City of Edinburgh Leisure Development Schedule 2015
Strategic Planning Policy, Services for Communities, City of Edinburgh Council, January 2016
Contents
Introduction
Commentary
Graph - leisure developments in Edinburgh 2015
Graph - historic trends
Summary of leisure developments as at 31 December 2015
Table 1 - Schedule of developments completed in 2015
Table 2 - Schedule of developments under construction at year end 2015
Table 3 - Schedule of developments that gained planning consent in 2015
Table 3a - Schedule of other developments with planning consent at year end 2015
Table 4 - Schedule of developments awaiting planning determination at year end 2015
Table 5 - Schedule of closures occurring in 2015
Map of leisure developments in Edinburgh Map of leisure developments in Edinburgh city centre
Explanatory notes
Cover photo: Warriston Community Tennis Club, Warriston Crescent
Whilst reasonable efforts have been made to verify the information in this report, the City of Edinburgh Council are unable to provide an assurance as to the accuracy, currency or comprehensiveness of tables and commentary. Users should undertake their own checks before using the data in this report as an input to policy or investment decisions.
This schedule has been prepared by Strategic Planning Policy, Planning & Transport, City of Edinburgh Council.
Contact: Simon Antrobus ([email protected], 0131-469-3597)
Commentary
Development summary
This is the eighth leisure schedule to be produced by the City of Edinburgh Council. It is one of seven which take an overview of commercial development in the city over the past year.
The schedule details significant (over 500 sq. m.) completions, properties under construction, planning consents, applications awaiting determination and closures.
‘Leisure’ is defined in this schedule as developments falling under Classes 10 and 11 of the Town & Country Planning (Use Classes) (Scotland) Order 1997. This includes, but is not limited to, galleries, museums, cinemas, casinos, concert halls and sporting facilities.
Graph 1 shows that there were 16,611 sqm of completions in 2015. There were 289,185 sqm under construction, 48,718 sqm of developments with planning consent and 8,500 sqm awaiting determination.
Nine of the eleven completions and developments under construction in 2015 were on brownfield sites, as are all existing consents.
Trends
‘Leisure’, unlike hotels, for example, is a disparate category, and it is therefore difficult to identify meaningful trends. However, it is possible to see in Graph 2 that consents rose by a factor of fifty,
due to the construction of the National Performance Centre for Sport at Heriot-Watt University.
In a change from 2014, the majority of completions, developments under construction and consents in 2015 were outwith the City Centre.
Significant developments
• Construction was completed on a new De Vere Urban Resort Village at Crewe Toll.
• Construction was completed on a multi-screen cinema complex at Fort Kinnaird.
• Construction is underway on the National Performance Centre for Sport at Heriot-Watt University.
Leisure developments in Edinburgh 2015
350000
289,185300000
) 250000
mq 200000
(s
ecp 150000
srfl 100000
48,71850000
16,611 8,500 0
completions under construction consents awaiting determination
HISTORIC TRENDS : DEVELOPMENT PIPELINE
2008 2009 2010 2011 2012 2013 2014 2015 completions 0 3,094 13,490 6,782 6,286 34,599 2,121 16,611 under construction 0 4,050 5,373 29,272 30,800 2,347 5,793 289,185 consents 11,998 31,923 62,926 52,532 51,897 48,036 330,420 48,718
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
2008 2009 2010 2011 2012 2013 2014 2015
sq. m
.
completions under construction consents
Summary of Leisure Developments as at 31 December 2015 (Core Development Areas)
1) UNDER CONSTRUCTION 2) PLANNING PERMISSION 3) TOTAL IN THE PIPELINE (*1)
Core Development new change refurb. TOTAL new change refurb. TOTAL new change refurb. TOTAL Areas build of use build of use build of use
City Centre 1,453 1,453 3,695 3,695 1,453 3,695 5,148 West Edinburgh 279,000 279,000 279,000 279,000 Waterfront 7,100 7,100 4,225 4,225 11,325 11,325 South East 4,709 4,709 4,709 4,709
Outwith Core Areas 1,632 1,632 36,089 36,089 37,721 37,721
TOTAL 289,185 289,185 45,023 3,695 48,718 334,208 3,695 337,903
(*1) Under construction + planning permission
4) COMPLETED FLOORSPACE 5) AWAITING DETERMINATION
Core Development new change refurb. ext. TOTAL new change refurb. TOTAL Areas build of use build of use
City Centre West Edinburgh Waterfront South East 2,714 2,714
Outwith Core Areas 10,035 3,862 13,897 8,500 8,500
TOTAL 12,749 3,862 16,611 8,500 all floorspaces are square metres gross
Table 1: Leisure developments completed between 1 January 2015 and 31 December 2015
APPLIC. NO ADDRESS APPLICANT
DATE OF CONSEN
T DEVELOPMENT
TYPE WARD
FLOOR SPACE (SQM) NOTES
12/00531/FUL Bristo Place, 3 Malcolm Innes Innlaw Ltd May-12 part c/u 11 862 restaurant with ancillary entertainment uses
12/04235/FUL Crewe Road South, 140 DeVere Hotels and Leisure Ltd Jul-13 new 5 1,626 gym, pool and beauty therapy suites
12/03386/FUL Inverleith Place, 60 (Newfield Rec. Ground) The Edinburgh Academy Nov-12 new 5 565 enlarged replacement of hockey sports pavillion
12/02091/FUL Kinnaird Park, 1 (Fort Kinnaird Retail Park) Gibraltar General Partners Ltd. May-13 new 17 2,714 7 screen multiplex cinema
14/00821/FUL Malleny, 5 CEC Jun-14 new 2 7,000 artificial rugby pitch & lighting
13/02168/FUL Warriston Crescent, 35 Warriston Community Tennis Club Jul-14 new 5 844 new tennis and mini-tennis courts
14/01180/FUL Westside Plaza Shopping Centre, unit 39-40 Xercise4less May-14 c/u 7 3,000 gym
Total floor space
No. of sites
16,611
7
Table 2: Leisure developments under construction between 1 January 2015 and 31 December 2015
APPLIC. NO ADDRESS APPLICANT DATE OF CONSENT
DEVELOPMENT TYPE WARD
FLOOR SPACE (SQM) NOTES
12/01964/FUL Marine Drive, 25 World of Football at Edin. Telford Coll. Oct-12 new 4 7,100 6 covered 5-a-side pitches and extended changing facilities
10/02373/FUL Morrison Street, 189 Tiger Haymarket Developments Ltd Mar-11 new 11 1,453 part of larger development
14/02494/FUL Riccarton Mains Road [land 272m south of] Heriot-Watt University Dec-14 new 2 279,000 National Performance Centre for Sport
14/00437/FUL Woodhall Road, 154 [land 108m east of] Blagdon Equestrian Ltd. Jul-14 new 8 1,632
Total floor space 289,185
No. of sites 4
equestrian centre
Table 3a: Leisure developments with planning consent as at 31 December 2015 - Consent gained during 2015
APPLIC. NO ADDRESS APPLICANT DATE OF CONSENT
CONSENT EXPIRES
DEVELOPMENT TYPE WARD
FLOOR SPACE (SQM) NOTES
14/02936/FUL Lothian Road, 31 JD Wetherspoon plc Jul-14 Jul-17 c/u 11 3,065 former Caley Picture House
Total floor space
No. of sites
3,065
1
Table 3b: Leisure developments with planning consent as at 31 December 2015 - Consent gained prior to 2015
APPLIC. NO ADDRESS APPLICANT DATE OF CONSENT
CONSENT EXPIRES
DEVELOPMENT TYPE WARD
FLOOR SPACE (SQM) NOTES
11/01492/PPP Cramond Road North [land adjacent to 34] AMA (New Town) Ltd * legal n/a new 1 3,040‡ sports facilities - cricket & football 11/01493/PPP Cramond Road North [land adjacent to 34] AMA (New Town) Ltd * legal n/a new 1 6,911‡ sports facilities - tennis & football 11/01494/PPP Cramond Road North [land adjacent to 34] AMA (New Town) Ltd * legal n/a new 1 7,796 sports facilities - tennis & cricket 14/01611/FUL George IV Bridge, 9A, 10-11 Merefern Ltd. Oct-14 Oct-17 c/u 11 630 restaurant/bar
10/02955/PPP Gilmore Park, Fountain Brewery LTSB (Fountainbridge1) Ltd Sep-11 never new 7 n/a 9,290 sqm class 1, 2, 3 & 11 - part of larger development
13/01258/FUL The Loan, 55, South Queensferry Mr. & Ms. P.S. & D. M. Lindsay & Gamble May-13 May-16 c/u 1 n/a c/u soft play area to gym 11/00941/FUL New Market Road, 6 Marcos Leisure * legal n/a new 9 3,000 indoor football pitches 13/03406/FUL New Street [land adjacent to] Artisan REI Mar-14 Mar-17 new 11 n/a 13/03407/FUL New Street, 2, 4, 5, Canongate, 221, 223, 227, 231 Artisan REI Mar-14 Mar-17 new 11 n/a 14/03416/PPP Niddrie Mains Road [development site at] Parc Craigmillar Ltd. Dec-14 Dec-17 new 17 1,000 restaurant 08/02553/OUT Niddrie Mains Road [site at] Parc Craigmillar Ltd * legal n/a new 17 3,709 leisure part of larger development
12/03567/FUL Portgower Place, 11a Raeburn Place Development Ltd. Jul-14 Jul-17 new 5 7,893 Stadium, hospitality, office, museum, retail
13/04507/FUL Ravelrig Gait, 21 Ravelrig RDA May-14 May-17 new 2 17,400 indoor riding arena for RDA 08/03361/OUT St. James Centre Henderson Global Investors Jun-09 never new 11 n/a leisure unidentified 13/04320/AMC West Harbour Road, 65 Granton Central Developments Ltd. Jan-14 Jan-17 new 4 4,225 14/05305/AMC West Harbour Road, 65 Granton Central Developments Ltd. * legal n/a new 4 4,225‡
* consent subject to legal agreement Total floor space 45,653 ‡ not included in total; multiple applications for same site
No. of sites 16
Table 4: Leisure developments awaiting determination between 1 January 2015 and 31 December 2015
APPLIC. NO ADDRESS APPLICANT DATE OF
APPLICATION DEVELOPMENT
TYPE WARD
FLOOR SPACE (SQM) NOTES
15/00557/FUL Heriot Mount, St. Leonard's Hill [land 25m north of] Braidwood Bikepark Feb-15 new 15 8,500 mountain bike trail
Total floor space 8,500
No. of sites 1
Table 5: Leisure closures between 1 January 2015 and 31 December 2015
APPLIC. NO ADDRESS APPLICANT DATE OF CONSENT
DEVELOPMENT TYPE
NEW USE WARD
FLOOR SPACE (SQM) NOTES
Total floor space
No. of sites
0
NOTES
WARD
Ward 1 - Almond Ward Ward 2 - Pentland Hills Ward Ward 3 - Drum Brae/ Gyle Ward Ward 4 - Forth Ward Ward 5 - Inverleith Ward Ward 6 - Corstorphine/ Murrayfield Ward Ward 7 - Sighthill/ Gorgie Ward Ward 8 - Colinton/ Fairmilehead Ward Ward 9 - Fountainbridge/ Craiglockhart Ward Ward 10 - Meadows/ Morningside Ward Ward 11 - City Centre Ward Ward 12 - Leith Walk Ward Ward 13 - Leith Ward Ward 14 - Craigentinny/ Duddingston Ward Ward 15 - Southside/ Newington Ward Ward 16 - Liberton/ Gilmerton Ward Ward 17 - Portobello/ Craigmillar Ward