5
LR LR Lab University High School Facilities Master Plan– University High School 4771 Campus Dr | Irvine, CA 92612 SCALE 1:200 N 1 ST FLOOR C 2 ND FLOOR UHS CAPACITY 77 Teaching Stations +8 SDC =85 Teaching Stations 12 DHH Teaching Stations Grades: 2014/15 Enrollment: Year Built: Modernization: Site Acreage: # Portables: Existing Parking: Targeted Enrollment SCHOOL STATISTICS 9-12 2577 1971 1996 42.0 4 ± 628 2600 Project 1 PROPOSED SCOPE Modernization Reconfiguration New Construction New Site Work Demolition UTILIZATION LEGEND Classroom Clusters Science Business/Design/Engineering Special Ed (SDC/SH) DHH Physical Education Performing Arts/Multi Media ASB/Library/Student Union Portable (Color based on Program) Other Spaces Main Entry Secondary Entry Drop-Off Playfields/ Landscape Hardcourts Play Apparatus Parking Trees LEGEND Re-configure Space Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE (E) CLASSROOM BLDGS SCIENCE 12,444 SF THEATER 9,457 SF PE 18,670 SF PLAYFIELDS HARDCOURTS THEATRE AUX GYM POOL BLACK BOX ELD SP ED SP ED AMIN. FOOD SVC. PARKING (+/241) PARKING (+/168) ENGLISH FOREIGN LANGUAGE SCIENCE MATH SCIENCE ENGLISH & MATH HUMANITIES HOME MTU MAIN GYM LIBRARY/ MEDIA RR RR RR PARKING (+/219) Oct 2015 UPGRADE THEATER LIGHTING, RIGGING, AND AV SYSTEMS The Master Plan for this site is conceptual in nature and shows potential/possible facility improvements at the site aligned to IUSD Educational Specifications. Funding and prioritization of the scope of work listed will determine how the Master Plan for the site is implemented. COUNSELING MPR

CLASSROOM BLDGS SCIENCE SF THEATER 9,457 SF PE SF … · Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE(E) CLASSROOM

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CLASSROOM BLDGS SCIENCE SF THEATER 9,457 SF PE SF … · Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE(E) CLASSROOM

LR

LR

Lab

Uni

vers

ity H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Uni

vers

ity H

igh

Scho

ol47

71 C

ampu

s D

r |

Irvin

e, C

A 9

2612

SCALE 1:200

N

1ST FLOOR

C

2ND FLOOR

UHS CAPACITY 77 Teaching Stations+8 SDC

=85 Teaching Stations

12 DHH Teaching Stations

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment

SCHOOL STATISTICS

9-1225771971199642.0

4± 6282600

Project 1

PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGEND

Classroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

DHH

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

Main Quad

AcademicQuad

MODERNIZE (E) CLASSROOM BLDGSSCIENCE  12,444 SFTHEATER 9,457 SFPE  18,670 SF

PLAYFIELDS

HARDCOURTS

THEATRE

AUX GYM

POOL

BLACK BOX

ELD

SP ED

SP ED

AMIN.

FOOD SVC.

PARKING(+/‐ 241)

PARKING(+/‐ 168)

ENGLISH

FOREIGN LANGUAGE

SCIENCE

MATH

SCIENCE

ENGLISH & MATH

HUMANITIES

HOME

MTU

MAIN GYMLIBRARY/

MEDIA

RR

RR

RR

PARKING(+/‐ 219)

Oct 2015

UPGRADE THEATER LIGHTING, RIGGING, AND AV SYSTEMS

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/po

ssible

facility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritizationof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.

COUNSELING

MPR

Page 2: CLASSROOM BLDGS SCIENCE SF THEATER 9,457 SF PE SF … · Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE(E) CLASSROOM

LR

LR

Lab

Uni

vers

ity H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Uni

vers

ity H

igh

Scho

ol47

71 C

ampu

s D

r |

Irvin

e, C

A 9

2612

C

UHS CAPACITY 85 Teaching Stations-4 Teaching Stations

+5 Teaching Stations86 Teaching Stations

SCHOOL STATISTICS

Project 2

PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGEND

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

SCALE 1:200

N

Main Quad

AcademicQuad

Athletic Plaza Stadium 

Entry

2ND FLOOR

RR

RR

PLAYFIELDS

HARDCOURTS

THEATRE

AUX GYM

POOL

ELD

SP ED

SP ED

ADMIN.

FOOD SVC.

SP ED

ELDSP ED

PARKING(+/‐ 168)

ENGLISH

FOREIGN LANGUAGE

SCIENCE

MATH

SCIENCE

ENGLISH & MATH

HUMANITIES

MAIN GYM

PARKING(+/‐ 219)

REMOVE EXISTING RESTROOM & CLASSOOMBUILDINGS & RELOS

BLACK BOX

1ST FLOOR

PARKING(+/‐ 241)

C

HOME

MTU

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment

9-1225771971199642.0

4± 6282600

LIBRARY/MEDIA

LIBRARY/MEDIA/

CR

IL

NEW  2‐STORYLIBRARY/MEDIA CENTER/(5) TS CLASSROOM BLDGCLASSROOMS  8,991 SFLIBRARY 12,165 SFCOPY  1,000 SFNew building to include Student & Staff Restrooms

Classroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

DHH

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

12 DHH Teaching Stations

Oct 2015

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/po

ssible

facility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritizationof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.

COUNSELING

MPR

Page 3: CLASSROOM BLDGS SCIENCE SF THEATER 9,457 SF PE SF … · Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE(E) CLASSROOM

RR

LR

LR

Lab

Uni

vers

ity H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Uni

vers

ity H

igh

Scho

ol47

71 C

ampu

s D

r |

Irvin

e, C

A 9

2612

1ST FLOOR

C

UHS CAPACITY 86 Teaching Stations+1 ASB

=87 Teaching Stations

SCHOOL STATISTICS

Project 3

PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGEND

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

SCALE 1:200

N

BLACK BOX

Main Quad

AcademicQuad

LIBRARY/MEDIA

RECONFIGURE LIBRARY/MEDIA CENTER (7,000 SF) TO MPR/STUDENT UNION & ASB EXPANSION(2,289 SF) Athletic 

Plaza Stadium Entry

CONSTRUCT NEW ATHLETIC PLAZA/STADIUM ENTRY

2ND FLOOR

PARKING(+/‐ 241)

PLAYFIELDS

HARDCOURTS

THEATRE

AUX GYM

POOL

ELD

SP ED

SP ED

ADMIN.

FOOD SVC.

SP ED

ELDSP ED

PARKING(+/‐ 168)

ENGLISH

FOREIGN LANGUAGE

SCIENCE

MATH

SCIENCE

ENGLISH & MATH

HUMANITIES

MAIN GYM

PARKING(+/‐ 219)

REMOVE (3) COURTS

ENTRY IMPROVEMENT

HOME

MTU

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment

9-1225771971199642.0

4± 6282600

LIBRARY/MEDIA/(5) CR

IL

LUNCH CANOPIES9600 SF

FOOD KIOSK100 SF

STUDENT UNION

ASB

Classroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

DHH

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

12 DHH Teaching Stations

Oct 2015

COUNSELING

MPR

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/po

ssible

facility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritizationof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.

Page 4: CLASSROOM BLDGS SCIENCE SF THEATER 9,457 SF PE SF … · Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE(E) CLASSROOM

LR

LR

Lab

Uni

vers

ity H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Uni

vers

ity H

igh

Scho

ol47

71 C

ampu

s D

r |

Irvin

e, C

A 9

2612

1ST FLOOR

C

UHS CAPACITY 87 Teaching Stations-2 Teaching Stations(Music)

+4 Teaching Stations (PA)+4 Teaching Stations (Tech Arts)

=93 Teaching Stations

SCHOOL STATISTICS

Project 4

PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGEND

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

STUDENT UNION

SCALE 1:200

N

BLACK BOX

Main Quad

AcademicQuad

Athletic Plaza Stadium 

Entry

2ND FLOOR

PARKING(+/‐ 241)

PLAYFIELDS

HARDCOURTS

THEATRE

AUX GYM

POOL

ELD

SP ED

SP ED

ADMIN.

FOOD SVC.

SP ED

ELDSP ED

PARKING(+/‐ 168)

ENGLISH

FOREIGN LANGUAGE

SCIENCE

MATH

SCIENCE

ENGLISH & MATH

HUMANITIES

MAIN GYM

PARKING(+/‐ 219)

RR

REMOVE RESTROOM BUILDING

DEMO (E) MUSIC BUILDING7,642 SF

NEW 2 STORY (8) TS PERFORMING/TECH ARTS  BUILDING17,450 SF + 11,239 SFNew building to include Student & Staff Restrooms

CORE

CHORAL

C TECH ARTS

NEW LOBBY ADDITION1,417 SF

HOME

MTU

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment

9-1225771971199642.0

4± 6282600

LIBRARY/MEDIA/

CR

IL

BLACK BOX

DANCE

INSTR

CORE

Classroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

DHH

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

12 DHH Teaching Stations

RELOCATE. PROVIDE NEW ELECTRICAL SWITCH GEAR

Oct 2015

COUNSELING

MPR

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/po

ssible

facility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritizationof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.

Page 5: CLASSROOM BLDGS SCIENCE SF THEATER 9,457 SF PE SF … · Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible Main Quad Academic Quad MODERNIZE(E) CLASSROOM

LR

LR

Lab

Uni

vers

ity H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Uni

vers

ity H

igh

Scho

ol47

71 C

ampu

s D

r |

Irvin

e, C

A 9

2612

C

UHS CAPACITY 93 Teaching Stations-5 Teaching Stations (Elective Bldg)

+ 7 Reconfiguration (Elective Bldg)+ 5 Portables =100 Permanent Teaching Stations

SCHOOL STATISTICS

Project 5

PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGEND

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

STUDENT UNION

SCALE 1:200

N

Main Quad

AcademicQuad

LIBRARY/MEDIA/

CR

Athletic Plaza Stadium 

Entry

2ND FLOOR

PLAYFIELDS

HARDCOURTS

THEATRE

AUX GYM

POOL

ELD

SP ED

SP ED

ADMIN.

FOOD SVC.

SP ED

ELDSP ED

PARKING(+/‐ 168)

ENGLISH

FOREIGN LANGUAGE

SCIENCE

MATH

SCIENCE

ENGLISH & MATH

HUMANITIES

MAIN GYM

PARKING(+/‐ 219)

BLACK BOX

1ST FLOOR

PARKING(+/‐ 241)

CORE

C

C

C C

C

C

C

CONVERT (10) TS TO SHARED COMMONS AREAS

CONVERT BLACK BOX TO LECTURE HALL1,800 SF

RECONFIGURE TO SUPPORT ELECTIVE PROGRAM NEEDS12,100 SF

*LANDSCAPE UPGRADES THROUGHOUT

IL

HOME

MTU

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment

9-1225771971199642.0

4± 6282600

*SAFETY ISSUE:  CAMPUS WIDE OUTDOOR LIGHTING UPGRADE

Classroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

DHH

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

12 DHH Teaching StationsCORE

CHORAL

CTECH ARTS

BLACK BOX

DANCE

INSTR

CORE

(5) NEW PORTABLES

Oct 2015

COUNSELING

MPR

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/po

ssible

facility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritizationof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.