DEPARTMENT OF
CITY PLANNING
- CITY PLANNING COMMISSION
DAVID H. J. AMBROZ PRESIDENT
RENEE DAKE WILSON VICE-PRESIDENT
CAROLINE CHOE
RICHARD KATZ
JOHN W. MACK SAMANTHA MILLMAN
MARC MITCHELL VERONICA PADILLA-CAMPOS
DANA M. PERLMAN
ROCKY WILES COMMISSION OFFICE MANAGER
(213) 978-1300
City of Los Angeles
CALIFORNIA
ERIC GARCETTI
MAYOR
June 23, 2017
EXECUTIVE OFFICES
200 N. SPRING STREET, ROOM 525 LOS ANGELES, CA 90012-4801
VINCENT P. BERTONI, AICP DIRECTOR
(213) 978-1271
KEVIN J. KELLER, AICP
DEPUTY DIRECTOR
(213) 978-1272
LISA M. WEBBER, AICP
DEPUTY DIRECTOR
(213) 978-1274
JAN ZATORSKI
DEPUTY DIRECTOR
(213) 978-1273
http://planning.lacity.org
NOTICE OF EXTENSION
*This notice is to advise you that the comment period for
the Notice of Preparation has been extended.
NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT
AND PUBLIC SCOPING MEETING
CASE NO.: ENV-2016-3343-EIR
PROJECT NAME: Paseo Marina
PROJECT APPLICANT: Sares-Regis Group
PROJECT ADDRESS: 13400-13450 Maxella Avenue, 4305-4363 Glencoe Avenue,
Los Angeles, California, 90292
COMMUNITY PLANNING AREA: Palms - Mar Vista - Del Rey
COUNCIL DISTRICT: 11- Bonin
COMMENT PERIOD: June 9, 2017 – July 11, 2017 July 18, 2017
DUE DATE FOR PUBLIC COMMENTS: 4:00 P.M. on July 11, 2017 4:00 P.M. on July 18, 2017
SCOPING MEETING: June 27, 2017. See more information below.
Pursuant to the California Environmental Quality Act (CEQA) Guidelines Section 15082, once
the Lead Agency decides an Environmental Impact Report (EIR) is required for a project, a
Notice of Preparation (NOP) describing the project and its potential environmental effects shall
be prepared. You are being notified of the intent of the City of Los Angeles, as Lead Agency, to
prepare an EIR for the Paseo Marina Project, which is located in an area of interest to you
and/or the organization or agency you represent. The EIR will be prepared by outside
consultants under the supervision of the Department of City Planning.
The City of Los Angeles requests your comments as to the scope and content of the EIR,
including any mitigations or alternatives to reduce potential impacts. Comments must be
submitted in writing pursuant to the instructions provided below. If you represent an agency,
the City is seeking comments as to the scope and content of the environmental information in
the document that is germane to your agency’s statutory responsibilities in connection with the
Project. Your agency will need to use the EIR prepared by our agency when considering your
permit or other approvals for the Project.
ENV-2016-3343-EIR Page 2
A Scoping Meeting will be held on June 27, 2017, as detailed below. The Scoping Meeting will
be in an open house format. The Scoping Meeting is NOT the required public hearing for
Municipal Code entitlement requests; that hearing will be scheduled after completion of the
EIR.
The environmental file for the Project is available for review at the Department of City Planning,
200 North Spring Street, Room 750, Los Angeles, CA 90012, during regular office hours,
Monday–Friday from 8:00 A.M.–4:00 P.M. A copy of the Initial Study prepared for the Project is
not attached but may be viewed online at http://planning.lacity.org by clicking on the
“Environmental Review” tab, then “Notice of Preparation & Public Scoping Meetings.”
PROJECT LOCATION: The Project Site comprises an approximately 6.06-acre portion of the
existing Marina Marketplace Shopping Center located in the Palms–Mar Vista–Del Rey
Community Plan area. The Project Site is bounded by Maxella Avenue to the north, Glencoe
Avenue to the east, Marina Marketplace Shopping Center uses to the south, and the Stella
Apartments to the west.
PROJECT DESCRIPTION: The Project proposes to replace three existing shopping center-
related buildings within the Project Site that together comprise approximately 100,781 square
feet and associated surface parking areas with a new mixed-use development consisting of 658
multi-family residential units and an estimated 27,300 square feet of neighborhood-serving
commercial uses, including approximately 13,650 square feet of retail space and approximately
13,650 square feet of restaurant space. The proposed multi-family residential and commercial
uses would be provided within three seven-story buildings with a maximum height of
approximately 77 feet.
In accordance with the requirements of the Los Angeles Municipal Code (LAMC), the proposed
uses would be supported by 1,217 parking spaces, which would be distributed throughout the
Project Site in two subterranean parking levels and in two above-grade parking levels located
within each of the three buildings. The Project would include residential lobbies and leasing
areas, pools, a spa, and outdoor kitchens with lounges and seating. In addition, per the
requirements set forth in the LAMC, the Project would provide approximately 70,175 square
feet of open space, including paved plazas with seating, landscaped paseos, and landscaped
open space at the ground level that would be privately maintained and publicly accessible. The
proposed plazas located along the northwest portion and in the center of the Project Site would
connect to a publicly accessible, privately maintained open space area, including a one-story
amenity building and additional seating, located along the southwestern portion of the Project
Site via outdoor pedestrian paseos. Overall, the Project would remove approximately 100,781
square feet of existing commercial floor area and construct approximately 674,329 square feet
of new residential and commercial floor area, resulting in a net increase of 573,548 square feet
of net new floor area within the Project Site for a total floor area ratio of approximately 2.6 to 1.
REQUESTED PERMITS/APPROVALS: The entitlements being requested for the Project
include, but may not be limited to, the following:
1. General Plan Amendment to the Palms–Mar Vista–Del Rey Community Plan to change the Community Plan land use designation from Limited Manufacturing to General Commercial;
2. Vesting Zone and Height District Change from [Q]M1-1 to (T)(Q)C2-2D;
ENV-2016-3343-EIR Page 3
3. Site Plan Review;
4. Master Conditional Use Permit to allow the onsite and offsite sale of a full line of alcoholic beverages;
5. Coastal Development Permit;
6. Mello Act Compliance Review;
7. Vesting Tentative Tract Map together with a haul route;
8. Lot Line Adjustment; and
9. Other discretionary and ministerial permits and approvals that may be deemed necessary, including but not limited to temporary street closure permits, grading permits, excavation permits, foundation permits, and building permits.
PROBABLE ENVIRONMENTAL EFFECTS OF THE PROJECT: Aesthetics; Air Quality;
Geology and Soils; Greenhouse Gas Emissions; Hazards and Hazardous Materials; Hydrology
and Water Quality; Land Use and Planning; Noise; Public Services (fire protection, police
protection, schools, parks, and libraries); Recreation; Transportation/Traffic; Tribal Cultural
Resources; and Utilities and Service Systems (water, wastewater, solid waste, and electricity
and natural gas facilities). Other environmental areas addressed in the Initial Study and
determined to result in no impacts, less than significant impacts, or less than significant impacts
with mitigation measures imposed, will not be analyzed further in the EIR.
PUBLIC SCOPING MEETING DATE AND LOCATION: A public scoping meeting in an open
house format will be held to receive written public comments regarding the scope and content
of the environmental analysis to be included in the Draft EIR. City staff, environmental
consultants, and Project representatives will be available, but no formal presentation is
scheduled. You may stop by at any time between 5:00 P.M. and 7:00 P.M. to view materials,
ask questions, and provide written comments. The City of Los Angeles encourages all
interested individuals and organizations to attend this meeting. The location, date, and time of
the public scoping meeting for this Project are as follows:
Date: June 27, 2017
Time: 5:00 P.M.–7:00 P.M.
Arrive any time between 5:00 P.M.–7:00 P.M. to speak one-on-one with
City staff and Project consultants.
Location: Hotel MdR
13480 Maxella Avenue
Marina del Rey, CA 90292
(See attached map)
Free and ADA-compliant parking will be available to Scoping Meeting attendees.
The enclosed materials reflect the scope of the Project (subject to change). The City of Los
Angeles will consider all written comments regarding the potential environmental impacts of the
Project and issues to be addressed in the EIR. Written comments must be submitted to
this office by 4:00 P.M., July 11, 2017 4:00 P.M., July 18, 2017. Written comments also will be
accepted at the public scoping meeting described above.
Venice
Rose
Culve
r
Palms
Walgrove
InglewoodAlla
Ocean Park
PCH
Washington Glencoe
McLaughlin
Lincoln
Marina
Short
Jefferson
Neilson
Abbot Kinney
MindanaoMaxella Ave
23rd
Dolce
Califo
rnia
Beethoven
Grand
ZanjaCentinela
PCH
Abbot Kinney Culve
r
Venice
Lincoln
Centinela
Inglewood
Admiralty
Main
Brad
dock
Marina
Sawtelle
Pacific
Sepulveda187
1
1
405
ProjectSite
Source: Los Angeles County GIS, 2015; Eyestone Environmental, 2016.
0 10.5Miles
N
Figure A-1Project Location Map
NOT TO SCALE
�
405
101
91
1182
710
1
1
405
10
105
405
210
110
605
5
5
San Pedro
Encino Sherman Oaks
Van Nuys
Chatsworth
Carson
Santa Monica Mtns.
San Gabr ie l Mtns.
Glendale
Hollywood
Santa Monica
Manhattan Beach
Redondo Beach
Torrance
Long Beach
Malibu
Woodland Hills
Simi Valley
Agoura Hills
Los Angeles
Pasadena
Project Site
MAXELLA AVE
GLENCOE AVE
LINCOLN BLVD
MIN
DA
NA
O W
AY
REDWOOD AVE
Project Site
Source: Google Earth, 2016.
Figure A-2Aerial Photograph of Project Vicinity
MAXELLA AVE
GLE
NCO
E A
VESource: TCA Architects, Melendrez, 2016.
Figure A-3Conceptual Site and Landscape Plan