BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
1. P-90-3.1 1 LS CONTRACTOR QUALITY CONTROL $220,000.00 $220,000.00 $300,000.00 $300,000.00 $850,000.00 $850,000.00
2. LEFT BLANK INTENTIONALLY
3. P-101-6.1 3,150 LF
SAWCUT EXISTING ASPHALT
CONCRETE PAVEMENT
(FULL DEPTH)
$2.00 $6,300.00 $5.25 $16,537.50 $2.95 $9,292.50
4. P-101-6.2 1,320 LF
SAWCUT EXISTING PORTLAND
CEMENT CONCRETE PAVEMENT (FULL
DEPTH)
$6.00 $7,920.00 $6.25 $8,250.00 $10.00 $13,200.00
5. P-101-6.3 5,240 SY
PORTLAND CEMENT CONCRETE
PAVEMENT REMOVAL
(FULL DEPTH)
$13.00 $68,120.00 $25.00 $131,000.00 $8.00 $41,920.00
6. P-101-6.5 208,620 SY
ASPHALT CONCRETE PAVEMENT
REMOVAL BY MILLING, FULL DEPTH
(MAINLINE)
$1.80 $375,516.00 $8.50 $1,773,270.00 $2.40 $500,688.00
7. P-101-6.6 87,200 SY
ASPHALT CONCRETE PAVEMENT
REMOVAL BY MILLING, FULL DEPTH
(SHOULDER)
$1.00 $87,200.00 $1.75 $152,600.00 $1.15 $100,280.00
8. P-151-4.1 61.15 AC CLEARING AND GRUBBING $500.00 $30,575.00 $750.00 $45,862.50 $2,300.00 $140,645.00
9. P-151-4.2 30 LF REMOVE EXISTING STORM DRAIN PIPE $14.00 $420.00 $75.00 $2,250.00 $20.00 $600.00
10. P-151-4.3 2 EA REMOVE EXISTING CATCH BASIN $700.00 $1,400.00 $3,000.00 $6,000.00 $795.00 $1,590.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 1 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
11. P-152-4.1 165,200 CYUNCLASSIFIED EXCAVATION-HAULED
OFF-SITE$12.00 $1,982,400.00 $15.00 $2,478,000.00 $13.30 $2,197,160.00
12. P-152-4.2 4,130 CY
OVER EXCAVATION
(OF CLAY, INCLUDING BACKFILL)
(ALLOWANCE)
$15.00 $61,950.00 $36.00 $148,680.00 $21.00 $86,730.00
13. P-152-4.3 109,150 SY
PREPARED AND COMPACTED SELECT
FILL EMBANKMENT,
18" DEPTH
$4.00 $436,600.00 $10.00 $1,091,500.00 $4.00 $436,600.00
14. P-152-4.4 277,350 SYCOMPACTED SUBGRADE,
6" DEPTH$1.00 $277,350.00 $0.35 $97,072.50 $0.95 $263,482.50
15. P-152-4.5 7,350 SYCOMPACTED SUBGRADE,
24" MINIMUM DEPTH$6.00 $44,100.00 $3.50 $25,725.00 $3.20 $23,520.00
16. P-156-5.1 1 LSSTORM WATER POLLUTION
PREVENTION PLAN$200,000.00 $200,000.00 $185,000.00 $185,000.00 $180,000.00 $180,000.00
17. P-209-6.1 1,230 CY
CRUSHED AGGREGATE BASE
COURSE, 6" DEPTH
(PC MAINLINE)
$50.00 $61,500.00 $24.00 $29,520.00 $56.00 $68,880.00
18. P-209-6.2 64,570 CY
CRUSHED AGGREGATE BASE
COURSE, 11" DEPTH
(AC MAINLINE)
$47.00 $3,034,790.00 $24.00 $1,549,680.00 $57.00 $3,680,490.00
19. P-209-6.3 18,340 CYCRUSHED AGGREGATE BASE
COURSE, 10" DEPTH (SHOULDER)$48.00 $880,320.00 $24.00 $440,160.00 $58.00 $1,063,720.00
20. P-401-8.1 57,450 TONBITUMINOUS SURFACE COURSE, 5"
DEPTH (AC MAINLINE)$58.00 $3,332,100.00 $60.00 $3,447,000.00 $63.70 $3,659,565.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 2 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
21. P-401-8.2 91,930 TONBITUMINOUS BASE COURSE,
8" DEPTH (AC MAINLINE)$58.00 $5,331,940.00 $60.00 $5,515,800.00 $63.70 $5,855,941.00
22. P-401-8.3 7,620 TON
PG 76-22 ASPHALT CEMENT FOR
SURFACE/BASE COURSE,
13" DEPTH (AC MAINLINE)
$800.00 $6,096,000.00 $980.00 $7,467,600.00 $885.00 $6,743,700.00
23. P-403-8.1 2,400 TON BITUMINOUS BASE COURSE,
6" DEPTH (PC MAINLINE)$60.00 $144,000.00 $65.00 $156,000.00 $69.00 $165,600.00
24. P-403-8.2 14,360 TONBITUMINOUS SURFACE COURSE, 4"
DEPTH (SHOULDER)$57.00 $818,520.00 $65.00 $933,400.00 $70.00 $1,005,200.00
25. P-403-8.3 120 TON
PG 64-22 ASPHALT CEMENT FOR BASE
COURSE,
6" DEPTH (PC MAINLINE)
$500.00 $60,000.00 $750.00 $90,000.00 $525.00 $63,000.00
26. P-403-8.4 730 TON
PG 64-22 ASPHALT CEMENT FOR
SURFACE COURSE,
4" DEPTH (SHOULDER)
$500.00 $365,000.00 $750.00 $547,500.00 $525.00 $383,250.00
27. P-501-8.1 7,030 SYPORTLAND CEMENT CONCRETE
PAVEMENT, 15.5" DEPTH$75.00 $527,250.00 $65.00 $456,950.00 $90.00 $632,700.00
28. P-603-6.1 8,380 GAL BITUMINOUS TACK COAT $3.00 $25,140.00 $10.00 $83,800.00 $6.00 $50,280.00
29. P-604-7.1 5,660 LF PREFORMED SEALER, 1/2-INCH JOINT $6.00 $33,960.00 $6.80 $38,488.00 $4.60 $26,036.00
30. P-604-7.2 550 LF PREFORMED SEALER, 1-INCH JOINT $30.00 $16,500.00 $6.85 $3,767.50 $7.70 $4,235.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 3 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
31. P-605-5.1 1,430 LF PCC / ASPHALT EDGE SEAL $8.00 $11,440.00 $6.50 $9,295.00 $8.80 $12,584.00
32. P-621-4.1 154,844 SYASPHALT CONCRETE PAVEMENT SAW
CUT GROOVING$1.70 $263,234.80 $1.40 $216,781.60 $1.65 $255,492.60
33. P-621-4.2 4,191 SYPORTLAND CEMENT CONCRETE
PAVEMENT SAW CUT GROOVING$2.00 $8,382.00 $1.67 $6,998.97 $1.95 $8,172.45
34. SP-10.1 36,400 SYSUBGRADE SOIL CEMENT
STABILIZATION, 8" DEPTH$2.00 $72,800.00 $3.00 $109,200.00 $5.30 $192,920.00
35. SP-10.2 721 TON CEMENT TREATMENT (6%) $160.00 $115,360.00 $193.00 $139,153.00 $168.00 $121,128.00
36. SP-11.3 26,600 SY RAP MILLINGS, 9" DEPTH $6.00 $159,600.00 $25.00 $665,000.00 $17.00 $452,200.00
37. SP13-35 14,467 SY TURF REINFORCEMENT MAT $10.00 $144,670.00 $8.50 $122,969.50 $11.40 $164,923.80
38. SP14-13 264,576 SY LIQUID STABILIZER $2.40 $634,982.40 $0.80 $211,660.80 $1.60 $423,321.60
39. D-701-5.1 16 LF18" REINFORCED CONCRETE PIPE,
CLASS V$70.00 $1,120.00 $140.00 $2,240.00 $81.00 $1,296.00
40. D-701-5.2 125 LF30" REINFORCED CONCRETE PIPE,
CLASS V$150.00 $18,750.00 $180.00 $22,500.00 $134.00 $16,750.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 4 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
41. D-701-5.3 3 EA CONCRETE PIPE COLLAR $380.00 $1,140.00 $775.00 $2,325.00 $1,800.00 $5,400.00
42. D-751-5.1 1 EA STORM DRAIN MANHOLE $15,000.00 $15,000.00 $35,000.00 $35,000.00 $16,000.00 $16,000.00
43. D-751-5.2 1 EA CATCH BASIN $13,000.00 $13,000.00 $40,000.00 $40,000.00 $21,000.00 $21,000.00
44. T-901-5.1 7.50 AC SEEDING $1,600.00 $12,000.00 $10,495.00 $78,712.50 $8,200.00 $61,500.00
45. TXDOT 431 330 SYPNEUMATICALLY PLACED CONCRETE,
3" DEPTH$90.00 $29,700.00 $45.00 $14,850.00 $42.50 $14,025.00
46. TXDOT 432 580 SY GROUTED RIP-RAP (D50 = 6") $28.00 $16,240.00 $55.00 $31,900.00 $31.00 $17,980.00
47. TXDOT 529 2,640 LF CONCRETE VALLEY GUTTER $20.00 $52,800.00 $35.00 $92,400.00 $32.00 $84,480.00
48. L-100-5.1 1 LSAIRFIELD ELECTRICAL SYSTEM
DEMOLITION AND SALVAGE $40,000.00 $40,000.00 $41,317.00 $41,317.00 $40,000.00 $40,000.00
49. L-100-5.2 1 LSFURNISH AND INSTALL ASOS FEEDER
CABLES$13,000.00 $13,000.00 $11,913.00 $11,913.00 $13,000.00 $13,000.00
50. L-100-5.3 1 LS PHOTOMETRIC TESTING $24,000.00 $24,000.00 $14,637.00 $14,637.00 $24,000.00 $24,000.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 5 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
51. L-105-5.1 5,000 LFL-824, TYPE C, 1/C #8, 5 KV CABLE,
ABOVE GROUND (TEMPORARY)$1.00 $5,000.00 $1.72 $8,600.00 $1.05 $5,250.00
52. L-105-5.2 5,000 LFSINGLE-WAY 2" CONDUIT,
TEMPORARY (ALLOWANCE)$2.00 $10,000.00 $1.72 $8,600.00 $2.10 $10,500.00
53. L107-5.1 2 EA8 FOOT LED SUPPLEMENTAL WIND
CONE AND FOUNDATION, IN PLACE$6,500.00 $13,000.00 $5,312.00 $10,624.00 $6,600.00 $13,200.00
54 L-108-5.1 98,200 LF L-824, TYPE C, 1/C #8, 5 KV CABLE $1.40 $137,480.00 $0.63 $61,866.00 $1.35 $132,570.00
55. L-108-5.2 43,000 LF
BARE 1/C, #6 AWG, SOLID
COUNTERPOISE WIRE, INSTALLED IN
TRENCH, INCLUDING GROUND RODS
$1.70 $73,100.00 $1.11 $47,730.00 $1.70 $73,100.00
56. L-108-5.3 5,600 LF
BARE 1/C, #1/0 AWG, STRANDED
COUNTERPOISE WIRE, INSTALLED IN
TRENCH, INCLUDING GROUND RODS
$4.10 $22,960.00 $3.55 $19,880.00 $4.20 $23,520.00
57. L-110-5.1 3,560 LFSINGLE-WAY 2" CONDUIT, CONCRETE
ENCASED $22.30 $79,388.00 $16.90 $60,164.00 $22.50 $80,100.00
58. L-110-5.2 10,000 LFSINGLE-WAY 2" CONDUIT, DIRECT
BURIED$14.40 $144,000.00 $13.35 $133,500.00 $14.50 $145,000.00
59. L-110-5.3 4,360 LFMULTIPLE-WAY (2) 2-INCH CONDUIT,
CONCRETE ENCASED$20.50 $89,380.00 $25.50 $111,180.00 $21.00 $91,560.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 6 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
60. L-110-5.4 18,050 LFMULTIPLE-WAY (2) 2-INCH CONDUITS,
DIRECT BURIED$16.00 $288,800.00 $13.75 $248,187.50 $16.50 $297,825.00
61. L-110-5.5 5,100 LFMULTIPLE-WAY (2) 4-INCH CONDUITS,
CONCRETE ENCASED$35.00 $178,500.00 $37.80 $192,780.00 $35.50 $181,050.00
62. L-110-5.6 4,950 LFMULTIPLE-WAY (6) 2-INCH CONDUITS,
CONCRETE ENCASED$40.00 $198,000.00 $43.95 $217,552.50 $41.00 $202,950.00
63. L-110-5.7 75 LFMULTIPLE-WAY (12) 4-INCH CONDUITS,
CONCRETE ENCASED$125.00 $9,375.00 $105.00 $7,875.00 $125.00 $9,375.00
64. L-115-5.1 19 EAAIRCRAFT LOAD RATED CONCRETE
HANDHOLE$8,400.00 $159,600.00 $10,115.00 $192,185.00 $8,500.00 $161,500.00
65. L-140-6.1 4,240 LF25-PAIR, 19-GAUGE COMMUNICATIONS
CABLE$5.20 $22,048.00 $4.30 $18,232.00 $5.25 $22,260.00
66. L-140-6.2 1 LS
600V DIRECT BURIED CABLE
REPLACEMENT AND POWER RACK
RELOCATION
$12,500.00 $12,500.00 $6,830.00 $6,830.00 $12,600.00 $12,600.00
67. L-850-4.1 18 EA
NEW FLUSH RUNWAY EDGE LIGHT
WITH NEW ISOLATION
TRANSFORMER, SHIPPING, HANDLING
AND INSTALLATION ON NEW OR
EXISTING BASE"
$380.00 $6,840.00 $341.00 $6,138.00 $380.00 $6,840.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 7 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
68. L-850-4.2 18 EA
NEW L-850C QUARTZ RUNWAY EDGE
LIGHT WITH NEW ISOLATION
TRANSFORMER - MATERIAL ONLY
(ALLOWANCE)
$1,000.00 $18,000.00 $1,047.00 $18,846.00 $1,020.00 $18,360.00
69. L-850-4.3 18 EA
ADDITIONAL COST OF NEW L-805C
LED RUNWAY EDGE LIGHT WITH NEW
ISOLATION TRANSFORMER –
MATERIAL ONLY (ALLOWANCE)
$600.00 $10,800.00 $858.00 $15,444.00 $610.00 $10,980.00
70.A L-850-4.4 3 EA
NEW TEMPORARY L-850C RUNWAY
EDGE LIGHT WITH NEW ISOLATION
TRANSFORMER
$1,500.00 $4,500.00 $2,052.00 $6,156.00 $1,510.00 $4,530.00
70. L-858-5.1 1 EA
NEW SIZE 3, 1-MODULE LED
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$4,600.00 $4,600.00 $3,755.00 $3,755.00 $4,600.00 $4,600.00
71. L-858-5.2 1 EA
NEW SIZE 3, 2-MODULE LED
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$6,000.00 $6,000.00 $5,185.00 $5,185.00 $6,000.00 $6,000.00
72. L-858-5.3 8 EA
NEW LED RETROFIT KIT AND PANEL IN
EXISTING SIZE 3, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$3,700.00 $29,600.00 $2,958.00 $23,664.00 $3,700.00 $29,600.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 8 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
73. L-858-5.4 1 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 2-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$5,000.00 $5,000.00 $3,912.00 $3,912.00 $5,000.00 $5,000.00
74. L-858-5.5 4 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 3-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$5,500.00 $22,000.00 $5,365.00 $21,460.00 $5,500.00 $22,000.00
75. L-858-5.6 1 EA
NEW LED RETROFIT KIT AND PANEL IN
EXISTING SIZE 3, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$1,400.00 $1,400.00 $1,190.00 $1,190.00 $1,350.00 $1,350.00
76. L-858-5.7 5 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 2-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$2,500.00 $12,500.00 $2,224.00 $11,120.00 $2,550.00 $12,750.00
77. L-858-5.8 12 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 3-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$3,000.00 $36,000.00 $3,130.00 $37,560.00 $3,100.00 $37,200.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 9 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
78. L-858-5.9 3 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 4, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$4,600.00 $13,800.00 $4,061.00 $12,183.00 $4,600.00 $13,800.00
79. L-858-5.10 8 EA
NEW LED RETROFIT KIT AND PANEL IN
EXISTING SIZE 4, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$2,500.00 $20,000.00 $2,217.00 $17,736.00 $2,550.00 $20,400.00
80. L-858-5.11 1 EANEW SIZE 3, 1-MODULE CONCRETE
FOUNDATION $3,200.00 $3,200.00 $1,222.00 $1,222.00 $3,300.00 $3,300.00
81. L-861T-4.1 96 EA
NEW L-861T(L) LED TAXIWAY EDGE
LIGHT ON NEW OR EXISTING BASE
WITH ISOLATION TRANSFORMER
$520.00 $49,920.00 $544.00 $52,224.00 $515.00 $49,440.00
82. L-861T-4.2 20 EASALVAGE AND REINSTALL EXISTING
LED TAXIWAY EDGE LIGHT $300.00 $6,000.00 $180.00 $3,600.00 $310.00 $6,200.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 10 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
83. L-862-4.1 118 EA
NEW RUNWAY EDGE OR
END/THRESHOLD LIGHT WITH NEW
ISOLATION TRANSFORMER SHIPPING,
HANDLING AND INSTALLATION ON
NEW OR EXISTING BASE
$470.00 $55,460.00 $225.00 $26,550.00 $470.00 $55,460.00
84. L-862-4.2 118 EA
NEW L-862 QUARTZ RUNWAY EDGE
OR END/THRESHOLD LIGHT WITH
NEW ISOLATION TRANSFORMER -
MATERIAL ONLY (ALLOWANCE)
$400.00 $47,200.00 $485.00 $57,230.00 $410.00 $48,380.00
85. L-862-4.3 118 EA
ADDITIONAL COST OF NEW L-862 LED
RUNWAY EDGE OR END/THRESHOLD
LIGHT WITH NEW ISOLATION
TRANSFORMER – MATERIAL ONLY
(ALLOWANCE)
$600.00 $70,800.00 $690.00 $81,420.00 $610.00 $71,980.00
86. L-862-4.4 75 EASALVAGE AND REINSTALL EXISTING
RUNWAY EDGE LIGHT$420.00 $31,500.00 $182.00 $13,650.00 $420.00 $31,500.00
87. L-867/868-6.1 3 EA
NEW SIZE “B” L-867 BASE CAN STEEL
BLANK COVER ON EXISTING BASE
CAN
$200.00 $600.00 $118.00 $354.00 $205.00 $615.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 11 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
DAN WILLIAMS COMPANY GRANITE CONSTRUCTION COMPANY J.D ABRAMS LP
AUSTIN, TX TUCSON, AZ AUSTIN, TX
BIDDER 1 OF 5 BIDDER 2 OF 5 BIDDER 3 OF 5
BASE BID I - UNIT PRICE SCHEDULE: CIVIL WORK
ITEM
#
SPECIFICATION
NUMBER
EST
QTYUNIT BRIEF DESCRIPTION OF ITEM
88. L-867/868-6.2 197 EA
NEW SIZE “B” L-867 BASE CAN FOR
ANY NEW ELEVATED FIXTURE IN NEW
PAVEMENT
$1,500.00 $295,500.00 $990.00 $195,030.00 $1,500.00 $295,500.00
89. L-867/868-6.3 1 EA
NEW SIZE “B” L-867 BASE CAN FOR
ANY NEW ELEVATED FIXTURE IN
EXISTING PAVEMENT
$2,500.00 $2,500.00 $1,339.00 $1,339.00 $2,550.00 $2,550.00
SUM TOTAL BASE BID and MOBILIZATION $29,860,541.20 $32,611,623.00 $34,155,673.45
AMENDMENTS NO. 1, NO. 2, NO. 3, NO. 4 ACKNOWLEDGED: YES YES YES
BID BOND SUBMITTED YES YES YES
90. L-867/868-6.4 18 EA
NEW SIZE “B” L-868 BASE CAN FOR
ANY NEW IN-PAVEMENT FIXTURE IN
NEW PAVEMENT
$2,200.00 $39,600.00 $1,294.00 $23,292.00 $2,250.00 $40,500.00
SUM TOTAL BASE BID (Items 1 - 90) $28,410,541.20 $31,076,312.37 $32,455,673.45
MOBILIZATION / DEMOBILIZATION (P-100.4.1)
(NOT TO EXCEED 5% OF BASE BID)$1,450,000.00 $1,535,310.63 $1,700,000.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 12 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
$6.50 $1,356,030.00 $0.00
2. LEFT BLANK INTENTIONALLY
3. P-101-6.1 3,150 LF
SAWCUT EXISTING ASPHALT
CONCRETE PAVEMENT
(FULL DEPTH)
$11.00 $34,650.00 $2.80 $8,820.00 $0.00
4. P-101-6.2 1,320 LF
SAWCUT EXISTING PORTLAND
CEMENT CONCRETE PAVEMENT (FULL
DEPTH)
$11.00 $14,520.00 $9.60
9. P-151-4.2 30 LF REMOVE EXISTING STORM DRAIN PIPE $20.00 $600.00 $84.00 $2,520.00
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
DEPARTMENT: CAPITAL IMPROVEMENT
BIDDER 4 OF 5 BIDDER 5 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
1. P-90-3.1 1 LS CONTRACTOR QUALITY CONTROL $244,000.00 $244,000.00 $800,000.00 $800,000.00 $0.00
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
$12,672.00 $0.00
5. P-101-6.3 5,240 SY
PORTLAND CEMENT CONCRETE
PAVEMENT REMOVAL
(FULL DEPTH)
$17.00 $89,080.00 $15.00 $78,600.00 $0.00
7. P-101-6.6 87,200 SY
ASPHALT CONCRETE PAVEMENT
REMOVAL BY MILLING, FULL DEPTH
(SHOULDER)
$0.65 $56,680.00 $1.10 $95,920.00 $0.00
6. P-101-6.5 208,620 SY
ASPHALT CONCRETE PAVEMENT
REMOVAL BY MILLING, FULL DEPTH
(MAINLINE)
$1.80 $375,516.00
8. P-151-4.1 61.15 AC CLEARING AND GRUBBING $720.00 $44,028.00 $560.00 $34,244.00 $0.00
$0.00
10. P-151-4.3 2 EA REMOVE EXISTING CATCH BASIN $1,500.00 $3,000.00 $2,650.00 $5,300.00 $0.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 13 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
EL PASO, TX ALBUQUERQUE, NM
BIDDER 4 OF 5 BIDDER 5 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
DEPARTMENT: CAPITAL IMPROVEMENT
$0.00
14. P-152-4.4 277,350 SYCOMPACTED SUBGRADE,
6" DEPTH$0.55 $152,542.50 $1.25 $346,687.50
11. P-152-4.1 165,200 CYUNCLASSIFIED EXCAVATION-HAULED
OFF-SITE$12.00 $1,982,400.00 $8.80 $1,453,760.00 $0.00
12. P-152-4.2 4,130 CY
OVER EXCAVATION
(OF CLAY, INCLUDING BACKFILL)
(ALLOWANCE)
$12.00 $49,560.00 $14.00 $57,820.00
20. P-401-8.1 57,450 TONBITUMINOUS SURFACE COURSE, 5"
DEPTH (AC MAINLINE)$55.00 $3,159,750.00 $57.00 $3,274,650.00
17. 1,230 CY
CRUSHED AGGREGATE BASE
COURSE, 6" DEPTH
(PC MAINLINE)
$34.00 $41,820.00 $41.00 $50,430.00
19. P-209-6.3 18,340 CYCRUSHED AGGREGATE BASE
COURSE, 10" DEPTH (SHOULDER)$32.00 $586,880.00 $41.00 $751,940.00
$0.00
13. P-152-4.3 109,150 SY
PREPARED AND COMPACTED SELECT
FILL EMBANKMENT,
18" DEPTH
$3.00 $327,450.00 $4.50 $491,175.00 $0.00
$0.00
15. P-152-4.5 7,350 SYCOMPACTED SUBGRADE,
24" MINIMUM DEPTH$3.20 $23,520.00 $9.00 $66,150.00 $0.00
16. P-156-5.1 1 LSSTORM WATER POLLUTION
PREVENTION PLAN$130,000.00 $130,000.00 $28,000.00 $28,000.00 $0.00
18. P-209-6.2 64,570 CY
CRUSHED AGGREGATE BASE
COURSE, 11" DEPTH
(AC MAINLINE)
$32.00 $2,066,240.00 $41.00 $2,647,370.00 $0.00
$0.00
$0.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 14 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
$454.00 $331,420.00
25. P-403-8.3 120 TON
PG 64-22 ASPHALT CEMENT FOR BASE
COURSE,
6" DEPTH (PC MAINLINE)
$500.00 $60,000.00 $454.00 $54,480.00 $0.00
22. P-401-8.3 7,620 TON
PG 76-22 ASPHALT CEMENT FOR
SURFACE/BASE COURSE,
13" DEPTH (AC MAINLINE)
$810.00 $6,172,200.00 $756.50 $5,764,530.00
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
21. P-401-8.2 91,930 TONBITUMINOUS BASE COURSE,
8" DEPTH (AC MAINLINE)$55.00 $5,056,150.00 $57.00 $5,240,010.00 $0.00
DEPARTMENT: CAPITAL IMPROVEMENT
EL PASO, TX ALBUQUERQUE, NM
BIDDER 4 OF 5 BIDDER 5 OF 5
$0.00
23. P-403-8.1 2,400 TON BITUMINOUS BASE COURSE,
6" DEPTH (PC MAINLINE)$57.00 $136,800.00 $57.00 $136,800.00 $0.00
24. P-403-8.2 14,360 TONBITUMINOUS SURFACE COURSE, 4"
DEPTH (SHOULDER)$55.00 $789,800.00 $57.00 $818,520.00 $0.00
$0.00
27. P-501-8.1 7,030 SYPORTLAND CEMENT CONCRETE
PAVEMENT, 15.5" DEPTH$70.00 $492,100.00 $127.00 $892,810.00 $0.00
$0.00
29. P-604-7.1 5,660 LF PREFORMED SEALER, 1/2-INCH JOINT $5.00 $28,300.00 $3.65 $20,659.00 $0.00
26. P-403-8.4 730 TON
PG 64-22 ASPHALT CEMENT FOR
SURFACE COURSE,
4" DEPTH (SHOULDER)
$500.00 $365,000.00
30. P-604-7.2 550 LF PREFORMED SEALER, 1-INCH JOINT $10.00 $5,500.00 $7.30 $4,015.00 $0.00
28. P-603-6.1 8,380 GAL BITUMINOUS TACK COAT $5.00 $41,900.00 $1.85 $15,503.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 15 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
$106,347.50 $0.00
32. P-621-4.1 154,844 SYASPHALT CONCRETE PAVEMENT SAW
CUT GROOVING$1.70 $263,234.80 $1.60 $247,750.40 $0.00
33. P-621-4.2 4,191 SYPORTLAND CEMENT CONCRETE
PAVEMENT SAW CUT GROOVING$1.80 $7,543.80 $1.85 $7,753.35
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
31. P-605-5.1 1,430 LF PCC / ASPHALT EDGE SEAL $4.00 $5,720.00 $2.80 $4,004.00 $0.00
DEPARTMENT: CAPITAL IMPROVEMENT
EL PASO, TX ALBUQUERQUE, NM
BIDDER 4 OF 5 BIDDER 5 OF 5
$0.00
34. SP-10.1 36,400 SYSUBGRADE SOIL CEMENT
STABILIZATION, 8" DEPTH$1.00 $36,400.00 $4.70 $171,080.00 $0.00
36. SP-11.3 26,600 SY RAP MILLINGS, 9" DEPTH $7.00 $186,200.00 $6.35 $168,910.00 $0.00
35. SP-10.2 721 TON CEMENT TREATMENT (6%) $170.00 $122,570.00 $147.50
37. SP13-35 14,467 SY TURF REINFORCEMENT MAT $8.75 $126,586.25 $10.00 $144,670.00 $0.00
$0.00
39. D-701-5.1 16 LF18" REINFORCED CONCRETE PIPE,
CLASS V$90.00 $1,440.00 $122.00 $1,952.00 $0.00
40. D-701-5.2 125 LF30" REINFORCED CONCRETE PIPE,
CLASS V$146.00 $18,250.00 $240.00 $30,000.00 $0.00
38. SP14-13 264,576 SY LIQUID STABILIZER $1.00 $264,576.00 $2.65 $701,126.40
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 16 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
$85,470.00 $0.00
42. D-751-5.1 1 EA STORM DRAIN MANHOLE $40,000.00 $40,000.00 $29,325.00 $29,325.00 $0.00
43. D-751-5.2 1 EA CATCH BASIN $23,000.00 $23,000.00 $13,225.00 $13,225.00
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
41. D-701-5.3 3 EA CONCRETE PIPE COLLAR $750.00 $2,250.00 $1,725.00 $5,175.00 $0.00
DEPARTMENT: CAPITAL IMPROVEMENT
EL PASO, TX ALBUQUERQUE, NM
BIDDER 4 OF 5 BIDDER 5 OF 5
$0.00
44. T-901-5.1 7.50 AC SEEDING $3,500.00 $26,250.00 $1,100.00 $8,250.00 $0.00
46. TXDOT 432 580 SY GROUTED RIP-RAP (D50 = 6") $60.00 $34,800.00 $90.00 $52,200.00 $0.00
45. TXDOT 431 330 SYPNEUMATICALLY PLACED CONCRETE,
3" DEPTH$43.00 $14,190.00 $259.00
47. TXDOT 529 2,640 LF CONCRETE VALLEY GUTTER $23.00 $60,720.00 $24.00 $63,360.00 $0.00
$0.00
49. L-100-5.2 1 LSFURNISH AND INSTALL ASOS FEEDER
CABLES$13,000.00 $13,000.00 $13,500.00 $13,500.00 $0.00
50. L-100-5.3 1 LS PHOTOMETRIC TESTING $15,000.00 $15,000.00 $16,665.00 $16,665.00 $0.00
48. L-100-5.1 1 LSAIRFIELD ELECTRICAL SYSTEM
DEMOLITION AND SALVAGE $75,000.00 $75,000.00 $99,000.00 $99,000.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 17 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
55. L-108-5.2 43,000 LF
BARE 1/C, #6 AWG, SOLID
COUNTERPOISE WIRE, INSTALLED IN
TRENCH, INCLUDING GROUND RODS
$1.20 $51,600.00 $1.30 $55,900.00 $0.00
52. L-105-5.2 5,000 LFSINGLE-WAY 2" CONDUIT,
TEMPORARY (ALLOWANCE)$1.75 $8,750.00 $2.00 $10,000.00 $0.00
53. L107-5.1 2 EA8 FOOT LED SUPPLEMENTAL WIND
CONE AND FOUNDATION, IN PLACE$5,500.00 $11,000.00
CITY OF EL PASO
BID TABULATION FORM
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
51. L-105-5.1 5,000 LFL-824, TYPE C, 1/C #8, 5 KV CABLE,
ABOVE GROUND (TEMPORARY)$1.75 $8,750.00 $2.00 $10,000.00 $0.00
DEPARTMENT: CAPITAL IMPROVEMENT
EL PASO, TX ALBUQUERQUE, NM
BIDDER 4 OF 5 BIDDER 5 OF 5
$0.00
54 L-108-5.1 98,200 LF L-824, TYPE C, 1/C #8, 5 KV CABLE $0.70 $68,740.00 $0.70 $68,740.00 $0.00
56. L-108-5.3 5,600 LF
BARE 1/C, #1/0 AWG, STRANDED
COUNTERPOISE WIRE, INSTALLED IN
TRENCH, INCLUDING GROUND RODS
$3.75 $21,000.00 $4.00 $22,400.00 $0.00
$6,050.00 $12,100.00
57. L-110-5.1 3,560 LFSINGLE-WAY 2" CONDUIT, CONCRETE
ENCASED $18.00 $64,080.00 $19.00 $67,640.00 $0.00
$0.00
59. L-110-5.3 4,360 LFMULTIPLE-WAY (2) 2-INCH CONDUIT,
CONCRETE ENCASED$26.00 $113,360.00 $29.00 $126,440.00 $0.00
58. L-110-5.2 10,000 LFSINGLE-WAY 2" CONDUIT, DIRECT
BURIED$14.00 $140,000.00 $15.00 $150,000.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 18 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
$40.00 $204,000.00 $43.00
60. L-110-5.4 18,050 LFMULTIPLE-WAY (2) 2-INCH CONDUITS,
DIRECT BURIED$14.00 $252,700.00 $16.00 $288,800.00
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
$0.00
66. L-140-6.2 1 LS
600V DIRECT BURIED CABLE
REPLACEMENT AND POWER RACK
RELOCATION
$7,000.00 $7,000.00 $7,775.00 $7,775.00 $0.00
67. L-850-4.1 18 EA
NEW FLUSH RUNWAY EDGE LIGHT
WITH NEW ISOLATION
TRANSFORMER, SHIPPING, HANDLING
AND INSTALLATION ON NEW OR
EXISTING BASE"
$350.00 $6,300.00 $389.00 $7,002.00 $0.00
CITY OF EL PASO
BID TABULATION FORM
DEPARTMENT: CAPITAL IMPROVEMENT
BIDDER 4 OF 5 BIDDER 5 OF 5
BID NO: 2017-1059
$219,300.00 $0.00
62. L-110-5.6 4,950 LFMULTIPLE-WAY (6) 2-INCH CONDUITS,
CONCRETE ENCASED$45.00 $222,750.00 $50.00 $247,500.00 $0.00
$0.00
64. L-115-5.1 19 EAAIRCRAFT LOAD RATED CONCRETE
HANDHOLE$11,000.00 $209,000.00 $11,500.00 $218,500.00 $0.00
61. L-110-5.5 5,100 LFMULTIPLE-WAY (2) 4-INCH CONDUITS,
CONCRETE ENCASED
65. L-140-6.1 4,240 LF25-PAIR, 19-GAUGE COMMUNICATIONS
CABLE$4.50 $19,080.00 $5.00 $21,200.00 $0.00
63. L-110-5.7 75 LFMULTIPLE-WAY (12) 4-INCH CONDUITS,
CONCRETE ENCASED$115.00 $8,625.00 $120.00 $9,000.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 19 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
BID NO: 2017-1059
CITY OF EL PASO
BID TABULATION FORM
70. L-858-5.1 1 EA
NEW SIZE 3, 1-MODULE LED
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$4,000.00 $4,000.00 $4,276.00 $4,276.00
68. L-850-4.2 18 EA
NEW L-850C QUARTZ RUNWAY EDGE
LIGHT WITH NEW ISOLATION
TRANSFORMER - MATERIAL ONLY
(ALLOWANCE)
$1,100.00 $19,800.00 $1,193.00 $21,474.00
70.A L-850-4.4 3 EA
NEW TEMPORARY L-850C RUNWAY
EDGE LIGHT WITH NEW ISOLATION
TRANSFORMER
$2,300.00 $6,900.00 $2,337.00
DEPARTMENT: CAPITAL IMPROVEMENT
BIDDER 4 OF 5 BIDDER 5 OF 5
BASE BID - UNIT PRICE SCHEDULE
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
69. L-850-4.3 18 EA
ADDITIONAL COST OF NEW L-805C
LED RUNWAY EDGE LIGHT WITH NEW
ISOLATION TRANSFORMER –
MATERIAL ONLY (ALLOWANCE)
$900.00 $16,200.00 $978.00 $17,604.00 $0.00
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
$0.00
$7,011.00 $0.00
$0.00
71. L-858-5.2 1 EA
NEW SIZE 3, 2-MODULE LED
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$5,300.00 $5,300.00 $5,910.00 $5,910.00 $0.00
72. L-858-5.3 8 EA
NEW LED RETROFIT KIT AND PANEL IN
EXISTING SIZE 3, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$2,800.00 $22,400.00 $3,368.00 $26,944.00 $0.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 20 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
CITY OF EL PASO
BID TABULATION FORM
DEPARTMENT: CAPITAL IMPROVEMENT
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
BIDDER 4 OF 5 BIDDER 5 OF 5
BASE BID - UNIT PRICE SCHEDULE
ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
BID NO: 2017-1059
$0.00 73. L-858-5.4 1 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 2-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$4,000.00 $4,000.00 $4,454.00 $4,454.00
76. L-858-5.7 5 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 2-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$2,300.00 $11,500.00 $2,532.00 $12,660.00 $0.00
77. L-858-5.8 12 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 3-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$3,300.00 $39,600.00
74. L-858-5.5 4 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 3, 3-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$5,500.00 $22,000.00 $6,110.00 $24,440.00 $0.00
75. L-858-5.6 1 EA
NEW LED RETROFIT KIT AND PANEL IN
EXISTING SIZE 3, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$1,200.00 $1,200.00 $1,356.00 $1,356.00 $0.00
$3,564.00 $42,768.00 $0.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 21 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
81. L-861T-4.1 96 EA
NEW L-861T(L) LED TAXIWAY EDGE
LIGHT ON NEW OR EXISTING BASE
WITH ISOLATION TRANSFORMER
$600.00 $57,600.00 $620.00 $59,520.00 $0.00
82. L-861T-4.2 20 EASALVAGE AND REINSTALL EXISTING
LED TAXIWAY EDGE LIGHT $180.00 $3,600.00 $206.00 $4,120.00 $0.00
CITY OF EL PASO
BID TABULATION FORM
DEPARTMENT: CAPITAL IMPROVEMENT
BIDDER 4 OF 5 BIDDER 5 OF 5
$0.00
79. L-858-5.10 8 EA
NEW LED RETROFIT KIT AND PANEL IN
EXISTING SIZE 4, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER
$2,300.00 $18,400.00 $2,525.00 $20,200.00 $0.00
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
BASE BID - UNIT PRICE SCHEDULE
80. L-858-5.11 1 EANEW SIZE 3, 1-MODULE CONCRETE
FOUNDATION $1,250.00 $1,250.00 $1,392.00 $1,392.00 $0.00
78. L-858-5.9 3 EA
NEW LED RETROFIT KIT AND PANELS
IN EXISTING SIZE 4, 1-MODULE
GUIDANCE SIGN WITH NEW
ISOLATION TRANSFORMER AND NEW
CONCRETE FOUNDATION
$4,200.00 $12,600.00 $4,625.00 $13,875.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 22 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)ITEM
#
SPECIFICATION
NUMBER
EST
QTY UNIT BRIEF DESCRIPTION OF ITEM
$0.00
BID NO: 2017-1059
CITY OF EL PASO
BID TABULATION FORM
86. L-862-4.4 75 EASALVAGE AND REINSTALL EXISTING
RUNWAY EDGE LIGHT$195.00 $14,625.00 $207.00 $15,525.00
DEPARTMENT: CAPITAL IMPROVEMENT
BIDDER 4 OF 5 BIDDER 5 OF 5
BASE BID - UNIT PRICE SCHEDULE
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
84. L-862-4.2 118 EA
NEW L-862 QUARTZ RUNWAY EDGE
OR END/THRESHOLD LIGHT WITH
NEW ISOLATION TRANSFORMER -
MATERIAL ONLY (ALLOWANCE)
$500.00 $59,000.00 $552.00 $65,136.00 $0.00
83. L-862-4.1 118 EA
NEW RUNWAY EDGE OR
END/THRESHOLD LIGHT WITH NEW
ISOLATION TRANSFORMER SHIPPING,
HANDLING AND INSTALLATION ON
NEW OR EXISTING BASE
$225.00 $26,550.00 $256.00 $30,208.00
$82,600.00 $785.00 $92,630.00 $0.00
$0.00
87. L-867/868-6.1 3 EA
NEW SIZE “B” L-867 BASE CAN STEEL
BLANK COVER ON EXISTING BASE
CAN
$120.00 $360.00 $135.00 $405.00 $0.00
85. L-862-4.3 118 EA
ADDITIONAL COST OF NEW L-862 LED
RUNWAY EDGE OR END/THRESHOLD
LIGHT WITH NEW ISOLATION
TRANSFORMER – MATERIAL ONLY
(ALLOWANCE)
$700.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 23 of 24
BID TITLE: RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT
BID DATE: MAY 24, 2017
UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT UNIT TOTAL AMOUNT
PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE) PRICE (Qty x UNIT PRICE)
$1,500,000.00
SUM TOTAL BASE BID and MOBILIZATION
BASE BID I - UNIT PRICE SCHEDULE: CIVIL WORK
ITEM
#
SPECIFICATION
NUMBER
EST
QTYUNIT BRIEF DESCRIPTION OF ITEM
$0.00
89. L-867/868-6.3 1 EA
NEW SIZE “B” L-867 BASE CAN FOR
ANY NEW ELEVATED FIXTURE IN
EXISTING PAVEMENT
$1,400.00 $1,400.00 $1,525.00 $1,525.00 $0.00
90. L-867/868-6.4 18 EA
NEW SIZE “B” L-868 BASE CAN FOR
ANY NEW IN-PAVEMENT FIXTURE IN
NEW PAVEMENT
AMENDMENTS NO. 1, NO. 2, NO. 3, NO. 4 ACKNOWLEDGED: YES YES
BID BOND SUBMITTED YES YES
SUM TOTAL BASE BID (Items 1 - 90) $25,936,537.35 $29,074,701.15 $0.00
88. L-867/868-6.2 197
$27,231,537.35 $30,574,701.15 $0.00
CITY OF EL PASO
BID TABULATION FORM
DEPARTMENT: CAPITAL IMPROVEMENT
BIDDER 4 OF 5 BIDDER 5 OF 5
BID NO: 2017-1059
JORDAN FOSTER CONSTRUCTION,
LLC
MOUNTAIN
STATESCONSTRUCTORS, INC
EL PASO, TX ALBUQUERQUE, NM
EA
NEW SIZE “B” L-867 BASE CAN FOR
ANY NEW ELEVATED FIXTURE IN NEW
PAVEMENT
$1,000.00 $197,000.00 $1,126.00 $221,822.00
$1,400.00 $25,200.00 $1,475.00 $26,550.00 $0.00
MOBILIZATION / DEMOBILIZATION (P-100.4.1)
(NOT TO EXCEED 5% OF BASE BID)$1,295,000.00
Approved By: ___/s/________
Date: ____6/1/17___________ 2017-1059 - RECONSTRUCTION OF RUNWAY 4-22 EL PASO INTERNATIONAL AIRPORT Page 24 of 24