DESCRIPTION
Circuit-wise Buffer Insertion and Gate Sizing Algorithm with Scalability. Zhanyuan Jiang and Weiping Shi. DAC 2008, June 8–13, 2008, Anaheim, California, USA. Outline. Introduction Problem Formulation Algorithm Post-buffering Timing Estimation - PowerPoint PPT Presentation
Citation preview
Circuit-wise Buffer Insertion Circuit-wise Buffer Insertion and Gate Sizing Algorithm and Gate Sizing Algorithm
with Scalabilitywith Scalability
Zhanyuan JiangZhanyuan Jiang and Weiping Shiand Weiping Shi
DAC 2008, June 8–13, 2008, Anaheim, California, USA.
OutlineOutline
IntroductionIntroduction Problem FormulationProblem Formulation AlgorithmAlgorithm
Post-buffering Timing Estimation Linear Modeling of Non-linear Delay vs. Cost
Tradeoff Dynamic Critical Sink Selection Linear Programming Circuit Partition
Experimental ResultsExperimental Results ConclusionConclusion
OutlineOutline
IntroductionIntroduction Problem FormulationProblem Formulation AlgorithmAlgorithm
Post-buffering Timing Estimation Linear Modeling of Non-linear Delay vs. Cost
Tradeoff Dynamic Critical Sink Selection Linear Programming Circuit Partition
Experimental ResultsExperimental Results ConclusionConclusion
IntroductionIntroduction
As VLSI technology enters the nanoscale regime, a great amount of efforts have been made for timing optimization.
Among them, buffer insertion stands out as an effective technique to reduce interconnect delay.
Due to technology shrinking, more and more gates are placed on a chip, and algorithms without scalability can not fit into future physical synthesis flow.
OutlineOutline
IntroductionIntroduction Problem FormulationProblem Formulation AlgorithmAlgorithm
Post-buffering Timing Estimation Linear Modeling of Non-linear Delay vs. Cost
Tradeoff Dynamic Critical Sink Selection Linear Programming Circuit Partition
Experimental ResultsExperimental Results ConclusionConclusion
Problem FormulationProblem Formulation
We represent a combinational circuit as a Directed Acyclic Graph (DAG) G = (V,E).
Problem FormulationProblem Formulation
The paper abstract the routing tree of the circuit and ignore all the details (i.e., Steiner node and interconnect tree structure, etc.) within the routing tree.
The vertices only represent PI/PO of the circuit and input/output pins of modules while edges only for input-to-output paths within a module.
Problem FormulationProblem Formulation
OutlineOutline
IntroductionIntroduction Problem FormulationProblem Formulation AlgorithmAlgorithm
Post-buffering Timing Estimation Linear Modeling of Non-linear Delay vs. Cost
Tradeoff Dynamic Critical Sink Selection Linear Programming Circuit Partition
Experimental ResultsExperimental Results ConclusionConclusion
Post-buffering Timing Estimation
A post-buffering timing estimation technique is proposed in [12], which derives delay equations along a buffered wire segment and applies the equations for the delay estimation upon multiple-sink nets.
Linear Modeling of Non-linear Linear Modeling of Non-linear Delay vs. Cost TradeoffDelay vs. Cost Tradeoff
Table 1 shows that the impact of varying downstream sink size from 1X to 4X is negligible at the driver.
Linear Modeling of Non-linear Linear Modeling of Non-linear Delay vs. Cost TradeoffDelay vs. Cost Tradeoff
Linear Modeling of Non-linear Linear Modeling of Non-linear Delay vs. Cost TradeoffDelay vs. Cost Tradeoff
A curve fitting method is adopted to approximate each tradeoff as several linear segments.
In this paper, the number of segments is set as 2, which gives good accuracy.( ( If the number of segments is 3, the final circuit Elmore delay improves less than 0.1% while the linear programming solver time increases more than 50%. ))
Linear Modeling of Non-linear Linear Modeling of Non-linear Delay vs. Cost TradeoffDelay vs. Cost Tradeoff
QQrootroot + c + c11XXcc + c + c33 ≤ Q ≤ Qsinksink, , (1)(1)
QQrootroot + c + c22XXcc + c + c44 ≤ Q ≤ Qsinksink, , (2)(2)
LLcc ≤ X ≤ Xcc ≤ U ≤ Ucc, , (3)(3)
QQroot root :RAT values at root:RAT values at root
QQsink sink :RAT values at sink:RAT values at sink
XXc :c :the number of buffers at this netthe number of buffers at this net
CCi :i :the curve fitting coefficientthe curve fitting coefficient
LLc, c, UUc :c :lower bound and upper bound of the number of bufferslower bound and upper bound of the number of buffers
Linear Modeling of Non-linear Linear Modeling of Non-linear Delay vs. Cost TradeoffDelay vs. Cost Tradeoff
Dynamic Critical Sink Selection
A multiple-sink net contains sink S1, S2, · · · , Sn, and each sink has corresponding RAT Q1, Q2, · · · , Qn. It is hard to know which is critical sink before the stage of buffer insertion.
At the root, for a specific buffer number, we select the solution that minimizes the maximum delay among all sinks. Thus, only one delay cost tradeoff curve is returned.
Dynamic Critical Sink Selection
Dynamic Critical Sink Selection
Solution set 1Solution set 2
Dynamic Critical Sink Selection
Qroot + c1Xc + c5 ≤ Qsinkone, (1)Qroot + c2Xc + c6 ≤ Qsinkone, (2)Qroot + c3Xc + c7 ≤ Qsinktwo, (3)Qroot + c4Xc + c8 ≤ Qsinktwo, (4)Lc ≤ Xc ≤ Uc, (5)
QQroot root :RAT values at root:RAT values at rootQQsink sink :RAT values at sink:RAT values at sinkXXc :c :the number of buffers at this netthe number of buffers at this netCCi :i :the curve fitting coefficientthe curve fitting coefficient
LLc, c, UUc :c :lower bound and upper bound of the number lower bound and upper bound of the number of buffers of buffers
Linear Programming
CCi :i :the curve fitting coefficientthe curve fitting coefficient
Xi :Xi :the cost of routing tree RT(i)
Lc, Uc :lower bound and upper bound
Circuit Partition
This paper This paper adopt the divide-and-conquer scheme to speed up the algorithm.
The key components of the circuit partition technique are how to decide partition boundaries and how to set up side inputs/outputs in the sub-circuits.
Circuit Partition
In order to minimize partition error, the technique avoids partitioning the critical paths into different sub-circuits, which means that partition boundaries never cut through the most critical path.
If there is an overlap between different downstream cones, the overlap part belongs to the cone with the most critical primary input.
Circuit Partition
Figure 5: The circuit is partitioned into three subcircuits based on the downstream cones of primary inputs. The input a is the most critical primary input in the circuit.
OutlineOutline
IntroductionIntroduction Problem FormulationProblem Formulation AlgorithmAlgorithm
Post-buffering Timing Estimation Linear Modeling of Non-linear Delay vs.
Cost Tradeoff Dynamic Critical Sink Selection Linear Programming Circuit Partition
Experimental ResultsExperimental Results ConclusionConclusion
Experimental ResultsExperimental Results
Experimental ResultsExperimental Results
Experimental ResultsExperimental Results
OutlineOutline
IntroductionIntroduction Problem FormulationProblem Formulation AlgorithmAlgorithm
Post-buffering Timing Estimation Linear Modeling of Non-linear Delay vs.
Cost Tradeoff Dynamic Critical Sink Selection Linear Programming Circuit Partition
Experimental ResultsExperimental Results ConclusionConclusion
ConclusionConclusion
Experiments demonstrate that the circuit-wise algorithm achieves on average 17.4X speedup compared with the path based algorithm.
The whole circuit is partitioned into n downstream cones plus the remaining circuit.
The circuit is partitioned into n + m or n + k sub-circuits depending on whether the remaining circuit is disjointed or not.
The problem defined as follows: Given a DAG which represents a placed and
routed combinational circuit, possible candidate buffer locations, a buffer library and a gate library, find a buffering and gate sizing solution such that the total cost of buffers and gates are minimized, and the required arrival time at each primary input is less than a given constant constraint.
Elmore delayD(e) =R(e)[C(e)/2 + C(vj)]D(vD(vjj) = K(b) + R(b) ) = K(b) + R(b) .. C(vC(vjj))
e: edge (vi, vj)R(e): resistance of eC(e): capacitance of eC(vj): downstream capacitance at vj
K(b): intrinsic delay of buffer bR(b): R(b): driving resistance of buffer b