/ CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free: 1800180600316004 Fax: 014622281171228119 E-Mail: [email protected] Website : www.shreecemenUn SHREE CEMENT LTD. a\c:.~;IOOI a~S~~llaO()" .ri. .ri. Regd. Office: . ' . p. . 0lt . b'" BANGUR NAGAR, POST BOX NO.33, BEAWAR 305 901, RAJASTHAN, INDIA 'At 66S~" S 8:\\) .w.. SCUBWRlENV/Z016-17/ Date:-25/11/2016 To, The Di .ector, Mi . try of Environment & Forest, gional office (Central Region), \. Kendriya Bhawan, 5th Floor Sector 'H' Aliganj, Lucknow (U.P.), Pin-226024. Sub> Compliance of conditions of environmental clearance letter of Unit-II of MIs Shree Cement Limited located at village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) Ref. - Environment Clearance letter No. J-llOll/101l96-IA-II (1) dated 09/04/1997. Dear Sir, In reference to the above subject matter and referred letter, we are submitting herewith the point wise compliance of conditions of the above environmental clearance letter tor the period from, April 16 to September 16. This is for your kind information please. Thanking you, Yours faithfully, For Shree Cement Ltd. (Rakesh Bhaf ava) ~ Vice President (Environment) Cc to:- 1. The Director (IA Dtv.-Thcrmal Power), Ministry of Environment & Forests lndra Paryavaran Bhavan, Iorbag Road, New Delhi-ll0003 2. The In-Charge (Zonal Office), Central Pollution Control Board ((PCB), 3 rd Floor, Sahkar Bhawan, North T.T. Nagar, Bhopal-462003(M.P.) 3. The Member Secretary, Rajasthan Pollution Control Board, 4, Institutional Area, Jhalana Doongri, JAIPUR-302004(Rajasthan). JAIPUR OFFICE: SB-187, Bapu Nagar, Opp. Rajasthan University, JLN Marg, Jaipur-302 015 Phone: 0141 4241200,4241204, Fax: 0141 4241219 NEW DELHI OFFICE: 122-123, Hans Bhawan, 1, Bahadurshah Zafar Marg, New Delhi 110002 Phone: 011 23370828,23379218,23370776, Fax: 011 23370499 CORP. OFFICE: 21, Strand Road, Kolkata 700 001 Phone: 033-22309601-4 Fax: 033 22434226

c:.~;IOOI .ri. a~S~~llaO().ri. · 2016-12-12 · (iii) The gaseous and SPM ermssion from Emission levels are well within the standards prescribed various units must confirm to the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: c:.~;IOOI .ri. a~S~~llaO().ri. · 2016-12-12 · (iii) The gaseous and SPM ermssion from Emission levels are well within the standards prescribed various units must confirm to the

/CIN No. : L26943RJ1979PLC001935Phone : 01462228101-6Toll Free: 1800180600316004Fax: 014622281171228119E-Mail: [email protected] : www.shreecemenUn

SHREE CEMENT LTD. a\c:.~;IOOI a~S~~llaO()".ri. .ri.Regd. Office: . ' . p. . 0lt .b'"

BANGUR NAGAR, POST BOX NO.33, BEAWAR 305 901, RAJASTHAN, INDIA 'At 66S~" S 8:\\).w..

SCUBWRlENV/Z016-17/ Date:-25/11/2016

To,The Di .ector,Mi . try of Environment & Forest,

gional office (Central Region),\. Kendriya Bhawan, 5th Floor Sector 'H' Aliganj,

Lucknow (U.P.), Pin-226024.

Sub> Compliance of conditions of environmental clearance letter of Unit-II of MIsShree Cement Limited located at village Andheri Deori, Tehsil-Masuda, DistrictAjmer (Rajasthan)

Ref. - Environment Clearance letter No. J-llOll/101l96-IA-II (1) dated 09/04/1997.

Dear Sir,

In reference to the above subject matter and referred letter, we are submittingherewith the point wise compliance of conditions of the above environmental clearanceletter tor the period from, April 16 to September 16.

This is for your kind information please.

Thanking you,Yours faithfully,For Shree Cement Ltd.

(Rakesh Bhaf ava)~ Vice President (Environment)

Cc to:- 1. The Director (IA Dtv.-Thcrmal Power), Ministry of Environment & Forestslndra Paryavaran Bhavan, Iorbag Road, New Delhi-ll0003

2. The In-Charge (Zonal Office), Central Pollution Control Board ((PCB), 3rd

Floor, Sahkar Bhawan, North T.T. Nagar, Bhopal-462003(M.P.)

3. The Member Secretary, Rajasthan Pollution Control Board, 4, InstitutionalArea, Jhalana Doongri, JAIPUR-302004(Rajasthan).

JAIPUR OFFICE: SB-187, Bapu Nagar, Opp. Rajasthan University, JLN Marg, Jaipur-302 015Phone: 0141 4241200,4241204, Fax: 0141 4241219

NEW DELHI OFFICE: 122-123, Hans Bhawan, 1, Bahadurshah Zafar Marg, New Delhi 110002Phone: 011 23370828,23379218,23370776, Fax: 011 23370499

CORP. OFFICE: 21, Strand Road, Kolkata 700 001 Phone: 033-22309601-4 Fax: 033 22434226

Page 2: c:.~;IOOI .ri. a~S~~llaO().ri. · 2016-12-12 · (iii) The gaseous and SPM ermssion from Emission levels are well within the standards prescribed various units must confirm to the

SHREE CEMENT LIMITED UNIT-IIVillage Andheri Deori, Tehsit-Masuda, District Ajmer (Rajasthan)

COMPLIANCI~ STATUSJ- J JOJ 1110 lf96-lA-U m dated. April 09, 1997April,I6 to Scptemebcr,16Rllj-20-140-1997

J.:N\'IROl\ME~'I' CLEARANCE I.ETI'ER No.PERIOD OF COMPLIANCEProject Code

A Conditions Compliances status(i) The project authority must take necessary All necessary measures have been taken as per the

action to adhere to the conditions and measures stipulated by state government and statemeasures stipulated by state government pollution control board.and state pollution control board.

I (i o No further expansion of the plant can be Prior approval shall be taken from Ministry for anytaken up without the prior approval of this further expansion.

I Illllnistry.

(iii) The gaseous and SPM ermssion from Emission levels are well within the standards prescribedvarious units must confirm to the standards by the central government, and state pollution controlprescribed by the central government 01' board.state pollution control boa rd under the EPA

I In01'111::! whichever is more stringent. At notime the emission must oxceed theprescribed limits. In the event of failure ofany pollution control system adopted by theunit (s) must be put the control system arerectified to achieve the desired efficiency.

(iv)II Ambient ail' quality including ambient Ambient. ail' qualities including ambient noise level are

noise level must not exceed the standards well within the prescribed standards stipulated under

Istipulated under EPA/State authorities. EPA/State authorities. Monitoring of ambient air qualityMonitoring of ambient ail' quality and stack and stack emission IS being carried out regularly.emission shall be carried out regularly in Monthly monitoring report is submitted to SPCB and halfconsultation with SPCB and report yearly to the Ministry. Monitored data from April,16 tosubmitted to the board quarterly and to the Septemeber,16 is enclosed as AnnexureI.ministry (regional office at Lucknow) half-yearly.

(v) Fugitive emission of dust should be All measures to control the fugitive emission and bettercontrolled and work environment housekeeping have been taken & maintained regularly.I monitoring by adequate dust collection andextraction system and housekeeping.

I(vi) I The project authority shall not, change any No change in design of stack height.

design/height of the stack withoutpermission of state pollution control board.

(vii) 'Water requirement for both process and Water consumption 111 process is around 500 KLD.domestic purpose envisaged at 2070m3/day Domestic water consumption is common for all unitsmust be met from mine water sources only which is around lOOO KLD.adopting propel' mine storage and waterutilization schemes.

(viii)

IOccupational health of the workers should Occupational health of the workers is periodicallybe periodically monitored and record monitored and record maintained. No any such disease ismaintained. found so far.

~) I--

As proposed in the EMP, green belt must, be 'free plantation is our on-going process. Out of total landL I develoeed in 75 hac. Around the plant in 231.94 hectare we have developed green belt in the area

Page 1 of 3

Page 3: c:.~;IOOI .ri. a~S~~llaO().ri. · 2016-12-12 · (iii) The gaseous and SPM ermssion from Emission levels are well within the standards prescribed various units must confirm to the

(

--addition to greenery/plantation in 10.54hac. A norms of 1500-2000 plantation/hac.of diverse species in consultation with stateforest/horticulture deptt. can be followed.

of 82.83 hectare which covers around 35.71 % of totalarea with 224749 nos of trees saplings.

(x) A separate environmental management cellwith suitably qualified personnel to carryout various environmental managementfunctions should be set up under the controlof a senior who will 1'0P01't directly to thehead of the organization.

(xi) The project authority must set uplaboratory facility for collection andanalysis of samples under the supervisionof competent technical personnel who willdirectly report, to the chief executive.

We have separate environmentalmanagement cell has been established withsuitably qualified personnel to carry outvarious environmental managementfunctions under the control of V.P.~fi:nvironment) .Well equipped laboratory for environmental monitoringand analysis has been stabilized.

(xii) The fund earmarked for environmentalmanagement measures should not bediverted for other purpose and year-wiseexpenditure should be reported to thisministry. A six monthly progress report onthe project vis-a-vis environmentalmeasures must be submitted to the state /central authorities.

Yearly environmental expenditure is being submitted toMOEF. Environment management expenses of Cementunits I, II and Captive power plant during 201.5-16 wasapprox. 479.81 Lacs.

(xiii) The ministry of any other competentauthority may stipulate any furthercondition after reviewing the compliancereports. The above conditions will bemonitored by the Regional office of thisministry located at Lucknow/CPCB/SPCBwith respect to its implementation.

Shall be complied.

(xiv) The ministry may revoke 01' suspendclearance, if implementation of thestipulated conditions is not satisfactory.

All the terms and conditions are being implemented andcompliance report I being submitted to SPCB/CPCB andMoEF timely.

(xv) The above conditions will be enforced inter-alia under the water (prevention andcontrol of pollution) Act, 1.974, Air(prevention and control of pollution) Act,1986 and public liability insurance act,1991 along with their amendments.

Complying with water (prevention and control ofpollution) Act and Ail' (prevention and control ofpollution) Act.

Page 2 of 3

Page 4: c:.~;IOOI .ri. a~S~~llaO().ri. · 2016-12-12 · (iii) The gaseous and SPM ermssion from Emission levels are well within the standards prescribed various units must confirm to the

Annexure: IShree Cement Limited,

UnitIlAndheri Deori TehsilMasuda DistrictAjmcr, Rajasthan

Monitored data

1_ Ambient Air Quality Monitoring Data :-(Period: April, 16 to Septemeber.Jfll > (All ~~.--~--- , . -,

Location Plant boundary towards village Sarakana Plant boundary towards Shree Mega Power Residential Colony Main Gate

MonthPM10 PM 2.5 S02 NOx PM 10 PM 2.5 S02 NOx PM 10 PM 2.5 S02 NOx PM 10 PM 2.5 S02 NOx

I

Apr-16 51 29 9 10 53 28 10 10 50 26 6 7 52 29 10 8May-16 52 30 10 11 54 29 11 9 49 27 8 8 53 28 11 9Jun-16 56 29 9 10 54 30 10 10 48 26 7 9 52 29 10 9 I

Jul-16 52 26 8 9 51 28 9 9 47 24 7 7 50 27 9 8Aug-16 53 27 9 10 52 29 10 10 48 26 8 6 51 28 8 9Sept-Iti __ L__._

52 26 8 9 53 28 11 12 47 25 7 8 52 27 8 10

2. Stack Emission Monitoring data>(Period: Am-i] , 16 to Sentemeber, 16)

All values in (mgINm3)MONTH RAW MILL& KILN COALMILL-1 CLINKERCOOLER CEMENT MIILLApr-16 30 29 32 33MaY-16 31 30 31 34Jun-16 33 29 30 33Jul-16 34 30 31 32

Auo-16 Not running Not running Not running 30Sept-If Not running Not running Not running 32

3. Ambient Noise Level Monitoring Data>Noise Level (Leq-dBW (Period: April, 16 to S,, . _ ............. """" .......... "",

Location Plant boundary towards village Sarakana Plant boundary towards Power Plant Residentia I Colony Main Gate

Month DayTime NightTime DayTime NightTime DayTime NightTime Day Time NightTimeApr-16 70.8 525 70.2 52.1 48.1 42.3 71.3 51.9MaY-16 70.6 51.8 70.4 52.3 47.6 42.1 70.9 51.3Jun-16 70.2 51.4 70.1 51.8 47.1 41.8 70.4 50.4Jul-16 70.4 51.2 69.2 51.4 47.2 41.6 70.2 50.5Aug-16 70.6 508 69.1 51.6 47.3 41.7 69.4 508SePt-16 70.8 51.2 69.7 52.1 49.2 - 40.9 69.8 51.3-- --- -- ---- --- --- ------_. .._---------