Upload
swann
View
23
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Civil-Military Workshop Harmonised Data Sharing. Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO. TOPICS. Data. Data Flows. Notification. Real time. INPUT/OUTPUT PHASE 1. AAs. AMCs. FMPs. NM. Airspace data. Other data. ASM areas* NO ASM areas CDRs Sectors Route Net. RAD - PowerPoint PPT Presentation
Citation preview
The European Organisation for the Safety of Air Navigation
Civil-Military Workshop
HarmonisedData Sharing
Giuseppe Acampora
EUROCONTROL DNM/COO/NOM/OPL/PRO
Notification
Data
Data Flows
Real time
The European Organisation for the Safety of Air Navigation
INPUT/OUTPUT PHASE 1
ASM/ATFCMASM/ATFCM PROCESSPROCESS
•METMET•Traffic dataTraffic data•Areas requestsAreas requests•CDRs requestsCDRs requests•LoAsLoAs•Sector capacitySector capacity•Sector LoadSector Load
Other dataOther data
FlowFlowmeasuresmeasures
AreasAreasAll./Act.All./Act.
CDRsCDRsAvai./UseAvai./Use
AOsAOs GAGA MILMIL
•ASM areas*ASM areas*•NO ASM areasNO ASM areas•CDRsCDRs•SectorsSectors•Route Net.Route Net.•RADRAD•RegulationsRegulations•NOTAMsNOTAMs
Airspace dataAirspace data
TSA/TRA, R&D AMC Manageable, CBA, RCA, PCA (previous co-or. Area)TSA/TRA, R&D AMC Manageable, CBA, RCA, PCA (previous co-or. Area)
NMNMFMPsFMPsAMCsAMCsAAsAAs
The European Organisation for the Safety of Air Navigation
INPUT/OUTPUT Phase 2
•ASM areas*ASM areas*•NO ASM areasNO ASM areas•CDRsCDRs•SectorsSectors•Route Net.Route Net.•RADRAD•RegulationsRegulations
ASM/ATFCMASM/ATFCM PROCESSPROCESS
•METMET•Traffic dataTraffic data•Sector capacitySector capacity•Sector LoadSector Load•Areas requestsAreas requests•CDRs requestsCDRs requests•LoAsLoAs
FlowFlowMeasuresMeasures
AreasAreasAll./Act.All./Act.
Airspace dataAirspace data Other dataOther data
CDRsCDRsAvai./UseAvai./Use
AOsAOs GAGA MILMIL
TSA/TRA, R&D AMC Manageable, CBA, RCA, PCA (previous co-or. Area)TSA/TRA, R&D AMC Manageable, CBA, RCA, PCA (previous co-or. Area)
CFMUCFMUFMPsFMPsAMCsAMCsAAsAAs
•ASM areas*ASM areas*•NO ASM areasNO ASM areas•CDRsCDRs•SectorsSectors•Route Net.Route Net.•RADRAD•RegulationsRegulations•X NOTAMsX NOTAMs•Airport inf.Airport inf.•Airport capacityAirport capacity•RWY in useRWY in use•SID/STAR in useSID/STAR in use•Airp. Slot timeAirp. Slot time•TWY timeTWY time
•METMET•Traffic dataTraffic data•Sector capacitySector capacity•Sector LoadSector Load•Areas requestsAreas requests•CDRs requestsCDRs requests•LoAsLoAs•Areas UsageAreas UsageFlowFlow
MeasuresMeasuresSector in.Sector in.
ASM/ATFCM dataASM ToolsADR
Draft/
National
AUP/UUP
eAMI eRAD
Level 1
Data User
CIAM
EAUP/EUUP
ASM Data Flows – Phase 1
ASM/ATFCM dataASM ToolsADR
Draft/
National
AUP/UUP
AS Activations /de-activations
AS Activations /de-activations
•eAMI
• eRAD
•Level 1
Data User
CIAM
EAUP/EUUP
ATS Systems
ASM Level 2/3 data
Post OPS
ASM data archive
ASM Data Flows – Phase 2
Rolling Process Scenario - Notification
NOP PortalB2BB2C
RRPFLSIFPS
AOLO
LeadTime?
Notification
0
5
10
15
20
25
30
Austri
a
Belgium
Bulgar
ia
Cypru
s
Czech
Rep
ublic
Denm
ark
Finlan
d
Franc
e
Germ
any
Greec
e
Hunga
ry
Nethe
rland
s
Norway
Poland
Roman
ia
Slovak
ia
Spain
Sweden
Switzer
land
Ukrain
eUK
Country
No
of
pu
blic
ati
on
s
August
March
Rolling UUP – March vs August 2012
e-AMI B2B service – June 2012
E-AMI B2B – Major Users
E-AMI B2B – Major Users
Not Using CIAM
Allocated in CIAM
Not allocated in CIAM
RSA Publication in CIAM
Direct Impact on AUP/UUP Procedures• Country Code Restrictions: This restriction ID type will be
proposed to identify RSA allocations, published via daily AUP/UUP. The RSA’s must be implemented in CACD.
• Example: EBTRA01, EGD701
• All FPL’s (including DCT filing) through the EBTRA01, EGD701 will become invalid.
• This restriction (Dependant Applicability) will only work when:• - The RSA is created in CACD• - The Restriction is created in CACD with RL the required
RSA (TRA01,D701)• - The RSA is allocated via CIAM ( with time and level)
NM ID RESTRICTIONS
Background
Benefits
Validation Process
Background
• OCG/9: an investigation activity to be launched
• Ad Hoc Task Force O (1st March 2010)
• 8th Task Force O (13th April 2010)
• ADR Workshop (22nd March 2010)
Awareness
Safety
ATFM measures
Post OPS
Airspace usage
To be validated