City of Phoenix Phoenix Sky Harbor International Airport Terminal 4, S-1 Concourse CMAR Project No. AV21000097-1 Construction Services July 13, 2017 Pre - Submittal Meeting

City of Phoenix Phoenix Sky Harbor International Airport ... · Please hold questions until the Q&A period. This is the ONLY opportunity to discuss this project with City staff. Project

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

City of PhoenixPhoenix Sky Harbor International Airport

Terminal 4, S-1 ConcourseCMAR

Project No. AV21000097-1

Construction ServicesJuly 13, 2017

Pre-Submittal Meeting

• Liz Blakley, Contract Specialist Street Transportation Department

• BA Golston, Project Manager Design and Construction Services

• Valerie Churchwell, Small Business Engagement Manager

Aviation Department

● Joanne McLaughlin, Equal Opportunity SpecialistEqual Opportunity Department

Welcome and Introductions

Meeting Overview

Sign-in please…copies of sign in sheet will be available on website:

http://phoenix.gov/streets/procurement/current-opportunities

Please hold questions until the Q&A period.

This is the ONLY opportunity to discuss this project with City staff.

Project DescriptionProject Scope of WorkSBE InvolvementSOQ CriteriaSubmittal RequirementsSelection ScheduleQuestions?

Agenda

Project Description

On October 25, 2016, the Phoenix City Council approved construction and funding of T4 S-1:

Tenant is Southwest Airlines Providing up to eight new gates at PHX Relieve terminal and concourse constraints Allow for additional and newer facilities to enhance

customer service More easily serve passengers and support long term

airline activity.

Project Scope of Work A new 3-4 level concourse (basement, apron and

passenger levels) with approximately 30,000 square feet per level; mezzanine potential.

Connector bridge with moving walkways. Transfer bridge with moving walkways.May include Aircraft apron and hydrant fueling system.

a federal grant for the apron may be procured under a separate construction services process and contract.

Security screening expansion at Checkpoint D. Ticketing counter and baggage claim carousel expansion Baggage handling system and EDS expansion to service

T4 S1 and T4 S2 demand.

Associated structural, electrical, mechanical and civil work.

Retail and food and beverage shell spaces. Public Restrooms Potential International Facilities. Passenger boarding bridge and gate equipment. Airside, landside access and loading dock. Service road below taxiways.

Project Scope of Work(cont…)

Planning / Programming Planning/Programming - scope anticipates: Concept planning for a new 8 gate concourse (S1)

• Gate and seating layouts• Commercial and support spaces

Concept planning of the apron and stand to support (S1)• Aircraft parking and Passenger Boarding Bridge configuration• Ground Service Equipment (GSE) movement areas and airside

vehicle roadways Confirmation the existing processor to support (S1)

• Ticketing counters• Baggage claim and handling• Security screening • Commercial and support spaces

Project Schedule / Budget

• Budget: $250M• Construction cost: approximately $180M

* Operational Readiness and Testing

Preliminary Project Schedule: This is preliminary in concept and is subject to change.

• May 2017 Start Planning/Programming Phase Services • Early 2018 Start Preconstruction Design Phase Services • Mid-2018 Start Enabling Projects (utility relocations if required). • Late-2018 Start Construction of Foundations • Late-2018 Start Construction of Heavy Structural/Civil • Early-2019 Start Construction of Facility • Early-2020 Start construction of Apron • Late-2020 Complete Facilities and Apron

Experienced CMAR team – bring it in on time and on budget Active airside / landside environment – Minimize disruptions Extensive input and coordination with various City, State

and Federal entities, Aviation divisions and stakeholders Address all Federal, State and Local requirements Extensive SBE coordination on large public projects. Experience in planning/scheduling/coordinating the work of

public utility entities. Public Art – Procurement and install (design by the City) Utilize the City’s web based project management system,

Unifier In-depth City and stakeholder input and participation

Project Expectations

14

QUESTIONS?

Small Business Outreach and Compliance

OBJECTIVE: Achieve small business participation in EVERY AIRPORT CONTRACT

• NO established small business goal for Design Contracts

• SBE goals for CONSTRUCTIONContracts are established at the substantial completion of design

• Successful Submitter will work with the Small Business Team prior to goal setting

Pre-Award SBE Requirements• No SBE documents due at time of initial

submittal• Outreach Efforts and SBE Plan should

be actively in development• “Good Faith Efforts”

–If Contractor is unable to meet the goal• Must submit fully documented waiver request

City of Phoenix SBE Certification Program

LOCAL PROGRAM-Small Business Enterprise (SBE)• Applicable to City of Phoenix-funded contracts

administered by the City• Available only to firms with a principal location in

Maricopa County

MARICOPA COUNTY

Small Business Outreach and Compliance

To locate certified firms visit:https://phoenix.diversitycompliance.com

Select:City of Phoenix

Directory of SBE Certified

Firms

REMEMBERconfirm certification

status of a firm (database is updated

frequently)

Small Business Outreach and Compliance

• SBE documents due to EOD at each GMP*Contractor’s Statement of Proposed SBE Utilization *Letter of Intent to Perform as an SBE Subcontractor/Supplier

• SBE firms must be certified at the time of each GMP• SBE participation counted for certified firms performing

a Commercially Useful Function (CUF) in their certified scope of work

• Contractor is required to demonstrate good faith efforts to utilize small business throughout the contract

• All subcontractors/suppliers must be reported within the B2G System

• All small business participation will be tracked and reported by the Equal Opportunity Department

Post-Award SBE Requirements

For more information please contact:

Joanne McLaughlinEqual Opportunity Specialist

Equal Opportunity [email protected]

602-534-1279

The selection of the CMAR will be based on the following qualifications:

General Information – 15 points Experience of the Prime Firm – 20 points Experience of Key Personnel and Subconsultants – 25

points Project Understanding and Approach – 35 points Overall Evaluation – 5 points

Statement of Qualifications

Each page side with criteria information will be counted.

Pages that have photos, charts, and graphs will be counted toward maximum number of pages.

Front and back cover, Table of Contents and tab dividers will NOT be counted toward the maximum page limit, UNLESS they include information that may be considered by the selection panel.

Statement of Qualifications, Cont.

Submit 10 copies of the SOQ SOQ due: 12:00 p.m. Noon – Arizona Local Time

Friday, July 28, 2017

City EngineerCITY OF PHOENIX

200 W. Washington Street, 6th FloorPhoenix, AZ 85003

c/o Liz Blakley

Statement of Qualifications, Cont.

Grounds for Disqualification: Receipt of submittal after specified cut-off date and

time Too few copies of the submittal Deposit of submittal in the wrong location Violating the “Contact with City Employees” policy

contained in the RFQ

Statement of Qualifications, Cont.

Cover Letter (company name, address and contact information)

Evaluation Criteria (including project organizational chart)

Additional Content (resumes or other information)

MAXIMUM pages permitted is 20 pages:

+ Evaluation Criteria (including organizational chart)+ Additional Content (resumes or other information)

= 20 MAXIMUM pages permitted + a one page cover letter

Submittal Requirements

• SOQs due at 12:00 p.m. July 28, 2017• Interview Notification August 17, 2017• Interviews September 8, 2017• Scope Meeting September 2017

Selection Schedule

Request for QualificationsNotificationsPower Point PresentationPlan Holder ListFirms to be Interviewedhttp://phoenix.gov/streets/procurement/project-interviewsAwardhttp://phoenix.gov/streets/procurement/bid-results

Streets Transportation Webpage

Liz Blakley, Contracts Specialist

(602) 681-5317

[email protected]

Questions After Today