12

City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th
Page 2: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

City’s Transportation Planning Work Underway

Inglewood Transit Connector

Transportation Management & Operations Plan for Stadium & Entertainment District Neighborhood Protection Plan

Inglewood Mobility Plan

2

Page 3: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Map is conceptual and subject to change

The Forum

Proposed Inglewood Basketball and

Entertainment Center

Los Angeles Stadium & Entertainment District at

Hollywood Park

Downtown Inglewood

Westchester/Veterans

Aviation/96th St (AMC)

Aviation/LAX Hawthorne/Lennox

The City’s Challenge: Direct Connection to Rail

3

Aviation/Century

Legend

Metro Crenshaw/LAX LineMetro Green Line

Metro Local Bus Metro Rapid Line

Page 4: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

A. Market/ManchesterB. Fairview HeightsC. Arbor VitaeD. Century Boulevard

Legend

Metro Crenshaw/LAX LineMetro Green Line

Alt. A Market-ManchesterAlt. B Fairview HeightsAlt. C Arbor VitaeAlt. D Century Boulevard

Alignment Alternatives

The Forum

Los Angeles Stadium & Entertainment District

at Hollywood Park

Proposed Inglewood Basketball and

Entertainment Center

Map is conceptual and subject to change 4

Page 5: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Comparison Table of Alternatives

Alternative A: Market -

Manchester Street

Alignment

Alternative B: Fairview

Heights Alternative

Alternative C: Arbor Vitae

Street Alignment

Alternative D: Century Blvd

Alignment

Capital Cost (2018$) $614.4 M $625.1 M $756.7 M $769.2 M

Operation & Maintenance Cost

(2018$) $18.2 - $ 19.5 M $18.2 - $ 19.5 M $18.2 - $ 19.5 M $18.2 - $ 19.5 M

Event - Annual Ridership 1,025,908 939,920 986,368 1,064,410

Non-Event - Annual Ridership 1,552,212 954,906 1,060,687 1,868,737

Annual Ridership 2,578,120 1,894,826 2,047,055 2,933,147

1.8 miles 2.2 miles 3 miles 3.1 miles

Minimal/Good

Minimal/Good (with

potential impacts to

Inglewood Cemetery due to

narrow roadway)

Minimal/Good (with

potential impacts to small

businesses and residences

due to narrow roadway)

Major/Limited (major

utilities with impacts driving

property acquisitions)

Minimial Potential Impact to

Inglewood Cemetary

Potential impacts to small

businesses and residences

Property acquisitions likely

due to major utility

relocations

High High High High P3 Opportunities

Co

st

Approx. length of the system (mi.)

Utility Conflicts/ability to resolve with

relocations

Potential Right-of-Way Impacts/ability to

resolve (based on roadway width)

Rid

ers

hip

Page 6: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Alternative A: Market – Manchester Alignment

Characteristics • Elevated, APM/Monorail System• Approx. 1.8 mile length• 5 Stations

Recommended for Future Study

• Promotes local economic development opportunities in downtown Inglewood

• Enhances future transit oriented development opportunities

• Provides a direct connection between downtown Inglewood and major activity centers

• Minimal utility relocation conflicts that can be resolved due to sufficient roadway width and project design

The Forum

Map is conceptual and subject to change

Los Angeles Stadium & Entertainment District

at Hollywood Park

Proposed Inglewood Basketball and

Entertainment Center

Legend

Metro Crenshaw/LAX Line

Metro Green Line

Alt. A Market-Manchester

6

Page 7: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Alternative B: Fairview Heights Alignment

Los Angeles Stadium & Entertainment District

at Hollywood Park

Map is conceptual and subject to change

The Forum

Proposed Inglewood Basketball and

Entertainment Center

Characteristics • Elevated, APM/Monorail

System• Approx. 2.2 mile length• 4 Stations

Not Recommended for Future Study

• Does not provide opportunity for integration with revitalization goals of Market Street

• Does not provide a direct connection between downtown Inglewood and major activity centers

• Potential impact to Inglewood Cemetery due to narrow roadway width

Legend

Metro Crenshaw/LAX Line

Metro Green Line

Alt. B Fairview Heights

7

Page 8: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Alternative C: Arbor Vitae Alignment

The Forum

Los Angeles Stadium & Entertainment District

at Hollywood Park

Proposed Inglewood Basketball and

Entertainment Center

Map is conceptual and subject to change

Legend

Metro Crenshaw/LAX LineMetro Green Line

Alt. C Arbor Vitae

Characteristics • Elevated, APM/Monorail

System• Split routes to serve the

Forum and the proposed Inglewood Basketball and Entertainment Center

• Approx. 2.2 mile length• 5 Stations

Not Recommended for Future Study

• Does not provide a direct connection between downtown Inglewood and major activity centers

• Potential major impacts to existing small businesses

• Possible neighborhood displacement

Coordination with LAWA LAMP Program and Metro Required

8

Page 9: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Alternative D: Century Blvd Alignment

Los Angeles Stadium & Entertainment District

at Hollywood Park

The Forum

Proposed Inglewood Basketball and

Entertainment Center

Map is conceptual and subject to change

Legend

Metro Crenshaw/LAX LineMetro Green Line

Alt. D Century Boulevard

Characteristics • Elevated, APM/Monorail

System• Approx. 2.2 mile length• 5 stations

Not Recommended for Future Study

• Does not provide opportunity for integration with revitalization goals of Market Street

• Challenges to crossing over/under the I-405

• Requires major utility relocations and/or property acquisitions to accommodate design

Coordination with LAWA LAMP Program and Metro Required

9

Page 10: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Team is currently evaluating the potential for implementation of an Enhanced Infrastructure Financing District (EIFD)

• Enables tax increment financing for local/regional projects (purchase, construction, expansion, improvement, seismic retrofit, rehabilitation)

• Does not increase property taxes

Team also evaluating other potential funding sources including but not limited to:

• Public private partnerships

• Development agreement / impact fees• Private investment• Public funds such as SB 1, GHG reduction

funds (state), AQMD funds, Prop A, Measure R and M local return

Transit-Priority Projects

Civic Infrastructure

Rail

Enhanced Infrastructure Finance Districts (EIFD’s)

Page 11: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Inglewood Transit Connector

1. Release Notice of Preparation/Initial Study: Mid-July

2. Anticipated Scoping Meeting: July 26, 2018

3. Define Funding Strategy: March 2019

4. Define Project Development and Delivery Strategy: December 2018

5. Stakeholder Outreach: Initiated Spring 2018

6. Initiate procurement process, and present for City approval – simultaneous to environmental clearance process

Other Planning Work Simultaneously

Underway

1. Develop the Inglewood Mobility Plan, Transportation Management and Operations Plan, and Neighborhood Protection efforts.

2. Coordination with strategic agency partners (i.e. Caltrans, Metro, SCAG, South Bay Cities Council of Governments, City of Los Angeles, etc.)

Next Steps and Overall Process

Page 12: City’s Transportation Planning Work Underwayenvisioninglewood.org/wp-content/uploads/2018/07/06.26...2018/07/06  · Hollywood Park Downtown Inglewood Westchester/Veterans Aviation/96th

Connecting People, Places, and the Future