    Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060

    ATTN: Document Control Desk AUG 30 2H1? Serial No. 12-508U. S. Nuclear Regulatory Commission LIC/JG/ROWashington, DC 20555-0001 Docket No.: 50-305

    License No.: DPR-43

    DOMINION ENERGY KEWAUNEE. INC.KEWAUNEE POWER STATIONREACTOR VESSEL INTERNALS INSPECTION PLAN REVIEW REQUESTSUPPLEMENT AND RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION

    By application dated December 12, 2011 (Reference 1), Dominion Energy Kewaunee,Inc. (DEK), requested approval, pursuant to the provisions of Renewed OperatingLicense DPR-43, of the inspection plan fo r reactor vessel internal (RVI) components atKewaunee Power Station (KPS). This inspection plan submittal was to fulfill certainrequirements of Renewed Operating License DPR-43, Section 2.C(1 5)(b); specifically,Commitment Items 1 and 2 of Appendix A of NUREG-1958, "Safety Evaluation ReportRelated to the Kewaunee Power Station," dated January 2011. The inspection planwas supplemented on June 28, 2012 (Reference 2).Subsequently, the Nuclear Regulatory Commission (NRC) transmitted a request foradditional information (RAI) regarding the inspection plan (Reference 3) . The NRCquestions were discussed with NRC staff to obtain clarification, during a telephoneconference on July 23, 2012. The DEK response is provided in Attachment 1 to thisletter. Attachment 2 provides revised RVI components inspection plan tables.

  • 7/27/2019 Clevis Bolts Material 2

    2/14

    Serial No. 12-508Page 2 of 2

    References:1. Letter from J. Alan Price (DEK) to Document Control Desk (NRC), "Reactor VesselInternals Inspection Plan Review Request," dated December 12, 2011.2. Letter from J. Alan Price (DEK) to Document Control Desk (NRC), "Reactor Vessel

    Internals Inspection Plan Review Request, Supplement and Response to Requestfor A dditional Information," dated June 28, 2012.3. Email from Karl D. Feintuch (NRC) to Jack Gadzala (DEK) et al , "ME7727 -

    Kewaunee - Request for Additional Information Re: RVI components InspectionPlan - Follow-up RAI to response provided fo r RAI item Cher-006," dated July 17 ,2012.

    Commitments made by this letter: NONE

    cc: Regional Administrator, Region IIIU. S. Nuclear Regulatory Commission2443 Warrenville RoadSuite 210Lisle, IL 60532-4352Mr. Karl D. FeintuchProject ManagerU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-H4A11555 Rockville PikeRockville, MD 20852-2738

  • 7/27/2019 Clevis Bolts Material 2

    3/14

    Serial No. 12-508

    ATTACHMENT 1

    RESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONREACTOR VESSEL INTERNALS INSPECTION PLAN REVIEW REQUEST

  • 7/27/2019 Clevis Bolts Material 2

    4/14

    Serial No. 12-508Attachment 1

    Page 1 of 6RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION

    INSPECTION PLAN FOR THE AUGMENTED INSERVICE INSPECTION PROGRAMFOR EXAMINATION OF REACTOR VESSEL INTERNALS

    On July 17, 2012, the NRC transmitted to Dominion Energy Kewaunee, (DEK) a requestfor additional information (RAI) (Reference 1) concerning the inspection plan for reactorvessel internal (RVI) components at Kewaunee Power Station (KPS). This inspectionplan submittal was to fulfill certain requirements of Renewed Operating License DPR-43, Section 2.C(1 5)(b); specifically, Commitment Items 1 and 2 of Appendix A ofNUREG-1958, "Safety Evaluation Report Related to the Kewaunee Power Station,"dated January 2011. The inspection plan was supplemented on June 28, 2012(Reference 2).The NRC staff reviewed DEK's June 28, 2012 supplement (Reference 2), specifically asit responds to NRC question ME7727-RAII-EVIB-CHER-006-2012-05-09, and has someconcerns regarding the aging degradation in Alloy X-750 clevis insert bolts.Consequently, the NRC staff developed a follow-up question (below) on the issue.This question was discussed with NRC staff to obtain clarification during a telephoneconference on July 23, 2012. During the conference, NRC staff requested that DEKstate whether a VT-3 inspection is required by ASME Section XI (because the clevisinsert bolts are a reactor vessel internals structure). The staff also requested aqualitative analysis regarding the minimum number of clevis insert bolts (and the dowelpin) that must be functional.The RAI question is provided below, followed by the DEK response.

  • 7/27/2019 Clevis Bolts Material 2

    5/14

    Serial No. 12-508Attachment 1Page 2 of 6

    B - If the Alloy X-750 material is not in HTH condition, the staff requests that thelicensee include verification of aging degradation due to cracking in its inspectionand evaluation guidelines for these bolts at KPS.C -VT-3 examination of the bolts every 10 years would detect completely failed ormissing bolts but not partially cracked bolts. Therefore, the staff requests the

    licensee to provide:(1) Justification that VT-3 technique would be adequate fo r monitoring the crackingissue in the clevis insert bolts before it fails;(2) Information on the number of clevis insert bolts that are necessary for

    maintaining their function during the extended period of operation; and,(3) Information on the number of clevis insert bolts that are currently present at

    KPS.Response:The primary function of the core barrel is to support the core. Lateral support for thecore is provided at the upper and lower core plate locations and at intermediatepositions during a seismic and LOCA event. During a seismic and LOCA event, thecore may impact the baffle/former assembly that is supported by the core barrel(Reference 3).The core rests directly on the lower core plate that is ultimately supported by the corebarrel. The lower core plate is attached at its periphery to the core barrel insidediameter and supported by lower support columns that are attached to the lower

  • 7/27/2019 Clevis Bolts Material 2

    6/14

    Serial No. 12-508Attachment 1Page 3 of 6

    assembly, as the internals are lowered into the vessel, the keys engage the keyways ofthe inserts in the axial direction. With this design, the core barrel is provided with asupport at the farthest extremity and may be viewed as a beam fixed at the top andguided at the bottom. With the radial key and inserts, the radial and axial expansions ofthe core barrel are accommodated, but circumferential movement (i.e., rotation) of thecore barrel is restricted. The thickness of the clevis inserts is customized to have theoptimum gap sizes.Each clevis is welded to the inside wall of the reactor vessel at 900 intervals to align withthe four radial keys. The clevis inserts are attached to the clevis with eight bolts andone dowel pin. Each bolt is restrained by a bolt-head locking bar that prevents it fromvibrating out of its threaded receptacle. The locking bar is attached with a tack weld oneach end. The clevis inserts are retained within the clevis by friction (interference fit).Therefore, the clevis bolting is a designed redundancy to the friction fit (Figure 2). Thefunction of the dowel pin is to offload any shear from the bolts for a case where a load isacting vertically upward on the clevis insert.A loose parts evaluation of a clevis insert bolt that experienced cracking at anotherutility (performed by Westinghouse Electric Company) determined that the separatedheads will remain captured in the clevis insert counter-bores and will not impactoperation. No safety or operability concerns were identified during this evaluation(Reference 4) .The core barrel and its radial support keys are classified as core support structures.The clevis inserts are classified as reactor vessel internals structures and are also oneof the components that form the interface between core supports and internalsstructures.

  • 7/27/2019 Clevis Bolts Material 2

    7/14

    Serial No. 12-508Attachment I

    Page 4 of 6

    Locking Mechanism(tab across bolt head)

    Clevis Insert Bolt Head 0Dowel Pin

    ClevisClevis Insert

    Clevis Insert(Section A-A

    Figure 1above)View towardsreactor vesselinterior wall

    Figure 2Basis for VT-3 Examination of Clevis BoltsSince the clevis insert bolts are a reactor vessel internals structure (and a componentthat forms the interface between core supports and internals structures), a VT-3inspection is required by ASME Code, Section XI. These inspections are covered underan existing ASME Xl program and not under MRP-227 (Existing Program Items, ItemB13.70 (formerly identified as Item B13.10), VT-3 examination of the clevis bolting).Based on the staff's concern, DEK has revised this item to include "loss of material

  • 7/27/2019 Clevis Bolts Material 2

    8/14

    Serial No. 12-508Attachment 1Page 5 of 6

    a bolt failure is not significant. Therefore, the planned VT-3 inspection of these boltsevery 10 years, as required by ASME Code, Section XI, is adequate fo r verification oftheir condition. Three previous VT-3 inspections have verified that the clevis bolts areinstalled and that the locking bar and tack welds are in place.Degradation of the clevis insert bolts would not result in a loss of intended function dueto the nature of the design. A significant change in this support would be recognized bycomparing changes from baseline neutron noise data from the excore detectors, thusproviding a means fo r observing core barrel motion and the frequencies and modeshapes governing such motion. Moreover, to reach this stage, tw o additionalcomponents would have to fail. Therefore, the effects of primary water stress corrosioncracking (PWSCC) of the clevis insert bolts are not considered significant (Reference3).As discussed above, each of the four clevis inserts is secured to its support via eightbolts and one dowel pin. Therefore, a total of 32 clevis insert bolts and four dowel pinsare in place to provide their restraining function. Since the clevis inserts are retained inplace by means of an interference fit and dowel pin, the bolting is a designedredundancy. The function could reasonably be expected to be maintained (and reactoroperation could safely continue) even with failure of multiple clevis bolts, since failedbolting would remain in place due the locking mechanism. Additionally, the close fit ofthe radial key (when the core barrel is in place) would prevent any bolt (and any dowelpin) from backing out of its housing. Even if a bolt completely cracked and itsassociated locking bar concurrently failed, the cracked bolt would not actually bereleased until the core barrel was subsequently removed. The primary consequence ofa clevis bolt failure (should it occur) would be potentially to increase local wear betweenthe radial keyways and clevis inserts. Failure of multiple bolts would likely lead to anincrease in that wear potential. The presence of the dowel pin will provide some

  • 7/27/2019 Clevis Bolts Material 2

    9/14

    Serial No. 12-508Attachment 1

    Page 6 of 6head to shank radius. If failure did occur at the head to shank radius, the remainingshank provides an additional defense against the clevis insert dislodging verticallyupward.As such, no additional inspections to assure the function of the clevis insert bolts areneeded during the period of extended operation. As stated above, DEK has revised theKPS Reactor Vessel Internals Inspection Plan, Existing Program Items, Item B13.70,VT-3 examination of the clevis insert bolting, to include "loss of material (wear) andcracking". The revised Reactor Vessel Internals Inspection Plan Table 3 showing thischange is provided in Attachment 2 to the letter transmitting this response.

    REFERENCES1. Email from Karl D. Feintuch (NRC) to Jack Gadzala (DEK) et al, "ME7727 -

    Kewaunee - Request for Additional Information Re: RVI components Inspection Plan- Follow-up RAI to response provided for RAI item Cher-006," dated July 17, 2012.2. Letter from J. Alan Price (DEK) to Document Control Desk (NRC), "Reactor VesselInternals Inspection Plan Review Request, Supplement and Response to Requestfor Additional Information," dated June 28, 2012.

    3. Letter from Christopher I. Grimes (NRC) to Roger A. Newton (Westinghouse OwnersGroup), "Acceptance for Referencing of Generic License Renewal Program TopicalReport Entitled, 'License Renewal Evaluation: Aging Management for ReactorInternals', WCAP-14577, Revision 1, October 2000," dated February 10, 2001.4. Westinghouse InfoGram IG-10-1, "Reactor Internals Lower Radial Support ClevisInsert Cap Screw Degradation," dated March 31, 2010.

  • 7/27/2019 Clevis Bolts Material 2

    10/14

    Serial No. 12-508

    ATTACHMENT 2

    SUPPLEMENT TOREACTOR VESSEL INTERNALS INSPECTION PLAN REVIEW REQUEST

    TABLE 3 (REVISION 1)

  • 7/27/2019 Clevis Bolts Material 2

    11/14

    Serial No. 12-508

    Table 3 (Revision 1)Reactor Vessel Internals Inspection Plan

    MRP-227Westinghouse Plants Existing Programs Components

    (3 pages)

  • 7/27/2019 Clevis Bolts Material 2

    12/14

    Serial No . 12-508

    Reactor VesselInternals

    B13,70 Core Barrel Assembly Attachment Reactor Vessel Y X x2 VT-3 examination. Loss ofCore Barrel Flange Figure 4 Core Barrel material (wear).

    XK-67866B13.70 Upper Internals Attachment Reactor Vessel Y X X X X VT-3 examination. Cracking

    Assembly Upper Figure 4 and Upper Internals (IASCC, Fatigue)Support Ring or Skirt Figure 5 AssemblyXK-67866 Upper SupportRing or Skirt

    B13.70 Lower Internals Attachment Reactor Vessel Y X X VT-3 examination of the lowerAssembly Lower Core Figure 4 and Lower Internals core plate to detect evidence of

    Plate Figure 5 Assembly distortion and/or loss of boltXK-67866 Lower Core integrity. Cracking (IASCC,Plate Fatigue)

    B13.70 Lower Internals Attachment Reactor Vessel Y X X VT-3 examination. Loss ofAssembly Lower Core Figure 4 and Lower Internals material (wear).Plate Figure 5 Assembly

    XK-67866 Lower CorePlateB13.70 Alignment and Attachment Reactor Vessel Y X X X X VT-3 examination. Loss of

    Interfacing Figure 2 Upper Internals material (wear).Components Upper XK-67866 Upper Core

    Core Plate Alignment Plate AlignmentPins PinsCategory Notes:

    1. End of Original License is December 21, 2013.2. Examinations are performed when the core barrel is removed typically once per interval.

    Table 3, Page 1 of 3

  • 7/27/2019 Clevis Bolts Material 2

    13/14

    Serial No . 12-508

    Reactor VesselInternals

    B13.70 Alignment and Attachment Reactor Vessel Y X VT-3 examination once per intervalInterfacing Figure 4 Internals when the lower internals areComponents Clevis removed. Loss of material (wear)

    Insert Bolts and cracking (Note 4). Eight boltsper clevis; four clevis at 900

    I Iintervals.Category Notes:

    1. End of Original License is December 21, 2013.2. The clevis insert bolts are located on the reactor vessel below the lower internals.3. Per B-N-3, the structure shall be removed from the reactor for examination.4. Clevis insert bolts were screened in because of stress relaxation and associated potential for cracking; however, wear of the clevis/insert isthe primary reason for the inspection.

    Table 3, Page 2 of 3

  • 7/27/2019 Clevis Bolts Material 2

    14/14

    Serial No. 12-508

    Reactor VesselInternals

    IEB 88-09 Reactor Vessel Flux Thimble Y X Eddy Current ExaminationBottom Mounted Tubes (36) of the Flux Thimble TubesInstrumentation Once Every Five Years

    System FluxThimble TubesCategory Notes:

    1. End of Original License is December 21, 2013.

    Table 3, Page 3 of 3