Mary Mundy and Tim Dennis

21 May 2015

CIPS South Yorkshire branch

Procurement Law Update

Page 2: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Legal background EU directives

Concession Directive 2014/23/EC

Public directive 2014/24/EC

Utilities Directive 2014/25/EC

English law covers Wales and NI (separate Scottish Regs)

Public Contracts Regulations 2015 (PCR)

Public Contracts Regulations 2006 (as amended) still valid forhealth service purchasing under NHS (Procurement, PatientChoice and Competition) (No 2) Regulations 2013 – healthservice purchasing by NHS England and CCGs andconcessions

Case law

Guidance and PPNs

Page 3: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Concessions Directive Works/ services concessions over threshold (£4,322,012)

Must include transfer of operating risk covering demand/ supply orboth

All public, some utility provisions and defence

For social/ other services – contract notice and award notice only

Time limited - recoup investment and a return on capital

General process subject to Treaty principles

Minimum period for tenders 17 days

Award criteria in descending order of importance and potential to re-order where an unforeseen innovative solution with exceptional

functional performance arises

Page 4: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

PCR 2015 In force 26 February 2015

Procurements with contract notice on/after that date

Works, supplies, non “light touch” services

Existing thresholds apply

Light touch regime for social and other specific services -replaces Part B

Page 5: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

“Social and other Specific Services” Replaces Part B

Schedule 3 exclusive list of services by CPV code

£625,050 threshold

OJEU advertising: contract notice or PIN published “continuously”

Treaty principles apply - equal treatment and transparency

Significant flexibility in process, time limits to be reasonable, nostandstill required (?)

Contract award notice (can be published quarterly)

Page 6: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

New obligations – SME friendly? Contracts Finder notices (above and below threshold)

All procurement documents must be available via the internet fromdate of OJEU publication

Standard CCS PQQ mandated - England

No PQQ below goods & services threshold

Contracts Finder award notice (above and below threshold)

Contracts Finder notices for framework call-offs (any value)

Justification for not subdividing into lots

30 day payment terms throughout supply chain and annualreporting on compliance

Page 7: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Available proceduresProcedure When?

OpenRestricted

Freely available

Innovation partnerships Where innovative need not freely available onthe market

Competitive dialogueCompetitive procedure withnegotiation

Where needs:- adaptation of readily available solutions- design or innovative solutions- prior negotiation of contract needed- technical specification cannot be established

Negotiated procedurewithout prior publication

Very limited grounds

Utilities free choice except negotiated without publication

Page 8: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Tendering processesOpen Restricted Negotiated Comp

dialogueInnovationpartnership

Pre marketengagement

Contract notice

PQQ x

ITT

Negotiation X X

Tender

Post selectionnegotiation

X X X

Award

Page 9: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Comp negotiation vs Comp dialogue Competitive negotiation

Know needs and characteristics

Negotiate with all on basis of initial and subsequent tenders,but not final tenders (runs like restricted)

Competitive dialogue

Know needs and requirements

Dialogue with all to identify solutions and means best suited tosatisfying needs, final tenders

Clarify, specify and optimise all tenders

Final negotiations to confirm commitments/ terms but not onessential elements or to distort competition

Page 10: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Innovation Partnerships Must be able to identify a need for an innovative product, service or

works that cannot be met by the current market

“Innovation” …new or significantly improved… including…production, building or construction processes, a new marketingmethod, or a new organisational method in business practices,workplace organisation or external relations including…helping tosolve societal challenges or support the Europe 2012 [2020]strategy for smart, sustainable and inclusive growth

One partner or several partners each conducting separate R&D

Negotiation permitted and must structure in successive phases: egR&D, prototype, manufacture, delivery

Must establish IP rights base to go to market

Value of delivery not disproportionate to value of investment fordevelopment

Page 11: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Pre Market Engagement Expressly permitted (and encouraged by Cabinet Office)

To prepare the procurement and inform the market of procurementplans and requirements

Authority must take appropriate measures to ensure thatcompetition is not distorted

Can only exclude where there are no other means to ensure non-distortion of competition

Must provide the tenderer with an opportunity to prove distortion ofcompetition will not result

Page 12: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

CCS Standard PQQ Must use for all procurements (including light touch) if over

threshold

Core questions and additional modules

Must add your own evaluation methodology

“Reportable Deviations” cannot deviate from questions or questionwording unless justified and then must report to CCS within 30days of making PQQ available to candidates – from 1 September2015

Cannot use PQQ stage below goods & services threshold

Will be replaced by ESPD - European Single ProcurementDocument

Page 13: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

PQQ grounds Mandatory exclusion criteria (5 years)

Discretionary exclusion criteria (3 years)

Significant or persistent deficiencies under a prior publiccontract which led to early termination, damages or comparablesanctions

Economic and financial standing

Minimum turnover (max 2x contract value unless exceptional)

Information on accounts (must state how scored)

Any minimum hurdles must be in contract notice or ITCI

Self cleansing/ declaration permissible

Continuing obligation throughout process

Page 14: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Contract award criteria Must award to “most economically advantageous tender”

On basis of price or cost – so can be price only

Or can include the best price/quality ratio

Price can include life cycle costing looking at acquisition,maintenance, end of life costs, usage eg energy consumption

Quality criteria can take into account e.g.

Technical merit, social, environmental and innovativecharacteristics

Qualifications and experience where significant impact oncontract performance

After sales service

Page 15: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Frameworks Methods of call off:

Single supplier framework – direct call off

Multi supplier framework – direct call off or mini-competition ORmini-comp only

Must set out in framework agreement:

Objective criteria for deciding between direct call-off or minicompetition

How decision will be made if direct call off; and

Mini-competition award criteria

Must publish contract award information on Contracts Finder foreach call off contract

Page 16: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Awards to mutual or social entities Contracts for limited range of social/ other specific services

including surgical and medical hospital services, education

Can restrict award to types of organisation where

its objective is a public service mission

profits are reinvested or distributed to participants

management/ ownership is based on employee ownership/participatory principles

haven’t awarded a contract for those services by that authorityin past 3 years

Limit of 3 years’ duration on the awarded contract

Competition amongst reserved bodies

Page 17: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

“In house” awards Structural (Teckal) - award to a legal person governed by private or

public law

Control test - decisive influence over strategic objectives andsignificant decisions (can be jointly exercised)

Activity test - 80% of the activities must be carried out for thecontrolling authority

Capital – no direct private capital participation except requirednon-controlling, non-blocking without decisive influence

Public to public co-operation (Hamburg)

Co-operate to deliver public services driven by goal ofachieving common objectives

Governed solely by public interest considerations

Perform on the open market less than 20% of activities

Page 18: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Modification of contracts - allowed Modification can occur without a new procurement arising where:

Contract clearly and unequivocally provides for the change andit doesn’t affect overall nature

Additional provision not envisaged but a change of contractorcan’t be made due to interchangeability or interoperabilityissues or significant inconvenience/ substantial cost duplicationand not >50% of contract value

Couldn’t be foreseen, doesn’t affect overall nature and not>50% of contract value

Change of contractor due to merger, insolvency, acquisition etc

Change value doesn’t exceed the relevant threshold AND isless than 10% of the original contract value (services) or 15%of the contract value (works) – net cumulative value of changes

Not “substantial”

Page 19: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

What is “substantial” modification Changes are substantial, and therefore give rise to a new

procurement, where it:

Renders the contract materially different in character to thatoriginally concluded

Introduces conditions which if included originally would havebrought other bidders/ different winner

Changes the economic balance of the contract in favour of thecontractor in a manner not provided for initially

Extends the scope of the contract considerably or

A new contractor replaces the original contractor (exceptinsolvency, acquisition, re-organisation)

Page 20: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Reporting Information on every contract/ framework agreement/ DPS

Authority details, the subject matter and value of the contract

Details of any shortlisting or de-selection and reasons;

Reasons for rejection of any abnormally low tenders

Winning bidder identity and reasons and if known any sub-contracting levels and main sub-contractor identities

Justification for the choice of procedure – negotiated/ dialogue

Reasons for any decision not to make an award

Reasons why any non-electronic communication has beenused for tender submission

Any conflicts of interest detected and subsequent measurestaken

Send to Commission or Cabinet Office on request

Page 21: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Documentation retention Keep documentation for at least 3 years to "justify decisions taken

in all stages of the procurement procedure" such as on

Communications with bidders and potential bidders and internaldeliberations

Preparation of procurement documents

Any dialogue or negotiation

Selection and award of the contract

Page 22: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Claims/ remedies

Pre contract award Post contract award

Breach of duty Automatic suspensionDamages

Damages

Ineffectiveness- illegal direct award- breach duty &

standstill- incorrect over

threshold frameworkcall off

Automatic SuspensionVoiding of contractDamagesCivil financial penaltiesContract cancellation

Voiding of contractDamagesCivil financial penaltiesContract cancellation

Page 23: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Issues relevant to litigation Reporting requirements and record keeping

Document Retention

Discretionary exclusion criteria – persistent deficiencies under aprior public contract – may result in more disputes between partiesduring contracts

Revised definition of “Economic Operator” – wider group ofpotential claimants under PCR 2015?

Page 24: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

What we tell bidders Go fishing

Time is of the essence - act quickly

Use your contacts - “off the record” isn’t off the record!

Press the procuring body - debriefs

No stigma to challenging

Reasons/ issues can leak out more as you push to keep going

Get legal advice ASAP – don’t prejudice claim

Page 25: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Current trends Increasingly litigious area

Public Sector challenging Public Sector

Increasing claims in SOS services areas – stopping awards

Economics often driving challenges

Page 26: CIPS South Yorkshire branch Speaker... · 21 May 2015 CIPS South Yorkshire branch Procurement Law Update. Legal background EU directives ... Guidance and PPNs. Concessions Directive

Phone a friend

Mary Mundy

Associate

T: 0113 251 4727

M: 07711 389413

E: [email protected]

Tim Dennis

Associate

T: 0191 404 4003

M: 07725 642701