METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY City of Atlanta Sales Tax Referendum Draft Project List MARTA Board of Directors May 11, 2016

City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

1 METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY

City of Atlanta Sales Tax Referendum Draft Project List

MARTA Board of Directors May 11, 2016

Page 2: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

2 City of Atlanta Sales Tax Referendum Draft Project List

SB 369 Overview

§  Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA

§  Purpose is to significantly expand MARTA transit service

§  Concurrent with existing MARTA tax through 2057

§  Must serve, in whole or in part, the City of Atlanta

§  Receipts projected at $2.5 billion (2016$) over life of the tax

§  Referendum in November 2016 or 2017

Page 3: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

3 City of Atlanta Sales Tax Referendum Draft Project List

Potential Sales Tax Overview

§  Proposed service options for a 0.50% sales tax in City of Atlanta

§  Current MARTA initiatives are potential options to be included in the project list

§  City of Atlanta will engage community stakeholders to fully develop the project list

§  Final list of will be determined in coordination with the City of Atlanta

Page 4: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

4 City of Atlanta Sales Tax Referendum Draft Project List

Project List Development Criteria

§  Consistent with existing plans §  Maximizes multimodal connections §  Equitable distribution of projects §  Potential to leverage additional

funding sources §  Comprehensive transit network §  Balanced investment in existing

and expanded system

Page 5: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

5 City of Atlanta Sales Tax Referendum Draft Project List

Potential High Capacity Improvements §  I-20 East Bus Rapid Transit §  I-20 West Heavy Rail Transit §  Northside Drive Bus Rapid Transit §  Atlanta Light Rail Transit

§  BeltLine Loop §  Purple Line §  Orange Line

§  Clifton Corridor Light Rail Transit*

* Contingent upon funding agreement with DeKalb County for capital and operations and maintenance.

Page 6: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

6 City of Atlanta Sales Tax Referendum Draft Project List

Potential High Capacity Improvements §  Capacity Improvements

§  Station Rehabilitation (Airport, Bankhead, CNN/Dome, GA State, H.E. Holmes, Inman Park, Vine City)

§  Infill Stations (Armour, Boone, Mechanicsville and Murphy Crossing)

§  Additional Railcars §  Power System

§  Station Enhancements §  Aesthetics/Maintenance §  Signage/Wayfinding

Page 7: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

7 City of Atlanta Sales Tax Referendum Draft Project List

     Potential High Capacity Improvements

Page 8: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

8 City of Atlanta Sales Tax Referendum Draft Project List

     Potential High Capacity Improvements      Alternative Option

Page 9: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

9 City of Atlanta Sales Tax Referendum Draft Project List

Potential Bus Service Improvements

§  Five (5) Arterial Rapid Transit Routes §  Campbellton - Greenbriar Mall to Oakland City rail station §  Cascade - Fulton Industrial Blvd to West End rail station §  Cleveland - Jonesboro Rd and Browns Mill Rd to East Point rail station §  Metropolitan - West End rail station to College Park rail station §  Peachtree - Brookhaven rail station to Five Points rail station

§  Two (2) Transit Centers §  Greenbriar - Greenbriar Mall §  Moores Mill - Bolton Rd and Marietta Blvd

Page 10: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

10 City of Atlanta Sales Tax Referendum Draft Project List

Potential Bus Service Improvements §  Frequent Local Service

§  15-minute peak; 30-minute off-peak service on Routes 12, 49, 51, 55 and 60

§  Supporting Local Service §  Increased service during off-peak to include midday, nights and weekends

on selected routes

§  Community Circulator Service §  Six new neighborhood-friendly and activity center-oriented circulator routes

§  Ashview Heights/Mozley Park §  Atlanta Medical Center §  Castleberry Hill §  Centennial Olympic Park §  Elmco Estates §  West Atlanta

Page 11: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

11 City of Atlanta Sales Tax Referendum Draft Project List

     Potential Bus Service Improvements

Page 12: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

12 City of Atlanta Sales Tax Referendum Draft Project List

     Potential Pedestrian Improvements §  Pedestrian/ADA/Bicycle

Improvements §  Arterial Rapid Transit

Corridors §  Station Areas

§  Ashby §  Edgewood/Candler Park §  H.E. Holmes §  King Memorial §  Oakland City §  West End §  West Lake

Page 13: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

13 City of Atlanta Sales Tax Referendum Draft Project List

Potential Program

Estimated Capital Cost (Base Year $ in Millions)

Estimated Annual O&M

Cost (Base Year $ in Millions)

Federal Share

Local Share

Total

High Capacity Improvements $3,207.4 $2,487.0 $5,694.4 $102.6

Bus Service Improvements N/A $63.8 $63.8 $33.6

Pedestrian Improvements N/A $11.6 $11.6 N/A

Total Estimated Cost $3,207.4 $2,562.4 $5,769.8 $136.2

     Potential Program Summary

Page 14: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

14 City of Atlanta Sales Tax Referendum Draft Project List

     Next Steps

Activity Target Date Adoption of the Project List by the MARTA Board May 11 COA City Council Work Session Briefing May 18

COA Public Meetings May 25 & 26 June 1 & 2

Draft List Submitted to COA City Council May 31 City Ordinance Adoption for November Referendum By June 30 Final List Presented to COA City Council July 31 Public Education and Outreach Campaign July – November Ads of Notice of Proposed Referendum October 10 – October 31 Referendum Vote November 8 Amendment to the RTCAA (with a positive referendum vote) November – December

Page 15: City of Atlanta Sales Tax Referendum Draft Project List · 5/12/2016  · Campbellton - Greenbriar Mall to Oakland City rail station ! Cascade - Fulton Industrial Blvd to West End

15 City of Atlanta Sales Tax Referendum Draft Project List

Benjamin Limmer, AICP Assistant General Manager, Planning

MARTA 404-848-4401

[email protected]

Discussion