6
A) Customer Information 1. Company 2. Street Address City / State / Zip City / State / Zip 2. Street Address 1. Project Name B) Project Information 3. Contact Info (Name) Phone Fax e-mail Date Nearest Major City 1. Process to be performed in Cleanroom C) General Cleanroom Design Parameters Unless otherwise instructed by your product / process specialist, design will be based on vertical airflow projection Desired project completion Date Cleanroom Planning Guide (This guide provides us with the necessary information to prepare a reliable proposal) When you have completed the form, you will have the option to print it to submit by fax, or simply use the submit by e-mail button 2. Select Desired Cleanliness Classification ISO-4 (Class 10) ISO-5 (Class 100) ISO-6 (Class 1,000) ISO-7 (Class 10,000) ISO-8 (Class 100,000) Unsure 3. Select Desired Airflow Direction Vertical (Downward) Horizontal 4. Heat Load generated by equipment in Cleanroom (kW or BTU/hr) 5. Duty cycle of heat-producing equipment in Cleanroom Running 25% of the time Running 50% of the time Running 75% of the time Running 100% of the time Unsure Phone: 800-459-6320 e-mail: [email protected]

Clean Air Technology Cleanroom Planning Guide

  • Upload
    phamnga

  • View
    223

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Clean Air Technology Cleanroom Planning Guide

A) Customer Information

1. Company

2. Street Address

City / State / Zip

City / State / Zip

2. Street Address

1. Project Name

B) Project Information

3. Contact Info (Name)

Phone Fax e-mail

Date

Nearest Major City

1. Process to be performed in Cleanroom

C) General Cleanroom Design Parameters

Unless otherwise instructed by your product / process specialist, design will be based on vertical airflow projection

Desired project completion Date

Cleanroom Planning Guide (This guide provides us with the necessary information to prepare a reliable proposal) When you have completed the form, you will have the option to print it to submit by fax, or simply use the submit by e-mail button

2. Select Desired Cleanliness Classification

ISO-4 (Class 10)

ISO-5 (Class 100)

ISO-6 (Class 1,000)

ISO-7 (Class 10,000)

ISO-8 (Class 100,000)

Unsure

3. Select Desired Airflow Direction Vertical (Downward) Horizontal

4. Heat Load generated by equipment in Cleanroom (kW or BTU/hr)

5. Duty cycle of heat-producing equipment in Cleanroom

Running 25% of the time

Running 50% of the time

Running 75% of the time

Running 100% of the timeUnsure

Phone: 800-459-6320 e-mail: [email protected]

Page 2: Clean Air Technology Cleanroom Planning Guide

7. Average number of persons that will be working in the Cleanroom

CFM Exhaust:

Phone: 800-459-6320 e-mail: [email protected]

6. Is any heat-producing equipment in Cleanroom water cooled?

Yes No

8. Are hazardous or Flammable materials used in process?

Yes No

9. Will the Cleanroom have any fume hoods, or process exhaust requirements? If yes, please identify quantity (CFM)

Yes No

10. Desired Airlock / Change room conditions:

c. Relative Pressure (in/W.C.)

a. Temperature (Farenheit) +/-

b. Relative Humidity (Minimum) (Maximum)

c. Relative Pressure (in/W.C.)

11. Desired Cleanroom conditions, Cleanroom #1:

b. Relative Humidity (Minimum) (Maximum)

c. Relative Pressure (in/W.C.)

12. Desired Cleanroom conditions, Cleanroom #2: (if applicable)

b. Relative Humidity (Minimum) (Maximum)

a. Temperature (Farenheit) +/-

a. Temperature (Farenheit) +/-

13. Desired Lighting Level (typically 80/100 FC)

15. If special light condition desired, please specify:

Photo Resist Yellow Light? Yes No

14. Are hazardous location light fixtures required? Yes No

16. Lighting control preference:

At entry to each room

At entry to Airlock(s)

From Distribution Panel

Other (Please Specify)

Page 3: Clean Air Technology Cleanroom Planning Guide

D) Room Details and accessories

a: Airlock / Change Room (width) X (length) X (ceiling height)

b: Cleanroom #1 (width) X (length) X (ceiling height)

c: Cleanroom #2 (width) X (length) X (ceiling height)

1. Room Sizes

i: Airlock #2 (width) X (length) X (ceiling height)

2. Doors (Standard finish on doors is Anodized Aluminum, custom finishes available on request)

Standard 3' x 7' Doors Quantity If special size, please identify:

Motorized Sliding Doors Quantity

Double 6' x 7' Doors Quantity

If special size, please identify:

If special size, please identify:

Phone: 800-459-6320 e-mail: [email protected]

d: Additional Airlock between Change Room and Cleanroom? Yes No

3. Windows (Standard Windows are 36" x 36", clear safety glass)

Please list any special features, if any, required for pass-thru's

Quantity

Quantity

Photo Resist Yellow Glass? Yes No

Mechanically Interlocked Doors Electrically Interlocked Doors(Requires Power source)

Stainless Steel Finish White Laminate Finish with Clear Polycarbonate Doors

4. Pass-thru (s) (Standard Pass-thru cabinet is 20"W x 20"H x 20"D interior dimensions. Custom sizes are available)

5. Wall finish color: Standard is easy-clean White Aluminum. If other is desired, please specify below

Sheet Vinyl

Sheet Rubber

Epoxy-Coated

Anti-Static

Computer-room style raised

Other (Please specify below)

6. Flooring preference:

Please specify any other special flooring requirements below - if none, leave blank

Page 4: Clean Air Technology Cleanroom Planning Guide

7. Electrical power in Cleanroom

120V Duplex Receptacles Quantity Spaced every Feet

120V Quadplex Receptacles Quantity Spaced every Feet

220-230V Specialty Receptacles Specify Amperage:

480V Specialty Receptacles Specify Amperage:

Other: Please specify

8. Data / telecommunications in Cleanroom

Data / Ethernet connections Quantity

Telephone connections Quantity

Intercom connections Quantity

Other: Please specify

9. Process or Utility piping requirements in Cleanroom

Compressed air Quantity

Quantity

Quantity

Phone: 800-459-6320 e-mail: [email protected]

Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference

Vacuum Quantity

Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference

Nitrogen Quantity

Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference

Argon Quantity

Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference

Other Quantity

Standard quick-disconnect Ball Valve Capped for custom fittingFitting Preference

Type?

Natural Gas, Please specify quantity, size and flow requirements

Housekeeping Central Vacuum System (typically supplied with a single 25' hose, and quantity of connections to allow entire cleanroom to be reached )

Please list any additional piping requirements.

Page 5: Clean Air Technology Cleanroom Planning Guide

11. Safety (check all that apply)

Building has existing fire sprinkler system

Cleanroom will require fire sprinklers

Fire alarm and/or pull stations required in cleanroom

Fire alarm remote tie-in required

Smoke detector remote tie-in required

Please list any other safety systems required (if none, leave blank)

E) Site Information

1. Project will be located on the floor of story buildingfeet from outside wall

2. What is the clear height from floor to roof joists or other structural steel at cleanroom location?

3. What is the height of the roof joists?

4. What is the spacing between the roof joists?

5. What is the height to the roof or other remaining overhead obstructions?

Phone: 800-459-6320 e-mail: [email protected]

6. Access to the cleanroom area from loading dock area is Easy Difficult

7. How many feet from cleanroom area to loading area?

8. How wide are access hallways between cleanroom area and loading area?

9. A/C Equipment is / will be located on

10. Controls

What control system is currently installed in building?

Simple Heat-Cool Thermostat Stand-alone economical control and monitor panel Monitor panel only

PC or Building automation system interface? (required) Yes No

Roof Ground outside Other (Please describe below)

Gravel / Tar

Rubber Membrane

Metal Not Sure

Other (Please Describe)

10. Existing roof type

11. Are existing building area drawings available? Yes No

Page 6: Clean Air Technology Cleanroom Planning Guide

If yes, at what temperature?

17. Conditions in space surrounding cleanroom (inside building)

Summer Temperature

Summer Humidity

Winter Temperature

Winter Humidity

18. Conditions outside building

Summer Temperature

Summer Humidity

Winter Temperature

Winter Humidity

19. Electrical service available in building (check any / all that apply)

460-480V (3-phase) 220-240V (3-phase) 120-208V (1-phase) 277V (1-phase) for lighting

21. Please list any other site conditions (if none, leave blank)

Please either scan and e-mail, or fax a sketch of the proposed cleanroom. One of our sales representatives will contact you as soon as this planning guide is received and reviewed. Thank you.

Phone: 800-459-6320 e-mail: [email protected]

12. Is year round chilled water available? Yes No

13. Is year round cooling tower water available? Yes No

If yes, at what temperature?14. Is year round boiler hot water available? Yes No

15. Is year round steam available? If yes, at what presure?Yes No

16. Is there a city drain for A/C condensate located near the cleanroom? Yes No

20. Is union labor required? Yes No