City of Yukon
Document Packet
Repair and Capital Improvements
City of Yukon
Capital Repair and Improvement Items
1. Clarifier Rehab (Cost per Clarifier) a. Rehab 35 yr old Clarifiers, includes new mechanical components.
(see Attachment Quote from BW Services)
2. Return Activated Sludge Building Rehab a. Replace RAS Pumps, sludge meters, and install telemetry on old RAS building.
1. Control Building 12X12 2. Pumps (see quote from Bertrem) 3. Automated Valves and Meters 4. VFD’s and Telemetry
3. Bar Screen for WWTP a. Install new ½ “ (half-inch) automatic bar screen at Wastewater
Treatment plant. Replace panels in existing screen with 1/16” plates.
4. West Screw Pump for Headworks a. Replace old screw pump with a double flight USFilter unit. This unit
should be the same setup as the east screw pump.