1
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Client: Coast to Country Planning
Project: Bushfire Management Statement for
Lot 2 Blackers Road Narrawong, Victoria.
Date: March 16, 2020
Contact: C/- Fiona Castley [email protected]
Landtech: Peter Austin [email protected]
161 Skene St, Warrnambool.Vic.3280. Ph.0408-615677.
Figures 1 & 2 - Lot proposed for 5-bedroom dwelling to the west of Blackers Road, Narrawong (Source: Coast to Country 2020).
Prepared by: Peter Austin trading as Landtech Consulting ABN: 4531 2192 419
BSc (Env.Sc), Grad Dip Env Heath, Dip Horticulture, Dip VET, Cert IV TAE.
www.landtechconsulting.com.au
2
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Document control
Assessment Bushfire Management Statement; 5-bedroom dwelling (150m²) development.
Address Lot 2 Blackers Road Narrawong Vic
Project number 461
Project manager Peter Austin (Landtech Consulting)
Mapping Peter Austin (Landtech Consulting)
Client Coast to Country Planning
CFA Fire Region Barwon South West – Casterton – CFA District 04
CMA Glenelg-Hopkins CMA
Council Glenelg Shire Council
Acknowledgements
Copyright © Landtech Consulting
This document is subject to copyright and may only be used for the purposes for which it was commissioned. The use or
copying of this document in whole or part without the permission of Landtech Consulting is an infringement of copyright.
Disclaimer
Although Landtech Consulting have taken all the necessary steps to ensure that an accurate document has been prepared,
the company accepts no liability for any damages or loss incurred as a result of reliance placed upon the report and its
contents.
Figure 3 – Forms of Bushfire Attack and management assessment related to this report.1
1 DELWP BMO Technical Guide 2017; Clause 44.06 Vic Planning Provisions, Accessed from:
https://www.planning.vic.gov.au/__data/assets/pdf_file/0029/107669/Technical-Guide-Planning-Permit-Applications-Bushfire-Management-Overlay.pdf
3
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Summary
This report is prepared in support of a planning permit application to be lodged by Coast to Country Planning
Group for a development proposal at Lot 2 Blackers Road Narrawong, Victoria. The planning permit application
seeks approval for a proposed 611m² (5-bedroom) dwelling and shed footprint, proximal to modified remnant
vegetation.
The site is entirely within the Bushfire Management Overlay and is within a highly bushfire-prone area.
Therefore, the nature of this development requires effective bushfire safety management measures to best
protect property and life.
A Bushfire Management Statement has been sought by the applicant to demonstrate how relevant bushfire
matters have been considered in the location and design of the proposal.
This Bushfire Management Statement (BMS) has been prepared by Landtech Consulting (see Figures 1 & 2)
and should be read in conjunction with the accompanying planning permit application. The BMS will
accompany a planning permit application involving the development of the proposed dwelling and shed,
including the use of building envelopes.
In addition to informing the siting and design of the proposed dwelling and location, this report will assist in an
assessment of the proposal by the Country Fire Authority (CFA), and a decision on the permit application by the
responsible authority (Glenelg Shire Council).
Further details on the design of the proposed buildings are located in the Town Planning Report and
Architectural Drawings enclosed with this planning permit application.”
The proposed development takes into account defendable space requirements from 22m to 50m which occurs
within the study area land parcel.
A BAL 12.5 construction standard is possible with managed defendable space within lot boundaries without
reliance on offsite management. Options for reduced defendable space will require increased building
construction standards and a change to BAL assessment.
Figure 4 – Proximal and linked remnant vegetation providing a landscape fire risk due to constraints beyond the lot (Source: Google 2020).
4
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
The site is within a declared Bushfire Prone Area however and within the Bushfire Management Overlay (BMO)
under the Glenelg Shire Planning Scheme. This statement outlines how the proposed development responds to
the purpose and objectives of Clause 53.02-3 Bushfire Protection Objective:
Clause 53.02-3 applies to an application to construct a single dwelling or construct or carry out works
associated with a single dwelling if all of the following requirements are met: The land is zoned Neighbourhood
Residential Zone, General Residential Zone, Residential Growth Zone, Urban Growth Zone, Low Density
Residential Zone, Township Zone or Rural Living Zone. There is only one dwelling on the lot. The application
meets all of the approved measures contained in Clause 53.02-3,2 including the decision guidelines of the
Clause 44.06 Bushfire Management Overlay.3
The Bushfire Management Statement (BMS) has been prepared in response to the requirements of Clause 44.06 –
Bushfire Management Overlay, and in accordance with the application requirements of Clause 52.47-1 Dwellings in
existing settlements. This requires that approved measures AM 1.1, AM 1.2 and AM 1.3 be included in an application
The statement contains three components:
1. 1. A Bushfire Hazard Landscape Assessment including a plan that describes the bushfire hazard of the
general locality more than 150m from the site. Images or other techniques may be used to assist in describing
the bushfire hazard.
2. A Bushfire Hazard Site Assessment including a plan that describes the bushfire hazard within 150m of the
proposed development. The description of the hazard must be prepared in accordance with Section 2.2.5 of
AS3959:2018 Construction of Buildings in Bushfire Prone Areas (Standards Australia) excluding paragraph (a)
of Section 2.2.3.2. Images or other techniques may be used to assist in describing the bushfire hazard.
3. A Bushfire Management Statement describing how the proposed development responds to the requirements
of Cause 44.06, 53.02 and 53.02-3.
This report has been prepared in accordance with guidance provided in the Planning Permit Applications
Bushfire Management Overlay Technical Guide (DELWP, 2017).
Figure 5 – Site location with proximity to Mt.Clay SP with a history of broad-scale bushfires (Source: Google 2020).
2 https://planning-schemes.delwp.vic.gov.au/schemes/vpps/53_02.pdf 3 DPCD 2020; Advisory Note 46; Bushfire Management Overlay Mapping Methodology and Criteria. Accessed from:
https://www.planning.vic.gov.au/__data/assets/word_doc/0030/97572/AN46-Bushfire-Management-Overlay-Mapping-Methodology-and-Criteria.doc
5
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
CONTENTS
1. APPLICATION DETAILS………………………………………………………………………………………………………………………… 6
1.1 Site Description
1.2 Subject Site, Interfaces, Land Uses
1.3 Adjoining Land Uses
2. PLANNING CONTROLS……………………………………………………………………………………………………………………….. 8
3. BUSHFIRE HAZARD LANDSCAPE ASSESSMENT (hazard >150m)………………………………………………………………… 11
3.1 Bushfire Landscape Assessment
3.3 Description of surrounding area
3.3 Landscape risk
3.4 Bushfire Landscape Assessment Plan
4. BUSHFIRE HAZARD SITE ASSESSMENT (hazard <150m)…………………………………………………………………………….. 22
4.1 Vegetation
4.2 Topography
4.3 Defendable Space and Bushfire Attack Level (BAL)
4.4 Defendable Space Plan
4.5 Bushfire Site Assessment Plan
5. BUSHFIRE MANAGEMENT STATEMENT………………………………………………………………………………………………………. 33
5.1 Bushfire protection objectives
5.2 Landscape, siting and design
5.3 Defendable space and construction
5.3 Water supply and access objectives
6. CONCLUSION…………………………………………………………………………………………………………………………………….. 38
7. BUSHFIRE MANAGEMENT PLAN…………………………………………………………………………………………………………. 39
8. OWNERS OBLIGATIONS…………………………………………………………………………………………………………………………… 42
APPENDIX 1 – SITE DEVELOPMENT FEATURE SURVEY……………………………………………….................................. 43
APPENDIX 3 – LANDSCAPE SCENARIOS – LANDSCAPE ASSESSMENT……………………………………………………... 44
APPENDIX 4 – BUSHFIRE ATTACK LEVELS………………………………………………………………..................................... 44
6
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
1. APPLICATION DETAILS
Table 1 – Application and lot details.
Municipality Glenelg Shire Council
Address Lot 2 Blackers Road NARRAWONG 3285
Council Property Number 90035000.09
Zoning RURAL LIVING ZONE (RLZ)
SCHEDULE TO THE RURAL LIVING ZONE (RLZ)
Overlays BUSHFIRE MANAGEMENT OVERLAY (BMO)
ENVIRONMENTAL SIGNIFICANCE OVERLAY (ESO)
Figure 6 – Image depicts largely cleared landscape surrounding Mt.Clay State Park and location of study area north of Narrawong
(Source: Google 2020).
7
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
1.1 Site Description
Table 2 – Site description parameters.
Site shape The site is broadly rectangular in shape and aligned approximately north-south (east – road frontage, west –
pasture to remnant bushland).
Site dimensions Site length – 235m
Site width – 140m - 202m
Site area 4Ha
Existing use and
siting of buildings
and works on and
near the land
The site is generally cleared of vegetation and built infrastructure existing as a vacant lot. The lot has a small
ephemeral dam in the east-north-east of the site which is proximal to the proposed built footprint.
This lot is wire fenced within surrounding rural and residential similar land-use lots. Proposed infrastructure
includes a 5-bedroom dwelling and shed.
Existing vehicle
arrangements
There is a single gravel cross-over into the property directly accessing Blackers Road to the north-east of the
lot.
Location of nearest
fire hydrant A fire hydrant does not exist within or proximal to the subject site.
Any other features
of the site relevant
to bushfire
considerations
The entire land parcel is essentially clear of vegetation apart from limited remnant single and grouped trees
proximal to the proposed dwelling to the east of the lot.
Within the lot the main significant areas of remnant vegetation exist sparsely across the site which is
dominated by pasture grasses. In addition to grass fire risk on all sides of the property, to the west includes a
strip of vegetation along a proximal watercourse which eventually leads north to Mt Clay National Park.
Roadside linear strips of vegetation lead to, and past the site to the east along Blackers Road.
Figure 7 – Site descriptive feature map showing localised vegetation connections relating to landscape fire risk (Source: Google 2020).
8
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
1.2 Subject Site, Interface, Land Uses
The subject site is recognised as Lot 2 Blackers Road Narrawong and located within the Rural Living Zone (RLZ), and
the subject to an Environmental Significance (ESO) and Bushfire Management Overlay (BMO).
The site has an area of approximately 4 hectares (deduced from title), with direct access to Blackers Road to the east,
with the land parcel sharing all other boundaries with adjoining freehold lots, with a maximum parcel depth of
235 metres.
Figure 8 – Sparse site remnant vegetation persists to the east of the lot with single specimens within pasture-dominated areas elsewhere
(Source: Google 2020).
Site features include an approximately 100m² dam, located in the east-north-east portion of the lot, and proximal to the
proposed dwelling and shed development. Site infrastructure includes the dam and essentially cleared pasture.
In addition to part-wire boundary fencing (east and north boundaries), and power infrastructure are contained within
areas proximal to the dwelling. The site contains single specimen trees and few clumps of remnant vegetation.
9
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
1.3 Adjoining Land Uses
The surrounding coastal and hinterland landscapes contain a number of small townships/settlements. These
settlements include clusters of rural-residential lots within larger agriculturally-based lots, proximal large
protected areas with a history of significant bushfire hazard.
The RBPA (Barwon South West)4 suggests the study area continues to experience development pressure east of the
Narrawong settlement in proximity to a bushfire hazard area. Clusters of small lots at Narrawong exist in close
proximity to bushfire hazard areas associated with scattered remnant vegetation.5
Section 5.2 of RBPA (Barwon South West) suggests that the south-east of this CFA management district which
includes the assessed lot, is within forest, heathland, and grassland environments. Several watercourses
descend through the area containing linear and connecting corridors of riparian vegetation such as that
adjoining the west of the site.
The coastal hinterland areas provide a bushfire hazard for surrounding settlements which contain small and
rural/residential lots in or in proximity to bushfire hazard areas. The aesthetic and natural values of these areas
attract development pressure for rural-residential settlement.
Land adjoining the subject site has been previously used for grazing and general agricultural activity, with rural-lifestyle
subdivisions to the east of the site.
Land to the north of the study area is linked via riparian remnant vegetation leading to large protected areas as part of
Mt.Clay State Forest and a major bushfire hazard proximal to the site.
Land to the south and east includes a dominance of managed (grazed) grassland, with the site linked to partly-
contiguous road and fence-line vegetation.
Figure 9 – Identified bushfire hazard areas due to incremental lifestyle development within largely rural landscapes.
To the west the lot (study area), an adjoining large hectare lot abuts the Mt.Clay SF and Narrawong Flora reserve, a
large core of classifiable vegetation with a varied planned burn and wildfire history.
Land to the east includes newly subdivided but generally wooded lots that require fire management practices to reduce
ongoing fire-risk.
4 Victorian Government 2018 Barwon South-west Region Fire Management Plan; Accessed from:
https://www.planning.vic.gov.au/__data/assets/pdf_file/0018/102294/Barwon-South-West-Region-Part-1.pdf 5 RBPA CFA Barwon South West; Glenelg-Shire; Accessed from: https://www.vfrr.vic.gov.au/
10
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
2. PLANNING CONTROLS
a. Planning Policy Framework
The Planning Policy Framework (PPF) seeks to ensure the objectives of planning in Victoria (as set out in
Section 4 of the Planning and Environment Act 1987) are fostered through appropriate land use, development
policies, and practices.
The PPF informs the preparation and implementation of local planning policy objectives and the introduction of
zone and overlay controls. It seeks to integrate relevant environmental, social and economic factors in the
interest of net community benefit and sustainable development.
The objective of Clause 13.02-1S Bushfire Planning is ‘to strengthen the resilience of settlements and
communities to bushfire through risk-based planning that prioritises the protection of human life.’
Strategies to achieve the objective include identifying and assessing bushfire hazards, appropriate settlement
planning, consideration to areas of high biodiversity conservation value, and use and development controls in
a Bushfire Prone Area.
Hazards identified and risks assessed in Clause 13.02-1S by:
- Prioritising the protection of human life over all other policy considerations.
- Directing population growth and development to low risk locations and ensuring the availability of, and
safe access to, areas where human life can be better protected from the effects of bushfire.
- Reducing the vulnerability of communities to bushfire through the consideration of bushfire risk in
decision-making at all stages of the planning process.
- Not approving development where a landowner or proponent has not satisfactorily demonstrated that the
relevant policies have been addressed, performance measures satisfied, or bushfire protection measures
can be adequately implemented.
b. Bushfire Management Overlay (BMO)
The purposes of the Bushfire Management Overly include:
• To ensure that the development of land prioritises the protection of human life and strengthens
community resilience to bushfire.
• To identify areas where the bushfire hazard warrants bushfire protection measures to be
implemented.
• To ensure development is only permitted where the risk to life and property from bushfire can be
reduced to an acceptable level.
Planning Advisory Note 46 Bushfire Management Overlay Mapping Methodology and Criteria outlines that the
Bushfire Management Overlay generally applies to areas of significant bushfire hazard where head fire
intensity is modelled to be 30,000 kW/m or more.
Under the Bushfire Management Overlay, a planning permit is required to construct a dwelling.
11
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
An application must meet the requirements contained in Clause 53.02 Bushfire Planning of the Glenelg
Planning Scheme. The provisions of Clause 53.02 contain:6
- Objectives. An objective describes the outcome that must be achieved in a completed
development.
- Approved measures (AM) - An approved measure meets the objective.
- Alternative measures (AltM) - An alternative measure may be considered where the responsible
authority is satisfied that the objective can be met. The responsible authority may consider other
unspecified alternative measures.
- Decision guidelines. The decision guidelines set out the matters that the responsible authority
must consider before deciding on an application, including whether any proposed alternative
measure is appropriate.
Section 5 of this report outlines how the proposed development responds to the requirements of Clause 53.02
& 53.02-3.
Clause 53.02-1 (2018) applies to an application (under Clause 44.06 - Bushfire Management Overlay), unless
the application meets all of the requirements specified in a schedule to Clause 44.06.
Clause 53.02-3 applies to an application to construct a single dwelling or construct or carry out works
associated with a single dwelling if all of the following requirements are met:
• The land is zoned Neighbourhood Residential Zone, General Residential Zone, Residential Growth
Zone, Urban Growth Zone, Low Density Residential Zone, Township Zone or Rural Living Zone.
• There is only one dwelling on the lot.
• The application meets all of the approved measures contained in Clause 53.02-3. Clause 53.02-4
applies to all other applications.
APPROVAL PATHWAY7
PATHWAY 1 – CLAUSE 52.47-1 DWELLINGS IN EXISTING SETTLEMENTS
Clause 52.47-1 provides a streamlined process for preparing and assessing a planning application.
Clause 52.47-1 applies to an application to construct a single dwelling or construct or carry out works
associated with a single dwelling where the following apply:
• The land is zoned Neighbourhood Residential Zone, General Residential Zone, Residential Growth Zone,
Urban Growth Zone, Low Density Residential Zone, Township Zone or Rural Living Zone.
• There is only one dwelling on the lot. Clause 52.47-7 operates as follows:
• The application must meet all the approved measures in Clause 52.47-1.
• Where an application meets the applicable approved measures the corresponding objective is also met.
• All approved measures must be met.
• No alternative measures can be included in an application.
If an applicant chooses to include alternative measures, the application will be assessed under Pathway Two
and all relevant approved or alternate measures of Clause 52.47-2 must be met.
6 DELWP; Victorian Planning Schemes; Accessed from: https://planning-schemes.delwp.vic.gov.au/schemes/glenelg 7 Technical-Guide-Planning-Permit-Applications-Bushfire-Management-Overlay; Accessed from:
https://www.planning.vic.gov.au/__data/assets/pdf_file/0029/107669/Technical-Guide-Planning-Permit-Applications-Bushfire-Management-Overlay.pdf
12
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
c. Other development controls - Zoning
The subject site is zoned Rural Living Zone (RLZ).
d. Other development controls - Overlays
The subject land is affected by a Bushfire Management Overlay.8 This overlay has a focus on:
• Implement the Municipal Planning Strategy and the Planning Policy Framework.
• To ensure that the development of land prioritises the protection of human life and strengthens
community resilience to bushfire.
• To identify areas where the bushfire hazard warrants bushfire protection measures to be
implemented. To ensure development is only permitted where the risk to life and property from
bushfire can be reduced to an acceptable level.
The subject land is also subject to an Environmental Significance Overlay (ESO).9 This overlay has a focus on
• To implement the Municipal Planning Strategy and the Planning Policy Framework.
• To identify areas where the development of land may be affected by environmental constraints.
• To ensure that development is compatible with identified environmental values.
8 Technical-Guide-Planning-Permit-Applications-Bushfire-Management-Overlay; Accessed from:
https://www.planning.vic.gov.au/__data/assets/pdf_file/0029/107669/Technical-Guide-Planning-Permit-Applications-Bushfire-Management-Overlay.pdf 9 Technical-Guide-Planning-Permit-Applications-Environmental Significance Overlay; Accessed from:
https://www.planning.vic.gov.au/__data/assets/pdf_file/0029/107669/Technical-Guide-Planning-Permit-Applications-Environmental-Significance-Overlay.pdf
13
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
3. BUSHFIRE HAZARD – LANDSCAPE ASSESSMENT
The bushfire hazard landscape assessment provides information on the bushfire hazard more than 150 metres from a
development site. Considering bushfire from this broader landscape perspective is important as it affects the level of
bushfire risk a development and its future occupants may be exposed to.10
Considering the bushfire risk arising from the broader landscape
Bushfire is a dynamic hazard and can be highly unpredictable with factors contributing to the bushfire risk diverse.
The purpose of the landscape assessment is not to predict the outcome of a bushfire event, but to provide information
that builds a better understanding of the bushfire risk in a location, and to inform decision-making.
These seek to support more consistent decision-making, based on the risk from the landscape beyond the site.
The broader landscape and the potential size or scale of a bushfire is an important consideration in the assessment of
a planning application. The likelihood of a bushfire, its severity and intensity, and the potential impact on life and
property varies, depending on where a site is located in the surrounding landscape.
The defendable space and construction requirements in the BMO and Clause 53.02 Bushfire Planning are based on standard requirements. To determine these requirements, models are used to predict radiant heat from a
fire-front based on specific inputs and assumptions. Considering the surrounding landscape in bushfire decisions is
important because the accuracy of the models in reflecting bushfire exposure on a particular site varies in different
landscapes.
This is because the scale of a bushfire and its potential destructive power is driven by the characteristics and previous
management of the broader landscape, rather than those characteristics within 150 metres of the site.
How is the landscape assessment used in preparing and assessing a planning application?
The landscape assessment presents contextual information on a site and informs the following-stage Bushfire Hazard
Site Assessment. It provides information critical to potential bushfire behaviour, and how the approved and alternative
measures adequately mitigate the risk.
The landscape assessment is used where Clause 53.02 Bushfire Planning requires consideration of the bushfire
risk from the landscape beyond the site. This requires that approved measures AM 1.1, AM 1.2 and AM 1.3 be
included in an application and associated decision guidelines.
The assessment provides information that allows these provisions to be responded to as part of the bushfire
management statement submitted with an application.
Figure 10 – 100m² ephemeral dam exists within the north-east part of the lot and proximal to where a dwelling is proposed.
10 DELWP Planning Permit Applications Bushfire Management Overlay Technical Guide; Accessed from:
https://www.planning.vic.gov.au/__data/assets/pdf_file/0029/107669/Technical-Guide-Planning-Permit-Applications-Bushfire-Management-Overlay.pdf
14
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
3.1 Bushfire Landscape Assessment Hazard
The bushfire hazard landscape assessment provides information on the bushfire hazard more than 150 metres away
from a development site and includes:
▪ Factual information on the bushfire hazard (vegetation extent and slope);
▪ Information on key features of the general locality relevant to better understanding the protection provided by
the location; and
▪ Provides contextual information on a site.
The landscape assessment does not assess a specific development proposal and is only required where Clause
53.02 Bushfire Planning requires consideration of the bushfire risk from the landscape beyond the site.
3.2 Description Of Surrounding Area
The surrounding landscape has a mixed fire history based on the broadscale 1939 fires, followed by various
fires within the Mt.Clay protected area including in 2016, in addition to planned management burns.
The immediate area consists of large rural and agricultural-sized lots with recent rural living development
providing the locality a mixed forest and open space and rural character (see Figures 1-12).
Topography within the surrounding area is variable and includes foothill gullies and ridges of the southern
flanks of Mt.Clay State Park/Forest), in addition to sloping sites to the south toward the more level farmland
adjacent to the coast.
The study site slopes from the north-west to the south and adjoins a local watercourse to the west of the site
buffered by an additional land parcel in between.
Classifiable vegetation within rural properties to the east of the site include elements of remnant Lowland Forest
and more distant riparian vegetation (see Figure 12) which has been variably cleared, including specifically much
understorey potentially reducing fire risk. The rest of the localised landscape is dominated by exotic pasture and
native grassland species as part of ongoing agricultural properties.
In addition, site linkage vegetation includes isolated riparian vegetation to the west of the site (adjoining the
bare lot directly to the west) and variably contiguous vegetation to the east from roadside remnant vegetation
along Blackers Road (Narrawong).
15
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
3.3 Landscape Risk
The former Planning Practice Note 65 provides useful guidance on describing landscape typology.
The landscape typologies outlined in Practice Note 65 range from low risk landscapes where there is little
vegetation beyond 150 metres of the site and extreme bushfire behaviour is not possible, to extreme risk
landscapes with limited or no evacuation options.
Figure 11 – Site immediately south and within the foothills of Mt.Clay State Park (Source: Google 2020).
Figure 12 – Site of increased landscape-based hazard due to complex terrain within and beyond the site (Source: Google 2020).
Once a bushfire is large, the weather and the interaction of the fire with itself becomes the dominant driver of
fire behaviour. Variation in fuel and topography become less relevant as large bushfires tend to ‘smooth’ these
out.
16
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
This should be remembered when classifying vegetation and determining slope in landscape types Three or
Four and the assessment of these factors should be made with due caution. This will include:11
• Considering the influence of slope on fire behaviour beyond the 150m assessment area as well as
within.
• Determining effective slope on worst case rather than an average.
• Choosing the more conservative fuel type in situations where the classifiable vegetation does not fit
neatly into a specific vegetation class.
• For ‘modified’ vegetation to be considered a valid classification, the level of modification and the
distance the fire has to travel through these modified fuels must be significant.
• In most instances it will not be appropriate to classify fuels as modified in landscape types Three or
Four.
• Similarly, fuels must be significantly managed and clearly meet defendable space prescriptions before
they can be classified as ‘low threat’.
Landscape Scenario
It is considered that Landscape Scenario Three best represents the area surrounding the subject site, although
not specifically applying to this area.
• The type and extent of vegetation located more than 150 metres from the site may result in neighbourhood-
scale destruction as it interacts with the bushfire hazard on and close to a site.
• Bushfire can approach from more than one aspect.
• The site is located in an area that is not managed in a minimum fuel condition.
• Access to an appropriate place that provides shelter from bushfire is not certain.
Bushfire can approach at the site from more than one aspect (N, NW, S, SE – coastal influence). While the site
is located in an area which includes mainly pasture and is generally managed in a minimum fuel condition
utilising cattle grazing, this is not always the case as observed.
Fire Authorities have assessed Narrawong as having a VERY HIGH bushfire risk, suggesting local residents and
visitors should be prepared for fire and have a plan for when the Fire Danger Rating is SEVERE, EXTREME or
CODE RED.
The Regional Bushfire Planning Assessment - Barwon South West Region (DPCD 2012) identifies scattered
remnant vegetation and vast tracts of unmanaged grassland as a known fire risk within the region however the
area does not have a Community Information Guide – Bushfire (Township Protection Plan) in place with
evacuation focused southwards to the coast.
An NSP-BPLR may be an open space at a local sports field, foreshore or park, or they may be located within a
community building such as a hall or sports pavilion. Narrawong or Tyrendarra does not have a designated
Neighbourhood Safer Place12 with Portland the suggested closest site (15km to the south-west of study site).
11 CFA Applying the Bushfire Hazard Landscape Assessment in a Bushfire Management; Accessed from:
https://www.cfa.vic.gov.au/documents/20143/69511/guidence-applying-the-landscape-assessment_V3.pdf/27fc4afb-2dee-32ff-67db-e584efade2c0 12 CFA Safer Places Database (Victoria), Accessed from: http://www.saferplaces.cfa.vic.gov.au/cfa/search/default.htm
17
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Table 3 – Landscape risk threats within the landscape beyond a 150m buffer area.
Parameter Detail
Overview
The subject site is located within a rural conservation setting to the north-east of Portland (14km), surrounded by rural
and agriculture-based landscapes on three sides, and Blackers road to the east.
Land to the north, south, and east across Blackers Road contains moderately-sized 2-6ha lots with patches of planted
and indigenous vegetation, typically lacking understorey, and dominated across the landscape of seasonally-cured
exotic pasture grasses.
Apart from the potential risk of grassland fire from all directions (principally from the west and south, mostly contiguous
riparian and roadside vegetation provides potential landscape-scale fire linkage to the study site. Riparian and lowland
forest vegetation types presents a hazardous fire risk within such areas.
The likely bushfire would originate from the Mount Clay State Forest to the north and west.13 This forest
vegetation is on a downslope with low managed grassland/pasture buffer in between.
This forest has bushfire fuel and risk management control by DELWP. The approach of fire from the south is
less likely due to lack of high-risk fuel sources, low threat managed vegetation, and the predominant wind
direction being from the west-north-west, however localised downslope south present a fire risk if exotic
pasture fuels are not managed.
Protection can be provided in the nearby township of Narrawong. This is a short distance of 3km to the south
which can be done by exiting the property away from the likely bushfire approach direction.
North: Rural properties to the north of the site consist of generally managed grassland-dominated vegetation cover,
however with partly contiguous fence-line and riparian-fringing remnant vegetation.
These lots could be considered managed spaces however the linkage to the vegetation toward a northern gully
increases potential landscape risk.
East: Rural acreage properties (approx. 4ha) to the east and south-east contain contiguous elements of lowland forest
within such lots lacking middle and understorey elements. Grassland persists within the understorey contain exotic and
native grass species in an unmanaged state.
The upslope then downslope nature of the topography to the east presents a bushfire risk due to such landscape
features and relatively complex terrain. The contiguous nature of the vegetation to provide fire linkage in times of high
fire danger also presents a risk from this direction.
13 EMV Victoria 2018, BSW Regional Strategy Fire Management Plan; Accessed from: https://files-em.em.vic.gov.au/public/EMV-web/Barwon-South-West-
Regional-Strategic-Fire-Management-Plan.pdf
18
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
West: There are two land parcels to the west preceding the Mt.Clay State Forest, a large remnant forest with Heathy
Woodland and Lowland Forest vegetation types. Notwithstanding a 200m buffer past the adjoining western lot, riparian
vegetation linked to the broader Mt.Clay remnant vegetation may increase fire risk. Ember attack could be significant
subsequent to a wind change from the west.
South: Bushfire risk from the south consists of exotic pasture grass dominated land cover types, generally grazed and
therefore considered a managed vegetation type. However, this cannot be guaranteed, and the threat must be
accounted for within this assessment due to wind change fire scenario’s.
Sparsely contiguous vegetation persists to the south-east lacking middle and understorey vegetation structural
elements. Reduced patches of roadside vegetation persist to the south along Blackers Road.
Subject site
information
Landscape Assessment Plan (see Figure 13 & Section 3.4):
• subject site
• scale and distance bar
• vegetation extent in the broader locality (0-100km)
• road networks
• fire run(s) into the site
• a bushfire direction of travel diagram
• history of bushfire in the area
• any significant landscape features that are relevant to the considerations set out in Clause 53.02; and
• information from the relevant Regional Bushfire Planning Assessments.
Landscape Scale Map with measured distances indicate the following:
-20km, 50km, 100km (where relevant) landscape buffers;
-proximity of the site to nearby urban, township or other areas where fuel is managed in a minimum fuel
condition.
19
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Parameter Detail
Localised fire
history
1939 – in January (“Black Friday”) when 2 million hectares of Victoria burnt including most of the
now Glenelg Shire, and including Portland, Heywood, Bridgewater, Tyrendarra, Condah, Lyons,
Dartmoor, Rennick, Strathdownie and Tullich.
2006 - a fire at Tyrendarra was ignited by lightning in farmland east of Heywood and spread for
several days across farmland, rough lava flow areas along the Fitzroy River. The fire threatened
communities in the Tyrendarra and Narrawong areas before eventually being controlled near the
coast.
2014 – a fire started in the Mount Clay/Narrawong state forest burning an area of approximately
1300 hectares.
Figure 13 – Broad-scale landscape assessment map.
20
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Parameter Detail
Provide further
information for
more complex
locations
The surrounding landscape has been assessed as having VERY HIGH bushfire risk.14
The most likely bushfire scenarios are those typically associated with the direction of wind on severe,
extreme or code red days (in other words, extremely hot, dry, northerly wind conditions).
The site has potential to be impacted by a large landscape-scale fire approaching from the north and
north-west from Mt.Clay State Park/Forest which could include ember attack under strong north and
north-west winds. The reserve is used heavily by campers and 4WD enthusiasts adding risk to the
potential for weather driven dry lightning strikes accompanied by extreme fire weather (low FDI etc).
The additional most likely bushfire scenarios are those typically associated with a wind change from the
west-south-west post-northerly winds based on a potential grass fire.
While areas of grassland within southern and the surrounding area may moderate the speed and
intensity of the fire before it impacts the subject site, under conditions typical of severe, extreme or
code red days, the subject site is likely to be impacted upon by grassland ember attack. This is
especially the case due to sloping upslope sites dominating the lot.
Roadside tree-planting and lots further east which include potential upslope sites outside the 150m
landscape scenario also present a risk when winds become variable in localised fire weather.
This directional should not be discounted even where a catastrophic northerly fire approach is most
likely.
Exotic grassland dominating surrounding properties within and outside 150m of the site are currently in a
managed state, which would reduce fire risk if such conditions prevailed long-term. This cannot be considered
secure and as such grassland fire linked by contiguous roadside vegetation linking many of the local properties
is a possibility.
The Regional Bushfire Planning Assessment - Barwon South West Region (DPCD 2012) identifies
scattered remnant vegetation and vast tracts of unmanaged grassland as a known fire risk within the
region however the area does not have a Community Information Guide – Bushfire (Township
Protection Plan) in place with evacuation focused southwards to the coast at Narrawong (Princes
Highway).
An NSP-BPLR may be an open space at a local sports field, foreshore or park, or they may be located
within a community building such as a hall or sports pavilion. Narrawong or Tyrendarra does not have
a designated Neighbourhood Safer Place15 with Portland the suggested closest site (15km to the south-
west of study site).
The Bushfire Risk Management Register (Glenelg VFRR 2017)16 suggests Narrawong has the
potential for a high-risk fire based on development and settlement patterns.
Apply landscape
typology and
provide conclusions
It is deemed the subject site and broader landscape type can be described as Broader Landscape Type 3, (see
Table 4 of this report) as referred to within Practice Note 65:
The type and extent of vegetation located more than 150 metres from the site may result in neighbourhood-
scale destruction as it interacts with the bushfire hazard on and close to a site.
• Bushfire can approach from more than one aspect.
• The site is located in an area that is technically not managed in a minimum fuel condition (although in reality
from site observation in peak fire season actually is managed).
• Access to an appropriate place that provides shelter from bushfire is certain including defendable areas within
the west of the site, although sheltering would not be advisable and where protection within the Narrawong
township 3km south is the less hazardous option.
The study site has the potential to be also impacted by exotic-species grass fire hazard to the west and south.
Retained roadside vegetation on Blackers Road on a north-south axis adjacent to the east of the site also
provides potential connection of highly flammable grass and crown fire.
14 Glenelg Shire (2019); Site and Context Description and Design Response; Accessed from:
https://www.glenelg.vic.gov.au/files/Planning/P19122_Advertising_for_web.pdf 15 http://www.saferplaces.cfa.vic.gov.au/cfa/search/default.htm 16 EMV Victoria, Bushfire Risk Management Register - Glenelg VFRR (2017); Accessed from: https://www.vfrr.vic.gov.au/
21
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
3.4 Bushfire Landscape Assessment Plan
Figure 14 – Overarching landscape factors before management is considered within the broader landscape >150m beyond the site.
22
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
4. BUSHFIRE HAZARD – SITE ASSESSMENT
The Bushfire Hazard Site Assessment describes the subject site and bushfire hazard within 150m of the proposed
development.
Pursuant to Clause 53.02 Bushfire Planning, “the description of the hazard must be prepared in accordance with
Sections 2.2.3 to 2.2.5 of AS3959:2018 Construction of buildings in bushfire prone areas (Standards Australia)
excluding paragraph (a) of section 2.2.3.2”.17
This Bushfire Hazard Assessment:
Provides factual information on the bushfire hazard (vegetation type and slope);
Informs defendable space and building construction requirements; and
Utilises the methodology contained in Australian Standard AS3959:2018 Construction of buildings in bushfire prone
areas (AS3959) to provide contextual information on a site.
Figure 15 – Dam to the north of the proposed house site with treed cover and generally sparse or grassland understorey.
Figure 16 – >150m landscape assessment zone includes classified woodland to the east.
17 SAI 2018, Australian/New Zealand Standards; AS3959:2018 Construction of buildings in bushfire-prone areas; Accessed from:
https://www.saiglobal.com/PDFTemp/Previews/OSH/as/as3000/3900/3959-2018.pdf
23
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
4.1 Vegetation
Vegetation within 150 metres of the site has been classified in accordance with the descriptions contained in
Section 2.2.3 in AS3959:2018 (Standards Australia: Construction of buildings in bushfire-prone areas) and the
CFA’s Vegetation Classes guide.18
Figure 17 – View looking north-east over proposed part of dwelling site with dam in background adjoining Blackers Road.
1. Classified Vegetation - Woodland
Patches of contiguous remnant vegetation located within the 150m buffer zone from north-east to south-east
match the AS3959 Woodland vegetation group, broadly defined as:
‘Woodlands or (rarely) forests that lack an abundance of hard-leaved (sclerophyllous) shrubs in the
understorey. Perennial grasses interspersed with perennial herbs are prominent in the understorey and may
be continuous, with shrubs being clumped or sparse in more open woodlands, typically 5–20 metres high’.19
In addition, areas of non-contiguous roadside vegetation within the same buffer persists along Blackers Road
to the north and south, and are variably managed, with increased flammability due to exotic grass dominance
within the understorey.
Figure 18 – Commencement of Woodland vegetation type with linkage from site to roadside to unmanaged lots to the north-east and
beyond and where vegetation management regimes could be variable.
18 CFA; Vegetation Classes – Bushfire Management Overlay 2018; Accessed from: https://www.cfa.vic.gov.au/documents/20143/69511/Vegetation-Classes-
Victorian-Bushfire-Management-Overlay-v0-3.pdf/f29e4450-a4ea-bfcb-ffe5-13cbbf01c746 19 CFA 2014; Vegetation Classes for BMO; Accessed from: https://www.cfa.vic.gov.au/documents/20143/69511/Vegetation-Classes-Victorian-Bushfire-
Management-Overlay-v0-3.pdf/f29e4450-a4ea-bfcb-ffe5-13cbbf01c746
24
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
2. Classified Vegetation - Grassland (managed/unmanaged exotic pasture grass)
Remaining areas have been classified as Grassland (AS3959); defined as all forms of grassy vegetation
(including cropping and pasture) and including areas with shrubs and trees, if overstorey foliage is less than
10% canopy cover. Areas shown as Grassland appear to be regularly maintained / grazed.
For the purposes of this assessment however a precautionary approach has been adopted, and all areas
shown as grassland are assumed unmanaged, and therefore potentially classifiable vegetation.
The degree of slope southwards, notwithstanding the major fire risk from the north and north-west must form
part of fire risk mitigation.
Figure 19– Example of exotic grassland species required to be assessed due to the fire-producing nature of species if left unmanaged.
Figure 20 – Southern down-sloping flanks of lot and roadside edge to the right.
Figure 21 – Western view across currently managed vegetation cover to adjoining site and ephemeral riparian area.
25
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
3. Low-threat vegetation and non-vegetated areas
Areas of low threat vegetation and non-vegetated areas have been excluded under the following AS3959
criteria:
a) Vegetation of any type that is more than 100m from the site;
d) Strips of vegetation less than 20m in width regardless of length and not within 20m of the site, or each other:
e) Non-vegetated areas, including driveways, roads, footpaths, buildings and rocky outcrops; and
f) Low threat vegetation, including managed grassland, maintained lawns, golf courses, maintained public reserves and
parklands, botanical gardens, vineyards, orchards, cultivated ornamental gardens, commercial nurseries, nature strips and
wind breaks.
Areas of low threat vegetation and non-vegetated areas are located as single specimen trees within the western
and southern part of the site, roads, driveways, lawns within the 150m lot buffer. Defendable space
requirements proximal to the proposed dwelling will be managed landscapes and included as low threat
vegetation.
Figure 22 – Single specimen remnant trees exist well-spaced within the site.
Figure 23 – Part of suggested defendable space with enhanced vegetation management risk reduction measures required.
26
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
4.2 Topography
The slope of the land under the vegetation influences likely fire behaviour. As the slope increases so does the
intensity and rate of spread of bushfire.
The assessment requires the slope under classifiable vegetation to be identified according to the following
classifications:
• All upslopes and flat land (0 degrees)
• Downslope >0 to 5 degrees
• Downslope >5 to 10 degrees
• Downslope >10 to 15 degrees
• Downslope >15 to 20 degrees
• Downslope greater than 20 degrees.
Topography within the site falls from 91m elevation (north-east of lot) to the southern boundary on a
downslope of >5 to 10 degrees.
Topography to the south of the lot and within the 150m buffer includes downslope of >5 to 10 degrees.
Topography to the north of the site (within 150m of the development) consists of upslopes and flat land (0
degrees).
Topography to the east of the lot and within the 150m buffer includes upslopes and flat land (0 degrees).
Topography to the west of the site and within the 150m buffer includes >0 to 5 degrees downslope.
The proposed development is exposed to vegetation classified as:
- Low threat (managed) vegetation to the north upslopes and flat land (0 degrees).
- Woodland to the east within upslopes and flat land (0 degrees).
- Grassland to the south includes downslope of >5 to 10 degrees.
- Grassland to the west includes >0 to 5 degrees downslope
Figure 24 - Slope map in degrees showing extent of site slope within and beyond the study area.
27
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Table 4 - Characteristics present within the site and surrounding environs.
Assessment area and
analysis of the site
The broadly rectangular north-south aligned lot occupies an area of 4 Hectares and contains
predominantly low-threat exotic grassland pasture species. It also has trees remaining from remnant
vegetation that were left around a small dam as part of former farming activities that are proximal to
the proposed dwelling.
The study site (lot) is located within the Rural Living Zone (and Schedule’s) and is also affected by
the following overlay:
Bushfire Management Overlay (BMO)
The subject site is set amongst an established rural 2-40ha lots on generally rectangular land
configurations running north-south. The vegetation within the immediate and wider areas is
dominated by remaining Lowland Forest vegetation and modified roadside vegetation with grassy
understorey.
Vegetation classification
This is Section 2.2.3 in
AS3959
Vegetation within the assessable area (150m radius) is either low-threat managed land excludable
pursuant to AS3959-2018 2.2.3.2 (f); or, ‘woodland’ generally dominated by Manna Gum, Swamp
Gum, Messmate and grassy understorey; or
1. Patches of remnant vegetation located within the 150m zone from north-east to
south-east match the AS3959 Woodland vegetation group.
2. Remaining areas have been classified as Grassland (AS3959); defined as all forms
of grassy vegetation (including cropping and pasture) including areas with shrubs
and trees if overstorey foliage is less than 10% canopy cover.
Exclusions – low-threat
vegetation and non-
vegetated areas
This is Sect ion 2.2.3.2 (f) in
AS3959
Vegetation exclusions within the assessable area includes single specimen trees within the
western and southern part of the site, roads, driveways, lawns within the 150m lot buffer,
managed defendable space areas proximal to the proposed dwelling (managed to a state of
‘low threat’ and is therefore excludable pursuant to AS3959-2018 2.2.3.2 (f)).
Distance to classifiable
vegetation
This is Section 2.2.4
AS3959
The closest classifiable vegetation (woodland) is located:
• 48m to east (on an adjoining property)
The closest classifiable vegetation (grassland) is located:
• 78m to the north
These vegetation patches do not meet the exemption detailed in AS395-2018 2.2.3.2 (d) as they
are connected to larger areas of classifiable vegetation (with road break to the east).
Slope under the classifiable
vegetation
This is Section 2.2.5 in
AS3959
The effective slope under the classified vegetation is as follows: North (and north-east): Upslope/Flat
East: Upslope/Flat
South: Downslope
West: Downslope
Note: where the vegetation classification is “Low Threat”; the prevailing slope has no bearing on the BAL rating.
Reticulated Water Supply,
Fire Hydrant
The closest fire hydrant is located > 3km to the south within Narrawong coastal township (based
on information from the CFA 2020).
28
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
4.3 Bushfire Site Assessment Plan
Figure 25 – Bushfire Risk Site Assessment Map.
29
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
4.4 Defendable Space Bushfire Attack Levels (BALs)
Figure 26 – Part of defendable space required proximal to the proposed dwelling site shown above.
Defendable space is an area of land around a building where vegetation is modified and managed to reduce the effects
of flame contact, radiant heat, and embers associated with bushfire. Flame contact, radiant heat, and embers are the
way a bushfire attacks a building.
It is in the Client’s interest to be setback as far as reasonably possible from this risk; accordingly building envelopes are
setback from each site boundary and other dwellings as far as reasonably possible.
CFA referral regarding defendable space and construction requirements is suggested to support that building
envelope layout has satisfactorily responded to Clause 53.02 Bushfire Planning.
As the application proposed is a single dwelling PATHWAY 1 – CLAUSE 52.47-1 DWELLINGS IN EXISTING
SETTLEMENTS applies.
30
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Clause 52.47-1 Dwellings in existing settlements A streamlined process for preparing an application can be used.
This requires that approved measures AM 1.1, AM 1.2 and AM 1.3 be included in an application and that land is
zoned Neighbourhood Residential Zone, General Residential Zone, Residential Growth Zone, Urban Growth
Zone, Low Density Residential Zone, Township Zone or Rural Living Zone.
• There is only one dwelling on the lot. Clause 52.47-7 operates as follows:
• The application must meet all the approved measures in Clause 52.47-1.
• Where an application meets the applicable approved measures the corresponding objective is also met.
• All approved measures must be met.
• No alternative measures can be included in an application.
Clause 52.47-1 Dwellings in existing settlements A streamlined process for preparing an application can be used.
This requires that approved measures AM 1.1, AM 1.2 and AM 1.3 be included in an application
Approved measure AM 1.1: Siting
Approved measure AM 1.2: Defendable space and construction
Approved measure AM 1.2 (continued): Defendable space on adjoining land
Approved measure AM 1.3: Water supply and access
Permit exemption to create defendable space Clause 52.48-5 sets out a planning permit exemption to create
defendable space for a single dwelling or an alteration or extension to a dwelling.
Where a planning permit has been issued under the Bushfire Management Overlay, the removal, destruction or
lopping of vegetation to create a defendable space cannot be prevented by:
• any requirement of a planning permit, including any condition, or
• any requirement or provision of the planning scheme.
This exemption only applies where land is in the General Residential Zone, Residential Growth Zone, Neighbourhood
Residential Zone, Urban Growth Zone, Low Density Residential Zone, Township Zone, Rural Living Zone, Farming Zone
or Rural Activity Zone.
31
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Bushfire Attack Level (BAL) Construction standards are referred to within AS3959:2018.
The defendable space required is determined by the vegetation type, slope and the preferred BAL construction
standard. Clause 52.47-1 suggests single dwellings must be constructed to BAL12.5.
The defendable space requirements for BAL-12.5 are detailed within the following table. Defendable space for this
development is within property boundaries (see Figure 27 & Table 5).
Please note: For this proposal within lot boundaries all vegetation must be managed (grazed) on an ongoing basis,
and treed area immediately north of built infrastructure requires vegetation management by the owner to support on-
site defendable space and chosen BAL construction requirements.
Table 5 – Defendable space and required construction standards as per AS3959:2018.
Parameter North South East West
FDI 100 100 100 100
Classified vegetation type Low threat#
(and managed) Grassland Woodland Grassland
Effective slope
(degrees)
Upslope/Flat
0 deg
Downslope
<5 to 10 deg
Upslope/Flat
0 deg
Downslope
>0 to 5 deg
Distance to classified
vegetation (metres) 78 115 48 100
Defendable Space
Requirements (metres) (need) 50m
25m (BAL 12.5)
33m (BAL 12.5) (including road interception)
22m (BAL 12.5)
Construction to BAL LOW 12.5 12.5 12.5
#Low Threat vegetation - Defendable space is to be provided for a distance of 50 metres, or the property boundary whichever is the lesser, for buildings
constructed to all bushfire attack levels. The minimum construction standard is BAL 12.5.
Topography to the north of the site (within 150m of the development) consists of upslopes and flat land (0 degrees).
Topography to the south of the lot and within the 150m buffer includes downslope of >5 to 10 degrees.
Topography to the east of the lot and within the 150m buffer includes upslopes and flat land (0 degrees).
Topography to the west of the site and within the 150m buffer includes >0 to 5 degrees downslope.
Vegetation
- Low threat (managed) vegetation to the north upslopes and flat land (0 degrees).
- Woodland to the east within upslopes and flat land (0 degrees).
- Grassland to the south includes downslope of >5 to 10 degrees.
- Grassland to the west includes >0 to 5 degrees downslope
Table 720 – Outbuilding construction requirement
Building construction condition
The proposed outbuilding is separated from the adjacent building by a wall that extends to the underside of a non-combustible
roof covering and has a FRL of not less than 60/60/60 for load-bearing walls and -/60/60 for non-load-bearing walls when
tested from the attached structure side, or is of masonry, earth wall or masonry-veneer construction with the masonry leaf of not
less than 90mm in thickness. Any openings in the wall shall be protected in accordance with the following: i. Doorways – by FLR -/60/30 self-closing fire doors
ii. ii. Windows – by FRL -/60/- fire windows permanently fixed in the closed position
iii. iii. Other openings – by construction with a FRL of not less than -/60/Note: Control and construction joints, subfloor vents, weep-holes and
penetrations for pipes and conduits need not comply with Item iii.
20 Victorian Government; Victorian Planning Provisions;
32
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
4.5 Defendable Space Plan
Figure 27 - Defendable Space Map.
33
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
5.BUSHFIRE HAZARD – SITE ASSESSMENT
This section of the report describes how the proposal responds to requirements of Clause 44.06 (Bushfire
Management Overlay) and Clause 53.02 (Bushfire Planning).
5.1 Bushfire protection objectives
The proposal is located within Pathway 1 in accordance with Clause 53.02-3 (2018) Dwellings in existing
settlements – Bushfire protection objective of the Glenelg Shire Planning Scheme, which specifies
requirements for bushfire design and construction measures to reduce the risk to life and property to an
acceptable level. This is in addition to Clause 52.47-1 objectives and approved measures.
Objective 52.47-1.1 Siting
Approved measure AM 1.1: Siting
Objective 52.47-1.2 Defendable Space and Construction
Approved measure AM 1.2: Defendable space and construction
Approved measure AM 1.2 (continued): Defendable space on adjoining land
Objective 52.47-1.3 Water Supply and Access
Approved measure AM 1.3: Water supply and access
34
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
5.2 Landscape, siting and design
Objective 52.47-1.1 Siting
Approved measure AM 1.1: Siting
Requirement
Bushfire protection can be enhanced by considering the separation of a dwelling from the bushfire
hazard, proximity to public roads and emergency service vehicle access on a site. Considering these
elements together supports the selection of an appropriate place to site a dwelling.
Each application can demonstrate that the best possible site for the dwelling is selected, even if there
are siting constraints, such as lot size. AM 1.1 can therefore be implemented on all sites.
AM 1.1 A building is sited to ensure the site best achieves the following:
• The maximum separation distance between the building and the bushfire hazard.
• The building is in close proximity to a public road.
• Access can be provided to the building for emergency service vehicles.
Response
• All siting options have been considered with potential for minor variation with advice from CFA and the
Responsible Authority.
• Existing cleared areas have been selected as site for proposed dwelling.
• The dwelling (footprint) has been sited to achieve BAL12.5 defendable space.
• The single dwelling will be provided with defendable space to property boundaries.
• The proposed development will immediate vehicle access to Blackers Road and escape pathways to
the south.
• Consult with property owners from the north through to the east to minimise exposure to the bushfire
hazard from neighbouring land
• The preferred siting options are detailed in the bushfire management statement.
• As the bushfire hazard is from three potential aspects, managed defendable space is maximised to
increase the separation distance on these sides of the building.
• Siting complies with neighbouring development and complies with local planning schemes and
building regulations.
Has Approved Measure AM 1.1 been fully met? Yes ✓ No ☐ Partially met ☐
35
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Objective 52.47-1.2 Defendable Space and Construction
Approved measure AM 1.2: Defendable space and construction
The main feature is to consider defendable space around a structure that mitigates the effects of flame
contact, radiant heat and embers on buildings and to apply the corresponding construction standard
(referred to as a bushfire attack level).
Requirement
A building provides the defendable space in accordance with Column A, B, C, D or E of Table 1 to Clause 52.47-3.
Table 6 (BMO Technical Guide) sets out the vegetation management requirements within the defendable
space. Adjoining land may be included as defendable space where there is a reasonable assurance that the
land will remain or continue to be managed in that condition as part of the defendable space.
A building is constructed to the bushfire attack level:
• That corresponds to the defendable space provided in accordance with Table 1 to Clause 52.47-3, or
• The next lower bushfire attack level that corresponds to the defendable space provided in accordance with
Table 1 to Clause 52.47-3 where all of the following apply:
x A private bushfire shelter (a Class 10c building within the meaning of the Building Regulations 2006) is
constructed on the same land as the dwelling.
x A minimum bushfire attack level of BAL 12.5 is provided in all circumstances.
Response
• The building provides defendable space in a accordance with Column A, B, C, D or E of Table 1
to Clause 52.47-3.
• Adjoining land will not be relied upon as defendable space due to inability to guarantee
managed landscapes.
• AM 1.2 and Table 1 provided information for the choice of how much defendable space is
provided (the less defendable space provided the higher the construction standard and
associated cost).
• The applicable construction standard (bushfire attack level) has been applied.
• Table 1 (reading down the columns) was used to obtain the applicable bushfire attack level.
• Consideration was given to whether the next lower bushfire attack level is more appropriate
The bushfire attack level can never be lower than BAL 12.5 (basic ember protection).
Has Approved Measure AM 1.2(a) been fully met? Yes ✓ No ☐ Partially met ☐
36
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Objective 52.47-1.2 Defendable Space and Construction
Approved measure AM 1.2 (continued): Defendable space on adjoining land
Adjoining land can be ‘included’ as defendable space where it is managed in a condition that achieves
the same outcome as if it was managed and located on site.
A reasonable assurance however that the land will remain or continue to be managed in that condition as part
of the defendable space is required.
The bushfire hazard site assessment suggest reliance on adjoining land for defendable space requirements
cannot be guaranteed.
Requirement
The bushfire hazard site assessment should justify that any adjoining land meets the defendable space
requirements if this approved measure is included in an application.
Design suggestions include:
• Low-threat vegetation will often be suitable as off-site defendable space if it can be demonstrated that the
adjoining land will remain in that condition.
• If off-site defendable space can be justified the actual defendable space on that aspect is provided to the
property boundary of the site subject to the application.
• If adjoining land will be managed in future then a permit condition should require management to occur
before development commences.
• The bushfire management statement will need to provide evidence that the adjoining land will remain in that
condition.
Response
• Low-threat vegetation immediately surrounding the proposed house site will be included as
defendable space via owner ongoing and within-site landscape and vegetation management options.
• As off-site defendable space is not proposed to be utilised, defendable space to the property
boundaries to the north, west and south will not be part of defendable space calculations.
• If adjoining land will be managed in future, then a permit condition should require management to
occur before development commences. The bushfire management statement would need to be
modified and evidence provided that adjoining land will remain in that condition.
• Managed defendable space will only be on the land subject to the application.
Has Approved Measure AM 1.2(b) been fully met? Yes ✓ No ☐ Partially met ☐
37
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Objective 52.47-1.3 Water Supply and Access
Approved measure AM 1.3: Water supply and access
Once a site for a dwelling is selected the static water supply and vehicle access design and construction
standards can be applied.
A building is provided with water supply and access features such as:
• A static water supply for firefighting and property protection purposes specified in Table 4 to Clause
52.47-3. The water supply may be in the same tank as other water supplies provided that a separate
outlet is reserved for firefighting water supplies.
• Vehicle access that is designed and constructed as specified in Table 5 to Clause 52.47-3. Information
The bushfire hazard site assessment provides the information to respond to this approved measure.
Requirement
• Fire authority access and length of the access are the essential criteria to determine the applicable
requirements under AM 1.3. Table 4 and the Fire Authority Requirements set out the fittings and access
requirements. Further detail is provided in Section 7.6 of this report.
• Incorporating this approved measure simply involves:
-identifying the applicable requirements in the bushfire management statement
-showing the applicable requirements on the submitted plans.
Fire authority access to the water supply (if required) will be an important factor when considering where to site
the structure in AM 1.1.
• The water supply and vehicle access design and construction standards will be a condition on the planning
permit.
Response
• It is proposed that a minimum total capacity of 10,000L be provided as a dedicated static water
supply for firefighting and property protection purposes.
• Water tank(s) must be non-combustible and sited so that firefighting vehicles can get within 4m
of outlets.
• The water supply outlet must be located within close proximity of the dwelling. Fittings must be
in accordance with CFA requirements.
All internal roads must provide access in accordance with the following vehicle design and construction
requirements:
- All-weather construction and load limit of at least 15 tonnes.
- Provide a trafficable width of 3.5 metres and clear of encroachments for at least 0.5 metres on each side and at least 4 metres
vertically. Curves must have a minimum inner radius of 10 metres.
- The average grade must be no more than 1 in 7 (14.4%) (8.1°) with a maximum grade of no more than 1 in 5 (20%) (11.3°) for no
more than 50 metres. Dips must have no more than a 1 in 8 (12.5 per cent) (7.1 degrees) entry and exit angle.
- A turning area for fire fighting vehicles must be provided close to the building by one of the following: turning circle minimum radius
of eight metres.
Has Approved Measure AM 1.3 been fully met? Yes ✓ No ☐ Partially met ☐
38
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
6. CONCLUSION
The single dwelling development proposal at Lot 2 Blackers Road Narrawong has been assessed against the
requirements of the Glenelg Shire Planning Scheme. The proposal typically requires the Clause 53.02-3
application Pathway One. The surrounding landscape has been assessed as having very high bushfire risk.
The site has potential to be impacted by a landscape scale fire approaching from the north, west or south and
east if topography and wind direction coincide to produce such a fire.
A fire from these directions would typically approach through grassland and patches of remnant vegetation,
driven by in the first instance hot, dry variable northerly winds which are then impacted typically by west south-
westerly wind change. The site is also in areas that incur coastal wind influence as can be seen from
assessment maps within this report.
While areas of grassland within the surrounding area may moderate the speed and intensity of the fire before it
impacts the subject site, under conditions typical of severe, extreme or code red days, the subject site is likely
to be impacted upon by ember attack.
Remnant core areas such as Mt.Clay State Park to the north and north-west are ever-present potential source
of high intensity fire approaching from this direction.
In accordance with the requirements of the Bushfire Management Overlay, the following applies:
− A minimum of 48 metres defendable space for classified Woodland to the east of the proposed dwelling
in accordance with Table 1 under Clause 53.02-3.
− A minimum of 100 metres defendable space for classified Grassland to west and south of the proposed
development in accordance with Table 1 under Clause 53.02-3.
− The proposed single dwelling is to be appropriately sited on a generally cleared and proposed highly
managed site, with defendable space from the bushfire threat accommodated, and constructed to
BAL12.5.
− Blackers Road immediately to the east of the lot provides direct access and egress for emergency
vehicles.
− A total (minimum) of 10,000 litres of static water supply will be provided onsite in an easily accessible
location, dedicated for personal use during an emergency.
− Site access will be upgraded if required to accommodate emergency vehicles in accordance with
requirements set out in Table 6 under Clause 53.02-3.
In light of the above, the proposal is considered to appropriately adhere to the requirements of the Bushfire
Management Overlay (if it applied to the proposed development site), ensuring risk to life and property have
been reduced to an acceptable risk.
39
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
7. BUSHFIRE MANAGEMENT PLAN
7.1 Maintenance Schedule
Before the occupation of the building defendable space must be implemented on the land and thereafter
maintained as specified below:
- Grass must be short cropped and maintained during the declared fire danger period.
- All leaves and vegetation debris must be removed at regular intervals during the declared fire danger
period.
- Shrubs must not be located under the canopy of trees.
- Individual and clumps of shrubs must not exceed 5m² in area and must be separated by at least
5 metres.
- The canopy of trees must be separated by at least 5 metres.
- There must be a clearance of at least 2 metres between the lowest tree branches and ground level.
7.2 Additional requirements within 10 metre management zone:
- Within 10 metres of a building, flammable objects must not be located close to the vulnerable parts of
the building.
- Plants greater than 10 centimetres in height must not be placed within 3 metres of a window or glass
feature of the building.
- Trees must be trimmed to provide a minimum 10 metre clearance from the building.
- Trees must not overhang or touch any elements of the building.
Outside of the Bushfire Management Overlay, areas that are subject or likely to be subject to bushfire are included in the
Bushfire Prone Area designated under the Building Regulations 2006 (regulation 810).
There are three forms of bushfire attack:
• ember attack which occurs when small burning twigs, leaves and bark are carried by the wind
• radiant heat which can ignite houses and other assets
• flame contact involving burning vegetation directly touching a house or other asset.
Passive risk mitigation through location, spacing and alignment of group accommodation and/or by establishing a buffer
between the bushfire hazard and the development. The use of internal and perimeter roads, water bodies, and open
spaces managed in a minimal fuel state, are examples of effective buffers.
Buffer distances may be determined using AS3959-2018 Building in bushfire prone areas (Standards Australia).
The Australian Standard uses vegetation type and the slope of the land to determine minimum distances between a
bushfire hazard and new development.
A buffer distance equivalent to a bushfire attack level of 12.5 for new development should be used. Note that for land
subject to the Bushfire Management Overlay different buffer distances apply. The following examples illustrate approaches
that can be taken.
Where such approaches are adopted the bushfire risk should usually be considered to have been reduced to an acceptable
level.
40
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
7.3 Static Water Supply Requirements
The building must be provided with a static water supply (minimum 10,000 litres) for property protection
purposes.
The water supply may be in the same tank as other water supplies provided that a separate outlet is reserved
for firefighting water supplies.
The water supply must be an above ground water tank constructed of concrete or metal.
All fixed above ground water pipes and fittings required for firefighting purposes made of corrosive resistant
metal.
7.4 Water tank requirements
The water supply should be stored in an above ground water tank constructed of concrete, steel, or corrugated
iron. The water supply should be identified.
Shared water tank Water supply identification
Figures 28 & 29 – Water tank and supply identification panels required (Source: CFA 2020).
7.5 Water supply outlet, pipe work and valves
Figure 30 – Water supply outlet, pipework, and valves (Source: CFA 2020).
41
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
7.6 Access Requirements
Where the length of access is greater than 200 metres the following design and construction requirements apply:
- All-weather construction.
- A load limit of at least 15 tonnes.
- Provide a trafficable width of 3.5 metres.
- Be clear of encroachments for at least 0.5 metres on each side and at least 4 metres vertically.
- Curves must have a minimum inner radius of 10 metres.
- The average grade must be no more than 1 in 7 (14.4%) (8.1°) with a maximum grade of no more than 1 in 5
(20%) (11.3°) for no more than 50 metres.
- Dips must have no more than a 1 in 8 (12.5 per cent) (7.1 degrees) entry and exit angle.
- A turning area for fire fighting vehicles must be provided close to the building by one of the following:
- A turning circle with a minimum radius of eight metres.
- A driveway encircling the group accommodation.
- The provision of other vehicle turning heads - such as a T or Y head - which meet the specification of
Austroad Design for an 8.8 metre Service Vehicle.
Width Dips and gradients Encroachments
Figures 31 & 32 – Access and encroachment dimensions (Source: CFA 2020).
42
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
8. OWNERS OBLIGATIONS
There are a range of obligations of the landowner. It is important that the landowner is aware of these obligations and
understand what is required to ensure ongoing compliance.
1. Bushfire Attack Level (BAL) Rating and Construction Requirements
Buildings and works to the land must be developed within building envelopes and constructed to a minimum BAL 12.5.
2. Vegetation Management and Defendable Space
The following management prescriptions must be applied and maintained in all areas nominated as ‘defendable
space’:
Within 10 metres of a building, flammable objects such as plants, mulches and fences must not be located close to
the vulnerable parts of the building such as windows, decks and eaves.
Trees must not overhang the roofline of the building, touch walls or other elements of a building.
Grass around properties should be kept short. Five centimeters or less is considered short. All leaves and vegetation
debris must be removed at regular intervals.
Shrubs should not be planted under trees.
Plants greater than 10 centimetres in height at maturity must not be placed directly in front of a window or other
glass feature.
Tree canopy separation of two metres and overall canopy cover of no more than 15 per cent at maturity.
3. Water supply construction and maintenance requirements
Onsite static water supply is required to be installed and must be designated solely for firefighting purposes (and may
incorporate use of the dam within the east and at the highest elevation within the site).
43
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
APPENDIX 1 – SITE DEVELOPMENT FEATURE SURVEY
44
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
APPENDIX 2 – LANDSCAPE SCENARIOS – LANDSCAPE ASSESSMENT21
Broader Landscape Type
One
Broader Landscape Type
Two
Broader Landscape Type
Three
Broader Landscape Type
Four
- There is little vegetation
beyond 150 metres of
the site (except
grasslands and low-
threat vegetation).
- Extreme bushfire
behaviour is not
possible.
- The type and extent of
vegetation is unlikely to
result in neighbourhood-
scale destruction of
property.
- Immediate access is
available to a place that
provides shelter from
bushfire.
- The type and extent of
vegetation located more
than 150 metres from
the site may result in
neighbourhood-scale
destruction as it
interacts with the
bushfire hazard on and
close to a site.
- Bushfire can only
approach from one
aspect and the site is
located in a suburban,
township or urban area
managed in a minimum
fuel condition.
- Access is readily
available to a place that
provides shelter from
bushfire. This will often
be the surrounding
developed area.
- The type and extent of
vegetation located more
than 150 metres from
the site may result in
neighbourhood-scale
destruction as it
interacts with the
bushfire hazard on and
close to a site.
- Bushfire can approach
from more than one
aspect.
- The site is located in an
area that is not managed
in a minimum fuel
condition.
- Access to an appropriate
place that provides
shelter from bushfire is
not certain.
- The broader landscape
presents an extreme
risk.
- Evacuation options are
limited or not available.
INCREASING RISK
APPENDIX 3 – BUSHFIRE ATTACK LEVELS
BAL levels explained (Source: Victorian Building Commission 2019).22
21 Myers Planning 2020 from Former Planning Practice Note 65, DTPLI, 2014. 22 Victorian Building Authority 2019; Bushfire Assessment Levels Explained; Accessed from: https://www.vba.vic.gov.au/consumers/bushfire-protection
45
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020
Defendable Space Requirements (Source: Victorian Building Commission 2019).23
23 Victorian Building Authority 2019; Bushfire Assessment Levels Explained; Accessed from: https://www.vba.vic.gov.au/consumers/bushfire-protection
46
QUOTATION: Landtech Consulting - Bushfire Management Statement; Quote; Lot 2 Blackers Road Narrawong Vic. Version: 16 March 2020