CITY OF KIRKLAND Planning and Building Department 123 Fifth Avenue, Kirkland, WA 98033 425.587.3600 www.kirklandwa.gov
MEMORANDUM
To: Design Review Board
From: Jon Regala, Planning Supervisor
Date: March 28, 2016
File No.: DRV15-01765 Subject: VILLAGE AT TOTEM LAKE – PHASE I (LOWER MALL) DESIGN RESPONSE CONFERENCE – Continued from March 7, 2016
I. MEETING GOALS
At the April 4, 2016 Design Review Board (DRB) meeting, the DRB should continue their review from the March 7th Design Response Conference. The DRB should discuss and provide feedback on the applicant’s design response (see Attachment 1) to the following Phase I (lower Mall) components:
Building C (multi-story mixed-use building) Design approach for the existing building’s facades (Ross, Car Toys, etc.)
The DRB’s discussion and feedback should be based on the design guidelines and conditions found in the Totem Lake Mall Amended Conceptual Master Plan (CMP). Tenant guidelines for changing the building façade (‘kit of parts’, materials, articulation, and criteria/thresholds for façade changes) should also be addressed (see Attachment 2, Section 3.3). Following discussion on the above topics, the DRB should give final approval of the complete package for Phase I of the Village at Totem Lake project (see Attachment 1, Appendices). The DRB may include conditions of approval in regards to Building C if needed.
II. DRB DIRECTION FROM JANUARY 20TH MEETING
A complete design response packet was not provided to staff in advance of preparing this memo, so a staff analysis of the applicant’s revisions is not included below. At the March 7th DRB meeting, the DRB requested the following in regards to Building C:
Detailed wall sections to understand the proposed massing scheme to include building details and articulation.
Provide options to screen the upper story parking garage A canopy and lighting plan Details on the ramp/garage entry area along 120th Avenue NE and options on how
blank walls are being treated Design update to building façades north of Ross to reflect design palette of
Buildings A, B, and C Actual material samples or alternatives to the proposed orange color
III. ATTACHMENTS
1. Applicant’s Design Response & Final Packet (Appendices) 2. Tenant Criteria Manual
1
GBD Architects Incorporated 1120 NW Couch St., Suite 300 Portland, OR 97209 Tel. (503) 224-9656 www.gbdarchitects.com
THE VILLAGE AT TOTEM LAKE
MIXED-USE DEVELOPMENTKIRKLAND, WASHINGTON
CenterCal Properties, LLC • DeveloperGBD Architects Inc. • Architect
SUBMITTAL DATE: 3/28/16PRESENTATION DATE: 4/4/16
DESIGN REVIEW BOARD SUBMITTAL
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
3
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 2
DRB COMMENTS FROM MARCH 7TH:
1. Parking Entry: Quality of materials at entry
2. Screen the garage openings
3. Show representative wall sections of key parts of the project
4. Show details for privacy screens, canopies, and railings
5. Further study the cementitious siding colors and details
6. Provide lighting plans
7. Improve elevations of storefronts north of Ross
DESIGN TEAM RESPONSE TO CONDITIONS:
1. Wrap building materials into the garage entry.
2. Show strategies for screening the garage
3. Provide wall sections
4. Provide details for privacy screens, canopies, and railings
5. Provide details and rendered image of cementitious siding
6. Provide lighting plans for garage and landscape courtyards
7. Provide modified elevations for storefronts north of Ross
MATERIAL STUDIES
1
3
2
WALL SECTIONS
CANOPY DETAILS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
4
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 3
BUILDINGS C & D -NEW Wall Sections pages 4-9Railings & Privacy Screens 10-11Typical Window Details 12-13Typical Details @ Screened Openings 14-15Garage Screening Options 16Rendering at Parking Entry Ramp 17Lighting Plans 18-20Building Height Calculations 21
BUILDINGS C & DSite Information pages 22-23Floor Plans 24-31Site Sections 32-33Materials 34-35Landscape 36-37Sun Studies 38-39Renderings 40-46Elevations 48-51
APPENDIX ARoss Elevations
APPENDIX BLandscape, Hardscape, and Building L
APPENDIX CBuildings A, B, K, M, Loading Dock A & B
TABLE OF CONTENTS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
5
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 4
WALL SECTION 1: PAINTED STEEL CANOPY WITH WOOD INFILLREPRESENTATIVE IMAGES OF PAINTED STEEL CANOPY WITH WOOD INFILL
ENLARGED SOUTH ELEVATION @ SW CORNER
1
1
RETAIL WALL SECTION #1
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
6
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 5
WALL SECTION 2: AWNING WITH FABRIC OR PAINTED METALREPRESENTATIVE IMAGES OF RETAIL AWNINGS WITH FABRIC OR PAINTED METAL
2
2
ENLARGED SOUTH ELEVATION @ MIDBLOCK
RETAIL WALL SECTION #2
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
7
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 6
WALL SECTION 3: PAINTED STEEL CANOPY WITH GLASS INFILLREPRESENTATIVE IMAGES OF PAINTED STEEL CANOPY WITH GLASS INFILL
ENLARGED EAST ELEVATION @ SE CORNER
3
3
RETAIL PAL
RETAIL WALL SECTION #3
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
8
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 7
LETTE 1
WALL SECTION 4: RETAIL AWNING WITH FABRIC OR PAINTED METALREPRESENTATIVE IMAGES OF RETAIL AWNINGS WITH FABRIC OR PAINTED METAL
4
4
ENLARGED SOUTH ELEVATION @ MIDBLOCK
RETAIL WALL SECTION #4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
9
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 8
WALL SECTION 5: PAINTED METAL ROOF OVERHANG @ 7TH FLOORREPRESENTATIVE IMAGES OF PAINTED METAL ROOF OVERHANGS
ENLARGED SOUTH ELEVATION @ SW CORNER
5
5
WALL SECTION #5
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
10
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 9
WALL SECTION #6
WALL SECTION 6: RESIDENTIAL BALCONIESREPRESENTATIVE IMAGES OF RESIDENTIAL BALCONIES
6
6
ENLARGED EAST ELEVATION @ MIDBLOCK
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
11
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 10
TYPICAL GLASS RAILING TYPICAL CABLE RAILING
TYPICAL RAILING TYPES
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
12
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 11
TYPICAL PRIVACY SCREENS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
13
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 12
1
3
2
WALL DETAILS @ COURTYARDS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
14
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 13
1
3
2
JAMB @ FIBER-CEMENT BOARD
SILL @ METAL PANEL
HEAD @ METAL PANEL
WALL DETAILS @ COURTYARDS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
15
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 14
1
3
2
4
PARKING GARAGE SCREEN DETAILS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
16
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 15
1
3
2JAMB @ PARKING SCREEN
SILL @ PARKING SCREEN
HEAD @ PARKING SCREEN
4 FRAME DETAIL @ METAL SCREEN
PARKING GARAGE SCREEN DETAILS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
17
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 16
PARKING SCREEN: METAL MESH PARKING SCREEN: PERF PANEL PARKING SCREEN: FRAMED OPENINGS AND SOLID STEEL HEADLIGHT SCREEN
PARKING GARAGE SCREEN STRATEGIES
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
18
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 17
PARKING GARAGE ENTRY PERSPECTIVE
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
19
~----~------------------------------------------------------~~----~ ....
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 18
LIGHTING PLAN: GARAGE ENTRY
STRIP UPLIGHTING ANDRAMP CURBLIGHTING
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
20
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 19
LIGHTING PLAN: PARKING LEVELS
WALL WASHDOWNLIGHT
STRIP UPLIGHTING ANDRAMP CURBLIGHTING
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
21
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 20
LIGHTING PLAN: RESIDENTIAL COURTYARDS
WALL WASH
UNIT ENTRY DOWNLIGHT
PLANTER STICK LIGHT
RECESSED GROUND UPLIGHT
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
22
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 21
BUILDING HEIGHT CALCULATION
(318 X 130.5’) + (310 X 131’) + (154 X 130.5’) + (185 X 130’) + (164 X 129.5’) + (125 X 130’)
IN ORDER TO DEMONSTRATE COMPLIANCE WITH KZC SECTION 55.21.010 (HEIGHT REQ.), KZC CHAPTER 180, PLATE 17B WAS USED AS A MEANS OF DETERMINING THE AVERAGE BUILDING HEIGHT ELEVATION.
*
(318 + 310 + 154 + 185 + 164+ 125)
= 130.37’ AVERAGE BUILDING ELEVATION
PARAPET = 218’ = 87.63’
+130
’-0”
125’
-0”
+130
’-0”
185’
-0”
318’-0”
+130’-6”
164’-0”
+129’-6”
+131
’-0”
310’
-0”
+130’-6”154’-0”
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
23
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 22
HOUSHOUSHOUSHOUSHOUSHOUSHOUHOUSHOUSOUSOUSHOUUSSUSUSHOUUSSUSSUSSUSHOUSUSUSUUSOUSSSSHOUSUUSSSUUUSUUSSSSSSSO SSUSSSSSUSSSUSUSU INGINGINGINGINGINGINGGGINGGINGINGINGINGNNGGNGINGINNGNGNGGNGNGINGNGGIINGGGGINII GNGIIINGNGGIII GIINGGIINGNGNGGGINNNGNGGINNNNIIINNNNINNNINN
RERERETRRERERETAETAETATARETARETAARETRERERETRRETAETETRETARETARRETETARE ARREEEETRREERRERERRETREERRRRRERETREERETARRETRREREEETREEEEEEEEE AEETTTAETETT ILILILILILLLLILLIILILLLILIILL
SERVSERVSERVSSEERVERVERVERVERVRRRERRERVRVVVRVSERVSERVERVERVRVSERVVVVERVEERSERVSERVVRVVSEERERVRVRVRVSERVSERRVVVRERVERVRRRRVRVVRVSERRRRVVVVRVRVVVRVVRRVRVVICICEICE ICCICICE EEICEIICICEICECCICECE ICICICCEICICICCCCEEIICICCCCCCCCEEICICCICCCEII ECCCC / SU/ SU/ SU/ SU/ SUSUSUSUUUU/// SU/ SU/ SUPPORPPPORPPPPPPPPPORPOPPPPPORPPORPPOROPPORPPORORPPORPPPPPPOPPPPORPPOOPPOPPOPPORORORPPORPPPPORORPPORPP RPPORPPPPPORPPORPPOOPOROOOOOOOOOOOOO TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
CIRCCIRCIRCCIRCIRCIRCRCCIRCIRRCCIRCCCICIRCCCIRCCIRCICCICIRIR ULATULATULATULAULATLATLALATLATLLATAAATATATULATULATLATLLALAULAATAAATTLALAAAAULATAATTULATTLLALAAAAALALATLAAATATATATTTTULLATTLALATAATLALATAAATTATATTATAAATATLATTTTLL TTAATTAATAATTTTIOIONONOIONIOIONIONONNIONONIONIONIONIONONONONI NNONIIOIOIOIIOOOIIOOONIONIIOOIOI
PAPAPPAPAPARPARPARKARKPARKARKARKRKRKKPARKPAPARPARKARKKKKARKKKPARPPARPAARKPAAARKKAPARPARKKPPAAPAPAAPAAAPPAR INGINGINGNININGIINGI GGINIIIIING
120th Ave NE
Totem Lake Park
Tote
m L
ake
Way
Totem Lake Blvd NE
Interstate 405
NE
128t
h St
SITE AERIAL VIEWN
SSSSSSSSSIIIIIIIIITTTTTTEEEEEEEEE
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
24
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 23
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKING
BUBBUBUBUBUBUBBBUUILILILLLILLLLILILLLLLLLLDIDIIDIDDIDDIDD NGNGNGGNGNGNGNGGNGNGNNN DDDDDDDDDDDD
BUBUBUBUBUBUBBUBBUB ILILLLLILIILILILLDIDIDDIDIDDDIDD NGNGNGGNGNGNGGNGNGNNGNNGG CCCCCCCCCCCCCCCCCCCCCCCCCCCC BUBUBUBUILIILILILILILLILILILLILLI DIDIDIDID NGNGNGNGGG BBBB
FUFUTUTURE DEVEV LOLOPMPMENTT
VIVIVV LLLLLAGAAGEE PAPAAARKRKKRKKKKKKKKKKK
VIVIVVIVIVIVIVVVVV LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLAGAAGAGAGAGAAGGAGAGGAGGAGAGGAGEEEEEEEEE MAMAMAMAMAMAMAAAAMAAAAMAMAAMAMAMMAMM ININININNNNNNNNN TSTSTSTSTSTSTTSTTTTTTRERERERERERERERR TETETETETTETTTTT
BLBLBLBLLLBLBLBLBLLBBLDGDGDGDGDGGGGGGGGGDGGGGGDGGGGDGGGGGDGGG LLLLLLLLLLL
BLBLBLLLLBLBLLLBBLB DGDGDGDGDGDGDGDGDGDGDGGGDG MMMMMMMMMMMMMMM
EXEXIEXIE STISTITIS NGGGGNGNG
EEEEEXIEXIEEEEEEEEEEEEEEEEEEE STISTISTS NGNGNNNNGNGGGGGGGNGNGGGGGGGGGGGGGGG
BLBLBLBLLLLLLLLLLLLBLBLBLLBLBBLDGDGDGDGDGDGDGGDGDGDGDGDGDGDGGDGGDGGDDGGDGDG KKKKKKKKKKKK
BUBUBUBUBUUBUBB ILLLLILILILLLLLLLLLLLLLDIDIDIDDDIDD NGNGNGNGGNGNGGGGNGNGNGN AAAAAAAAAA
CHASCHCHACHAACHASCHASSSSASSSSSSSSSSEEEEEEEE EEEEEE EEEEEEEBABBABABANBANNNNKBANKKNKKBANKKKKBANKNBANKNNNKKKKB KKBB KBBBB KKBBBBB KBBBB NNKKB N
NE 1
E 1
E 1
E 1
NE 1
E20
TH
20TH
20TH
20TH
T20
TH
20TH
AV
EA
VE
VE
AV
EA
VE
AV
EA
VE
TOTETOTETTTTT M LAM AKE BLVDVDDDDDDVDVDD
11111111 TTT022120T0120T11 0T120020T20T0020T02000T2220T2222222020211 002212002 T1220T2 TT21 TT00211 01 02 TT2 TT00022 T200222 T0120T2000T202 TT211 T0021 TTT0TT0000TTT22222222002 TT20T2 T0001 T0000T00000001 02 T01 T0T111 TT020T0000TTT0T0000000000002220T00200T12020TT0000020T1 TTT21 00001 TT2 T000T001 TT0TT000TTTTTT000222 TTTT0000000000000T22200022212020TTT000TTT0T222222222222222 T20T1111 00222 T20TTT01 TT1 000000000TT01111 0TTTT00000T02 T222112222222222222222222120222222220120000200T0T00000000TTTTTTTTT00002200TT111 0TTTTT201111111111 0T0T22222222222222222222200000222000TT1 020TTT00T111 01122222222222 T00TTTTTTT0TTT0012000T0TT1 00011111211202222222222222222220T222222222200000TTTTTT111222222222000TTTTTTTTTTTT221111222220TTTTTTTT2212212222222 TTTTTTT11 T11222 TT000111111111111111222 T00TTTTT0T222 TT0TT0 H AVAVAVAVAAA AAAH H HH AVAVAVVAVVVVVAH AAVAVVVVAHHH VAAHHHH VVVVVAAHHHHHHHH VVAHH AHHHH VVAH VVVAAAAAAHHHHHH AAAVVVAAAAHHHHHHH VHHH VAVVVVVVAVAAHHH VVAHHHH VVVVVVVAAAAHHH VVVAAHHH VVVAAH AVHH VVAH VV HH VVVAAH VAVAVHHH AAAAAAAAAAAAAAAAAAAAVAAAAVVH VVVVVVVVH AVVH VVVVVH AAH AHH AHHHHH VVHH VVH VAHHHH AAAAAAAVVVVVAAAAAAAAAAAVVVVVVVAAHHHHHH AAHH VAVHHHHHH AAVAAAAAAAAAVVVVAAAAAAAAAAAAAVVVVAVVVVVVVVAAAAVHHHHHHH VVH AAAAAAVVVVVVA ENUEUEUENUEENUENUEUUENUEEEENNENUUEENUEENUENUEENUEENUENUEENUEENUEENUENUEE UEENE UENEEEEENUNNNEENUENNEEEEEEEE UEE UENENUEEEENE UUUNUEENEEENUEEEENUENENENEEEEENENNNUUEEEE ENUNNNEEEEEEE EEEEEUUUUUUUUENUEEEE EEEUUEE UNUEUUENUEENUEEEENEE EENUEUENUENNNEEEEEEEE EEE EUNE EEEEEEUUNNNNNNEEEEE EE EENNNENE ENNNEEEENNN EEUNE UNNUNNNUNUEENUUUUUEEUUUUUUUUEUUUEUNUUUN EEEEUUUUUEEE UEUEUUUUNUENUENNNNNNUEUEEEEUNUNUUUUUUUUNUUUUUEEUENUENENEEEEENEEEEEEEE UUUEEENE EENEEE EE UUN EUEEEEEEEEEEEENN EEEEEEUEENUEEEEEEUEENNNUNNNNNNUUNUUEUUEUUNNUUUENUNUUUEEEEUUUUN EEUUEUEEEEUNNNUUUUUUEEUNUUUUNUUUUUN EUEEEEEEEEEEEE UEEEEEEEEEEEEEEE UNUUUNNNNUNNUUEUUUUEEEEEUNUUNNNNNNUUUUUNNNNNNNNNNNUUUUUUUEEEUUUUUUUUUUUUUUUUUUEUUUUUEUUUUUUUUUE UEEEEENNNNNNUUUUUUUUUUUUUUUUUUUUEN EUUNUUEENNNNNUUUUUN EEUUUUEEENUEEEUUUUUUUUUEUUUUUUEEUUUUUUUUUUNUUUNNUNUNUU
SITE PLAN
EXISTING
SITE AERIAL VIEWN
BUILDING D
BUILDING C
VILL
AGE
MA
IN S
TREE
T (S
OU
TH)
VILL
AGE
MA
IN S
TREE
T (N
OR
TH)
FUTUREDEVELOPMENT
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
25
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 24
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKING0’ 20’ 40’ 80’LEVEL 1 SITE PLAN: RETAIL
ROSSRETAILRETAILRETAIL
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
26
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 25
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 1.5 PLAN: MEZZANINE 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
27
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 26
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 2 PLAN: PARKING 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
28
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 27
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 3 PLAN: PARKING 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
29
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 28
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 4 PLAN: PARKING 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
30
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 29
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 5 FLOOR PLAN: HOUSING 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
31
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 30
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 6 FLOOR PLAN: HOUSING 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
32
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 31
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGLEVEL 7 FLOOR PLAN: HOUSING 0’ 20’ 40’ 80’
1
1
2
2
3 3
4
4
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
33
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 32
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKING
SECTION 2
BUILDING SITE SECTIONS 0’ 20’ 40’ 80’
SECTION 1
120T
H AV
E
SURFACE PARKING
90’-0”
A
BC
D
A
BC
D
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
34
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 33
HOUSING
RETAIL
SERVICE / SUPPORT
CIRCULATION
PARKINGBUILDING SITE SECTIONS
SECTION 4
120T
H AV
E
SURFACE PARKING
A
BC
D
SECTION 3
VILL
AGE M
AIN
STRE
ET (S
OUTH
)
VILL
AGE M
AIN
STRE
ET (N
ORTH
)
A
BC
D
0’ 20’ 40’ 80’
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
35
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 34
LIGHT PALETTE
DARK PALETTE
GLASS EYEBROW PALETTE
COURTYARD PALETTE
RETAIL PALETTE 2
RETAIL PALETTE 1
MATERIAL PALETTE PERSPECTIVE DIAGRAMDIAGRAM
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
36
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 35
LIGHT PALETTE DARK PALETTE COURTYARD PALETTE
GLASS EYEBROW PALETTE RETAIL PALETTE 1 RETAIL PALETTE 2
pp metal panel
gggg gggglazlazlazlazeded ed ed bribribribrickckckck
p g cementitious lap sidingcececeememenmentittitti iouiouiou ls ls lapap pppp sidsidsidinginggg
wwwwwwwoodoodoodoodoodoodood wiwiwiwiwiiiiwiwwwwwwwwwwwwiwiiwiwwwiiiwwwwwiiwwiiwwwwiwwiiwwiiwwwwwww nnndondondondondodondonnn onnnnnnnnnnnnnndonnnnnnnnnnnn ws wsws ws wsww atat atat attat stostostostostorefrefrefrefrefrefre ronronroronono tttttt
rrr ddeddeded ed b ib ibribribrrbribri kkckckck ck anddanndandandand bbbblblbbbbbblblbblbblb ackacackkackackkack acacacacacaacaaaaaa cencencentttststs
g pllllllllighighighghghighighighghhhghhhhghghgghighg tt it it it it it iit it ironronronronronroronoronnoononrononspospospospospospospospospspspospsspspssssp t bt bt bt bt bt b bbbtt bbbbriricricriccccicccriccricrirriicccr ccr ccckkkkkkkkkkkkkk
bbbbbbbbbbrusrusrusrusrusrusrusrussshedhedhedhedhedhedhedhededd mmmmmmmmmetaetaetaetaetaetaetaetalllll black accents
pp g cemcemententtitiitiousousss lalalap sp sp idiidid ngng
p metal panel
accent color
g yssssilvilviil er-er--gragragraaagraay by by bby by by bricricricricr crr kkkkkk
g yg y silver-gray trim and accentmmmettatataetall p pppaneaneananeaneaneean l ll lll ll louvouvouvvouvouvuversers
bbbbbbbbrusrusrusrusrusrusrusrusrusruuu hedhedhedhedhedheddhedhhedddhed mmmmmmmmmmetaetaetaetaetaetataetaetat llllllll dark accents
metal panel trim
wwwwwwwwwwwwooooooodododdodddoodooddodododo ssososososooffiffiffitffiffitffitffitffitffiffiffitffiffiffiffiffiffiffiffi
glasss as aaaaa aa aaaaaaaaand nnnnnnnnnnnnnnnd nd metmetmememetmetmetetetetetettetettettttetettmettee aaaalaaa at atatatatatatatat attatatttattattaatatt ttatat atattta bbababaabaaabalbalbaba conconono y
EXTERIOR BUILDING MATERIALS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
37
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 36
LANDSCAPE INSPIRATION IMAGES
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
38
-------====r=---
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 37
LEVEL 5 PLAN: LANDSCAPE 0’ 20’ 40’ 80’
1 2
4 5
1 RED CRIMSON MAPLE (LG)2 JAPANESE MAPLE (SM, ACCENT)3 BLUE SPRUCE4 ELIZABETH MAGNOLIA (FLOWERING)5 GINKGO BILOBA (MED, ACCENT)
6 PRECAST CONCRETE PAVERS7 YELLOW GENISTA8 JAPANESE HOLLY9 CONCRETE FEATURES
6
67 9
109
9 LINEAR STONE PAVERS10 STONE PAVERS
5
8
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
39
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 38
EQUINOX | March 21st + Sept 21st SUMMER SOLSTICE | June 21st
8 AM 10 AM NOON
2 PM 4 PM
8 AM 10 AM NOON
2 PM 4 PM 6 PM
2 PMNOON10 AM8 AM
NOON2 PM
4 PM
NOON10 AM
8 AM
2 PM4 PM
530 PM
NOON
SUN STUDIES
N N
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
40
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 39
WINTER SOLSTICE | Dec 21st
9 AM 11 AM 1 PM 3 PM
8 AM11 AM
1 PM
3 PM
SUN STUDIES
N
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
41
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 40
RENDERING MAP
A
B
CD
3
24
1
5
6
N
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
42
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 41
ENTRY VIEW FROM TOTEM LAKE BLVD. (VIEW 1)
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
43
~----~------------------------------------------------------~~----~ ....
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 42
VIEW FROM DEVELOPMENT ACROSS 120TH (VIEW 2)
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
44
~----~------------------------------------------------------~~----~ ....
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 43
VIEW DRIVING SOUTH ALONG 120TH (VIEW 3)Site approach from Hospital Hill
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
45
~----~------------------------------------------------------~~----~ ....
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 44
VIEW FROM ROSS PARKING LOT (VIEW 4)
see appendix A
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
46
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 45
VIEW FROM 124TH STREET (VIEW 5)
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
47
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 46
VIEW FROM AUTOZONE (VIEW 6)
Site approach from Totem Lake Blvd
see appendix A
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
48
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 47
This page intentionally left blank
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
49
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 48
BUILDING ELEVATIONS
0’ 32’ 64’ 128’OVERALL SITE - WEST ELEVATION
Approved - Prior PackageApproved - Prior Package
A
BC
D
120T
H AV
ENUE
NE
VILLAGE AT TOTEM LAKE FAIRFIELD DEVELOPMENT EVERGREEN HOSPITAL (BEYOND)
MADISON HOUSE
View Southwest towards Juanita Bay
A
BC
D
0’ 24’ 48’ 96’
OVERALL SITE SECTION - LOOKING NORTH
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
50
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 49
0’ 16’ 32’ 64’BUILDING C - WEST ELEVATION
Approved - Prior Package
A
BC
D
0’ 16’ 32’ 64’BUILDING A/B - WEST ELEVATION
Approved - Prior Package
A
BC
D
BUILDING ELEVATIONS
LIGHT PALETTE
RETAIL PALETTE 2
GLASS EYEBROW PALETTE
RETAIL PALETTE 1 LIGHT PALETTE DARK PALETTE
Unscreened section of parking garage
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
51
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 50
BUILDING ELEVATIONS
0’ 16’ 32’ 64’
BUILDING C - SOUTH ELEVATION
A
BC
D
0’ 16’ 32’ 64’
BUILDING B - NORTH ELEVATION
Approved - Prior Package
A
BC
D
LIGHT PALETTE
COURTYARD PALETTE
RETAIL PALETTE 1
GLASS EYEBROW PALETTE
RETAIL PALETTE 2
LIGHT PALETTE
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
52
THE VILLAGE AT TOTEM LAKECENTERCAL PROPERTIES, LLC GBD ARCHITECTS MAR. 2016 51
A
BC
D
BUILDING ELEVATIONS
0’ 16’ 32’ 64’BUILDING C/D - EAST ELEVATION
A
BC
D
0’ 16’ 32’ 64’BUILDING C/D - NORTH ELEVATION
LIGHT PALETTE
DARK PALETTE
GLASS EYEBROW PALETTE
RETAIL PALETTE 2
DARK PALETTE
COURTYARD PALETTE
GLASS EYEBROW PALETTE
DARK PALETTE
COURTYARD PALETTE
GLASS EYEBROW PALETTE
Unscreened section of parking garage
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
53
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
APPENDIX AROSS ELEVATIONS
54
BUILDING C - SOUTHWEST ELEVATION
PARTIAL FIRST FLOOR/SIDEWALK PLAN
BUILDING MATERIALS
BUILDING C - SOUTHWEST ELEVATIONThe Village at Totem Lake
CenterCal Properties, LLC - DeveloperIBI Group - Architect
Lifescapes International, Inc. - Landscape Architect
BRICK
CAST STONE CAST STONE CAST STONE CAST STONEEXISTING STOREFRONTALUM. STOREFRONT
STUCCO FABRIC AWNING METAL CANOPY STONE
STONE
STONE
STONE
STUCCO STUCCO
STUCCO STUCCO
ALUM. STOREFRONT
Stucco Stucco Stucco Stucco Cast StoneAluminum Storefront
Pre nishedAluminum
Existing Storefront Stone Stone Brick
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
55
APPENDIX BTHE VILLAGE AT TOTEM LAKE LANDSCAPE/ HARDSCAPE
BUILDING L - WELLS FARGO
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
57
PRESENTED 12/07/2015
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
APPENDIX B
58
THE VILLAGE AT TOTEM LAKE
Mixed-Use Development Kirkland, Washi ngton
CenterCal PropertieS, LLC Developer Antunov1ch Associates Ar<h1tect
Ufescapes International. Inc · Landscape Architect
SUBMITTAL DATE : 11/30/15 PRESENTATION DATE: 12/07/15
DESIGN REVIEW BOARD SUBMITTAL
PRESENTED 12/07/2015
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
APPENDIX B
59
The Village at Totem Lake CenterCol P~ lLC De~
Antui'ICW\c1 Auoca.~t~ ArcM.ct L•tt~ lntvr~llon<'JI. tn:: wnd..C4!)CI An:;MOCl
LANDSCAPE SITE PLAN
BUII:.DIN G A
SCAt.£ l••so·-o- 5
PRESENTED 12/07/2015 PREVIOUS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
APPENDIX B
60
Tile VJ-.ge et Totlllm l.ela. o.ttii'QI~-l.LC · ~ ~.-.-.:1-- · ~
.....__ hllmdfaniL h: · Un41twt! AlcM.a:
PROJECT INFORMATION
ProJect Information .....,... lllu'WI .... ot-LIIoo
AD- tiiiG'l--arY/aThJP: --~ ....... -CCIU!m': 0. Oull7 lJ OF IIUIU.NUC 5 (J'tl.-1) PRODUcr TYPE; Mt.t·U. D~.,,,.l-111:atlt
.m; Nl£k ..w.-F / 21 ACIIEII-IA - ll)
PAIIIQNII 5TAU.II \ IIDD IIUJDEHTW. ~11111: WI IETAJLc.A: rn.-
ProJect Description --Ta waul t bl .. ..,.., .. atdc ' ,... am.r • wt.l: hllwolvwd ..._ •.......,. __ .. _.. __ ... __ ,_u ... ..-m---'"' ......... rNnlrv: n.VI-IOT-....-d-oulJno!Nc ___ ..,_.. --·-·-------.. -..... ....----Obi lew. Tiluo , ... _<Jf_.__ltlot-..Lollo--wlho ............ ..-.w ... .................. ..,............ • ............. ... .... ~. n. Jildlllf_, :•&at'TIIIIVI .... IIT..._La .. WII~ .. O.-CIIfrlftUIJiw whll ..... •nd NIIIIIWMI ...._ Ml ...--- ... c-IMNIIn N dl'. It uull-ul ...... --, II ..OOOUUimo.__,.. __ --.... -.... ----... -~----...... -
1
PRESENTED 12/07/2015 PREVIOUS
ATTACHMENT 1 FILE NO. DRV15-01765
APPLICANT DESIGN RESPONSE & FINAL PACKET
APPENDIX B
61
Design Guidelines
Village at Totem Lake
Project Goal: To completely transform an antiquated ratall center at what has evolved Into a primary trade node In north Kirkland, along the 1·405 corridor, Into a signature mixed-use devel· opment.
Project Summary; The VIllage at Totem Lake will become a dynamic mixed-use project focused on expand· ed retail offerings, a new market, restaurants and cafes, entertainment and upmarket residential.
Progrem Objectives: To ra·estebllsh the core of what has become the Totem Lake business district, with a semi-regional retail and mixed-use complex to create a vibrant, pedestrian-oriented vii· lage center. The radevelopment of The VIllage at Totem Lake will provide the Kirkland community with retail and restaurant offerings not presently represented in the city. It will also showcase a significant upmarket residential community that will benefit from the proximity to these new amenities and the nearby regional transit center and medical complex.
Project Phasing: In order to move this project along In a timely manner, phase one Is focused on the lower existing mall site, primarily driven by some strategic relocations needed to maintain certain existing tenants. This essentially creates, what CenterCal believes would be a slight delay on starting a phase two, which is presently the site of the upper mall. This area is expected to be begin development almost In parellel to the phase one effort, but may take slightly longer to complete.
Development Plan: The rebuilt Village at Totem Lake envisions a high quality mixed use village with em· phasls on vibrant streetscapas, public spaces with amenities that tie together the retail, restaurants and cafes, residents as well as employees on site and the adJacent medical offices and hospital. Centercal will create stylish pedestrian oriented architecture using high quality materials and details Including brick, precast, stone, and cementuous siding integ1111ted into a timeless combination of architecture. The building design will provide a variety of shapes and sizes that will Incorporate Individual tenant storefronts within a strong Centercal design standards and internal review process.
The Village at Totem Lake
Site Plan & Landscaping Objectives Village at Totem Lake
LANDSCAPE/ SITE PLAN
1. Please provide clear direction and design for the bike path on Totem Lake Blvd.
2. Please indicate the final cross section and bike lane strategy for 120th.
3. Please indicate the final cross section for Main Street.
4. Please clearly indicate zero curb zones and describe drainage strategy.
5. Please provide clear strategy and design intent for the loading dock door.
6. Please highlight the addition of Evergreen Magnolias.
General Concepts/Concerns:
A. How do we make this feel like a piece of Kirkland, not "anywhere USA"
B. Are we ok with the development as a Mall not a Village
C. Location of Loading for Building A and B
D. Main Street parking lot instead of green space
CenterCal Properties, LLC Developer Antunovich Associates · Architect DESIGN GUIDELINES & ORB COMMENTS
Lifescapes International, Inc Landscape Architect
2