing of Slab and Wall using SEH25 - Inner Surface Application
Completed 2008
117.Texas InstrumentAngeles City, Clark Pampanga
A.G. Araja Construction & Dev't Corp
Repair/ Strengthening of slab & beams using SCH41
Completed 2008
118.Philippine Flour MillsHondagua, Lopez Quezon
Phil Flour Mills DCCD Engineering Corp
Retrofitting if beams & columns for 6th Storey Bldg./ Milling Area using SEH51
Completed 2008
119.Radison HotelCebu City
ESCAStructural Retrofiting using SCH41 & Epoxy Injection of Beams/ Girder
Completed 2008
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
120. East West Bank, Fort Bonifacio, Taguig East West Bank / ASAISlab Enhancement due to additional loading
Completed 2009
121. Mandarin Square, Ongpin Binondo, Manila EEI / ASAIRetrofitting of beams, slab and shear wall using Tyfo SCH41 and Tyfo SEH 51
Completed 2009
122. Landbank Building, Roxas Boulevard, Manila G.E. Origenes & Associates
Slab Enhancement using SCH41 Carbon Fiber
Completed 2009
123. Sumlog Bridge, Cabaguio Avenue, Davao City
ALGON Engineering Construction, Corp.Builders Contractors & Gen. Merchant
Furnish and Application / Installation of TYFO Carbon Fiber for the Replacement of Deckslab, Girder and Coping Enhancement
Completed 2009
124.Manila Doctors Hospital, United Nations Ave.,Ermita Manila
Manila Doctors Retrofitting of beams using SCH41 Carbon fiber
Completed 2009
125.PHILJA Training Center, Brgy. Maitim Tagaytay City
E.M. Cuerpo Incorporated
Expansion ( Renovation & construction using SEH51 Glass fiber)
Completed 2009
126. La Fuerza, Chino Roces Avenue Makati City LA FUEZA INC.Repair/Strengthening of Slabs, Beams, Girders and Columns using SCH41 Carbon Fiber
Completed 2009
127. Batangas Fly-Over, Batangas CityF.F. Cruz & Company Inc.
Slab Panel Epoxy Injection & Glass Fiber Application, at Fly Over & Approach Slab Epoxy Injections
Completed 2009
128.Maynilad Espiritu Water Reservoir, Espiritu St., San Andres Bukid, Manila
MWSIRepair, Retrofitting and Waterproofing of the Espiritu Pumping Station & Reservoir
Completed 2009
129.Ayala Life-FGU Alabang Building, Madrigal Business Park Alabang, Muntinlupa City
Bank of Philippine Islands
Retrofitting of Beams using UC Laminated strip with SCH 41 Carbon Fiber
Completed 2009
130. Astoria Boracay, Station 1, Malay Aklan Astoria PlazaRepair/Strengthening of slab & beams using SCH41 & SEH51
Completed 2009
131. Mezza Residences, Paco, ManilaNew Golden City Builders
Strengthening of Bottom slab @Water Tank Tower 1 and 2 using SCH 41 Carbon Fiber
Completed 2009
132. Cabalan Watertank, Subic Bay, Olongapo City Subic WaterRetrofitting of Watertank using SCH 41 Carbon Fiber & SEH51 Glass Fiber
Completed 2009
133. Asia Town IT Park Cebu Cebu CityRetrofitting of Watertank using SCH41 Carbon Fiber & SEH51 Glass Fiber
Completed 2009
134.4 Columns Retrofitting Sta. Lucia East Comm'l.Co.
Sta. Lucia East Comm'l.Co.
Structural Reinforcement of Columns
Completed 2009
135. CABURLOTO SCHOOL EXTENTION J.O. Dizon & Assoc. Caburloto School Extention Completed 2009
136. MACEDA INTEGRATED SCHOOL REPAIR North Manila Eng'g District
Columns Retrofitting and Cracks Epoxy Injection
Completed 2009
137. 2 Storey Bldg. w/ Deck Repair Dr. Genesis P. RonquilloRetrofitting of Existing Two-Story Buildingwith Deck
Completed 2009
138. Bldg. C astoria Boracay Astoria Plaza Bldg. C Restoration Completed 2009
139. Repair of South Radial Gate PL1,Lamesa Dam D.M.. Consunji, Inc. Beam and Columns Retrofitting Completed 2009
140. GREEN TOP CONDOMINIUM JOC Fab. 7 Const. Corp. Elevator Core Wall Retrofitting Completed 2010
141. HYATT REGENCY HOTEL RB Sanches ConsultantRepair/ Strengthening of columns and beam using SEH51A glass fiber
Completed 2010
142. SCANDIA SUITES BLDG 2 Cathay Land Inc. Gen. Construction of 7 Storey Condominium
Completed 2010
143. EFFIE LEAŇo RES. EFFIE LEAŇoProposed 2 storey Resedintial with roofdeck
Completed 2010
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
144. RADISSON HOTEL SM INVESTMENTConstruction of Swimming Pool, Water Features and Major earthworks
Completed 2010
145. ACACIA GROOVE HOTEL Holcim Philippines,. Inc.Strengthening of 9 Columns- Acacia Groove Hotel
Completed 2010
146. EUROTILES, INC. In-House Construction of Warehouse Completed 2010
147. PIER REHABILATATION Bj Construction & Material Supply
Strengthening of RC Piles, Beam & Slabs
Completed 2010
148. GOOD EARTH PLAZA BUILDING Aromin & Sy AssociatesRepair and Strengthening of Columns
Completed 2010
149. UNION BANK ( EDSA-PIONEER BRANCH Aromin & Sy Associates Strengthening of Cash Vault Completed 2010
150. West Tower Aromin & Sy Associates Retrofitting of Beams Completed 2010
151. Liberty Flour Mill In-House Painting of Silos Completed 2010
152. PPA Port Rehabilitation Philippine Port Authority Port Rehabilatation Completed 2010
153. Propose Additional Mezzanine Construction and Retrofitting Completed 2010
154. Astoria Plaza Gapuz Group Retrofitting of Slab at Dumpwater Area Receiving
Completed 2010
155. Gate Chateux to Miami Cathay Land Construction Completed 2010156. Bridge of Montalban CSII Construction Completed 2010
157.Restoration Work For the repair of Coping Beam located bet. Sta. 7-8NB (B16~Bay 309)
Tes Phils.Restoration Work For the repair of Coping Beam located bet. Sta. 7-8NB (B16~Bay 309)
Completed 2010
158. Renovation of Warehouse Gernandiso Lim Renovation Completed 2010
159. Unionbank Edsa Pioneer Branch Aktino Builder's Corp.Strengthening of Cash Vault @ Unionbank Edsa Pioneer Branch
Completed 2010
160. Acacia Groove Hotel Holcim Phils., Inc.Strengthening of 9 Columns - Acacia Groove Hotel
Completed 2010
161. Legazpi Village Project Makati Dev't. Corp.Retrofitting of Slab - Legazpi Village Project
Completed 2010
162. Eurotiles Warehouse Construction Eurotiles Inc. Construction Completed 2010163. Slab Retrofitting Dr.Arthus Roxas Slab Retrofitting Completed 2010
164. Phil. Flour Mills Tank Lining Phil. Flour MillsRepair and Application of Tank Lining
Completed 2010
165. Alabang Town Center VGP Limdico & AssocRetrofitting of Proposed BPI Office- Alabang Town Center
Completed 2010
166.Waterproofing of the Firewall Mabalacat Water District
Mabalacat Water DistrictSupply of Labor,Equipment & Mat'ls for the Waterproofing of the Firewall
Completed 2010
167. Phil. Flour Mills Water Proofpainting Phil. Flour MillsRepair & Epoxy Lining w/ Water Proofpainting
Completed 2010
168. Caray Caray Bridge Hi-Tri Dev't. Corp. Retrofitting of Caray Caray Bridge Completed 2010
169. BDO Avecshares Branch C.L. Garcia Const.Retrofitting of Beams of BDO Avecshares Branch
Completed 2010
170. Arellano University DCCD Eng'g. Corp. Retrofitting of Arellano University Completed 2010
171. Mill 1-3 using Elastomeric Paint Liberty Flour MillsPainting Works @ Mill 1-3 using Elastomeric Paint
Completed 2010
172. Potable Tank, Radisson HotelSM Hotels&Entertainment Corp.
Carbon Fiber & Epoxy in Potable Tank, Radisson Hotel
Completed 2010
173. Tabacalara Office @ 6th Floor LevelAlphaland Southgate Tower
Strengthening Of Beams & Slabs Tabacalara Office @ 6th Floor Level
Completed 2010
174. Eurotiles Inc. Electrical Works Eurotiles Inc.Proposed Power Feeder-Electrical Works
Completed 2010
Client / Consultant Type of Application Status Installation
P R O J E C T R E F E R E N C E
Project Description
175. Sumlog BridgeAlgon Eng'g. Const.,Corp.
Rehabilitation of Sumlog Bridge Completed 2010
176. Rovic TheaterGrepac Construction & Dev't. Corp.
Rovic Theater&Hotel Retrofitting Completed 2010
177. Structural Reinforcement of BeamStructural Reinforcement of Beam
Completed 2010
178. Mandarin SquareGrepac Construction & Dev't. Corp.
Mandarin Square Retrofitting Works
Completed 2010
179.Structural Retrofitting using Tyfo Fiber Wrap SystemCity Place
Megaworld Corp.Structural Strengthening of City Place @ Binondo
Completed 2010
180. Retrofitting Works Mandarin Square Jose Aliling & Associates Retrofitting Works Mandarin Square
Completed 2010
181. Strutural Of Roof Framing TSD TSD Strutural Of Roof Framing Completed 2010
182. Retrofitting works Malaybalay Road Bldg. Stratigic Alliance Holdings, Inc.
Retrofitting Works & Construction of Shearwall Bukidnon, Malaybalay Road Bldg.
Completed 2010
183.Proposed 4 Storey Residential Bldg. with Mezz.
Mr. Allan NgProposed 4 Storey Residential Bldg. with Mezz.
Completed 2010
184. Proposed Waterproofing of Firewall Mr. Loreto LimcoliocRetrofitting/Waterproofing of Firewall
Completed 2010
185. Retrofitting at File Computer AreaDiversified Technology Solutions International, Inc.
Retrofitting at File Computer Area Completed 2010
186.Painting Oof Packer Room and Quality Control Room
Liberty Flour MillsPainting Oof Packer Room and Quality Control Room
Completed 2010
187. Structural Strengthening@ Connecticut St. TSD Construction,Inc.Structural Strengthening@ 107 Connecticut St., Northeast, Greenhills, Sanjuan Manla
Completed 2010
188. Rehabilitation of Lift Station 510 SubicWater Rehabilitation of Lift Station 510 Completed 2010
189.VAG Building Renovation Structural Investigation & Evaluation
GENATO INVESTMENTS INC.
VAG Building Renovation Structural Investigation & Evaluation
Completed 2010
190.Restoration Work For the repair of Cracks on Roop Deck Beams @ Sta.1(North Ave. & Sta.3(GMA-Kamuning)
Tes Phils.
Restoration Work For the repair of Cracks on Roop Deck Beams @ Sta.1(North Ave. & Sta.3(GMA-Kamuning)
Completed 2010
191.Balara-San Juan AQ2 Transmission Main Rehabilitation Project
BSP & Company, Inc Pipe Rehabilitation Completed 2010
192.Old A.Rita Transmission Main Rehabilitation Project
BSP & Company, Inc Pipe Rehabilitation Completed 2010
193. Retrofitting Of Farmix Bldg Bulk Handlers Retrofitting Of Farmix Bdg Completed 2011
194. Retrofitting Works @ Gramercy ResidencesCentury Properties Mgmt. & Const. Corp.
Retrofitting Works @ Gramercy Residences
Completed 2011
195.Retrofitting Works@ Gramercy Columns using Steel Plates
Century Properties Mgmt. & Const. Corp.
Retrofitting Works@ Gramercy Columns using Steel Plates
Completed 2011
196.Structural Investigation & Evaluation of Left Wing Bldg. @ Cityhall Complex, Batangas City
MADRECLARA Guest Center Inc.
Structural Investigation & Evaluation
Completed 2011
197. Corrosion Prptection of Elevated Water Tank Tarlac Power Corp. Corosion Protection Completed 2011
198.Construction for the Retrofitting of Structural Member of St. La Salle Hall
De La Salle UniversityConstruction for the Retrofitting of Structural Member of St. La Salle Hall
Completed 2011
199. Retrofitting of ColumnsIKM Builders & Construction Supply
Retrofitting of Columns Completed 2011
200.Retrofitting Works and Construction of Shear Wall
Strategic Alliance Holdings,Inc.
Retrofitting Works and Construction of Shear Wall
Completed 2011