4
200TH ST SW 50TH AVE W 48TH AVE W 44TH AVE W I-5 SOUTH I-5 NORTH Sheet List Table Sheet No. Sheet Title Dwg No. LYNNWOOD W A S H I N G T O N SUMMER 2020 48TH AVE SEWER MAIN & 200TH ST WATER MAIN IMPROVEMENTS CITY OF LYNNWOOD MAYOR NICOLA SMITH PUBLIC WORKS DIRECTOR WILLIAM A. FRANZ CITY COUNCIL GEORGE HURST SHANNON SESSIONS JULIETA ALTAMIRANO-CROSBY CHRISTINE FRIZZELL IAN COTTON JIM SMITH RUTH ROSS CONTACT PERSONNEL CALL 48 HOURS BEFORE YOU DIG ONE CALL 811 OR 1-800-424-5555 REPORT ALL SPILLS DEPT. OF ECOLOGY 1-800-258-5990 RICK BALLARD, P.E. RH2 ENGINEERING (425) 951-5328 EDWIN HALIM, P.E. RH2 ENGINEERING (425) 951-5332 ALEX FUSSELL, P.E. RH2 ENGINEERING (425) 951-5348 SADIA FAIZA CITY OF LYNNWOOD (425) 670-5229 REPAIR DEPT. PUGET SOUND ENERGY (888) 225-5773 REPAIR DEPT. CENTURY LINK (800) 244-1111 VICINITY MAP PROJECT LOCATION CONSTRUCTION NOTES 1. SITE ADDRESS: 200TH ST SW & 44TH AVE W., LYNNWOOD, WA 98036 200TH ST SW & 48TH AVE W., LYNNWOOD, WA 98036 2. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO IMPLEMENTATION OR CONSTRUCTION. 3. CONTRACTOR MUST KEEP A COPY OF THE APPROVED PLANS ON-SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS. 5. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING COMPLETE AS-CONSTRUCTED (AS-BUILT) RECORDS. 6. CONSTRUCTION OF IMPROVEMENTS SHALL CONFORM TO THE CURRENT EDITION OF THE CITY OF LYNNWOOD STANDARDS AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION. THESE DOCUMENTS HEREINAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS. 7. A PRECONSTRUCTION CONFERENCE AND 24-HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING CONSTRUCTION OR RESTARTING CONSTRUCTION AFTER A PERIOD OF MORE THAN 5 DAYS OF NO WORK BEING PERFORMED. 8. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO CONDITIONS EQUAL OR BETTER TO THOSE FOUND PRIOR TO CONSTRUCTION. 9. THE CONTRACTOR SHALL CLEANUP ALL AREAS AFFECTED BY THEIR ACTIVITIES TO THE SATISFACTION OF THE CITY REPRESENTATIVE BY THE END OF EACH WORKING DAY OR MORE FREQUENTLY IF REQUIRED BY THE CITY REPRESENTATIVE. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUSTIONS AND THE METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES REQURIED TO PERFORM THE WORK. PROJECT LOCATION PROJECT LOCATIONS SHADED PAGES TO BE ADDED IN FUTURE SUBMITTAL 30% SUBMITTAL

CITY OF LYNNWOOD … · repair dept. century link (800) 244-1111 vicinity map project location construction notes 1.site address: 200th st sw & 44th ave w., lynnwood, wa 98036 200th

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CITY OF LYNNWOOD … · repair dept. century link (800) 244-1111 vicinity map project location construction notes 1.site address: 200th st sw & 44th ave w., lynnwood, wa 98036 200th

200TH ST SW

50T

H A

VE

W

48T

H A

VE

W

44T

H A

VE

W

I

-

5

S

O

U

T

H

I

-

5

N

O

R

T

H

Sheet List TableSheet No. Sheet Title

Dwg No.

LYNNWOOD

W A S H I N G T O N

SUMMER 2020

48TH AVE SEWER MAIN & 200TH ST WATER MAIN IMPROVEMENTS

CITY OF LYNNWOOD

MAYORNICOLA SMITH

PUBLIC WORKS DIRECTORWILLIAM A. FRANZ

CITY COUNCIL GEORGE HURST

SHANNON SESSIONSJULIETA ALTAMIRANO-CROSBY

CHRISTINE FRIZZELLIAN COTTONJIM SMITH

RUTH ROSS

CONTACT PERSONNEL

CALL 48 HOURS BEFORE YOU DIGONE CALL 811 OR 1-800-424-5555

REPORT ALL SPILLSDEPT. OF ECOLOGY 1-800-258-5990

RICK BALLARD, P.E. RH2 ENGINEERING (425) 951-5328

EDWIN HALIM, P.E. RH2 ENGINEERING (425) 951-5332

ALEX FUSSELL, P.E. RH2 ENGINEERING (425) 951-5348

SADIA FAIZA CITY OF LYNNWOOD (425) 670-5229

REPAIR DEPT. PUGET SOUND ENERGY (888) 225-5773

REPAIR DEPT. CENTURY LINK (800) 244-1111

VICINITY MAP

PROJECT LOCATION

CONSTRUCTION NOTES

1. SITE ADDRESS: 200TH ST SW & 44TH AVE W., LYNNWOOD, WA 98036

200TH ST SW & 48TH AVE W., LYNNWOOD, WA 98036

2. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO IMPLEMENTATION OR

CONSTRUCTION.

3. CONTRACTOR MUST KEEP A COPY OF THE APPROVED PLANS ON-SITE WHENEVER CONSTRUCTION IS IN PROGRESS.

4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES. CONTRACTOR

SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE

BEEN COMPLETED IN ACCORDANCE WITH THE PLANS.

5. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING COMPLETE AS-CONSTRUCTED (AS-BUILT) RECORDS.

6. CONSTRUCTION OF IMPROVEMENTS SHALL CONFORM TO THE CURRENT EDITION OF THE CITY OF LYNNWOOD STANDARDS AND THE

STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT

OF TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION. THESE DOCUMENTS HEREINAFTER REFERRED TO AS THE

STANDARD SPECIFICATIONS.

7. A PRECONSTRUCTION CONFERENCE AND 24-HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING CONSTRUCTION OR RESTARTING

CONSTRUCTION AFTER A PERIOD OF MORE THAN 5 DAYS OF NO WORK BEING PERFORMED.

8. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO CONDITIONS EQUAL OR BETTER TO THOSE FOUND PRIOR

TO CONSTRUCTION.

9. THE CONTRACTOR SHALL CLEANUP ALL AREAS AFFECTED BY THEIR ACTIVITIES TO THE SATISFACTION OF THE CITY REPRESENTATIVE BY

THE END OF EACH WORKING DAY OR MORE FREQUENTLY IF REQUIRED BY THE CITY REPRESENTATIVE.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUSTIONS AND THE METHODS, TECHNIQUES, SEQUENCES AND

PROCEDURES REQURIED TO PERFORM THE WORK.

PROJECT

LOCATION

PROJECT

LOCATIONS

SHADED PAGES TO BE ADDED IN FUTURE SUBMITTAL

30%

S

U

B

M

IT

TA

L

Page 2: CITY OF LYNNWOOD … · repair dept. century link (800) 244-1111 vicinity map project location construction notes 1.site address: 200th st sw & 44th ave w., lynnwood, wa 98036 200th

48TH AVE W

200TH ST SW

281 LF OF 18" PVC SEWER

PROVIDE:

(1) 48" TYPE 1 MANHOLE

11 LF OF 18"

PVC SEWER

PROVIDE:

(1) 48" TYPE 1 MANHOLE41 LF OF 18"

PVC SEWER

PROVIDE:

(1) 48" TYPE 1 MANHOLE

SS

02

M

AT

CH

L

IN

ES

SO

2 M

AT

CH

L

IN

E

200TH ST SW

50

TH

A

VE

W

48

TH

A

VE

W

44

TH

A

VE

W

I

-

5

S

O

U

T

H

I

-

5

N

O

R

T

H

VICINITY MAP P

R

E

LIM

IN

A

R

Y

R

E

V

IE

W

D

R

A

W

IN

G

S

CIT

Y O

F LY

NN

WO

OD

48TH

AV

E S

EW

ER

MA

IN A

ND

200

TH S

TW

ATE

R M

AIN

IMP

RO

VE

ME

NTS

XX

X

XX

X

Mar 18, 2020

Mar 18, 2020

LY

NN

119-207

LW

S-D

-S

EW

ER

P.D

WG

SHOWN

SS01 3

YY

DWG NO.:

DATE

DESC

RIPT

ION

RE

VIS

ION

S

BYRE

VIEW

ENG

INEE

R:SA

VE D

ATE:

REVI

EWED

:PL

OT

DATE

:

CLIE

NT:

FILE

NAM

E:

SHEET NO.:

JOB

NO.:

NO.

0" 1" 2"DRAWING IS FULL SCALE WHEN

BAR MEASURES 2"

SCALE:

48TH

AV

E P

RO

PO

SE

D S

EW

ER

PLA

N I

LY

NN

WO

OD

W A

S

H

I N

G

T

O

N

PRELIMINARY

PRELIMINARY

PROPOSED SEWER PLAN

NTC: PLEASE ADVISE IF THIS STRUCTURE AND PIPE SHOULD BE

INSTALLED UNDER THIS CONTRACT TO FACILITATE A FUTURE

CONNECTION. THIS APPROACH MAY MINIMIZE FUTURE ROAD

CLOSURES, AS A CLOSURE OF 200TH ST SW WILL ALREADY BE

NECESSARY FOR THIS PROJECT. IF THIS IS NOT INSTALLED

NOW, THE SEGMENT OF 12" CONC STORM IMMEDIATELY EAST

WILL NEED TO BE UPSIZED AT A LATER TIME.

NTC: THIS PIPE IS UNDERSIZED

AND WILL NEED TO BE UPSIZED

DURING THIS OR THE PLANNED

FUTURE PROJECT.

RECONNECT SIDE SEWER

TO PROPOSED LINE, TYP.

Page 3: CITY OF LYNNWOOD … · repair dept. century link (800) 244-1111 vicinity map project location construction notes 1.site address: 200th st sw & 44th ave w., lynnwood, wa 98036 200th

48TH AVE W332 LF OF 18"

PVC SEWER

PROVIDE:

(1) 48" SADDLE MANHOLE

7 LF OF 21"

PVC SEWER

SS

01

M

AT

CH

L

IN

ES

S0

1 M

AT

CH

L

IN

E

200TH ST SW

50

TH

A

VE

W

48

TH

A

VE

W

44

TH

A

VE

W

I

-

5

S

O

U

T

H

I

-

5

N

O

R

T

H

SS

01 M

AT

CH

LIN

ES

S01 M

AT

CH

LIN

E

VICINITY MAP P

R

E

LIM

IN

A

R

Y

R

E

V

IE

W

D

R

A

W

IN

G

S

CIT

Y O

F LY

NN

WO

OD

48TH

AV

E S

EW

ER

MA

IN A

ND

200

TH S

TW

ATE

R M

AIN

IMP

RO

VE

ME

NTS

XX

X

XX

X

Mar 18, 2020

Mar 18, 2020

LY

NN

119-207

LW

S-D

-S

EW

ER

P.D

WG

SHOWN

SS02 4

YY

DWG NO.:

DATE

DESC

RIPT

ION

RE

VIS

ION

S

BYRE

VIEW

ENG

INEE

R:SA

VE D

ATE:

REVI

EWED

:PL

OT

DATE

:

CLIE

NT:

FILE

NAM

E:

SHEET NO.:

JOB

NO.:

NO.

0" 1" 2"DRAWING IS FULL SCALE WHEN

BAR MEASURES 2"

SCALE:

48TH

AV

E P

RO

PO

SE

D S

EW

ER

PLA

N II

LY

NN

WO

OD

W A

S

H

I N

G

T

O

N

PRELIMINARY

PRELIMINARY

PROPOSED SEWER PLAN

RECONNECT SIDE SEWER

TO PROPOSED LINE, TYP.

Page 4: CITY OF LYNNWOOD … · repair dept. century link (800) 244-1111 vicinity map project location construction notes 1.site address: 200th st sw & 44th ave w., lynnwood, wa 98036 200th

200TH ST SW

44TH

AVE

W

18 LF OF 12"

DI WATER

77 LF OF 12"

DI WATER

200TH ST SW

50

TH

A

VE

W

48

TH

A

VE

W

44

TH

A

VE

W

I

-

5

S

O

U

T

H

I

-

5

N

O

R

T

H

P

R

E

LIM

IN

A

R

Y

R

E

V

IE

W

D

R

A

W

IN

G

S

CIT

Y O

F LY

NN

WO

OD

48TH

AV

E S

EW

ER

MA

IN A

ND

200

TH S

TW

ATE

R M

AIN

IMP

RO

VE

ME

NTS

VICINITY MAP

XX

X

XX

X

Mar 18, 2020

Mar 18, 2020

LY

NN

119-207

LW

S-D

-W

AT

ER

P.D

WG

SHOWN

W01 5

YY

DWG NO.:

DATE

DESC

RIPT

ION

RE

VIS

ION

S

BYRE

VIEW

ENG

INEE

R:SA

VE D

ATE:

REVI

EWED

:PL

OT

DATE

:

CLIE

NT:

FILE

NAM

E:

SHEET NO.:

JOB

NO.:

NO.

0" 1" 2"DRAWING IS FULL SCALE WHEN

BAR MEASURES 2"

SCALE:

200T

H S

TRE

ET

PR

OP

OS

ED

WA

TER

MA

INP

LAN

LY

NN

WO

OD

W A

S

H

I N

G

T

O

N

PRELIMINARY

PRELIMINARY

PROPOSED WATER MAIN PLAN

PROVIDE TEE CONNECTION TO EXISTING

MAIN WITH VALVING TO FACILITATE

FUTURE CONNECTIONS, TYP. OF EACH END

PROVIDE VALVES TO

FACILITATE FUTURE

CONNECTION