Overview:-
This year has been another busy year, and I am pleased that we have achieved so
much, especially on the automation of admission and registration process for the
foundation students. Online automated service provided to students have reached a
very good status where it currently covers admission, registration, financial status
and financial aid request, academic progress lookup, learning objects management to
upload, view and download learning materials, instant messaging and SMS
communication.
Smartcard activation has added another dimension to the online services provided to
students. This cover fees payments, printing and photocopying services, eCash point
of sales, Library services and automated card topping services using ATM machines.
Soon, we will also activate the smart attendance system and the access control at
variuos locations at the campus.
Another noticeable achievement to report this year was the establishment of the
disaster recovery site to improve the resilience and availability of services with a
better reliability of data integrity. We are extending free Wi-Fi across campus and in
residences so staff and students can stay connected in all areas. We have embrace the
social media, embed it into our website and encouraged the university community to
get the best out of it.
Success never comes for free (or No success goes without a challenge). We faced
various challenges before we achieved our goals. Financial support was a major
hurdle to kick off many projects in time as well delayed receiving the required
support from partners. Academic staff exchange and low digital literacy rate have
increased the pressure on the helpdesk team. Service interruptions due to power
outage were also a noticeable issue to report. These issues were due to a variety of
different factors. Some, like main power supply outage, is completely outside of our
control. We are always very sorry for the inconvenience these disruptions to service
may have caused, and it goes without saying that we do not welcome them either.
However, it is at times like these that our incident management and communication
procedures are put into place, and staff from all areas come together to solve
Page | 4
problems. I am very grateful to all of the staff involved who had to stay back long
outside working hours to restore services.
The report includes details of other projects, Facts and figures, Challenges and future
plans.
Center board:-
VC for Academic Affair
Abdulaziz al-kindi
CIS Director
Abdumenum Al-kharusi
Learning
Technology
Azman Abduallah
Network and Security
Suleiman Al-Harrasi -
Acting
Systems
Amjad Al-kharusi
Help Desk
Saleh Al-Hatmi -
Acting
Page | 5
Staff:
This year CIS witnessed a major reorganization and change of three department
heads. Mohammed Al Mawali, the head of Networking and Security department has
left the team temporarily to pursue his further studies in Spain. He is expected to
complete his master’s degree in information security within two years. Sulieman al
Harassi who recently re-joined after completing his master degree from Lund
University in Sweden took over as networking section acting head. The team is
suffering a serious shortage. Abdullah Al Rahbi, the helpdesk team head has also
resigned. Saleh Al Hatmi from the entrepreneur project took over on temporary
basis. A great challenge was faced in recruiting professionals due to high demand in
other competing recruiting firms.
Total
CIS
members
Recruited Resigned Have
Degree Male Female
Helpdesk
member
Study
leave
2010 23 1 0 5 21 2 12 0
2011 24 4 4 8 20 4 12 1
2012 27 2 0 11 22 5 13 1
Table (1): CIS staff statistics
Page | 6
Units:- A. Helpdesk and Support Services
The Helpdesk at the University of Nizwa provides an on-campus ICT services to all
members of the University. We provide troubleshooting, consultation, printing,
learning technology support and various other services related to hardware and
software solutions. Currently we have 13 staff members distributed as follows:
- Six Helpdesk technicians who are responsible for supporting the users and fix
hardware and network problems, supply ICT equipment and install software
applications.
- Three printing press technicians who are responsible for printing exams papers
course notes, booklets, banners and other photocopy jobs.
- Two labs supervisors who are currently the custodians of Al Fiker labs.
- Two call centre operators who are responsible for receiving users’ calls, logging
ticket, dispatching jobs to respective helpdesk members and solve problems
remotely.
This team is also suffering an overload due to the increase in number of users from
faculty, staff and students.
Developments during this year:
● Improved the usage of the smartITSM service management system by activating
more advance feature and assigning dedicated members from the team to operate it.
● Activated new modules in smartITSM covering the change management,
configuration management and store management.
● Synchronized the CIS store with the smartITSM store system management.
● Attained required technical knowledge through attending an advanced Systems
administrative course (MCITP) by all Helpdesk staff members.
● Introduced the Thin client workstations for IC3 computer labs and nComputing
technology for offices.
● Installed high quality projectors at labs, lecture halls and meeting rooms.
The chart below shows incidence recorded during the year for each department.
Page | 7
Figure 1: Incidents by department
Figure 2: Root Cause of Incidents
B. Systems & Applications
* Facts & Figures:
Over 2000 total computers (1:4 computer to students ratio)
With CPN over 2500 students received laptop computers
1:1 computer to faculty ratio
75% classroom equipped with LTE (Learning Technology Equipment). 100% for IT classrooms
100% access to printing/copying services
Over 70 bookable laptop in colleges
Over 20 software applications on common classroom computers.
24/7 Applications and Internet at campus & hostels.
Potential improvement
1:35 computer to students ratio at self access computers
No 24/7 computer access.
Low rate of knowledge transfer sessions on available ICT services.
Page | 8
The Systems division is offering excellent enterprise systems and applications. It
supports and maintains the Core Infrastructure Systems, “EduWave” the Student
Information and Learning Management System, “WaveERP” the University Resource
Planning and Workflow, the Email System, the Library Management System,
Disaster Recover and Backup System, and the University Website. This is in addition
to a number of in-house built applications.
Developments in EduWave & WaveERP:
● The activation of the Admission module where the admission of the Fall semester was
done through this module.
● The activation of a new transportation module to manage all transport request fleet
management which will soon be enriched with smart system connected through the
satellite.
● The activation of the redesigned Inventory module to manage all
university stores.
● The integration EduWave with the newly add ePayment service for
restaurants point of sales. Soon, fees payment and eCash smart card top-up
machines will also be part of the integrated system.
● Integration of WaveERP and POS machine.
● The new updates on the registration module to cover new registration rules with the
English Skills Development Courses (ESDC).
● The enhancement of the foundation module to include new workflow processes, new
report, grade management mechanism and modified registration rules.
● The enhancement to the financial module that include new screens and reports,
advanced payment management, scholarship setting and configuration, and Maeen
fund management.
Development on Architecture and classroom solutions:-
● Improved the utilization of the VMware server consolidation solution.
● Upgraded the storage equipment to a higher performance module in response to the
deployment of the Thin client solution.
● Updated the SunRay Thin client deployment plan for better management of
computer labs. Equipped 7 computer labs for IC3 course and deployed remaining
thin client at classrooms and instructor offices
Page | 9
● Deployed an advanced Disaster Recovery in Building 8 with capability of recovering
all services within half an hour in the event of a full disaster at the main data centre
in Building 26.
● Improved the backup system to prevent the loss of more than two hours old data. The
earlier system was capable of preserving a maximum of one day old data. Currently
we are working to improve this to reduce the gap of data loss to the last minute before
the disaster.
● Followed and announced the new enhancements on the email service and Google
apps application
● Upgraded the Library management system with a new version of Virtua.
Development in supportive applications:
● Designed and launched a new website for the training workshops: "Usage of Digital
Resources, Writing Peer Review Paper and Presenting Scientific Research at
International level" at http://www.unizwa.edu.om/workshop/. It will manage the
registration and provide description and the program of the workshop.
● Develop the Systems Portal that works as a single sign-in for all the existing
supportive applications.
● Develop Research system for the Office of the Vice Chancellor for Graduate Studies,
Research and International Relations to manage research and investigator
information and manage the finance budget plan.
● Develop Al-Mashariq Hall reservation system for the Public Relation department. It
will manage the reservation of the hall for the events.
● Setup the mail archiving system for the Community Service Center, Deanship of
Record and Registrations,Trusteeship of Student Affairs and Public Relations
department which manages the incoming and outgoing mail.
*Facts & Figures ● Over 38 supported applications
● Over 8000 supported domain users
● 15000 EduWave registered students,6526 Active and
enrolled,3627 graduated and 335 postponed.
● 981leave requests processed by WaveERP
● Over 18.5 million received emails. 19% are spam
*Improvement Required:
● Descriptions field on EduWave and WaveERP
requires appropriate translation.
● Lack of use of complete system workflow in financial
and procurement modules
● Lack of use of student advising and LMS modules
● Shortage of knowledgeable business users at
inventory and transportation modules
● Inconsistency in data entry
● Shortage of CIS technical/business support.
http://www.unizwa.edu.om/workshop/
Page | 10
● Develop a system for the Volunteer Program to manage student participation in the
volunteer program and help issue transcript in addition to the academic transcript.
● Develop a system for CIS to follow up the online request of the user accounts, emails
and ICT. It is also used by the CIS staff to plan their annual leave and as a reference
by CIS staff for network IPs that is used for servers and printers.
● Develop a passwords system for CIS to store all passwords of the systems with a
special encryption method. It helps keeping these password as a backup in
emergency cases.
● Develop a system for the Networks department of CIS to manage IP telephones
distribution.
● Continuous enhancements and updates for the existing supportive applications.
Page | 11
C. Network & Security
The responsibility of Network and Security team is to manage and maintain the
Network Infrastructure, besides monitoring the Communication and Security services
for the University. These services include CCTV, proxies, IDS, IPS, AV, firewalls, VPN,
voice communication, and wired and wireless networks. Noticeable development this
year includes:
● Upgraded IP Telephony system of new CISCO call manager with more servers for
redundancy and added features. Presently we have over 600 extensions.
● Replaced connection between the current campus and GANA Medical Centre to
ensure reliable connection.
● Maintain all the 247 CCTV camera and 9 road barriers and added two more cameras
in Building 13.
● Added 7 more LCD screens to monitor the systems in Building 12, 23, 5B, 26, and 5D
to increase the total to 25 screens.
● Acquired new version of anti-virus Kaspersky version 8 for Win7 and version 6 for
WinXp.
● Installed an additional 38 wireless access points Building 2, 26, and 32 to improve
wireless coverage. Increase the wireless coverage by 17.5% to cover 86.5% of whole
university area. The Wireless for Smart-Phone users “UoN-Mobile” covers 75% of
university area.
● Installed a total of 734 new network points at various locations (Building 2: +350
points, Building 5: 50 points, Building 26: 100 points, CIS new wing: 24 points, small
libraries: 24 * 2 points , Building 29: 24 points, Building 4: 100 points, male and
female restaurants: 14 points, hostels supervisor: 24 points).
● Distributed first patch of desk-phone for staffs (phone for everyone).
● Upgraded Internet access with the new Nawras lease line (34Mbps) to ensure
redundancy Internet services and increase the bandwidth capability.
● Provided redundant line and devices for Voice services.
● Enhance the information security.
● Establish a new auditorium in Building 2 ( Al-Mashariq )
Page | 12
● Over 200 network points added
● Reach total of 102 wirelesses AP to cover 86.5% of
the whole area.
● 350 wireless devices connected at peaks.
● 34Mbps University connection to the internet
from OmanTel and 32Mbps from Nawras.
● 222 cameras are up.
● 2 Internet service interruptions from ISP.
● 2 Telephone lines interruptions from ISP
● Over 10 incidents of power outage.
● 25 cameras and 2 DVR are down.
Page | 13
D. Learning Technology
Learning Technology provides members of the University of Nizwa with access to
course materials and learning methods in an on-demand fashion. Amongst the tools
and applications used in the Learning Technology branches are: EduWave, Moodle,
workshops, and seminars.
Development in Learning Technologies
1. Online ESDC and placement test carried out in January 2012. Online IELP resit exam
carried on 8th - 9th of July 2012.
2. Online TOFEL Project (In progress).
3. Instructional design services:
a. Upgrade from Moodle 1.9 to Moodle 2.2. (Installed in summer 2012).
b. Development of online materials for Nursing course (NURS 460
Community Health Promotion (Summer 2012).
c. Development of teaching and learning materials for Foundation Active
Learning Center and Foreign Languages courses.
4. Training
a. A series of training on online applications was conducted early this year to the
faculty and staff members. The applications include; Moodle version 2, and
Basics of Microsoft office 2010.
b. New training plan is currently being drafted to enhance the training program
for the faculty members.
5. Others
a. Developing CIS site to provide information to UoN community members
regarding the various systems and applications supported by CIS.
b. Establishing a social network (Facebook page) for the university. The unizwa
Facebook site contains two pages (university of Nizwa) where we
communicate with others and (LLI) where we add all courses advertisements.
The Facebook page also contains 6 groups; pharmacy, nursing, FI, Special
education, media group, and health life style.
● Placement test prepared for over 140 new students.
● ESDC for about 1900 students was successfully carried
out with minimal problems.
● IELP resit exam for about 550 students.
● Training on the latest technology was carried out
including the Moodle 2.0 and basics of Microsoft
office2010.
● CIS site
● Unizwa Facebook site
IELP was hastily done and processes not
thoroughly thought through.
Number of faculty members who attended the
training remained low.
https://sites.google.com/a/unizwa.edu.om/cis/
http://www.facebook.com/unizwaoman
http://moodle.unizwa.edu.om/course/view.php?id=313http://moodle.unizwa.edu.om/course/view.php?id=313http://moodle.unizwa.edu.om/course/category.php?id=57https://sites.google.com/a/unizwa.edu.om/cis/
Page | 14
5) Material Resources and usage:
Materials and usage details for each department of the CIS were included in each respective
section with indication of facts & figures as well as improvement requirements.
Below we cover the materials resources and usage for the printing and photocopying
services.
Printing Press:
The print press at the campus provides special printing services including printing
business card, letter head, Student plastic card, broachers and leaflets.
● 7,760 print/photocopy jobs processed
● Around 13 million papers used
● 120,000 Omani Rials spent on photocopying
● Over 30% of heavy duty photocopying is done by FI.
● Departmental printer misused is frequently reported
Page | 15
Photocopy Center:
1. Photocopy centre is undertaking major photocopy jobs at the university. Most of
the jobs here can be replaced by the online content management tools including
EduWave, Moodle and Google Apps. In addition, E-Learning strategy is
encouraging the use of online materials delivery method instead but this requires
more support from faculty heads. The following points are the main development
in that section according to the need
Signing some cost effective agreements with multifunction printer's suppliers,
which in turn spared a lot of money and effort on the university and adds
more modern and advanced multifunction prints features.
Activate and extend the printers centralized service through the department
multifunction prints which it has more features and avoid to use of the
personal printers.
Inauguration of MY FAIR CARD service to easily, fastest access and releasing
printing jobs from the multifunction printing machine, this is one of the
smartest , latest and high class technologies in access control technique.
Add follow me feature to the multifunction print to easily get the prints from
anywhere all over the university
Summary of photocopy jobs undertaken during this year is given below:
Page | 16
Page | 17
Main development:
In this section a summary of main development during this year is provided.
1. Enriched the main data centre with a more powerful storage and a new power
supply stabilizer. This adds better business continuity assurance.
2. Extended the IC3 classroom to Building 7 and one lab at Building 8 and equipped
them with new thin client computers.
3. Added new high quality departmental printers at various buildings with the
activation of the follow me print and smart card operation.
4. Upgraded the wireless coverage to cover over 86% of the university campus
including indoor and outdoor.
5. Upgraded the smartITSM helpdesk application to activate and “Change
management” and “Store management” modules.
6. Reorganized the centre structure by changing the Helpdesk and Networking
sections’ head and recruiting new members to provide you with better services.
7. Activated the point of sales (POS) systems at staff restaurant as part of the
eCampus solution.
8. Activated the disaster recovery (DR) site to improve business continuity
assurance and reduce data loss impact.
Page | 18
Future plan
We contentiously review and align our direction in accordance to the strategic plan. The plan emphasis on four main areas: Increase & Stabilize Infrastructure, Innovative use of Educational Technology, Competence and Professionalism and Research and Maximize Resources. This section details the achievements in each of the four areas and provides futuristic vision
1- Increase and Stabilize Infrastructure
Through innovative expansion of the
Intranet and Internet based systems, CIS will
provide consistent and robust end user
experiences.
1.a) Constantly assess and upgrade
the UON systems and network in
order to provide excellent end-user
experiences.
1.a.1 - Expand the already present wireless
coverage allowing further and greater access
for all members of the University
community.
2011 - Completed all meeting rooms,
hostels, most of open areas and new
classrooms.
2012 – Covered about 86% of the campus
area.
1.a.2- Accommodate emerging technologies,
with a particular focus on mobile
technologies.
2011- Configured University network for
Mobile users, introduced iPad for helpdesk
and key users.
2012- Introduced Thin Client Technology at
classrooms and office.
Improved mobile connection coverage and
security.
1.a.3- Utilize emerging technologies that
will increase the speed, coverage,
accessibility and manageability via thin and
smart access points and supporting
applications.
2011- Thin access point implemented with
advanced security features.
2012- Thin client Technology for Desktop
user was implemented.
1.a.4- Build strong enough Internet and
Intranet services to meet the increasing needs
for instruction and research using multi-
media elements; particularly video
collaboration. Internet speed should be
2011- Intranet applications are being served
sufficiently with required bandwidth.
Internet services bandwidth from OmanTel
was upgrade to 34 Mbps.
2012- A new agreement was signed with Al
Page | 19
improved through close contact with the
main ISP provider (OmanTel) to replace the
16 mbps copper line to a fibre line. This will
allow us increase the bandwidth up to
multiple of STM1 lines. On the other side
should get an alternative line from another
ISP (Al Nawras) provider for redundancy
and increased bandwidth. New technological
options such as LTE from OmanTel and
WiMax from Al Nawras should also be
considered on their arrival
Nawras as an extension to the current
OmanTel line with additional 32Mbps leased
line speed. Activation is expected soon.
1.b) Provide proactive effective and
evolving risk management solutions.
1.b.1- Move the current data centre to
Building 26 for more security and enhanced
operation continuity
This was successfully accomplished
1.b.2- Upgrade the University Business
Continuity Plan to cover current trends. This
can be done through implementing a new
disaster recovery site with practical
strategies to ensure operation continuity for
core applications such as EduWave,
WaveERP and email service
2011- This is in the pipeline along with the
Data centre project and should be completed
soon. In future we need to improve solutions
to cover power outage, all systems
applications and communications zero
downtime.
2012- A disaster recovery site was
established with improved backup plan
1.b.3- Implement data backup services for
database servers, application servers as well
as enterprise operating systems, and
departmental servers.
This is accomplished as part of the Data
centre project. More improvement is
required to reduce the gap of data loss.
1.c) Deliver easy to use technology to
all members of the community along
with prompt, amicable responses.
1.c.1- Develop usability surveys to target
and improve the use of IT at UON.
This is an on-going task
1.c.2- Provide more assessment materials to
the University community to ensure that all
needs are being met. Analyse results and
2012- Established online assessment for
IELP program including IC3, ESDC course,
and TOEFL and placement test. Other course
Page | 20
create initiatives for improvement based on
the assessments
using the online assessments ate Comp 101
and Pharmacology
1.c.3- Improve attendance taking
mechanism through integrating mobile RFID
readers with the EduWave.
2011- This is planned as part of the eCampus
solution.
2012- Project postponed due to financial
issues.
1.d) Introduce new models and
developments for IT support that are
cost effective
1.d.1- Implement ITIL compliant IT
services management that cover, incident
management, Service Request Management,
problem management SLA management and
other ITIL practices
2011- Implemented with major modules.
2012- Added a change management and
store management modules.
1.d.2- Train helpdesk members in ITSM
guidelines and practices.
2011- Training plan generated, approvals
requested.
2012- Training conducted
1.d.3- Deploy effective methods for users
training and awareness spread.
2011- Several knowledge transfer session
were conducted.
2012- Several knowledge transfer and
mentoring sessions were conducted.
1.d.4- Use of thin client workstations at
general computing labs then spread across
the campus for better ROI and total cost of
ownership
2011- Plan and research
2012- Deployed at IC3 labs, some non IT
classrooms for presentation and at Novice
instructors offices. 2nd phase will be to place
them at Al Fiker labs.
1.d.5- Improve email services through usage
of cloud computing solutions
2011- This is successfully accomplished
with great benefits on management, spam
filtering and cost saving.
2012- Improved the use of Google
collaborative tools, Google storage of 5GB
to each user plus 25 GB email space.
2- Innovative use of Educational Technology
Use instructional design elements and
models that will directly address the
uniqueness of the University of Nizwa
community.
Page | 21
2.a) Collaborate with faculty, staff,
and students to choose the most
effective software and hardware
solutions for their needs. Improve the
learning environments for students,
research efforts, and the
administrative tasks of all members of
the University community
Gather feedback regarding the solutions to
further improve the delivery systems to
support teaching and learning. This is done
through discussions with various members of
the faculty.
2.a.1- Work with various committees to
recognize and develop areas where
technologies would best be used to enhance
learning, research, and administrative
procedures.
Provided support throughout the academic
year to various faculty members and centers
on the use of tools for teaching and learning
including:
1. Foundation Institute 2. College of Pharmacy and Nursing 3. College of Economics, Management
& Information Systems
4. College of Arts and Science
Shared the articles and news about the
online/blended learning with the UNIZWA
community via e-mail
2.a.2- Create procedures aimed at assessing
and distributing current developments in
educational technology that would aid all
members of the University community
Made available the content development
process and schedule to the development
team members.
2.b) Create a governing body to
evaluate and innovate the uses of
educational technology
Activate the function of the e-learning
committee
2.b.1- The E-Learning Board will decide on
which courses or projects will be turned into
e-materials and presented online.
E-Learning Strategy deployment need
further enhancement
2.b.2- Design and deploy a testing stage
(i.e., a laboratory) for students, faculty, and
staff, to use new software and hardware
solutions
Work with the ITG to improve the Eduwave
LMS to improve the system and to pilot to
selected teachers and students
2.c) Enlarge and enrich resources at
the disposal of staff, faculty, and
students. Promote champions in all of
these groups to better help the
deployment of educational
CIS (E-Learning) is working with some
faculty members in Foundation Institute,
College of Arts and Science, College of
Pharmacy and Nursing, College of
Economics, Management & Information
Page | 22
technology Systems who be the catalyst for the expansion of technology use among the
faculty members.
2.d) Deliver quality consultation for
researching, projects, and solutions.
Faculty members can freely seek advice
from CIS regarding blended learning and its
delivery system
2.d.1- Produce rubrics to better evaluate the
efficacy of any given solution
Annual survey will be carried out to
evaluate the efficacy of the systems, starting
Summer 2013.
2.e) Sign agreements with various
public and private sector clients to
run experimental projects.
Work with the service provider such as
Blackboard and ITG to pilot projects relate
to blended learning.
3- Competence and Professionalism
Recruit, Train, and Retain staff who are
experts in their respective fields.
3.a) Develop transparent and
comprehensive human resource
plans for University staff.
3.a.1- Establish competitive compensation
and benefits packages that will draw new,
and retain old, professionals.
2011- Special packages were established to
CIS team.
2012- Compensation and benefits package
requires improvement.
3.a.2- Create succession plans for all IT
positions.
2011- Recruited couple of highly
professional members with good
compensation scheme. Thanks to
management and HR.
2012- Sent two members to higher study,
lost an important member. Great shortage in
professionals recruits due to high demand in
Muscat area.
3.b) Encourage professional
development and motivation of IT
staff.
3.b.1- Oblige each member of the IT staff to
have training based on their basic job duties
and responsibilities.
2011- Several meetings conducted in this
regard. A plan was established
2012- the plan was implemented partially.
Page | 23
3.b.2- Outline possible career tracks for all
IT staff. Develop training programs to
enhance staff experience and skill sets.
2011- Training plan was developed by
deployment was postponed.
2012- Several centre members attended
training course abroad as well as locally.
New training plan was submitted to career
development department.
4- Research and Maximize Resources
Visiting conferences, tradeshows, and
seminars, members of the CIS team will
research current trends allowing them to
provide optimal experiences for the
University of Nizwa community.
4.a) Produce awareness campaigns
toting the various tools available
through the library.
4.b)Conduct workshops in current
information technology and trends.
4.c)Find new means and methods to
generate interest in electronic
research.
Page | 24
Challenges
No success goes without challenges, we went through quite interesting challenges during this year but all have contributed in strengthening the CIS team to deliver high standard quality services without a compromise. Major challenges are listed below:
1. Power outage and unstable current supply. This has been a continuous disturbance to the team especially the non-planned ones which were quite often this summer. The root cause of this problem was the main power supply from the government line. Voltage fluctuates to a dangerous degree that causes serious damages to a many sensitive ICT equipment. Luckily the impact had been reduced this year due to the power stabilizer added to the data centre. As for the power outage, we equipped both the data centres with uninterrupted power supply (UPS) units and power generators. Communication switches and critical desktop computers as well as IC3 classroom computers were equipped with individual UPS units to reduce power outage and insure business continuity.
2. Thin Clients project was intended to replace eight computer labs with a better
technological solution for the advantages described in the last year report. The plan was modified to exclude advanced computer labs and include non-IT as well as instructors who have less practical knowledge in IT. This plan has had started successfully but then the instructors backed off due to unrealistic storage demand and the non-availability of an appropriate furniture to place the devices at classrooms. A managerial and financial support is required to reinstate the plan.
3. eCampus solution was planned to complete this year. It facilitates a single
card to be used for identification, access, attendance and purchase services such as print/copy or buy food. Unfortunately, although a great part of the solution is deployed, it is not fully operational due to administrative issue. This is in regards to the point of sales as part of the eCash solution. As far as the access control and attendance systems the project was put on hold due to financial budgeting issues that we expect will get sorted soon.
4. High Internet connection cost. This remains an obstacle in achieving optimized learning objectives due to its dependency to high bandwidth internet service. Currently OmanTel has the technology to provide us with the required bandwidth but too costly. Although recently signed a contract with another provider (Al Nawras), it still needs to build the infrastructure which take some time.
5. Professional recruitment and Training needs for CIS members. The centre had
lost important members from the networking section as well as from the helpdesk. Covering this loss was not easy to high competition for professionals in the region and the low package at the university to compensate the location and facilities provided in other regions such as Muscat. On the training side,
Page | 25
majority of CIS members are having basic academic certifications. Hence, a wide gap in professional skills is needed to be filled. Self-study and in-house team knowledge transfer sessions were not sufficient to reduce this gap due the work overload among skilled members. We have submitted a complete training plan and expecting the management kind approval.
Page | 26
Center for Information
Systems
University of Nizwa
P.O.Box: 33, pc 616, Birkat
Al-Mouz Sultanate of Oman
Tel: +968 25446210
Fax: +968 25446372
Email: [email protected]
www.unizwa.edu.om