1
WilliamS.PrattPEPrincipalEngineer- AECApplications
CIMandProject/AssetManagement@CTDOT
2
CIMCivilIntegratedManagement
WhatisCIM:“CivilIntegratedManagement(CIM)isthetechnology-enabledcollection,organization,managedaccessibility,andtheuseofaccuratedataandinformationthroughoutthelifecycleofatransportationasset.
Theconceptmaybeusedbyallaffectedpartiesforawiderangeofpurposes,includingplanning,environmentalassessment,surveying,construction,maintenance,assetmanagement,andriskassessment.”
-FHWA,AASHTO,ARTBA(2012)
3
CIMCivilIntegratedManagement
WhatisCIM:– CIMisnotjusttechnology– itencompasseschangestothetypicalworkprocessessupportingprojects.
– ApplicationofCIMcanrangefromincrementalimprovementoffunctionstoleaningoutdisruptiveworkflows
– CIMcanenablefullydigitalworkflowfromprojectinceptiontoassetmanagement
– UseofCIMisnotallornothing– agenciescanselecttoolsforspecificapplicationstoday,andincreaseuseovertime
4
CIMCivilIntegratedManagement
DrivingForcesforCIM:• TED(TransportationEnterpriseData)agrassroutesefforttoestablishdata
governanceandstewardshipinvolvingrepresentationfrom:– AECApplications– AssetManagement– Planning– Safety– OIS
• BetterandFasterAsset/SafetyDataManagementthroughIntegration• Beneficiaries
– AssetManagementGroup(TAMP)– NetworkSafetyAnalysis(RDIP)– Engineering– MaintenanceOperations
5
CIMCivilIntegratedManagement
• AuthoritativeData– AssetManagementSystems– CompositeProjectData
• ATLAS(Asset/ProjectTracking+Location)=GIS– ToolsRequired
• ProposedProject(PP)Location• RecommendedProject(RP)Location• AssetLocation• Points,Lines,Polygons&ExtractedLRSRegistration• Project/AssetDatajoinedwithLocation
• EachAssethasaSteward/SMEandanAuthoritativeManagementSystem– GeospatialMetadataGuidelinesarebeingdeveloped– CADtoGISApplicationsarebeingdeveloped
• ToIdentifyAssetsforDecommissioning• ToIdentifyNewandManageExistingAssets
EditingClients
CTDOTFirewall
CTDOTOnPremise
CTDOTBusinessSQLServer
• CompositeProjectDBSchedulesEstimatesScope
CopyorreplicateBusinessData(UsingODATAwebserviceorsimilar)
OBL CORE SiteManagerGenInfoSTIPStatusExpenditures
ConstructionInfo
ExtractTransformLoadReportingData
ProjectAuthoritativeDB’s
CTDOT/BentleyArchitectureDiagramCurrentArchitecture
AssetsandTeam
ProjectAssets
ProjectWise
SQLServer
InspectTech
SQLServer
AWALIM
Oracle
SUPERLOAD
SQLServer
BentleyProductClients
BentleyCloud
EditingClients
ExoreB
AssetWiseALIM
CTDOTFirewall
BentleyFirewall
CTDOTOnPremise
CTDOTBusinessSQLServer
• CompositeProjectDB• InspectTechBridgeDB• TrafficSignalDB
SchedulesEstimatesScope
CopyorreplicateBusinessData(UsingODATAwebserviceorsimilar)
OBL CORE SiteManagerGenInfoSTIPStatusExpenditures
ConstructionInfo
ExtractTransformLoadReportingData
ProjectAuthoritativeDB’s
CTDOT/BentleyArchitectureDiagramCurrentArchitecture
AssetsandTeam
ProjectAssets
ProjectWise
SQLServer
InspectTech
SQLServer
AWALIM
Oracle
SUPERLOAD
SQLServer
WebReportingClient
(Web-GISpages)
BentleyProductClients
BentleyCloudMapsWFS/WMSServices
WebServicejoininginfo
withSpatialLocation
ExoreB
AssetWiseALIMAssetWiseDashboardandReportingService
AssetWiseALIMPublishing
CTDOTFirewall
BentleyFirewall
CTDOTCloud
CTDOTOnPremise
CTDOTBusinessSQLServer
• CompositeProjectDB• InspectTechBridgeDB• TrafficSignalDB
SchedulesEstimatesScope
SQLServerpolygonlocations
AtlasDatabase
CopyorreplicateBusinessData(UsingODATAwebserviceorsimilar)
OBL CORE SiteManagerGenInfoSTIPStatusExpenditures
ConstructionInfo
ExtractTransformLoadReportingData
ProjectAuthoritativeDB’s
EditingClients
CTDOT/BentleyArchitectureDiagramCurrentArchitecture
SQLServer
TEDDatabaseProjectAssets
AssetsandTeam
EditingClients
9
CTDOT– TED(TransportationEnterpriseData)
• ProjectsWorkAreas• Facilities• OSTAPermits
• Assets• BridgeDeckAreas• TrafficSignalAreas
• Orthoimagery• Hydraulics• SoilBorings• ROW• Town,County,RegionalBoundaries
• RoadNetwork• Inventory• NHS,Func Class
• Projects:• Capital• MaintenanceVIP
• Assets:• Bridges• Pavements• TrafficSignals
• TrafficMonitoring:• AADT• Accidents
• PublicTransportation
SpatiallyBasedData- ATLAS/ESRI LRSBasedData- EXOR
CTDOTGISData
10
As-Built
RecordingBy InspectorAddenda
Plans/Specs
Project Timeline
Recommended ProjectMemo
Project Initiation Design Approval FDP Submittal
Construction Completed
Contract Award
04_C
ontr
act-P
roce
ssin
g
Jan-09
Jan-08 Nov-08
Jun-10 - Sep-10Jul-07 - Jan-08
Nov-08 - Jan-09Contract Processing
Jan-09 - Jun-10Construction
Order Plans/Specs
Jan-08 - Nov-08Jul-07 - Jan-08
2/2/2014
Jul-07
Sep-10
Jun-08 - Nov-08
Jan-09 - Jul-10
Jan-08 - Jun-0830% 60% 90%
Jul-07 - Dec-07PPI
Development 01_Planning 02_Pre-Design 03_Final-Design 05_Construction 06_Completed
LocatingandTrackingCapitalProjects
ContractPlansSpecsandEstimates2D/3DModels
PromotePPIConceptandMajorAssetworkitemstoProject
UpdateProjectLocation
PPI/ProjectLocation:• GeospatialPolygonsrepresentingWorkAreaLimits
BenefitsforDesigner:• UnderlyingRoadNetworkSectionsandtheir
characteristics(Route/RoadID,State/Local,MPstart/end,ADT,Interstate,FC,NHS,Towns,MPO,COG,UrbanArea,Population&CTCoreFC)
POC- QueryroadassetswithinProjectWorkArea
POC- NewandManagedAssetInventories
POC- DecommissionedAssetInventories
LocateandTrackPPIConceptincluding
MajorAssetworkitems
POC- AssetFieldValidationandAs-Builts
11
Demonstration
12
Demonstration
13
Demonstration
• PyramidofGeo-SpatialDataConsumptionOptions– AWP(AssetWisePublisher)
• Assets- RoadNetworkandMP’s,Bridges,Signals• ActiveProjects - ProjectInformation,Project0017-0182