City College Arts & Humanities Business Technology Buildings Pre-Bid Workshop

  • View
    215

  • Download
    0

Embed Size (px)

DESCRIPTION

The new Arts & Humanities building will consist of approximately 128,378 square feet of new construction for the Arts and Humanities department including space for Visual Arts, English, English for Speakers of Other Languages (ESOL), Speech and Foreign Language, Honors, World Cultures, and City Works programs. The building will include new classrooms, a lecture hall, computer labs, and studio space for drawing, ceramics, sculpture, and graphics. The new Business Technology building will consist of approximately 62,000 square feet of new construction for the business department; including new space for Business Studies, the Students in Free Enterprise (SIFE) program, Business and Computer Systems, common areas and associated support space for faculty and staff. The project will include seven computer labs, classrooms, a lecture hall, and areas for start‐up businesses for students in the Business Education program.

Text of City College Arts & Humanities Business Technology Buildings Pre-Bid Workshop

  • Arts & HumanitiesArts & Humanities Business TechnologyBusiness Technology

    BuildingsgPreBidWorkshoppAugust20,2010

  • Project TeamProjectTeam

    Owner: San Diego Community College DistrictOwner:SanDiegoCommunityCollegeDistrict(SDCCD)

    Program Manager: Gafcon ProgramManager:Gafcon Architect:RoeslingNakamuraTeradaA hiArchitects

    ConstructionManager:TurnerConstruction

  • Turner ConstructionTurnerConstruction

    HistoryHistory Founded1902 BuildingtheFutureg

    CoreValues IntegrityIntegrity Commitment Teamwork

    SafetyRecord/Standard/

  • Turner ConstructionTurnerConstruction

    Outreach EffortsOutreachEfforts SchoolofConstructionPast Event PastEvent

    CurrentProjects Airport BEQs

    UpcomingProjects Library

  • Proposition S & NPropositionS&N

    Prop S $685 million bond passed in 2002PropS $685millionbondpassedin2002 PropN $870millionbondpassedin2006

    id ili i d j ProvidesNewFacilitiesandMajorRenovations

    80+ProjectsCampusWide City,Mesa,Miramar,andSixContinuingEducationCampuses

  • PrequalificationPrequalification

    Prequalification for contracts $500K and UpPrequalificationforcontracts$500KandUp Requalification

    lifi d i 2008 d i Prequalifiedpriorto2008=NeedstoturninPrequalification,NOTRequalification

    Submit2weekspriortoBidOpening SafetyRecordy

    EMRover1=Disqualification

  • Project OverviewProjectOverview

    Arts&HumanitiesBuilding BusinessTechnologyBuildingg

    128,000SFNewConstruction

    gy g

    62,000SFNewConstruction PreCastConcreteStructure FiveStoryBuilding

    PreCastConcreteStructure ThreeStoryBuilding

    SublevelParkingArea PerformingArtsVenue Unitized Curtain Wall System

    ComputerLabs LectureRoom Unitized Curtain Wall System UnitizedCurtainWallSystem

    BrickVeneer UnitizedCurtainWallSystem VerticalTrellisSystem

  • Project DetailsProjectDetails

    DSAProjectj PrevailingWageProject 20MonthDurationofWork LEEDGold LaborCompliance/Tracking OSHA30Requirement Safety/CompetentPersonD T i DrugTesting

    TowerCranes Busy Site (Other Projects) BusySite(OtherProjects)

  • Site LogisticsSiteLogistics

  • Bid InformationBidInformationBidPackages

    14. Painting15. TheatricalRigging16. AudienceSeating

    1. PreCastConcrete*2. Demolition/Abatement/SWPPP*3. Excavation/Grading/Utilities/Shoring g

    17. Landscape &Irrigation18. Elevators19. Fire Protection

    / g/ / g4. StructuralConcrete5. Survey6. Steel & Metals 19. FireProtection

    20. Plumbing Systems21. Mechanical Systems22. Electrical Systems

    6. Steel&Metals7. GeneralTrades8. Millwork9. Roofing & Sheet Metal 22. Electrical Systems

    23. Site Concrete24. Asphalt25 Utilities

    9. Roofing&SheetMetal10. Storefront& Glazing11. Tiling12 Flooring 25. Utilities

    26. WindowWashingSystems12. Flooring13. AccessFlooring

    *PackageAlreadyBid

  • Bid ScheduleBidSchedule

    Contract Documents: www.mayer.comContractDocuments:www.mayer.com GotoCurrentProjectsBidding

    Increment 1 (Phase 2)Increment1(Phase2) BidPackage#3:Excavation/Grading/Utilities/Shoring

    BiddingAugust27,2010 Increment2 BidPackages#4 26 LateFall2010 PendingDSAApproval

  • Big Opportunities for Small BusinessBigOpportunitiesforSmallBusiness

    TheSDCCDislookingtoincreasethegparticipationofsmallandhistorically

    underutilizedfirmsonPropositionsSandNprojectsprojects.

    Directsourcingsmalljobswhichdonotexceed$15,000 Prebideventsonupcomingprojects AnnualContractorsOutreachBreakfast August AnnualMeetandGreetwithCampusProjectManagersAnnual Meet and Greet with Campus Project ManagersOctober RegisterwithSDContractingOpportunitiesCenterhttp://ptacsandiego org/index htmlhttp://ptacsandiego.org/index.html

  • Future Opportunities with SDCCDFutureOpportunitieswithSDCCDFurniture,fixturesandequipment(FF&E)budgetfornewfacilitiesiscurrentlybudgetedat$70.1million,andtypicallyy g yp yincludes:

    Classroomandotherfurniture Laboratoryequipment Kitchenequipmentandsupplies Audiovisualequipment,computers,printers,etc.q p , p , p ,

  • City College OverviewCityCollegeOverview Sevennewteachingandlearningfacilities

    Seven major renovations Sevenmajorrenovations

    Campus expansion willCampusexpansionwillprovidefacilities/programstoaccommodateeventualenrollmentof25,000students

  • City College Future ProjectsCityCollegeFutureProjectsMATHANDSOCIALSCIENCESBUILDING

    Project Budget: $83.5 million (incl landProjectBudget:$83.5million(incl.landacquisition)

    ExpectedConstructionStart:January2011T t d C l ti M 2012 TargetedCompletion:May2012

    Projectinvolveslandacquisitionandconstructionofnew72,000sq.ft.classroomandlaboratorybuilding.ItwillincludetheDistrictsCorporateEducationCenter,MilitaryEducation,aFamilyHealthCenterandasixstoryparkingstructurewith400+stalls.

    DeliveryMethod:Design/Build(RNT,Sundt)

    SubOpportunities:Majortradesubcontractorshave been selected for MEP Structure andhavebeenselectedforMEP,Structure,andConcrete.Multipletradecontractswillbesolicitedinlatefall2010.

  • City College Future ProjectsCityCollegeFutureProjectsSCIENCEBUILDING

    P j t B d t $54 8 illi ProjectBudget:$54.8million ExpectedConstructionStart:May2011 TargetedCompletion:January2013

    F t L h d b ildi idi Fourstory,Lshapedbuildingproviding73,000squarefeetofnewconstructionforclassrooms,labsandaplanetarium.

    li h d DeliveryMethod:CMMP CM:Rudolph&Sletten Architect:HarleyEllisDevereaux SubOpportunities:Multipletradebid

    packagessolicitedinspring2011. FF&EOpportunities:Laboratory

    equipment&supplies,furniture

  • Mesa College OverviewMesaCollegeOverview

    Ni j t l t d NineprojectscompletedunderPropositionsSandN

    Twoprojectscurrentlyunderconstruction;threemoreindesign

    S i i Sevenmoreremainingaspartofcampusexpansion

  • Mesa College Future ProjectsMesaCollegeFutureProjectsMath&ScienceBuilding

    ProjectBudget:$117million

    ExpectedConstructionStart:Feb.2011

    TargetedCompletion:January2013 New200,000GSF,fourstorybuildingwillhave

    classrooms,lecturerooms,labsforscientificexperiments,computerlabs,andfacility,staffd d i i t ti tandadministrativesupportareas.

    DeliveryMethod:CMMP CM:McCarthy

    A hit t D l i Wilk R d i B k Architect:DelawieWilkesRodriguesBarker SubOpportunities:Alltradeswiththeexception

    ofstructuralconcrete,buildingenvelope,MEP,and drywall/studs.anddrywall/studs.

    FF&EOpportunities:Laboratoryequipment,furniture,etc.

  • Miramar College OverviewMiramarCollegeOverview

    13 completed projects13completedprojects

    Infrastructureproject,twop jclassroombuildingsandLibraryLearningResource

    lCentercurrentlyinconstruction

    Campusexpansionwillaccommodateeventualenrollmentof25,000

  • Miramar College Future ProjectsMiramarCollegeFutureProjectsCafeteria/BookstoreandStudent/CampusCenter

    Project Budget: $33 2 million ProjectBudget:$33.2million EstimatedConst.Start:Spring2011 TargetedCompletion:Spring2013 Newmultistorywillconsistofapprox.

    45,000SFofnewconstructiontohouseanewcafeteria,bookstoreandstudentservicescenter.

    DeliveryMethod:CMMP CM:CWDriver Architect: NTD ArchitectureArchitect:NTDArchitecture SubOpportunities:Multipletradepkgs. FF&EOpportunities:Kitchenequipment&

    supplies lounge furniture classroom andsupplies,loungefurniture,classroomandotherfurniture

  • Miramar College Future ProjectsMiramarCollegeFutureProjectsHeavyDutyAdv.TransportationTech.CenterExpansion

    Project Budget: $11 6 millionProjectBudget:$11.6million EstimatedConstructionStart:Early2011 TargetedCompletion:Spring2012 Projectwillconsistofapproximately14,000SFofnew

    constructiontosupportprogramexpansiontodiesel,naturalgas,hybridbusandtransittechnologyandnew developments in construction equipmentnewdevelopmentsinconstructionequipmenttechnology

    DeliveryMethod:CMMP Architect:MarleneImirzian SubOpportunities:Multipletrade

    packageswillbesolicitedinlatefall2010 FF&EOpportunities:Heavyduty

    h i l i t t timechanicalequipment,automotivetestinganddiagnosticequipment,furniture

  • Miramar College Future ProjectsMiramarCollegeFutureProjectsAviationMaintenanceTechnologyCenter Project Budget: $8 9 million ProjectBudget:$8.9million EstimatedConstructionStart:Spring2011

    TargetedCompletion:Summer2012 Additionofapprox.6,500SFofnewconstruction

    toaddadditionallaboratoryandclassroomspaceandstorage.Additionally,ADAupgradesandminorrenovationswillbeperformedonexistingp gbuilding.

    DeliveryMethod:CMMP Architect:JosephWongDesignAssociates SubOpportunities:Multipletradepkgs.,

    targetingforearly2011.

    FF&EOpportunities:Sheetmetalfabricationequipment,aeronauticsimulationsystems,furniture

  • Continuing Education OverviewContinuingEducationOverview

    Fourprojectscompleted

    Fourprojectsindesign

    TotalofeightprojectstoexpandandmodernizesixC ti i Ed ti itContinuingEducationsites

  • Continuing Education Future ProjectsContinuingEducationFutureProjectsNorthCityCampusandParkingStructure Project Budget: $50.7 millionProjectBudget:$50.7million ExpectedConstructionStart:May2011 TargetedCompletion:December2012 Landacquisition;constructionofanew,twoq ; ,

    story,40,500GSFclassroombuildingtoserveastheCampusofExcellenceforMultimediaandInnovation; and construction of a 300spaceInnovation;andconstructionofa300 spaceparkingstructure.

    DeliveryMethod: CMMP CM: BarnhartCM:Barnhart Architect:JosephWongDesignAssociates SubOpportunities:Alltrades Parking structure: TBD Parkingstructure:TBD FF&EOpportunities:Furniture

  • Continuing Education Future Pro