1
CLE 305 QUANTITY SURVEYING AND ESTIMATING Course Prerequisites: Building Drawing (CLE 209) Objectives : 1. To understand the types of estimates 2. To identify the methods used for different structural components 3. To understand rate analysis and process of preparation of bills 2. Vajarani (1997), Estimating and costing, Khanna Publishers. Mode of Evaluation : Assignment, Seminar and Written Examination. Recommended by the Board of Studies on: 13/11/2010 Date of approval by the Academic Council: 30.11.2010 L T P C 2 0 0 2 Expected Outcome: Students will be able to 1. Prepare a detailed estimate for different types of structures 2. Prepare valuation reports and cost quality control UNIT I : Analysis of Rates Rate analysis & preparation of bills – Data analysis of rates for various items of works – abstract estimates for Building projects UNIT II : Quantity Estimation for Building Estimation of building – Procedure of estimating, Types of estimates, detailed estimate of buildings including sanitary & electrical fittings. UNIT III : Quantity Estimation for Roads Estimate of R.C.C and Steel works - Scheduling - Slab - beam - column, Road – earthwork fully in banking, cutting, partly cutting & partly filling. Detailed estimate for WBM, Bituminous road. UNIT IV : Valuation Valuation- rent fixation, tenders, - contracts –accounting procedure, measurement book, stores, cost & quality control – PWD & CPWD practice – Software Applications for Estimation of Buildings. Reference Books 1. B.N.Dutta (1998), Estimating and costing, Charator Publishing House.

CLE305 - Quantity Surveying Estimating - Syllabus

Embed Size (px)

DESCRIPTION

Structural Health Monitoring

Citation preview

Page 1: CLE305 - Quantity Surveying Estimating - Syllabus

CLE 305 QUANTITY SURVEYING AND ESTIMATING

Course Prerequisites: Building Drawing (CLE 209)

Objectives : 1. To understand the types of estimates 2. To identify the methods used for different structural components 3. To understand rate analysis and process of preparation of bills

2. Vajarani (1997), Estimating and costing, Khanna Publishers. Mode of Evaluation : Assignment, Seminar and Written Examination. Recommended by the Board of Studies on: 13/11/2010

Date of approval by the Academic Council: 30.11.2010

L T P C 2 0 0 2

Expected Outcome: Students will be able to 1. Prepare a detailed estimate for different types of structures 2. Prepare valuation reports and cost quality control UNIT I : Analysis of Rates Rate analysis & preparation of bills – Data analysis of rates for various items of works – abstract estimates for Building projects UNIT II : Quantity Estimation for Building Estimation of building – Procedure of estimating, Types of estimates, detailed estimate of buildings including sanitary & electrical fittings. UNIT III : Quantity Estimation for Roads Estimate of R.C.C and Steel works - Scheduling - Slab - beam - column, Road – earthwork fully in banking, cutting, partly cutting & partly filling. Detailed estimate for WBM, Bituminous road. UNIT IV : Valuation Valuation- rent fixation, tenders, - contracts –accounting procedure, measurement book, stores, cost & quality control – PWD & CPWD practice – Software Applications for Estimation of Buildings. Reference Books 1. B.N.Dutta (1998), Estimating and costing, Charator Publishing House.