Clear Lake · from Decorah, IA was the lowest responsive and responsible bidder for this project,...
36
Clear Lake · from Decorah, IA was the lowest responsive and responsible bidder for this project, with a bid of $281,156.57. The engineer's estimate of the probable cost of construction