26
COMMISSION MEMBERS BRUCE HETZEL CHAIRPERSON TERM EXP. 2020 SCOTT BORCHARDT TERM EXP. 2017 DALE ARTHUR TERM EXP. 2019 ALLEN LEITZ TERM EXP. 2018 BILL PAULSON TERM EXP. 2021 “WINTER, SPRING, SUMMER, FALL… TOMAHAWK HAS IT ALL” CITY OF TOMAHAWK WATER AND SEWER UTILITY COMMISSION Tuesday, July 25, 2017 City Hall, Council Chambers 5:00PM 23 N 2 nd Street Any additions to this agenda will be added to the original posted at City Hall. Any person who has a qualifying disability as defined by the American’s with Disabilities Act, that requires the meeting or materials at the meeting to be in an accessible location or format must contact the Clerk-Treasurer at City Hall, 453-4040, at least three days prior to the meeting so any necessary arrangements can be made to accommodate each request. PLEASE TURN CELL PHONES ON SILENT DURING MEETINGS Posted: 07/20/2017 Page 1 of 1 AGENDA A. CALL TO ORDER B. PUBLIC COMMENTS (During this item on the agenda the Commission listens to oral comments from members of the public on non-agenda items. When speaking please state your name and limit your time to five minutes.) C. MINUTES 1. June 27, 2017 D. CHECKS – 16542 – 16585 in the amount of $91,932.21 E. FINANCIAL REPORT – July 20, 2017 F. OTHER BUSINESS 1. Water Projects i. Well House No 4 and No 5 Rehab 2. Infiltration into Sanitary Sewers and Inflow into the Waste Water Treatment Facility 3. Amendment Number One – Nsighttel Wireless, LLC (d/b/a Cellcom) 4. Foaming and Lining of the Sanitary Sewer on Washington Avenue between 8 th Street and 9 th Street and between 2 nd Street and Tomahawk Avenue. G. DIRECTOR’S REPORT H. NEXT MEETING DATE(S) – August 29, 2017 at 5:00PM I. ADJOURN

CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

COMMISSION MEMBERS

BRUCE HETZEL CHAIRPERSON TERM EXP. 2020 SCOTT BORCHARDT TERM EXP. 2017 DALE ARTHUR TERM EXP. 2019 ALLEN LEITZ TERM EXP. 2018 BILL PAULSON TERM EXP. 2021

“WINTER, SPRING,

SUMMER, FALL… TOMAHAWK HAS IT ALL”

CITY OF TOMAHAWK WATER AND SEWER UTILITY COMMISSION Tuesday, July 25, 2017 City Hall, Council Chambers 5:00PM 23 N 2nd Street

Any additions to this agenda will be added to the original posted at City Hall. Any person who has a qualifying disability as defined by the American’s with Disabilities Act, that requires the meeting or materials at the meeting to be in an accessible location or format must contact the Clerk-Treasurer at City Hall, 453-4040, at least three days prior to the meeting so any necessary arrangements can be made to accommodate each request.

PLEASE TURN CELL PHONES ON SILENT DURING MEETINGS Posted: 07/20/2017 Page 1 of 1

AGENDA A. CALL TO ORDER

B. PUBLIC COMMENTS (During this item on the agenda the Commission listens to oral

comments from members of the public on non-agenda items. When speaking please state your name and limit your time to five minutes.)

C. MINUTES

1. June 27, 2017

D. CHECKS – 16542 – 16585 in the amount of $91,932.21

E. FINANCIAL REPORT – July 20, 2017

F. OTHER BUSINESS 1. Water Projects

i. Well House No 4 and No 5 Rehab 2. Infiltration into Sanitary Sewers and Inflow into the Waste Water Treatment

Facility 3. Amendment Number One – Nsighttel Wireless, LLC (d/b/a Cellcom) 4. Foaming and Lining of the Sanitary Sewer on Washington Avenue between 8th

Street and 9th Street and between 2nd Street and Tomahawk Avenue.

G. DIRECTOR’S REPORT

H. NEXT MEETING DATE(S) – August 29, 2017 at 5:00PM

I. ADJOURN

Page 2: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Water and Sewer Utility Commission June 27, 2018 Page 1 of 3

MINUTES OF THE 1

WATER AND SEWER UTILITY COMMISSION 2

City of Tomahawk 3

City Council Chambers 4

June 27, 2017 5

6 CALL TO HETZEL called the meeting of the Water and Sewer Utility Commission to order at 7 ORDER 5:01PM. 8 9 ROLL CALL Members present were Bruce Hetzel, Scott Borchardt, Dale Arthur, Allen Leitz and Bill 10

Paulson. 11 12

Also present was Director of Public Works John Cole, Clerk-Treasurer Amanda L. Bartz, 13 CMC and Water Leadsperson Brandon Strelow. 14

15 PUBLIC There were no public comments. 16 COMMENTS 17 18 MINUTES LEITZ MOVED to approve the May 30, 2017 minutes and ARTHUR seconded. The VOTE 19

was unanimous. 20 21 CHECKS The Commission reviewed and discussed the checks as presented. 22 23

HETZEL MOVED to approve checks 16500 – 16541 in the amount of $225,488.11 and 24 PAULSON seconded. The VOTE was unanimous. 25

26 FINANCIAL ARTHUR MOVED to approve the Financial Report and LEITZ seconded. The VOTE was 27 REPORT unanimous. 28 29 30 OTHER 1.) 2017 Water Projects 31 BUSINESS 32 Well House No 4 and No 5 Rehab 33 34 Greg Droessler, Town and Country Engineering, stated that they are at the 95% 35

completions stage of the plan. He stated that the deadline for submittal of the 36 application for the Safe Drinking Fund Loan Program is June 30, 2017. He stated that 37 the preliminary cost of the project is $690,000.00. 38

39 Droessler stated with the plans complete, they will be ready for the bidding process in 40

December of 2017 or January of 2018. He stated that they tend to see a jump in pricing 41 in April and May and would like to have the bidding completed before then. 42

43

Page 3: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Water and Sewer Utility Commission June 27, 2018 Page 2 of 3

BORCHARDT asked when the Utility would know about the funding and any possible 1 principal forgiveness. Droessler stated that the State has 90 days from submittal of the 2 plans to review them. He stated that they will publish a funding report in August or 3 September. 4

5 2.) Infiltration into Sanitary Sewers and Inflow into the Waste Water Treatment 6

Facility 7 8 HETZEL stated that the inflows into the Treatment Facility are higher than the 9

Department of Natural Resources permit allows and that he is concerned with the 10 scoring for the 2017 Compliance and Maintenance Annual Report (CMAR). 11

12 COLE stated that he has talked with the City of Rhinelander on how they handle 13

infiltration from sump pumps into the system and Clerk BARTZ has talked with the 14 attorney. He stated that the normal inflow into the Treatment Plant is 600,000 gallons a 15 day and it is currently up to 1-1.1 million gallons a day. 16

17 Clerk BARTZ reviewed the correspondence with Jim Kalny, Davis and Kuelthau Attorneys 18

at Law. COLE stated that if you tell them that they cannot pump into the sanitary 19 sewers, where will they go with their storm water. 20

21 BORCHARDT asked if we are ok with collecting the fee or if we are more concerned with 22

getting them disconnected from the system to decrease the inflow. Clerk BARTZ stated 23 that if we cannot make them disconnect then we need to recoup the cost to process the 24 clear water. 25

26 Discussion followed regarding the record amount of rainfall in 2017 and the level of the 27

groundwater. 28 29 Droessler suggested educating people with an informational flyer. He stated that some 30

communities offer an incentive program. 31 32 COLE stated that if we disconnect them, do we have to give them another option (storm 33

water). 34 35 This item will remain on the agenda and Clerk BARTZ will talk with the City attorney to 36

see if he can teleconference with the Commission at their next meeting. 37 38

1.) 2017 Water Projects (continued) 39 40 Well House No 4 and No 5 Rehab 41 42 PAULSON MOVED to recommend approve to the Common Council a resolution 43

declaring official intent to reimburse expenditures for Well House Renovations and a 44 resolution authorizing a representative to file applications for financial assistance from 45

Page 4: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Water and Sewer Utility Commission June 27, 2018 Page 3 of 3

the State of Wisconsin Environmental Improvement Fund. BORCHARDT seconded. The 1 VOTE was unanimous. 2

3 3.) Dean Road Culvert Replacement (Waste Water Treatment Plan Outflow) 4 5 COLE stated that the 18” effluent culverts on Dean Road was washed out and are being 6

replaced with two 24” culverts to help prevent this in the future. 7 8 DIRECTOR’S COLE reported that the gate openers and the pumps at Veterans Memorial Park had 9 REPORT been completed. He also reported that the Utility employees attended a confined space 10

training. 11 12 COLE stated that WJJQ Radio located on E Mohawk Drive is looking into hooking up to 13

the Water System. 14 15

NEXT The Water and Sewer Utility Commission will meet on July 25, 2017 at 5:00PM at 16 MEETING City Hall in the Council Chambers. 17 18 ADJOURN PAULSON MOVED to adjourn the meeting of the Water and Sewer Utility Commission 19

and BORCHARDT seconded. The VOTE was unanimous. The meeting was adjourned at 20 5:43PM. 21

22 Approved: Draft 23 Clerk/Treasurer, Amanda L. Bartz, CMC 24

Page 5: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Reprint Check Register - Quick Report - ALL 19:32 AMACCT

1ST MERIT - WATER AND SEWER CHECKING ALL Checks

Posted From:Thru Account:Thru: 7/20/2017

______________________________________________________________________________________Check Nbr Check Date Payee Amount

From Account:6/21/2017

7/20/2017 Page:

1,188.5916542 CITY OF TOMAHAWK SOLID WASTE FUND6/22/2017

1,175.4116543 CITY OF TOMAHAWK SOLID WASTE FUND6/22/2017

11,072.7416544 CITY OF TOMAHAWK6/23/2017

1,501.9216545 CITY OF TOMAHAWK SOLID WASTE FUND6/27/2017

9.0016546 CITY OF TOMAHAWK PETTY CASH6/29/2017

511.6916547 CITY OF TOMAHAWK SOLID WASTE FUND6/29/2017

6,080.0016548 TOWN & COUNTRY ENGINEERING, INC6/29/2017

2,686.1116549 CITY OF TOMAHAWK SOLID WASTE FUND7/10/2017

11,515.8616550 CITY OF TOMAHAWK7/07/2017

15,852.5616551 CITY OF TOMAHAWK7/07/2017

100.0016552 FRONTIER7/07/2017

239.7216553 UNITED STATES POSTAL SERVICE7/14/2017

604.8616554 ADVANCED SAFETY TECHNOLOGY INC7/14/2017

106.3516555 CITY OF TOMAHAWK SOLID WASTE FUND7/14/2017

162.1816556 EAGLE WASTE & RECYCLING INC.7/14/2017

193.9016557 FRONTIER7/14/2017

11.4616558 MINNESOTA LIFE7/14/2017

11,130.4916559 SECURITY HEALTH PLAN7/14/2017

185.8016560 SHELL7/14/2017

526.7916561 TOMAHAWK ACE HARDWARE7/14/2017

238.8316562 VERIZON WIRELESS7/14/2017

7,884.4316563 WISCONSIN PUBLIC SERVICE7/14/2017

584.6416564 CITY OF TOMAHAWK SOLID WASTE FUND7/18/2017

459.2616565 AUCA CHICAGO MC LOCKBOX7/20/2017

32.3616566 BUMPER TO BUMPER TOMAHAWK7/20/2017

129.7716567 CHARTER COMMUNICATIONS7/20/2017

4,580.0616568 FERGUSON WATERWORKS #14767/20/2017

1,313.4816569 FIRST SUPPLY7/20/2017

220.5616570 GARD SPECIALISTS CO. INC7/20/2017

208.8216571 GRAINGER7/20/2017

1,428.1516572 HAWKINS INC7/20/2017

423.0416573 HD SUPPLY WATERWORKS, LTD7/20/2017

75.5916574 HIGH PERFORMANCE PRODUCTS7/20/2017

Page 6: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Reprint Check Register - Quick Report - ALL 29:32 AMACCT

1ST MERIT - WATER AND SEWER CHECKING ALL Checks

Posted From:Thru Account:Thru: 7/20/2017

______________________________________________________________________________________Check Nbr Check Date Payee Amount

From Account:6/21/2017

7/20/2017 Page:

215.0316575 LINCOLN COUNTY TREASURER'S OFFICE7/20/2017

5,000.0016576 LOCAL GOVERNMENT INVESTMENT POOL7/20/2017

44.4816577 NCL OF WISCONSIN INC7/20/2017

301.4316578 NORTHERN LAKE SERVICE INC7/20/2017

602.3216579 NORTHWOODS SUPERIOR CHEMICAL CORP7/20/2017

89.9916580 RADIO SHACK7/20/2017

1,522.1616581 ROBIN MYRE ELECTRICAL CONTRACTING LLC7/20/2017

1,033.0016582 TEAM LABORATORY CHEMICAL CORP.7/20/2017

114.0016583 TECHNOLOGY MANAGEMENT7/20/2017

445.3816584 TOMAHAWK LEADER INC7/20/2017

130.0016585 VORPAHL7/20/2017

91,932.21Grand Total

Page 7: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Reprint Check Register - Quick Report - ALL 39:32 AMACCT

1ST MERIT - WATER AND SEWER CHECKING ALL Checks

Posted From:Thru Account:Thru: 7/20/2017

______________________________________________________________________________________Amount

From Account:6/21/2017

7/20/2017 Page:

57,697.63Total Expenditure from Fund # 610 - WATER FUND

34,234.58Total Expenditure from Fund # 620 - SEWER FUND

91,932.21Total Expenditure from all Funds

Page 8: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

City of TomahawkP.O. Box 469, Tomahawk, WI 54487(715) 453-4040 phone (715) 453-2717 faxwww.cityoftomahawk.com

To: Members of the Tomahawk Water and Sewer Utility CommissionFrom: Clerk-Treasurer Amanda L. Bartz, CMC, WCMCSubject: Non-Audited Financial Report

102,222.41$ 106,901.14$ (91,932.21)$

117,191.34$

125,067.68$ 242,259.02$

336,916.84$ 179,312.94$

Balance3,019,071.97$

Next Payment Date

123,120.00$ Next Payment Date

3,645,000.00$ Next Payment Date

6,787,191.97$

Due to General Fund from Water 40,258.96$ Due to General Fund from Sewer 100,100.78$

We, the members of the Tomahawk Water and Sewer Utility Commission, have examined to the extent we feel necessary, and approve the above numbered checks with a value of :

91,932.21$

July 20, 2017

Total Treasurer's Cash Last Report June 21, 2017

Fund Balances:

Debts:

Credits- Cash Receipts/Transfers Debits - Checks Total Treasurer's Cash May 20, 2017

Total Debt

$1,641.60 10/1/2017

N. 4th St Utilities/River Crossing - Matures 2028 -1.250%

State Local Government Investment PoolTotal Cash Available

Equipment Replacement FundClean Water Debt Fund

Clean Water Fund - Matures 2035 - Interest 2.363%35,904.76$ 11/1/2017

S. Tomahawk Ave. - Matures 2022 - Interest 2.250%

55,909.38$ 10/1/2017

Page 9: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Budget Comparison - Detail

________________________________________________________________________________________________________________________________________________

20172017 Budget

Status Budget% of

July

Fund: 610 - WATER FUND

1ACCT

11:38 AM7/20/2017

Actual 2017Account Number 07/20/2017 Budget

Page:

0.00 0.00 0.00 0.00610-00-44180-000-000 NON OPERATING RENTAL 0.00308.62 500.00 -191.38 61.72610-00-44190-000-000 INTEREST AND DIVIDEND INTEREST 0.00

0.00 274.77 -274.77 0.00610-00-44191-000-000 INTEREST SPECIAL ASSESSMENTS 0.000.00 0.00 0.00 0.00610-00-44192-000-000 CAPITAL CONTRIBUTIONS 0.00

8,555.00 0.00 8,555.00 0.00610-00-44210-000-000 MISC. NON-OPERATING INCOME 0.000.00 0.00 0.00 0.00610-00-44290-000-000 AMORTIZATION OF DEBT PREMIUM 0.00

600.00 0.00 600.00 0.00610-00-44601-000-000 BULK WATER SALES 0.0088,832.22 200,000.00 -111,167.78 44.42610-00-44611-000-000 RESIDENTIAL WATER 12,524.83

2,624.00 7,000.00 -4,376.00 37.49610-00-44612-000-000 MULTI FAMILY RESIDENTIAL WATER 98.8039,273.12 90,000.00 -50,726.88 43.64610-00-44613-000-000 COMMERCIAL WATER 5,210.1738,652.50 75,000.00 -36,347.50 51.54610-00-44615-000-000 INDUSTRIAL WATER 162.00

6,079.48 13,000.00 -6,920.52 46.77610-00-44617-000-000 PUBLIC AUTHORITY WATER 1,983.580.00 0.00 0.00 0.00610-00-44619-000-000 INTERDEPARTMENTAL WATER 0.00

5,880.00 12,000.00 -6,120.00 49.00610-00-44620-000-000 PRIVATE FIRE -WATER 570.00109,810.50 219,621.00 -109,810.50 50.00610-00-44630-000-000 PUBLIC FIRE PROTECTION 18,301.75

13,849.39 25,000.00 -11,150.61 55.40610-00-44700-000-000 CUSTOMER FORFEITED PENALTIES 2,937.540.00 0.00 0.00 0.00610-00-44710-000-000 MISC. SERVICE REVENUE 0.00

25,619.23 43,918.68 -18,299.45 58.33610-00-44720-000-000 WATER TOWER RENT 1,980.00100.49 500.00 -399.51 20.10610-00-44740-000-000 MISC. WATER REVENUE 40.00640.00 1,000.00 -360.00 64.00610-00-44741-000-000 RECONNECTS -MISC. SERVICE 240.00

=========================================================================================================================================LICENSES AND PERMITS 44,048.67 49.55340,824.55 -346,989.90687,814.45=========================================================================================================================================

0.00 0.00 0.00 0.00610-10-49200-000-000 TRANSFER 0.00=========================================================================================================================================DONATIONS 0.00 0.000.00 0.000.00==================================================================================================================================================================================================================================================================================

340,824.55 687,814.45Total Revenues 44,048.67 49.55-346,989.90=========================================================================================================================================

Page 10: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Budget Comparison - Detail

________________________________________________________________________________________________________________________________________________

20172017 Budget

Status Budget% of

July

Fund: 610 - WATER FUND

2ACCT

11:38 AM7/20/2017

Actual 2017Account Number 07/20/2017 Budget

Page:

66,720.31 136,242.10 69,521.79 48.97610-00-57080-000-000 TAXES 11,073.363,865.75 8,710.84 4,845.09 44.38610-00-57081-000-000 TAXES -FICA 330.08

0.00 0.00 0.00 0.00610-00-57343-000-000 ASSET:DISTRIBUTION MAINS 0.000.00 0.00 0.00 0.00610-00-57345-000-000 NEW SERVICES 0.000.00 0.00 0.00 0.00610-00-57346-000-000 METERS 0.000.00 0.00 0.00 0.00610-00-57390-000-000 ASSET:STRUCTURES & IMPROVEMENT 0.000.00 0.00 0.00 0.00610-00-57392-000-000 ASSET: TRANSPORTATION EQUIPMNT 0.000.00 2,000.00 2,000.00 0.00610-00-57394-000-000 TOOLS,SHOP & GARAGE EQUIP 0.00

36,106.98 0.00 -36,106.98 0.00610-00-57403-000-000 DEPRECIATION 0.0015,406.50 0.00 -15,406.50 0.00610-00-57404-000-000 CONTRIBUTED DEPREC (NON-OP) 0.00

0.00 98,425.00 98,425.00 0.00610-00-57427-000-000 PRINCIPAL ON DEBT 0.000.00 0.00 0.00 0.00610-00-57428-000-000 AMORTIZATION OF DEBT DISCOUNT 0.00

18,835.56 36,546.96 17,711.40 51.54610-00-57431-000-000 INTEREST ON DEBT 0.0023,996.80 51,761.02 27,764.22 46.36610-00-57600-000-000 OPERATING SUPERVISION 1,970.19

4,777.80 6,000.00 1,222.20 79.63610-00-57602-000-000 SOS MISCELANEOUS SUPPLIES 459.60145.99 500.00 354.01 29.20610-00-57605-000-000 MAIN OF WATER SOURCE PLANT 0.00

2,502.73 3,343.90 841.17 74.84610-00-57620-000-000 PUMP EXPENSE - LABOR 171.4710,840.91 23,000.00 12,159.09 47.13610-00-57622-000-000 PUMP EXPENSE - FUEL/POWER 1,709.35

1,435.46 2,500.00 1,064.54 57.42610-00-57623-000-000 PUMP EXPENSE - OTHER EXPENSES 0.001,273.37 3,150.00 1,876.63 40.42610-00-57625-000-000 PUMP EXPENSE - MAINT OF PLANT 124.411,544.40 3,343.90 1,799.50 46.19610-00-57630-000-000 WATER TREATMENT - LABOR 0.00

24,030.55 25,000.00 969.45 96.12610-00-57631-000-000 WATER TREATMENT - CHEMICALS 1,428.15744.77 2,675.12 1,930.35 27.84610-00-57640-000-000 TRANS & DIST - LABOR 0.00

3,145.83 13,000.00 9,854.17 24.20610-00-57641-000-000 TRANS & DIST - SUPPLIES 439.023,221.59 15,000.00 11,778.41 21.48610-00-57650-000-000 TRANS & DIST - RES/STAND PIPE 150.96

29,570.51 45,652.60 16,082.09 64.77610-00-57651-000-000 TRANS & DIST - MAINTENANCE 537.051,513.87 7,404.35 5,890.48 20.45610-00-57652-000-000 TRANS & DIST - MAIN SERVICE 147.86

25,404.97 7,165.50 -18,239.47 354.55610-00-57653-000-000 TRANS & DIST - MANIT OF METERS 4,781.345,681.18 6,353.41 672.23 89.42610-00-57654-000-000 TRANS & DIST - HYDRANT MAINT 1,087.22

0.00 0.00 0.00 0.00610-00-57655-000-000 TRANS & DIST - MAINT OTHER 0.000.00 48,500.00 48,500.00 0.00610-00-57656-000-000 TRANS & DIST - POWER OP EQUIP 0.000.00 0.00 0.00 0.00610-00-57676-000-000 MAINT OF METERS 0.00

5,561.80 10,676.60 5,114.80 52.09610-00-57901-000-000 CUST A/C - METER READ LABOR 531.8212,466.92 24,933.84 12,466.92 50.00610-00-57902-000-000 CUST A/C - COLLECTION LABOR 2,077.82

687.98 1,400.00 712.02 49.14610-00-57903-000-000 CUST A/C - SUPPLIES, BILLING 119.860.00 0.00 0.00 0.00610-00-57904-000-000 CUST A/C - UNCOLECTABLE ASSETS 0.00

720.00 1,080.00 360.00 66.67610-00-57920-000-000 ADMIN & GEN - LABOR 234.00560.39 1,500.00 939.61 37.36610-00-57921-000-000 ADMIN & GEN - SUPPLIES & EXPEN 0.00

39,681.54 15,000.00 -24,681.54 264.54610-00-57923-000-000 ADMIN & GEN - OUTSIDE SERVICE 506.270.00 0.00 0.00 0.00610-00-57923-001-000 ADMIN & GEN--OUTSIDE SERV 0.00

5,253.60 5,000.00 -253.60 105.07610-00-57924-000-000 ADMIN & GEN - INSURANCE 0.0050,525.18 69,806.57 19,281.39 72.38610-00-57926-000-000 ADMIN & GEN - EMPLOYEE BENEFIT 6,310.30

0.00 750.00 750.00 0.00610-00-57928-000-000 ADMIN & GEN - REGULATORY COMM 0.003,218.06 6,000.00 2,781.94 53.63610-00-57930-000-000 ADMIN & GEN--MISC EXPENSES 445.38

0.00 0.00 0.00 0.00610-00-57930-001-000 ADMIN & GEN - UNCLAIMED PROP 0.002,763.21 5,000.00 2,236.79 55.26610-00-57933-000-000 ADMIN & GEN - TRANSPORTATION 304.37

=========================================================================================================================================CAPITAL OUTLAY 34,939.88 58.51402,204.51 285,217.20687,421.71=========================================================================================================================================

0.00 0.00 0.00 0.00610-00-59000-000-000 OTHER FINANCING USES 0.000.00 0.00 0.00 0.00610-00-59200-000-000 INTERFUND TRANSFER 0.00

Page 11: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Budget Comparison - Detail

________________________________________________________________________________________________________________________________________________

20172017 Budget

Status Budget% of

July

Fund: 610 - WATER FUND

3ACCT

11:38 AM7/20/2017

Actual 2017Account Number 07/20/2017 Budget

Page:

=========================================================================================================================================OTHER FINANCING USES 0.00 0.000.00 0.000.00==================================================================================================================================================================================================================================================================================

402,204.51 687,421.71Total Expenses 34,939.88 58.51285,217.20=========================================================================================================================================________________________________________________________________________________________________________________________________________________

61,772.70392.749,108.79 -15628.65-61,379.96Net Totals

Page 12: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Budget Comparison - Detail

________________________________________________________________________________________________________________________________________________

20172017 Budget

Status Budget% of

July

Fund: 620 - SEWER FUND

1ACCT

11:41 AM7/20/2017

Actual 2017Account Number 07/20/2017 Budget

Page:

1,311.18 1,000.00 311.18 131.12620-00-44190-000-000 INTEREST AND DIVIDEND INTEREST 0.000.00 520.42 -520.42 0.00620-00-44191-000-000 INTEREST SPECIAL ASSESSMENTS 0.000.00 0.00 0.00 0.00620-00-44192-000-000 CAPITAL CONTRIBUTIONS 0.000.00 0.00 0.00 0.00620-00-44210-000-000 MISC. NON-OPERATING INCOME 0.00

1,267.50 0.00 1,267.50 0.00620-00-44210-001-000 MISC. NON-OPERATING INCOME 344.000.00 0.00 0.00 0.00620-00-44290-000-000 AMORTIZATION OF DEBT PREMIUM 0.000.00 0.00 0.00 0.00620-00-44320-000-000 INTEREST CHARGED TO CONST 0.00

=========================================================================================================================================LICENSES AND PERMITS 344.00 169.602,578.68 1,058.261,520.42=========================================================================================================================================

691.32 1,100.00 -408.68 62.85620-00-46211-000-000 FLAT RESIDENTIAL SEWER 0.00275,425.56 550,000.00 -274,574.44 50.08620-00-46221-000-000 METERED RESIDENTIAL SEWER 33,819.75

10,013.14 25,000.00 -14,986.86 40.05620-00-46221-001-000 METERED MULTI FAM RES SEWER 233.13121,280.38 275,000.00 -153,719.62 44.10620-00-46222-000-000 METERED COMMERCIAL SEWER 18,030.66100,143.84 140,000.00 -39,856.16 71.53620-00-46223-000-000 METERED INDUSTRIAL SEWER 331.98

20,122.24 40,000.00 -19,877.76 50.31620-00-46224-000-000 METERED PUBLIC AUTHORITY 6,335.610.00 0.00 0.00 0.00620-00-46226-000-000 Leachate Treatment 0.000.00 0.00 0.00 0.00620-00-46230-000-000 BOD CHARGES - HARLEY DAVIDSON 0.000.00 0.00 0.00 0.00620-00-46310-000-000 PENALTIES 0.000.00 0.00 0.00 0.00620-00-46320-000-000 SERVICING CUSTOMER LATERALS 0.000.00 0.00 0.00 0.00620-00-46350-000-000 MISC. OPERATING REVENUE 0.00

=========================================================================================================================================PUBLIC CHARGES FOR SERVICES 58,751.13 51.18527,676.48 -503,423.521,031,100.00=========================================================================================================================================

0.00 0.00 0.00 0.00620-10-49200-000-000 TRANSFER 0.000.00 0.00 0.00 0.00620-10-49200-001-000 TRANSFER TO OTHER FUNDS 0.00

=========================================================================================================================================DONATIONS 0.00 0.000.00 0.000.00==================================================================================================================================================================================================================================================================================

530,255.16 1,032,620.42Total Revenues 59,095.13 51.35-502,365.26=========================================================================================================================================

Page 13: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Budget Comparison - Detail

________________________________________________________________________________________________________________________________________________

20172017 Budget

Status Budget% of

July

Fund: 620 - SEWER FUND

2ACCT

11:41 AM7/20/2017

Actual 2017Account Number 07/20/2017 Budget

Page:

0.00 0.00 0.00 0.00620-00-59080-000-000 TAXES 0.005,758.46 14,962.35 9,203.89 38.49620-00-59081-000-000 TAXES -FICA 393.67

0.00 0.00 0.00 0.00620-00-59200-000-000 INTERFUND TRANSFER 0.000.00 0.00 0.00 0.00620-00-59313-000-000 COLLECTING MAINS & ACCESSORIES 0.000.00 0.00 0.00 0.00620-00-59379-000-000 ASSET: GEN EQUIP. LAB, COMMUNI 0.00

96,712.44 0.00 -96,712.44 0.00620-00-59403-000-000 DEPRECIATION 0.000.00 336,341.76 336,341.76 0.00620-00-59427-000-000 PRINCIPAL ON DEBT 0.00

79,521.64 155,265.88 75,744.24 51.22620-00-59431-000-000 INTEREST ON DEBT 0.000.00 0.00 0.00 0.00620-00-59432-000-000 AMORTIZATION OF DEBT DISCOUNT 0.00

66,279.06 158,614.20 92,335.14 41.79620-00-59820-000-000 OPERATION SUPERVISION & LABOR 4,707.8036,491.14 65,000.00 28,508.86 56.14620-00-59821-000-000 POWER & FUEL FOR PUMPING 6,175.08

3,163.74 6,500.00 3,336.26 48.67620-00-59825-000-000 SLUDGE CONDITIONING CHEMICALS 0.000.00 0.00 0.00 0.00620-00-59826-000-000 OTHER CHEMICALS-SEWAGE 0.00

1,850.67 5,500.00 3,649.33 33.65620-00-59827-000-000 OTHER OPERATING SUPPLIES 383.428,590.19 12,500.00 3,909.81 68.72620-00-59828-000-000 OPERATION-TRANSPORTATION 0.00

915.29 5,000.00 4,084.71 18.31620-00-59831-000-000 MAINT SEWAGE COLLECTIONS 0.0010,105.16 20,000.00 9,894.84 50.53620-00-59832-000-000 MAINT COLLECTION SYSTEM PUMP 2,827.3513,137.52 20,000.00 6,862.48 65.69620-00-59833-000-000 MAINT TREATMENT/DISPOSAL PLANT 2,227.33

0.00 0.00 0.00 0.00620-00-59833-001-000 MAINT TREATMENT/DISPOSAL PLANT 0.005,499.51 9,000.00 3,500.49 61.11620-00-59834-000-000 MAINT GENERAL PLANT STRUCTURE 0.00

0.00 0.00 0.00 0.00620-00-59834-001-000 MAINT GENERAL PLANT STRUCTURE 0.002,471.09 7,398.00 4,926.91 33.40620-00-59835-000-000 MAINT OF METERS 100.64

16,896.27 34,000.00 17,103.73 49.69620-00-59840-000-000 BILLING, COLLECTING & ACCTG 2,821.244,865.47 10,727.10 5,861.63 45.36620-00-59842-000-000 METER READING 484.60

720.00 13,915.00 13,195.00 5.17620-00-59850-000-000 ADMIN & GENERAL SALARIES 234.003,570.15 10,000.00 6,429.85 35.70620-00-59851-000-000 OFFICE SUPPLIES & EXPENSES 466.808,761.87 5,000.00 -3,761.87 175.24620-00-59852-000-000 OUTSIDE SERVICES EMPLOYED 302.43

30,962.90 60,000.00 29,037.10 51.60620-00-59852-001-000 OUTSD SERV.-TEST/SLUDGE HAUL 301.430.00 0.00 0.00 0.00620-00-59852-002-000 OUTSD SERV.-PHOSPHOROUS 0.00

5,253.60 7,500.00 2,246.40 70.05620-00-59853-000-000 INSURANCE EXPENSE 0.0045,198.81 66,726.06 21,527.25 67.74620-00-59854-000-000 EMPLOYEE PENSIONS & BENEFITS 5,487.91

0.00 0.00 0.00 0.00620-00-59855-000-000 REGULATORY COMMISSION 0.002,188.67 5,000.00 2,811.33 43.77620-00-59856-000-000 MISC. GENERAL EXPENSE 162.18

=========================================================================================================================================OTHER FINANCING USES 27,075.88 43.63448,913.65 580,036.701,028,950.35==================================================================================================================================================================================================================================================================================

448,913.65 1,028,950.35Total Expenses 27,075.88 43.63580,036.70=========================================================================================================================================________________________________________________________________________________________________________________________________________________

-77,671.443,670.0732,019.25 2,216.3581,341.51Net Totals

Page 14: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

Tomahawk WT

AMENDMENT NUMBER ONE TOWER SPACE OPTION AND LEASE AGREEMENT THIS AMENDMENT NUMBER ONE TOWER SPACE OPTION AND LEASE AGREEMENT (this “Amendment”) is made and entered into this ___ day of _________, 2017, by and between the City of Tomahawk, a Wisconsin Municipality (“Lessor”) and Nsighttel Wireless, LLC, d/b/a Cellcom, a Wisconsin limited liability company (“Lessee”).

WITNESSETH: WHEREAS, Lessor and Lessee entered into a Tower Space Option and Lease Agreement dated the 21st day of August, 2006 (the “Lease”) for the rental of water tower and ground space on that Water Tower owned by Lessor and more particularly identified in the Lease; and WHEREAS, Lessor and Lessee desire to amend certain terms and conditions contained in the Lease as set forth herein. NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, Lessor and Lessee agree as follows:

1. Exhibit “A” to the Tower Space Option and Lease Agreement is hereby deleted and replaced with Exhibit “A-1” attached hereto.

2. Exhibit “B” to the Tower Space Option and Lease Agreement is hereby deleted and replaced with Exhibit “B-1” attached hereto.

3. Lessee shall retain its entitlements to six (6) total panel antennas.

4. Except as specifically modified by this Amendment the Lease shall remain in

effect as written.

[END OF AMENDMENT - SIGNATURE PAGE FOLLOWS]

Page 15: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

- 2 -

IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first written above.

LESSOR: City of Tomahawk By: ____________________________________________ ______________________, Its ________________

LESSEE: Nsighttel Wireless, LLC, d/b/a Cellcom By: ____________________________________________

Lee Thibaudeau, Its: CTO and V.P. of Engineering

Page 16: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

- 3 -

SCHEDULE “A-1”

TOWER AND TOWER SITE LOCATION AND SPECIFICATIONS

“SEE ATTACHED DRAWINGS”

Page 17: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

SC

OP

E O

F W

OR

KS

IT

E L

OC

AT

IO

N M

AP

S

SIT

E L

OC

AT

IO

N

I:\14400\14459\CAD\Plot\CDs\T-1.dgn

NO

RT

H

SH

EE

T T

IT

LE

NO

:

SH

EE

T I

ND

EX

PR

OJE

CT

IN

FO

TIT LE S H E E T

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

T-1

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

TIT LE S H E E T

4/2

7/2

017

PR

OJE

CT

#:

T-1

.dgn

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

DIR

EC

TO

RY

UT

IL

IT

Y I

NF

O

SIT

E L

OC

AT

IO

N

NO

RT

H

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

Sig

natu

re:

Date

:

EN

GIN

EE

R S

EA

L:

1-8

00

-24

2-8

51

1

ME

MB

ER

ONECAL

L

SYST

EM

SIN

TE

R

NA

TIO N A L

FA

CIL

ITIE

S B

EF

OR

E Y

OU

DIG

IN W

ISC

ON

SIN

, CA

LL

TO

OB

TA

IN L

OC

AT

ION

OF PA

RT

ICIPA

NT

S' UN

DE

RG

RO

UN

D

FA

X A

LO

CA

TE

1-8

00-3

38-3

860

DIG

GE

R'S

HO

TL

INE

TO

LL

FR

EE

3 WO

RK

DA

YS N

OT

ICE

BE

FOR

E Y

OU

EX

CA

VA

TE

WI S

TA

TU

TE

182.0175 (1974) RE

QU

IRE

S M

IN. O

F

UN

DE

R T

HE

LA

WS O

F TH

E ST

AT

E O

F WISC

ON

SIN.

A D

UL

Y L

ICE

NSE

D PR

OFE

SSION

AL

EN

GIN

EE

RN

OT

ED

IN T

HE

SHE

ET

IND

EX

, AN

D T

HA

T I A

MSU

PER

VISIO

N O

TH

ER

TH

AN

TH

E E

XC

EPT

ION

SPR

EPA

RE

D B

Y M

E O

R U

ND

ER

MY

DIR

EC

TI H

ER

EB

Y C

ER

TIFY

TH

AT

TH

IS PLA

N SE

T W

AS

* PRE

PAR

ED

BY

OT

HE

RS

ST

AM

PE

D F

INA

L D

WG

S:

14459

FA

X: 920.986.3041

PH

ON

E: 920.982.3286

CO

NT

AC

T: JIM

WE

INM

AN

N

NE

W L

ON

DO

N, W

I 54961

2310 MIL

L ST

RE

ET

WIR

EL

ES

S P

LA

NN

ING

SO

LU

TIO

NS

SIT

E A

CQ

UIS

ITIO

N:

FA

X: 608.644.1549

PH

ON

E: 608.644.1449

CO

NT

AC

T: K

EN

BA

UM

GA

RD

T

PR

AIR

IE D

U S

AC

, WI 53578

624 WA

TE

R ST

RE

ET

ED

GE

CO

NS

UL

TIN

G E

NG

INE

ER

S, IN

C.

EN

GIN

EE

R:

FA

X: 920.617.7319

PH

ON

E: 920.617.7058

CO

NT

AC

T: B

RA

D H

ER

M

GR

EE

N B

AY

, WI 54313

450 SEC

UR

ITY

BL

VD

NSIG

HT

TE

L W

IRE

LE

SS, LL

C

CL

IEN

T:

N-1

A-4

A-3

A-2

A-1

C-2

C-1

T-1

CO

NS

TR

UC

TIO

N N

OT

ES

EQ

UIPM

EN

T D

ET

AIL

S

TO

WE

R C

OA

X R

OU

TIN

G

AN

TE

NN

A C

ON

FIG

UR

AT

ION

TO

WE

R E

LE

VA

TIO

N

CO

MP

OU

ND

PL

AN

SITE

PLA

N

TIT

LE

SHE

ET

GR

OU

ND

EL

EV

AT

ION

(NG

VD

): 1455.8'

MA

PP

ING

CO

OR

DIN

AT

ES

PH

ON

E: 715.453.2404

CO

NT

AC

T: JO

HN

CO

LE

- PU

BL

IC W

OR

KS

DIR

EC

TO

R

TO

MA

HA

WK

, WI 54487

23 N 2N

D S

TR

EE

T

CIT

Y O

F T

OM

AH

AW

K

TO

WE

R O

WN

ER

:

TO

MA

HA

WK

, WI 54487

23 N 2N

D S

TR

EE

T

CIT

Y O

F T

OM

AH

AW

K

PR

OP

ER

TY

OW

NE

R:

TO

MA

HA

WK

, WI 54487

32 E. B

IRC

HW

OO

D A

VE

NU

E

SIT

E L

OC

AT

ION

:

161' W

AT

ER

TO

WE

R

LT

E U

PG

RA

DE

DR

AW

IN

GS

TO

MA

HA

WK

, WIS

CO

NS

IN

TO

MA

HA

WK

WT

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

EL

EC

TR

IC SE

RV

ICE

PRO

VID

ER

:P

HO

NE

: 877-444-0888W

ISC

ON

SIN

PU

BL

IC S

ER

VIC

E

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

GA

LV

AN

IZE

D M

AS

T P

IPE

S.

& R

EP

LA

CE

W/ 7'-0" L

ON

G x 2 3/8" O

.D.

RE

MO

VE

(3) EX

ISTIN

G A

NT

EN

NA

MA

ST PIPE

S

NO

TE

:

(3) PR

O. D

IPL

EX

ER

SE

QU

IPM

EN

T:

(6) EX

IST

ING

1 5/8" CO

AX

CA

BL

ES

:

(3) PR

OP

OS

ED

AN

TE

NN

AS

(6) EX

ISTIN

G T

O B

E R

EM

OV

ED

AN

TE

NN

AS

:

163.0' AB

OV

E T

.O.C

.P

RO

: AN

TE

NN

A C

/L:

RF D

ESC

RIPT

ION

(VE

RIFY

WIT

H W

OR

K O

RD

ER

):

EX

IST

ING

PP

C: 200 A

MP

PP

C C

AB

INE

T

EX

IST

ING

LE

AS

E A

RE

A: 10' x 20'

EQ

UIPM

EN

T: 3'-2" x 11'-10" E

QU

IPME

NT

PLA

TFO

RM

PRO

JEC

T T

YPE

: 161' WA

TE

R T

OW

ER

PR

OJE

CT

DE

SC

RIP

TIO

N:

Page 18: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

W

W

I:\14400\14459\CAD\Plot\CDs\C-1.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

C-1

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

NO

RT

H

C-1

S IT E P LA N

SHEET TITLE:

AE

RIA

L O

VE

RV

IE

W O

F S

IT

E

0

SC

AL

E:

15'

15'

30'

11" x

17" - 1

" = 3

0'

22" x

34" - 1

" = 1

5'

GR

AV

EL

AR

EA

EX

ISTIN

G M

UL

TI-M

ET

ER

RA

CK

GR

AS

S

GR

AS

S

GR

AS

S

GR

AV

EL

AC

CE

SS

DO

OR

EX

ISTIN

G W

AT

ER

TA

NKW

OO

DS

WO

OD

S

WO

OD

S

SHE

LT

ER

EQ

UIP

ME

NT

V

ER

IZO

NE

XIS

TIN

G

CO

NC

RE

TE

SP

ILL

PA

DO

VE

RF

LO

W P

IPE

&

TO

WE

RW

AT

ER

E

XIS

TIN

G

NSIG

HT

LE

ASE

AR

EA

EX

IST

ING

10'-0" x 20'-0"

STE

EL

PLA

TFO

RM

EX

ISTIN

G 3'-2" x 11'-10" E

LE

VA

TE

D

BIR

CH

WO

OD

AV

EN

UE

PROPERTY LINE PROPERTY LINE

PROPERTY LINEPROPERTY LINE

RIG

HT

OF

WA

YR

IGH

T O

F W

AY

RIG

HT O

F WAY

Page 19: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

W

I:\14400\14459\CAD\Plot\CDs\C-2.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

C-2

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

GR

AV

EL

NE

TW

OR

K C

AB

INE

T O

N 3' x 4' P

AD

EX

ISTIN

G N

SIGH

T O

UT

DO

OR

EQ

UIP

ME

NT

ON

EX

ISTIN

G PL

AT

FOR

M; T

O R

EPL

AC

E E

XIST

ING

P

RO

PO

SE

D N

SIG

HT

CM

O E

QU

IPM

EN

T C

AB

INE

T

EQ

UIP

ME

NT

ON

EX

ISTIN

G PL

AT

FOR

M; T

O R

EPL

AC

E E

XIST

ING

PR

OPO

SED

NSIG

HT

LT

E E

QU

IPME

NT

CA

BIN

ET

GR

AV

EL

AR

EA

EX

ISTIN

G M

UL

TI-M

ET

ER

RA

CK

GR

AS

S

GR

AS

S

GR

AS

S

GR

AV

EL

PE

DE

ST

AL

EX

ISTIN

G T

EL

CO

AC

CE

SS

DO

OR

EX

ISTIN

G W

AT

ER

TA

NK

SHE

LT

ER

EQ

UIP

ME

NT

V

ER

IZO

NE

XIS

TIN

G

CO

NC

RE

TE

SP

ILL

PA

DO

VE

RF

LO

W P

IPE

&

TO

WE

RW

AT

ER

E

XIS

TIN

G

STE

EL

PLA

TFO

RM

EX

ISTIN

G 3'-2" x 11'-10" E

LE

VA

TE

D

ICE

BR

IDG

EE

XIST

ING

VE

RIZ

ON

AB

OV

E W

AT

ER

TA

NK

,O

UT

LIN

E O

F

HY

DR

AN

T

LA

ND

SC

AP

E S

TO

NE

NS

IGH

T L

EA

SE

AR

EA

W/

EX

IST

ING

10'-0" x 20'-0"

FIBE

R V

AU

LT

EX

ISTIN

G C

HA

RT

ER

C-2

NO

RT

H

C O M P O U N D P LA N

WIT

H N

EW

CM

O U

NIT

.T

O B

E R

EM

OV

ED

& R

EP

LA

CE

D

EX

ISTIN

G E

QU

IPME

NT

CA

BIN

ET

S

NO

TE

:

(L

OO

KIN

G N

OR

TH

)

EX

IS

TIN

G L

EA

SE

AR

EA

(L

OO

KIN

G D

OW

N F

RO

M T

OW

ER

)

SIT

E O

VE

RV

IE

W

14" (TY

P.)

20'-0" MINIMUM (SEE NOTE ABOVE)

(3) #3 TIE

S @

18" O.C

.

22" x 34" - 1" = 1'-0"

SC

AL

E: 11" x 17" - 1/2" =

1'-0"B

PIE

R F

OU

ND

AT

IO

N D

ET

AIL

SU

BG

RA

DE

EX

ISTIN

G

GR

AD

EFIN

ISHE

D

@ 28 D

AY

SM

INIM

UM

OF

3,000 PS

I C

ON

CR

ET

E T

O B

E A

STE

EL

POST

(TY

P.)G

AL

VA

NIZ

ED

3" D

IA. S

CH

40

LO

CA

L F

RO

ST

DE

PT

H.

MIN

IMU

M O

F 48"; D

EP

TH

TO

EX

CE

ED

P

IER

FO

UN

DA

TIO

N D

EP

TH

TO

BE

A

CO

VE

R IN

AL

L D

IRE

CT

ION

S.

MA

INT

AIN

3" MIN

IMU

M R

EB

AR

RA

CK

S A

ND

ICE

BR

IDG

E P

OS

TS

.PIE

R R

EIN

FOR

CIN

G U

SED

FOR

UT

ILIT

Y

NO

TE

S:

EQ

UA

LL

Y SPA

CE

D(6) #4 R

EB

AR

CO

NC

RE

TE

FIN

ISH

OR

CR

OW

NE

DP

RO

VID

E P

ITC

HE

D

PA

GE

AN

D R

RU

DE

TA

ILS

ON

A-4.

BR

AC

KE

TS. SE

E D

ET

AIL

B O

N T

HIS

PIP

E P

OS

T W

/ DU

AL

MO

UN

T

MO

UN

TE

D O

N P

RO

PO

SE

D 3" D

IA.

(6) PR

OP

OS

ED

RR

US

TO

BE

3'-0" x 4'-6" WO

OD

EN

CL

OS

UR

EB

UR

IED

CO

ND

UIT

S STU

B-U

P INSID

E ON

4'-0" x 10'-0" CO

NC

RE

TE

SL

AB

EX

ISTIN

G V

ER

IZO

N G

EN

ER

AT

OR

PP

C C

AB

INE

T U

TIL

ITY

RA

CK

W/

EX

ISTIN

G N

SIGH

T

6" DIA

. PV

C C

ON

DU

ITS

(4) EX

ISTIN

G B

UR

IED

PIPE PE

NE

TR

AT

ION

S(4) E

XIS

TIN

G 6" D

IA.

0

SC

AL

E:

5'

5'

10'

11" x

17" - 1

" = 1

0'

22" x

34" - 1

" = 5

'

Page 20: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

I:\14400\14459\CAD\Plot\CDs\A-1.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

A-1

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

A-1

T O W E R E LE V A TIO N

TO

WE

R P

RO

FIL

E (

WE

ST

EL

EV

AT

IO

N)

AT

OW

ER

EL

EV

AT

IO

NB

E D CS

EC

TO

R P

AN

EL

AN

TE

NN

AS

EX

IS

TIN

G N

SIG

HT

AL

PH

A

SE

CT

OR

PA

NE

L A

NT

EN

NA

S

EX

IS

TIN

G N

SIG

HT

BE

TA

SE

CT

OR

PA

NE

L A

NT

EN

NA

S

EX

IS

TIN

G N

SIG

HT

GA

MM

A

22 x 34: 1" = 30"-0"

SC

AL

E: 11 x 17: 1" =

15'-0"

2.) RE

FER

TO

STR

UC

TU

RA

L R

EV

IEW

NO

TE

ON

T-1.

OF

AN

TE

NN

A W

ITH

FIN

AL

WO

RK

OR

DE

R.

1.) CO

NT

RA

CT

OR

TO

VE

RIF

Y H

EIG

HT

AN

D D

IRE

CT

ION

NO

TE

S:

PROPOSED ANTENNAS C/L @ 163'-0" ABOVE T.O.C.(T.O

.C.) @

6" AG

LT

OP

OF

CO

NC

RE

TE

C/L

@ 163'-0" A

BO

VE

T.O

.C.

(3) PR

OP

OS

ED

NS

IGH

T A

NT

EN

NA

S,

EX

ISTIN

G W

AT

ER

TO

WE

R

(6) EX

ISTIN

G V

ER

IZO

N A

NT

EN

NA

S,

EX

ISTIN

G O

MN

I AN

TE

NN

A, T

O R

EM

AIN

EQ

UIPM

EN

T PL

AT

FOR

MC

AB

INE

TS O

N E

XIST

ING

NSIG

HT

IN

ST

AL

L P

RO

PO

SE

D E

QU

IPM

EN

T

UP T

OW

ER

INT

ER

IOR

EX

IST

ING

CO

AX

RO

UT

E

RE

MO

VE

DC

/L @

162'-0" AB

OV

E T

.O.C

., TO

BE

(6) E

XIS

TIN

G N

SIG

HT

AN

TE

NN

AS

,

6

EX

IS

TIN

G C

OA

X I

NF

O

QU

AN

TIT

Y

HE

IGH

T F

RO

M T

.O.C

. TO

AN

TE

NN

A C

/L

HO

RIZ

ON

TA

L T

OW

ER

RO

UT

ING

TO

AL

PHA

HO

RIZ

ON

TA

L T

OW

ER

RO

UT

ING

TO

GA

MM

A

TO

TA

L C

OA

X L

EN

GT

H - A

LPH

A

TO

TA

L C

OA

X L

EN

GT

H - B

ET

A

TO

TA

L C

OA

X L

EN

GT

H - G

AM

MA

HO

RIZ

ON

TA

L T

OW

ER

RO

UT

ING

TO

BE

TA

LE

NG

TH

FRO

M SH

EL

TE

R T

O T

OW

ER

CE

NT

ER

TY

P. S

EE

LA

YO

UT

ON

A-2.

ON

MA

ST

PIP

ES

, BE

HIN

D A

NT

EN

NA

S,

(3) PR

OP

OS

ED

DIP

LE

XE

RS

MO

UN

TE

D

MO

UN

TE

D O

N N

EW

PO

ST

.(3) P

RO

PO

SE

D R

RU

S T

O B

E

Page 21: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

I:\14400\14459\CAD\Plot\CDs\A-2.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

A-2

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

A-2

A N T E N N A C O N FIG U R A TIO N

NO

RT

HN

OR

TH

BA

22" x 34" - 1/2" = 1'-0"

SC

AL

E: 11" x 17" - 1/4" =

1'-0" 22" x 34" - 1/2" =

1'-0"S

CA

LE

: 11" x 17" - 1/4" = 1'-0"

EX

IS

TIN

G A

NT

EN

NA

AS

SIG

NM

EN

TP

RO

PO

SE

D A

NT

EN

NA

AS

SIG

NM

EN

T

AN

TE

NN

A L

EG

EN

D:

AN

TE

NN

A L

EG

EN

D:

FRO

M T

RU

E N

OR

TH

AL

L A

NT

EN

NA

AZ

IMU

TH

S TO

BE

NO

TE

:

2.) SEE

SHE

ET

A-4 FO

R A

NT

EN

NA

S AN

D E

QU

IPME

NT

DE

TA

ILS.

1.) AL

L A

NT

EN

NA

AZ

IMU

TH

S RE

FER

EN

CE

D FR

OM

TR

UE

NO

RT

H.

NO

TE

S:

EX

ISTIN

G V

ER

IZO

N A

NT

EN

NA

EX

ISTIN

G A

NT

EN

NA

, TO

RE

MA

IN

90°

330°

210°

90°

90°

210°

210° 330°

330°

AN

TE

NN

AS

TO

RE

MA

IN, T

YP

.(6) E

XIS

TIN

G V

ER

IZO

N

VE

NT

HA

TC

HH

AT

CH

CO

AX

RO

UT

EE

XIS

TIN

G N

SIG

HT

CO

AX

RO

UT

EE

XIST

ING

VE

RIZ

ON

TR

IPO

D M

OU

NT

EX

IST

ING

OM

NI O

N

VE

RIZ

ON

RR

U, (3) T

YP

.

VE

RIZ

ON

SP

D, (1) T

YP

.

BR

AC

ES

ON

RA

ILIN

G(12) E

XIS

TIN

G D

IAG

ON

AL

ON

TA

NK

RO

OF

EX

IST

ING

22' DIA

. RA

ILIN

G

LIG

HT

SO

BS

TR

UC

TIO

N

ON

TA

NK

RO

OF

EX

IST

ING

22' DIA

. RA

ILIN

G

VE

RIZ

ON

SP

D, (1) T

YP

.

TR

IPO

D M

OU

NT

EX

IST

ING

OM

NI O

N

CO

AX

RO

UT

EE

XIST

ING

VE

RIZ

ON

VE

RIZ

ON

RR

U, (3) T

YP

.

LIG

HT

SO

BS

TR

UC

TIO

N

BR

AC

ES O

N R

AIL

ING

(12) EX

IST

ING

DIA

GO

NA

L

CO

AX

PE

NE

TR

AT

ION

S(6) N

SIG

HT

4" O.D

.

MIC

RO

WA

VE

DIS

HF

UT

UR

E 3' D

IA. V

ER

IZO

N

MIC

RO

WA

VE

DIS

HF

UT

UR

E 3' D

IA. V

ER

IZO

N

TO

BE

RE

MO

VE

D, T

YP

. OF

(6)A

LL

GO

N #: 7220.42

EX

IST

ING

AN

TE

NN

AS

CO

AX

RO

UT

EE

XIST

ING

NSIG

HT

CO

AX

PE

NE

TR

AT

ION

S(6) E

XIS

TIN

G N

SIG

HT

4" O.D

.

SEE

DE

TA

ILS O

N A

-4K

AT

HR

EIN

#: 800 10765V01, T

YP

. OF

(3),P

RO

PO

SE

D L

TE

AN

TE

NN

AS

,

GA

LV

MA

ST

PIP

ES

, (3) TY

P.

INS

TA

LL

NE

W 7'-0" L

ON

G, 2 3/8" O

.D.

RE

MO

VE

EX

ISTIN

G M

AST

PIPE &

AN

TE

NN

AS

TO

RE

MA

IN, T

YP

.(6) E

XIS

TIN

G V

ER

IZO

N

AN

TE

NN

A, T

YP

. OF

(3)M

OU

NT

TO

MA

ST

PIP

E B

EH

IND

JM

A W

IRE

LE

SS

#: DB

C-67C

-U-2S

F,

PR

OP

OS

ED

DIP

LE

XE

R,

PR

OP

OS

ED

DIP

LE

XE

R

PRO

POSE

D L

TE

AN

TE

NN

A

Page 22: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

A-3

T O W E R C O A X R O U TIN G

UP

PE

R P

EN

ET

RA

TIO

NS

TO

P O

F A

CC

ES

S T

UB

EL

OO

KIN

G U

P A

CC

ES

S T

UB

E

LO

OK

IN

G U

P T

AN

K S

HA

FT

TO

WE

R B

AS

E P

EN

ET

RA

TIO

NS

VERIZON

NSIGHTVERIZON

NSIG

HT

1/2

" CO

AX

(2) EX

ISTIN

G V

ER

IZO

N

HY

BR

ID C

AB

LE

EX

ISTIN

G V

ER

IZO

N

EX

IS

TIN

G C

OA

X R

OU

TE

TO

RA

IL

IN

G

PEN

ET

RA

TIO

NS

EX

ISTIN

G N

SIGH

T T

OW

ER

ON

CL

UST

ER

BR

AC

KE

TS

EX

ISTIN

G N

SIGH

T C

AB

LE

RO

UT

E

ON

EX

PA

NS

ION

BR

AC

KE

TS

EX

ISTIN

G N

SIGH

T C

AB

LE

S

EX

ISTIN

G N

SIGH

T C

OA

X L

AD

DE

R

CO

AX

, TY

P.

PEN

ET

RA

TIO

NS W

ITH

EX

ISTIN

G(6) E

XIS

TIN

G N

SIG

HT

4" O.D

.

CO

AX

CO

ND

UIT

S(4) E

XIS

TIN

G 6" D

IA.

CA

BL

E R

OU

TE

EX

ISTIN

G V

ER

IZO

N

I:\14400\14459\CAD\Plot\CDs\A-3.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

A-3

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

Page 23: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

A-4

E Q U IP M E N T D E T A ILS

AS

CA

LE

: NT

S

AN

TE

NN

A D

AT

A S

HE

ET

SID

E V

IE

WF

RO

NT

VIE

W

TO

P V

IE

W

17

"

7.2"17.8"

17

"

17.8"

7.2

"

SC

AL

E: N

TS

SC

AL

E: N

TS

DM

OU

NT

IN

GA

NT

EN

NA

& E

QU

IP

ME

NT

EX

IS

TIN

G M

AS

T P

IP

E M

OU

NT

TO

EX

ISTIN

G R

AIL

ING

ME

MB

ER

S, SIMIL

AR

TO

EX

ISTIN

G H

OR

IZO

NT

AL

INST

AL

L 5/8" G

AL

V. U

-BO

LT

S

AS

PR

AC

TIC

AL

)(M

OU

NT

AS

LO

W

AN

TE

NN

A, T

YP

. P

RO

PO

SE

D L

TE

GA

LV

AN

IZE

D M

AST

PIPE (T

YP.)

PR

OP

OS

ED

2 3/8" O.D

. x 7'-0" LO

NG

RE

PLA

CE

EX

ISTIN

G M

AST

PIPE W

/

TO

NS

IGH

T M

AS

T P

IPE

, TY

P.

PRO

POSE

D D

IPLE

XE

R SE

CU

RE

D

TY

P.

CO

AX

JUM

PE

R,

EX

IST

ING

1/2"

SEC

UR

ED

TO

MA

ST PIPE

(TY

P.) D

IPLE

XE

R T

O L

TE

AN

TE

NN

AP

RO

PO

SE

D JU

MP

ER

FR

OM

SC

AL

E: N

TS

BR

EM

OT

E R

AD

IO

UN

IT

(R

RU

)

SE

E D

ET

AIL

C/A

-4D

UA

L M

OU

NT

ING

BR

AC

KE

T,

MO

DE

L # R

RU

S 11

ER

ICS

SO

N R

EM

OT

E R

AD

IO U

NIT

WE

IGH

T: 51.0 L

BS

DIM

EN

SIO

NS

: 19.7" x 17.0" x 7.2" (H x W

x D)

ER

ICS

SO

N P

AR

T # R

RU

S 11

RE

MO

TE

RA

DIO

UN

IT :

SE

E D

ET

AIL

S O

N C

-2P

IPE

PO

ST

,P

RO

PO

SE

D 3" D

IA.

I:\14400\14459\CAD\Plot\CDs\A-4.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

A-4

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

FIEL

D V

ER

IFY E

XA

CT

LA

YO

UT

TY

P. A

NT

EN

NA

MO

UN

T

BR

EM

OT

E R

AD

IO

UN

IT

(R

RU

)

WE

IGH

T: 51.0 L

BS

DIM

EN

SIO

NS

: 17.8" x 17" x 7.2" (H x W

x D)

ER

ICS

SO

N P

AR

T # R

RU

S 11

RE

MO

TE

RA

DIO

UN

IT:

Page 24: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

N-1

EL

EV

AT

ION

LIM

ITA

TIO

NS A

RE

NO

T E

XC

EE

DE

D.

UN

TIL

PER

MA

NE

NT

LIG

HT

ING

IS OPE

RA

TIO

NA

L. T

HE

CO

NT

RA

CT

OR

SHA

LL

EN

SUR

E T

HA

T A

NY

FAA

L

IGH

TIN

G R

EQ

UIR

EM

EN

TS. C

ON

TR

AC

TO

R SH

AL

L PR

OV

IDE

TE

MPO

RA

RY

FAA

APPR

OV

ED

LIG

HT

ING

R

EFE

R T

O C

ON

STR

UC

TIO

N D

OC

UM

EN

TS A

ND

CO

NST

RU

CT

ION

MA

NA

GE

R FO

R FA

A A

ND

STA

TE

1.7 FAA

PER

MIT

AN

D T

OW

ER

LIG

HT

ING

TH

E O

WN

ER

OF A

NY

RE

QU

IRE

ME

NT

S TH

AT

MA

Y D

EV

IAT

E FR

OM

TH

E C

ON

STR

UC

TIO

N D

OC

UM

EN

TS.

PRO

JEC

T R

EL

AT

ED

RE

QU

EST

S AN

D SU

GG

EST

ION

S MA

DE

BY

BU

ILD

ING

INSPE

CT

OR

, AN

D IN

FOR

M

CO

OR

DIN

AT

E A

ND

SCH

ED

UL

E R

EQ

UIR

ED

INSPE

CT

ION

S AT

TH

E JO

B SIT

E, C

OM

PLY

WIT

H SPE

CIFIC

T

HE

CO

NT

RA

CT

OR

IS RE

SPON

SIBL

E T

O O

BT

AIN

TH

E B

UIL

DIN

G PE

RM

IT. C

ON

TR

AC

TO

R SH

AL

L

1.6 BU

ILD

ING

PER

MIT

S

MU

ST

BE

RE

PL

AC

ED

. O

WN

ER

WIL

L H

AV

E T

HE

RIG

HT

TO

ASSU

ME

TH

AT

TH

E W

OR

K W

AS N

OT

CO

MPL

ET

ED

PRO

PER

LY

AN

D

CO

MPL

ET

ION

OF W

OR

K. IF A

N IT

EM

IS CO

MPL

ET

ED

WIT

HO

UT

TH

E R

EQ

UE

STE

D IN

SPEC

TIO

N, T

HE

D

. IT IS THE C

ON

TRAC

TOR

’S RESPO

NSIBILITY TO

ENSU

RE TH

AT INSPEC

TION

S OC

CU

R PR

IOR

TO

RE

LIE

VE

TH

E C

ON

TR

AC

TO

R O

F AN

Y R

ESPO

NSIB

ILIT

IES IN

TH

IS RE

GA

RD

.D

ISCR

EPA

NC

Y/D

EFE

CT

OR

IMM

ED

IAT

EL

Y N

OT

IFY T

HE

CO

NT

RA

CT

OR

OF SA

ID D

EFE

CT

DO

ES N

OT

C

. TH

E C

ON

TR

AC

TO

R IS T

HE

GU

AR

AN

TO

R O

F AL

L W

OR

K. FA

ILU

RE

TO

IDE

NT

IFY A

FOU

ND

AT

ION

, UT

ILIT

IES, E

TC

.). SU

BG

RA

DE

WO

RK

TH

AT

CA

NN

OT

BE

VISIB

LY

INSPE

CT

ED

UPO

N C

OM

PLE

TIO

N (G

RO

UN

DIN

G,

TO

TH

E O

WN

ER

ON

A W

EE

KL

Y B

ASIS. PH

OT

OG

RA

PHS SH

AL

L IN

CL

UD

E D

OC

UM

EN

TA

TIO

N O

F AL

L

B. T

HE

CO

NT

RA

CT

OR

SHA

LL

TA

KE

PHO

TO

GR

APH

S OF A

LL

CO

MPL

ET

ED

WO

RK

AN

D PR

OV

IDE

TH

ESE

GR

OU

ND

ING

, SUB

STA

NIT

AL

CO

MPL

ET

ION

, AN

D FIN

AL

.T

HE

OW

NE

R O

R E

NG

INE

ER

. AT

A M

INIM

UM

TH

IS WIL

L T

YPIC

AL

LY

INC

LU

DE

TH

E FO

UN

DA

TIO

N,

PRIO

R T

O C

OM

ME

NC

ING

WO

RK

, TH

E C

ON

TR

AC

TO

R SH

AL

L R

EQ

UE

ST A

LIST

OF IN

SPEC

TIO

NS FR

OM

WIL

L A

LL

OW

FO

R C

OO

RD

INA

TIO

N W

ITH

INS

PE

CT

ION

CO

MP

AN

IES

.O

F S

PE

CIF

IC IN

SP

EC

TIO

N M

ILE

ST

ON

ES

(SU

CH

AS

FO

UN

DA

TIO

N P

OU

RIN

G). A

DV

AN

CE

NO

TIC

E

AS SO

ON

AS T

HE

Y A

RE

KN

OW

N. T

HE

CO

NT

RA

CT

OR

SHA

LL

PRO

VID

E 48-H

OU

R A

DV

AN

CE

NO

TIC

E

IN A

DD

ITIO

N, T

HE

CO

NT

RA

CT

OR

SHA

LL

NO

TIFY

TH

E O

WN

ER

OF A

NY

CH

AN

GE

S TO

TH

E SC

HE

DU

LE

A

. TH

E C

ON

TR

AC

TO

R S

HA

LL

PR

OV

IDE

A P

RO

JEC

T S

CH

ED

UL

E P

RIO

R T

O C

OM

ME

NC

ING

AN

Y W

OR

K.

1.5 QU

AL

ITY

ASSU

RA

NC

E

RE

CO

MM

EN

DA

TIO

NS

AN

D A

PP

LIC

AB

LE

ST

AN

DA

RD

S (A

CI, IB

C, N

EC

, ET

C).

B. IN

AD

DIT

ION

TO

AL

L C

OD

ES, C

ON

TR

AC

TO

R SH

AL

L FO

LL

OW

AL

L M

AN

UFA

CT

UR

ER

SP

EC

IFIC

AT

ION

S.

OR

DIN

AN

CE

, RE

GU

LA

TIO

N O

R R

UL

E IS M

EN

TIO

NE

D IN

TH

E D

RA

WIN

GS O

R W

RIT

TE

N

RE

GU

LA

TIO

NS, A

ND

RU

LE

S. TH

IS RE

SPON

SIBIL

ITY

IS IN E

FFEC

T R

EG

AR

DL

ESS O

F WH

ET

HE

R T

HE

LA

W,

A. C

ON

TR

AC

TO

R SH

AL

L B

E R

ESPO

NSIB

LE

FOR

FOL

LO

WIN

G A

LL

FED

ER

AL

, STA

TE

, AN

D L

OC

AL

LA

WS,

1.4

CO

DE

S

AN

D S

AT

ISF

AC

TO

RY

TO

TH

E O

WN

ER

.C

. TH

E SIT

E SH

AL

L B

E L

EFT

IN A

CO

ND

ITIO

N E

QU

IVA

LE

NT

TO

TH

E PR

E-C

ON

STR

UC

TIO

N C

ON

DIT

ION

CO

NSE

RV

AT

IVE

ASSU

MPT

ION

SHA

LL

BE

UT

ILIZ

ED

FOR

BID

DIN

G PU

RPO

SES.

SPEC

IFICA

TIO

NS O

N T

RE

E PL

AC

EM

EN

T A

ND

DISPO

SAL

. IF RE

QU

IRE

ME

NT

S AR

E N

OT

SPEC

IFIED

, A

FRO

M T

HE

SITE

AN

D D

ISPOSE

D O

F PRO

PER

LY

. TH

E O

WN

ER

SHA

LL

BE

CO

NSU

LT

ED

FOR

B

. IF CL

EA

RIN

G IS R

EQ

UIR

ED

, AL

L B

RU

SH, ST

UM

PS, AN

D O

TH

ER

WA

STE

MA

TE

RIA

L SH

AL

L B

E R

EM

OV

ED

MA

TE

RIA

L, IN

CL

UD

ING

AL

L C

ON

TR

AC

TO

R T

OO

LS. L

EA

VE

TH

E SIT

E C

LE

AN

AN

D R

EA

DY

FOR

USE

.E

MPL

OY

EE

S. AT

TH

E C

OM

PLE

TIO

N O

F TH

E W

OR

K, R

EM

OV

E A

LL

WA

STE

AN

D N

ON

-CO

NST

RU

CT

ION

A

. TH

E C

ON

TR

AC

TO

R SH

AL

L K

EE

P TH

E SIT

E FR

EE

FRO

M A

CC

UM

UL

AT

ION

OF W

AST

E C

AU

SED

BY

1.3 CL

EA

NU

P

BE

GR

OU

ND

S F

OR

CH

AN

GE

OR

DE

RS

OR

AL

TE

RIN

G T

HE

SC

HE

DU

LE

.N

EC

ESSA

RY

TO

SUB

MIT

A FIX

ED

BID

. IGN

OR

AN

CE

OF T

HE

SITE

OR

PRO

JEC

T C

ON

DIT

ION

S WIL

L N

OT

A

DD

ITIO

N, C

ON

TR

AC

TO

R SH

AL

L PE

RFO

RM

TE

STIN

G A

ND

AD

DIT

ION

AL

INV

EST

IGA

TIO

N A

S DE

EM

ED

B

. TH

E C

ON

TR

AC

TO

R IS R

EQ

UIR

ED

TO

VISIT

TH

E SIT

E T

O A

SSESS C

ON

DIT

ION

S PRIO

R T

O B

IDD

ING

. IN

RE

SOL

UT

ION

BE

FOR

E PR

OC

EE

DIN

G W

ITH

TH

E W

OR

K IN

TH

E A

FFEC

TE

D A

RE

AS.

CO

NT

RA

CT

OR

MU

ST SU

BM

IT N

OT

ICE

OF A

NY

DISC

RE

PAN

CY

IN D

IME

NSIO

NS T

O O

WN

ER

FOR

D

UE

TO

DIFFE

RE

NC

ES B

ET

WE

EN

AC

TU

AL

DIM

EN

SION

S AN

D D

IME

NSIO

NS SH

OW

N O

N T

HE

PLA

NS.

OR

DE

RIN

G M

AT

ER

IAL

S OR

DO

ING

AN

Y W

OR

K. N

O E

XT

RA

CO

MPE

NSA

TIO

N W

ILL

BE

AL

LO

WE

D

A. T

HE

CO

NT

RA

CT

OR

SHA

LL

BE

RE

SPON

SIBL

E FO

R V

ER

IFYIN

G A

LL

ME

ASU

RE

ME

NT

S AT

TH

E SIT

E B

EFO

RE

1.2 CO

NF

LIC

TS

EX

EC

UT

ION

AN

D C

OM

PL

ET

ION

OF

TH

E W

OR

K.

B. T

HE

CO

NT

RA

CT

OR

SHA

LL

INC

LU

DE

AL

L L

AB

OR

AN

D M

AT

ER

IAL

S NE

CE

SSAR

Y FO

R T

HE

PRO

PER

AT

TE

NT

ION

OF

TH

E O

WN

ER

AN

D/O

R E

NG

INE

ER

. D

ISCR

EPA

NC

IES O

R D

ISAG

RE

EM

EN

TS A

RE

IDE

NT

IFIED

, TH

IS SHO

UL

D B

E B

RO

UG

HT

TO

TH

E

SHO

UL

D A

NY

TH

ING

BE

SHO

WN

, IND

ICA

TE

D, O

R SPE

CIFIE

D IN

ON

E A

ND

NO

T T

HE

OT

HE

R, O

R IF A

NY

A

. TH

E D

RA

WIN

GS A

RE

SUPPL

EM

EN

TA

L T

O A

NY

WR

ITT

EN

SPEC

IFICA

TIO

NS O

R R

EQ

UIR

EM

EN

TS.

1.1 PU

RP

OS

E A

ND

INT

EN

T

SEC

TIO

N 1: G

EN

ER

AL

RE

QU

IRE

ME

NT

S

9.2 INST

AL

LA

TIO

N9.1 P

RO

TE

CT

ION

SEC

TIO

N 9: L

AN

DSC

APIN

G A

ND

SITE

RE

STO

RA

TIO

N

SEC

TIO

N 8: T

OW

ER

AN

D A

NT

EN

NA

INST

AL

LA

TIO

N

SEC

TIO

N 7: E

LE

CT

RIC

AL

SE

CT

ION

6: GR

OU

ND

ING

SEC

TIO

N 5: ST

RU

CT

UR

AL

STE

EL

4.4 QU

AL

ITY

CO

NT

RO

L4.3 C

AS

T-IN

-PL

AC

E C

ON

CR

ET

E4.2 C

ON

CR

ET

E R

EIN

FO

RC

EM

EN

T4.1 C

ON

CR

ET

E F

OR

MW

OR

K

SE

CT

ION

4: CO

NC

RE

TE

WO

RK

3.6 CO

MP

AC

TIO

N3.5 B

AC

KFIL

LIN

G3.4 T

RE

NC

H P

RO

TE

CT

ION

3.3 TR

EN

CH

EX

CA

VA

TIO

N3.2 PIPE

DE

TE

CT

ION

AN

D ID

EN

TIFIC

AT

ION

3.1 MA

TE

RIA

LS

SEC

TIO

N 3: T

RE

NC

HIN

G

2.6 RE

TA

ININ

G W

AL

LS

2.5 GR

AV

EL

SU

RF

AC

ING

2.4 SIT

E G

RA

DIN

G2.3 E

XC

AV

AT

ION

2.2 SITE

PRE

PAR

AT

ION

2.1 SC

OP

E O

F W

OR

K

SEC

TIO

N 2: E

AR

TH

WO

RK

1.10 CH

AN

GE

OR

DE

R P

RO

CE

DU

RE

1.9 SIT

E C

ON

TR

OL

1.8 TO

WE

R SE

CU

RIT

Y1.7 FA

A PE

RM

IT A

ND

TO

WE

R L

IGH

TIN

G1.6 B

UIL

DIN

G PE

RM

ITS

1.5 QU

AL

ITY

AS

SU

RA

NC

E1

.4 C

OD

ES

1.3 CL

EA

NU

P1.2 C

ON

FL

ICT

S1.1 P

UR

PO

SE

AN

D IN

TE

NT

SEC

TIO

N 1: G

EN

ER

AL

RE

QU

IRE

ME

NT

S

CO

MP

AC

TE

D T

O 95%

ST

AN

DA

RD

PR

OC

TO

R IN

MA

XIM

UM

8" LIF

TS

.M

INIM

UM

SOIL

BE

AR

ING

CA

PAC

ITY

OF 2,500 P.S.F. L

L B

AC

KFIL

LE

D M

AT

ER

IAL

SHA

LL

BE

C

. AL

L B

AC

KFIL

LE

D M

AT

ER

IAL

SHA

LL

BE

QU

AL

ITY

SOIL

S (SAN

D, G

RA

VE

L, O

R SIL

TY

SAN

D) W

ITH

A

GU

IDE

LIN

ES

.B

. CO

NT

RA

CT

OR

SHA

LL

FOL

LO

W A

LL

MA

NU

FAC

TU

RE

R D

ESIG

N C

HA

RT

S AN

D IN

STA

LL

AT

ION

TE

N (10) P

RO

JEC

TS

OF

SIM

ILA

R S

IZE

AN

D S

CO

PE

.A

. RE

TA

ININ

G W

AL

LS T

O B

E IN

STA

LL

ED

BY

AN

EX

PER

IEN

CE

D C

ON

TR

AC

TO

R FA

MIL

IAR

WIT

H A

T L

EA

ST

2.6 RE

TA

ININ

G W

AL

LS

TO

PL

AC

ING

NE

XT

LIF

T.

B. PL

AC

E FIL

L O

R ST

ON

E IN

MA

XIM

UM

EIG

HT

INC

H L

IFTS A

ND

CO

MPA

CT

TO

SPEC

IFIED

DE

NSIT

Y PR

IOR

CO

NS

TR

UC

TIO

N M

AN

AG

ER

.FIN

ISH C

OU

RSE

S AS SPE

CIFIE

D IN

TH

E C

ON

STR

UC

TIO

N D

OC

UM

EN

TS O

R A

S DIR

EC

TE

D B

Y T

HE

A

. CO

NS

TR

UC

T G

RA

VE

L D

RIV

E A

ND

CO

MP

OU

ND

AR

EA

S U

SIN

G C

RU

SH

ED

AG

GR

EG

AT

E B

AS

E A

ND

2.5 GR

AV

EL

SU

RF

AC

ING

G. T

HE

FINISH

ED

GR

AD

E SH

AL

L E

XT

EN

D A

MIN

IMU

M O

F ON

E FO

OT

BE

YO

ND

TH

E C

OM

POU

ND

FEN

CE

.

F. AL

L E

XPO

SED

SOIL

SHA

LL

BE

PRO

PER

LY

SEE

DE

D A

ND

PRO

TE

CT

ED

FRO

M E

RO

SION

.

DIT

CH

ING

AN

D R

OU

TIN

G O

F S

UR

FA

CE

WA

TE

R, A

ND

AV

OID

PO

ND

ING

AN

D E

RO

SIO

N.

E. A

LL

FINISH

ED

SUR

FAC

ES SH

OU

LD

BE

GR

AD

ED

TO

DR

AIN

FRO

M FO

UN

DA

TIO

N, PR

OV

IDE

PRO

PER

ST

RIC

TL

Y.

FOU

ND

AT

ION

DR

AW

ING

S (INC

LU

DIN

G T

HE

MIN

IMU

M SO

IL C

OV

ER

) MU

ST B

E A

DH

ER

ED

TO

D

. RE

GA

RD

LE

SS OF T

HE

CO

NT

OU

RS D

EPIC

TE

D IN

TH

E PL

AN

S, AL

L R

EQ

UIR

EM

EN

TS IN

TH

E T

OW

ER

AN

D O

BT

AIN

OW

NE

R A

PPRO

VA

L PR

IOR

TO

WO

RK

ING

OU

TSID

E T

HE

AB

OV

E L

IMIT

S.A

RE

A A

ND

ASSO

CIA

TE

D E

ASE

ME

NT

. IF TH

IS IS NO

T PO

SSIBL

E, C

ON

TA

CT

TH

E PR

OJE

CT

MA

NA

GE

R

C. T

HE

CO

NT

RA

CT

OR

SHA

LL

LIM

IT A

LL

SITE

GR

AD

ING

AN

D C

ON

STR

UC

TIO

N A

CT

IVIT

IES T

O T

HE

LE

ASE

D

WO

RK

. AN

Y C

HA

NG

ES

TO

TH

E G

RA

DIN

G P

LA

N C

ON

TO

UR

S M

US

T B

E P

RE

AP

PR

OV

ED

.T

HE

SE SH

OU

LD

BE

BR

OU

GH

T T

O T

HE

AT

TE

NT

ION

OF T

HE

EN

GIN

EE

R PR

IOR

TO

PRO

CE

ED

ING

WIT

H

B. IF D

ISCR

EPA

NC

IES A

RE

IDE

NT

IFIED

BE

TW

EE

N T

HE

GR

AD

ING

PLA

N A

ND

AC

TU

AL

SITE

CO

ND

ITIO

NS,

SP

EC

IFIC

AT

ION

S.

(ON

-SITE

OR

IMPO

RT

ED

) SHA

LL

BE

AD

EQ

UA

TE

LY

CO

MPA

CT

ED

PER

TH

E E

AR

TH

WO

RK

M

AT

ER

IAL

S, WE

T SO

IL, FR

OZ

EN

SOIL

, OR

POO

R SO

IL B

E U

SED

AS O

N-SIT

E FIL

L. IN

AD

DIT

ION

, AL

L FIL

L

AN

D C

RO

SS

SE

CT

ION

S S

HO

WN

ON

TH

E D

RA

WIN

GS

. HO

WE

VE

R, IN

NO

CA

SE

SH

AL

L O

RG

AN

IC

A. C

ON

TR

AC

TO

R SH

AL

L U

SE O

N-SIT

E M

AT

ER

IAL

S OR

IMPO

RT

ED

FILL

TO

MA

TC

H T

HE

LIN

ES, G

RA

DE

S,

AN

D SPE

CIFIC

AT

ION

S SHA

LL

BE

RE

SOL

VE

D IN

FAV

OR

OF T

HE

STR

ICT

ER

RE

QU

IRE

ME

NT

.A

NY

INC

ON

SISTE

NC

IES B

ET

WE

EN

TH

E G

EO

TE

CH

NIC

AL

RE

POR

T, SIT

E D

RA

WIN

GS, T

OW

ER

PLA

NS,

2.4 SIT

E G

RA

DIN

G

BR

OU

GH

T T

O T

HE

IMM

ED

IAT

E A

TT

EN

TIO

N O

F TH

E E

NG

INE

ER

.IN

CO

NSIST

EN

CIE

S, DISC

RE

PAN

CIE

S, OR

ASSU

MPT

ION

S TH

AT

PRO

VE

TO

BE

INC

OR

RE

CT

, SHA

LL

BE

A

BO

VE

TO

TH

E G

EO

TE

CH

NIC

AL

RE

POR

T, T

HE

PLA

NS, A

ND

TH

E T

OW

ER

DR

AW

ING

S. AN

Y

SITE

AN

D SO

IL C

ON

DIT

ION

S TH

RO

UG

HO

UT

TH

E C

ON

STR

UC

TIO

N PR

OC

ESS A

ND

CO

MPA

RE

TH

E

D. R

EG

AR

DL

ESS O

F TH

E A

BO

VE

RE

CO

MM

EN

DA

TIO

N, T

HE

CO

NT

RA

CT

OR

IS RE

SPON

SIBL

E T

O O

BSE

RV

E

EL

EM

EN

TS

.R

EV

IEW

SOIL

CO

ND

ITIO

NS A

ND

AN

AC

I CE

RT

IFIED

INSPE

CT

OR

TO

RE

VIE

W A

LL

FOU

ND

AT

ION

C

. IT IS R

EC

OM

ME

ND

ED

TH

AT

TH

E O

WN

ER

HIR

E A

N IN

DE

PEN

DE

NT

GE

OT

EC

HN

ICA

L E

NG

INE

ER

TO

INC

ON

SISTE

NC

IES SH

OU

LD

BE

BR

OU

GH

T T

O T

HE

IMM

ED

IAT

E A

TT

EN

TIO

N O

F TH

E E

NG

INE

ER

.F

OU

ND

AT

ION

PL

AN

S T

HO

RO

UG

HL

Y P

RIO

R T

O B

IDD

ING

. AN

Y D

ISC

RE

PA

NC

IES

OR

B

. CO

NT

RA

CT

OR

SHA

LL

RE

VIE

W T

HE

GR

AD

ING

PLA

NS, G

EO

TE

CH

NIC

AL

RE

POR

T, A

ND

TO

WE

R

OW

NE

R W

ILL

BE

EX

CA

VA

TE

D, FIL

LE

D, A

ND

RE

CO

MPA

CT

ED

AT

CO

NT

RA

CT

OR

'S EX

PEN

SE.

OF SE

TT

LE

ME

NT

IDE

NT

IFIED

WIT

HIN

ON

E Y

EA

R O

F AC

CE

PTA

NC

E O

F FINA

L C

ON

STR

UC

TIO

N B

Y

D-1557 FO

R SIT

E W

OR

K A

ND

95% M

AX

IMU

M D

RY

DE

NSIT

Y U

ND

ER

STR

UC

TU

RA

L E

LE

ME

NT

S. AR

EA

S M

INIM

UM

CO

MPA

CT

ION

SHA

LL

BE

90% M

AX

IMU

M D

RY

DE

NSIT

Y IN

AC

CO

RD

AN

CE

WIT

H A

STM

A. C

ON

TR

AC

TO

R SH

AL

L E

XC

AV

AT

E T

O D

EPT

H, A

ND

GR

AD

ES SH

OW

N O

N T

HE

PLA

NS.

2.3 EX

CA

VA

TIO

N

RE

PO

RT

.D

. CO

NT

RA

CT

OR

SH

AL

L F

OL

LO

W R

EC

OM

ME

ND

AT

ION

S C

ON

TA

INE

D IN

PL

AN

S A

ND

GE

OT

EC

HN

ICA

L

AN

D/O

R E

NG

INE

ER

FO

R G

UID

AN

CE

.E

NC

OU

NT

ER

ED

, CO

NT

RA

CT

OR

SHO

UL

D IM

ME

DIA

TE

LY

CO

NT

AC

T C

ON

STR

UC

TIO

N M

AN

AG

ER

O

RG

ANIC

MATER

IALS AND

WET O

R PO

OR

SOILS. IF M

OR

E THAN

2’-0” OF PO

OR

SOILS AR

E C

. PRIO

R T

O PL

AC

EM

EN

T O

F FILL

OR

BA

SE M

AT

ER

IAL

S, CO

NT

RA

CT

OR

SHA

LL

RE

MO

VE

AL

L T

OPSO

IL,

EN

TIR

E C

OM

PO

UN

D A

ND

AC

CE

SS

DR

IVE

.SO

IL, C

ON

TR

AC

TO

R SH

AL

L O

VE

R E

XC

AV

AT

E A

MIN

IMU

M O

F 18 INC

HE

S OF M

AT

ER

IAL

FRO

M T

HE

B

. STR

IP AL

L O

RG

AN

IC M

AT

ER

IAL

FRO

M C

OM

POU

ND

AN

D A

CC

ESS D

RIV

E. IF SIT

E C

ON

TA

INS W

ET

FR

OM

TH

E P

RO

PE

RT

Y A

ND

DIS

PO

SE

D O

F P

RO

PE

RL

Y.

AL

L W

AST

E M

AT

ER

IAL

S INC

LU

DIN

G, B

UT

NO

T L

IMIT

ED

TO

, STU

MPS A

ND

DE

BR

IS SHA

LL

BE

RE

MO

VE

D

SOIL

, AN

D O

TH

ER

DE

TR

IME

NT

AL

MA

TE

RIA

L C

OM

PLE

TE

LY

UN

DE

R E

NT

IRE

CO

MPO

UN

D A

ND

DR

IVE

. R

EQ

UIR

ED

. SEE

SITE

PLA

N FO

R A

PPRO

PRIA

TE

AR

EA

TO

BE

CL

EA

RE

D. R

EM

OV

E ST

UM

PS, OR

GA

NIC

A

. CL

EA

R T

RE

ES, B

RU

SH A

ND

DE

BR

IS FRO

M C

OM

POU

ND

, AC

CE

SS DR

IVE

, AN

D U

TIL

ITY

PAT

H A

S

2.2 SITE

PRE

PAR

AT

ION

RE

FER

TO

TH

E SU

RV

EY

AN

D SIT

E PL

AN

FOR

EX

ISTIN

G G

RA

DE

S AN

D FIN

AL

EL

EV

AT

ION

S.

2.1 SC

OP

E O

F W

OR

K

SEC

TIO

N 2: E

AR

TH

WO

RK

ASSO

CIA

TE

D C

OST

INC

UR

RE

D W

ILL

NO

T B

E PA

ID.

SHA

LL

PLA

CE

FUL

L R

ESPO

NSIB

ILIT

Y O

F TH

ESE

AC

TIO

NS O

N T

HE

CO

NT

RA

CT

OR

AN

D A

NY

W

HIC

H A

RE

PER

FOR

ME

D B

Y T

HE

CO

NT

RA

CT

OR

WIT

HO

UT

WR

ITT

EN

APPR

OV

AL

BY

TH

E O

WN

ER

P

RO

CE

ED

ING

OR

INC

UR

RIN

G A

NY

CO

ST

S. A

NY

CH

AN

GE

S IN

SC

OP

E O

F W

OR

K O

R M

AT

ER

IAL

S

KN

OW

LE

DG

E. A

NY

CL

AIM

(CH

AN

GE

OR

DE

R) M

US

T B

E A

PP

RO

VE

D B

Y T

HE

OW

NE

R P

RIO

R T

O

BY

OW

NE

R) T

HA

T M

AY

RE

SUL

T IN

A T

IME

DE

LA

Y O

R C

OST

CH

AN

GE

WIT

HIN

1 DA

Y O

F FIRST

C

LA

IM FO

R C

ON

CE

AL

ED

OR

UN

KN

OW

N C

ON

DIT

ION

S, OR

AN

Y O

TH

ER

ITE

M (E

VE

N IF A

RE

QU

EST

T

HE

CO

NT

RA

CT

OR

MU

ST PR

OV

IDE

NO

TIC

E IN

WR

ITIN

G O

N PR

OPE

R FO

RM

S OF A

NY

POT

EN

TIA

L

1.10 CH

AN

GE

OR

DE

R P

RO

CE

DU

RE

BY

TH

E P

RO

PE

RT

Y O

WN

ER

.T

O T

HE

LE

ASE

D A

RE

A A

ND

LE

GA

L E

ASE

ME

NT

S UN

LE

SS PER

MISSIO

N T

O D

O O

TH

ER

WISE

IS GR

AN

TE

D

D. T

HE

CO

NT

RA

CT

OR

SHA

LL

CO

NT

AIN

AL

L C

ON

STR

UC

TIO

N A

CT

IVIT

IES, M

AT

ER

IAL

S, EQ

UIPM

EN

T, E

TC

.

MA

INT

EN

AN

CE

OF D

RA

INA

GE

PRO

VISIO

NS W

ILL

BE

TH

E R

ESPO

INSIB

ILIT

Y O

F CO

NT

RA

CT

OR

.T

O ST

AN

D O

R PO

ND

. AN

Y D

AM

AG

E T

O ST

RU

CT

UR

ES O

R T

HE

SITE

CA

USE

D B

Y IN

AD

EQ

UA

TE

C

. TH

E C

ON

TR

AC

TO

R IS T

O M

AIN

TA

IN A

DE

QU

AT

E D

RA

INA

GE

AT

AL

L T

IME

S. DO

NO

T A

LL

OW

WA

TE

R

CO

NSE

QU

EN

CE

S, INC

LU

DIN

G FIN

ES (E

VE

N IF A

SSESSE

D T

O T

HE

OW

NE

R).

DIST

UR

BA

NC

E O

CC

UR

S, TH

E C

ON

TR

AC

TO

R SH

AL

L B

E R

ESPO

NSIB

LE

FOR

AL

L C

OST

S AN

D

AL

L N

EC

ESSA

RY

PRE

CA

UT

ION

S TO

EN

SUR

E T

HA

T T

HE

Y A

RE

NO

T D

ISTU

RB

ED

IN A

NY

MA

NN

ER

. IF B

. IF WE

TL

AN

DS A

RE

PRE

SEN

T IN

TH

E PR

OJE

CT

VIC

INIT

Y T

HE

CO

NT

RA

CT

OR

IS RE

SPON

SIBL

E T

O T

AK

E

CO

RR

EC

TE

D B

Y T

HE

CO

NT

RA

CT

OR

AT

NO

AD

DIT

ION

AL

EX

PEN

SE T

O O

WN

ER

.O

F ER

OSIO

N A

T T

HE

SITE

. AN

Y D

AM

AG

E T

O A

DJA

CE

NT

OR

DO

WN

STR

EA

M PR

OPE

RT

IES W

ILL

BE

A

. TH

E C

ON

TR

AC

TO

R IS C

OM

PLE

TE

LY

RE

SPON

SIBL

E FO

R C

ON

TA

INM

EN

T O

F SED

IME

NT

AN

D C

ON

TR

OL

1.9 SIT

E C

ON

TR

OL

TO

WE

R E

RE

CT

ION

.T

HE

SITE

MU

ST B

E SE

CU

RE

LY

FEN

CE

D (PE

RM

AN

EN

TL

Y O

R T

EM

POR

AR

ILY

) WIT

HIN

24 HO

UR

S OF

TH

E C

ON

TR

AC

TO

R IS R

ESPO

NSIB

LE

FOR

SITE

SEC

UR

ITY

TH

RO

UG

HO

UT

TH

E C

ON

STR

UC

TIO

N PH

ASE

.

1.8 TO

WE

R SE

CU

RIT

Y

OT

HE

R PA

RA

ME

TE

RS) B

EFO

RE

PLA

CIN

G A

NY

SER

VIC

E L

OA

DS.

D. C

ON

TR

AC

TO

R M

UST

VE

RIFY

TH

AT

CO

NC

RE

TE

ME

ET

S DE

SIGN

RE

QU

IRE

ME

NT

(FOR

STR

EN

GT

H A

ND

SUB

SEQ

UE

NT

LY

, TH

E C

ON

TR

AC

TO

R SH

AL

L ST

ILL

BE

RE

SPON

SIBL

E T

O C

OR

RE

CT

SAID

DE

FEC

T.

IDE

NT

IFIED

BY

TH

E IN

SPEC

TO

R, O

WN

ER

, OR

CO

NST

RU

CT

ION

MA

NA

GE

R, B

UT

IDE

NT

IFIED

W

OR

K A

ND

IS TH

E G

UA

RA

NT

OR

OF T

HE

FINISH

ED

PRO

DU

CT

. IF A D

EFE

CT

IS NO

T IM

ME

DIA

TE

LY

C

. DE

SPITE

TH

E A

BO

VE

RE

QU

IRE

ME

NT

, TH

E C

ON

TR

AC

TO

R IS R

ESPO

NSIB

LE

TO

PER

FOR

M Q

UA

LIT

Y

CY

LIN

DE

RS A

T H

IS SOL

E E

XPE

NSE

.A

RE

AL

LO

WE

D. IF T

HE

CO

NT

RA

CT

OR

CH

OO

SES, H

E M

AY

CO

LL

EC

T A

ND

TE

ST A

DD

ITIO

NA

L

RE

GA

RD

ING

TH

E M

ET

HO

D U

SED

TO

CO

LL

EC

T T

HE

TE

ST C

YL

IND

ER

S OR

PER

FOR

M T

HE

LA

B T

EST

ING

R

EPL

AC

ED

. TH

E A

VE

RA

GE

OF T

HE

TW

O 28 D

AY

BR

EA

K R

ESU

LT

S SHA

LL

GO

VE

RN

. NO

DISPU

TE

S M

INIM

UM

CO

MPR

ESSIV

E ST

RE

NG

TH

RE

QU

IRE

D U

PON

CO

MPL

ET

ION

OF L

AB

TE

STIN

G SH

AL

L B

E

CO

NT

AIN

ED

IN T

HE

PLA

NS O

R T

OW

ER

DR

AW

ING

S. AN

Y C

ON

CR

ET

E T

HA

T D

OE

S NO

T M

EE

T T

HE

C

ON

CR

ET

E T

HA

T D

OE

S NO

T M

EE

T T

HE

AB

OV

E SPE

CIFIC

AT

ION

S, OR

SIMIL

AR

SPEC

IFICA

TIO

NS

B. T

HE

CO

NT

RA

CT

OR

SHA

LL

BE

RE

SPON

SIBL

E T

O R

EM

OV

E A

ND

RE

PLA

CE

, AT

HIS SO

LE

EX

PEN

SE, A

NY

INST

AL

LA

TIO

N W

AS N

OT

INST

AL

LE

D C

OR

RE

CT

LY

AN

D R

EQ

UIR

E R

EPL

AC

EM

EN

T.

POU

R O

CC

UR

S WIT

HO

UT

TH

E R

EQ

UE

STE

D IN

SPEC

TIO

N, T

HE

OW

NE

R C

AN

ASSU

ME

TH

AT

TH

E

AN

D/O

R T

ES

TIN

G A

GE

NC

Y A

MIN

IMU

M O

F 48 H

OU

RS

PR

IOR

TO

EA

CH

FO

UN

DA

TIO

N P

OU

R. IF

A

TH

E C

ON

TR

AC

TO

R IS R

ESPO

NSIB

LE

FOR

CO

OR

DIN

AT

ION

WIT

H T

HE

CO

NST

RU

CT

ION

MA

NA

GE

R

CY

LIN

DE

R SH

AL

L B

E R

ESE

RV

ED

FOR

RE

-TE

STIN

G, IF N

EC

ESSA

RY

.M

INIM

UM

, 5 CY

LIN

DE

RS SH

AL

L B

E C

AST

AN

D T

EST

ED

AT

7, 14, AN

D 28 D

AY

S . TH

E R

EM

AIN

ING

O

R O

TH

ER

WISE

). AL

L ST

RU

CT

UR

AL

CO

NC

RE

TE

SHA

LL

BE

TE

STE

D B

Y A

N IN

DE

PEN

DE

NT

LA

B. A

T A

A

. AL

L ST

RU

CT

UR

AL

CO

NC

RE

TE

SHA

LL

BE

INSPE

CT

ED

BY

IND

EPE

ND

EN

T, Q

UA

LIFIE

D PE

RSO

NN

EL

(AC

I

4.4 QU

AL

ITY

CO

NT

RO

L

SE

GR

EG

AT

ION

.A

IR B

UB

BL

ES ST

OP B

RE

AK

ING

TH

E L

EV

EL

ING

SUR

FAC

E. D

O N

OT

OV

ER

VIB

RA

TE

AS T

HIS M

AY

CA

USE

A

ND

INT

O C

OR

NE

RS A

ND

IRR

EG

UL

AR

ITIE

S. DISC

ON

TIN

UE

VIB

RA

TIO

N W

HE

N R

ISING

EN

TR

APPE

D

INT

ER

VA

LS A

ND

OV

ER

EN

TIR

E SU

RFA

CE

TO

SOL

IDL

Y FIL

L A

RO

UN

D A

ND

BE

TW

EE

N R

EIN

FOR

CE

ME

NT

M

EC

HA

NIC

AL

IMM

ER

SION

TY

PE V

IBR

AT

OR

S. INSE

RT

VIB

RA

TO

RS IN

CO

NC

RE

TE

AT

RE

GU

LA

R

B. A

LL

CO

NC

RE

TE

SHA

LL

BE

VIB

RA

TE

D IN

PLA

CE

USIN

G H

IGH

FRE

QU

EN

CY

, LO

W A

MPL

ITU

DE

A. A

LL

CO

NC

RE

TE

SUB

JEC

T T

O FR

EE

ZE

-TH

AW

SHA

LL

CO

NT

AIN

4-8% A

IR E

NT

RA

INM

EN

T.

CO

MP

RE

SS

IVE

ST

RE

NG

TH

OF

3,000 PS

I.FO

UN

DA

TIO

NS, E

TC

. AN

Y N

ON

-STR

UC

TU

RA

L SIT

E C

ON

CR

ET

E SH

AL

L H

AV

E A

MIN

IMU

M

RE

FER

TO

STR

UC

TU

RA

L D

RA

WIN

GS FO

R C

ON

CR

ET

E R

EQ

UIR

EM

EN

TS FO

R FO

OT

ING

S,

4.3 CA

ST

-IN-P

LA

CE

CO

NC

RE

TE

RE

FER

TO

PLA

NS A

ND

TO

WE

R D

RA

WIN

GS FO

R R

EIN

FOR

CE

ME

NT

RE

QU

IRE

ME

NT

S.

4.2 CO

NC

RE

TE

RE

INF

OR

CE

ME

NT

D. R

EFE

R T

O PL

AN

S AN

D T

OW

ER

DR

AW

ING

S FOR

AD

DIT

ION

AL

RE

QU

IRE

ME

NT

S.

OR

BU

RIE

D.

C. U

PO

N C

OM

PL

ET

ION

, CO

NT

RA

CT

OR

SH

AL

L R

EM

OV

E A

LL

FO

RM

S, IN

CL

UD

ING

TH

OS

E C

ON

CE

AL

ED

ED

GE

S SHA

LL

RE

CE

IVE

A T

OO

LE

D R

AD

IUS FIN

ISH.

B. E

XPO

SED

ED

GE

S OF A

LL

TO

WE

R FO

UN

DA

TIO

NS SH

AL

L R

EC

EIV

E A

3/4" CH

AM

FER

. OT

HE

R E

XPO

SED

FOR

M R

EL

EA

SE A

GE

NT

S AS N

EC

ESSA

RY

.A

. FOR

MS SH

AL

L B

E SM

OO

TH

AN

D FR

EE

OF SU

RFA

CE

IRR

EG

UL

AR

ITIE

S. CO

NT

RA

CT

OR

SHA

LL

UT

ILIZ

E

CO

MP

LE

TIN

G C

ON

CR

ET

E W

OR

K.

CO

NT

RA

CT

OR

SHA

LL

FOL

LO

W A

LL

APPL

ICA

BL

E C

OD

ES A

ND

STA

ND

AR

DS (IB

C, A

CI, E

TC

.) WH

EN

4.1 CO

NC

RE

TE

FO

RM

WO

RK

SE

CT

ION

4: CO

NC

RE

TE

WO

RK

AD

DIT

ION

AL

EX

PE

NS

E T

O O

WN

ER

.M

INIM

UM

) SHA

LL

BE

RE

MO

VE

D, R

EPL

AC

ED

, AN

D R

EC

OM

PAC

TE

D B

Y C

ON

TR

AC

TO

R A

T N

O

C. A

NY

SUB

SEQ

UE

NT

SET

TL

EM

EN

T O

F TR

EN

CH

OR

BA

CK

FILL

DU

RIN

G M

AIN

TE

NA

NC

E PE

RIO

D (1 Y

EA

R

RE

PLA

CE

WIT

H A

PPRO

VE

D B

AC

KFIL

L, A

ND

RE

CO

MPA

CT

AS SPE

CIFIE

D.

B. IF R

EQ

UIR

ED

CO

MPA

CT

ION

DE

NSIT

Y IS N

OT

OB

TA

INE

D, R

EM

OV

E B

AC

KFIL

L FR

OM

TR

EN

CH

,

A. C

OM

PA

CT

BA

CK

FIL

L T

O A

T L

EA

ST

95% S

TA

ND

AR

D P

RO

CT

OR

.

3.6 CO

MP

AC

TIO

N

BA

CK

FILL

INT

O T

RE

NC

H U

NT

IL T

HE

RE

IS AT

LE

AST

12 INC

HE

S OF C

OV

ER

OV

ER

TH

E C

ON

DU

IT.

LO

AD

ING

TO

AV

OID

DISPL

AC

EM

EN

T O

F CO

ND

IUT

AN

D/O

R ST

RU

CT

UR

ES. D

O N

OT

FRE

E FA

LL

B

. PRO

TE

CT

CO

ND

UIT

FRO

M L

AT

ER

AL

MO

VE

ME

NT

, DA

MA

GE

FRO

M IM

PAC

T, O

R U

NB

AL

AN

CE

D

OF

BA

CK

FIL

LIN

G.

A. C

ON

TR

AC

TO

R SH

AL

L N

OT

IFY T

HE

CO

NST

RU

CT

ION

MA

NA

GE

R A

T L

EA

ST 24 H

OU

RS IN

AD

VA

NC

E

3.5 BA

CK

FILL

ING

B. SH

EE

TIN

G A

ND

BR

AC

ING

SHO

UL

D M

EE

T O

R E

XC

EE

D O

SHA

RE

QU

IRE

ME

NT

S.

A. PR

OV

IDE

MA

TE

RIA

LS, L

AB

OR

, AN

D E

QU

IPME

NT

NE

CE

SSAR

Y T

O PR

OT

EC

T T

RE

NC

HE

S AT

AL

L T

IME

S.

3.4 TR

EN

CH

PR

OT

EC

TIO

N

NE

CE

SSAR

Y T

O A

VO

ID E

ND

AN

GE

RIN

G E

XIST

ING

OR

NE

W ST

RU

CT

UR

ES O

R O

TH

ER

FAC

ILIT

IES.

D. U

SE H

AN

D E

XC

AV

AT

ION

ME

TH

OD

S WH

EN

RE

QU

IRE

D B

Y L

OC

AL

OR

STA

TE

GU

IDE

LIN

ES, O

R W

HE

N

C. D

ISPOSE

OF E

XC

ESS A

ND

UN

SUIT

AB

LE

EX

CA

VA

TIO

N M

AT

ER

IAL

PRO

PER

LY

.

AD

JAC

EN

T F

AC

ILIT

IES

.IN

SPEC

TIO

N O

F TH

E PR

OJE

CT

, WIT

HO

UT

EN

DA

NG

ER

ING

OT

HE

R C

ON

STR

UC

TIO

N W

OR

K O

R

B. T

RE

NC

H L

EN

GT

H SH

AL

L B

E SU

FFICIE

NT

TO

AL

LO

W FO

R SA

TISFA

CT

OR

Y C

ON

STR

UC

TIO

N A

ND

CO

NS

TR

UC

TIO

N M

AN

AG

ER

.A

. DIG

TR

EN

CH

TO

DE

PTH

S AN

D G

RA

DE

S SHO

WN

ON

TH

E PL

AN

S OR

AS D

IRE

CT

ED

BY

TH

E

3.3 TR

EN

CH

EX

CA

VA

TIO

N

AL

L E

LE

CT

RIC

SER

VIC

E T

RE

NC

HE

S SHA

LL

BE

MA

RK

ED

WIT

H D

ET

EC

TA

BL

E W

AR

NIN

G T

APE

.

3.2 PIPE D

ET

EC

TIO

N A

ND

IDE

NT

IFICA

TIO

N

TA

MP

ER

S.

HE

AV

Y C

OM

PAC

TIO

N E

QU

IPME

NT

OR

6 INC

H L

OO

SE L

IFTS W

HE

N U

TIL

IZIN

G H

AN

D O

PER

AT

ED

V

OID

S IN T

HE

MA

TE

RIA

L. C

OM

PAC

TIO

N O

F SOIL

SHA

LL

BE

IN 8 IN

CH

LO

OSE

LIFT

S WH

EN

UT

ILIZ

ING

O

R PO

TE

NT

IAL

LY

HA

ZA

RD

OU

S. TH

E FIL

L M

AT

ER

IAL

SHA

LL

CO

NT

AIN

FINE

S SUFFIC

IEN

T T

O FIL

L A

LL

SH

AL

L B

E FR

EE

OF O

BJE

CT

ION

AB

LE

MA

TE

RIA

LS A

ND

/OR

MA

TE

RIA

LS D

ESIG

NA

TE

D A

S HA

ZA

RD

OU

S T

HE

FILL

MA

TE

RIA

L SH

AL

L C

ON

TA

IN N

O O

RG

AN

IC M

AT

ER

IAL

S OR

RO

CK

S. AL

L FIL

L M

AT

ER

IAL

C

ON

STR

UC

TIO

N M

AN

AG

ER

AN

D SH

AL

L C

ON

FOR

M T

O L

OC

AL

UT

ILIT

Y C

OM

PAN

Y R

EQ

UIR

EM

EN

TS.

TR

EN

CH

ES O

N-SIT

E. ST

RU

CT

UR

AL

FILL

, SAN

D O

R SL

UR

RY

SHA

LL

BE

APPR

OV

ED

BY

TH

E

FILL

MA

TE

RIA

LS SH

AL

L B

E O

BT

AIN

ED

, WH

EN

POSSIB

LE

, FRO

M M

AT

ER

IAL

S EX

CA

VA

TE

D FR

OM

3.1 MA

TE

RIA

LS

SEC

TIO

N 3: T

RE

NC

HIN

G

ST

RE

NG

TH

OF

LT

DS

= 1350 P

K.

F. AL

L G

EO

GR

ID M

AT

ER

IAL

IS TO

BE

CO

AT

ED

POL

YE

STE

R W

ITH

A M

INIM

UM

AL

LO

WA

BL

E D

ESIG

N

AD

DIT

ION

, MIN

IMU

M E

MB

ED

ME

NT

MU

ST E

XC

EE

D A

NY

MA

NU

FAC

TU

RE

R D

ESIG

N G

UID

EL

INE

S. E

. RE

TA

ININ

G W

AL

L E

MB

ED

ME

NT

SHA

LL

BE

AT

LE

AST

TH

E M

INIM

UM

SPEC

IFIED

IN T

HE

DR

AW

ING

S. IN

AG

GR

EG

AT

E B

AC

K D

RA

IN.

TIL

E IN

3/4" CR

USH

ED

AG

GR

EG

AT

E A

ND

FILT

ER

FAB

RIC

WIT

H D

RA

INA

GE

CO

MPO

SITE

OR

D

AYLIGH

T AT A MAXIM

UM

INTER

VAL OF 20’. W

HEN

SITE CO

ND

ITION

S REQ

UIR

E, WR

AP DR

AINAG

E D

. DR

AIN

AG

E T

ILE

SHA

LL

BE

USE

D B

EH

IND

TH

E R

ET

AIN

ING

WA

LL

. TH

E D

RA

INA

GE

TIL

E SH

AL

L R

UN

TO

OB

TA

INE

D.

AR

EA

S BY

WA

TE

RIN

G. C

ON

TIN

UE

TO

RE

WO

RK

BA

RE

AR

EA

S UN

TIL

CO

MPL

ET

E C

OV

ER

AG

E IS

C. IT

IS TH

E C

ON

TR

AC

TO

R'S R

ESPO

NSIB

ILIT

Y T

O E

NSU

RE

GR

OW

TH

OF SE

ED

ED

AN

D L

AN

DSC

APE

D

B. SO

W SE

ED

IN T

WO

DIR

EC

TIO

NS IN

TW

ICE

TH

E Q

UA

NT

ITY

RE

CO

MM

EN

DE

D B

Y T

HE

SEE

D PR

OD

UC

ER

.

RA

KE

AR

EA

S TO

BE

SEE

DE

D T

O E

VE

N T

HE

SUR

FAC

E A

ND

LO

OSE

N T

HE

SOIL

.A

. SEE

D A

ND

FER

TIL

IZE

R SH

AL

L B

E A

PPLIE

D T

O SU

RFA

CE

CO

ND

ITIO

NS T

O E

NC

OU

RA

GE

RO

OT

ING

.

9.2 INST

AL

LA

TIO

N

C. A

LL

EX

POSE

D A

RE

AS SH

AL

L B

E PR

OT

EC

TE

D A

GA

INST

WA

SHO

UT

S AN

D SO

IL E

RO

SION

.

GR

OU

ND

ON

FO

UR

SID

ES

OF

TH

E T

RE

E.

HO

SE PR

OT

EC

TE

D W

IRE

AN

D SE

CU

RE

D T

O A

STE

EL

AN

GL

E E

XT

EN

DIN

G T

WO

FEE

T IN

TO

TH

E

B. A

LL

TR

EE

S PLA

CE

D IN

CO

NJU

NC

TIO

N W

ITH

A L

AN

DSC

APE

PLA

N W

ILL

BE

WR

APPE

D, T

IED

WIT

H

CO

NT

RO

L M

ES

H O

R M

UL

CH

NE

T.

A. C

ON

TR

AC

TO

R SH

AL

L PR

OT

EC

T SE

ED

ED

AR

EA

S FRO

M E

RO

SION

TH

RO

UG

H T

HE

USE

OF A

N E

RO

SION

9.1 PR

OT

EC

TIO

N

OR

VISIB

LY

DIST

RE

SSED

PLA

NT

S WIT

HIN

TH

IS PER

IOD

.SH

AL

L G

UA

RA

NT

EE

LA

ND

SCA

PING

FOR

A M

INIM

UM

OF 1 Y

EA

R A

ND

SHA

LL

RE

PLA

CE

AN

Y D

EA

D

LA

ND

SCA

PING

IS PRO

PER

LY

INST

AL

LE

D, W

AT

ER

ED

, AN

D O

TH

ER

WISE

MA

INT

AIN

ED

. CO

NT

RA

CT

OR

C

ON

TR

AC

TO

R SH

AL

L U

TL

IZE

TH

E SE

RV

ICE

S OF A

LA

ND

SCA

PE C

ON

TR

AC

TO

R T

O E

NSU

RE

TH

E

CO

NST

RU

CT

ION

DR

AW

ING

S OR

RE

QU

IRE

D IN

TH

E SPE

CIFIC

AT

ION

S.C

ON

TR

AC

TO

R SH

AL

L FU

RN

ISH, IN

STA

LL

, AN

D M

AIN

TA

IN L

AN

DSC

APE

WO

RK

AS SH

OW

N O

N T

HE

SEC

TIO

N 9: L

AN

DSC

APIN

G &

SITE

RE

STO

RA

TIO

N

222 (LA

TE

ST V

ER

SION

), FAA

AD

VISO

RY

CIR

CU

LA

R A

C70/7460-1A

, FCC

RU

LE

S & R

EG

UL

AT

ION

S. F. C

ON

TR

AC

TO

R SH

AL

L FO

LL

OW

AL

L A

PPLIC

AB

LE

STA

ND

AR

DS IN

CL

UD

ING

, BU

T N

OT

LIM

ITE

D T

O: E

IA

ER

EC

TIO

N O

F AN

TE

NN

AS, T

RA

NSM

ISSION

LIN

ES A

ND

SUPPO

RT

STR

UC

TU

RE

S. E

. AN

TE

NN

A IN

STA

LL

AT

ION

TO

BE

CO

ND

UC

TE

D B

Y FIE

LD

CR

EW

S EX

PER

IEN

CE

D IN

TH

E A

SSEM

BL

Y A

ND

D. A

SSIST O

WN

ER

TE

CH

NIC

IAN

S IN PE

RFO

RM

ING

SWE

EP T

EST

OF IN

STA

LL

ED

CO

AX

.

AP

PR

OV

ED

BY

TH

E C

ON

ST

RU

CT

ION

MA

NA

GE

R.

C. IN

ST

AL

L A

NT

EN

NA

AN

D C

OA

X M

OU

NT

ING

HA

RD

WA

RE

AS

IND

ICA

TE

D O

N T

HE

DR

AW

ING

S O

R

SP

EC

IFIC

AT

ION

S.

B. IN

STA

LL

AN

TE

NN

AS A

ND

LIN

ES A

S IND

ICA

TE

D O

N T

HE

DR

AW

ING

S AN

D PE

R O

WN

ER

OR

TE

STIN

G R

EQ

UIR

EM

EN

TS.

CO

NC

RE

TE

HA

S ME

T T

HE

MIN

IMU

M ST

RE

NG

TH

RE

QU

IRE

ME

NT

S AS W

EL

L A

S AN

Y O

TH

ER

INSPE

CT

ION

A

. IF RE

QU

IRE

D, E

RE

CT

FUR

NISH

ED

TO

WE

R. PR

IOR

TO

ER

EC

TIO

N, C

ON

TR

AC

TO

R M

UST

VE

RIFY

TH

AT

SEC

TIO

N 8: T

OW

ER

AN

D A

NT

EN

NA

INST

AL

LA

TIO

N

E. A

LL

MA

TE

RIA

LS U

TIL

IZE

D SH

AL

L B

E U

.L. L

ISTE

D.

PA

ID B

Y C

ON

TR

AC

TO

R.

PER

MA

NE

NT

POW

ER

TO

TH

E SIT

E. T

HE

TE

MPO

RA

RY

POW

ER

AN

D A

LL

HO

OK

UP C

OST

S SHA

LL

BE

D

. CO

NT

RA

CT

OR

TO

CO

OR

DIN

AT

E W

ITH

UT

ILIT

Y C

OM

PA

NY

FO

R C

ON

NE

CT

ION

OF

TE

MP

OR

AR

Y A

ND

UN

LE

SS TH

IS CO

ND

ITIO

N H

AS B

EE

N M

ET

.C

HA

NG

E O

RD

ER

S RE

LA

TE

D T

O U

TIL

ITY

RE

QU

IRE

ME

NT

S OR

RE

QU

EST

S WIL

L N

OT

BE

AL

LO

WE

D

VE

RIFY

TH

AT

SER

VIC

E H

AS B

EE

N O

RD

ER

ED

AN

D D

ISCU

SS AN

Y SIT

E SPE

CIFIC

RE

QU

IRE

ME

NT

S. C

. CO

NT

RA

CT

OR

SHA

LL

CO

NT

AC

T U

TIL

ITY

PRO

VID

ER

PRIO

R T

O B

IDD

ING

AN

D C

ON

STR

UC

TIO

N T

O

SHA

LL

BE

RE

PAIR

ED

AT

TH

E C

ON

TR

AC

TO

R'S SO

LE

EX

PEN

SE.

TR

EN

CH

ING

. AN

Y D

AM

AG

E C

AU

SED

TO

TH

E E

XIST

ING

UN

DE

RG

RO

UN

D SE

RV

ICE

S OR

SYST

EM

S G

RO

UN

DIN

G C

ON

DU

ITS, A

ND

AL

L O

TH

ER

UT

ILIT

Y E

ASE

ME

NT

S AN

D/O

R W

IRE

S PRIO

R T

O

B. T

HE

CO

NT

RA

CT

OR

SHA

LL

LO

CA

TE

AN

D M

AR

K A

LL

EX

ISTIN

G U

ND

ER

GR

OU

ND

POW

ER

, TE

LC

O,

A. PR

OV

IDE

2 PUL

L ST

RIN

GS SE

CU

RE

LY

FAST

EN

ED

AT

EA

CH

EN

D O

F AL

L C

ON

DU

ITS.

SEC

TIO

N 7: E

LE

CT

RIC

AL

PH

OT

OG

RA

PH

S T

O C

ON

ST

RU

CT

ION

MA

NA

GE

R W

ITH

IN 48 H

OU

RS

.IS N

OT

PRE

SEN

T, C

ON

TR

AC

TO

R SH

AL

L PH

OT

OG

RA

PH E

NT

IRE

INST

AL

LA

TIO

N A

ND

PRO

VID

E

RE

PRE

SEN

TA

TIV

E C

AN

INSPE

CT

TH

E G

RO

UN

D R

ING

BE

FOR

E IT

IS BA

CK

FILL

ED

. IF A R

EPR

ESE

NT

AT

IVE

N

OT

IFY T

HE

OW

NE

R 24 H

OU

RS IN

AD

VA

NC

E O

F TH

E G

RO

UN

D R

ING

INST

AL

LA

TIO

N SO

TH

AT

A

K. D

O N

OT

INST

AL

L B

UR

IED

GR

OU

ND

RIN

G O

UT

SIDE

OF T

HE

LE

ASE

D A

RE

A. C

ON

TR

AC

TO

R SH

AL

L

MA

NA

GE

R.

SHA

LL

BE

DO

CU

ME

NT

ED

, WIT

H C

OPIE

S PRO

VID

ED

TO

TH

E O

WN

ER

AN

D C

ON

STR

UC

TIO

N

RE

SISTIV

ITY

OF 5 O

HM

S MU

ST B

E A

CH

IEV

ED

PRIO

R T

O PR

OC

EE

DIN

G. T

HE

RE

SUL

TS O

F TH

IS TE

ST

J. RE

SISTIV

ITY

TE

ST SH

AL

L B

E PE

RFO

RM

ED

BY

TH

E C

ON

TR

AC

TO

R PR

IOR

TO

BA

CK

FILL

ING

. A M

AX

IMU

M

I. OX

IDE

INH

IBIT

ING

CO

MP

OU

ND

TO

BE

US

ED

AT

AL

L C

ON

NE

CT

ION

S.

H. D

OU

BL

ING

UP

OR

"ST

AC

KIN

G" O

F C

ON

NE

CT

ION

IS N

OT

PE

RM

ITT

ED

.

MO

UN

TIN

G H

AR

DW

AR

E.

RIN

G A

S IN

DIC

AT

ED

ON

DR

AW

ING

S. C

ON

TR

AC

TO

R T

O P

RO

VID

E G

RO

UN

D B

AR

AN

D A

LL

G

RO

UN

D B

AR

. LO

CA

TE

GR

OU

ND

RIN

G A

RO

UN

D T

OW

ER

AN

D B

ON

D G

RO

UN

D B

AR

TO

GR

OU

ND

G

. AT

BA

SE O

F AN

TE

NN

A T

OW

ER

, AT

TA

CH

GR

OU

ND

KIT

S FRO

M C

OA

XIA

L C

AB

LE

S TO

TO

WE

R

F. PRO

POSE

D G

RO

UN

D R

ING

SHA

LL

BE

INST

AL

LE

D A

MIN

IMU

M O

F 2' FRO

M A

NY

STR

UC

TU

RE

.

IN 2 L

OC

AT

ION

S.

E. C

ON

TR

AC

TO

R T

O B

ON

D P

RO

PO

SE

D G

RO

UN

D S

YS

TE

M T

O E

QU

IPM

EN

T/B

UIL

DIN

G G

RO

UN

D R

ING

D. A

SM

OO

TH

, DO

WN

WA

RD

PA

TH

TO

GR

OU

ND

IS R

EQ

UIR

ED

FO

R A

LL

GR

OU

ND

LE

AD

S.

TH

E P

OS

T.

C. IC

E B

RID

GE

GR

OU

ND

- GR

OU

ND

SU

PP

OR

T P

OS

T T

O G

RO

UN

D R

ING

AN

D G

RO

UN

D IC

E B

RID

GE

TO

12 INC

HE

S AB

OV

E G

RO

UN

D B

UT

MU

ST B

E V

ISIBL

E).

B. G

RO

UN

D A

LL

CO

RN

ER

PO

ST

S W

ITH

EX

OT

HE

RM

IC W

EL

DS

(CO

NN

EC

TIO

N T

O B

E N

O M

OR

E T

HA

N

AB

OV

E G

RO

UN

D L

EA

DS T

O B

E SE

AL

ED

IN C

AR

FLE

X C

ON

DU

ITS.

A. G

RO

UN

D R

ING

IS TO

BE

CO

NST

RU

CT

ED

OF M

AT

ER

IAL

S IND

ICA

TE

D O

N T

HE

DR

AW

ING

S. AL

L

SE

CT

ION

6: GR

OU

ND

ING

ST

RU

CT

UR

AL

WE

LD

ING

CO

DE

.G

. WE

LD

ING

SH

AL

L B

E IN

AC

CO

RD

AN

CE

WIT

H T

HE

AM

ER

ICA

N W

EL

DIN

G S

OC

IET

Y (A

WG

) D.1.1-92.

EN

GIN

EE

R. A

LL

SPLIC

ES M

UST

TH

EN

ME

ET

AL

L A

PPLIC

AB

LE

AST

M ST

AN

DA

RD

S FOR

SPLIC

ING

.F. SPL

ICE

S IN R

EIN

FOR

CE

ME

NT

STE

EL

AR

E PR

OH

IBIT

ED

, UN

LE

SS APPR

OV

ED

BY

TH

E ST

RU

CT

UR

AL

3 INC

HE

S. CO

NT

RA

CT

OR

SHA

LL

UT

ILIZ

E SPA

CE

RS A

ND

CH

AIR

S AS R

EQ

UIR

ED

.E

. UN

LE

SS OT

HE

RW

ISE N

OT

ED

, AL

L R

EIN

FOR

CE

ME

NT

SHA

LL

HA

VE

A M

INIM

UM

CO

NC

RE

TE

CO

VE

R O

F

D. A

LL

RE

INFO

RC

EM

EN

T B

AR

S AR

E T

O B

E FR

EE

FRO

M L

OO

SE R

UST

AN

D SC

AL

E.

TH

E ST

RU

CT

UR

AL

EN

GIN

EE

R.

C. H

EA

TIN

G A

ND

WE

LD

ING

OF B

AR

S IS PRO

HIB

ITE

D U

NL

ESS W

RIT

TE

N A

PPRO

VA

L IS O

BT

AIN

ED

FRO

M

DE

FO

RM

ED

.B

. AL

L R

EIN

FOR

CIN

G ST

EE

L SH

AL

L B

E N

EW

BIL

LE

T ST

EE

L, C

ON

FOR

MIN

G T

O A

STM

A-615, G

RA

DE

60,

CO

NC

RE

TE

ST

RU

CT

UR

ES

(AC

I 315).SH

AL

L C

ON

FOR

M T

O T

HE

MA

NU

AL

OF ST

AN

DA

RD

PRA

CT

ICE

FOR

DE

TA

ILIN

G R

EIN

FOR

CE

D

A. U

NL

ESS O

TH

ER

WISE

NO

TE

D, A

LL

DE

TA

ILIN

G, FA

BR

ICA

TIO

N A

ND

PLA

CIN

G O

F RE

INFO

RC

ING

STE

EL

SEC

TIO

N 5: ST

RU

CT

UR

AL

STE

EL

C O N S T R U C TIO N N O T E S

I:\14400\14459\CAD\Plot\CDs\N-1.dgn

SHEET TITLE:CH

EC

KE

D B

Y:

PL

OT

DA

TE

:

FIL

E N

AM

E:

SH

EE

T N

UM

BE

R:

Edge

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street

C onsulting E ngineers, Inc.

4/2

7/2

017

PR

OJE

CT

#:

N-1

.dg

n

AD

S

INT

:

PR

EL

IM D

WG

S - 12/23/2016

PR

EL

IMIN

AR

Y D

WG

S:

C E

DG

E C

ON

SU

LT

ING

EN

GIN

EE

RS

, INC

.

ST

AM

PE

D F

INA

L D

WG

S:

14459

T O M A H A W K , W IS C O N S IN

T O M A H A W K W T

KC

B

AD

SA

NT

EN

NA

MO

DE

L - 1/25/2016

AD

SR

F D

ES

IGN

- 4/27/2017

Page 25: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

- 4 -

SCHEDULE “B-1”

LESSEE’S EQUIPMENT

• Three (3) Kathrein Model #80010766 Panel Antennas Mounted on the Tower as Depicted in the attached Site Drawings

• Three (3) Duplexors Model #DBC-67C-U-2SF, Mounted on the Tower as Depicted in the attached Site Drawings

• Six (6) 1-5/8” Foam Dielectric, LD57 Series – 50 ohm coax runs

• Three (3) Nortel Outdoor Metro Cell transmitters/cabinets as Depicted in the attached Site Drawings.

• One (1) GPS unit

Page 26: CITY OF TOMAHAWK WATER AND SEWER UTILITY ...92CBFAD3...2017/07/25  · Water and Sewer Utility Commission June 27, 2018 Page 1 of 3 1 MINUTES OF THE 2 WATER AND SEWER UTILITY COMMISSION

5 Year Capital Improvement Plan

City of Tomahawk, Wisconsin

2018 2022thru

Description

Foaming and Lining of the sanitary sewer lines at the follwing:

-Washington Avenue between 8th Street and 9th Street (1 Block)-Washington Avenue beteen 2nd Street and Tomahawk Avenue (1 Block)

Project # WW-18-003

Priority 1 Critical

Justification

Tree roots have penetrated the sanitary sewer lines in the segments of roads indicated in the descrition. The project would include a foam treatment to kill the roots in the system and then to line the sanitary sewer lines.

Budget Impact/Other

Useful Life 30 years

Project Name Sanitary Sewer Lining

Category Wastewater

Type Improvement

Contact Sewer Leadsperson

Department Sewer Department

Total Project Cost: $0

Total2018 2019 2020 2021 2022Expenditures00Construction/Maintenance

0 0Total

Total2018 2019 2020 2021 2022Funding Sources00Sewer Fund

0 0Total

Thursday, July 20, 2017Page 1