32
clean rooms

clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

clean rooms

Page 2: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,
Page 3: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

clean rooms

Page 4: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

Iguña is an installer engineering company specialized in design and development of Clean Rooms, for the chemical, biomedical, pharmaceutical, hospital, cosmetics, optics, microelectronics and aerospace industry.

Page 5: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

We offerour 25 years of experience in engineering, construction, commissioning and qualification of Clean Rooms.

We do our “know how” to get the best results in the design and implementation of projects of Clean Rooms and White Rooms, semicritical and critical areas, controlled environment areas and biosecurity and containment areas, etc.

We carry out turnkey projects, from initial phase to the validation and commissioning, proposing effective solutions to engineering, adapting your needs to current rules.

Our goal

is to facilitate the development of your Clean Room projects, providing real solutions in each phase:

Definition and design Construction and installation Commissioning Validation Installation maintenance

clean rooms

Page 6: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

4

ARCHITECTURE: ENCLOSURES

Clean Room construction through the installation of enclosures made up of sandwich panels, doors and health finishing profiles.

The enclosures built in sandwich panels provide the installation with flexibility, by means of our modular constructive system, enabling the distribution of the different areas as needed.

Enclosures built in sandwich panels with fire resistance and fire reaction certificates.

Vertical Enclosures 6

Roofs 8

Doors 10

Pass-troughs 12

Optional elements 12

Page 7: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

1A

RC

HIT

EC

TU

RE

: EN

CLO

SU

RE

S

Page 8: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

6 ARCHITECTURE: ENCLOSURES IGUÑA CLEAN ROOMS

Sandwich panels may have different finishes, both interior and exterior, depending on the materials and requirements of each customer.

Vertical Enclosures

Page 9: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

7

Page 10: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

8 ARCHITECTURE: ENCLOSURES IGUÑA CLEAN ROOMS

Made with sandwich panel, they may be passable or not practicable and, in both cases, you can make reticulated roofs, continuous roofs or registrable modular system with concealed profile.

Roofs

Page 11: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

9

Page 12: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

10 ARCHITECTURE: ENCLOSURES IGUÑA CLEAN ROOMS

Doors

Page 13: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

11

Doors designed for clean rooms, made with sandwich panel and exterior finish of phenolic resin or sheet metal.

Well skimmed doors with aluminium frame or straight frame of resin compact, to be integrated into the enclosure.

Single-leaf doors, double-leaf and sliding doors of various sizes and optional elements to include, such as: peephole, locks, access control, lower weather strip, door closers or retainer arm and crash bars.

Page 14: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

12 ARCHITECTURE: ENCLOSURES IGUÑA CLEAN ROOMS

Clean Room Furniture:

Pass-troughs

Optional elements

Personal benches built of panel, with possibility of drawers for shoes.

Personal lockers made of phenolic resin.

Construction of sandwich panel_pass-through or stainless steel_pass-through.

Page 15: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

13

Page 16: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

14

AIR TREATMENT: HVAC SYSTEM

HVAC system (Heating, Ventilation & Air Conditioning). In each project the environmental requirements of the classified areas are defined, controlling the parameters of temperature, humidity, pressure and classification of rooms.

Definition and development of air treatment systems in areas where specific environmental parameters, temperature control and humidity control are required.

We design Clean Rooms fulfilling environmental conditions and ensuring the classification of the rooms according to current regulations.

HVAC system 16

Page 17: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

AIR

TR

EA

TM

EN

T: H

VAC

SY

ST

EM

2

Page 18: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS

HVAC system

We install the constructive project of integral HVAC system, from the design phase, construction and validation of the system, with the most advanced technology to ensure the quality of our service through our detail engineering:

Thermal calculations

Principle diagrams

Control specifications: temperature, humidity, pressure scale

Detail of the installation: making plans

Documentation

Page 19: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

17

Page 20: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

18 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS

HVAC system

Mains of air impeller and air return conduits with rectangular or circular section, in steel sheet metal and thermally insulated, sized for the air supply in each area.

Diffusion terminal elements (such as diffusers and terminal filtration boxes) and return elements (screens and filters), and all the auxiliary equipment required for classified air and air-conditioned circulation.

Page 21: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

19

Page 22: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

20

ELECTRICITY AND LIGHTING SYSTEM

We develop all the electric installation of Clean Rooms, by means of a previous design of the needs of each project.

We do the lighting study recommended to Clean Room applications, using isolux diagrams for each room and adjusting the number and types of light fixtures to include according to the design engineering.

The light fittings are specially designed for white rooms, being perfectly integrated into the whole enclosure.

Page 23: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

ELE

CT

RIC

ITY

AN

D L

IGH

TIN

G S

YS

TE

M3

Page 24: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

22

REGULATION AND CONTROL SYSTEM

We provide you with the design of a system of regulation and control of the facility in order to control the elements of the air treatment system, specific to each area.

Regulation and control system in the control board. It has the necessary elements to control the air handling system, specific to each application.

Centralized control by PLC, directly connected to the monitoring means to supervise and record all items included in the installation.

Page 25: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

RE

GU

LAT

ION

AN

D C

ON

TR

OL

SY

ST

EM

4

Page 26: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

24

QUALIFICATION AND VALIDATION SERVICES

We provide Qualification and Validation services of the facilities, performing the exhaustive tests according to ISO standards, GMP (Good Manufacturing Practices) of the Pharmaceutical Industry, GLP (Good Laboratory Practices) and FDA (Food and Drug Administration).

Page 27: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

QU

ALI

FIC

AT

ION

AN

D V

ALI

DA

TIO

N S

ER

VIC

ES

5

Page 28: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

26

AFTER-SALES SERVICE MAINTENANCE

Keep your facilities in top condition for better performance through the implementation of preventive and corrective maintenance on a regular basis.

We develop exhaustive monitoring of your facilities ensuring total and continuous operation of the facility.

Our after-sales customer service offers you extend the useful life of your equipment allowing the detection of failures and reducing repair costs.

Page 29: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

AFT

ER

-SA

LES

SE

RV

ICE

MA

INT

EN

AN

CE

6

Page 30: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

clean rooms

www.iguñamontajes.com

Page 31: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,
Page 32: clean rooms - Interempresas€¦ · 16 AIR TREATMENT: HVAC SYSTEM IGUÑA CLEAN ROOMS HVAC system We install the constructive project of integral HVAC system, from the design phase,

Venus, 55-B Pol. Ind Can Parellada 08228 Terrassa (BCN) SPAINT (+34) 93 784 28 25 F (+34) 93 784 13 55 [email protected]

www.iguñamontajes.com

IGUÑA MONTAJES, S.L.

clean rooms

Engineering and development of clean rooms