City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 1
DOCUMENT 009113 – ADDENDUM
0.1 ADDENDUM NUMBER: 2
0.2 PROJECT INFORMATION
A. Project Name: Baler Building / MRF Expansion
B. Owner: City of Casper
C. Architect: Hein Bond
D. Date of Addendum: March 7, 2018.
0.3 NOTICE TO BIDDERS
A. This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders
and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede
information in the Project Manual, Drawings, and previously issued Addenda. Portions of the
Addendum affecting the Contract Documents will be incorporated into the Contract by
enumeration of the Addendum in the Owner/Contractor Agreement.
B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid
Form.
C. The date for receipt of bids is unchanged by this Addendum, at same time and location.
0.4 ATTACHMENTS
A. This Addendum includes the following attached Documents and Specification Sections:
1. Document Pre-Bid Meeting notes, dated March 6, 2018, (new) (3 pages).
2. Section 033600 – POLISHED CONCRETE FINISHING, (new) (2 pages).
B. This Addendum includes the following attached Sheets:
1. Architectural Sheet A011, dated March 7, 2108, (reissued).
2. Architectural Sheet A102, dated March 7, 2018, (reissued).
3. Architectural Sheet A103, dated March 7, 2018, (reissued).
4. Architectural Sheet A105, dated March 7, 2018, (reissued).
5. Architectural Sheet A601, dated March 7, 2018, (reissued).
6. Architectural Sheet A701, dated March 7, 2018, (reissued).
C. This Addendum includes the attached Addendum Drawings:
1. Haul Routes – Refer to drawing for locations for soil waste and construction debris
relative to project area.
City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 2
0.5 REVISIONS TO PREVIOUS ADDENDA
1. None.
0.6 REVISIONS TO DIVISION 00 PROCUREMENT REQUIREMENTS AND CONTRACTING
REQUIREMENTS
A. Document STANDARD INSTRUCTIONS TO BIDDERS, (not reissued).
1. Section 5 “PRE-BID CONFERENCE:” Add the following:
a. Bidders that are not able to attend the Pre-Bid Conference must schedule a meeting
at the project site with the Consultant and the City representatives prior to the bid
date to be considered qualified.
2. Paragraph 13.2: Change, “...a Successful Resident Bidder shall not subcontract more than
thirty percent (30%) of Work....”
0.7 REVISIONS TO DIVISION 01 GENERAL REQUIREMENTS
A. Specification Section 013323 – ELECTRONIC SUBMITTAL PROCEDURES, (not reissued).
1. Procore (www.procore.com) is an accepted equal.
2. Disregard reference to Alternate Form 004323.
0.8 REVISIONS TO DIVISIONS 02 - 49 SPECIFICATION SECTIONS
A. Specification Section 051000 – Structural Metal Framing
1. Delete requirement that installer participate in AISC Certification program.
B. Specification Section 071113 – BITUMINOUS DAMPPROOFING
1. Paragraph 2.1. Products: DECO 20 is an approved product.
C. Specification Section 077253 – SNOW GUARDS, (not reissued).
1. Paragraph 2.1, A, 1. Manufacturers: SnoGem, iClad-S is an approved product.
2. Paragraph 2.1, A, 2. Description: Brackets with one rail, with a plate between brackets
that extends below the rail to prevent snow from sliding underneath the rail.
D. Specification Section 083613 – SECTIONAL DOORS (not reissued)
1. Paragraph 2.1, A: Change basis of design product to Overhead Door Corporation model
592, or equal.
2. Paragraph 2.1, G, 4: Obstruction detection device: Change to 3-foot light curtain.
City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 3
E. Specification Section 084513 – STRUCTURED POLYCORBONATE PANEL ASSEMBLIES
1. Paragraph 2.3, A. Manufacturers: Wasco Skylights is an approved manufacturer. Crystal
Structures arcoPlus 547 is an approved product.
F. Specification Section 263100 – PHOTOVOLTAIC COLLECTORS, (not reissued)
1. Paragraph 2.3, A, 1: Change reference to Alternate No. 5 to Bid Item No. 13
2. Paragraph 2.3, A, 2: Change reference to Alternate No. 6 to Bid Item No. 14
G. Specification Section 263106 – FIRE ALARM SYSTEM (not reissued)
1. Installing company SHALL employ NICET technicians on site per specifications.
0.9 REVISIONS TO DRAWING SHEETS
A. Sheet C2.1 – Utility Plan (not reissued)
1. Drawing calls for a clean-out and backflow valve on the 4” Bailer Building Sanitary
Sewer Service Line at station 4+73.37 just prior to the wye connection to the 8” main. It
has been determined that the backflow valve is not necessary in this situation. Eliminate
the backflow valve.
B. Sheet C5.2 – Landfill Drainage Improvements (not reissued).
1. Bid Item #9, Drainage Improvements West Side of Landfill Access Road involves
removing collected sediment and materials in the ditch. This removed material (trash
removed) may be mixed with stored topsoil from the earthwork portion of this project
and placed on the finished slopes prior to seeding.
C. Sheet A011 - Overall Floor Plan with MRF Building Expansion (reissued).
1. “Room Schedule”: Electrical Room 302 to receive rubber base (096513) on Framed walls
(Wall type A1), both sides of walls.
2. “Room Schedule”: Wall and ceiling finish 053000 is meant to designate interior metal
building liner panel.
D. Sheet A102 – Existing Pit Floor Plan (reissued).
1. Add push wall curb detail as shown.
2. Modify area of 033510 as shown.
E. A103 – New Pit Area Floor Plan (reissued)
1. Add push wall curb detail as shown.
2. Modify area of 033510 as shown.
City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 4
F. Sheet A105 – Miscellaneous Enlarged Plans (reissued)
1. Change door 001A to overhead coiling door.
2. Add window detail 6 as shown.
G. Sheet A601 – Interior Elevations (reissued).
1. Modify detail 10 as shown.
H. Sheet A701 – Schedules (reissued).
1. “Room Schedule”: Wall and ceiling finish 053000 is meant to designate interior metal
building liner panel.
2. Modify door schedule as shown.
I. Sheet MP-5 – Methane Protection System Details (not reissued)
1. Installation of blowers are not part of scope; references to blowers throughout the MP plans
are associated with the construction of connection points in the event that blowers are
required in the future
J. Sheet S1.2 – Floor and Foundation Plan Area “B” (not reissued)
1. 12” of gravel is required under the entire slab as specified in detail 1/MP-4.
K. Sheet M201 – Plumbing Piping Plan – Pit and Baler Area (not reissued)
1. Provide a reduced pressure principle backflow preventer after the water meter as located
in Water #1 110 and provide a 1” CW pipe to gridline JJ10 for connection to lawn
irrigation
L. Sheet M301 – Mechanical Details and Schedules (not reissued)
1. Plumbing Fixture Schedule: Change EQC to Elkay LZS8WSVRSV Electric Water
Cooler with Bottle Filling Station, stainless steel construction.
2. Rooftop unit HX-1 shall be constructed of aluminum (in lieu of galvanized steel). Install
the control panel outside of restroom below the unit as indicated on 3/M202. Provide
necessary wiring from control panel to HX-1 as required for unit to operate. Revise LAT
to be 90 degrees I lieu of 101°F for the heating mode. Revise the ambient temperature in
the cooling mode to be 95°F.
M. Sheet E001 – Electrical Cover Sheet (not reissued)
1. Unmarked pole light north of the MRF is a new Type S fixture and shall be provided un-
der this contract.
2. The intent of the project is to furnish and install (2) complete and fully operational Grid
Tied PV systems capable of producing 25kW each under this contract. Provide all
City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 5
equipment, material, and labor for a complete installation. Refer to Specification Section
26 3100 for a list of approved vendors.
3. Clarification: The optional routes indicated for feeding Panel CB are not intended to be
priced separately during the bidding process but are rather options for the contractor to
choose from during construction. However, change orders will not be accepted based on
routing and feeding Panel CB during construction, which is intended to be including in
this contract.
N. Sheet E201 – Electrical Plan – Existing Pit Area and Baler Area (not reissued).
1. Water #2 111 – Provide (2) Type G light fixtures spaced evenly in room and (2) 3-way
light switches, one at each door, and connect to nearest lighting circuit.
O. Sheet E202 – Electrical Plan – New Pit Area (not reissued).
1. Water #1 110 – Provide (3) Type G light fixtures spaced evenly in room and (1) local
light switch, mounted at door, and connect to nearest lighting circuit.
2. Water #1 110 – Provide dedicated GFCI protected receptacle for irrigation controller.
Homerun to spare 20A/1P breaker in Panel P (P-43) with #12 AWG in a ¾” conduit.
Coordinate location of controller with Landscape Contractor
P. Sheet E302 – Electrical Plan – MRF Building Expansion (not reissued)
1. Electrical Room – Provide (2) Type G light fixtures spaced evenly in room and (1) local
light switch, mounted at door, and connect to nearest lighting circuit.
2. Modify Specific Note E257 to read as follows: Provide (1) 4” Conduit with pull string
from Gridline 1-DDD to MDP for connection to future Baler. Provide (1) 1” Conduit
with pull string from Gridline 1-DDD to data rack for future CAT 6 connection to future
baler. Cap both conduits.
Q. Sheet E401 – Electrical schedules (not reissued).
1. Lighting Fixture Schedule: Fixture Types AE and A2E (Shaded A and A2 Fixtures) – All
wiring and connections shall be provided between fixture and battery pack (integral or
remote) as a part of this contract. Remote battery packs shall be provided with an appro-
priate enclosure for the space mounted in.
2. Lighting Fixture Schedule: Fixture Type G shall accept voltages from 120-277V
(MVOLT).
3. Main Distribution Panel MDP: The 350A/3P Circuit Breaker for the Future Baler shall
remain as a SPARE.
R. Sheet E403 – Power Distribution Diagrams (not reissued)
1. Clarification: Bid Schedule Items #12 & #14 shall be completely separate Bid Items. Do
not include #14 with #12.
0.10 GENERAL CLARIFICATIONS
A. Construction Materials Testing services paid by the design Team as follows:
City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 6
1. Earthwork Density testing
2. Reinforcing steel documentation
3. Drilled pier observation
4. Concrete testing
5. Asphalt testing
6. Construction material laboratory testing
All other tests and inspections are the responsibility of the Contractor according to the Standard
General Conditions and Supplementary Conditions.
B. Regarding Bid Schedule Items: Items on Drawings not specifically labeled with a Bid Schedule
Item number shall be included in Bid Schedule Item 1 “Baler Building Expansion”
C. Regarding the basis for awarding the project: The project will be awarded based on the combined
total price of every bid schedule item, to be listed on the Bid Schedule as “TOTAL BASE
BID”. The Owner reserves the right to accept or reject any bid items on the schedule. The
contract amount will be the combined total of every accepted bid item.
D. Regarding Davis-Bacon Wage rates: If a classification is missing from the wage determination,
contractors/subcontracts will need to submit a “Request for Authorization of Additional
Classification and Rate, as instructed at https://www.wdol.gov/db_confrmnce.aspx
PRODUCT APPROVALS:
The manufacturers and products, which are listed in the following texts, are approved for bidding. Final
acceptance is contingent upon receipt and approval of final shop drawings. Manufacturer shall conform
to all warranties, performances, size, etc., as the item specified. The burden of proof of the merit of the
proposed substitution is upon the proposer. Those items not specifically listed by addendum shall not be
approved for bidding.
SECTION DESCRIPTION MANUFACTURER
22 4000 Emergency Shower/Accessories Bradley
26 5100 Interior Lighting
-Types A & AE Paclights, Lithonia, Metalux
-Types A2 & A2E Litetronics, Lithonia, Metalux
-Type C Elite, Columbia, Lumenwerx
-Types D & DE Noribachi, Columbia, Mark Lighting,
Metalux
-Types E & RH Isolite, Dual Lite, Sure-Lites
-Type F Noribachi, Columbia, Mark Lighting,
Metalux
-Type G Litetronics, Columbia, Lithonia, Metalux
-Type H Noribachi, Columbia, Mark Lighting,
Metalux
-Type J Elite, Columbia, Metalux
-Type X1 Dual Lite, Sure-Lites
City of Casper Baler Building / MRF Expansion
ADDENDUM 2 009113 - 7
SECTION DESCRIPTION MANUFACTURER
-Lighting Controls Eaton
26 5200 Exterior Lighting
-Type B LSI, Hubbell, McGraw-Edison
-Type S LSI, Leotek/Valmont,
McGraw-Edison/Lumark
-Lighting Controls Eaton
28 3106 Fire Alarm System Potter
END OF DOCUMENT 009113
Pre-Bid Meeting
City of Casper – Baler / MRF Expansion
March 6, 2018, 10:00AM
1. Introduction
2. General discussion of the project
3. Submittals per project manual – all materials to be used for construction must be approved prior to construction.
1. Shop Drawings: two sets reviewed and annotated by the contractor. The Bid Documents
specify Electronic Submittal Procedures, for the contractor to use Submittal Exchange
for the project. Other systems like Procore will be acceptable for the electronic submittal
procedures. Refer to Specification section 013323
2. Materials Lists including manufacturer’s name and catalogue number.
3. Submit Contractor/Sub-Contractor credentials for Owner’s approval for all sections as specified.
4. Submit Manufacturer’s printed installation instructions for each product requiring special installation techniques.
5. Proposed schedule for construction as well as a schedule of values.
6. Bonding Requirements 1. Bid Security in amount of 5% of total maximum bid. 2. See Section “Instructions to Bidders”
7. Bid Date/Addendum 1. March 13, 2018 until 2:00 PM, then read aloud. 2. There will be a 5% Wyoming Contractor preference.
8. Contract Time 1. Substantially Completed by 420 calendar days. 2. Ready for Final Payment 30 calendar days following substantial completion.
9. Funding Agencies 1. SRF funding 2. MRF separate The other bid schedule items are from a separate funding source as
well. Payment applications will need to have any bid schedule items accepted
separated so the appropriate funding source can pay for their respective parts.
10. Payment Procedures 1. Progress Payments need to be turned in to Architects in time to allow review and
submittal to the City by the 25th of each month;
11. Compliance with Federal Labor Standards and safety of job site 1. Contractor is responsible for the safety of his crew and his sub’s crews
12. Liquidated Damages 1. Liquidated damages will be included in the contract, details can be found in the
Standard Form of Agreement between Owner and Contractor, Article 3, Section 2, $1000.00 per day for each day past Substantial Completion and an additional $200.00 for each day past Final Completion.
General Questions / Answers:
• What is the design for the solar panel system. Solar Panel and inverters are specified in
Section 263100. The associated disconnects and wiring is identified on the Electrical
drawings.
• Are work hours limited to the City’s operation hours? The City will provide contractors
access to the project site so work can take place beyond the normal operational hours.
• Is the Engineered Metal Building open to any metal building suppliers? Yes, however
they would have to comply with the Buy American / Use of American Iron and Steel
requirement for the project.
• Please clarify the electrical requirements for the future baler. The future baler in the MRF
has not been purchased by the City yet and is not included in this contract. We will
clarify what electrical items related to the future baler will be required for this project.
Look for that in an upcoming addendum.
• Explain the testing requirements for the methane barrier. The Design team will have an
engineer to assist with the testing and inspection of the methane barrier. The Contractor
will be responsible for the smoke testing of the methane barrier components. The
methane barrier will have to be tested prior to installation of the concrete slab. Details
on the methane protection system are explained in the CQA plan in the specifications.
• Would an alternate for concrete paving in lieu of asphalt paving be considered? Yes,
substitutions would be considered if submitted.
• Is the AISC certification required for steel erection / fabrication? The certification will be
waived.
• Where will extra dirt and the demolished concrete / asphalt be taken? We will provide a
map to the locations on site for those materials to go.
• Will there be any fees to dump the removed materials? The City will waive the fees for
the project since it is within the landfill property. A site tour followed the meeting. A list of attendees is attached. End of Document.
Baler/MRF Expansion
Pre-Bid Meeting
March 6, 2018 10:00 am
Attendees
Page 1
Name Company Phone E-mail
Mike Lewan 71 Construction 307-235-2922
Chad Westbrook Applied Const Tech Inc. 307-262-3670
Kluke Bouma Carpet One Commercial Floors 952-300-0298
Colton Sasser Caspar Building Systems 307-235-5690
Neal Branon Caspar Building Systems 307-235-5690
Wes Hayden Caspar Building Systems 307-235-5690
Kelly Boyle City Service Electric 307-265-0659
Dean Byrne DDR LLC 307-996-7579
Jake Hatch Diamond Point 307-684-7171
Shawn Gustafson ECS Engineers 307-337-2883
Mary Mateo ECS Engineers 307-337-2883
Andrew Rein Eric Reichert Insulation & Construction 308-225-3440
Eric Reichet Eric Reichert Insulation & Construction 308-633-3595
Gary Hall Grizzly Excavating
Billy Hutchison Hutch's Hi-Country Plumbing 307-235-8060
Travis Ferguson Inberg-Miller Engineers 307-577-0806
Chris Schwahn Knife River 307-797-0702
Nick Rayes Modern Electric 307-266-1711
Loran Workman Northwestern Electric 307-266-4206
Chris Audiss Oftedal Construction 307-267-4044
Cory Kopp Plumbing Masters 307-258-6116
Greg Pope Pope Construction 307-472-3241
Kim Essen Powder River Const. 307-680-0378
Logan Hewitt Power Plus Electric 307-277-7632
Ed McAuley Sampson Construction 307-640-4734
Steve Sprecher Sprecher Electric 307-265-8135
Andrew Maxwell West Plains Engineering 307-234-9484 [email protected]
City of Casper Baler Building / MRF Expansion
POLISHED CONCRETE FINISHING 033600 - 1
SECTION 033600 - POLISHED CONCRETE FINISHING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes polished concrete finishing, including staining.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For each type of product requiring color selection.
1.3 QUALITY ASSURANCE
A. Field Sample Panels: After approval of samples, produce field sample panels to demonstrate the approved
range of selections made under Sample submittals. Produce a minimum of three sets of full-scale panels,
approximately 48 by 48 inches (1200 by 1200 mm) minimum, to demonstrate the expected range of
finish, color, and appearance variations.
1. Locate panels as indicated or, if not indicated, as directed by Architect.
2. Maintain field sample panels during construction in an undisturbed condition as a standard for
judging the completed Work.
3. Demolish and remove field sample panels when directed.
PART 2 - PRODUCTS
2.1 STAIN MATERIALS
A. Penetrating Stain: Water-based, acrylic latex, penetrating stain with colorfast pigments.
2.2 LIQUID FLOOR TREATMENTS
A. Penetrating Liquid Floor Treatments for Polished Concrete Finish: Clear, waterborne solution of
inorganic silicate or siliconate materials and proprietary components; odorless; that penetrates, hardens,
and is suitable for polished concrete surfaces.
PART 3 - EXECUTION
3.1 POLISHING
A. Polish: Level 3: High sheen, 800 grit.
B. Apply polished concrete finish system to cured and prepared slabs.
City of Casper Baler Building / MRF Expansion
POLISHED CONCRETE FINISHING 033600 - 2
1. Machine grind floor surfaces to receive polished finishes level and smooth.
2. Apply reactive stain for polished concrete in polishing sequence and according to manufacturer's
written instructions.
3. Apply penetrating liquid floor treatment for polished concrete in polishing sequence and according
to manufacturer's written instructions, allowing recommended drying time between successive
coats.
4. Apply penetrating stain for polished concrete in polishing sequence and according to
manufacturer's written instructions.
5. Continue polishing with progressively finer-grit diamond polishing pads to gloss level, to match
approved mockup.
6. Control and dispose of waste products produced by grinding and polishing operations.
7. Neutralize and clean polished floor surfaces.
3.2 STAINING
A. Newly placed concrete shall be at least 30 days old before staining.
B. Prepare surfaces according to manufacturer's written instructions.
1. Clean concrete thoroughly by scraping, applying solvents or stripping agents, sweeping and
pressure washing, or scrubbing with a rotary floor machine and detergents recommended by stain
manufacturer. Rinse until water is clear and allow surface to dry.
2. Test surfaces with droplets of water. If water beads and does not penetrate surface, or penetrates
only in some areas, profile surfaces by grinding, sanding, or abrasive blasting. Retest and continue
profiling surface until water droplets immediately darken and uniformly penetrate concrete
surfaces.
C. Allow concrete surface to dry before applying stain. Verify readiness of concrete to receive stain
according to ASTM D 4263 by tightly taping 18-by-18-inch (450-by-450-mm), 4-mil- (0.1-mm-) thick
polyethylene sheet to a representative area of concrete surface. Apply stain only if no evidence of
moisture has accumulated under sheet after 16 hours.
D. Penetrating Stain: Apply penetrating stain to concrete surfaces according to manufacturer's written
instructions and as follows:
1. Apply first coat of stain to dry, clean surfaces by airless sprayer or by high-volume, low-pressure
sprayer.
2. Allow to dry four hours and repeat application of stain in sufficient quantity to obtain color
consistent with approved mockup.
3. Rinse until water is clear. Control, collect, and legally dispose of runoff.
END OF SECTION 033600
UP
RE
F.
DW
UP
UP
EXISTING PIT AREA
EXISTING LOWER
BALER AREA
JJ
HH
GG
FF
EE
DD
CC
AA
A203
2
A203
3
A203
1
113 = 5131
1
23
45
67
JJJ
GGG
FFF
EEE
DDD
CCC
BBB
AAA
9
12' - 11 1/2
"20' - 0
"
20' - 0
"
20' - 0
"
20' - 0
"
20' - 0
"
20' - 0
"12
' - 11 1/2"
HHH
20' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
14' - 6"
130
' -
0"
BB
20
' -
0"
20
' -
0"
20
' -
0"
20
' -
0"
20
' -
0"
20
' -
0"
10' -
0"
14' - 0" 4' - 6" 14' - 0"1' - 10"
3' - 4"1' - 7 1/2"
1' - 10 1/2" 2' - 7 1/2"
21' - 0
"
32' - 0
"
10' - 0"5' - 0
"
A203
4
301
MRF
302
ELEC
A106
1
1 HR. RATED WALL ASSEMBLYUL DESIGN NO. U489. COORDINATEDESIGN ASSEMBLY WITH PEMB WALLDETAILS.
NEW PIT AREA
NEW MRF EXPANSION
BID SCHEDULE #12G
E301h
E301g
G
E301f
E301e
301
302
E301a
E301b E301c
E301d
CO
PYR
IGH
T H
EIN
/BO
ND
LLC
Job No.
Date:
Drawn By:
235 S. David, Ste. D, Casper, WY 82601
307.234.3601 heinbond.com
LICE
NSED ARCH
I TECT
STA
TEOF WY
OM
ING
B-0260
Date:
JEFFER
YC . BOND
,JR.
3/7/20
18 4
:32:4
1 PM
A011
KRP
JULY 10, 2017
15-Balefill
OVERALL FLOORPLAN WITH MRF
BUILDINGEXPANSION
BA
LE
FIL
L E
XP
AN
SIO
NS
& R
EM
OD
EL
CIT
Y O
F C
AS
PE
R
188
6 N
OR
TH
ST
AT
ION
RO
AD
1/16" = 1'-0"1
OVERALL FLOOR PLANWITH MRF BUILDINGEXPANSION
Door Schedule - BID SCHEDULE #12
Mark Width HeightDoorType Material Glazing Finish
FireRating
FrameMaterial
FrameFinish
HardwareGroup Comments
301 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG 1-HR BY MFG BY MFG BY MFG COILING
302 3' - 0" 7' - 0" F HM 099113 HM 099113 2.1
E301a 3' - 0" 7' - 0" V HM 099113 HM 099113 1
E301b 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E301c 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E301d 3' - 0" 7' - 0" V HM 099113 HM 099113 1
E301e 8' - 8" 9' - 6" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG COILING
E301f 8' - 8" 9' - 6" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG COILING
E301g 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E301h 3' - 0" 7' - 0" V HM 099113 HM 099113 1
Room Schedule - BID SCHEDULE #12
Name NumberApproximate
Area Floor FinishWall
FinishCeilingFinish Comments
MRF 301 18000 SF 096723 053000 053000
ELEC 302 144 SF 096723 053000 053000
7/10/2017
REVISIONS
1 3-7-2018
F
EXIS
TIN
G L
OW
ER
B
ALER
AR
EA
1
A301
17 18 19 20 21 22 23
A
B
C
D
E
F
G
H
101
EXISTING PLATFORM
NEW CONCRETE, MATCH HEIGHT OF EXISTING PLATFORM
NEW CONCRETE PUSH WALL WITH METAL PLATE, SEE STRUCTURAL
INSTALL NEW STEEL PLATE ON EXISTING CONCRETE WALL, SEE STRUCTURAL
NEW CONCRETE, MATCH EXISTING PIT FLOOR HEIGHT
LOCATION OF NEW STEEL REINFORCED CONCRETE
TIPPING FLOOR
EXISTING PIPE BOLLARDS TO REMAIN
NEW PIPE BOLLARDS, TYP
NEW COLUMNS,SEE STRUCTURAL, TYP.
NEW 6" CONCRETE APRON, SEE CIVIL
NEW CONCRETE
102
RES. UNLOADING
100
EXISTING PIT
E101
E102CE102D E102B E102A
X3
X2X2
E1
E2
X1
X1X2
18' - 0"
111
WATER #2
111
F2
A1
A1
88' - 6" 11' - 3"
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 25' - 0"
125' - 0"
13' -
11"
96' -
10 1
/2"
NEW METAL PLATE, SEE STRUCTURAL
A105
5
10' -
0"
1' -
0"
6' - 0"16' - 0"
NEW CONCRETE STAIR AND METAL RAILING
34 71 00.A1
03 41 00
X2
ADDITIONAL SLOPED CONCRETE PUSH WALL WITH METAL PLATE, TAPER AT ENDS, SEE DETAIL
03 35 10
E1
PEMB WALL PANELPEMB GIRTINSULATION, VAPOR BARRIERINTERIOR METAL LINER PANEL
PEMB WALL PANELWEATHER BARRIER5/8" EXTERIOR GYP. SHEATHING6" STEEL STUD FRAMING
MOUNT FLUSH TO INTERIOR OF GIRTSOUND BATT INSULATION
5/8" TYPE 'X' GWB
E2
5/8" TYPE 'X' GWB3 5/8" STEEL STUD FRAMING
SOUND BATT INSULATION5/8" TYPE 'X' GWB
A1 5"
FRP OVER5/8" TYPE 'X' GWB3 5/8" STEEL STUD FRAMING
SOUND BATT INSULATIONPLUMBING CHASE OR ADJACENT WALL SURFACE
A3
4 1
/2"
M 8" CONCRETE MASONRY UNIT
7 1
/2"
F112" CAST-IN-PLACE CONCRETE
SEE STRUCTURAL
5/8" TYPE 'X' GWB6" STEEL STUD FRAMING
SOUND BATT INSULATION5/8" TYPE 'X' GWBINTERIOR METAL LINER PANEL
B1
7 1
/2"
X1
EXISTING PEMB WALL PANELEXISTING PEMB GIRTEXISTING PEMB INSULATION, VAPOR BARRIEREXISTING PEMB INTERIOR LINER PANEL
X2
EXISTING PEMB EXTERIOR WALL PANELEXISTING PEMB GIRTNEW INSULATION, VAPOR BARRIERNEW INTERIOR METAL LINER PANEL
NEW INTERIOR METAL LINER PANELNEW INSULATIONOVER EXISTING WALL SYSTEM
X3
WALL TYPES
F224" CAST-IN-PLACE CONCRETE
SEE STRUCTURAL
5/8" TYPE 'X' GWB3 5/8" STEEL STUD FRAMING
SOUND BATT INSULATION5/8" TYPE 'X' GWBFRP, ON SIDE WHERE SYMBOL OCCURS
A2 5"
F36" CAST-IN-PLACE CONCRETE
SEE STRUCTURAL
CO
PYR
IGH
T H
EIN
/BO
ND
LLC
Job No.
Date:
Drawn By:
235 S. David, Ste. D, Casper, WY 82601
307.234.3601 heinbond.com
LICE
NSED ARCH
I TECT
STA
TEOF WY
OM
ING
B-0260
Date:
JEFFER
YC . BOND
,JR.
3/7/20
18 4
:32:4
3 P
M
A102
KRP
JULY 10, 2017
15-Balefill
EXISTING PITFLOOR PLAN
BA
LE
FIL
L E
XP
AN
SIO
NS
& R
EM
OD
EL
CIT
Y O
F C
AS
PE
R
188
6 N
OR
TH
ST
AT
ION
RO
AD
1/8" = 1'-0"1
EXISTING PIT FLOORPLAN
7/10/2017
REVISIONS
1 3-7-2018
UP
RE
F.
DW
2
A301
A105
1
16
17
18
A
B
C
H
107
MENS
106
WOMENS
108
JAN
105
BREAK ROOM
10
10
11
11
12
12
13
13
14 15
JJ
HH
GG
FF
EE
DD
CC
AA
NEW CONCRETE PUSH WALL WITH METAL PLATE, SEE STRUCTURAL
LOCATION OF NEW STEEL REINFORCED CONCRETE TIPPING FLOOR
NEW CONCRETE
NEW CONCRETE PUSH WALL WITH METAL PLATE, SEE STRUCTURAL
110
WATER #1
104
COM. UNLOADING
103
NEW PIT AREA
109
STAIR
E104
E102C
E102D
E104BE104CE104DE104E E104A
E103a
E105
105
200
106
107
108110
PIPE BOLLARDS, TYP.
STEEL WHEEL STOPS, TYP.
20
' -
0"
20
' -
0"
20
' -
0"
20
' -
0"
20
' -
0"
20
' -
0"
10' -
0"
130
' -
0"
20' - 0"20' - 0"20' - 0"20' - 0"26' - 6"
25' - 0"
20' - 0"
108' -
0"
20' -
0"
X2
X2
E1
E1
E1
E2
E1
E1
E2
F2
A1
A1
E1
F2
F2
F2
E103b
86' - 6"
A105
3
4
A402
22' -
6"
7' - 4"
9
6' -
0"
24' - 6"
RAISED CONCRETE PLATFORM FOR MECHANICAL EQUIPMENT
4' -
8"
9' - 0"8' - 0"6 1/2"
05 52 00
05 52 00
METAL STAIRS AND HANDRAIL
CONCRETE STAIRS AND METAL HANDRAIL
4' -
8"
16' - 0"
113' - 0"
122' - 0"
120' - 0"
SLOPED GRAY HATCH AREA TOWARD PIT
ADDITIONAL SLOPED CONCRETE PUSH WALL WITH METAL PLATE, TAPER AT ENDS, SEE DETAIL 2/A103
03 35 10
1' - 6"
1' -
0"
2' -
4"
5/8" STEEL PLATE, WELDED CONTINUOUS
5/8" STEEL PLATE, WELDED CONTINUOUS
FILL VOID WITH CONCRETE
CO
PYR
IGH
T H
EIN
/BO
ND
LLC
Job No.
Date:
Drawn By:
235 S. David, Ste. D, Casper, WY 82601
307.234.3601 heinbond.com
LICE
NSED ARCH
I TECT
STA
TEOF WY
OM
ING
B-0260
Date:
JEFFER
YC . BOND
,JR.
3/7/20
18 4
:32:4
5 P
M
A103
KRP
JULY 10, 2017
15-Balefill
NEW PIT AREAFLOOR PLAN
BA
LE
FIL
L E
XP
AN
SIO
NS
& R
EM
OD
EL
CIT
Y O
F C
AS
PE
R
188
6 N
OR
TH
ST
AT
ION
RO
AD
1/8" = 1'-0"1
NEW PIT EXPANSIONFLOOR PLAN
7/10/2017
REVISIONS
1 3-7-2018
1 1/2" = 1'-0"2PUSH WALL CURB
UP
RE
F.
DW
V
F
T
F
F
UP
T
F
F
3
A301
16 17
A
B
C
105
BREAK ROOM
106
WOMENS 107
MENS
108
JAN
15
E105
105
200
106 107 108
B
B
B
A
A
AAA
A
A
A601 1 A6015
A601
9
4
3
2
6
7
8
A60114
A601
12
A601
1311
109
STAIR
X2
E2
E2
B1
B1
B1
B1
B1
B1
B1
B1
F2
A2A1 A2
A1
A2
A3A2
A3
A1
A2
E2
E1
5
A402 A2A2
A1
A1
10
25' - 0"
1' - 6"12' - 8 1/2"
5' -
0 1
/2"
7' -
10"
5' - 11"1' - 11"1' - 4"
1' - 4" 14' - 5" 1' - 0"
2' - 2"
2' - 6"
4' - 11"
6' - 9
"
3' - 0 1/
2"7' - 8"
1' - 6"
2' - 3"
105C
105B
E105A
3/8" PLEXI GLASS
SMART TV WITH TV AND DATA PORT IN WALL
6
A105
6
A105
201
OFFICE 1
4' -
0"
202
OFFICE 2
204
STORAGE
203
ELECTRICAL / DATA
200
CORRIDOR
203
204
202 201
C
CC
C
C
C
C
C C
C
15' - 11 1/2
"
1' -
6 1
/2"
4' -
4"
6' -
0"
19' -
8 1
/2"
13' - 9 1
/2"
4' - 8"
5' - 5 1/2"
4' - 4" 4' - 4" 10' - 6" 4' - 4" 3' - 0"
2' -
4"
4' -
4"
4' - 4" 2' - 6" 4' - 4"
4' - 4"
4' - 4
"
1' - 0 1/2
"
4' - 4
"
1' - 6"
MECHCHASE
A1 A1
A1
A1
B1 A1
A1
A1
E2
E2
E2
A1
A1
B1
B1
B1 B1
B1
X2
A1
A1A1
7' -
10"
E204
18' -
0"
5' - 0
"
14' - 11 1/2"
05 50 00.A1
05 50 00.B1
05 52 00
3/8" PLEXI GLASS
6
A105
6
A105
6
A105
16
17
H
13 14
E103aE103b
3' - 4" 14' - 0"
20' - 0"
103
NEW PIT AREA
34 71 00.A1
34 71 00.A1
34 71 00.A1
22 23
F
G
H
EXISTING CONCRETE WALL
INSTALL NEW DOORS
EXISTING CONCRETE WALL
24' - 0"
12' -
11"
EXISTING OPENING
EXISTING CONCRETE WALL
NEW CONCRETE WALL
6' - 0" 4' - 0"
8' -
8"
2' -
7"
001b
001a
001
STORAGE
F1
F3
H
G
F
6' -
0"
NEW COILING DOOR, 8'8" X 9'6"
NEW BOLLARDS, EACH SIDE
METAL PLATFOR
M
5' - 0"
8' -
3" 2' -
8"
E103c
2' - 8"
05 50 00.A1
05 50 00.B1
05 52 00
05 50 00.A2
HOLLOW METAL WINDOW
3/8" PLEXI GLASS
2X4 WRAPPED WITH METAL FLASHING ATTACHED TO METAL STUDS
5/8" TYPE 'X' GWBINTERIOR METAL LINER PANEL
WINDOW SILL, JAMB, AND HEAD DETAIL SIMILAR
CO
PYR
IGH
T H
EIN
/BO
ND
LLC
Job No.
Date:
Drawn By:
235 S. David, Ste. D, Casper, WY 82601
307.234.3601 heinbond.com
LICE
NSED ARCH
I TECT
STA
TEOF WY
OM
ING
B-0260
Date:
JEFFER
YC . BOND
,JR.
3/7/20
18 4
:32:4
9 P
M
A105
KRP
JULY 10, 2017
15-Balefill
MISCELLANEOUSENLARGED PLANS
BA
LE
FIL
L E
XP
AN
SIO
NS
& R
EM
OD
EL
CIT
Y O
F C
AS
PE
R
188
6 N
OR
TH
ST
AT
ION
RO
AD
1/4" = 1'-0"1
BREAK ROOM /TOILETS
1/4" = 1'-0"2OFFICE FLOOR
1/4" = 1'-0"3SOUTH DOORS
1/4" = 1'-0"4
EXISTING BALER AREA1ST FLOOR - NEWSTORAGE
1/4" = 1'-0"5
ACCESS LADDER ANDPLATFORM
7/10/2017
REVISIONS
1 3-7-2018
1" = 1'-0"6WINDOW DETAIL
1' -
3"
10 28 00.C2
10 28 00.F1
10 28 00.D1
09 30 13
106
6"
TYP.
4' -
0"
6"
10 28 00.E1
09 30 13
10 28 00.F1
10 28 00.A1
09 30 13
10 28 00.C1
10 28 00.C3
10 28 00.F1
09 30 13
10 28 00.D1
10 28 00.C210 28 00.A1
10 28 00.F1
09 30 13
10 28 00.C3
10 28 00.C1 10 28 00.E1
09 30 13
6"
TYP.
4' -
0"
6"
107
15" 30"
30
"18
"36"
36" 15" 30"
200
6' -
0"
1' -
4"
06 64 00
06 64 00
E105A
A
A A A A A
B B
30"36"24"30"30"30"
46"
6"
36"
40"16"52"8"52"8"52"
86"
B B B
105
106 107 108
NEW 80" SMART TV W/ WIFI, ETHERNET, HDMI.ADD ELECTRICAL OUTLET BEHIND TV AND CONDUIT IN WALL TO ELECTRICAL ROOM ABOVE TO HIDE CABLES.
CO
PYR
IGH
T H
EIN
/BO
ND
LLC
Job No.
Date:
Drawn By:
235 S. David, Ste. D, Casper, WY 82601
307.234.3601 heinbond.com
LICE
NSED ARCH
I TECT
STA
TEOF WY
OM
ING
B-0260
Date:
JEFFER
YC . BOND
,JR.
3/7/20
18 4
:32:5
6 P
M
A601
KRP
JULY 10, 2017
15-Balefill
INTERIORELEVATIONS
BA
LE
FIL
L E
XP
AN
SIO
NS
& R
EM
OD
EL
CIT
Y O
F C
AS
PE
R
188
6 N
OR
TH
ST
AT
ION
RO
AD
1/4" = 1'-0"1Womens - East
1/4" = 1'-0"2Womens - South
1/4" = 1'-0"3Womens - West
1/4" = 1'-0"4Womens - North
1/4" = 1'-0"5Mens - West
1/4" = 1'-0"6Mens - North
1/4" = 1'-0"7Mens - East
1/4" = 1'-0"8Mens - South
1/4" = 1'-0"9
Break Room -Casework
1/4" = 1'-0"14Janitors
1/4" = 1'-0"11Break Room - East
1/4" = 1'-0"12Break Room - South
1/4" = 1'-0"13Break Room - West
1/4" = 1'-0"10Break Room - North
7/10/2017
REVISIONS
1 3-7-2018
F FGV L OH
6"8"
36"
6"
5" 5"
7"
15"
C
4' - 4"
5' -
4"
2' -
0"
A
HOLLOW METAL, FIXED
4' - 4"
3' -
10"
3' -
6"
B
HOLLOW METAL, FIXED
4' - 4"
4' -
4"
3' -
0"
C
HOLLOW METAL, FIXED
5' -
0"
18' - 0"
EQ. EQ. EQ. EQ.
E
STRUCTURAL PANEL - 084513
4' -
0"
14' - 0"
EQ. EQ. EQ. EQ.
D
STRUCTURAL PANEL - 084513
3' -
6"
18' - 0"
EQ. EQ. EQ. EQ.
F
STRUCTURAL PANEL - 084513
VAR
IES
VARIES
H
1/4" ACRYLIC PLEXIGLASS
VAR
IES
VARIES
J
3/8" ACRYLIC PLEXIGLASS
CO
PYR
IGH
T H
EIN
/BO
ND
LLC
Job No.
Date:
Drawn By:
235 S. David, Ste. D, Casper, WY 82601
307.234.3601 heinbond.com
LICE
NSED ARCH
I TECT
STA
TEOF WY
OM
ING
B-0260
Date:
JEFFER
YC . BOND
,JR.
3/7/20
18 4
:32:5
7 P
M
A701
KRP
JULY 10, 2017
15-Balefill
SCHEDULES
BA
LE
FIL
L E
XP
AN
SIO
NS
& R
EM
OD
EL
CIT
Y O
F C
AS
PE
R
188
6 N
OR
TH
ST
AT
ION
RO
AD
Room Schedule
Name NumberApproximat
e Area Floor FinishBaseFinish Wall Finish
CeilingFinish Comments
STORAGE 001 310 SF 033000
EXISTING PIT 100 8626 SF 033000 \033510
053000 053000
EXISTING PLATFORM 101 1598 SF 033000 053000 053000
RES. UNLOADING 102 1087 SF 033000 053000 053000
NEW PIT AREA 103 13357 SF 033000 \033510
053000 053000
COM. UNLOADING 104 3040 SF 033000 053000 053000
BREAK ROOM 105 690 SF 033600 096513 092900 \ 099123 095113
WOMENS 106 63 SF 033600 093013 093013 095113
MENS 107 56 SF 033600 093013 093013 095113
JAN 108 127 SF 033000 096513 092900 \ 099123
STAIR 109 74 SF 033600 \096513
096513 092900 \ 099123 095113
WATER #1 110 158 SF 033000 096513 092900 \ 099123
WATER #2 111 265 SF 033000 096513 092900 \ 099123
RESTROOM 114 50 SF 033600 093013 093013 095113
CORRIDOR 200 175 SF 033600 096513 092900 \ 099123 095113
OFFICE 1 201 174 SF 033600 096513 092900 \ 099123 095113
OFFICE 2 202 218 SF 033600 096513 092900 \ 099123 095113
ELECTRICAL / DATA 203 148 SF 033600 096513 092900 \ 099123
STORAGE 204 193 SF 033600 096513 092900 \ 099123
MENS LOCKER ROOM 205 699 SF BID SCHEDULE ITEM #4
WOMENS L. ROOM 206 316 SF BID SCHEDULE ITEM #4
Door Schedule
Mark Width HeightDoorType Material Glazing Finish
FireRating
FrameMaterial
FrameFinish
HardwareGroup Comments
001a 8' - 8" 9' - 6" C BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG COILING
001b 6' - 0" 7' - 0" F HM 099113 HM 099113 8
105 3' - 0" 7' - 0" V HM 099113 HM 099113 9
105B 2' - 0" 3' - 0" F HM 099113 HM 099113 10
105C 2' - 0" 3' - 0" F HM 099113 HM 099113 10
106 3' - 0" 7' - 0" F HM 099113 HM 099113 4
107 3' - 0" 7' - 0" F HM 099113 HM 099113 4
108 3' - 0" 7' - 0" F HM 099113 HM 099113 3
110 3' - 0" 7' - 0" F HM 099113 HM 099113 2
111 3' - 0" 7' - 0" F HM 099113 HM 099113 2
200 3' - 0" 7' - 0" V HM 099113 HM 099113 5.1
201 3' - 0" 7' - 0" FG HM 099113 HM 099113 7
202 3' - 0" 7' - 0" FG HM 099113 HM 099113 7
203 3' - 0" 7' - 0" F HM 099113 HM 099113 3.1
204 3' - 0" 7' - 0" F HM 099113 HM 099113 5
E102A 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E102B 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E102C 14' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E102D 12' - 0" 14' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E103a 14' - 0" 18' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E103b 3' - 0" 7' - 0" V HM 099113 HM 099113 1
E103c 3' - 0" 4' - 0" F HM 099113 HM 099113 11
E104 3' - 0" 7' - 0" FG HM 099113 HM 099113 1
E104A 14' - 0" 28' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E104B 14' - 0" 28' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E104C 14' - 0" 28' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E104D 14' - 0" 28' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E104E 14' - 0" 28' - 0" OH BY MFG BY MFG BY MFG BY MFG BY MFG BY MFG SECTIONAL
E105 3' - 0" 7' - 0" FG HM 099113 HM 099113 1
E105A 3' - 0" 7' - 0" FG HM 099113 HM 099113 1
E204 3' - 0" 7' - 0" F HM 099113 HM 099113 6
1/4" = 1'-0"1DOOR TYPES
1/4" = 1'-0"2WINDOW TYPES
7/10/2017
REVISIONS
1 3-7-2018
SHEET____OF____
DR
AW
N B
Y:
CH
EC
KE
D B
Y:
AP
PR
OV
ED
B
Y:
DA
TE
:D
AT
E:
DA
TE
:
11
HA
UL
R
OU
TE
S
EY
SO
3/6
/1
83
/6
/1
8
CIT
Y O
F C
AS
PE
R
BA
LE
R B
UIL
DIN
G E
XP
AN
SIO
N
EX
PE
CT
ED
H
AU
L R
OU
TE
S
N
PROJECT AREA
SOIL WASTE TO BE
DUMPED AS DIRECTED
BY CITY STAFF
CONSTRUCTION DEBRIS
TO BE DUMPED AS
DIRECTED BY CITY STAFF
SOIL WASTE ~ 2.3 MILES
CONSTRUCTION
WASTE ~ 1.7 MILES