23
CHUNG-A ST Company Profile Total Cleanroom Solution www.cacr.co.kr Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head Office and Research Institute 173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong) Tel. (+82) 32-579-3078 Fax. (+82) 32-579-3079 Management Office (Sales and Management) 285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong) Tel. (+82) 2-862-8283 Fax. (+82) 2-857-7417 CHUNG-A Vina (Vietnam Corporation) No 37, Lane 52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, Vietnam Tel. (+84) 4-6686-3422 VOIP. (+82) 70-8280-8079 CHUNG-A LCD (China Corporation) Industrial Park, Suzhou, Jiangsu, China Tel. (+86) 512-6296-1230 Fax. (+86) 512-6296-1626

CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

CHUNG-A ST Company ProfileTotal Cleanroom Solution

www.cacr.co.kr

Clean Room System

Machinery & Fire Protection

Facilities

HVAC & Clean Equipment

Utility Total Solution

Head Office and Research Institute173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong)Tel. (+82) 32-579-3078 Fax. (+82) 32-579-3079

Management Office (Sales and Management)285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong)Tel. (+82) 2-862-8283 Fax. (+82) 2-857-7417

CHUNG-A Vina (Vietnam Corporation)No 37, Lane 52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, VietnamTel. (+84) 4-6686-3422 VOIP. (+82) 70-8280-8079

CHUNG-A LCD (China Corporation)Industrial Park, Suzhou, Jiangsu, ChinaTel. (+86) 512-6296-1230 Fax. (+86) 512-6296-1626

Page 2: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

Clean & Affluent World Through Advanced Technology

ContentsCompany Profile CEO Message Company Profile Organizational Structure Company History Company Philosophy Core Values Patents and Registrations Certificates List of Personnel Specialized in Construction and Fire Protection Technology

Business Areas Clean Room System HVAC & Clean Equipment Utility Total Solution Machinery & Fire Protection Facilities

Technical Design Area System Design Production Design Site Design

Precision T.A.B.

Follow Up Plans Regular Maintenance and Follow Up Plans Follow Up Plans After Warranty Period

Performances Major Performances Other Performances

Access Map

Page 3: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

Best Partner That Creates Best Values! Reliable Partner with Trust!

Since its establishment in 2000, CHUNG-A ST started its cleanroom businesses and has diversified the business structure into mechanical and fire protection facility works while expanding its overseas business networks to establish infrastructure for global development.

CHUNG-A ST will reward support and interest from our customers with best quality.

CHUNG-A ST strives to be a company with trust by creating designs and installations that can maintain best conditions for various industrial sites and buildings based on its accumulated technical competence and experience.

CHUNG-A ST will be continuously committed to development of original technology and quality improvement by continued R&D investments to realize its vision of “Customer Impression Service” and “Technology That Changes the World.”

Lee Dong-cheol, CEO of CHUNG-A ST Co., Ltd.

ORGANIZATION CHART

COMPANY PROFILECHUNG-A ST Co., Ltd.

January 06, 2000

Lee Dong-cheol

Head Office and Research Institute173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong)

Seoul Office285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong)

China CorporationCHUNG-A LCD SUZHOU Co., Ltd. Industrial Park, Suzhou, Jiangsu, China

Vietnam CorporationCHUNG-A VINA Co., Ltd. No 37, Lane52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, Vietnam

Company Name

Date of Establishment

CEO

Business Locations

Overseas Corporation

CEO

Management Support

Plan Technical Sales Manufacturing Vietnam CorporationCleanroom Design Cleanroom

Construction Quality ControlR&D

Finance / Accounting Maintenance China CorporationMachinery Design Machinery

Construction

Human Resources / General Affairs A/SFire Protection

Facility DesignFire Protection Facility Work

Auditor Environment / Safety

Management Strategy Division Business Management Division

Affiliated Research Institute DesignSales Construction /

ManagementProduction Overseas Businesses

Quality & Safety

President

Page 4: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

2000-2001 2002-2004 2009-2011 2012 2013 2014-2016

2012. 04Obtained Venture Business certification (Korea Technology Finance Corporation)

Obtained INNO-BIZ certification for small and medium business with technical innovation

2012. 08Constructed and relocated to a new head office building (Geomdan General Industrial Complex)

2012. 09Capital increased (200 million KRW) and licensed for a specialized construction company

(Machinery and Installation Work; Seo-gu, Incheon 2012-10-14)

2013. 04Reported for overseas construction businesses

2013. 05Established an affiliated research institute

2013. 07Obtained certification for industry-university cooperation family company by Korea Polytechnic University

Certified to ISO 14001 environmental management system

Certified to ISO 9001 quality management system

2013. 11Selected for a national project related to energy technology development ‘Eco Heat Pump Air Handling Unit System’

2013. 12Contracted with Seoul National University of Science and Technology for industry-university cooperation

2014. 04Vietnam Corporation ‘CHUNG-A VINA’ established

2014. 12Registered as a supplier for 4 Samsung companies (Samsung C&T Corporation, Samsung Engineering, Samsung Everland and Samsung Heavy Industries)

2015. 03Obtained K-Mark for ‘Eco Heat Pump Air Handling Unit System’ by Korea Testing Laboratory

2016. 01Capital increased (300 million KRW)

2016. 02Licensed for specialized fire protection facility work

2000. 01CHUNG-A Air Conditioning Co., Ltd. established 83-4, Guro-dong, Guro-gu, Seoul

2000. 05Factory registered for ‘production of air Handling Unit with No. 29172’

2001. 05Utility model registered for ‘cooler’ (No. 2001-0005361)

2002. 02Relocated the head office to ‘525-5, Gajwa-dong, Seo-gu, Incheon’

2002. 05Obtained the first overseas construction project in ‘Myanmar’

2009. 03Patent applied for air Handling Unit with new concept

2009. 07China Corporation ‘CHUNG-A Air Conditioning (Suzhou) Co., Ltd’ established

2010. 06China Corporation changed its legal description to ‘CHUNG-A LCD (Suzhou) Co., Ltd.’

2011. 03Company name changed to ‘CHUNG-A ST Co., Ltd.’

Patent registered for ‘air conditioning systems (No. 10-1024699)’

2011. 12Achieved sales of 10 billion KRW

CHUNG-A'S HISTORY

Page 5: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

We cannot rely on outsourcing to provide services.

We cannot rely on outsourcing to provide services.

Our dedicated A/S personnel will resolve your inconvenience in a fast and

accurate manner.

We cannot negotiate quality with anything.

We are challenging for Zero Defect by applying strict quality control criteria

for both production and installation stages.

Our experienced personnel are producing their own equipment.

Offering quality products at reasonable price.

We have established our own database for raw materials and labor

cost to provide quality products and services at reasonable price and

realized the most economic and stable systems meeting your needs.

CHUNG-A'S VISION CORE VALUE

Realizing

Clean and Rich World Through Advanced TechnologyCHUNG-A ST develops new technology and products allowing customers to cope with ever changing industrial conditions and produce

advanced products in more stable environment.

CHUNG-A ST will be committed to providing differentiated products and services for customer satisfaction.

CHUNG-A ST will change the world for everyone to live in clean and rich environment.

Clean & Affluent World Through Advanced

Technology

Technology

Technology That Changes the World

Service

Customer Impression Service

Based on its accumulated know-how since the establishment in 2000, CHUNG-A ST will realize

customer satisfaction by providing differentiated products and services.

SSpeed

PPrice

QQuality

Page 6: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

CERTIFICATE CERTIFICATE

Business Registration Certificate

Utility Model Certificate

Factory Registration Certificate Patent Registration Certificate

Page 7: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

CERTIFICATE CERTIFICATE

Construction Business Registration Certificate

Overseas Construction Business Certificate

Fire Protection Facility Work Registration Certificate

Affiliated Research Institute Certificate

Page 8: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

Venture Business Certificate

CERTIFICATE CERTIFICATE

ISO 9001 Certificate

CERTIFICATE

INNO-BIZ ISO 14001 Certificate

Page 9: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

CERTIFICATE CERTIFICATE

K-Mark Certificate by Korea Testing Laboratory

OHSAS Certificate

Family Company Certificate by Korea Polytechnic University

Agreement for Industry-University Cooperation with Seoul National University of

Science and Technology

Page 10: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

CERTIFICATE CERTIFICATE

Supplier Registration Certificate with 4 Samsung Companies

Tax Registration Certificate for Vietnam Corporation

Approval Certificate

Business Registration Certificate for China Corporation

Page 11: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

List of Construction Specialists

No NameQualification

QualificationItem Grade Qualification No. Qualification Date

1 Lee Dong-cheol Electric welding Craftsman Electrical Welding 84406060321L 1984.08.13

2 Lee Seong-deok Machinery Entry Level Engineer 81308201886F 1981.11.30 Industrial Engineer Computer Aided Manufacturing

3 Kim Yeong-gap Machinery Craftsman Sheet Metal Boiler Making 85410380268S 1985.12.30

4 Kwon Jae-won Machinery Entry Level Engineer G00450878 2006.12.06

5 Yu Yeong-seok Electricals Craftsman Electricity 88405153781T 1988.09.05

6 Park Jun Machinery Entry Level Engineer G00649554 2009.02.20

7 Kim Yong-gil Construction Professional Engineer 82309210315k 1982.12.20Engineer Construction SafetyEngineer Architecture Grade 1Engineer Landscape Architecture Grade 1

8 Yu Ho-jun Machinery Mid-Level Engineer G00621378 2014.05.29 Craftsman Construction Piping

9 Kim Seong-su Air Conditioning and Freezing Machinery

Professional Engineer Air-conditioning

Refrigerating Machinery

05177010014Z 2005.11.28

No NameQualification

QualificationItem Grade Registration No. Registration Date

1 Kim Yong-gil Engineer Fire Protection System - Mechanical

Professional Level 82307200140 1982.11.08

2 Kim Yong-gil Engineer Fire Protection System - Electrical Entry Level 82307200140 1982.11.08

3 Rou Ho-jun Engineer Fire Protection System - Mechanical

Advanced Level 2009-01-00336W 1999.10.27

4 Rou Ho-jun Engineer Fire Protection System - Electrical

Advanced Level 2009-01-00336W 1999.10.27

5 Kwon Jae-won Qualification for Fire Protection Technology Entry Level 2016-01-00032L 2016.01.11

6 Park Jun Qualification for Fire Protection Technology Entry Level 2016-01-00033L 2016.01.11

7 Son Seong-ok Engineer Fire Protection System - Electrical Entry Level 15202102147S 2004.12.09

List of Fire Protection Specialists

LIST OF PERSONNEL SPECIALIZED IN CONSTRUCTION AND FIRE PROTECTION TECHNOLOGY

LIST OF PERSONNEL SPECIALIZED IN CONSTRUCTION AND FIRE PROTECTION TECHNOLOGY

Page 12: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

BUSINESS AREA

Clean Room System

HVAC & Clean Equipment

Utility Solution

Machinery & Fire Protection Facilities

Realizing clean spaces for advanced industries

Dust free devices to prevent contaminants from getting inside

Utility Solution Performing machinery & fire protection facility work

Page 13: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

CLEAN ROOM SYSTEMCleanroom systems create clean spaces that control dust and the number of bacteria for advanced industries.We provide the most appropriate cleanrooms for different purposes to realize the most economic and efficient spaces.

Total Consulting Company from Design to Installation and Maintenance

Applications

Applications

Semiconductors, displays (ICR)

2D/ 3D Design

Hospitals, laboratories (BCR)

Analyzing air flow, pressure distribution

Electrical/electronic, precision machinery (ICR)

Precision production / installation

Pharmaceuticals (GMP facilities), food (HACCP facilities)

Fast and direct controlled A/S services

H.V.A.C SOLUTION

Keeping constant temperature and humidity

HVAC solutions are systems that keep indoor spaces at constant temperature and humidity in clean environment by using air Handling Unit and duct systems. Air Handling Unit manufactured based on advanced engineering techniques and efficient system constructions will realize optimized indoor environment.

Page 14: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

UTILITY SOLUTION

P-VACUUM SYSTEM

CDA SYSTEM

PCW SYSTEM

DI WATER SYSTEM

EXHAUST SYSTEM

01

02

03

04

05

CLEAN EQUIPMENTCHUNG-A ST manufactures dust free devices necessary to maintain cleanliness in cleanrooms.

CLEAN ROOM SYSTEM

Clean Locker

Air Shower

Clean Bench

Pass Box

Clean Booth

HFU(HEPA Filter Unit)

Relief Damper

ACU(Air Control Unit)

FFU(Fan Filter Unit)

BFU(Blower Filter Unit)

PREPARE ROOM

CLEAN ROOMClass 1.000~100.000

CLEAN ROOMClass 1~100

SMOCK ROOM

Page 15: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

CHUNG-A ST provides installation of hygienic, heating and cooling, air conditioning and fire protection facilities.

CHUNG-A ST offers installation of fire protection, alarm, fire extinguishing, evacuation and fire water facilities.

Piping facilities necessary to use water in an easy and hygienic way.

1. Water Supply Facilities: piping installations to supply water to sinks, washstands and fireplugs2. Water Discharge Facilities: piping installation to discharge water used in sinks or bathtubs outside3. Ventilation Pipes: Piping installation to discharge polluted gases in pipes

Facilities to provide clean environment that residents need by maintaining indoor temperature higher or lower than outside temperature

1. Heating Facilities: various installations such as central heating, individual heating and regional heating2. Cooling Facilities: installations using fusion heat, sublimation heat and evaporation heat types, method to use expansion by

compressor and method to use Peltier effect

Facilities to maintain indoor places at proper temperature and humidity to create clean air and prevent pollution

Rectangular and spiral duct installation for ventilation, temperature and humidity control and air supply adjustment

Hygienic FacilitiesMachinery, equipment or facilities to use water or other fire extinguishing agents for fire fightingFire extinguishers, indoor fireplugs, outdoor fireplugs, sprinklers, temporary sprinklers, sprinkler facilities for early detection, water spraying fire extinguishers, water cannon facilities, carbon dioxide extinguishers, halogen compound extinguishers and clean extinguishing agents

Fire Extinguishing Facilities

Machinery, equipment or facilities to notify fire alarmsEmergency bell and auto siren facilities, independent alarm detectors, emergency broadcasting systems, short circuit alarms, auto fire detection facilities, visual alarms and gas leak alarms

Alarm Facilities

Facilities used to extinguish fire or rescue peopleAnti-smoke facilities, connecting pipes, connecting water spray facilities, emergency plug facilities and wireless communication support facilities

Fire Extinguishing Activity Facilities

Equipment or facilities used for evacuation from fireEscape slides, escape ladders, rescue system, escape ropes, air cushioning mattresses and other evacuation equipment, fire resistant clothes, air respirators and artificial ventilators, guide lights and signposts and emergency lights

Evacuation Facilities

Heating and Cooling Facilities

Air Conditioning Duct Facilities

MACHINERY WORK FIRE PROTECTION FACILITY WORK

Page 16: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

ENGINEERING FIELD

Realizing optimized custom designs based on strict technical verification and data with know-how accumulated for several years

Designating the project system designers as the onsite designers to minimize errors between designs and installations, allowing accurate onsite installations and realizing optimized deigns customized for sites based on know-how accumulated over time

We are committed to research projects together with our affiliated research institute to provide all the designs necessary for production, allow customer to produce accurate precision equipment and realize optimized designs with know-how accumulated for several years.

System Design Onsite Design

Production Design

Main Businesses

Main Businesses

Main Businesses

Sales Support Design

Equipment Production Design Equipment Improvement and Development

Onsite station and support design

Process monitoring and supervision

Custom designs for sites

New Technology Training

Precision Installation Design

Onsite Support Design

New Technology Training

Page 17: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

PRECISION T.A.B COMPANY MANAGEMENT

01

01

02

02

03

Regular Maintenance ·Regular maintenance is intended to prevent operational accidents of cleanrooms in advance in order to prevent any problems in production.

·We manage operation of the customer’s cleanrooms so that they can be maintained in their optimized conditions.

Quarterly Inspection Visits (Regular Maintenance) ·Regular maintenance will be done on a quarterly basis to manage cleanrooms in their optimized conditions.

·Particles (class) are measured for management and inspection.

·Systems are evaluated (temperature, humidity and operational conditions) for management and inspection.

·Components with potential problems are replaced before such problems occur.

·Cleanroom operation management and training is offered.

·Cleanroom status report is submitted to customers.

Follow Up Inspections Upon Customer Request (Non-regular Inspection) ·Preliminary actions are taken for customers to cope with emergency measures on the phone upon customer request.

·Visits are made within 6 hours after phone calls to identify causes and resolve them.

·Problems are recognized by customers and reporting is made in writing.

·Actions for cleanrooms are submitted to customers in reports.

Follow Up Plans After Warranty Period ·We enter into contracts with customers for follow up actions so that they can continue their production without problems.

Regular Maintenance After Warranty Period ·Regular maintenance will be done on a quarterly basis (twice a year) to manage cleanrooms in their optimized conditions

·Particles (class) are measured for management and inspection.

·Systems are evaluated (temperature, humidity and operational conditions) for management and inspection.

·Cleanroom operation management and training is offered.

·Cleanroom status report is submitted to customers.

* Above details may vary depending on contract terms for annual maintenance.

Measurement Items

Filter Installation Leak Test

Filter Face Velocity Test

Airborne Particle Count

Temperature & Humidity Test

Room Pressure Test

Air Flow Test

Sound Level Test

Lighting Level Test

Air Handling Unit air volume balancing

Heat source systems

Regular Maintenance

After Warranty Period

Maintaining cleanrooms in their best conditions and realizing best production environment through precision measurement and adjustment

Organizing dedicated T.A.B. outsourcing team

Page 18: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

PERFORMANCEPERFORMANCE

Site Hanoi, Vietnam

Year 2015

Scale 1,100m2

Project Name Cleanroom Design and Installation

Class 100,000 Zone

Site Hanoi, Vietnam

Year 2014

Scale 5,400m2

Project Name Cleanroom Design and Installation

Class 10 Zone

Daeduck GDS Vietnam Factory Project Cammsys Vina Clean Room Project

Page 19: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

PERFORMANCEPERFORMANCE

Air compressor installation200HP * 10SET

Site Weihai, China

Year 2013

Scale 7,600m2

Project Name Cleanroom Design and Installation

Class 10 Zone

Site Cheonan, Chungnam

Year 2011

Scale 4,300m2

Project Name Cleanroom Design and Installation

Class 1,000 Zone

Cleanroom facilities for Sun Yang DNT, Manufacturing Factory 1 in China Utility system works for DID Co., Ltd.

Page 20: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

PERFORMANCEPERFORMANCE

Site China Nanjing

Year 2011

Scale 11,200m2

Project Name Cleanroom Design and Installation

Class 1,000 Zone

Site Paju, Gyeonggi

Year 2010

Scale 1,200m2

Project Name Installation of ME fences

Class 100 Zone

Site Cheonan, Chungnam

Year 2010

Scale 4,300m2

Project Name Cleanroom Design and Installation

Class 1,000 Zone

Site China Suzhou

Year 2008. 09

Scale 12,000m2

Project Name Cleanroom Design and Installation

Class 1,000 Zone

LG Display P8E Project ME Construction of new cleanrooms for Dongwa Photoelectrics in China Suzhou

Construction of new cleanrooms for Donggwang Photoelectrics in China Nanjing Utility system works for DID Co., Ltd.

Page 21: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

PERFORMANCEPERFORMANCE

Site Cheonan, Chungnam

Year 2007. 08

Scale C/R 330m2

Project Name Installation of interior panels, air conditioning pipes and ducts, and cleanroom equipment

Class 100 Zone

Site Myanmar

Year 2003. 09

Scale C/R 990m2

Project Name HVAC installations

Class 1,000 Zone

Site Asan, Chungnam

Year 2004. 09

Scale C/R 400m2

Project Name Installation of clean booths

Class 100 Zone

Site Gumi, Gyeongbuk

Year 2010. 03

Scale C/R 1,160m2

Project Name Installation of air Handling Unit, interiors and cleanroom equipment

Class 1,000 Zone

Site Cheonan, Chungnam

Year 2004. 10

Scale C/R 2,150m2

Project Name Installation of interiors, air conditioning pipes and ducts, and cleanroom equipment

Class 1,000 Zone

Site Asan, Chungnam

Year 2008. 05

Scale C/R 330m2

Project Name Production and installation of air handling unit and cleanroom equipment

Class 10,000 Zone

Construction of new cleanrooms for Praxair Surface Technologies CJ Factory in Myanmar

Installation of clean booths for UNIMED Construction of new cleanrooms for Korea Powertrain

DI Co., Ltd. KB Chemicals

Page 22: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

Other Performances Domestic Other Performances Domestic

PERFORMANCEPERFORMANCE

NO Customer Project Name Site Year Class Scale Item

1 CJ Engineering & Construction Corporation Construction of a new office building in Daechi-dong Gangnam, Seoul 2016 - 23,100m2 -

2 CJ Engineering & Construction Corporation Construction of a new office building in Yeoksam-dong Gangnam, Seoul 2016 - 19,577m2 -

3 GS Neotek Construction of a new factory for IONES Co., Ltd. Anseong, Gyeonggi 2016 - - LCD

4 Samsung SDI Regular replacement of HEPA filters for the first line Ochang, Chungbuk 2015 1,000 - LCD POL

5 Samsung SDI Replacement of 1F acrylic booths for the first line Ochang, Chungbuk 2015 1,000 - LCD POL

6 Samsung Engineering Production and installation of air showers for Samsung SDI Ulsan 2014 1,000 - -

7 Samsung Everland Improvement works for air conditioning in PVA unwinding devices Ochang, Chungbuk 2014 1,000 - LCD POL

8 Samsung Everland Improvement works for air flows for the second and third coating lines Ochang, Chungbuk 2014 100 - LCD POL

9 DID Co., Ltd. Design and installation of cleanrooms for extend facilities Cheonan, Chungnam 2014 1,000 1,600m2 BLU,TFT LCD

10 Daeyang Chemical Co., Ltd. Cleanroom Design and Installation Yongin, Gyeonggi 2013 - 350m2 -

11 CAMMSYS Co., Ltd. Cleanroom Design and Installation Incheon 2013 10 7,600m2 Camera Module

12 DID Co., Ltd. Design and installation of cleanrooms for the second floor of the factory #1 Cheonan, Chungnam 2013 10,000 300m2 BLU,TFT LCD

13 DID Co., Ltd. Design and installation of cleanrooms for the third floor of the factory #2 Cheonan, Chungnam 2012 10,000 500m2 BLU,TFT LCD

14 Digitech Systems Co., Ltd. Hook up works for ventilation ducts Paju, Gyeonggi 2012 - - -

15 Sinnara Construction Co., Ltd.

Extension works for Seonyu factory #1 for Digitech Systems Paju, Gyeonggi 2012 10,000 4,000m2 Touch screens

16 BIO & CHEMICAL R&D Production and installation of microorganism rooms, stability sample rooms and culture rooms Yeoju, Gyeonggi 2012 10,000 4,500m2 Production of

pharmaceuticals

17 Korea Thumb Vet Co., Ltd. Supplementary works for KVGMP Iksan, Jeonbuk 2012 - - Production of animal medicine

18 DID Co., Ltd. Cleanroom Design and Installation Cheonan, Chungnam 2011 1,000 6,300m2 BLU,TFT LCD

19 CERAGEM MEDISYS Co., Ltd. Installation of constant temperature and humidity facilities Gwangju, Jeonnam 2010 - 500m2 Medical devices

20 EIG Co., Ltd. Installation of constant temperature and humidity facilities Cheonan, Chungnam 2010 - 500m2 Batteries for electric vehicles

21 C&C Automotive Cleanroom Design and Installation Yeoju, Gyeonggi 2010 - 2,500m2 Automotive navigation systems

22 NENSYS Co., Ltd. Installation of constant temperature and humidity facilities Suwon, Gyeonggi 2010 - 3,800m2 Production of medical compounds

23 Zeus Co., Ltd. Production and installation of LGD P8 EX ME & skirts Paju, Gyeonggi 2010 - 5,500m2 BLU,TFT LCD

24 KCTech Co., Ltd. Production and installation of LGD P8 EX ME & skirts Paju, Gyeonggi 2010 - 5,500m2 BLU,TFT LCD

25 SLS Co., Ltd. Production and installation of LGD P8 EX ME & skirts Paju, Gyeonggi 2010 - 5,500m2 BLU,TFT LCD

26 Korea Powertrain Cleanroom Design and Installation Waegwan, Gyeongbuk 2010 10,000 1,200m2 Automotive components

27 DID Co., Ltd. Utility system works for facility lines Cheonan, Chungnam 2009 1,000 6,000m2 BLU,TFT LCD

28 Samchundang Pharm Co., Ltd. Cleanroom Design and Installation Hyangnam, Gyeonggi 2009 1,000 4,200m2 Production of

pharmaceuticals

NO Customer Project Name Site Year Class Scale Item

29 Kyongbo Pharm Cleanroom Design and Installation Asan, Chungnam 2009 1,000 3,500m2 Production of

pharmaceuticals

30 NK BIO Cleanroom Design and Installation Sunggnam, Gyeonggi 2008 1,000 1,000m2 Stem cells

31 Kyongbo Pharm Cleanroom Design and Installation Asan, Chungnam 2008 1,000 3,500m2 Raw ingredients

32 KOLMAR KOREA Cleanroom Design and Installation Yeongi, Chungnam 2008 1,000 4,700m2 Production of cosmetics

33 DID Co., Ltd. Cleanroom Design and Installation Cheonan, Chungnam 2008 1,000 6,300m2 BLU,TFT LCD

34 Daesung Electric Co., Ltd. Repair and renovation of cleanrooms Ansan, Gyeonggi 2007 1,000 3,700m2 Automotive components

35 BIO & CHEMICAL R&D Cleanroom Design and Installation Yeoju, Gyeonggi 2007 100 4,000m2 Production of pharmaceuticals

36 Praxair Surface Technologies Cleanroom Design and Installation Cheonan, Chungnam 2006 1,000 2,000m2 Production of industrial

gases

37 Soon Chun Hyang University Hospital Installation of air conditioning facilities Yongsan, Seoul 2006 1,000 2,300m2 Surgical rooms

38 SJ Construction Co., Ltd. Cleanroom Design and Installation Eumseong, Chungbuk 2006 1,000 2,500m2 Electronic components

39 ACE, Inc. Installation of constant temperature and humidity facilities Mapo, Seoul 2005 1,000 1,200m2 BLU,TFT LCD

40 TSTI Installation of constant temperature and humidity facilities Asan, Chungnam 2005 1,000 1,000m2 Equipment measuring

rooms

41 Songdo Hospital Cleanroom Design and Installation Incheon 2005 1,000 3,900m2 Surgical rooms

42 Young Poong Pharmaceutical Cleanroom Design and Installation Incheon 2005 1,000 4,300m2 Production of

pharmaceuticals

43 Hanlim Pharmaceutical Cleanroom Design and Installation Yongin, Gyeonggi 2005 1,000 4,900m2 Production of

pharmaceuticals

44 Kangnam University Installation of constant temperature and humidity facilities Suwon, Gyeonggi 2005 - 500m2 Audio rooms

45 Hana Pharm Cleanroom Design and Installation Hwaseong, Gyeonggi 2004 1,000 3,000m2 Production of

pharmaceuticals

46 Kyungdong Pharm Cleanroom Design and Installation Osan, Gyeonggi 2004 100 5,500m2 Production of pharmaceuticals

47 Yonsei University Severance Hospital Cleanroom Design and Installation Sinchon, Seoul 2004 1,000 2,000m2 Surgical rooms

48 CJ Cleanroom Design and Installation Icheon, Gyeonggi 2004 1,000 5,000m2 Production of

pharmaceuticals

49 Soon Chun Hyang University Hospital

Installation of air conditioning facilities in general surgical rooms Yongsan, Seoul 2004 1,000 1,500m2 Surgical rooms

50 Korea Otsuka Pharmaceuticals Cleanroom Design and Installation Hyangnam,

Gyeonggi 2004 1,000 4,000m2 Production of pharmaceuticals

51 CJ Cleanroom Design and Installation Eumseong, Chungbuk 2003 1,000 6,200m2 Production of

pharmaceuticals

52 ISU Chemical Cleanroom Design and Installation Sinchon, Seoul 2003 1,000 3,500m2 Production of pharmaceuticals

53 KOLMAR KOREA Cleanroom Design and Installation Yeongi, Chungnam 2003 1,000 4,800m2 Production of

pharmaceuticals

54 BIO & CHEMICAL R&D Extension works for cleanrooms Incheon 2003 1,000 4,000m2 Production of pharmaceuticals

55 Wooyoung Co., Ltd Extension works for cleanrooms Osan, Gyeonggi 2002 1,000 2,800m2 BLU,TFT LCD

56 D&D Tech Extension works for cleanrooms Osan, Gyeonggi 2002 1,000 2,500m2 BLU,TFT LCD

57 Insect Bio Cleanroom Design and Installation Daejeon 2002 1,000 3,300m2 Production of pharmaceuticals

Page 23: CHUNG-A ST Company Profile · Company Profile Total Cleanroom Solution Clean Room System Machinery & Fire Protection Facilities HVAC & Clean Equipment Utility Total Solution Head

www.cacr.co.kr

MAPPERFORMANCE

NO Customer Project Name Site Year Class Scale Item

58 CJ Construction of cleanroom equipment Seoul 2002 1,000 5,000m2 Production of pharmaceuticals

59 Soon Chun Hyang University Hospital Construction of new cleanrooms for ICU Yongsan, Seoul 2002 1,000 2,000m2 Surgical rooms

60 Estech Pharma Construction of cooling storages Hwaseong, Gyeonggi 2002 1,000 1,500m2 Production of

pharmaceuticals

61 CJ Production Technology Center Cleanroom Design and Installation Seoul 2001 1,000 4,300m2 Production of

pharmaceuticals

62 Whanin Pharm Cleanroom Design and Installation Anseong, Gyeonggi 2001 1,000 1,500m2 Production of

pharmaceuticals

63 Onnuri Hospital Cleanroom Design and Installation Seoul 2001 1,000 2,000m2 Surgical rooms

64 Ducksung M&P Installation of heating and cooling systems for factory building Seoul 2001 1,000 3,500m2 Precision molding

65 DID Co., Ltd. Construction of cleanrooms for production building Cheonan, Chungnam 2000 1,000 7,200m2 BLU,TFT LCD

66 Hi-Q Co., Ltd. Cleanroom Design and Installation Gunpo, Gyeonggi 2000 1,000 2,000m2 Semiconductors

67 Samsung Pharm Cleanroom Design and Installation Hyangnam, Gyeonggi 2000 1,000 4,500m2 Production of

pharmaceuticals

NO Customer Project Name Site Year Class Scale Item

1 Cheil Industries Mobile1 Over Bridge Mechanical Work(Fire protection piping) Hanoi, Vietnam 2015 - 1,400m2 Production of mobile

phones

2 Daeduck GDS Installation of cleanrooms Hanoi, Vietnam 2015 100,000 1,100m2 PCB

3 CAMMSYS Vina Design and installation of cleanrooms Hanoi, Vietnam 2014 10 5,400m2 Camera modules

4 Sun Yang DNT, Manufacturing Factory1 Design and installation of cleanrooms Weihai, China 2012 10 4,200m2 Camera modules

5 Sun Yang DNT, Manufacturing Factory1 Design and installation of cleanrooms Weihai, China 2012 1,000 3,400m2 Camera modules

6 Donggwang Photoelectrics Design and installation of 3F cleanrooms Nanjing, China 2012 1,000 11,200m2 BLU,TFT LCD

7 Donggwang Photoelectrics Design and installation of cleanrooms Nanjing, China 2011 1,000 11,200m2 BLU,TFT LCD

8 Lumens Design and installation of cleanrooms Suzhou, China 2010 1,000 5,500m2 LED

9 Dongwa Photoelectrics Design and installation of the second cleanrooms Suzhou, China 2009 1,000 12,000m2 BLU,TFT LCD

10 Dongwa Photoelectrics Design and installation of the first cleanrooms Suzhou, China 2008 1,000 12,000m2 BLU,TFT LCD

11 Corhex Design and installation of cleanrooms Vietnam 2008 1,000 66,000m2 Production of mobile phones

12 Humantec Korea Engineering Design and installation of cleanrooms Suzhou, China 2007 1,000 4,500m2 BLU,TFT LCD

13 CJ Design and installation of cleanrooms Myanmar 2006 1,000 8,000m2 Medicine (injection)

Head Office and Incheon Factory

Seoul Office

Vietnam Corporation

China Corporation

173, Bodeum-ro, Seo-gu, Incheon (17 Block – 14 Lot, Geomdan General Industrial Complex, Oryu-dong)

Tel. (+82) 32-579-3078 Fax. (+82) 32-579-3079

285, Digital-ro, Guro-gu, Seoul (701-1, Ace Twin Tower #1, Guro-dong)

Tel. (+82) 2-862-8283 Fax. (+82) 2-857-7417

No 37, Lane 52 Pham Hung St., My Dinh 2 Ward, Nam Tu Liem Dist., Hanoi, VietnamTel. (+84) 4-6686-3422 VOIP. (+82) 70-8280-8079

Industrial Park, Suzhou, Jiangsu, ChinaTel. (+86) 512-6296-1230 Fax. (+86) 512-6296-1626

◀서인천화력(청라도)신공항고속도로

경인고속도로

강화(초지대교)▶

검단,강화▶

검단▶

▲신공항

계양▼

당하동▼

◀북향.INISTEEL경서동주물공단

(주)영기업

대덕강업

(주)제일티앤에이

서구청

백석초교

배수문

◀석남동

Other Performances Domestic

Other Performances Overseas