Civil Input to GPS III. PNT Advisory Board Meeting 16 Oct 08. HQ AFSPC Mr. Hank Skalski, OST Col Dave Buckman, A5P Peterson AFB, CO. Overview. Purpose Interagency Requirements Process (IRP) Nominal IFOR Approval Cycle Overall Approval Process GPS IIIB CDD Schedule - PowerPoint PPT Presentation

Citation preview

Page 1: Civil Input to GPS III

Working together todayto meet the

Positioning, Navigation and Timingneeds of tomorrow

Interagency Forum for Operational Requirements

Civil Inputto

GPS IIIPNT Advisory Board Meeting

16 Oct 08

HQ AFSPCMr. Hank Skalski, OSTCol Dave Buckman, A5PPeterson AFB, CO

Page 2: Civil Input to GPS III

Overview

• Purpose• Interagency Requirements Process (IRP)• Nominal IFOR Approval Cycle• Overall Approval Process• GPS IIIB CDD Schedule• Geodetic Requirement (Satellite Laser Reflectors

[SLRs])• Distress Alerting Satellite System (DASS)• Wrap Up

Page 3: Civil Input to GPS III

Purpose

• Describe GPS interagency requirements process• Provide information on candidate GPS

requirements/payloads• Geodetic

• DASS

Page 4: Civil Input to GPS III

Interagency Requirements Process

ValidatedCivil

Requirements

ValidatedInteragency

Requirements

ValidatedMilitary

Requirements

InteragencyRequirements

Board(IRB)

DOTExtended

Pos/Nav WG

Interagency Forumfor Operational

Requirements (IFOR)

InteragencyRequirements

OversightCouncil(IROC)

JROCApprove Military

Requirements

JCBCoordinate and

Adjudicate MilitaryRequirements

NC FCBCoordinate and

Adjudicate MilitaryRequirements

Civil Panel Military Panel

DOTExtendedPos/NavExCom

Approve CivilRequirements

Civil Department

RequirementsProcesses

Service’s &Defense AgencyRequirements

Processes

Page 5: Civil Input to GPS III

Nominal IFOR Approval Cycle

Send to IFOR For Review

ReceiveReq’t & AoA

ResolveComments

Prepare Package for Co-Chairs

Approve or Send for Rework

Incorporate into GPS Req’ts Documents

Day 0 Days 1-60 Days 61-90 Days 91-104 Day 105 Dependent on Req’t

Cycle

• Nominal Cycle Time is 105 days plus time associated with preparing documents

• Following document preparation, requirement documents (such as CDDs) will enter JCIDS process

EnterJCIDSProcess

Page 6: Civil Input to GPS III

Overall Approval Process

DEPSECDEF Approve?

EndInclude

Requirement on GPS

Yes

Cost/Funding Assessment

Security Assessment

Technical Assessment

Start

Exclude Requirement

from GPS

No

No

Yes

JCIDS & IRPProcesses Approve

Requirement?

Is this a secondary payload?

No

Yes

ValidatedCivil

Requirements

ValidatedInteragency

Requirements

ValidatedMilitary

Requirements

InteragencyRequirements

Board(IRB)

DOTExtended

Pos/Nav WG

Interagency Forumfor Operational

Requirements (IFOR)

InteragencyRequirements

OversightCouncil(IROC)

JROCApprove Military

Requirements

JCBCoordinate and

Adjudicate MilitaryRequirements

NC FCBCoordinate and

Adjudicate MilitaryRequirements

Civil Panel Military Panel

DOTExtendedPos/NavExCom

Approve CivilRequirements

Civil DepartmentRequirements

Processes

Service’s &Defense Agency

RequirementsProcesses

ValidatedCivil

Requirements

ValidatedInteragency

Requirements

ValidatedMilitary

Requirements

InteragencyRequirements

Board(IRB)

DOTExtended

Pos/Nav WG

Interagency Forumfor Operational

Requirements (IFOR)

InteragencyRequirements

OversightCouncil(IROC)

JROCApprove Military

Requirements

JCBCoordinate and

Adjudicate MilitaryRequirements

NC FCBCoordinate and

Adjudicate MilitaryRequirements

Civil Panel Military Panel

DOTExtendedPos/NavExCom

Approve CivilRequirements

Civil DepartmentRequirements

Processes

Service’s &Defense Agency

RequirementsProcesses

Page 7: Civil Input to GPS III

GPS IIIB CDD Schedule

Days Date Days Date1 Submit RSR Request to AF/A5RD 10-Jan-12 10-Jan-122 RSR Briefing to A-A5R 21 31-Jan-12 21 31-Jan-123 HPT Commences 30 1-Mar-12 30 1-Mar-124 HPT Ends 11 12-Mar-12 11 12-Mar-125 Internal Coordination & Cleanup 30 11-Apr-12 60 11-May-126 O-6 Review (MAJCOM, Air Staff, Joint Staff) 21 2-May-12 28 8-Jun-127 Sponsor Completes O-6-Level Comment Resolution 15 17-May-12 30 8-Jul-128 Submit CRM/Doc/Brief for AFROCC 14 31-May-12 14 22-Jul-129 AFROCC 16 16-Jun-12 16 7-Aug-1210 Flag-Level Review (If required*) 21 7-Jul-12 28 4-Sep-1211 Flag-Level Comment Resolution (If required*) 15 22-Jul-12 30 4-Oct-1212 FCB 7 29-Jul-12 14 18-Oct-1213 JCB 7 5-Aug-12 14 1-Nov-1214 JROC 7 12-Aug-12 14 15-Nov-1215 Document Signed 14 26-Aug-12 30 15-Dec-12

TOTAL # of Days: 229 340

EventRegulatory Goal Realistic

Step

Page 8: Civil Input to GPS III

New Requirements - Geodetic

• Geodetic Requirements• Achieve a stable geodetic reference frame with an

accuracy at least ten times better than anticipated user requirements

• Maintain a close alignment of the WGS84 reference frame with the International Terrestrial Reference Frame

• Provide a quality assessment capability independent of current radiometric measurement used to determine GPS orbits and clock performance

• Ensure interoperability of GPS with other GNSSs through a common, independent measurement technique

Page 9: Civil Input to GPS III

Geodetic Requirements – Status

• Requirements and AoA submitted to IFOR - Apr 07• One GPS-based alternative (Satellite Laser Reflectors) with other

non-GPS alternatives• Sent out for review Apr 07

• No critical/substantive comments received

• Many favorable comments received

• IFOR letter to NASA approving Geodetic Requirements for inclusion in GPS IIIB CDD prior to entering JCIDS process – Aug 07• GPSW analysis had not been accomplished

• IFOR Requested GPSW review for GPS III satellite impacts• White papers provided in Jun 08 opposing implementation on SVs, but

also provided possible solutions

• Geodetic Requirements Working Group chartered by IFOR

Page 10: Civil Input to GPS III

Geodetic Requirements Working Group

• Intent is to fully explore all security, cost, and technical issues prior to entering the JCIDS process

• First meeting held 17 July 08• Attended by representatives from NASA, USGS, NRL,

NGA, DOT, USNO, SAF/USA, AF/A5R, GPSW, AFTAC and AFSPC/A5P

• Created roadmap to resolve issues

• Additional Technical Meeting held 26 Aug 08 to further explore technical issues

• Next meeting – Nov 08

Page 11: Civil Input to GPS III

Geodetic Approval Cycle

Send to IFOR For Review

ReceiveReq’t & AoA

CommentResolution

Prepare Package for Co-Chairs

Approve or Send for Rework

Approved for IIIB CDD

GPSW Analysis &Comment Resolution

EnterJCIDSProcess

• Requirements submitted Apr 07• IFOR approval Aug 07

• Did not include GPSW analysis• GPSW analysis provided Jun 08• Currently working identified technical issues• Anticipated completion 1 Dec 08

Page 12: Civil Input to GPS III

Distress Alerting Satellite System (DASS)

• The United States Government, specifically the U.S. Coast Guard, Department of Defense, and the National Oceanic and Atmospheric Administration, requires an enduring space-based capability to detect, locate, and relay distress alerts from emergency beacons carried by aviators, mariners and land-based users to search and rescue services.

• The federal government requires a capability:• To support the general public• To support civilian SAR efforts of the USCG and DoD

worldwide• To support military SAR operations worldwide• To meet international obligations under the Chicago

Convention

Page 13: Civil Input to GPS III

DASS – Status

• Requirements and AoA received 28 Jul 08• Not a GPS or PNT requirement – would be a secondary

payload

• Package sent out for IFOR review 1 Aug 08, comments due 1 Oct 08• Letter supporting requirements received from Joint

Personnel Recovery Agency

• Comments received and being adjudicated

• GPSW performing cost and technical analysis• USAF Red Team conducting national security

analysis

Page 14: Civil Input to GPS III

DASS Approval Cycle

Send to IFOR for Review

ReceiveReq’t & AoA

CommentResolution

Prepare Package for Co-Chairs

Approve or Send for Rework

Approved for IIIB CDD

Day 0

Days 1-60

Days 61-90 Days 91-104 Day 105

Task GPSW for Analysis

• Requirements and AoA received Jul 08• Comments received Oct 08• In Comment Resolution• GPSW still conducting cost/technical analysis• Anticipated completion Dec 08

EnterJCIDSProcess

Page 15: Civil Input to GPS III

Wrap Up

• Flexibility in the requirements development process is key – one size doesn’t fit all

• Geodetic and DASS requirements are being processed through the IFOR • Each has unique issues that require slightly different

handling