City of Chicago Department of Business Affairs and Consumer Protection PUBLIC VEHICLE INDUSTRY NOTICE January 5, 2012 Notice No. 12-001 NOTICE OF STREET CLOSURES The Stage 3 of the Wacker Drive Reconstruction project is set to begin on Monday, January 9, 2012. Madison Street will be re-opened to pedestrian and vehicular traffic. Both Monroe Street and Adams Street will be closed from Canal Street to Franklin Street. The Monroe Street ramp between Upper and Lower Wacker Drives will not be available. Attached are maps and driving instructions prepared by the City of Chicago’s Department of Transportation (CDOT). For the latest construction updates and project news, please visit www.wackerdrive.org or www.cityofchicago.org/transportation Public Vehicle Operations Division ● 2350 W. Ogden, First Floor, Chicago, IL 60608 [email protected] ● 312-746-4300 www.cityofchicago.org/bacp

City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

City of Chicago Department of Business Affairs and

Consumer Protection

PUBLIC VEHICLE INDUSTRY NOTICE

January 5, 2012 Notice No. 12-001

NOTICE OF STREET CLOSURES

The Stage 3 of the Wacker Drive Reconstruction project is set to begin on Monday, January 9, 2012. ► Madison Street will be re-opened to

pedestrian and vehicular traffic. ► Both Monroe Street and Adams Street will

be closed from Canal Street to Franklin Street. ► The Monroe Street ramp between Upper

and Lower Wacker Drives will not be available.

Attached are maps and driving instructions prepared by the City of Chicago’s Department of Transportation (CDOT). For the latest construction updates and project news, please visit www.wackerdrive.org or www.cityofchicago.org/transportation

Public Vehicle Operations Division ● 2350 W. Ogden, First Floor, Chicago, IL 60608

[email protected] ● 312-746-4300 www.cityofchicago.org/bacp

Page 2: City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

January 5, 2012 Contact: Bill McCaffrey        312.744.6157 [email protected]

 Wacker Construction Moving to Monroe and Adams

Revive Wacker Drive, Part 2 remains on-schedule and on-budget CHICAGO –The Chicago Department of Transportation will start the next stage of Wacker Drive rebuilding on January 9 by beginning the construction of the Monroe Street and Adams Street intersections after completing the Madison Street intersection on-time and on-budget. The $300million reconstruction of Wacker Drive, which will completely rebuild and modernize the upper and lower levels of the nearly 60-year-old roadway, is scheduled for completion in late-2012. This stage of construction will close the Monroe Street and Adams Street intersections until summer, and the Madison Street intersection will be re-opened to all traffic. “Our crews continue to work efficiently to meet the demands of a very aggressive construction schedule,” said CDOT Commissioner Gabe Klein. “We will maintain that same level of efficiency in 2012 so that motorists, pedestrians and bicyclists can again have full access to this vital roadway and the businesses that surround it.” Pedestrian Impacts East-West Sidewalks along Madison Street will re-open to all pedestrian traffic. CDOT will also maintain a pedway on the north side of Monroe Street at Wacker Drive. Jackson Boulevard remains open to all pedestrian traffic. North-South Pedestrians can continue to use Canal Street and Franklin Street for north-south travel. The sidewalk along the east side of Wacker Drive from Jackson Boulevard will remain open to allow access to Willis Tower’s Wacker Drive entrance. All buildings and businesses near the construction zone will remain open and accessible throughout the project. Please visit www.wackerdrive.org to view the pedestrian and building access map for complete details. Vehicle & Bicycle Impacts East-West Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic.

Page 3: City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

North-SoFranklin north-soalternate Lower W Public TCDOT isCommunpossiblewww.tra Metra wiits transp Project North-SoreconstrWacker bicyclistsThe implevel at M2009, apModerniztravel tim Revive WJackson Parkwayas createlate-2012 For the l

outh Street remauth Wacker

e route.

Wacker will r

Transit s partnering nications to . Bus re-rounsitchicago

ill be leavingportation ce

Overview outh Wackeuction. ReviDrive by cres. Part 2 of trovements wMonroe Strepproximatelyzing Wacke

mes and enh

Wacker DrivBoulevard

y interchange a new thre2.

atest constr

ains open tor Drive. Nort

remain open

with the CTensure both

utes will be a.com/wacke

g messagesenters.

er Drive wasvive Wacker eating saferthe project will be met weet and a ney 60,000 ve

er Drive will hance aesth

ve, Part 2wilto Van Bure

ge, which is ee-acre par

ruction upda

www

o two-way trthbound traf

n for local ac

TA and Offich public tranavailable oner.

s on its train

s originally br Drive, Part r, more efficpicks up whwith wider rew left-turn ehicles travenot only imp

hetics for mo

ll continue ten Street. Wbeing recon

rk. Revive W

ates and pro

w.cityofchic

raffic to accffic can con

ccess only.

ce of Emergnsportation n the CTA’s

ns and will h

built in 1955t 2 will modecient roadwahere the 200roadways, alane for nor

el daily on thprove safetyotorists, bic

he second hWork also configured to i

Wacker Drive

oject news,

###

cago.org/tra

ommodate tinue to use

gency Manaand traffic f website,

have pedest

5, and is in nernize the uays for moto01-2002 reca new ramp rthbound Whe upper any, but will reyclists and

half of 2012ontinues at tmprove trafe, Part 2 is s

please visit

nsportation

vehicles dee Canal Stre

agement andflow as smo

trian detour

need of a copper and lo

orists, pedesconstructionfrom the upacker at Rad lower leve

elieve congepedestrians

2 with the rethe Wackerffic flow andscheduled f

t www.wack

etoured fromeet for an

d oothly as

information

omplete wer levels ostrians and left off.

pper to loweandolph. As els of Wackestion, redus.

econstructionr/Congress d safety, as for completi

kerdrive.org

m

n at

of

er of

ker. ce

n of

well on in

.

Page 4: City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

ENTRANCE ENTRANCE

ENTRANCEENTRANCE ENTRANCE

ENTRANCEENTRANCE

EN

TR

AN

CE

EN

TR

AN

CE

EN

TR

AN

CE

EN

TR

AN

CE

EN

TR

AN

CE

DRIVEWAY

ALL

EY

EN

TR

AN

CE

250 S. WACKER

PLAZA

QU

INC

Y

PLANTER

ENTRAN

CEENTR

ANCE

GA

RA

GE

E

NT

RA

NC

E

NOT TO SCALE

EXHIBIT

1

DATE: 12/08/11

TEMPORARY BARRIER

TRAFFIC DIRECTION PEDESTRIAN ACCESS

TEMPORARY SIDEWALK

STAGE 3 - WORK ZONEJAN, 2012 - JULY, 2012 OPEN ROADWAY

STAGE 3 - WACKER DRIVE SOUTH VIADUCT RECONSTRUCTION PROJECTMONROE STREET TO ADAMS STREET (JANUARY, 2012 - JULY, 2012)

Page 5: City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

The Wacker Drive Reconstruction Project 2012 Beginning January 9, 2012 Stage 3 of the Wacker Drive Reconstruction project will begin. The Madison viaduct will be opened to traffic and work will continue on Wacker from Monroe to south of Adams, with closures from Canal to Franklin. Travel routes will need to be adjusted to accommodate the new traffic configuration. The closure of Wacker from Monroe to Adams, includes the ramps from Upper to Lower Wacker. Below are directions to assist in navigating around the construction project. To access Lower Wacker- take Franklin to Lake Street to Post Place. Access from the east, at Lake Shore Drive is unchanged. If you take Interstate 90/94 (Dan Ryan/ Kennedy)- use the Washington Blvd east exit. Jackson will remain open but is often congested at Union Station during peak hours. If you take Interstate 290 (Eisenhower) or Interstate 55 (Stevenson) proceed to 90/94 and use the Washington Blvd (east) exit. If you take Lake Shore Drive proceed to Randolph west to Franklin for upper Wacker access, or use the Lower Wacker exit.

Page 6: City of Chicago€¦ · Madison Street will re-open the week of Jan. 9 to all westbound traffic. Jackson remains open to all eastbound traffic. North-So Franklin north-so alternate

STAGE 3

CHICAGO RIVER

CHICAGO RIVER

CANAL ST.

CLINTON ST.

WACKER DR.

FRANKLIN ST.

RA

ND

OL

PH

ST

.

JAC

KS

ON

BL

VD

.

WA

SH

ING

TO

N S

T.

MA

DIS

ON

ST

.

MO

NR

OE

ST

.

AD

AM

S S

T.

OGILVIETRANSPORTATION

CENTER

UNION STATIONACCESS(NORTH)RIVERSIDE PLAZA

20 N. WACKER110 N. WACKER

150 N. WACKER

155 N. WACKER123 N. WACKER101 N. WACKER29 N. WACKER

1 N. WACKER1 S. WACKER71 S. WACKER

10-30 S. WACKER100-150 S. WACKER

111 S. WACKER125 S. WACKER

OGILVIE PEDESTRIAN

WALKWAY ACCESS

UNION STATION(MAIN HALL)

UNION STATION(CONCOURSE)

233 S. WACKER

200 S. WACKER250 S. WACKER

NOT TO SCALE

EXHIBIT

3 PEDESTRIAN ACCESS PLAN - WACKER DRIVE SOUTH VIADUCT RECONSTRUCTION PROJECT STAGE 3 (JANUARY, 2012)

DATE: 12/12/11

WORK ZONE

TEMPORARY SIDEWALK

PEDESTRIAN ROUTE

TRANSPORTATION CENTER