City of Spruce Grove Capital Region Partners Presentation

2018

Trevor Crawford Supervisor of Capital ProjectsEngineering Department

Page 2: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

Spruce Grove

Stony PlainAcheson

Edmonton

Highway 16

Highway 16a

Page 3: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

Spruce Grove Background

• Spruce Grove is located 11km west of Edmonton, shares a boundary with the Town of Stony Plain to the west and is surrounded by Parkland County.• Growth of Spruce Grove:

• 2017 census indicated a 3.7% growth from 2016;• Average yearly growth rate for the years 2013 to 2017 of 5.8% per annum.

• Spruce Grove has emerged as a major regional commercial centre and industrial base, and is now home to a number of Industrial Subdivisions which employ an estimated 2,100 people. • Population of the City of Spruce Grove is now over 35 000 people and is currently

Alberta’s 9th largest City .

Page 4: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

Spruce Grove Development • In 2017, the City of Spruce Grove had 16 Development Agreements with various Land Developers.• In those 16 Development Agreements, there were over 550 residential lots. • 2017 Building Permits:

• Single Detached Residential – 149 ($45 million)• Semi Detached Residential – 148 ($33 Million)• Multi Family – 14 ($5.6 million)• Commercial – 12 ($21 million)• Industrial – 4 ($3.7 Million)• Institutional – 4 ($16.3 Million)

Page 5: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

Spruce Grove Projects New Growth Water and Sanitary

Definition: Water/Sanitary Trunk Main construction to keep ahead of growth & development.

New Growth Transportation

Definition: Arterial Roadway construction to keep ahead of growth & development.

Major Maintenance and Rehabilitation – Water and Sanitary

Definition: Yearly, dedicated funding for rehab of the existing water & sanitary sewer system.

Major Maintenance and Rehabilitation - Surface Infrastructure

Definition: Yearly, dedicated funding for rehab of surface infrastructure.

Page 6: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

2018 New Growth Water/Sanitary Sewer

• On Going Project:• Complete Zone 1 Water Reservoir and Pump Station.

• Expected to be complete by July, 2018.• New 19 500 cubic meter reservoir and pump station to serve the City to a population of 75 000 people.

• No additional New Growth Water/Sanitary Sewer projects planned for 2018. • Future Work:

• Pioneer Watermain which is a 400mm diameter along the north side of Hwy 16A from Century Road eastward to Pioneer Road.

• Extension of the Boundary Trunk Sewer southward, under Hwy 16A.

Page 7: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

2018 New Growth Transportation

• On Going Project:• Grove Drive West construction project (including two roundabouts).• Pioneer Road construction project (including four roundabouts).• $300 000.00 annual budget to construct missing pedestrian trail links.

No additional New Growth Transportation projects planned for 2018.

Page 8: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

2018 Major Maintenance and Rehabilitation Water/Sanitary Sewer

The City of Spruce Grove has yearly, dedicated funding in place to attend to aging Water/Sanitary Sewer Infrastructure.

2018 Project – Broxton Park neighborhood replacement of existing cast iron watermains and cc’s.

Page 9: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%

2018 Major Maintenance and Rehabilitation Surface Infrastructure

The City of Spruce Grove has yearly, dedicated funding in place to attend to aging Surface Infrastructure.

2018 Project – 250mm depth pavement/gravel base/cement powder pulverization and asphalt paving, 50mm mill and overlay, and concrete sidewalks and curb and gutter removal and replacement in the Broxton Park Neighbourhood.

Page 10: City of Spruce Grove Capital Region Partners …...2018/01/25  · • 2017 census indicated a 3.7% growth from 2016; • Average yearly growth rate for the years 2013 to 2017 of 5.8%