Cigré 2005, SC B5 Colloquium in Calgary Preferential Subject 1 Question 8. Zoran Gaji ć ABB Sweden. SC B5: PS1, Q8; Multifunctional Transformer Relays. COMPLEXITY ISSUES. Relay Complexity. Old Technology versus New Possibilities. Old versus New. - PowerPoint PPT Presentation

Citation preview

© A

BB

- 1

Cigré 2005, SC B5 Colloquium in Calgary Preferential Subject 1Question 8

Zoran GajićABB

Sweden

© A

BB

- 2

SC B5: PS1, Q8; Multifunctional Transformer Relays

COMPLEXITY ISSUES

Relay Complexity

© A

BB

- 3

Old Technology versus New Possibilities

© A

BB

- 4

Old versus New

© A

BB

- 5

New Technology Available for Relays as well

© A

BB

- 6

Compare Apples with Apples not with Pears

© A

BB

- 7

SC B5: PS1, Q8; Multifunctional Transformer Relays

ADAPTIVE TECHNIQUE

Adaptive Relays,

Use or not use new features

© A

BB

- 8

Adaptive Relays – OLTC Position Reading

On-line OLTC position monitoring available since 1998

Via BCD or mA signal

Hundreds of installations

Excellent performance record

Improved Trafo Diff and Voltage Control functionality

© A

BB

- 9

Adaptive Relays - Transformer Differential

Adaptive inrush restraint

Adaptive bias calculation for 1½ CB stations

Available since 1998

Thousands of installations

Excellent performance record

Improved Trafo Diff operation

Paper in WPRC 2003

© A

BB

- 1

0

New Features

© A

BB

- 1

1

New Feature –> Turn-to-Turn Fault Protection

Detects all turn-to-turn faults with more than 1% of shorted turns

Excellent add-on to the traditional differential protection

© A

BB

- 1

2

New Features -> Complex Settings?