Education Centre Feasibility Study Clearview Consulting September 2016 1 |
P a g e
Brixton
Windmill
Education
Centre
Feasibility
Study Report
Clearview Consulting
September 2016
Education Centre Feasibility Study Clearview Consulting September 2016 2 |
P a g e
Contents
Section Contents Page Number
Executive Summary 1. Background and Objectives
4
2. Methodology 5
3. Key Findings 7
Stage 1 – Current and Future Activity Planning 4. Stakeholder Engagement 23
5. Building Options Appraisal
29
6. Public Consultation 34
7. Business Planning 36
8. Market Analysis
57
9. Marketing Strategy 64
10. Brand Development
66
Stage 2 - Capability and Capacity Planning 11. Resourcing: Capacity Planning and
Capability Analysis
68
Stage Three - Develop Financial Model(s) and Risk Assessment 12. Funding Support 95
13. Cash Flow and Financials 98
14. Risks
100
Next Steps 15. Action Plan
103
Appendices A Building Option Appraisal 1-4 Detailed
Review
109
B Shaping the Future of Brixton
Windmill: Online Survey Results
Summary
Separate Attachment
C Brixton Windmill Restoration Project
2010 – 2015: Final Report and
Evaluation
Separate Attachment
D Sample Baking Courses:
Product/Pricing
113
E Funding Study Separate Attachment
F 10 Year Cash Flow Forecast Separate Attachment
G High Level Programme Schedule Separate Attachment
Education Centre Feasibility Study Clearview Consulting September 2016 3 |
P a g e
Executive Summary
Education Centre Feasibility Study Clearview Consulting September 2016 4 |
P a g e
1.0 Background and Objectives
1.1 Context The Brixton Windmill is one of the Borough of Lambeth’s great heritage assets. It is a hidden
gem, located in an unlikely situation but in the heart of the community and attracting much
loyalty from dedicated local volunteers through the Friends of Windmill Gardens (FoWG).
The Brixton Windmill and its park setting provides a rare view into Brixton’s industrial and
agricultural past. It is a valuable and valued educational resource. With the help of Heritage
Lottery Funding, the Friends of Windmill Gardens, in partnership with LBL, successfully
restored this Grade II* listed building and developed a series of educational workshops which
have been strongly supported by the Windmill Cluster of schools and others within Lambeth. From 2016, the building within which the FoWG resides will no longer sustainably support
both the FoWG and Holmewood Nursery School and Treetop Children’s Centre (‘Stay and
Play’) and it will become necessary to consider alternative arrangements. London Borough of
Lambeth recognises the positive contribution made to the community by the FoWG and has
earmarked £360,000 capital investment towards the building of a new Education Centre
subject to a well-rounded and independent assessment of agreed development options,
supported by a robust business plan.
1.2 Objectives To undertake a feasibility study and business planning exercise: 1.2.1 To assess 4 Building Options, working with the design team at Squire & Partners and
wider stakeholders to identify a preferred building option which best meets stakeholder needs
and which can be delivered within budget available
1.2.2 To develop business plan recommendations to support long-term sustainability of the
Friends of Windmill Gardens (FoWG)
1.2.3 To support the future sustainability of the one o’clock club as part of any proposal
given. Ideally, any recommended approach would also safeguard ongoing continuity of
provision by Holmewood Stay and Play as well as deliver a positive impact on their emerging
business plan.
“Looking Forward, Looking Back” photo by Owen Llewellyn
Education Centre Feasibility Study Clearview Consulting September 2016 5 |
P a g e
2.0 Methodology This has been segmented into three phases of work as follows:
2.1 Stage 1 – Current and Future Activity Planning The starting point was to understand the existing and potential activities of the FoWG,
Holmewood Stay and Play and other identified stakeholders. What these organisations can
achieve going forward will be dependent on what facilities are available to them and at what
financial costs in addition to efforts which can be made by paid staff and volunteers.
A creative assessment of funding opportunities was vital because this could help transform
possibilities. However, a long term sustainable option cannot be based on short term funding
opportunities.
2.2 Stage 2 - Capability and Capacity Planning This involved an assessment of the strengths of FoWG and identified any capacity or skills
gaps which may need to be addressed to support identified development.
This work stream helped define:
Governance structure
Management roles and responsibilities
Staffing structures (volunteer/paid)
Any proposed organisational changes
Partnerships and potential partnerships opportunities
Organisational policies that need to be developed
NB. This reports indicated recommendations against the above. The FoWG will need to
further refine as part of next stage Implementation planning.
2.3 Stage Three - Develop Financial Model(s) and Risk Assessment
2.3.1 Financial Model
In order to show long-term sustainability of the FoWG in this venture, a 10 year cash flow
forecast has been developed indicating income and expenditure covering:
All operational costs including volunteer and paid-for staffing, training and expenses
Running costs for the management and maintenance of the Education Centre
Support costs such as insurances, fire risk assessment and health & safety checks
Utilities and other service requirements
Business development costs and any start-up expenditure
New/existing income stream projections
Any miscellaneous income/expenditure
Any assumed grant income and/or other fundraising donations
Specialist insight has been sought to further develop the education and flour/bakery model as
a base business case; this includes realistic costs and likely income for short and longer-term
activity including consideration of any set-up costs and equipment purchase. Where possible,
assumptions have been tested with the FoWG and other stakeholders as well as through local
market analysis.
Education Centre Feasibility Study Clearview Consulting September 2016 6 |
P a g e
As part of detailed implementation plans further testing is recommended to help establish
robust marketing/pricing strategies and phased resourcing against market development would
be beneficial to support ongoing financial sustainability.
In areas of new activity in particular, groundwork undertaken for this report to establish
market opportunities should be expanded upon as part of detailed implementation plans and
new partnerships identified nurtured and grown.
A key requirement was to ensure that Holmewood Stay and Play will not be unduly impacted
by any planned business activity and that FoWG’s development objectives are not
compromised by mission drift into revenue raising ventures. Iterative work with both
organisations has ensured that the vital need to minimise service disruption can be met.
Potential for diversification of income has also been reviewed to support wider spread of risk.
2.4 Approach The approach taken was to look at low impact business models with minimum overheads
requiring realistic earnings. This means that a sound business could start quickly with the
options of growing over time once some reserves are built up. Consideration of outsourcing
and the scope for local park management possibilities has also been explored with key
stakeholders. Revenue focus was extremely important and had to be realistic because so much depends on
volunteers whose main interest is delivering the heritage, education and community
engagement side. The emergence of a vibrant food and social business culture with the
Cooperative Lambeth Council has created the context for a viable on-site and off-site food
business that could be helpful to new revenue streams. Discussions across the borough and
beyond suggest that the Brixton Windmill brand could be very strong.
Education Centre Feasibility Study Clearview Consulting September 2016 7 |
P a g e
3.0 Key Findings
3.1 Overview
Following a robust evaluation process, recommendation has been given for an
Education Centre building which houses the FoWG only sited within close proximity
to Brixton Windmill
Building decision was based on consideration of a range of parameters including key
stakeholder needs analysis, benefits, risks as well as costs and value for money
Education programmes developed in line with current educational curriculum
(including but not limited to History/Geography/Maths and Science) supporting the
sharing of the Windmill’s history and helping to safeguard the cultural heritage of
Brixton Windmill for generations to come, will be the core activity for the new
Education Centre; this is the primary reason funding for the new building has been
agreed
Maintaining the charging for educational programme delivery at affordable rates
however, means that income from educational delivery alone would not generate
sufficient income to maintain building/staffing running costs
Development of a viable business plan which would allow the FoWG to operate
sustainably is a requirement from London Borough of Lambeth before they will
release the building capital for the new centre
Educational activity will therefore need to be part of a wider portfolio of activity to
cross-subsidise this activity and to spread financial risk
Potential has been identified to further develop existing activity and scope exists
across all areas to either grow and/or optimize current working practices in order to
maximize revenue from these
In particular, flour milling has best potential for sales growth, subject to being able to
increase milling capacity, and having full-time access to a permanent building greatly
enhances opportunities to expand income from events and tours
Market demand already exists for wholesale flour sales and recent Beer & Bread
festival shows promise that scope exists to make larger community focused events
more profitable, working more closely in partnership with other local business
providers
Key new income streams which have potential to be profit making include: baking
courses, hall hire-out and the provision of a more regular pop-up café
Refreshments was a key ‘ask’ by residents and park users in recent public
consultation exercise as was baking related activity which would be a natural
progression from current FoWG involvement, many of whom bake at home, as well
as a key opportunity to extend the Brixton Windmill Flour brand
As per the detailed financial forecast, this indicates that the FoWG could operate
sustainably long-term without reliance on grant funding to cover ongoing running
costs over time and have the potential to generate increased income generation from
creating greater efficiencies within current activity and through the introduction of
new income streams
However, some grant funding would be advantageous, particularly in early start-up
years, while FoWG establish business development support and expertise needed to
implement new business activities and to support FoWG charitable activity
While a more detailed, annual fundraising strategy has been identified as part of the
FoWG Action Plan, initial focus to be given immediate attention will be for the
FoWG to submit a funding application for the new Heritage Lottery Resilient Fund;
this has an eight week decision timescale which, if successful, could generate
significant funding prior to the new Education Centre opening if the application is
submitted in the final quarter of 2016
Education Centre Feasibility Study Clearview Consulting September 2016 8 |
P a g e
LBL have allocated resource support to the FoWG to progress this quickly
The FoWG have a proven track record of developing smaller funding bids and it is
recommended that they continue to (selectively) proactively pursue these alongside
developing commercial activities as a means of supporting their charitable activities
3.2 Building Recommendations
Four building options were reviewed as part to the Feasibility study. These included:
Building Options
Option 1
Providing the education facility as a new building within the park, retaining
the one o’clock club (‘Stay and Play’) in its existing form, as a stand-alone
entity
Option 2
Demolish the existing one o’clock club building and provide a larger building
in the park for both organisations to use, with shared facilities where
appropriate and efficient, but with a clear separation where necessary
Option 3
Expand the current one o’clock club building to enable a larger building, as
with Option B
Option 4
Explore alternative sites for a new building, such as Thames Water sites
The following summarises the outcome of evaluation undertaken:
Evaluation Scoring: 1= weakest fit, 3= strongest fit. Maximum score is most suitable
option
Criteria / Objective Option
1
Option
2
Option
3
Option
4
Affordability - Cost falls within ballpark of
£360k allocated
3 1 1 1
Suitability for FoWG’s proposed activities 3 2 2 1
Suitability for Holmewood’s business
activities
3 2 2 1
Business sustainability 3 2 2 1
Environmental sustainability 3 3 2 1
Planning risk 2 1 2 1
Time to construct 2 1 2 1
Provides new and additional amenities to the
community
2 2 2 1
TOTAL SCORE 21 14 15 8
In essence, Building option 1 – providing a new Education Centre within the park as a stand-
alone building for FoWG usage, retaining the Stay and Play facility as is - was the only option
which could both meet stakeholder needs and be developed within budget.
Education Centre Feasibility Study Clearview Consulting September 2016 9 |
P a g e
3.3 Public Consultation
Extensive public consultation was undertaken to gauge the receptiveness of local residents
and park users to the proposal to build a new Education Centre within Windmill Gardens. A
high number of people were reached via a combination of activity and the overall response
was overwhelmingly supportive.
Activity included:
A series of panels detailing the Education Centre building development and
potential activities which might be introduced as part of the business plan were
displayed for two days in Windmill Gardens in July
Feedback was gathered by representatives from FoWG, London Borough of
Lambeth, Squire & Partners and Clearview Consulting who attended the event
People were notified of the consultation by leafleting all local residents in Blenheim
Gardens and neighboring streets, emailing residents (via BGRMO), posters in the
park and on the estate, online advertising of the event on both FoWG and BGRMO
websites, Twitter of Future Brixton and FoWG and word of mouth invitation
In excess of 100 people saw and commented on plans and 835 ‘ticks’ were recorded
in favour across all listed activities with almost no adverse feedback given
104 individual comments were recorded via post-it notes which were generally
extremely positive and supportive of proposals in addition to offering some other
valuable ideas for further consideration
Key concerns (although limited) appear to be more related to the fencing around the
children’s play area being too low and lack of park lighting at night
Consultation feedback was supplemented by an online survey published by Clearview
Consulting to gather more detailed views of planned business activity and to evaluate
existing FoWG members’ and volunteers’ thoughts on FoWG membership as well as
identify any capacity to support increased volunteering
The online survey was sent to over 1000 people via FoWG dedicated contact lists
(919), BGMRO emailed to all residents for whom email addresses were held and the
survey could be accessed through the FoWG website
90% of respondents said they would be interested in coming along (to centre) to learn
more about Brixton Windmill and the part this plays in Brixton’s cultural heritage;
80% were interested in Brixton Windmill and its history; 68% were interested in a
tour of the windmill and also in Brixton flour making; and 54% expressed interest in
baking classes
The survey also generated some useful information to support that existing volunteers
would consider increasing their volunteer time once the Education Centre opens and
in areas where there would be a need for increased volunteer resource (milling, tour
guides, events, fundraising and business support) indication was given of new
volunteer interest in all of these areas
3.4 Business Outlook
3.4.1 Commercial Activity
The Friends of Windmill Gardens have been extremely successful to date in developing the
Windmill and in harnessing voluntary support to ensure that this hidden gem finds a wider
audience, both within Brixton and further afield. Keen to re-introduce the popular educational
programme developed with the help of Heritage Lottery funding, the FoWG are now excited
Education Centre Feasibility Study Clearview Consulting September 2016 10 |
P a g e
at the prospect of a new Education Centre, which would enable them to grow and evolve their
oganisation and widen the cultural and community benefit they seek to deliver.
As a requirement of securing the release of building capital, the FoWG recognise the need to
develop a business plan which will allow them to operate sustainably and are open and
receptive to the challenges this brings in terms of running a building, covering costs and
putting in place new working practices to enable them to generate the necessary revenues to
do this.
Key income streams which have potential to be profit making include: flour milling, baking
classes and hall hire. Growth potential exists within membership and merchandising provided
improved system support and tighter controls can be put in place to effect greater working
efficiencies.
Education activity would be the core primary deliverable and scope exists to expand this
activity into new markets including parents and families, and schools outside of the borough.
Educational income on its own however would be insufficient to support long-term
sustainability and therefore needs to be part of a wider portfolio of activity to cross-subsidise
and spread financial risk.
In many cases, efficiency and greater optimisation of existing activity could be enhanced by
improved system support. Areas where improvements have already begun include efforts to
explore Direct Debit for membership payment and the introduction of product scanning which
will help more closely monitor merchandise sales. Key system development however is still
needed to centralise records management to afford better access to contact data and to enable
development of more targeted and timely communications.
In summary, system support recommendations include:
A centralized CRM system which would support better audience segmentation, more
targeted communications and could significantly aid ongoing membership
development
An updated website with more flexibility for content management and greater facility
to integrate with enhanced mailing tools such as MailChimp
Improved stock control systems to support better stock management and
understanding of merchandising sales/customer preferences i.e. what is
popular/profitable – so worth buying more of – and what is not (so can divest)
Improved financial control systems so can track invoicing and other regular income
and expenditure; this will be increasingly important once new business activity
introduced
In addition, once the new Education Centre opens, there will be a need to put in place
a scheduling and booking system to ensure that the centre usage – for Education
purposes, tours and visitor centre activity, baking classes and other centre hire can be
monitored effectively in order to ensure that the centre is managed properly and
opportunities for educational, charitable and income generation activity are optimised
3.4.2 Partnerships
3.4.2.1 Commercial
In terms of commercial partnership opportunities, a number of bakeries have already
discussed taking Brixton Flour on a wholesale basis and there is keen interest even at this
early stage in partnering for the delivery of bakery courses and training. Building on existing
and new partnerships forged as part of this reporting process, sales of Brixton Windmill Flour
Education Centre Feasibility Study Clearview Consulting September 2016 11 |
P a g e
have already been made to the Old Post Office Bakery, the Honest Loaf, Cornercopia, Bad
Boys Bakery (HMP Brixton) and the Dulwich Picture Gallery. The latter is currently running
an exhibition of windmill paintings so affords a prestigious ‘shop window’ for the display and
sale of branded Brixton Windmill Flour while Cornercopia sells local produce (so potential
for other future windmill product sales) and also has a restaurant arm so has opportunities to
use Brixton Windmill Flour also in its own food production.
Discussions with Ma Baker’s, Virtuous Bread and the Learning Loaf have given positive
indications for partnering with regards to running Baking classes and the Learning Loaf in
particular (baker’s arm The Honest Loaf) offer the possibility of a low risk entry to this
market by hiring the Education Centre space and organizing the classes and attraction of
attendees which could support a much faster introduction of this activity and would offer the
FoWG some valuable insight should they also wish to run their own courses alongside these.
Should milling capacity significantly increase, the FoWG could also consider developing
links with a supermarket which has affinity for artisan products as this would secure high
volume retail sales and would still deliver reasonable return even if profit margins reduce to
accommodate.
3.4.2.2 Wider Community
In addition to an existing network of community contacts as well as established working
relationships with Holmewood Stay and Play and Blenheim Gardens Resident Management
Organisation, the FoWG have an excellent working partnership with London Borough of
Lambeth (LBL). LBL administered the Heritage Lottery funding on behalf of the FoWG for
previous windmill improvements and have strongly supported the FoWG in plans to grow and
expand their Education programme delivery by ring-fencing funds for the building of a new
Education Centre. LBL have also facilitated the development of the FoWG first stage
business plan by recruiting external consultancy support (Clearview Consulting) to develop
this in conjunction with the FoWG and have since extended this support to enable the FoWG
to prepare their HLF Resilient Fund application as well as to help work through some of the
initial business modelling and governance recommendations made in this report.
3.5 Market and Brand Development
Key strengths of the FoWG include a relatively established organization - having been in
operation since 2003 – with a proven track record of making improvements to the windmill
and of successfully broadening awareness and growing support for this important heritage
asset.
The Brixton Windmill is perceived as a strong marketing brand – albeit there is a need to
exploit the ‘artisanal/niche’ angle rather than trying to emulate high street packaging. Design
and promotional materials are professional and good quality and the range of varied expertise
which exists across the volunteer base is exceptionally broad and of a high caliber.
Managing a wider portfolio of activity will require new skillsets and gaps exist in business
development expertise which would require further external support (funding/upskilling) to
enable the FoWG to successfully take developments to the next level. Current resource
capacity, while extremely committed, is insufficient to manage/implement new business
proposals and resource levels would need to grow in order to ensure future working is
operationally and financially sustainable. While the Brixton Windmill brand is extremely strong, there is currently inconsistency in its
representation which is diluting its impact and muddying brand positioning. The lack of an
Education Centre Feasibility Study Clearview Consulting September 2016 12 |
P a g e
agreed brand strategy cuts across everything from corporate vision and organisational values
(including how the volunteers work and communicate with each other) to brand identity
(‘brand story’, packaging, brand integrity etc.) to customer experience (the ‘customer
journey’ will need to be expanded upon once the Education Centre is open and regular sales
activity underway). Developing this alongside other key strategies (fundraising, events, sales)
will be an integral requirement towards helping the FoWG make the step-change needed to
transition to the next stage of its development. The FoWG are firmly committed to
developing all requirements themselves but the pace and depth at which this happens would
be substantially assisted should Resilient funding application be successful prior to the
building opening as it would extend current resourcing and staffing expertise much more
quickly.
Market and environmental analysis indicate that opportunities outweigh potential threats and
both charitable and commercial objectives could be met as part on an integrated business
plan. Public consultation supports the wider benefits the introduction of a new
Education/Visitor Centre would bring and there is a high degree of interest in all of the new
Education and other service activities proposed as well as general support from residents and
regular park users for facilities which do not currently exist including access to public toilets,
nappy changing facilities, provision of park refreshments (via pop-up café), better lighting in
the park at night and improved park landscaping
Creation of an enhanced educational facility would also afford the opportunity to expand the
educational programme and grow reach to a wider range of schools both within and outside
the Borough as well as introduce classes for adults/families working in conjunction with
Holmewood. Furthermore, having a recognized visitor centre will strengthen opportunities to
develop links with other windmills and cultural centres on a national and international basis.
Key areas to be addressed in terms of any potential threats include ensuring that the capability
and capacity to run the new Education Centre is sufficient and that the building design has
been ‘future-proofed’ to allow the FoWG the flexibility they need as they test different
income streams and refine their overall service portfolio over time. Close working with both
Squire & Partners and LBL throughout this process has been invaluable and the FoWG are
confident that the building space which is to be created will afford this.
One of the greatest concerns of the FoWG was the erosion of existing educational contact
base due to extended delays. Equally however, the pace at which the FoWG are being
expected to develop is quite daunting for the FoWG for whom this is a major step change in
terms of their operational and organisational working. The FoWG recognise the need for the
Education Centre to be in place as quickly as possible – and are fully committed to supporting
this - but it must also be acknowledged that the FoWG are fundamentally a volunteer-led
organisation and therefore much of what is being asked of them to transition to the new
business model is very new to them and will require some time and assistance to work
towards.
Some high level work to develop a route map for future service and product development has
been undertaken and next steps will be to develop more detailed business and marketing plans
for each of the work streams highlighted. The diagram overleaf summarises current and
future product activity which might be explored:
Education Centre Feasibility Study Clearview Consulting September 2016 13 |
P a g e
3.5 Capability and Capacity Planning
In summary, the areas which the FoWG must address include:
Capability and/or capacity to run the planned Education Centre
Succession planning to ensure clear leadership maintained at critical period of change
Consideration of the creation of a trading subsidiary for commercial activity
Key challenges will include the need to increase resource capacity from current levels to
sustain more frequent visitor centre activity and to maintain regular flour production to match
higher yield needed for (new) external demand. The need to upskill the volunteer force will
be imperative to create the business development expertise needed to manage and introduce
new income streams and further support would be advantageous in the areas of fundraising
and tighter financial management control; skills development and the introduction of some
paid for support might be assisted through the Heritage Lottery Resilient/Transition funding
(HLF) for which the Friends are intending to apply.
An essential resource which the FoWG need to prioritise will be the recruitment of a paid for
Education Officer (part-time); this is likely to introduce different challenges in terms of
having to take on responsibility for direct line management as this post was previously
managed by the Council who administered the HLF funding which paid for this. Currently,
funds exist to cover the cost of an Education Officer through a mix of remaining unrestricted
income and outstanding income still due from previous Schools’ work; these invoices are
currently being processed. Over time, it may be worth the FoWG exploring funding
opportunities to support this (although this is not reliant upon this to operate going forward).
There is a possibility that the former Education Officer, who was instrumental in establishing
the successful working partnership with the Windmill Cluster of Schools, and who also
designed many of the FoWG educational programmes, may become available to take on part-
time Education Officer work once current council contract ends at the end of September.
Education Centre Feasibility Study Clearview Consulting September 2016 14 |
P a g e
Regardless, the FoWG will be looking to recruit this post on a part-time basis as an immediate
priority.
Reassuringly, some commitment has been expressed from existing volunteers to increase the
time they volunteer once the new building opens and in a recent online survey, interest was
also recorded showing potential for a number of new volunteers in areas where activity will
require increased resource including flour milling, tour guiding and events. The survey also
indicated possibilities for increasing FoWG membership including new corporate members
(higher spend).
On the service delivery front, ROTL day release (HMP Brixton) offer added (free) resource
for flour milling, pop-up cafe and gardening projects and both Bad Boys Bakery and the
Clink Restaurant have expressed interest in partnering with FoWG to provide resource
support as well as purchasing flour. Opportunities also exist to strengthen existing
relationships with both Holmewood and Blenheim Gardens Resident Management
Organisation (BGRMO) and Holmewood are keen to work with the FoWG to potentially
develop joint education projects while BGRMO have access to a wide range of tradesmen
who currently service resident needs and potential exists to further explore gardening and
park upkeep as well as Education Centre building maintenance.
An important consideration for the FoWG will be whether to set up a separate trading
subsidiary for the management and accounting of the increased commercial activity to be
undertaken. It is recommended that further legal advice be sought on this but it will be
important to ensure that that the organisation has some professional safeguards in place so
that trading may be undertaken ethically and with complete financial transparency while also
ensuring that the necessary public and company liability insurances are in place and that
individual volunteers cannot be held personally responsible.
Currently, the FoWG has the necessary public and professional liability cover through their
existing insurance with the British Association of Friends of Museums (BAFM) underwritten
by NFU Mutual but this will need to be added to for wider Education Centre buildings and
contents purposes; the FoWG are currently exploring this.
In addition, much tighter financial controls need to put in place to ensure that any new
business activity can be run efficiently and effectively. It has been suggested that the FoWG
might consider moving towards a full cost recovery model but at the very minimum, a more
experienced financial resource will be required, whether bought in as a paid for resource or
through higher level training for volunteer staff.
On a personal level, volunteers should be valued and also value each other – this does not
come naturally and support needs to be sought for preparing a volunteer strategy which
should include proactive efforts to ensure that volunteers feel rewarded and support each
other with positive messages and actions.
Finally, the FoWG has a wealth of expertise across the organisation but in addition to
planning new/increased resourcing it will also be crucial to ensure that plans are in place for
the replacement of key Executive members should they decide to step down or move onto to
other things. Succession planning has been identified as a critical consideration for resource
planning when developing future implementation plans.
Overall, key organisational aims will be to ensure that whatever resourcing structure is
adopted, it will need to ensure that the social business can be well run without losing the
community charitable ethos that is so fundamental to the FoWG.
Education Centre Feasibility Study Clearview Consulting September 2016 15 |
P a g e
Based on the detailed review undertaken of FoWG skills and motivation, the conclusion is
that there can be a high level of assurance to LBL that the FoWG can have the capacity,
capability and motivation for their new business plan and the Education Centre.
The best assurance comes from the fact that the new building enables easier delivery of a
sustainable programme and a much more rewarding volunteering experience than current
shared facilities allow and which is cumbersome in terms of further growth plans. The
building will also be the centre of the business plan, trading, events, education and
fundraising so there is an imperative on the FoWG to make it work.
3.5.1 Governance Structure
As part of ‘Next Steps’ development, a more detailed governance review needs to be
undertaken with the FoWG to agree the appropriate governance structure as part of an
integrated work programme addressing all of the areas raised.
As a starting point, the following diagram sets out the possible principals that have been
discussed with the FoWG. Please note that this is indicative only at this stage; further work
needs to follow to scope this more fully as part of detailed implementation planning.
3.6 Organisational Sustainability The resoundingly good news is that the long-term business forecast is reinforcing that the
FoWG could operate sustainably without reliance upon grant funding to cover building
running costs. Grant funding could however provide much needed external business support
and mentoring affording the chance to really optimize longer term business planning and
revenue generation opportunities.
A key recommendation is for FoWG to apply for HLF Resilient Grant funding to support the
necessary upskilling and new business development expertise required to make the step-
change from existing to new business model; as this application has not yet been submitted it
is currently excluded from the financial forecast but it is anticipated that this could be
actioned prior to Christmas and if successful, funds could be in place prior to the new
building opening.
Education Centre Feasibility Study Clearview Consulting September 2016 16 |
P a g e
It is important to note however, that the FoWG are not reliant upon this income to be able to
cover the building costs from Year 1. As indicated in the financial forecast, the FoWG
Friends are able to just about wash their face if no reliance on grant income.
Please refer to attached snapshot which indicates income in Year 1 of £59,778 against
expenditure of £58,965.
FoWG Income and Expenditure - excluding Grants Yr 1 (refer to highlighted sections)
2017/18
TOTAL Yr1
£ £ £
Building construction costs ( inc F&F, VAT & fees) - -
Commercial standard kitchen 15,000.00 15,000.00
Purchase of a modular mill - -
15,000.00
WINDMILL BUILDING COSTS - -
-
EDUCATION BUILDING COSTS ( less staffing -cleaner) 3,600.00 3,600.00
Park & Gardens - -
-
STAFFING -
Development Officer 50% of £32pa 1FTE 12,800.00 12,800.00
Education Centre Officer 50% of £32k pa 12,800.00 12,800.00
Fundraising capability ( time bought) 10,000.00 10,000.00
Cleaner / cleaning services 600.00 600.00
Development upskilling capability 60,000.00 60,000.00
-
EDUCATION CENTRE COSTS ( less staff costs shown seperately above) 1,850.00 1,850.00
-
MILLING COSTS 5,300.00 5,300.00
-
MEMBERSHIP COSTS 160.00 160.00
-
EVENTS & TOURS COSTS 11,150.00 11,150.00
-
MERCHANDISING COSTS 1,500.00 1,500.00
-
BUILDING HIRE COSTS 2,250.00 2,250.00
-
OTHER EXPENDITURE ( less staff costs) 19,755.00 19,755.00
-
141,765.00 58,965.00 58,965.00
Net cash outflow -
EDUCATION CENTRE SALES 5,010.00 5,010.00
-
MILLING ENTERPRISE 6,478.00 6,478.00
-
MEMBERSHIP ( INCL MEMBERSHIP DONATIONS) 1,690.00 1,690.00
-
EVENTS & TOURS SALES 3,950.00 3,950.00
-
MERCHANDISING SALES 3,000.00 3,000.00
-
BUILDING HIRE INCOME 15,600.00 15,600.00
-
OTHER INCOME STREAMS ( excl grants itemised as a subset separately below)9,050.00 9,050.00
Fundraising incl. HLF Resilience Grant 100,000.00 100,000.00
144,778.00 -
Capital investment from LBL - -
Kitchen sponsorship 15,000.00 15,000.00
15,000.00 -
Net cash inflow 59,778.00 59,778.00
Cash inflow/outflow 59,778.00 59,778.00
In summary, Year 1:
Income marginally exceeds expenditure
There is sufficient income excluding grant money to fund building operational costs
and Education Development Officer post
Transitional funding is not required to cross-subsidise operational costs and Friends
could operate without this
Year 2 sees a rise in income across all income lines as a result of having the building.
Education Centre Feasibility Study Clearview Consulting September 2016 17 |
P a g e
3.6.1 HLF Resilience Fund
The FoWG have a very strong relationship with their HLF partner contact and are in a
good position to secure transitional funding as they are aligned with quite a lot of the
funding categories
This could be as much as £200K+ - the FoWG would want to aim for as high amount
as felt to be justifiable
Having confirmation of Education Centre building funds release will strengthen their
HLF application
3.6.2 FoWG Business Journey
The following diagram shows the potential future journey the FoWG may go through between
current and future operation subject to the level of financial success they may achieve.
3.6.3 Financial Conclusion
Given FoWG business plan is not reliant on HLF funding to be sustainable in early years to
cover operational costs this is not felt to be a high risk.
Funding included spread over 10 years is not high and has been successfully achieved at
higher levels on a consistent basis by the Friends previously so is not unrealistic.
HLF application process is quite rigorous so funding application support would be
advantageous for the FoWG to apply for HLF funding; LBL have already committed to
providing this.
Based on market analysis and business development potential, the FoWG are well placed to
realise significant income increases subject to the necessary upskilling of existing volunteers
and introduction of new business expertise; this feasibility study supports that the FoWG are
eligible and capable of achieving this.
Education Centre Feasibility Study Clearview Consulting September 2016 18 | P a g e
3.7 FoWG Business Plan: Summary of Recommendations and Detailed Actions
The following summarises all activity the FoWG need to consider in order to prepare for operational working at the new Education Centre and to successfully
implement a sustainable business plan:
Theme Points to Address Future Needs Governance Review Tasks
Overall Charity
Accountability,
Liabilities and
Reporting
Risk Management
and Safeguarding
Consider limited company (or similar) to protect
Trustees from most personal liability risks (not all)
Ensure safeguarding policies in place and in
practice
Consider for all partnerships the level and type of
partnership agreement needed
Governance review to consider some form of
charitable limited company or otherwise achieve
limited liability
A Full Cost Recovery model
Ensure that structure enables the social business to
be well run without losing the community
charitable ethos
Ensure that the whole organisation has bought into the new
plan and each group understands its role
Ensure that all activities are in pursuit of charitable objectives
For building opening ensure that the Trustees are prepared –
health & safety training, fire safety, individual responsibilities
Suite of partnership agreement documentation
Risk management and insurance policy
Theme Points to Address Future Needs Governance Review Tasks
Mentoring for the
Trustees
Supporting strategic leadership HLF Resilient Funding would provide this Identify key leaders
Sustainability of the
Charity and its
Activities
Meetings with this group and evidence of
experience suggest that this is a strong group but
is all voluntary work
Online Resilient Heritage strength checker
Capacity to support sustainability work e.g.
fundraising
Formal record to be kept of all voluntary efforts for
match funding purposes
Prepare a fundraising strategy
Start a formal process to consider longer term management of
windmill and park; identify/strengthen both existing and new
partnerships with BGRMO, LBL, HMP Brixton to support this
Theme Points to Address Future Needs Governance Review Tasks
Social Impact
Analysis
Need to be able to demonstrate Social Return on
Investment in the language that funders speak
This could be funded by the HF Resilient Fund Need firm targets and monitoring of SROI (social return on
investment) and an Evaluation policy
Financial and Data
Management and
Accountability –
Business
Management and
Development
As business increases capacity and capabilities
will need to be increased
External support to realise the business
development will be needed
Buying in professional accountancy support on a
part-time basis to be considered
Governance review to consider if right mix of skills
for an emerging significant social business
Professional book-keeping capacity will almost
certainly be needed
Reserves policy Clear and auditable protocols for Gift Aid Business development plan to align with marketing strategy Cash handling and security Data Protection policy Customer complaint handling process
Education Centre Feasibility Study Clearview Consulting September 2016 19 | P a g e
Theme Points to Address Future Needs Governance Review Tasks
Staffing, Paid and
Voluntary
The FoWG will also need to build into their
thinking the roles of cleaner and bookkeeper
ensuring that the roles can be deployed well
without resultant diminishing of the voluntary
efforts
Personnel policies need to be developed and a
training needs assessment should include
consideration of personnel management
HR policies needed e.g. Living Wage; Health and Safety; Lone
working; Manual handling; Display Screen; Equalities policy
Volunteer strategy may need reviewing
Policy on training
Theme Points to Address Future Needs Governance Review Tasks
Education Work Prepare for increased admin requirement ensuring
that income is collected in a timely manner,
records need to be accurate and updated on a
regular basis, and feedback (positive/ other) kept
to inform ongoing developments
Worker should be self-administering but voluntary
or paid admin capacity would allow for further
growth
Policies on charging and on safeguarding
Strategy for Education market development (inside and outside
Borough)
Theme Points to Address Future Needs Governance Review Tasks
Heritage A feasibility study would be needed on any
proposal to transfer responsibility for the
windmill to the FoWG
A service level agreement (SLA) would need to
be put in place between LBL and FoWG if
FoWG were to take on future windmill
maintenance
The building will open up many opportunities for
heritage talks and activities.
Visual access for those with disabilities e.g. CCTV
cameras could be considered
A project plan, conservation plan and an Audience
Development Plan may be needed for HLF funding
Theme Points to Address Future Needs Governance Review Tasks
Events The events do require “all hands on deck” which
can cause stress
The new building will reduce the reliance on
events to some extent as there will be a
permanent presence within the park
Fewer events may be needed as the FoWG is
established with regular opening and wider trading
etc.
Strategic review of which events prove to be more
successful in terms of community engagement,
growing brand reach (new membership sign up,
new volunteers etc.) and/or profitability/income
generation (donations, flour/other merchandising
sales)
Events strategy
Tighter measurement and tracking of income generated/cost of
event, sales and merchandising stock control, audience
participation
Theme Points to Address Future Needs Governance Review Tasks
Trading Including
Milling Flour
Will need trading systems and protocols (e.g.
agreeing profit margins)
May need trading subsidiary
Governance review to consider if a trading
subsidiary is needed both for focus and to meet
Charity Commission guidance
Review needed for separate trading subsidiary, set clear ethical
trading policies
Ensure all legislation including food hygiene policy includes all
aspects as well as home produce
Education Centre Feasibility Study Clearview Consulting September 2016 20 | P a g e
Physical shop in Education Centre will afford wider
access to Friends merchandise and support brand
extension
Online shop will increase reach and sales
opportunity when Education Centre closed
System capability required to better manage sales
recording and inventory stock control
Need stock-keeping policy including any ‘sell by’ requirements
for flour and any other perishable sales goods
Theme Points to Address Future Needs Governance Review Tasks
Facilities
Management (FM)
and General
Administration
A regime of management needs to be put in place
and owned at a high level
Building hires will need to be proactively
marketed and managed as it is one of the main
sources of regular discretionary income
In the governance review, a building management
group should be considered and both finance and
volunteer time budgeted for the medium and long
term
FM manuals for staff and hirers will be needed
A building hire and charging policy will be needed with a scale
of charges for community and other use
Policies on use and terms needed e.g. for alcohol consumption;
opening and closing times, cleaning charges, religious/ political
uses
Theme Points to Address Future Needs Governance Review Tasks
Communications
Consultation and
Marketing
Internal communications plan to engage existing
volunteers and to secure buy-in to new business
approach will be critical to success of business
venture
Communications with members could be
improved to increase sustainable income
Data held on various different databases leads to
duplication and inefficient contacts management
Ongoing user feedback systems should be
developed
Crowdfunding and similar popular appeals may be
the way forward and this would revolve around
how the Friends communicate the cause
Development of the FoWG/ Windmill ‘story’ needs
to be crafted for inclusion on promotional material
and on flour packaging to reinforce the brand
Current CMS, while adequate as a website, is
stubbornly inflexible. A different system e.g.
Wordpress would allow integration of mailing
records with a mailing system such as Mailchimp
as well as allowing a much more flexible website
Centralised CRM system would enable enhanced
audience segmentation to support more targeted
communications and facilitate better records
management
Reports of all consultations and surveys should be kept with
evidence of how they have influenced plans or service
provision
Overarching marketing strategy will be needed including brand
development/ growth policy
Education Centre Feasibility Study Clearview Consulting September 2016 21 | P a g e
Theme Points to Address Future Needs Governance Review Tasks
Environmental
Impact
n/a Most significant funders will want to see
measurable outcomes in place
A Transport policy (for the planning application) and an
environmental policy will be needed
Park, Gardening etc. Park upkeep should not be confused with the
current exercise
n/a at this stage; to be revisited within 3 years once
building in place
Agreed SLA (service level agreement) needed if to
be adopted
n/a at this stage
Membership Need a membership strategy to meet business
plan targets as well as inclusion
Membership admin system which supports
renewals; introduction of direct debit Payments
Membership benefits review
Membership strategy and policy on fees and membership rules
Direct Debit policy
Theme Points to Address Future Needs Governance Review Tasks
Legal Issues Lease Terms
Consumer Law
Health & Safety
Safeguarding
Contracts
Could apply for pro bono support Need external advice and support
Education Centre Feasibility Study Clearview Consulting September 2016 22 |
P a g e
Stage 1: Current and Future
Activity Planning
Education Centre Feasibility Study Clearview Consulting September 2016 23 |
P a g e
4.0 Stakeholder Engagement
4.1 Stakeholder Groups
Parties directly involved in this project included:
Friends of Windmill Gardens (FoWG)
Holmewood Nursery School and Treetop Children’s Centre (HNSTCC, more
commonly referred to within this report as ‘Holmewood’ or ‘Stay and Play’)
Investment & Growth, London Borough of Lambeth (LBL)
Windmill Cluster of Schools
Blenheim Gardens Resident Management Organisation (BGRMO)
Cllr. Garden
Eley Kishimoto (Design company/FoWG Creative Ambassador)
Squire & Partners (S&P Architects)
Clearview Consulting Services (conducting feasibility study)
Public consultation also included seeking feedback from wider residents and Windmill
Gardens park users (general public) – this is covered in more detail in Section 6.
4.2 Aims
• To capture business requirements and aspirations of all key stakeholder groups with
focus on long-term sustainability of FoWG and HNSTCC
• To inform S&P design brief for four building options under review
• To actively contribute to building options review in order to support optimum
building selection
• To manage risks and deliver added value/benefit to LBL and FoWG
4.3 Methodology
A series of face to face meetings were held to establish key requirements from stakeholder
groups. Areas probed included building needs, business aspirations, attitude towards proposed
building options – and whether any preferences were held for shared (joint) building or stand
alone.
In addition, stakeholder interviews identified any challenges/constraints and what might be
needed to support continuity of service, or at least could minimize service disruptions
(particularly important for Holmewood Stay and Play).
Within a 2 week period, Clearview attended:
11 face to face meetings
2 Exec Committees
Sustainability Sub-Group Meeting
1 FoWG Business Event
Spoke to 40+ people
Supplemented by desk research and review of existing documentation
Education Centre Feasibility Study Clearview Consulting September 2016 24 |
P a g e
4.4 Key Findings
The following summarises the detailed findings from each of the stakeholder interviews.
4.4.1 Friends of Windmill Gardens
4.4.1.1 What They Need
Classroom big enough to hold 30 people at a time
Facility to double up as required as a visitor centre
Dual purpose kitchen that can be used for training and catering
Toilets: male/female/disabled
Storage area for grain (consider weight)
Shelving and dry space to store flour
Easy to open shop and secure storage area for merchandising
Possible area for secondary modular milling facility*
Space will need to be multi-functional to support a variety of income streams
including bakery courses, hall hire out and other activities * put on hold for now
4.4.1.2 Preference for Building Location
Against the wall, but not obscuring the mural or encroaching onto existing children’s
play area
Liked the version which showed the centre going around the back of the windmill
with seating area viewing the windmill
Critical requirement is to have sight of windmill from centre
4.4.1.3 Single Building to House Both FoWG and HNSTCC
Feel that existing building is uneconomic to run and have concerns about how long it
will last
Issues with shape and where Education Centre part would be sited; if extending
existing building, consideration would need to be given to moving the stay and play
group further away so that could maintain eye-line to windmill
If new, shared building would a larger single building obscure view and/or be more
intrusive than two smaller buildings?
4.4.1.4 What FoWG Liked About “Inspired” Modular Building Option (Quote 2015)
Low cost > all options came in under £200K
Eco standards – vey high
Versatility - could easily adapt to different needs
Speed of construction
Liked that could have bi-fold windows all along wall > light and airy
Could choose type of roof/wall cladding; liked cedar exterior; saw a version in North
London which had panels which looked like weather boarding and replicated older
style of previous buildings
Inspired (modular building provider consulted) said could manage complete process
including planning application and other work needed within cost quoted
Education Centre Feasibility Study Clearview Consulting September 2016 25 |
P a g e
4.4.1.5 S&P Design – Positive
Liked that have been basing ideas on where older buildings had been and want to try
and replicate a “heritage centre”
Like timber building; colour not an issue
Like version which goes behind windmill and looks onto windmill; important to
make money from corporates that others can directly see windmill
Like that version behind windmill might support storage below land level, utilizing
land incline
4.4.1.6 S&P Design – Initial Concerns
S&P “too big” and this project too small for them; discussion re: Computeraid project
in Bogota, Columbia reinforced social commitment
Thought open rafters wasteful of space; now open to some areas being open to add to
ambience and some closed offering added storage potential
Unhappy about any versions which will obscure mural and/or encroach on existing
children’s play area
Areas where might help shift perception: longevity of S&P design v limited life span
of modular construction
Heavy weight storage (particular if modular milling adopted) will not be readily
supported by building without foundation
4.4.1.7 Café/Kitchen
Will need a kitchen which is dual purpose to support baking/other classes (training)
and catering (functions and events); size and dimensions yet to be ascertained
Much better ‘fit’ with business USP (flour) and less resource intensive to simply hire
out space
Mixed opinion within FoWG camp re: café but primary view is that there is currently
insufficient footfall to attract an interested café provider at this stage and there is
limited capacity/desire to manage
Typical income generation from small cafés is low and insufficient to sustain
Education Centre; potential may present in 3-5 years if neighboring residential area
grows
Would still benefit from building in designated customer seating area to support
FoWG pop-up café and for future proofing should café become viable in future
4.4.1.8 Building an Integrated Vision
FoWG are open to Holmewood’s needs for space to run classes and think they can
accommodate
Recognise there are periods when schools will not be using the centre, willing to
build in time to ongoing schedule where Holmewood could use free of charge at
outset
FoWG also open to more closely supporting Blenheim Gardens RMO in joint funding
applications; perception that once centre is established in park, this will potentially
open further doors to seek additional funding support for further park development
Very interested in exploring what might be feasible via BGRMO park maintenance
and building estate management
Education Centre Feasibility Study Clearview Consulting September 2016 26 |
P a g e
4.4.2 Homewood Nursery School and Treetop Children’s Centre
Currently only have one room; at maximum capacity now (24 children)
Can still expand with this by offering more stay and play sessions throughout the
week once have full access to own space
HNSTCC committed to continuing to use this building for vulnerable family
outreach; would use funding from supervised vulnerable 2 year olds’ programme to
fund park resources but would place in established facility in Upper Tulse Hill where
already equipped to deal
Ideally, to support HNSTCC business plan, need additional room to utilize for paid
for training purposes, 3 sessions a week x 2 hours
Feel this should be offered free of charge by FoWG for 3 years to reflect previous
shared arrangement
HNSTCC open to shared building IF all safeguarding needs can be met; would need
separate secure access and more protected play area (ideally electronic gate access or
at minimum higher fencing around outside play area)
Would require separate toilets for children and access to own kitchenette facilities
Would be interested in a shared used of hire out space for children’s parties – but
could use existing building room at weekends/evenings if have sole occupancy
Concerns expressed about being seen to be the ‘poor relation’ if new separate
building for Education Centre and no change to existing HNSTCC building; has been
communicated that LBL capital would only fund external updating to align with any
new building > would still require adaptation of play area fencing to allow FoWG to
explore opportunities with non-DBS and others
Question over longevity of existing building; but not an immediate concern for
HNSTCC (3 years into 7 year lease; may be extended to 11 years)
Issues exist with current boiler / electrics; some money already ear-marked by LBL
Children’s Services to address (Stella Clarke)
Excellent working relationship with Blenheim Gardens RMO; put in new flooring
and kitchenette free of charge and maintain garden area around building for free
Can see advantages to a new shared facility – but greatly concerned over who would
‘own’ responsibility for ongoing building maintenance and do not want to take on for
the whole building
Are content to remain in existing building if agreement reached for an
integrated vision for how FoWG and HNSTCC would continue to work together
4.4.3 Windmill Cluster of Schools
Completely committed to Brixton Windmill Education programme (“excellent”) and
have built bespoke links to their Geography and History teaching
Potential exists to extend programming so rather than a ‘bi-annual’ programme for
schools where two years taught together – if have a two-year teaching programme
with different content could send more classes each year
Budget set aside for school visits and some scope exists to increase sessional charges
Are interested in millers going into schools to support wider teaching programmes
(children growing wheat/making bread/pizza etc.)
Believe Educational sessions could be offered outside the borough to neighbouring
boroughs such as Southwark, Wandsworth and Westminister
Limitations with how classes could interact previously because of limited space
Seating and equipment of existing building not suitable for older children due to
small size
More space for the whole class (typically 30 in a class) would be advantageous
Believe that this is an important heritage site; providing for generations to come
very important
Education Centre Feasibility Study Clearview Consulting September 2016 27 |
P a g e
4.4.4 Blenheim Gardens Resident Management Group
Relatively good working relationship with FoWG but feel that ‘single-mindedness’ of
FoWG in past has led to wider park/community needs being neglected
Especially concerned about lack of recreational facilities for older children/teenagers
and would welcome some form of multi-surface pitch and/or equipment for them
Think a bigger childcare facility would be advantageous as can otherwise be very
expensive for parents to seek paid childcare elsewhere or take time off work,
particularly over key holiday periods such as Summer term, Easter, Christmas
Are very receptive to constructive discussion and have access to multiple services
which could be of benefit to FoWG; e.g. would consider taking on maintenance of
park and building estate management if residents get something in return e.g.
pitch/improved equipment
Blenheim Gardens residents quite affluent and could contribute to funding for this;
not that wouldn’t pay but haven’t previously been encouraged to do so
4.4.5 Cllr. Adrian Garden
Original FoWG ‘ask’ was too ambitious
No use just restoring something for heritage purposes only > has to be for benefit of
community and future
Backdrop of spiraling budget/service cuts, still require clearer definition of who does
what in terms of park management
Challenge of not losing green space > fact that there was a building there previously
is a good precedent
But not enough to say there was a building there before > need more of a compelling
argument
Open to a shared, single building; doesn’t think this has been fully considered before
4.4.6 Eley Kishimoto
A wide raft of ideas and acting as “FoWG Creative Ambassador” linking into wide
range of contacts
Believes park is ripe for development; warehouse development now completed
Considers café to be a critical requirement to sustain business model and to “hold
people there” in park; not aligned with desires of FoWG Exec who have neither the
desire nor staffing capability to manage a cafe
Sees this very much as a community project not just an “eco-asset” and so should
have capacity to meet various hall hire requirements and generate income
Considers costs to demolish existing building may be prohibitive and so would make
provision of one single, new, shared building possibly unfeasible > costs still to be
assessed
4.4.7 Other Considerations
Part of FoWG initial resistance to S&P was that FoWG not involved in discussions
from the outset; and that previous work to investigate other building options
seemingly ignored
FoWG needs to be more actively involved in design process; Clearview helping to
facilitate this but will still need more consideration by S&P of FoWG ideas/concerns
to secure FoWG buy-in to LBL/S&P vision
Education Centre Feasibility Study Clearview Consulting September 2016 28 |
P a g e
Brixton Prison may be closed and converted to housing development within next 5-10
years (BGRMO/Council) NB. This is perceived only, not confirmed
Possibility that Thames Reservoir may be converted to residential
In Prague Place, Liberty School has already closed; building 53 new units there
Younger people in vulnerable families now will age and influx of new families
increase demand for older children play area
Security of new building / protection against vandalism and break-ins
More lighting at night
Associated park furniture – can this be categorized as capital cost?
Community ‘value-add’ – park facility for older children?
Park opening times
City farm project - not active but could reappear / will be dealt with as separate
council project application; currently favoured by Windmill Cluster of Schools but
not supported by Blenheim Garden residents at this time
Education Centre Feasibility Study Clearview Consulting September 2016 29 |
P a g e
5.0 Building Options Appraisal
5.1 Building Options
Four building options were tabled for consideration in the invitation to tender for this
project. These were:
Building Options
Option 1
Providing the education facility as a new building within the park, retaining
the one o’clock club (‘Stay and Play’) in its existing form, as a stand-alone
entity
Option 2
Demolish the existing one o’clock club building and provide a larger building
in the park for both organisations to use, with shared facilities where
appropriate and efficient, but with a clear separation where necessary
Option 3
Expand the current one o’clock club building to enable a larger building, as
with Option B
Option 4
Explore alternative sites for a new building, such as Thames Water sites
5.2 Building Objectives
Building objectives were also tabled. These were:
Building Objectives to be met Provide a space suitable for a classroom/event/exhibition space/visitor centre, along
with suitable storage and toilets
A pop-up café and appropriate training kitchen facilities
Provide public toilet provision during times when the centre is staffed
Develop income generation activities to support the FoWG and the running of the
building, plus future maintenance of Brixton Windmill and the management of the
gardens, as well as the Brixton Windmill itself
Storing grain and flour to allow for the FoWG to build on their aspirations to develop
their commercial milling operation
Affordable and quick to assemble/construct
Achieve high levels of environmental sustainability
Be in keeping with the Grade II* listed Windmill building and park
Be of high eco rating and low maintenance costs
These objectives primarily relate to building requirements that will deliver the functional
needs of FoWG and support the use of the new Education Centre building and Windmill
Gardens park by FoWG and the wider neighbouring community.
The objectives also acknowledge key urban planning and environmental policies and
requirements, with opportunity to transfer the maintenance of Brixton Windmill and
potentially the upkeep of Windmill Gardens from 2020 to FoWG. (The latter would be
subject to negotiation with the FoWG).
Education Centre Feasibility Study Clearview Consulting September 2016 30 |
P a g e
They also acknowledge the conditional nature of the granting of capital funds to FoWG for
the construction of this building, i.e. the need to demonstrate a sustainable business model and
10 year financial forecast/business plan.
In addition, they also require the construction to be compliant with environmental and eco
policies that Lambeth require so that the building is environmentally sustainable.
Paramount to all the above is the need to demonstrate that the new building and its activities
create direct benefit and value add to the surrounding community. This latter point is
important and key to the council agreeing to offset the release of open space towards the
construction of a new community run site.
All the above requirements have been fully taken into consideration in all aspects of this
design and business development process.
5.3 Four Options to One
Squire and Partners (Architects) have produced 5 outline design proposals that addressed
options 1, 2 and 3. These have been costed by MACE and an order of costs for each design
proposal has been produced.
Option 4, exploring other alternative sites for a new building such as Thames Water, has been
ruled out. This is because at this moment in time no buildings in the vicinity of the Brixton
Windmill are available nor are any site locations within Windmill Gardens itself deemed
acceptable. Locating a new building at the farther end of Windmill Gardens, away from the
Brixton windmill itself is not acceptable. This is primarily based on historic responses from
the neighbouring residents and community at previous consultations in 2002 that did not want
to be overlooked, or their quiet enjoyment disturbed by increased levels of activity. From an
operational perspective, the distance from the windmill itself diminished the uniqueness and
validity of the proposed education centre itself.
The capital budget ring-fenced for this project by Lambeth is £360,000. Raising additional
further funds towards the construction of the building in addition to this sum, has been ruled
out. The possible time delay and dependency on having to raise further funds for the building,
was ruled out because the priority focus is to have a building in situ sooner rather than later,
in order not to lose the benefits already gained from the Heritage Lottery Funding and
Educational Centre development already in train. Adding to the fund raising activities of
FoWG whilst it was stretching to become a sustainable business was deemed too great a risk.
The five outline design proposals by Squire and Partners have resulted in only one design
falling within cost parameters and the capital budget available. The other four design
proposals were over budget by a considerable margin.
The costing of outline design options has essentially ruled out three of the four options that
required evaluation and consideration: Options 2, 3 and 4. Option 1 – ‘providing the
education facility as a new building within the park as a stand-alone entity, retaining the one
o’clock club in its existing form’’ now remains the only feasible option. This single option
focus has the agreement of London Borough of Lambeth and also FoWG.
As such, for completeness this report felt it important to undertake a short additional business
appraisal to further validate the above position to ensure the value of all other options were
considered, and that the single option approach was the right one to pursue.
See over for Building Options Diagram
Education Centre Feasibility Study Clearview Consulting September 2016 31 |
P a g e
Education Centre Building Options – Squire & Partners
Option 1 = Options A & D on diagram (New, stand-alone building for FoWG)
Option 2 = Option B on diagram (New, joint FoWG/Holmewood building)
Option 3 = Option C on diagram (Extended joint FoWG/Holmewood building)
Option 4 = already ruled out (Thames Water Sites)
Education Centre Feasibility Study Clearview Consulting September 2016 32 |
P a g e
5.4 Additional Options Appraisal
Broader business criteria have been used to appraise and evaluate each building option and
which also allow for comparison. The criteria (outlined below) takes into consideration the
building and business needs of the FoWG already mentioned previously. They also look at
benefits, risk as well as cost and value for money.
Appraisal criteria /objectives
Affordability – costs fall within ballpark of £360k allocated
Suitability for proposed activities of the Friends of Windmill Gardens
Suitability for Holmewood Stay and Play
Business Sustainability
Environmental / Building Sustainability
Planning risk (High risk 1, Low risk 3)
Time to construct (Slow 1, Fast 3)
Provides new and additional amenities to the local community
The original building options 1, 2, 3 and 4 have been appraised against these objectives. Each
option has then been scored 1-3; one being the weakest fit, three the strongest fit against each
of the criteria. The option with the highest overall score represents the most favourable option
based on the set criteria.
The results show that even when the options are evaluated together using the same appraisal
criteria, Option 1 still achieves the best score.
Evaluation Scoring: 1= weakest fit, 3= strongest fit. Maximum score is most suitable
option
Criteria / Objective Option
1
Option
2
Option
3
Option
4
Affordability - Cost falls within ballpark of
£360k allocated
3 1 1 1
Suitability for FoWG’s proposed activities 3 2 2 1
Suitability for Holmewood’s business
activities
3 2 2 1
Business sustainability 3 2 2 1
Environmental sustainability 3 3 2 1
Planning risk 2 1 2 1
Time to construct 2 1 2 1
Provides new and additional amenities to the
community
2 2 2 1
TOTAL SCORE 21 14 15 8
A detailed appraisal of building options 1-4 is given in Appendix A.
Education Centre Feasibility Study Clearview Consulting September 2016 33 |
P a g e
How The New Education Centre Might Appear
Education Centre Feasibility Study Clearview Consulting September 2016 34 |
P a g e
6.0 Public Consultation
6.1 Activity Undertaken
A series of panels were created detailing Education Centre building development
plans including reference to potential activities which might be introduced as part of
business plan
Panels were displayed for two days (Sat and Sun 9-10 July) in Windmill Gardens
with attendance by FoWG/S&P/Clearview Consulting/LBL
Communications plan included leafleting all local residents in Blenheim Gardens and
neighboring streets, emailing residents (via BGRMO), posters in park and on estate,
online advertising of event (FoWG and BGRMO websites), Twitter of Future Brixton
and FoWG and word of mouth invitation
Consultation feedback supplemented by online survey published by Clearview in
support of business planning activity
In excess of 100 people saw and commented on plans – a relatively good turnout
given we were competing with Brixton Arts festival and Wimbledon Finals weekend
835 ‘ticks’ were recorded in favour across all listed activities, with only 6
‘crosses’; at least 4 of the crosses were known to be by young children (e.g. “I like to
eat chocolate so can’t really say yes to nutritional advice”)
104 individual comments recorded via post-it notes – generally extremely positive
and supportive of proposals and offering some other valuable ideas for further
consideration
Key concerns (although limited) appear to be more related to the fencing around the
children’s play area being too low and lack of park lighting at night; one comment
suggested that activity should focus on community benefit rather than corporate
Education Centre Feasibility Study Clearview Consulting September 2016 35 |
P a g e
6.2 A Selection of Comments
Majority (70-80%) feel that this is a positive venture which will offer improvements
to the community/park and would be generally welcomed
Individual comments reinforced the desire for some form of refreshments/café area,
public toilets/nappy changing facility and a working water fountain as well as a
general interest in baking classes
Several comments reflected the desire for somewhere where older residents could go,
speech and language skills for non-English speaking and after schools’ clubs for
children
Quite a few comments liked the idea of having somewhere they could hire out for
parties and other family/social events (weddings were mentioned) and the
introduction of more musical events (‘acoustic afternoon’ specifically suggested)
Some interesting new ideas included: hire out of picnic blankets/food hampers, bee-
keeping activity, film hire location (FoWG already considering), Windmill Forest
school and keep fit/sports training linked with nutritional advice
Ideas which might merit pick-up or jointly developing with Holmewood included bug
hotels, trim trails for younger people/two year olds, climbing wall (popular,
mentioned several times), adventure play, musical walkway, “living wall”
6.3 Online Survey
Online survey ran 24 June to 14 July 2016
Solus email sent to 919 contacts
267 opened the email which was 29% of recipients (a higher percentage than for July
e-newsletter which went out 5 days later and also mentioned the survey)
Very low bounce rate at 1.63% (15) and 4 unsubscribed
Total survey response was 80; 70 came from FoWG e-mailing (57 click thrus) and
July e-newsletter (13 click thrus), 2 were ‘tests’ by Clearview and the remainder (8)
are assumed to come from Blenheim Gardens RMO e-mailout
Overall, Education Centre a popular idea* and positive response received
against all business income stream activities highlighted; *(further supported by
FoWG event questionnaire undertaken in Park)
6.3.1 Survey Highlights
90% of respondents said they would be interested in coming along (to centre) to learn
more about Brixton Windmill and the part this plays in Brixton’s cultural heritage
80% interested in Brixton Windmill and its history; 68% interested in a tour of the
windmill and also in Brixton flour making; 54% interested in baking classes
Of 46 volunteers, 46.3% (19) answered that they would consider increasing their
volunteer time once the Education Centre opens
42% (23) of those who said they do not currently volunteer said they would be
interested in volunteering in the future
In areas where there would be a need for increased volunteer resource, 8 said they
were interested in training to be a tour guide, 4 said they were interested in training to
be a miller, 3 said they would like to offer business planning/finance support and 3
are interested in fundraising
Of those interested in volunteering, 12.5% (4) said that they could volunteer once or
more than once per week, 25% (8) said they could volunteer once per month and
37.5% (12) said they could volunteer whenever there is an event
Please refer to Appendix B: Shaping the Future of Brixton Windmill: Online Survey
Results
Education Centre Feasibility Study Clearview Consulting September 2016 36 |
P a g e
7.0 Business Planning
7.1 Income Streams (New and Existing)
The following section reviews existing FoWG work streams and explores how these might be
improved and grown. It also identifies new areas of activity which the FoWG might consider
in order to generate increased income needed to ensure that the FoWG can operate
sustainably once the new Education Centre is in place.
The areas covered include:
7.1.1 Education Sessions
7.1.2 Flour Production/Sale
7.1.3 Membership Growth
7.1.4 Events/Merchandising
7.1.5 Paid for Tours e.g. London Walks
7.1.6 Baking Classes (Kitchen Hire-Out) *New
7.1.7 Hall Hire-Out *New
7.1.8 Holmewood Space Hire * New
7.1.9 Grants (start-up/business development support and ongoing events)
7.1.10 Other Donations/Fundraising
7.1.1 Education Sessions
Following provision of Heritage Lottery Funding, the Friends of Windmill Gardens
successfully introduced an ongoing cultural educational programme working in partnership
with the Windmill Cluster of Schools and London Borough of Lambeth who managed the
financial and staffing resource (Educational Development Officer) who delivered these.
These were extremely well received and subsequent stakeholder discussions reinforce that the
re-introduction of educational activity of this nature would be well received. Primary
discussions have also suggested that scope exists for a small increase per class from £60 to
£80 for Primary schools with higher charging for secondary classes where more preparation is
required to develop.
Education Centre Feasibility Study Clearview Consulting September 2016 37 |
P a g e
7.1.1.1 Market Development
Initial investigations to establish the ‘size of potential markets’ indicate substantial
opportunity for growth amongst both Primary and Secondary schools within Lambeth as well
as to neighbouring boroughs; Southwark, Wandsworth and Westminster as well as Croydon
appear to be primary markets with good bus/transport links. Other areas to be explored at a
later stage could include Camden and Islington, offering good tube links and as relatively
progressive London Boroughs could be receptive to such cultural visits.
In addition, regular access to facilities which can be more suitably tailored in terms of
desks/chairs and other working facilities offer potential to consider expanding delivery to
adult classes and working in partnership with Holmewood to deliver additional community
related education. Holmewood have already expressed an interest in utilising space at the new
Centre for delivery of ESOL (English Language) classes and Parents training.
As Holmewood Nursery School and Treetop Children’s Centre who occupy the current ‘Stay
and Play’ building have only one room which is occupied by younger children – and equipped
with toddler size chairs/toilet facilities – this does not readily lend itself to such expansion,
and now that their own funding subsidisation has ceased, this would benefit Holmewood in
the development of their own business plans while providing much needed local development
support.
As part of initial discussions, it has been agreed in principle that the FoWG would allow
Holmewood access to centre space for training purposes free of charge for an agreed time,
after which usage would become chargeable (likely to be at a discounted rate).
7.1.1.2 Volume
To ensure that a balance can be gained between educational provision and other FoWG
activity, recommendation is that this operates for a maximum of 3 days per week (week days)
to allow for service growth and optimum matching of resourcing against market opportunity.
Should demand grow faster than anticipated, scope exists for the FoWG to re-adjust their
business plan as needed.
Based on feedback from former Education Development Officer, the ‘school year’ has been
confirmed as 39 weeks. It is anticipated however that there is likely to be little out-of-school
trips taken in the first and last week of each school term (12 weeks in all) and September
could be a slow month, so it is more realistic to assume between 25-30 weeks for schools’
educational visits.
In the financial model, we have worked to 39 weeks with the additional weeks above schools’
usage assumed for adult and other classes together with possible Centre hire for summer
programmes and after-school club use.
NB. Projections for future growth have assumed a healthy increase once a permanent building
is in place. Scope exists for these figures to be adjusted (up or down against available
resource) once operationally active according to demand.
For further detail on previous educational activity undertaken, please refer to Appendix C:
Brixton Windmill Restoration Project 2010 – 2015 Final Report and Evaluation.
For further detailed breakdown of educational activity as included in the 10 Year Financial
Forecast, indicating market/pricing assumptions, please refer to Appendix G: 10 Year Cash
Flow Forecast (Summary and Education Tabs)
Education Centre Feasibility Study Clearview Consulting September 2016 38 |
P a g e
7.1.1.3 Staffing
For the purposes of the financial model enclosed, assumption has been made that a paid part-
time Education Development Officer would be employed on a contractor basis (no NI./other
run-on costs) for a maximum of 3 days per week. This might follow a staggered introduction
subject to market development and education programme needs.
Currently, funds exist through a mix of remaining unrestricted income and outstanding
income still due from previous Schools’ work; these invoices are currently being processed.
Furthermore, there is a possibility that the former Education Officer, who was instrumental in
establishing the successful working partnership with the Windmill Cluster of Schools, and
who also designed many of the FoWG educational programmes, may become available to
take on part-time Education Officer work once current council contract ends at the end of
September. Regardless of whether this happens or not, the FoWG shall be looking to put this
post in place as an immediate priority.
Based on feedback from Holmewood, it has been confirmed that they will not be introducing
any immediate changes to their activity for the coming term or directly after the Christmas
period. The Stay and Play building can therefore still be used on a part-time basis by the
FoWG for Educational programme delivery until the new Education Centre is in place as
soon as a new Education Officer is recruited.
Education Centre Feasibility Study Clearview Consulting September 2016 39 |
P a g e
7.1.2 Flour Production/Sale
7.1.2.1 Milling Production
Based on data provided by FoWG, the following indicates milling potential at current
operational working:
Milling days per week 1 day
per
week
2 days
per
week
3 days
per
week
4 days
per
week
5 days
per
week
6 days
per
week
Milling days per month
(assume per 4 weeks)
4
8
12
16
20
24
Volume at 72kg per day
(assumes 7-8 hour day,
includes wastage)
288kg 576kg 864kg 1152kg 1440kg 1728kg
Milling days per 39 weeks 39 78 117 156 195 234
Volume at 72kg per day output 2808kg 5616kg 8424kg 11232kg 14040kg 16848kg
Milling days per annum over
52 weeks (i.e. 48 weeks
assumed)
48 96 144 192 240 288
Volume at 72 kg per day 3456kg 6912kg 10368kg 13824kg 17280kg 20736kg
Current
As an organisation that relies on volunteer resource, it is unlikely that FoWG will choose to
grow milling capacity in the short to medium term, or if at all, unless there is significant sales
demand to do so and it fits with business vision. Yet the potential to be a full working mill,
subject to further work on where demand might be, and how easy and cost effectively this
demand can be serviced, is high and a real opportunity.
If current production levels can be consistently maintained, producing flour and some flour
by-products, could provide a healthy income stream for FoWG and a milling social enterprise.
Even at the lower end capacity of milling 1 day a week, this revenue stream appears profitable
with a good margin. Milling flour 3-4 days a month, (approximately one day a week), at an
average 7-8 hour day would typically produce a conservative estimate of 72kg of flour from
75kg of grain.
At 72kg a day for 4 days a month, this equates to 3456kg of milled flour per year (assume 48
weeks); this assume 4 days a month for this model from the outset.
7.1.2.2 Milling Resource
Currently, availability of milling resource fluctuates and so while forecast figures have used
the above model for financial purposes, it is recognised that some increase in milling capacity
would be needed to support this over time. Steps are currently being taken by the FoWG to
establish a wider milling base and to create a regular milling resource pool in the same way as
there are Windmill Tour Guides at present.
Based on initial discussions as part of the feasibility study, an opportunity has been identified
to develop working partnerships with both The Clink and Bad Boys Bakery at HMP Brixton.
Both have suggested the possibility of working with ROTL (released on temporary licence)
Day Release offenders, who could be trained up as millers and provided with work
placements in exchange for providing free supplementary milling resource support.
Education Centre Feasibility Study Clearview Consulting September 2016 40 |
P a g e
7.1.2.3 Retail Sales
30 x 25kg bags of grain (750kg) are required to produce approximately 720kg of flour. This
amount of grain would appear to last approximately 3 months based on a 3-4 day a month
level of milling. There is some wastage in production, but over time some of this should
lessen with increased capability and efficiency.
At 72kg of flour produced in an 8 hour day, current milling time equates to 48 x 1.5kg bags,
72 x 1 kg bags or 144 x 500g bags of flour possible per day.
Pricing
For the purpose of the model used in our forecast, retail sales price of £1.90 per 500g bag has
been used less expenditure on input costs (such as grain).
Three possible standard sizes of bag have been considered by FoWG: 500g, 1.5kg and 16kg;
500g is FoWG’s preferred size of bag to market as it provides the maximum profit margin. If
sold directly (without any intermediary), the profit margin for this size is assumed to be circa
£1.40 profit per 500g bag excluding some operational costs still to be established. At worst,
these additional operational costs might bring this margin down to say £1.25 per bag.
Choosing to work with only one size of bag initially for Retail purposes would be wise as it
will help reduce materials costs in the initial years.
(NB. Subsequent feedback since creating our costing model has confirmed that 16kg would be
used for wholesale use only; the latter would require further work on bag costs but this is not
believed to be prohibitive).
Channel Distribution
At the moment, 500g bags and 1.5kg bags of flour are sold at events, and there are some
stocked in a handful of local shops but visibility is low and sales return is not that closely
monitored. Introduction of a new permanent base will afford higher visibility and will open
up opportunities to increase retail sales via the increased tours planned and via new income
streams such as baking classes.
In addition, introducing an online shop will increase accessibility and encourage greater take-
up by new audiences although distribution methods beyond the centre will still need to be
considered for such a channel.
Current strategy is to provide locally to bakers and to household customers in the domestic
market.
If milling levels stay as they are currently, over a year 3456 kg of flour can be produced, or
6912 x 500g bags. This would mean circa 144 bags need to be sold a week or more likely 576
bags sold per month via multiple sources and at the Windmill. Channels for retail sale require
development as it unlikely current channels will produce sufficient sales to match potential
output and therefore, for the purposes of our financial model, an assumption has been made
that this amount of flour would need to be split between retail and wholesale flour sales.
Should other retail distribution channels with greater volume potential be possible, from say
larger local retail outlets or possibly in conjunction with local and regional branches of a
national supermarket, then it is more likely current levels supply will be balanced and met by
demand.
Education Centre Feasibility Study Clearview Consulting September 2016 41 |
P a g e
Should milling production significantly increase however, with more regular milling resource
readily available, future consideration should not be ruled out for negotiation with a larger
high street supermarket chain to locally stock Brixton Windmill Flour as part of any ‘artisan’
food section; it may very well be worth approaching the likes of Tesco’s who have branches
within Brixton and are supporting ‘farm to fork’ initiatives at present.
If further growth is possible, then milling an extra day a week (i.e. 2 days a week or 8 days a
month) may be worthwhile, especially as this extra flour could create a number of regular
medium to longer term contracts for the supply of flour.
Margins for larger volume purchase might be assumed to drop to £1 per 500g bag but the
benefit of known regular income in the medium term would be beneficial for the
sustainability of the business and worth considering. RRP (Recommended Retail price) is
suggested to remain the same as at the Windmill at £1.90 per 500g bag so would not erode
direct sales. Minimum volumes per month per supplier to make the margins worthwhile
would need to be considered.
It is suggested this extra milling could potentially start for Retail sales in year 6.
7.1.2.4 Wholesale Sales
Should FoWG not want to immediately increase milling days above current levels, the
financial model has allowed for a steady growth projection, including the introduction of a
wholesale market income stream to be trialled and developed in parallel. It is assumed that at
the outset, the total volume of flour produced will not be fully absorbed by retail sales only
and sales have been split across both retail and wholesale, subject to demand.
Building off the idea of selling to a different market, on a small but commercial scale, it is
anticipated that there would be wholesale demand from local bakeries and even HM Brixton
for a high quality, organic wholemeal flour produced locally, providing a known regular
income stream over the short to medium term.
Education Centre Feasibility Study Clearview Consulting September 2016 42 |
P a g e
Indeed, as part of feasibility study discussions, market demand for wholesale provision of
Brixton Flour has already been established with the Old Post Office Bakery advising they
would be willing to take 32kilos per month, HMP Brixton (Bad Boys Bakery) proposing that
they would trial between 4-8K per month, The Learning Loaf, advising that they would be
interested in taking 4K per month to start and a handful of other local bakeries suggesting
similar.
Given interest already exists, this could be capitalised upon immediately once the new
building and regular milling resource is in place to service demand. It is therefore suggested
that the wholesale market might be tested in Years 1 and 2 to refine pricing and distribution
strategies with a view to increasing production in Year 3 subject to resource/market demand.
Pricing
A 16 kg bag sold for between £16-£18 per bag would be competitive with other mills and
organic flour specialists whose prices vary from £15 - £22 per bag. (Bachedre mill £19 per
16kg bag, Shipton Mill £21.50 per 25kg bag, Marriage £15.49 per 16kg bag, Doves £18.90
per 25kg to cite just a few).
Our financial model has priced proposed wholesale bag at the low end at £16 per 16kg to aid
market entry. Brixton Windmill Flour could potentially command more, if its flour is deemed
a quality product and pricing increase to £17.50 might be tested once market penetration
established.
Producing larger volume bags could be more cost effective and operationally more efficient.
Sale price per kilo for this model is assumed to be £1 per kg and bags sold at £16 per 16 kg
bag. Price points need to be tested to ensure a regular income is possible. It might be
worthwhile to start entering any flour competitions in the coming few years to seek validation
of flour quality.
Volume makes these sales worthwhile as few bags need to be sold to bring in the same
income as of 8 x 500g bags, albeit at a lower profit margin.
With commercial volumes for retail or wholesale, a mix of volunteer and other resource might
be necessary (refer to 7.2.2.2). Staffing, operational and associated distribution costs need to
be considered and worked through for larger volume milling.
Side products (‘brand extension’) such as Windmill bread sales and baking classes can also be
built off the milling income stream and longer term, building a working partnership with a
college or work place provider might afford opportunities to develop apprenticeship training
in milling.
Education Centre Feasibility Study Clearview Consulting September 2016 43 |
P a g e
7.1.2.5 Bread sales
Currently, the FoWG receive a 0.40 pence donation per loaf from sales of Windmill loaves
made by the Old Post Office Bakery. Income is modest and while this is a welcome initiative
kindly offered, collection is problematic as payment is not made on a regular basis and so
difficult to factor into regular income projections.
Moving forward, it is suggested that the Friends might realise direct income from their own
bread sales from the FoWG shop within the Education Centre following bread making classes
and/or the Friends own baking use of the (planned) kitchen once this has been installed.
A modest income line has been put into the model for this for this that feels realistic and
achievable. If successful, this could be increased.
Over time, consideration might be given to introducing other ‘home-made’ produce by
Friends and potentially local people under a common ‘Brixton Windmill’ brand; this could
include jams and preserves as currently sold by the Friends’ Parks group and cakes and
sandwiches perhaps as part of the pop-up café made using Brixton Windmill Flour.
The FoWG have already been approached by the London Beekeepers Association (LBKA) to
work together at the new Centre which could generate honey alongside other Educational
partnership benefits.
Care would need to be taken that any perishable items sold adhere to required food hygiene
regulations in their production, and display ‘use/sell-by information’ as well as utilising eco-
friendly packaging.
7.1.2.6 Modular Milling
The possibility of adding a second, modular mill to enable increased milling capacity was
explored; this offers some benefits in that it can be operated with lower resource levels but
issues with quality and lack of space to house within the Education Centre have discounted
this at this time.
7.1.2.7 Miller Training Courses and Accreditation
Miller training courses could also be a possible by-product of the milling enterprise. Course
and proficiency accreditation is possibly worth pursuing and the cost per course evaluated as
another revenue stream.
Education Centre Feasibility Study Clearview Consulting September 2016 44 |
P a g e
7.1.3 Membership Growth
7.1.3.1 Membership Overview
Membership types Cost Proportion of
total paid
Total
Paid Up
Members
Total
Members
on VR List
Total
Lapsed
Single £5 51% 52
Family £8 27% 27
Concessions £2 16% 16
Life £100 5% 5
Corporate £250 1% 1
101 222 46%
Based on data provided by FoWG:
There are five membership types (outlined above)
Currently there are 101 paid up members on a mailing list of 222; of the paid up
members, the majority are ‘single’ or ‘family’ members, with just 1% (1) corporate
member
Almost half of the current membership mailing list has either lapsed or chosen to
cease being a member
In a recent online survey*, of those who replied as members (33), 20% (6) responded
to say that they had since lapsed, and of these, 100% gave the reply for the reason
they had lapsed as ‘not been contacted to renew’ (please note that this is a relatively
small number so must be taken in context of responses given)
Top 3 Reasons given as to why people had chosen to become a member included:
o Important to support a valuable community resource (81%)
o Like to be kept regularly informed of what’s happening (45%)
o Enjoy being involved in helping to shape the future of Brixton Windmill for
future generations (43%)
65% of members chose to pay by cash (20), with 26% paying online (PayPal) (8), and
16% (5) by cheque
61% said they would be interested in paying by direct debit
93% confirmed that annual one-off payment would be their preferred direct debit
option
More than 75% reported that they think membership rates are about right/offer good
value for money with just over a quarter (26%) thinking that they are too low
Currently, there is some crossover with volunteers mailing list but not all volunteers
are members; potential exists to convert 200+ from this list to membership status but
records are somewhat muddied so clear communications are hindered
Records are ‘historical’ – these have been inherited from someone who has now left
so there is a need for a new system, training and handover to fully optimise this
income stream
* Refer to Appendix B: Shaping the Future of Brixton Windmill – Online Survey
Results
At the moment, there is no designated membership strategy and in the past, members have
been allowed to lapse because it has been difficult to track when membership was coming up
for renewal. Based on online survey data and other ad-hoc feedback, it can be assumed that
members would, in the main, be happy to renew and feel that the rate they are paying is
offering good value or money.
Education Centre Feasibility Study Clearview Consulting September 2016 45 |
P a g e
Clearer financial record keeping will help paint a picture of membership profiling and for
membership segmentation purposes as well as to flag regular monthly membership due to be
renewed; as part of an agreed membership renewals contact strategy, set communications
templates could be developed as part of a ‘Reminder’ mailing (or emailing) cycle which could
be queued in email/CRM# system to send at regular points in run up to renewal date.
# Recommendation is made for new integrated customer records system (CRM).
Opportunities exist for membership income to be increased immediately through better data
management and clarity on contact records across both membership and volunteers so that the
‘size’ of current growth potential from existing contacts can be better understood. Currently,
there is some question as to whether volunteers should be members but introduction of a
simple, discounted membership offer for volunteers is recommended as this could help realise
several hundreds of pounds each year and would ensure that volunteers can be more involved
in decision-making through this support.
As part of membership strategy development, it may be necessary to consider whether
membership ‘benefits’ can be more clearly defined/enhanced; for example, currently,
everyone gets the e-newsletter whether a member or not so there is no real incentive for non-
members to join if their motivation is ‘to be kept informed of what’s happening’. Based on
survey data, most existing members see the Windmill (and associated activity) as “a valuable
community resource” which they wish to support and enjoy helping to shape the future of
Brixton Windmill “for future generations”; it may be worth exploring whether there are other,
more regular ways for people to actively contribute to this beyond just voting at the AGM
which can be more widely communicated to attract new members and/or convert those who
have already displayed a certain level of commitment to the development of the Windmill
through volunteering.
A good example is the current “Creative Ambassador” role recently introduced from which
the FoWG have significantly benefited through wider business introductions and other
promotional support.
7.1.3.2 Product/Market Development
In addition to a ‘volunteer membership’ offering, opportunities exist to develop or cross
promote membership to the families and others attending the educational programmes and to
consider synergies with other milling/windmill ventures – both National and International.
While corporate membership is somewhat neglected at present, this could offer a tangible
return if more detailed consideration can be given to recruitment strategy as this particular
membership product already has strong, clearly defined membership benefits.
A concerted drive to convert existing local business supporters to corporate members may
become easier once the new Education Centre is in place and a corporate ‘bundle’ involving
reduced hire rates for the centre space to supplement the use of the Windmill for corporate
events could help cross-sell both membership and event/space hire at the same time.
7.1.3.3 Pricing/Payment
Membership rates were increased only a year or so ago and while some 26% suggest that
current rates are ‘too low’, current rates compare very favourably against other visitor
attractions and existing members perceive they receive good value for money.
Education Centre Feasibility Study Clearview Consulting September 2016 46 |
P a g e
It is not recommended therefore that membership rates should be increased any time soon –
more simply that volume should be grown across all segments and that membership
categories could be expanded to recruit from a wider base (see ‘Product/Market
Development’ above).
The introduction of Direct Debit payment would afford several advantages and is highly
recommended:
o Significantly aids membership renewal if DD set to auto-renew
o Introduces ease of payment for the member, particularly useful for those who may be
time-stretched or who may have moved away (but still wish to support) so volunteers
dealing with membership renewal find it hard to reach them
o Annual DD appears to be the most popular – could introduce an influx of cash at key
points of the year which could be better mapped and included in financial forecasts as
payment dates (set against known renewal data) could be identified
o This is an area currently being explored by the FoWG
7.1.3.4 Donations
This is a valuable additional contribution which (joining) members can opt in to pay – thought
needs to be given as to how this could be better recorded – could suggested ‘amounts’ as tick
boxes be included on membership form perhaps as per standard fundraising communications
(could still include an ‘other’).
Efforts should be made to marry those who previously gave donations with renewals
communications, so that additional revenue could be sourced from a) membership renewal
and b) repeat donations. If set up via Direct Debit, the option to ‘opt in’ for auto payment of
both could be put in place which might see revenue from membership income double.
7.1.3.5 Gift Aid
Many have indicated their consent for Gift Aid to be processed – this could be worth in the
region of an additional 25% without any added cost to FoWG members - yet currently these
are not being actioned and untapped monies are simply waiting to be claimed.
Going forward, a process needs to be put in place to ensure that all Gift Aid contributions are
actioned and that there is ‘ownership’ within the Friends for overall membership development
(not just list management) linking back to wider FoWG development strategy.
Education Centre Feasibility Study Clearview Consulting September 2016 47 |
P a g e
7.1.4 Events/Merchandising
The Friends of Windmill Gardens deliver a regular programme of events each year consisting
seasonal events plus a series of larger festival type events which contribute to high profile
awareness raising and opportunities to recruit new members and volunteers. In addition,
events are used to fund raise via personal donations (‘bucket shaking’) as well as the
collections box specifically located near the entrance to the Windmill for those taking tours to
leave a contribution of an amount they feel is fair – the recommended amount is £3 but
visitors often leave more and have been known to donate up to £20 per visit.
This year, Brixton Windmill celebrated its 200th anniversary and a series of additional,
specialist events have been added to celebrate this magnificent achievement with differing
levels of success. Event attendance has been good across all but some have proven far better
financially and the FoWG has taken on board key earnings from these for future activity.
200th Anniversary 2016: Beer & Bread Festival, Windmill Gardens
Education Centre Feasibility Study Clearview Consulting September 2016 48 |
P a g e
7.1.4.1 Events List 2016
Event Group Event Title Event Funding Notes
Seasonal Easter Egg Hunt Part paid by the
Minet Trust Grant
Harvest Festival Paid for by the
Minet Trust Grant
Football Mostly paid for by
BGRMO grant
Art in the Park Paid for by the
Minet Trust Grant
and balance from
Parks income
Annual Festivals Summer Festival
and Parade
Costs £6-7K raised
from an Awards for
All grant plus £500
Historically, has
been the main
annual event of the
year
Very expensive to
produce as very
theatrical in nature
and involves lot of
costly contractors
Main road no longer
closed off now to
general traffic as
previously, so makes
difficult to stage the
Parade and
motivation to run
has lessened
Consideration being
given to phasing out
the Parade as new
events such as the
Beer & Bread
Festival generate
equally high
community
participation and
substantially more
profitable
200th Anniversary
Events
Easter Treasure
Hunt
Paid for itself
Beer & Bread
Festival
Sponsorship, stall
income, donations
Made a substantial
profit and allowed
the testing of a new
funding approach
including working in
partnership with
other business
Education Centre Feasibility Study Clearview Consulting September 2016 49 |
P a g e
providers (beer/food
stall holders)
Also afforded the
opportunity to use
the Windmill for
barley which was
very successful
Open Air Film
Show (Moulin
Rouge)
Made a loss but was
covered by profit
generated by Beer &
Bread Festival
Good attendance and
creative tie-in to the
Windmill through
film shown but high
costs to hire
equipment needed
and pay for film
licences required
negated profits made
previously by Beer
& Bread Festival
Allowed the
showing of new
FoWG ‘short’ film
Special Lecture Taking place later in
the year
Other All year round Tai
Chi
Paid for by Free
Sport Grant and then
self-financing
(collections each
week from
participants)
Popular and fits with
commitment to
healthy lifestyles
(aligns with Council
agenda)
It has been suggested as part of Capability and Capacity Planning analysis (refer to Section
11) that as the FoWG gear up for significant step-change in operational working, it might be
prudent to consider reducing the number of events they undertake given the high amount of
resource these take to deliver. This would allow greater focus on wider strategic business
planning and an opportunity to refocus resources in the short-medium term.
Concerns have been voiced about this as the FoWG see their events as a powerful vehicle
from which to draw a number of key supports including (but not limited to) wider awareness
raising and brand reach, opportunities to recruit new volunteers and members, income
generation through park fundraising and windmill merchandising sales, as well as potential
to widen local business partnerships.
In addition, a number of existing volunteers enjoy organising events activity and this is one of
the areas indicated in the online survey where a relatively high number of new volunteers
indicated that they would like to become involved.
With the introduction of a number of additional 200th Anniversary events this year, it has also
been voiced that some of the FoWG are experiencing ‘events fatigue’ and this may be a good
time to review events strategy for the immediate and longer term future.
Education Centre Feasibility Study Clearview Consulting September 2016 50 |
P a g e
Once the new Education Centre is in place, while the need for wider awareness raising will
still exist, this may be in part reduced and the balance of community engagement activity is
likely to shift.
Proposal therefore is that an events strategy be developed looking at primary and secondary
objectives and events which are cost prohibitive, such as the Annual Parade, be considered
either for cancellation or at least put on hold for the next year or two while new business
activity is established. In addition, it could be possible to bring on board ‘fresh faces’ in the
form of new volunteers to inject new energy and to free up more established volunteers to
input to the development of wider business plans.
Furthermore, crossover here comes in the development of new and existing business
partnerships and it is believed that scope exists for revenue to be increased at park events
through either some form of % contribution by non-FoWG stall-holders selling their own
produce, or perhaps by paying equivalent of a small ‘ground rental’ to include their stalls in
larger events.
NB. At the time of producing this report, data on income generated through events was
limited and so notional amounts have been included; scope exists for this section of the
financial forecast to be further developed by the FoWG.
7.1.4.2 Windmill Merchandising
The Friends of Windmill Gardens have a wide range of windmill merchandising which is sold
at events and tours and is stocked in a handful of shops in Brixton but with limited visibility.
Items include a range of colourfully designed mugs, t-shirts, shopping bags, books, greetings
cards, postcards and tea towels. Brixton Windmill Flour (500g and 1.5kg) has now also been
introduced.
Education Centre Feasibility Study Clearview Consulting September 2016 51 |
P a g e
Items are affordably priced and designed to a high standard. The range of postcards for
example offer a selection of beautiful windmill images covering original historic former
buildings to present day at only £2.50 for 6, while books such as “Mill Memories” offer a
collection of stories from Brixton residents and their families who have lived and worked
around the mill together with more detailed insight into the history and development of the
windmill and the Ashby family who once ran it.
Some funding support has been received previously towards this and in 2014, 600 of the Mill
Memories Book were produced, half of which were funded by All Our Stories Lottery Grant,
while this year, 5000 new guide books were printed, paid for by a Heritage Lottery Fund
grant.
It has been advised that mark up on all merchandising is a healthy 100% but gaps exist in
available data on individual costs and stock control is relatively loose with items stored in
various places including suppliers due to lack of storage at current premises. This should be
helped significantly by having a permanent building with space for own storage.
Stock assets are positive and it is estimated that £22,000 worth of stock is held at the time of
producing this report. Opportunities exist to extend the FoWG ‘shop window’ through the
introduction of an online shop which would improve accessibility and ease of ordering.
Education Centre Feasibility Study Clearview Consulting September 2016 52 |
P a g e
7.1.5 Paid for Tours
Currently, Windmill tours are offered to the public free of charge with a box encouraging
donations of £3.00. Visitors sometimes pay more, particularly if only notes are held or if
overseas visitor/s.
The tours typically run every second weekend of the month between March to October but are
also usually open to coincide with park festivals and other windmill events.
The FoWG intend to keep the weekend tours as free of charge as they see these as a
community benefit. Once the Education Centre is in place however, this opens up
opportunities to charge for mid-week visits linked to the newly available visitor centre where
more can be offered and which might open up the possibility of extending opening times
beyond October.
If tied in to walking tours and refreshments, a charge of £8-£10 per visit would not be
unreasonable and opportunities exist to further explore partnerships with other existing
London/Brixton walking tours. Access to the Education Centre shop will also provide greater
opportunity to link windmill merchandise sales more readily to windmill visits.
Education Centre Feasibility Study Clearview Consulting September 2016 53 |
P a g e
7.1.6 Baking Classes/Kitchen Hire-Out
7.1.6.1 Kitchen Design
This represents a new income stream which would offer positive return once kitchen has been
installed. Currently, the ring-fenced money from London Borough of Lambeth will not extend
to cover this but allowance has been made within the building design to accommodate this
after the building has been built and the financial forecast includes £30K to be raised by the
FoWG for kitchen fit-out. As far as the capital budget will allow, this will include the
‘infrastructure’ such as flooring, walls, mechanical & electrical (ventilation, electrical points
etc.) and services supply (electricity, water, no gas).
The allocated kitchen space is not huge (20m²) but discussions with various bakeries and a
baking enterprise which provides classes from a school in Charlton Manor (“The Learning
Loaf” http://www.thelearningloaf.com/ ) confirms that this would be possible with some
smart thinking and attention to the flow of the kitchen with adjoining classroom area. Having
a commercial/training kitchen opens up even more possibilities for FoWG and food related
courses and hire.
Initial discussions with bakeries including Bread Bread, The Old Post Office Bakery and Ma
Bakers amongst others have indicated the importance of getting the kitchen design best suited
to the purposes the Friends wish to use this for.
Advice has differed widely from purchasing new equipment including a four deck oven which
revised space would simply not accommodate to considering smaller key items and ensuring
all essential kit to be on wheels so that it can be moved accordingly to accommodate multi-
functional use, ranging from catering and food preparation surfaces (in support of a wedding
for example) to provision of baking teaching and demonstration spaces.
Discussions with The Learning Loaf who also offer a range of services including baking
classes, have suggested that rather than purchasing bread ovens, it could be more practical to
invest in a Rational Combi oven which are more expensive to buy but would be space saving
and could be used for everything from baking loaves to making cakes to cooking a full meal.
They can even be used for ‘proving’ the dough for baking.
These are typically more expensive costing on average between £7K-£10K new but a ‘nearly
new’ version could be purchased for around half this and would offer economies elsewhere in
that only one oven would be required which could service all kitchen needs, but perhaps as
importantly, unlike bread ovens, these do not require extensive ‘warming’ times so would
also save on extensive electricity bills as they can easily be switched on and off between use
rather than running for long periods to keep the right temperatures and running up huge
electrical bills!
A range of other equipment including mixing bowls, mixers, weighing scales, etc. has been
noted and would be required if offering classes on a commercial basis. Consideration would
also have to be given to stainless steel demonstration area and class working surfaces; these
could ‘double up’ as food display areas with table cloth covering if then to be used to service
an event such as a wedding.
Overall, an allowance of circa £30K is recommended to kit out kitchen equipment only and
this capital cost has been spread over two years in financial forecast to ensure cash flow is
realistic and positive. Sponsorship for the kitchen or some other form of fundraising (e.g.
crowd funding/grant support) would need to be sought if this is to be added sooner rather than
later.
Education Centre Feasibility Study Clearview Consulting September 2016 54 |
P a g e
7.1.6.2 Baking Classes
Offering baking classes would afford the FoWG the opportunity to build on their ‘USP’ – the
Brixton Windmill Flour – offering a natural brand extension and fulfilling a popular
community ‘ask’ as posted multiple times at the recent public consultation.
Charging for bakery classes for sour dough bread making and associated artisan loaves could
easily command between £75 - £125 per person and allowing for hire-in of a baking instructor
(averaging £150 a day) and a light lunch provision, could generate profits of around £750-
£1,000 per class for a group of 10-12. (Refer to Appendix D for a sample of Baking Courses
as currently offered).
Using this approach, the FoWG would be responsible for advertising and recruiting the class
attendees and general marketing of the courses which could add expense and resource to an
already demanding remit. It is anticipated that the FoWG would not want to run more than 1
every 1-2 months to do this. A tutor who delivers bakery /bread making courses from her
home in Fulham – so used to working with limited facilities – has already been identified who
is very interested in discussing this venture further with the FoWG
An alternative approach would be to simply hire out the kitchen/classroom space and the
trainer/s undertake their own marketing and bring all of the equipment – and the trainees –
with them. This offers a lower rate of return - perhaps somewhere in the region of £250 per
session - but this could open up the opportunity to run these more frequently so still achieving
potentially the same projected income but without initial set-up charges (other than kitchen)
offering a faster entry to market and lower financial risk.
In early start-up years at least, this may be a more practical way to test this market
opportunity without overly committing limited resources and a suitable partnership, via the
Learning Loaf, has already expressed an interest in both working with the FoWG to deliver
this. Furthermore, they would be happy to help guide on the design/flow of the kitchen as
well as purchase Brixton Windmill Flour as this allows them to fully ‘source’ this from a
local provider, replacing existing supplier with the FoWG.
Education Centre Feasibility Study Clearview Consulting September 2016 55 |
P a g e
7.1.6.3 Pop-Up Café
The Education Centre in its final dimensions (150m²) is too small to accommodate a full
blown café without requiring loss of other priority areas such as class room space or storage
(needed for both grain for milling as well as merchandising goods).
Furthermore, there is currently not felt to be sufficient market demand to attract a social
enterprise or commercial café operator and the FoWG themselves have neither the resource,
experience nor motivation to currently take on such a venture which they feel us too far
removed from their current goals.
However, the FoWG have experienced some limited success with providing refreshments for
events and tour visitors and many of the volunteers bake at home so there is potential to offer
a pop-up café to provide light refreshments to centre visitors.
In addition, initial discussions with Bad Boys Bakery (HMP Brixton) suggest that potential
could exist for ROTL Day Release offenders to set up and run a regular pop-up café in
partnership with the FoWG at the Education Centre possibly at weekends. It is recommended
that this be explored further as offering this service at a set time on a regular basis will
become known by regular park users and other residents and is therefore more likely to be
used more widely alongside centre visitors.
Education Centre Feasibility Study Clearview Consulting September 2016 56 |
P a g e
7.1.7 Hall Hire-Out
An additional new income stream has been identified as the hire out of the Education Centre
space when not directly in use for educational purposes or for tours/as a visitor centre. This is
likely to be in the evenings and during non-term times so the building space would lend itself
well to after school clubs and other classes such as adult classes and potentially hire for
summer programme use. The latter is quite resource intensive and so the FoWG have
expressed an interest in hiring out the space for a set fee rather than running these type of
programmes themselves.
In recognition of the unique appeal of the Windmill as a ‘niche’ venue, consideration of
testing the centre for wedding receptions and other celebratory purposes is something that
would not represent a core product but could yield a reasonably high return. Given the FoWG
have no experience in this highly specialised market, recommendation would be to partner
with an existing wedding planner and/or to get themselves onto a ‘niche wedding’ venue list.
In order to develop this particular income stream further consideration would be needed
against:
Rental hire strategy – pricing and bookings process, allowance for any tiering of
pricing e.g. lower rates might be applicable for regular usage and /or residents hire
versus corporate and other business usage
Scheduling – important for there to be overall sight of who is using the centre when
so that the centre is not double booked and the space can be optimised for both
meeting key educational/other aims as well as maximising revenue opportunities
Building centre management – who will hold responsibility for general maintenance
and upkeep, fire and health & safety checks, key holding, cleaning provision etc.
Stackable/foldable tables and chairs will be needed for the different functions the
space will need to be used for; it is possible to hire these in as needed for occasional
use such as weddings as these costs can be built into hire model and this furniture
would not therefore take up valuable storage space as needed for other requirements
7.1.8 Holmewood Space Hire
Holmewood are keen to develop an ‘integrated vision’ with the FoWG in relation to usage of
space within the centre. The building has been designed in such a way that it could
accommodate two separate teaching classes at the same time if necessary although it would
likely be more practical to arrange at different times if can be scheduled as the arrangement
for a moveable wall with open plan roof has reduced sound proofing capability. Holmewood
are interested in developing Adults and Families classes (e.g. ESOL classes, parents support
classes). Some mention has been made of birthday parties but further discussion between both
groups would be needed as to how these might be best accommodated/ charged for.
In principle, in order to support Holmewood’s business development, the FoWG are open to
discussing the use of the Education Centre by Holmewood free of charge for an agreed time
period, after which rental charges would apply at an agreed rate (likely to be discounted)
should Holmewod wish to continue to use this space.
7.1.9 Grants and 7.1.10 Other Fundraising, please refer to Funding Support (Section
12).
Education Centre Feasibility Study Clearview Consulting September 2016 57 |
P a g e
8.0 Market Analysis
8.1 Overview
Much of the detailed breakdown of information gained related to each income stream
(existing and new) is covered in Section 7: Business Planning. Where appropriate, this has
referred to market/product development, pricing considerations and other market related
factors.
Where possible, efforts have been made to establish data upon which to make assumptions
such as the size of the market e.g. number of available schools within each borough and
breakdown by school type for education work stream. Assumptions made are captured against
the individual work stream tabs in the financial forecast presented (Appendix G).
Given the range of income streams explored, and time available in which to complete this
study, in-depth analysis of each area could not be undertaken to full extent. It would be
beneficial therefore, for further market analysis to be undertaken to support new market entry
prior to implementation. By establishing more detailed understanding of the following for
each income stream, a more effective Marketing Strategy can be evolved:
Size of market/potential market share
Customer segmentation
Competitor information (product/pricing/distribution strategies)
Opportunities and Threats (i.e. barriers to entry)
Partnership development opportunities
Any other useful information relevant to each area
For the purposes of this report, the following reviews have been undertaken in relation to
FoWG and the development of the new Education Centre
8.2 PESTLE Analysis to provide an initial environmental assessment
8.3 SWOT Analysis to provide an organizational assessment as to current strengths
and any gaps in need of further development, as well as key opportunities and threats
for business/market development
8.2 PESTLE Analysis
See over page
Education Centre Feasibility Study Clearview Consulting September 2016 58 |
P a g e
8.2 PESTLE Analysis
(Political/Economic/Socialogical/Technological/Legal/Environmental)
POLITICAL ECONOMIC
Brexit; impact of this on market
development as yet unknown
Changes to government and council
funding and policies reduces
available subsidies for community
projects
Grant funding impacted by
legislative changes and the removal
of EU funding
Local policy changes create a
tougher business climate to operate
within
Other local community pressure
groups obstruct potential growth
plans
Exchange rate fluctuations raise the
cost of materials
Recessionary fears lead to lower
consumer confidence and lower
income generation
Well priced activities and
focused marketing lead to larger
volumes of visitors and buyers
Low interest rates and low inflation
supports being able to provide free
and concessionary participation in
activities provided by the charity
SOCIALOGICAL TECHNOLOGICAL
Diverse population in Brixton with
close proximity of affluence and
low income demographics
Established needs of local residents
and park users for a range of
services and activities which
Education Centre could support
Lack of leisure facilities on estate
for older children and growing
family demographic which will see
more teenagers on estate and in
nearby area
Opportunities to grow volunteer
base and potential for work
placement partnerships e.g. HMP
Brixton (ROTL Day Release
offenders)
Advance in interactive teaching
tools and support materials
Milling developments/efficiencies to
be realized
Range of systems which could aid
FoWG delivery (CRM/Invoicing/
Stock Management systems)
Online shop facilities
Modular building options a
consideration
Ongoing maintenance of Windmill
LEGAL ENVIRONMENTAL
Changes to employment legislation
increases operational costs by
requiring the charity to consider
paying for aspects of 'free resource'
it currently or is considering using
Health and safety legislation and
regulation places increasingly
onerous levels of safety on the
Grade II* building considerations
and wider cultural heritage
The loss of green space versus the
provision of other useful/needed
community benefits for the park and
gardens, in the planning application
Sustainable building to BREEAM
excellence rating
Education Centre Feasibility Study Clearview Consulting September 2016 59 |
P a g e
public and operational use of the
windmill to reduce income
generation
Changes to Health and Safety
legislation and building regulations
requires Education Centre/FoWG
to invest in infrastructure upgrades
to remain compliant and open to
the public
Sustainable maintenance of the park
and gardens and garden waste by-
products
Provision of an educational resource
to encourage environmental
sustainability in the young
Ethical pop-up / tenant hire from
local businesses encouraged to use
the space and gardens Safeguarding of new centre against
vandalism/break-in and reported
desire from local park users for
improved park lighting
Added value to be gained from new
communal facilities to be added e.g.
toilets, nappy changing facilities,
pop-up café
Development of any food products
and associated packaging
8.3 SWOT Analysis
See over page
Education Centre Feasibility Study Clearview Consulting September 2016 60 | P a g e
8.3 SWOT Analysis
(Strengths/Weaknesses/Opportunities/Threats)
STRENGTHS
WEAKNESSES
Brixton Windmill is a Grade II* listed building, the only building of its kind in central London and a key heritage asset for the Borough of Lambeth/Brixton
The Friends of Windmill Gardens have been in existence since 2003 and have a proven track record of making improvements to the Windmill and of successfully broadening awareness and growing support for this important cultural asset
With support from Heritage Lottery funding and London Borough of Lambeth, the Friends successfully established an educational programme within Lambeth working with local Cluster of Windmill Schools and other schools within Lambeth
Based on stakeholder feedback, there is high demand for the educational programe to continue/grow
London Borough of Lambeth recognises the importance of growing the educational activity linked to Brixton Windmill and have ear-marked £360K to provide a new educational facility
Established working partnerships with Holmewood Nursery School and Treetop Children’s Centre (adjacent ‘Stay and Play’/One o’clock club) and Blenheim Gardens Residents Management Organisation (BGRMO) will afford shared opportunities to further develop educational related activity which will benefit the local community
(continued over page)
Having to share a building with local Stay and Play Group giving reduced access to the number of days and limited facilities has hindered wider educational development
Educational activity in its own right is recognized as the ‘raison d’etre’ for the new Education Centre – but is not financially self-sustaining so will need to be cross-subsidized by other income streams
Establishing profitable income streams will take time and the FoWG would need to consider introducing a broader portfolio of activity in order to spread risk
Managing a wider portfolio will require new skillsets and gaps exist in business development expertise which would require further external support (funding/upskilling) to enable the FoWG to successfully take developments to the next level
Current resource capacity, while extremely committed, is insufficient to manage/implement new business proposals and resource levels would need to grow in order to ensure future working is operationally and financially sustainable
While the Brixton Windmill brand is extremely strong, there is currently inconsistency in its representation which is diluting its impact and muddying brand positioning
(continued over page)
Education Centre Feasibility Study Clearview Consulting September 2016 61 | P a g e
STRENGTHS
WEAKNESSES
Flour milling has now been introduced and Brixton Windmill Flour
is a high quality, artisanal flour which has been successfully used by
local bakers and others to make a range of bread and related items
Grain used is produced from organic Mulika wheat
Wheat is also grown on site next to the Windmill and the FoWG
work with other parks in the area and local schools who have a
wheat growing programme
The FoWG volunteer network has an extensive breadth of
professional expertise including marketing and communications,
PR, website development and design ensuring consistently
impressive promotion of windmill events and ongoing development
The FoWG events programme delivers high community
engagement and new events such as the Beer and Bread Festival,
introduced as part of the Windmill’s 200th year celebrations, have
been well received; creating opportunities to develop wider
business/community partnerships and introducing new audiences to
the Windmill
The Beer and Bread Festival in particular also established new ways
of using the windmills’ stones to mill barley for the beer and
successfully generated a much more profitable return with higher
levels of visitor donations and new business sponsorship
Overall, the core members of the Executive and specialist working
teams (Sustainability, Parks, Education & Heritage, Events,
Marketing and Communications) are all extremely committed and
active in their support for windmill development and tours/guiding
and milling operations are well managed and delivered to a high
standard
(continued over page)
Scope exists for more efficient working and activity would benefit
considerably from the introduction of system supports such as:
o a centralized CRM system which would support better audience
segmentation, more targeted communications and could
significantly aid ongoing membership development
o an updated website with more flexibility for content
management and greater facility to integrate with enhanced
mailing tools such as MailChimp
o Improved stock control systems to support better stock
management and understanding of merchandising
sales/customer preferences i.e. what is popular/profitable – so
worth buying more of – and what is not (so can divest)
o Improved financial control systems so can track invoicing and
other regular income and expenditure; this will be increasingly
important once new business activity introduced
o NB. These issues are not unrecognized and some work has
begun to address some of these in some areas already
Although quite clearly committed to the success of Windmill
development, the lack of longer term strategic planning and a
‘shared vision’ can sometimes mean that activity is not as ‘joined
up’ as it could be which can result in financial and other operational
inefficiencies
(continued over page)
Education Centre Feasibility Study Clearview Consulting September 2016 62 | P a g e
OPPORTUNITIES
THREATS
Opportunity to create an enhanced educational facility which will
greatly benefit users and add value to local area/residents
This would also afford the opportunity to expand the educational
programme and grow reach to a wider range of schools both within
and outside the Borough as well as introduce classes for
adults/families working in conjunction with Holmewood
Having a recognized visitor centre strengthens opportunities to
develop links with other windmills and cultural centres on a national
and international basis
Changing demographic of the borough is bringing a wider affluence
and extending cultural/heritage support
Community engagement is high > active ‘ownership’ of local area
change and improvement
Potential exists, through continuing growth of resident support, to
work with BGRMO and others in terms of taking on future
windmill maintenance and upkeep of the park (would need to be
negotiated)
Lambeth Council’s continuing commitment to regeneration of
Brixton as a whole and strong support within the Borough for food-
based enterprises and related activity is further strengthened by an
active commitment by LBL to supporting the FoWG and the
ongoing success of the Education Centre
Having a permanent educational base will allow the FoWG to
consider development of other beneficial projects which could
attract external funding to develop much needed systems and skills
development (refer also to Section 11 ‘Capacity and Capability
Planning’)
(continued over page)
Finite budget; £360K may limit building options which can be
delivered
Grade II* listed building carries more stringent considerations in
terms of building in surrounding area
Planning permission; in addition to listed building considerations,
review will need to be mindful of policy around loss of public open
space which any further development of the park could result in
Design Team are over ambitious and proposals are unrealistic or
unachievable within existing budget
Failure to ‘future proof’ building design leads to inability to
maximize service delivery
Future changes in local authority unduly impact rental/other tenancy
conditions (should be mitigated by putting in place SLA agreement)
Income/growth is slower than forecast; FoWG are unable to realise
sustainable revenue streams/ongoing operational costs and
maintenance cannot be met
Time/other delays erode existing educational contact base
Capability and/or capacity to run the planned educational centre is
insufficient
Reliance on volunteer pool may be hindered if volunteer pool
diminishes and/or new skills base not developed
Failure to put in place necessary succession planning could result in
loss of leadership at critical period of change
Education Centre Feasibility Study Clearview Consulting September 2016 63 | P a g e
OPPORTUNITIES
THREATS
Feasibility exercise has indicated that market demand for provision
of Brixton flour on a wholesale basis already exists and strong
potential exists for wider partnership development for flour sales as
well as extended service offerings such as baking classes
Public consultation supports the wider benefits the introduction of a
new Education/Visitor Centre would bring at different levels – high
degree of interest in all of the new Education and other service
activities listed (refer to section 6) as well as general support from
residents and regular park users for facilities which do not currently
exist including access to public toilets, nappy changing facilities,
provision of park refreshments (via pop-up café), better lighting in
the park at night and improved park landscaping
Development of an online shop would afford the opportunity to
widen access to FoWG merchandising and could help extend reach
Initial discussions with HMP Brixton suggest the possibility of
working partnership/s between The Clink Restaurant and Bad Boys
Bakery with the FoWG/Education Centre;
This could create much needed local work placement opportunities
for Day Release and ex-offenders whilst also offering access to a
(free) resourcing for milling, gardening and pop-up café
Education Centre Feasibility Study Clearview Consulting September 2016 64 |
P a g e
9.0 Marketing Strategy
A full Marketing Strategy has been identified as one of the ‘Next Steps’ in proposed Action
Plan outlined in section 15.
For the purposes of this report, an introductory outline has been included to indicate what this
typically might cover:
9.1 Product development; existing, new, product extensions
9.2 Pricing strategies; adapted for market penetration/growth, consider profit margins, any
repeat purchase and concessionary discounting
9.3 Place; channel/distribution strategies – postal, online, physical carriage
9.4 Promotion; marketing and communications, campaigns, promotional channel strategy e.g.
advertising, mail/e-mail, events, website, social media etc.
9.5 People; staffing, dependencies
9.6 Processes; system supports
9.1 Product Development and 9.2 Pricing
Outlined individually in more detail in section 7.2, the following shows the proposed product
portfolio for the FoWG moving forward, with indications of how these products might fit
together and how they might be positioned accordingly within the market.
The illustrative size of the work streams indicates income stream priority and anticipated
higher/lower volume of activity. This is not indicative of anticipated income levels which
might differ significantly (for example, education programmes are ranked as the highest
priority overall but anticipated that flour and baking classes will generate higher income).
Education Centre Feasibility Study Clearview Consulting September 2016 65 |
P a g e
9.3 Place/Distribution
Channel strategies would need to be devised across all of the above with particular
consideration to be given to flour deliveries (retail and especially wholesale), merchandising
extension (via pop-up shop in Education Centre and development of an online shop) and
wider partnership development for pop-up café, community hall hire and wedding venue
development.
9.4 Promotion
In addition to current marketing and communications activity, targeted campaigns would be
needed to ‘launch’ new products and further development of online and offline marketing
materials would be required.
Consideration would need to be given to:
Customer/Audience segmentation and key messages
Most appropriate way to reach identified target groups
Development of a more efficient CRM system which would allow more integrated
records and data management
Opportunities to ‘piggy back’ existing or partner communications to save cost and
extend reach
9.5 People and 9.6 Processes
These are covered in more detail in Section 11: Capability and Capacity Planning
Education Centre Feasibility Study Clearview Consulting September 2016 66 |
P a g e
10.0 Brand Development
Again, development of a future-facing brand development strategy is included as part of
‘Next Steps’ Action Plan in Section 15.
Different view-points are held regarding brand development, many see this as the visual
identity – the logo, ‘look and feel’, corporate image. Brand development in its truest form in
fact reflects every touch point across the organisation – so can include customer experience,
an organisation’s ‘values’, its strategic mission and vision. Everything an organisation does
should be aligned with what its overall brand vision and mission are.
Currently, the FoWG have a collective set of aims but could benefit from shaping this in a
way where there is an agreed FoWG “story” which can be consistently reflected and
promoted by all. The Brixton Windmill brand is strong, it represents an important part of
Brixton’s cultural heritage and is generally acknowledged as a high quality, artisanal brand
which more naturally occupies a niche rather than mass market position.
One key point to be raised within this report for further discussion is the critical importance of
ensuring that the integrity of the Brixton Windmill brand is protected at all times and the vital
role this will play in future business development.
In terms of visual identity, the FoWG greatly benefit from professional and well produced
materials and merchandising and promotional activity is good. In recent straw poll testing
amongst both local businesses and the residential market, feedback indicated that the simple,
‘rustic’ representation of the windmill was more in keeping with the windmill’s roots and a
simple, unfussy characterisation which is ‘clean’ and impactful was seen to be more powerful
than the multi-coloured text labelling which has been used on some 500g flour bags.
Original Later Designs
While these designs are professionally executed, they do not communicate the organic
‘artisanal’ qualities which are the brand’s strengths and current packaging appears more to be
mirroring high street labelling which is the wrong fit for Brixton Windmill Flour.
It is recommended that, as part of organisational/brand development going forward, a more
formal brand evaluation exercise be undertaken and development of key organisational
mission, vision and the ‘Brixton Windmill story’ be developed. The latter could be
reproduced on the back of flour bags, reinforcing the FoWG message more strongly – and
consistently – as the Brixton Windmill portfolio increases and more activities are introduced.
Education Centre Feasibility Study Clearview Consulting September 2016 67 |
P a g e
Stage 2: Capability and Capacity
Planning
Education Centre Feasibility Study Clearview Consulting September 2016 68 |
P a g e
11.0 Resourcing: Capacity Planning and Capability Analysis
11.1 Aims
To undertake an assessment of the strengths of FoWG and others who may be able to
input voluntary efforts
To inform options appraisal and business planning as well as any final
recommendations on governance and volunteer support/staffing
11.2 Methodology
To review existing skills and resourcing and to assess against identified future activity:
To scope the governance, management and staffing/volunteering needs of the new,
proposed sustainable social and education activities
To create a skills, time, capacity and motivation matrix of what is needed for success
This will be done by:
Completing an audit of skills, time and motivation of the known and likely personnel
available to make the Education Centre work; this will start with updating existing
audit work undertaken by the FoWG
11.2.1 Skills
This will include at least four types of skill:
Management, Leadership and Quality Systems Implementation
People skills, with colleagues and with the users and public
Community activism, social entrepreneurship, attracting support including funding
Necessary task skills e.g. café management, communication, IT, fundraising and office
management skills
11.2.2 Time
The time part of the audit needs to be realistic when it comes to reliance on voluntary efforts
in a complex urban situation.
Any additional business element will require considerable additional work – even if an
outsourcing arrangement is made.
11.2.3 Motivation
The motivation analysis is also vital as it cannot be assumed that the people who give up their
time to work with schoolchildren or as mill guides for example will also want to be
responsible for running a business and/or managing a building.
On the other hand, there may be new people attracted by the different skills needed.
Education Centre Feasibility Study Clearview Consulting September 2016 69 |
P a g e
11.2.4 Output
A matrix diagram will be produced identifying the strengths and weaknesses of the present
arrangements and how any gaps may be filled. This could be by upskilling, recruitment, re-
prioritising existing efforts, outsourcing and partnership working.
As above, this work stream will also outline proposed governance structure and management
roles and responsibilities, staffing structures, proposed organisational changes including
partnerships and potential partnerships, and define policies that would need to be developed
for the preferred option or options.
11.3 Key Findings and Recommendations
This section uses data from surveys, observational analysis and recent track record to assess
the capability and capacity of the FoWG for the new business plan and building.
It finds that while the group does have the capabilities and motivation needed at this point,
there does need to be a programme of preparation for the new building and the social
business.
There is good evidence of latent capacity that can be drawn on from both the survey work
undertaken by Clearview and from the currently under-tapped membership. However, there
needs to be a step-change in approach which means focusing more for the next two years on
systems, reporting, upskilling volunteers, marketing etc. as set out in the tables below.
One approach would be to consider reducing the number of events which take up a lot of
energy and effort; initial feedback from the FoWG however is that this is an area which the
FoWG feel should be maintained as events generate awareness, community engagement,
membership/volunteer recruitment and fundraising.
Nevertheless, some streamlining will still be needed to ensure energies are optimised on
activity which generate sufficient return and it may be necessary to supplement volunteer
resource with some paid for resource support in the short-medium term while new skills and
expertise is acquired.
If this approach is followed, the FoWG will meet the new challenges by better deployment of
resources rather than by sheer numbers of volunteers which could introduce instability at a
time of key change
11.3.1 Headlines from the Potential Volunteer Survey
Of 46 volunteers, 46.3% (19) answered that they would consider increasing their
volunteer time once the Education Centre opens
42% (23) of those who said they do not currently volunteer said they would be
interested in volunteering in the future
In areas where there would be a need for increased volunteer resource, 8 said they
were interested in training to be a tour guide, 4 said they were interested in training to
be a miller, 3 said they would like to offer business planning/finance support and 3
are interested in fundraising
Of those interested in volunteering, 12.5% (4) said that they could volunteer once or
more than once per week, 25% (8) said they could volunteer once per month and
37.5% (12) said they could volunteer whenever there is an event
Of those respondents currently volunteering, 28% (16) would like to do more
Education Centre Feasibility Study Clearview Consulting September 2016 70 |
P a g e
42% of those who don’t volunteer would be prepared to volunteer in the future
(equalling 23 people)
10 potential volunteers are prepared to do baking
8 potential volunteers are prepared to do gardening
Various questions relating to frequency confirm that there is positive support for both
regular monthly/weekly volunteering and also for events
There is no specific evidence that volunteers wish to be available for daily
volunteering so a growth business model would need to allow for some paid staff
resource if the building is to be used most days of the week as planned
11.3.2 Headlines from the Survey of Current Trustees’ and Group Members’ Skills
and Experience
This shows a high degree of expertise among a large voluntary leadership group. It is
unusually strong in so far as all of them have considerable relevant expertise. The benefit of
this is that the organisation can deal competently with a wide range of activities. (Refer to
Table in 11.3.2.1 below)
However, the new building and social business will need focus and prioritization and the
tables below (11.3.2.2 and 11.3.2.3) suggests how the strengths of the current groups can be
used to best advantage. Some gaps are also identified which need to be worked on as part of
the preparation for the future. It is vital to understand that an enterprise requires a different
structure and approach from a general voluntary group. The main differences being the need
for entrepreneurial flair to show through, while remaining accountable, and the need for a
concerted strategic approach to the income and expenditure which introduces another
dynamic.
11.3.2.1 Table Illustrating Skills/Experience of Trustees
Skills/Experience from Snap Shot Survey of Trustees (Supplied by FoWG)
Architect specialising in restoration of
historic buildings
Treasurer of Brixton Forum
Active member of Brixton Society
Engineering background
Completing accountancy training–
level 2
Retired associate lecturer
Long-time community activist
MA in Art History
Director at Makerhood, Established
Flextiles for her creative felt and
fabric work
Independent editorial consultant and
director at Write Expression Ltd,
Website development (specifically
Wordpress), social media,
commissioning and editing,
journalism
Degree in Biochemistry
Trained Art teacher. Currently
working full time on Kennington
Flower Garden HLF project.
Previously worked on Brockwell
and Hanwell Lido projects
Developed the Windmill
Education workshop programme
working closely with the
Windmill Cluster of schools.
Worked with Camila Cardenosa
on the Windmill Mural in
playground.
BGRMO Chair of board
Lambeth Housing worker
Long-term resident of Blenheim
Gardens
Former charity fund raiser
Former FoWG Exec member
(pre-restoration), now has own
Electrical engineer business
Very experienced costume
designer for film and stage; Won
Education Centre Feasibility Study Clearview Consulting September 2016 71 |
P a g e
Works full time. Part time Maths
teacher, passionate about astronomy,
photographing nature. Science /
Maths Msc
Musician, member of No Frills Band,
regularly plays at windmill events
Retired, has worked for a disability
organisation. Wrote text of our new
guide book, organising/editing the
history of the Windmill in 16 objects
project. Attended training at Mills
Archive; Keen to develop our archive
Self-employed designer; previously
worked primarily in magazine
design/typography; Experienced in
liaising with printers and production
companies
Recently retired from working at Big
Lottery Fund
Has experience of writing and
checking funding bids
Experienced journalist;(30 years’
magazine editing). Also has financial
bookkeeping experience
Emmy for Lion in Winter
costumes
Installation Artist, has own PR
company
Active in Wheels for Wellbeing
& Friends of Brockwell Park
Trained Blue Badge Guide
Former Lambeth Councilor 1980s
Former university teacher, fluent
in French, German & English
some Italian
Former Lambeth Community
Area officer,
Currently works full time for
Islington Council.
Active member of Brixton
Society and organises Friends of
Windrush Square
IT specialist (currently
unemployed)
Freelance graphic designer, has
experience of working in
museums
Retired youth worker, native
Italian speaker
11.3.2.2 Governance, Skills, Capacity and Motivation Analysis and
Recommendations (Detailed Action Plan) – please see over page
11.3.2.3 Key Skill Groups Matrix – this follows on from table above
Education Centre Feasibility Study Clearview Consulting September 2016 72 | P a g e
11.3.2.2
Stage 2 - Capability and Capacity Planning – Skills, Time and Motivation Audit Analysis: Recommendations and Detailed Actions
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Overall Charity
Accountability,
Liabilities and
Reporting.
Risk
Management
and
Safeguarding
AGM
General
meetings
Executive
meetings.
Management,
Leadership and
Quality Systems
Implementation/Y
es however a Full
Cost Recovery
model will need to
be developed if
HLF are to be
applied to.
Trustees may need
training/refresher
on this.
Yes, but need to
consider
succession
strategies so that
gaps don’t
emerge at crucial
times.
There are
many strongly
motivated
leaders/potenti
al leaders.
Need to ensure
that they are all
aligned to the
new Business
Plan.
Consider
limited
company or
similar status to
protect Trustees
from most (not
all) personal
liability risks.
Ensure
safeguarding
policies are in
place and in
practice.
Consider for all
partnerships the
level and type
of partnership
agreement
needed.
Governance
review to
consider some
form of
charitable
limited
company or
otherwise
achieve limited
liability.
A Full Cost
Recovery
model
Ensure that
structure
enables the
social business
to be well run
without losing
the community
charitable
ethos.
Ensure that the
whole
organisation has
bought into the
new plan and
each group
understands its
role.
Ensure that all
activities are in
pursuit of
charitable
objectives.
For building
opening ensure
that the Trustees
are prepared -
may well need
training and may
need to co-opt
people?
Suite of
partnership
Education Centre Feasibility Study Clearview Consulting September 2016 73 | P a g e
agreement
documentation.
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Mentoring for
the Trustees
n/a No, needs to be
independent
No, needs to be
independent
n/a Supporting
strategic
leadership
HLF Resilient
Funding would
provide this
Identify key
leaders
Sustainability of
the Charity and
its Activities.
Sustainability
group
Yes
There is an online
Resilient Heritage
strength checker
that can be used.
3 potential new
volunteers would
like to do
fundraising.
As above, there
are a lot of good
people serving –
need to plan their
roles into the
future.
As above – no
shortage of
motivation but
may need to
balance
breadth/freque
ncy of
activities/event
s against
freeing up
existing
volunteer
resource /
influx of
potential new
(events)
volunteers.
Fundraising is
still time
intensive and
some external
support may be
needed for
Meetings with
this group and
evidence of
experience
suggest that this
is a strong
group but is all
voluntary work
Online Resilient
Heritage
strength checker
Capacity to
support
sustainability
work e.g.
fundraising.
Formal record
to be kept of all
voluntary
efforts for
match funding
purposes
Prepare a
fundraising
strategy.
Start a formal
process of
considering the
longer term
questions of
managing park
and windmill.
Identify/strengthe
n both existing
and new
partnerships with
BGRMO, LBL,
HMP Brixton and
others to support
this.
Education Centre Feasibility Study Clearview Consulting September 2016 74 | P a g e
immediate
needs.
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Social Impact
Analysis
n/a No Needs time
bought in from
specialists
Yes, within the
Sustainability
Group
Need to be able
to demonstrate
Social Return
on Investment
in the language
that funders
speak.
This could be
funded by the
HF Resilient
Fund.
Need firm targets
and monitoring of
SROI (social
return on
investment) and
an Evaluation
policy.
Financial and
Data
Management
and
Accountability –
Business
Management
and
Development
Executive
Group
Partly
The current
Treasurer is
upskilling and
more of the FoWG
may need to
deploy or learn
skills around
business
accounting/invoici
ng etc.
3 potential new
volunteers would
like to do this
and this should
be a priority to
engage and
retain these if
they are suitable.
As business
increases
capacity and
capabilities will
need to be
increased.
External
support to
realise the
business
development
will be needed.
Buying in
professional
accountancy
support on a
part-time basis
to be considered
Governance
review to
consider if right
mix of skills
for an emerging
significant
social business.
Professional
book-keeping
capacity will
almost
certainly be
needed.
Reserves policy
Clear and
auditable
protocols for Gift
Aid
Business
development plan
to align with
marketing
strategy.
Risk management
and insurance
policy
Cash handling
and security
Education Centre Feasibility Study Clearview Consulting September 2016 75 | P a g e
Data Protection
policy
Customer
complaint
handling process
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Staffing, Paid
and Voluntary
The previous
Education
Development
Officer was
managed by
Lambeth
Council but
worked in
collaboration
with the FoWG
Executive
A volunteer
strategy is in the
pipeline.
Areas where some
paid part-time
resource has been
identified include
Education
Development
Officer,
professional
accountancy
support, cleaner
for the building.
These might be
contract-
based/self-
employed roles to
help contain costs
and/or ‘bought-in’
resource which
may be needed to
support particular
activity (e.g. end
of year accounts).
Ensuring that both
Capacity is
available to
manage part-time
staff but a clear
policy/ practice
note will be
needed as to
managing the
staff over the
working week.
While the Chair
will remain the
key anchor
person of the
organization, it
may be that
responsibility for
day-to-day line
management
shifts to another
member of the
team with a
wider remit for
There is a high
level of
motivation on
the Executive
and with other
volunteers for
the Education
worker who
will
undoubtedly
receive strong
support as
previously.
The
Sustainability
group is
motivated
towards having
a business
development
worker and
will no doubt
work well with
The FoWG will
also need to
build into their
thinking the
roles of cleaner
and bookkeeper
ensuring that
the roles can be
deployed well
without
resultant
diminishing of
the voluntary
efforts.
Personnel
policies need to
be developed
and a training
needs
assessment
should include
consideration
of personnel
management.
HR policies
needed e.g.
Living Wage;
Health and
Safety; Lone
working; Manual
handling; Display
Screen.
Equalities policy.
Volunteer
strategy may need
reviewing
Policy on
training.
Education Centre Feasibility Study Clearview Consulting September 2016 76 | P a g e
paid and volunteer
workers have
clearly defined
roles with clear
lines of decision
making
(empowerment)
and accountability
and will be
important to
facilitate
operational
efficiency as well
as personal
motivation.
In addition,
consideration will
be needed as to the
ongoing
management of
trading activity
and overall
business
development. It
may be that in
early start-up
years, this resource
is best ‘bought-in’
to focus on
creating a joined-
up business
managing
voluntary/paid-
for staff.
This could be as
the result of
upskilling
existing
volunteer Exec
members or via
creation of a new
post as part of
combined
Trading
Operations
management
that post-
holder.
Education Centre Feasibility Study Clearview Consulting September 2016 77 | P a g e
development and
wider resourcing
pool; this resource
might be funded
through HLF
Resilient funding.
While some
thought has been
given to an initial
governance
structure, there is a
marked step
change required in
operational
working and
current reporting
timescales have
been somewhat
prohibitive in
allowing for more
detailed
development of
this with wider
Friends Group.
Much closer
working with the
existing Exec as to
best method for
integration of
commercial
Education Centre Feasibility Study Clearview Consulting September 2016 78 | P a g e
expertise into
governance model
and how this
would best work
alongside
volunteer decision
makers is yet to be
fully agreed at
time of report
submission.
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Education Work Previously
Executive
Excellent current
level of research
and understanding.
6 potential new
volunteers would
like to do this but
still there is an
absolute
requirement for
at least a part-
time paid
education
worker.
Strong
motivation
needs to
include all the
back-up
systems to
administer an
increasing
workload.
This does not
mean simply
loading
existing
volunteers with
‘more work’;
while there has
been some
commitment
given by
Prepare for
increased admin
requirement
ensuring that
income is
collected in a
timely manner,
records need to
be accurate and
updated on a
regular basis,
and feedback
(positive/ other)
kept to inform
ongoing
developments
Worker should
be self-
administering
but
voluntary or
paid admin
capacity would
allow for
further growth.
Policies on
charging and on
safeguarding.
Strategy for
Education market
development
(inside and
outside Borough)
Education Centre Feasibility Study Clearview Consulting September 2016 79 | P a g e
existing
volunteers
towards
increasing the
frequency/volu
me of time
spent
volunteering
(online
survey),
emphasis will
be placed on
the need to
recruit a paid
for Education
worker and a
wider
volunteer pool
to help service
increased
requirements
elsewhere such
as week day
tours and
additional
milling activity
Education Centre Feasibility Study Clearview Consulting September 2016 80 | P a g e
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Heritage The windmill is
the
responsibility of
LBL
Experienced
technicians are
brought in by LBL
There is a good
supply of trained
tour guides and an
ongoing
programme of
training.
10 potential new
volunteers would
like to do either
local history or
mill tour guiding.
The windmill
itself is the
motivation for
the FoWG
work but there
is limited
motivation for
being
responsible for
it at this stage.
Clarity around
LBL rental
position (e.g.
possible offset
of peppercorn
rental against
FoWG taking
on windmill
maintenance
from 2020
could be
financially
beneficial to
FoWG while
returning
added value to
LBL)
A feasibility
study would be
needed on any
proposal to
transfer
responsibility
for the windmill
to the FoWG.
A service level
agreement
(SLA) would
need to be put
in place
between LBL
and FoWG if
FoWG were to
take on future
windmill
maintenance
The building
will open up
many
opportunities
for heritage
talks and
activities.
Visual access
for those with
disabilities e.g.
CCTV cameras
could be
considered.
A project plan,
conservation plan
and an
Audience
Development
Plan may be
needed for HLF
funding.
Education Centre Feasibility Study Clearview Consulting September 2016 81 | P a g e
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Events The Events
Group
Group contains
highly skilled,
networked and
motivated
organisers
12 potential new
volunteers would
like to help with
these as well as
the dozen or so
who already help
run events
There is strong
motivation
through FoWG
that events are
important and
must be
successful.
Events are a
key channel
for raising
awareness,
securing new
membership
and donations
and generally
effecting wider
community
engagement
The events do
require “all
hands on deck”
which can cause
stress
The new
building will
reduce the
reliance on
events to some
extent as there
will be a
permanent
presence within
the park
Fewer events
may be needed
as the FoWG is
established
with regular
opening and
wider trading
etc.
Strategic
review of
which events
prove to be
more
successful in
terms of
community
engagement
(attendance),
growing brand
reach (new
membership
sign up, new
volunteers
added etc.)
and/or
profitability/
income
generation
(donations,
Events strategy
Tighter
measurement and
tracking of
income
generated/cost of
event, sales and
merchandising
stock control,
audience
participation
Education Centre Feasibility Study Clearview Consulting September 2016 82 | P a g e
flour/other
merchandising
sales)
Vital not to
overstress
volunteers.
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Trading
Including
Milling Flour
Executive Excellent ideas,
enthusiasm and
work
4 potential new
volunteers would
like to train as
millers
Caution needs to
be applied to any
business
assumptions
about the growth
of milling and
other trading as
maintaining the
quality of flour
produced will be
critical and will
need to ensure a
regular milling
resource is
possible to
achieve desired
quantity levels.
There is a high
motivation
among the
friends to
undertake
milling as a
heritage/
education and
revenue raising
activity
Will need
trading systems
and protocols
(e.g. agreeing
profit margins).
May need
trading
subsidiary?
Governance
review to
consider if a
trading
subsidiary is
needed both for
focus and to
meet Charity
Commission
guidance.
Physical shop
in Education
Centre will
afford wider
access to
Friends
merchandise
and support
brand extension
Online shop
will increase
Review needed
for separate
trading
subsidiary, set
clear ethical
trading policies.
Ensure all
legislation
including food
hygiene policy
includes all
aspects as well as
home produce.
Need stock-
keeping policy
including any
‘sell by’
requirements for
flour and any
other perishable
sales goods
Education Centre Feasibility Study Clearview Consulting September 2016 83 | P a g e
reach and sales
opportunity
when
Education
Centre closed
System
capability
required to
better manage
sales recording
and inventory
stock control
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Facilities
Management
(FM) and
General
Administration
Currently ad hoc
arrangements
are made by the
Chair or
different
organisers to use
the windmill
and one o’clock
club (Stay and
Play)
Systematic
approach to FM
for new building
will be required.
A wide range of
skills is available
both from within
the group and
BGRMO and these
need to be
documented.
For some grant
funders such as
HLF there are
procurement
requirements that
4 potential
volunteers are
interested in
doing
administrative
work.
The capacity and
time should be
available for the
voluntary roles
and the budget
should be
available for the
paid roles.
The Executive
and
Sustainability
Groups are
strongly
motivated to
the building as
an essential
element of
growth and
sustainability.
There is a
strong
motivation to
use and
A regime of
management
needs to be put
in place and
owned at a high
level.
Building hires
will need to be
proactively
marketed and
managed as it is
one of the main
sources of
regular
discretionary
income.
In the
governance
review, a
building
management
group should
be considered
and both
finance and
volunteer time
budgeted for
the medium
and long term.
FM manuals for
staff and hirers
will be needed.
A building hire
and charging
policy will be
needed with a
scale of charges
for community
and other use.
Policies on use
and terms needed
e.g. for alcohol
consumption;
opening and
Education Centre Feasibility Study Clearview Consulting September 2016 84 | P a g e
need to be
understood and
met
support local
providers.
closing times,
cleaning charges,
religious/ political
uses
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Communications
Consultation and
Marketing
Communication
s Group meets
regularly to plan
and implement a
wide range of
successful
communications
Surveys of users
have been
conducted by
the FoWG
The group
continues to
increase its skills -
for example 2
members attended
archive training in
2015.
The work on the
Brixton Windmill
brand shows that
the group is skilled
for the new
business but may
need to consider
streamlining core
activity to avoid
brand dilution.
10 potential new
volunteers would
like to help with
this in addition to
the active and
successful
volunteers
currently
covering many
aspects of this
well.
Discussions
indicate a great
enthusiasm and
commitment to
developing the
range of
communicatio
ns including
the Brixton
Windmill
brand.
Internal
communications
plan to engage
existing
volunteers and
to secure buy-in
to new business
approach will
be critical to
success of
business
venture.
Communication
s with members
could be
improved to
increase
sustainable
income.
Data held on
various
different
databases leads
to duplication
Crowdfunding
and similar
popular appeals
may be the way
forward and
this would
revolve around
how the
Friends
communicate
the cause.
Development
of the FoWG/
Windmill
‘story’ needs to
be crafted for
inclusion on
promotional
material and on
flour packaging
to reinforce the
brand.
Current CMS,
while adequate
Reports of all
consultations and
surveys should be
kept with
evidence of how
they have
influenced plans
or service
provision.
Overarching
marketing
strategy will be
needed including
brand
development/
growth policy
Education Centre Feasibility Study Clearview Consulting September 2016 85 | P a g e
and inefficient
contacts
management.
Ongoing user
feedback
systems should
be developed
as a website, is
stubbornly
inflexible. A
different
system e.g.
Wordpress
would allow
integration of
mailing records
with a mailing
system such as
Mailchimp as
well as
allowing a
much more
flexible
website.
Centralised
CRM system
would enable
enhanced
audience
segmentation to
support more
targeted
communication
s and facilitate
better records
management
Education Centre Feasibility Study Clearview Consulting September 2016 86 | P a g e
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Environmental
Impact
n/a Yes, principally No, bringing in
independent
expertise may
ensure a system
is set up which
can then be kept
running,
n/a n/a Most
significant
funders will
want to see
measurable
outcomes in
place.
A Transport
policy (for the
planning
application) and
an environmental
policy will be
needed.
Park, Gardening
etc.
Park Group This will need to
be reviewed if
ultimately there
may be the
prospect of the
FoWG taking
responsibility for
the Park upkeep.
(NB. This has not
yet been agreed at
time of report
submission)
Depends what is
proposed;
outsourcing to
BGRMO may be
one way forward
if this were to
happen.
Utilisation of
‘free’ resource
e.g. HMP
Brixton Day
Release and/or
increased
volunteer
resource
Well motivated
growing fruit
and wheat as
well as
organizing jam
making
workshops.
8 potential
volunteers
have indicated
that they
would like to
do gardening.
Park upkeep
should not be
confused with
the current
exercise.
n/a at this
stage; To be
revisited within
3 years once
building in
place.
Agreed SLA
(service level
agreement)
needed if to be
adopted.
n/a at this stage
Membership Executive The skills are
available but the
focus has been on
inclusion rather
than integrating it
into the overall
Membership
review is needed
to explore
income
generating
potential.
Membership
has not been
regarded as a
core business
element to
date.
Need a
membership
strategy to meet
business plan
targets as well
as inclusion.
Membership
admin system
which supports
renewals;
introduction of
direct debit
Payments
Membership
strategy and
policy on fees and
membership rules
Direct Debit
policy
Education Centre Feasibility Study Clearview Consulting September 2016 87 | P a g e
development of
FoWG.
Membership
benefits review
Theme Current
Governance
Skills
Needed/Available
Capacity/Time
Available
Motivation Points to
Address
Future Needs Governance
Review Tasks
Legal Issues Executive Limited More legal
support needed
n/a - Lease Terms
- Consumer
Law
- Health &
Safety
- Safeguarding
- Contracts
Could apply for
pro bono
support
Need external
advice and
support
Education Centre Feasibility Study Clearview Consulting September 2016 88 | P a g e
11.3.2.3 Key Skill Groups Matrix
Key Skills matrix Management, Leadership
and Quality Systems
Implementation
People Skills, with
Colleagues and with the
Users and Public
Community Activism,
Social Entrepreneurship,
Attracting Support
including Funding
Necessary Task Skills e.g.
Café Management,
Communication, IT,
Fundraising and Office
Management Skills
Current Assessment Strong, multiple leadership
figures exist leading to
current high levels of
success.
The FoWG are very
successful at attracting both
volunteers and members.
There are however the usual
tensions and personality
difficulties that all such
groups face. Some of this is
attributable to there being so
many different activity
streams all run by
volunteers.
There clearly are Trustees
with experience of both
business and fundraising and
with a social emphasis.
The FoWG does achieve a
remarkable amount with few
resources at present.
However, this needs further
development as current
limited number of people
with these skills places
undue pressure on a few;
clear succession planning
important to ensure
continuity and continued
strong leadership for the
future.
Development of enhanced
administrative systems will
be needed to enable greater
efficiencies of working and
optimization of available
resource.
Education Centre Feasibility Study Clearview Consulting September 2016 89 | P a g e
Key Skills matrix Management, Leadership
and Quality Systems
Implementation
People Skills, with
Colleagues and with the
Users and Public
Community Activism,
Social Entrepreneurship,
Attracting Support
including Funding
Necessary Task Skills e.g.
Café Management,
Communication, IT,
Fundraising and Office
Management Skills
Future Needs Trustees will need to
increase emphasis on
systems as workload grows.
The business plan is a
chance to rally around the
core activities and take stock
of how all the different
energies can be best
deployed.
A Trading Group is
recommended to focus on
the social business with the
twin aims of delivering a
social return and raising
funds for the charity’s
activities.
The building and social
business require a new order
of accounting, reporting and
forecasting (though in some
respects they will make the
tasks more manageable).
Actions Needed to Meet
Future Needs
Ensure systems are designed
and operated to ensure that
business plan targets are
met.
Trustees should visit
successful social businesses
to learn about leadership and
management in a social
business context.
Mentoring support would
help the Trustees embrace
the changes needed.
There is a need to ensure a
much needed balance is
sought between maintaining
the charitable, community
focused ethos versus ability
to operate a business in a
financially sustainable way.
Need to review the make-up
and responsibilities of
Executive Group to ensure
correct level of decision
making; may require a core
group to include key
individuals who “own” the
building issues and who run
the trading operations,
supported by a range of
operational working groups
as at present
Further review
recommended for FoWG of
this area working with
external mentors and
specialist business
development expertise
Education Centre Feasibility Study Clearview Consulting September 2016 90 | P a g e
Key Skills matrix Management, Leadership
and Quality Systems
Implementation
People Skills, with
Colleagues and with the
Users and Public
Community Activism,
Social Entrepreneurship,
Attracting Support
including Funding
Necessary Task Skills e.g.
Café Management,
Communication, IT,
Fundraising and Office
Management Skills
Risks Too many competing
activities when
implementing new building
business plan;
training/upskilling of
existing volunteers and
injection of new resource
with specialist expertise will
be key to successful business
plan implementation.
Succession planning for all
key posts will be needed for
this crucial period of change.
Our surveys show that there
is huge support for the
Windmill and proposed new
activity
The FoWG need to set aside
the time and ensure the
systems in place to support
the successful introduction
of new/ongoing activity as
the building offers great
opportunity for engagement.
However, it is suggested that
the FoWG introduce a
phased approach to the
introduction of new activity,
allowing time to build skills
and resource needed; initial
focus on ensuring essentials
needed are in place while
also allowing some spare
capacity to prepare for the
next challenge/s will be
critical to success.
A key risk is losing the
FoWGs’ strong community
activism in a drive to
becomes a “safe” business.
This can be mitigated by
having a strong Executive
group with clear Social
Return on Investment targets
alongside focus on ensuring
robust finances; business
commercial activity should
underpin charitable aims
Must avoid drifting into the
new roles without adequate
preparation and thinking
about how these crucial
elements are planned and
how they need to interrelate.
Mitigation: Ensure clearly
defined business roles are
identified early on in
business development
process and steps taken to
introduce necessary resource
and/or upskilling of existing
resource as needed.
Education Centre Feasibility Study Clearview Consulting September 2016 91 | P a g e
Key Skills matrix Management, Leadership
and Quality Systems
Implementation
People Skills, with
Colleagues and with the
Users and Public
Community Activism,
Social Entrepreneurship,
Attracting Support
including Funding
Necessary Task Skills
e.g.Café Management,
Communication, IT,
Fundraising and Office
Management Skills
Likelihood of Success The new building and
business plan are key to
what the FoWG have been
working towards for a
decade. The facilities will
make operations much
easier.
There is a very high chance
that the building and FoWG
generally will succeed.
The new building and
business plan offer the
solutions to many of the
difficulties that the FoWG
already face and currently
overcome with some
difficulty.
The building will become a
central ‘hub’ enabling
enhanced interaction with
the community and wider
partners and stakeholder
groups.
Given the background and
experience of those involved
it is likely that the FoWG
will succeed.
Care will need to be taken
that they do this is in a
proactive and structured way
and avoid constant tension
between objectives
(common in these
situations).
FoWG early engagement
and involvement in co-
developing the proposed
business approach will be
vital to securing wider buy-
in across the FoWG group
Provided there is a
structured approach to these
tasks there is the capacity
and capability to do this.
A strong Executive must
make this a priority both
before the building opens
and thereafter.
External business mentoring
may be needed.
Education Centre Feasibility Study Clearview Consulting September 2016 92 |
P a g e
11.4 Conclusions
Conclusions drawn from the survey and from the business planning work in consultation with
the Sustainability and Executive groups indicates as follows:
There is a strong and competent volunteer force at present including leadership, however they
are stretched by having an intensive activity programme and lack of a proper base where
things can be stored, organized and run from.
More volunteers will be needed for the building and a growing work programme and there is
firm evidence that this can be forthcoming. However, to avoid the risks of over-extending the
capacity to govern, manage and run the proposed programme, consideration may be needed to
temporarily reduce the number of volunteer intensive and time consuming events so that there
is headroom to focus on quality and core business.
Alternatively, given the importance to the FoWG of community events – and given the
indicated interest of ‘new’ volunteers in contributing to events’ delivery - it could be that
some responsibility for these passes to new volunteer resource, which would support the
continuation of certain key events, freeing up established volunteer resource to focus on wider
strategic planning as needed.
There is a heroic approach to volunteering, keeping some remarkable things going against all
the odds. This should be balanced with an emphasis on the importance of the mundane day to
day tasks that a trading charity with a building will need to prioritise.
There has been remarkable longevity of the key figures’ involvement. However, times of
step-changes in activity such as will be needed for the next phase of development for the
FoWG may also see some key people choosing to move on so succession planning for key
posts will therefore be vital.
Volunteers should be valued and also value each other – this does not come naturally and
support needs to be sought for preparing a volunteer strategy which should include proactive
efforts to ensure that volunteers feel rewarded and support each other with positive messages
and actions.
The overall conclusion is that there can be a high level of assurance to LBL that the FoWG
can have the capacity, capability and motivation for their new business plan and the education
building.
However, this will require turning the potential into actuality and this will require a series of
detailed actions (please refer to Section 11.3 for recommendations for actions to be
undertaken).
The best assurance comes from the fact that the new building enables easier delivery of a
sustainable programme and a much more rewarding volunteering experience than current
shared facilities allow and which is cumbersome in terms of further growth plans.
The building will also be the centre of the business plan, trading, events, education and
fundraising so there is an imperative on the FoWG to make it work.
Education Centre Feasibility Study Clearview Consulting September 2016 93 |
P a g e
11.4.1 Governance Structure
As part of ‘Next Steps’ development, a more detailed governance review needs to be
undertaken with the FoWG to agree the appropriate governance structure as part of an
integrated work programme addressing all of the areas raised.
As a starting point, the following diagram sets out the possible principals that may emerge.
Please note that this is indicative only at this stage; a new structure should emerge from
the work that needs to follow.
Education Centre Feasibility Study Clearview Consulting September 2016 94 |
P a g e
Stage 3: Develop Financial
Model(s) and Risk Assessment
Education Centre Feasibility Study Clearview Consulting September 2016 95 |
P a g e
12.0 Funding Support
12.1 Funding Review Aims
The aims of the funding review undertaken is to feed into the options analysis, design and
business planning work. It informs the options appraisal and business planning aspects of the
Education Centre work
At the time of writing, the viable building options have been narrowed down to a single
building (subject to affordability and planning permission). This is undoubtedly better in
fundraising terms than a shared building as funders will be able to see clearly that any
investment that they make is going entirely to the work of the Windmill/FoWG. However, it
does mean that the FoWG will be liable for all the costs of the building.
There is also the question that funders will not all wish to fund a building that is to be owned
by the local authority. However, setting aside the capital funding for constructing the building
(which LBL have provisionally set aside funds to cover) the funding prospects for the FoWG
with their new building are reasonably good.
12.2 Results
Following research into more than 160 potential funders, 140 were investigated further of
which 85 were found to have some potential for the Windmill Gardens Education Centre and
activities.
There is sufficient information at this stage to give some confidence to the following:
Fundraising for capital build is not recommended mainly due to timescales, but
funding for fitting out/equipment etc. is possible
HLF Transition or Resilient funding should be sought after taking advice from the
HLF
Small grants funding applications should continue to be successful to new funders
and previous funders (when allowed)
There are sources of thematic revenue funding that the FoWG would have a good
chance of accessing with the new building coming into place. These are particularly
on themes such as food growing, heritage education (all ages) and engagement work
with young people. This is likely to be a fairly convoluted process of applying to a
mix of larger and small grant funding. The key to this will be the strategy and
capacity to make and follow through the applications. This should be applied for in
the HLF application
Community shares and/or crowd funding opportunities should not be pursued at this
stage
The building design, costs and capabilities and the emerging Business Plan are needed to
apply these results. The information gleaned is being fed into the iterative process throughout
to help assess the feasibility of different options. This funding work will then be able to give a
level of assurance to the FoWG Business Plan and London Borough of Lambeth.
Education Centre Feasibility Study Clearview Consulting September 2016 96 |
P a g e
12.3 Conclusions
Funding will be available for ongoing revenue activities within and from the building for 1-3
year project work periods. This can include core/overhead costs in some cases. However, a
regular stream of funding applications to support activities over 10 years and more would be
beneficial. The FoWG are more than capable of this but most likely will need capacity
support if a concerted drive is required over a fixed period. Once the building design is
finalised and the FoWG business plan is finalised then a strategy for fundraising needs to be
developed. There is a great range of choices and possibilities and the most important things
will be to prioritise the activities to fundraise for and to identify the capacity to fundraise.
Capital funding for the Education Centre is possible from a very limited pool and accessing it
could add up to 6 months to the build timetable with no guarantee of success. This is because
no funder will fund the building if it has been approved already by London Borough of
Lambeth. If there is to be a shortfall, it may be better to fundraise for specific fit-out,
furniture, equipment, landscaping elements which can be developed after the main building
has been approved (with some limitations).
Small grants funding which the FoWG have been excellent at should continue with every
possibility of success both with new funders and with going back to former funders (where
this allowed).
Funding for the windmill maintenance will be difficult as no funder wants to just pay for
regular maintenance. However, there are some funders who will pay for one-off investments
in conservation and it may be possible to use these one-off grants to continually improve the
windmill over time. Annual maintenance money will need to be earned by the FoWG and/or
paid by Lambeth.
It is understood that, as part of the Education Centre building provision by Lambeth, the
FoWG may be asked to take on the annual maintenance costs of the windmill once the current
maintenance contract expires in 2020. In this eventuality, it may be possible to treat the
windmill and building costs together as core costs and include some of these costs in project
funding applications.
Project development funding is likely to be available from intermittent sources – on the
themes of social enterprise /governance etc. but not immediately easily available – joining a
support organisation such as Locality http://locality.org.uk/ would give access to support and
grants. However, the Resilient Fund application will be critical in this process and has
potential to attract up to £250,000.
Community shares/crowdfunding and other alternative sources of funds will be available,
however the capacity needed and the extra risks and burdens involved mean that this needs to
be taken forward only as part of a well thought through business strategy probably once the
building has settled in. It is possible that expanding the milling business (or an expansion of
it) would be successful as a crowd-funding campaign not least because there is a product that
can be offered as a thank you.
There are a number of major funders (such as the Linbury Trust) which don’t accept
unsolicited applications – consideration needs to be given to all the partners to helping
fundraising by making contacts/introductions with some of the major private funders who are
usually involved with the Borough in other ways (e.g. on the South Bank).
In summary, raising capital funds to build the building in the time desired would need to be
carefully planned probably to raise funds for items such as equipment, fittings and furniture
Education Centre Feasibility Study Clearview Consulting September 2016 97 |
P a g e
that could be seen to be “owned” by the FoWG and were less time critical. There is likely to
be resistance from charitable bodies to give grants to fund a Lambeth building unless there
was some clear assurance of use by the FoWG for some period.
There is every expectation that the FoWG can raise funds to keep a good programme of short
and medium term activities going once the building is in place. This will require a lot of work
in preparing and submitting funding applications and dealing with all the follow up with
funders that is needed. However, this will not be able to fully underpin the Education Centre’s
operations. An estimate (subject to further work and discussion) is that fundraising may be
able to contribute towards some core costs in the business plan.
Some of the identified gaps will be able to be met by match in kind from the FoWG or
earned income for flour sales/classes etc.
12.4 Recommendations for Business Plan
An annual sum of £35-40K for funds raised could realistically be included in the business
plan and if this is backed up with a fundraising budget there could be a fair certainty that
these funds could be raised each year. It is likely that this figure could even be exceeded.
However, a cautious approach is being taken by Clearview in this current exercise and a
lower amount had been included at this time.
Please refer to Appendix E for details of full Funding Study
Education Centre Feasibility Study Clearview Consulting September 2016 98 |
P a g e
13.0 Cash Flow and Financials
13.1 Conclusions
Early conclusion is that the FoWG have basis for a robust business plan which
indicates operational sustainability
Management and running of the building is not reliant on fundraising
Recommendation is for FoWG to apply for HLF Resilient Grant funding to support
the necessary upskilling and new business development expertise required to make
step-change from existing to new business model; this application has not yet been
submitted so is excluded from financial forecast
Business Plan recommendations have been made based on the level of service review
and income stream analysis possible within the time frame available for this work.
Initial feedback from FoWG has been received but further testing of assumptions is
suggested and more detailed implementation plans will need to be developed in
conjunction with wider Action Plan recommended (see Section 15) and more detailed
actions listed as part of Capability and Capacity review (see Section 11)
13.2 Business Journey
This diagram shows the potential future journey the FoWG may go through between current
and future operation subject to the level of financial success they may achieve.
Please see over page for Overall Financial Summary and refer to Appendix F for
detailed breakdown of FoWG 10 year Cash Flow Forecast
Education Centre Feasibility Study Clearview Consulting September 2016 99 | P a g e
13.3 FoWG 10 Year Financial Forecast: Overall Summary
SUMMARY - ALL ACTIVITIES
2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27
TOTAL Yr1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10
£ £ £ £ £ £ £ £ £ £ £ £
Capital Costs
Building construction costs ( inc F&F, VAT & fees) - - - - - - - - - - -
Commercial standard kitchen 15,000.00 15,000.00 - - - - - - -
Purchase of a modular mill - - - - - - - - - - -
15,000.00
Revenue - Expenditure
WINDMILL BUILDING COSTS 53,700.00 - - - 6,600.00 7,000.00 7,200.00 7,500.00 8,000.00 8,400.00 9,000.00
-
EDUCATION BUILDING COSTS ( less staffing -cleaner) 94,750.00 3,600.00 5,200.00 10,200.00 10,400.00 10,550.00 10,750.00 10,750.00 11,100.00 11,100.00 11,100.00 Education Building costs are covered by income generated by other income streams such as Building Hire.
Park & Gardens - - - - - - - - - - - Assumes maintenance costs are zero and work done in kind via partnerships
-
STAFFING - Staffing has been shown separately to show the size of the commitment needed to be covered by income.
Development Officer 50% of £32pa 1FTE 140,800.00 12,800.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00 16,000.00
Education Centre Officer 50% of £32k pa 172,800.00 12,800.00 12,800.00 16,000.00 16,000.00 19,200.00 19,200.00 19,200.00 19,200.00 19,200.00 19,200.00
Fundraising capability ( time bought) 50,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
Cleaner / cleaning services 12,750.00 600.00 1,200.00 1,200.00 1,200.00 1,350.00 1,350.00 1,350.00 1,500.00 1,500.00 1,500.00
Development upskilling capability -
-
EDUCATION CENTRE COSTS ( less staff costs shown seperately above)18,500.00 1,850.00 1,850.00 1,850.00 1,850.00 1,850.00 1,850.00 1,850.00 1,850.00 1,850.00 1,850.00
-
MILLING COSTS 66,104.00 5,300.00 5,900.00 6,200.00 6,900.00 7,100.00 7,100.00 6,900.00 6,900.00 6,902.00 6,902.00
-
MEMBERSHIP COSTS 2,050.00 160.00 170.00 180.00 190.00 200.00 210.00 220.00 230.00 240.00 250.00
-
EVENTS & TOURS COSTS 146,500.00 11,150.00 11,150.00 11,150.00 16,150.00 16,150.00 16,150.00 16,150.00 16,150.00 16,150.00 16,150.00
-
MERCHANDISING COSTS 27,000.00 1,500.00 2,000.00 2,500.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
-
BUILDING HIRE COSTS 22,500.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00
-
OTHER EXPENDITURE ( less staff costs) 135,855.00 19,755.00 27,255.00 15,755.00 5,325.00 6,845.00 15,545.00 5,775.00 17,700.00 5,950.00 15,950.00
-
943,309.00 -
Net cash outflow 958,309.00 83,965.00 92,575.00 83,285.00 85,865.00 91,495.00 110,605.00 90,945.00 113,880.00 92,542.00 113,152.00
Income
EDUCATION CENTRE SALES 188,550.00 5,010.00 10,090.00 12,420.00 17,680.00 20,160.00 23,050.00 24,010.00 24,610.00 25,460.00 26,060.00
-
MILLING ENTERPRISE 205,478.00 6,478.00 13,594.00 17,322.00 19,322.00 19,322.00 25,888.00 25,888.00 25,888.00 25,888.00 25,888.00
-
MEMBERSHIP ( INCL MEMBERSHIP DONATIONS) 41,260.00 1,690.00 2,490.00 2,950.00 3,405.00 4,420.00 4,695.00 4,980.00 5,255.00 5,550.00 5,825.00
-
EVENTS & TOURS SALES 383,500.00 23,950.00 34,450.00 34,450.00 35,950.00 41,700.00 42,200.00 42,700.00 42,700.00 42,700.00 42,700.00
-
MERCHANDISING SALES 54,000.00 3,000.00 4,000.00 5,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00
-
BUILDING HIRE INCOME 232,900.00 15,600.00 20,600.00 21,200.00 23,100.00 24,600.00 24,600.00 25,800.00 25,800.00 25,800.00 25,800.00
-
OTHER INCOME STREAMS ( excl grants itemised as a subset separately below)167,250.00 9,050.00 34,050.00 14,050.00 15,050.00 15,300.00 15,550.00 16,050.00 16,050.00 16,050.00 16,050.00
General Fundraising 110,000.00 - 30,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
1,382,938.00 -
Capital investment from LBL - - - - - - - - - - -
Kitchen sponsorship 15,000.00 15,000.00
15,000.00 -
Net cash inflow 1,397,938.00 79,778.00 149,274.00 117,392.00 130,507.00 141,502.00 151,983.00 155,428.00 156,303.00 157,448.00 158,323.00
Cash inflow/outflow 439,629.00 4,187.00- 56,699.00 34,107.00 44,642.00 50,007.00 41,378.00 64,483.00 42,423.00 64,906.00 45,171.00
Education Centre Feasibility Study Clearview Consulting September 2016 100 |
P a g e
14.0 Risks
The following indicates a summary of risks against which contingency planning should be put
in place to mitigate should they occur.
Other risks relating to specific operational constraints are also referenced in relevant sections.
RISK Likelihood Impact MITIGATION
H M L H M L
BUSINESS RISKS
FoWG charity remains dependent
on the support of LBL for its
survival due to lack of income
generation
Ensure Education Centre is future-proofed
to allow the flexibility the FoWG need to
test and refine income streams over time so
that they can optimise income generation
opportunities.
Develop a clear business route map for
FoWG development which robustly
supports financial sustainability over time.
FoWG and LBL continue to nurture their
working relationship in ways which are
mutually beneficial to both parties e.g. LBL
support FoWG fundraising activities and
organisational development (e.g. through
allocation of support resource to FoWG);
FoWG remains open and receptive to
exploring ways in which they might
contribute to services which LBL would
find useful e.g. FoWG taking on the
maintenance of the Windmill
Insufficient sustainable income is
received in early years (1-3) to
cover the operational costs of
running the Education Centre and
windmill.
Focus on growth and delivery of the higher
return income streams.
Slow growth down initially to ensure
associated expenditure can be supported by
revenue.
Lambeth review and rescind their
agreement to provide a rent and
rate free building.
The forecast demonstrates that FoWG can
meet its outgoings by income generated
without cross subsidy from grants.
Should this risk arise, Lambeth would need
to continue/revert to taking on the cost of
maintaining the windmill and park upkeep
Capability to run the charity on
more commercial lines is lacking,
albeit the charitable intent is
serviced well
Strengthen the governing team with
additional / alternative members with
strong relevant business skills.
Strengthen governance processes and
accountability
Capability or capacity of
volunteer resource is insufficient
Consider a mix of paid expertise and
volunteer resource and the value add they
bring.
Education Centre Feasibility Study Clearview Consulting September 2016 101 |
P a g e
to manage and run all income
streams in the portfolio
Consider up-skilling training (HLF) and
other available ‘free’ resource to increase
capacity economically.
Consider prioritisation.
Insufficient fundraising capability
in initial stages of the charity’s
development
Lambeth provides fundraising support
whilst building is being built.
Up-skilling in specialist expertise via
mentoring and training paid for by
transitional grant funding.
Insufficient capability to replace
key roles on retirement from duty.
Start succession planning by up-skilling
capability within current roles and
providing ’shadowing’ opportunities where
helpful
Seek external mentoring
Encourage new membership with desired
skills to join.
Park upkeep maintenance
agreement with partner (e.g.
Blenheim Gardens RMO) expires
upon appointment of a new
service provider.
Seek an alternative viable agreement.
Use volunteers and other social enterprise
help in the interim.
Explore the possibility of ‘free’ gardening
resource via HMP Brixton ROTL* Day
Release (Released in Temporary Licence)
Appropriate grant funding streams
dwindle after years of successful
annual grant applications
Seek more diverse streams of relevant
funding.
Reduce further the need for regular funding
by increasing revenue in more successful
areas.
Education centre bookings
dwindle and the need for new
courses and / or interactive
technology grows to remain
competitive and interesting.
Refresh courses and education sector
relationships regularly.
Broaden market reach.
Build a technology reserve fund for
interactive learning and displays.
RISK Likelihood Impact MITIGATION
H M L H M L
OPERATIONAL RISKS
The windmill stops working and
is out of action for a significant
period of time whilst waiting for
repairs/treatment.
Ensure 1 month’s reserve flour products are
available for sale.
In medium to longer term put in place a
contingency plan to buy or hire a modular
mill or partner with another mill.
Milling business grows rapidly
and supply cannot meet demand
Should demand outstrip supply, consider a
modular mill to grow the revenue stream, or
re-packaging and raising prices to manage
supply.
Education Centre income streams
grow rapidly and supply cannot
meet demand
If demand outstrips supply, consider adding
more days and delivery support staff.
Raise prices to manage supply.
Education Centre Feasibility Study Clearview Consulting September 2016 102 |
P a g e
Flour milling using the Windmill
reaches capacity at 3 years.
Evaluate whether supply is increased by a
supporting modular mill, or price point
raised
The FoWG commercial activities
are successful, with full time
working 5-6 days a week, but are
now seen by residents as
detrimental to the local
environment
Evaluate the portfolio of activity against
delivering the charitable intent, and ensure
the benefits to the local community can
justify the work
Building is a target for theft and
vandalism
Architects to design security features such
as shutters, into the design.
Operational costs of running the
building are higher than predicted
As revenue grows, allow for a small reserve
contingency fund to meet unexpected costs.
Review energy systems set up and use to
optimise space.
Pace of change and/or lack of
clarity in new job roles leads to
volunteer demotivation and
potential loss of volunteer
resource
Ensure clarity of roles is established plus
sufficient training to upskill volunteers as
required
Manage pace of change, ensuring
volunteers are properly informed of what’s
happening/when
Build in sufficient feedback mechanisms to
allow volunteers a ‘voice’ in order to
capture/acknowledge any concerns and act
upon feedback received appropriately
H M L H M L
MARKETING RISKS
The website crashes and people
cannot access
Ensure processes in place to post a ‘holding
message’ if people try to access
Conduct regular site maintenance checks
Local/Other concerns about new
Education Centre/related activity
attracts adverse publicity
Ensure agreed lines of response
communicated and designated
spokesperson available to speak with press
if/when required
Proactively manage any complaints in a
timely and sensitive manner
Brand positioning is weakened by
unclear brand strategy
Develop agreed brand development plan
and put in place brand guidelines to ensure
consistency of brand representation
Develop integrated marketing and business
development strategy with clear brand
consideration given to all aspects of
Education Centre visitor/wider customer
experience
Education Centre Feasibility Study Clearview Consulting September 2016 103 |
P a g e
15.0 Next Steps
15.1 Action Plan
The Actions below are considered priority actions to move the FoWG quickly towards
a sustainable business footing and reduce current business risks. It is not exhaustive
and the section on Governance, Capability and Capacity Planning (Section 11)
contains more detailed actions and observations.
NB. It is recognised that these timings are ambitious and capacity/capability may in
some respect be dependent upon receiving external support in the next few months
from London Borough of Lambeth and possibly bought in development resource.
They are indicative only and subject to change in accordance with ongoing
planning discussions with FoWG.
A successful HLF Resilient funding application could fund support for much of the
new training and upskilling of existing volunteers as well as realise revenue to cover
such things as systems development and improvement.
Action By When Benefit Priority
Yr 0: Q1= Apr-Jun 2016, Q2=Jul-Sep 2016, Q3=Oct-Dec 2016, Q4=Jan-Mar 2017
Yr 1: Q1=Apr-Jun 2017, Q2=Jul-Sep 2017, Q3=Oct-Dec 2017, Q4=Jan-Mar 2018
Governance and Business Management
Ensure whole organisation
has bought into the new
business plan
Q3 2016 Maintaining
volunteers’ motivation
and commitment to
successful
development
HIGH
(Critical to
business
success)
Review governance
structure to ensure the right
level of decision-making,
accountability and
responsibility
Q3 2016 Balance of workload
and clearer
accountability
HIGH
Revisit chart of accounts,
cost codes and sub-codes to
gain visibility on
segmentation
Q3-Q4
2016
Financial management
Transparency of data
HIGH
Invest in financial and
database software
Q4 2016 Data management HIGH
Prepare for building
opening
- Health & safety
- Fire safety
- Risk management
- Insurance
Q4 2016 Ensure operationally
ready for new centre
launch
HIGH
Education Centre Feasibility Study Clearview Consulting September 2016 104 |
P a g e
Review the charity’s
operational status and
limited liability
Q4 2016 -
Q1 2017
Way to reduce
personal liabilities of
Trustees
HIGH
Merge all data lists and
review what reports wish to
draw off for different areas
of work
Q1 2017 Data management and
analytics
Audience
segmentation
(Comms/Membership)
MED
Rewrite terms of reference
for each governance
meeting to meet objectives
and management for the
future business model
Q1 2017 Clear accountability MED
Review and work out what
management reports are
needed and frequency for
different parts of the
business
Q1 2017 Know what you need
and produce reports
that support your
needs
MED
Put in place a weekly/
monthly update regime for
all activities of the business
Q1 2017 Operational discipline
and transparency
MED
Business Strategy and Planning
Prepare an Events strategy Q3 2016 Targets, resourcing HIGH
Prepare a Fundraising
strategy
Q4 2016 Targets, resourcing HIGH
Prepare a Flour Sales
strategy
Q4 2016 Targets, resourcing HIGH
Prepare an Education
strategy
Q4 2016 Targets, resourcing HIGH
Prepare a Membership
strategy
Q1 2017 Targets, resourcing HIGH
Create an integrated Data
Analytics strategy
Q2 2017 Targets & growth MED
Prepare a Merchandising
strategy
Q2 2017 Targets, resourcing MED
Prepare a Venue Hire
strategy
Q2 2017 Targets, resourcing MED
Commercial Arrangements
Focus on recouping
outstanding invoices and
high value fundraising and
income generation in short
term to fund parts of the
building and the education
officer’s immediate work
Q3-Q4
2016
Enables Education
work to start asap
Supports key building
fit-out requirements
not covered by LBL
budget
HIGH
Education Centre Feasibility Study Clearview Consulting September 2016 105 |
P a g e
Negotiate 1st wholesale
flour sales with local
bakeries and HMP Brixton
Q3 2016 Sizable income stream
waiting to be tapped
HIGH
Develop partnership
arrangements and source
additional milling resource
to mill additional flour
Q4 2016 Additional resource HIGH
Negotiate SLA agreement
with London Borough of
Lambeth for use of
Education Centre
Q4 2016 Purpose built building
to support FoWG
growth and expansion
of educational
programmes
HIGH
Negotiate SLA agreement
with London Borough of
Lambeth regarding
Windmill maintenance
from 2020
Q2 2017
(in
principle,
actual
SLA may
not be
required
until later)
Interdependency on
peppercorn rent for
building
MED
Negotiate agreement with
partners to maintain the
park and gardens *(not yet
agreed with Friends)
(within
first 3
years of
trading)
*subject to
Friends
agreement
Additional resource LOW
Marketing
Develop a Brand strategy
and Prepare set of
promotional Brand
Guidelines
Q4 2016 -
Q1 2017
Organisational
Positioning and
Promotion
HIGH
Develop overarching
Marketing and
Communications strategy
Q1-Q2
2017
Integrated approach to
optimise all
HIGH
Establish market appetite
and price points for
education, flour, building
hire and baking
Q1-Q2
2017
Competitive position HIGH
Continue to build local
relationships and potential
pipeline for flour sales -
retail & wholesale
Q1 2017
(ongoing)
Sales pipeline HIGH
Develop tactical
communications plans to
support events and
initiatives
Q1 2017
(ongoing)
Leveraging news,
local reach and
campaigns
MED
Education Centre Feasibility Study Clearview Consulting September 2016 106 |
P a g e
Develop set of brand
guidelines (build on
existing)
Q2 2017 Brand integrity MED
Fundraising
Create priority grant
applications list and plan
for remainder to ensure a
constant stream of income
for FoWG calendar of
Events
Q3 2016 Income generation to
cover core charitable
aims
HIGH
Develop HLF Resilient
Grant funding application
Q3 2016 Substantial support for
transitioning to a
sustainable business;
could include
mentoring and
upskilling of FoWG
volunteers as well as
support some paid for
resource e.g. building
management and
business development
HIGH
Agree annual fundraising
strategy with LBL
Q3-Q4
2016
Will help inform the
SLA
LBL providing
fundraising resource
support
HIGH
FoWG to explore
opportunities for
fundraising income for
Education Development
Officer (once building in
place)
Q1-Q2
2017
Ongoing delivery of
Education workshops
(NB. Not reliant on
fundraising)
Increases profit
capability
MED
Training
Training in fundraising and
campaigns
Q4 2016 Competence MED
Training in book-keeping,
financial records
Q4 2016 Competence MED
Training in data and
database management
Q4 2016 Competence MED
Trustee training – refresher
ahead of opening
Q4 2016 -
Q1 2017
Competence MED
Training in facilities
management & H&S
Q1 2017 Competence MED
Education Centre Feasibility Study Clearview Consulting September 2016 107 |
P a g e
Training in Human
Resource Management
Q2 2017 Competence MED
Training in business
continuity
Q2 2017 Competence MED
Recruit additional capability
Recruit Education
Development Officer -
contract
Q3 2016 Competence HIGH
Recruit ongoing
fundraising capability
Q3-Q4
2016
Competence HIGH
Recruit Business
Development resource –
contract
Q4 2016 -
Q1 2017
Competence HIGH
Capability to write the fire
management strategy
Q1-Q2
2017
Competence LOWER
Develop policy writing
capability
Q1-Q2
2017
Competence LOWER
Please refer to Appendix G for high level programme schedule.
(NB. This is subject to change in accordance with ongoing planning discussions with FoWG
and LBL).
Education Centre Feasibility Study Clearview Consulting September 2016 108 |
P a g e
Appendices
Education Centre Feasibility Study Clearview Consulting September 2016 109 |
P a g e
Appendix A: Building Options Appraisal 1-4 Detailed Review
Option 1 Build a new building near the Windmill and separate from the Stay and
Play Building
Built within budget and
capital cost provided Order of cost: £360,000. With some adjustments, it will be possible to
build a new separate building within the capital budget on offer by
London Borough of Lambeth
Suitability for proposed
FoWG activities A separate building provides FoWG with full operational freedom to
pursue activities to create a sustainable business
A multipurpose building that supports the FoWG’s primary aim to create
a permanent education centre, as well as providing supplementary
income from milling flour, pop-up café, room hire and other partnerships
will be possible
Size will be key. The original size of approximately 132m2 may be too
small to provide some medium term activities, such as a training kitchen.
If 150m2 or 180m2 is possible, there are more options available
Should FoWG apply for a Community Asset Transfer at a later date, a
separate building is likely to be easier to transfer
Suitability for
Holmewood Construction would present minimal negative impact on Holmewood’s
current operation
The separate building allows Holmewood Stay and Play to continue its
operations and grow capacity at its own building unencumbered
The new separate FoWG building could increase revenue for the Stay
and Play by enabling additional compatible services to be offered from
the new building at specific times
Business Sustainability Depending on the size of the building, some activities that are synergistic
ways for FoWG to produce a sustainable income may not be possible
Hire of adjacent space can mutually benefit both business operations and
provide regular income streams as a consequence
Environmental / Building
Sustainability The building will be a new build and will be compliant with BREEAM
and other eco policies that Lambeth adhere to. As such, it is likely to
require little maintenance in the short to medium term
It is more likely that a traditional build will achieve eco standards over a
prefabricated modular build
Planning risk The pre-application has come back with a positive statement subject to
satisfactory details on activities to be undertaken and their impact and
benefit on the community
The reduction in open space presents the greatest risk to success and is
dependent on a clear understanding of how the local community can
access and directly benefit from the new facility
Time to construct Choice of building method will be important to maximise funds
available. There are trade-offs between time and cost, or time and size.
Traditional form of contract and construction will bring the costs per m2
down from £3000m2 to £2000m2.
Provides new and
additional amenities to
the community
The new building can provide WC facilities for the park whilst open
The new building can provide the community with a local pop-up café
It can more easily manage the regular heritage and public events and
activities it holds monthly in the park gardens from a permanent base
Potential undertaking to manage and maintain the gardening of park at
Windmill Gardens supports the council and community
The education centre can support all ages of the community with its
offering.
Education Centre Feasibility Study Clearview Consulting September 2016 110 |
P a g e
Option 2 Demolish the existing Stay and Play building and rebuild a new
building that houses both FoWG and Holmewood Nursery
Capital Cost It was not possible to do this within the budget of £360,000.
Suitability for proposed
FoWG activities FoWG would gain a space of their own to undertake the activities they
need to become a sustainable business but is unlikely to have 100%
autonomy over what they can do at the site
Depending on the design of the shared building, there is most likely to
still be a dependency between FoWG and Holmewood Stay and Play
when planning revenue streams and growth activities so as not to
conflict with their neighbour
Some new revenue streams may not work well from a shared building,
such as milling and training kitchen.
Suitability for
Holmewood Holmewood would have a space of their own to continue their stay and
play activities
Depending on how the building and play area is designed, the
entrance(s) and services and connections between the two buildings
may present possible safeguarding issues for the young children
attending the stay and play groups
Demolishing the existing building could put current income and the
local stay and play target market at risk should Holmewood need to
move away from the area into decanting accommodation during
construction
Business Sustainability A shared building could present some limitations to the development of
other income streams should the target audiences and markets be very
different from educational products
A shared building could present some synergies for hiring shared space
from the other party
Environmental / Building
Sustainability The building will be a new build and to meet planning will need to be
built to comply with Lambeth’s policies and BREEAM and other
environmental policies.
Timber construction may be ruled out as a material because of a risk of
vandalism and arson.
Planning risk The protection of open spaces is a key development policy for Lambeth.
The larger the building footprint, albeit partly on the site of an existing
building, presents a greater risk to planning success than a smaller
separate building, especially if community parameters cannot be met
Time to construct Demolition and then new construction, plus decanting plans for
Holmewood Stay and Play and FoWG are likely to take longer than the
construction of a separate new build or simple extension to the existing
Stay and Play building
The form of contract is likely to be traditional or design and build,
ruling out modular prefabricated buildings
Modular buildings are more costly to purchase even though they may
be quicker to install
Provides new and
additional amenities to the
community
New amenities will be provided by this option in the form of an
education centre for local schools and a pop up café for the community.
The upkeep of the gardens and creation of windmill related park events
will also be available to the community
Education Centre Feasibility Study Clearview Consulting September 2016 111 |
P a g e
Option 3 Extend the Holmewood Nursery building to create a
larger building with a separate space for FoWG
Capital Cost The cost of undertaking this option was over budget.
Shared facilities have not reduced the cost of building
Suitability for proposed
FoWG activities FoWG would gain a space of their own to undertake their
current activities and growth towards becoming a
sustainable business but will not have 100% autonomy
over what they do at the site
Depending on the design of the shared building, there is
most likely to still be a dependency between FoWG and
Holmewood Stay and Play when planning revenue
streams and growth activities so as not to conflict with
their neighbour
Some new revenue streams may not work from a shared
building, such as milling and training kitchen
Suitability for
Holmewood Holmewood would have a space of their own to continue
their Stay and Play activities.
Depending on how the building and play area is designed,
the entrance(s) and services and connections between the
two buildings may present possible safeguarding issues
for young children attending the Stay and Play groups
Business Sustainability A shared building could present some limitations to the
development of other income streams for both
organisations should the target audiences and markets be
very different from educational products
A shared building could present some synergies for hiring
shared space from the other party
Environmental / Building
Sustainability The existing nursery building is not new and is in need of
maintenance and some infrastructure replacement.
The current building is unlikely to be designed to or meet
BREEAM
The new extension will need to be designed to meet
current environmental and eco standards of Lambeth
council
Planning risk The planning risk could be lower than that of a new
shared building on the same site, because it is only an
extension that is being added to the footprint. However,
the larger footprint in one location may not be deemed
appropriate to the setting and context of the building
Justification for loss of open space and value add to the
community will be paramount to get right
Time to construct Depending on the structure and condition of the current
building, time to construct could be faster or slower.
More work would be required to make an assessment
Provides new and
additional amenities to the
community
New amenities will be provided by this option in the form
of an education centre for local schools and a pop up café
for the community.
The upkeep of the gardens and creation of windmill
related park events will also be available to the
community
Education Centre Feasibility Study Clearview Consulting September 2016 112 |
P a g e
Option 4 New building on Alternative site
Capital Cost Unknown
To build a new building on another location may produce
construction costs similar to option 1
To lease or purchase an existing building and refurbish to suit FoWG
activities is likely to be above budget
Suitability for proposed
FoWG activities As neither a building nor site has been found that is deemed
acceptable, this objective cannot be assessed
FoWG cannot develop or grow their income streams effectively in
current accommodation
Suitability for Holmewood Without a site, FoWG are likely to remain renting within the current
Stay and Play space. This impacts on Holmewood’s ability to grow
and be sustainable
Business Sustainability Without the ability to grow a number of synergistic and varied
revenue streams, FoWG cannot become a sustainable business
Environmental / Building
Sustainability Unknown
Planning risk Unknown
Time to construct Unknown
Provides new and additional
amenities to the community Unknown
Education Centre Feasibility Study Clearview Consulting September 2016 113 |
P a g e
Appendix D: Sample Baking Courses: Product/Pricing
The Learning Loaf http://www.thelearningloaf.com/baking-classes.html
Full Day Bread Making Classes From techniques and tips, to making and baking - during our hands-on courses you will
explore the journey from flour to finished loaf and create your own bread to take home.
Held on Saturday’s, from 10am to 4pm in Charlton Manor Primary School, Indus Road,
London SE7 - our workshops can accommodate up to 10 people and include light
refreshments and lunch. Ingredients, equipment and recipes are provided.
These workshops are suitable for all levels of experience. Age 16 and over. Children are
welcome but must be accompanied by an adult.
16 July: Advanced Sourdough Bread Making - £125 This workshop is designed for people who have been baking sourdough for a while. We
will use slightly more complex techniques such as adding a seed soaker and fruit plus
working with heritage, wholemeal and sprouted grains. You will leave with your loaves to
bake off at home and a lot of new and improved skills.
22 October: Introduction to Sourdough Bread - £125 We will show you how to achieve the crust and crumb you’ve always aspired to. This
includes creating and keeping a healthy leaven, mixing, kneading, shaping and baking the
perfect loaf. You will leave with your loaf, a pot of leaven and a lot of new skills.
3 September: Introduction to English Bread Making
- £125 During this full day hands-on workshop run by Graham, you will learn how to make soda
bread, a white country loaf, and wholesome wholemeal rolls. This includes using different
organic flours, mixing, kneading, shaping, and baking the perfect loaves and rolls to take
home with you.
Evening Bread Making Classes If you are pushed for time, then these are the courses for you.
Held on Wednesday’s, from 6:30pm to 9:30pm in Bentham House, 2-4 Station Way, Royal
Arsenal, London SE18. Our workshops can accommodate six people. Ingredients,
equipment and recipes are provided including refreshments.
These workshops are suitable for all levels of experience. Age 16 and over. Children are
welcome but must be accompanied by an adult.
Education Centre Feasibility Study Clearview Consulting September 2016 114 |
P a g e
Corporate/Team Building Events
Looking to develop your team? Want to learn new and develop existing skills?
Then why not hold your team building event with us with a tailored corporate day. On
corporate days, we can accommodate up to 12 people. Please contact us to discuss
further.
13 July: Gluten free baking - £65 We take everything we know about baking bread to a gluten-free setting. You’ll create a
versatile everyday gluten free loaf and a zesty lemon polenta cake, all free of gluten-
containing ingredients.
29 July: Pizza dough - £65 You will learn how to make the perfect pizza dough. This includes mixing, kneading,
shaping, and baking - techniques that form this cornerstone of Italian cuisine.
(Continued Over Page)
Education Centre Feasibility Study Clearview Consulting September 2016 115 |
P a g e
Ma Baker’s -COURSES http://www.mabaker.london/courses
All classes are held in my Fulham kitchen, and are for a maximum of four participants. They
assume no prior cooking/baking experience and are taught in a friendly, informal atmosphere with
plenty of time for practice and individual guidance. Each class includes morning or afternoon tea,
home baked treats, lots of bread tastings, recipes to take home, all equipment and ingredients. You
will have plenty of your own handmade bread to take home with you as well. If you do not see a
class or time that suits, let me know and we can arrange one that does.
As well as the schedule of classes listed, Ma Baker can offer bespoke baking classes on other
dates for a private group wishing to book together, corporate groups or special occasions. Contact
me direct on [email protected], with details, and I will get back to you as soon as
possible.
INTRODUCTION TO BREAD - LONDON
Come and learn how to bake real bread in a small, personalised friendly class in a home kitchen.
You will have fun baking and shaping a variety of loaves and...
SEE DETAILS
INTRODUCTION TO BREAD - HOLYPORT
Come and learn how to bake real bread in a small, personalised friendly class in a home kitchen.
You will have fun baking and shaping a variety of loaves and...
SEE DETAILS
Education Centre Feasibility Study Clearview Consulting September 2016 116 |
P a g e
INTRODUCTION TO SOURDOUGH
Sourdough bread, made with a ‘wild’ yeast culture instead of commercial yeast, is delicious, has a
distinctive taste and is easier to digest than many other breads because of its...
SEE DETAILS
ARTISAN BREADS
During this class you will learn different shaping techniques, how to use a banneton (or proving
basket) how to plait a loaf and how to shape freeform loaves. We will...
SEE DETAILS
Education Centre Feasibility Study Clearview Consulting September 2016 117 |
P a g e
ITALIAN BREADS
Bring the taste of the Mediterranean into your home! During this hands-on class, we’ll make some
classic Italian breads including focaccia and ciabatta, so come prepared to get your hands...
SEE DETAILS
HOW TO SET UP YOUR OWN MICRO-
BAKERY
This is a hands on weekend course. On it, we teach people how to start their own micro bakery. In
addition to baking a lot of different kinds of bread,...
SEE DETAILS