85
Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd TRIECA _ March 26-27 th , 2013

Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Chris Denich, M.Sc., P.EngAquafor Beech Ltd

TRIECA _ March 26-27th, 2013

Page 2: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

New Development ROW– Upper Middle Road

Retrofits Public Realm– Green Glades Public Realm– Beach Boulevard Park Retrofit ROW Retrofit – Lakeview

Page 3: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 4: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Bioretention Unit New Development Oakville, Ontario Constructed in

2011 Facility- 1,600m2

Accepts 4ha road drainage

25mm event

Page 5: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

◦ Designed and constructed to address stormwater impacts to the habitat of Red-Side Dace, a fish species provincially designated as At Risk and protected under the Species at Risk Act (SARA).

◦ General reluctance to approve conventional SWM approaches: Wet ponds, wetlands and OGS for water quality

◦ Facility that can be characterized/become habitat are discouraged

◦ Thermal impacts are now a concern

◦ Disruption of baseflow, etc

Page 6: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Hydrogeological Study of Groundwater - Surface Water Interaction (Aquafor, 2009)

Previous Geotechnical reports – 05 & 07

Soil Stratigraphy>8m of unsorted Sand & Gravel, overlain and confined within the 

valley slopes by 5‐10m of silty clay (Halton Till)

Hydraulic Conductivity

Silty Clay till –low conductivity  (10‐7 to 10‐10 m/s)

Sand & Gravel unit – high conductivity  (10‐5 to 10‐6 m/s)• 2‐3 orders of magnitude difference  

•Using a sensitivity analysis, 15 mm/hr was determined using hand‐driven piezometers & sharp response  to rainfall events and 

rapid drainage as baseflow

Seasonally High Groundwater  Table Elevation  ±122.5m

Groundwater  Table Fluctuation  0.2‐0.5m

Page 7: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Bioretention Design

Plunge Pool

Grass Filter Strip

OGS Pre-Treatment 1. OGS (Stormceptor STC 14000)2. Plunge Pool - 150m2

3. Grass Filter Strip – 2.5m

Bioretention Facility Underdrain System

Overflow Channel

Page 8: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Bioretention Facility Design

Native Sand & Gravel

D-Washed 50mm ø

Underdrains

Media

Shredded HW-MulchObservation

Well

Page 9: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Can be characterized by the rain event type: Small Event

◦ Frequent/ ‘typical events’ –representing the majority of the annual rainfall events, typically characterized by low intensity, long duration.

Page 10: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Can be characterized by the rain event type: Large Events

◦ Infrequent/ Large Events -these types of events occur infrequently but are characterized by high intensity and short duration.

Page 11: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Bioretention Media is the functional component of the system –critical to the long-term function of the system

Page 12: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

7.83

18

7.6

6.26

17.7

7.6

5.60

18.3

7.6

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

% Fines CEC (meq/100g) pH

Prototype 1

Prototype 2

Prototype 3

Hand Mixed Prototypes

Page 13: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Mechanically Mixed Prototypes –Mass Production

7.83

18

7.67.7

15.6

7.5

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

% Fines CEC (meq/100g) pH

Prototype 1 (Hand Mixed) Prototype 1 (Mechanically Mixed)

Page 14: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

For Construction – Large Site

23.4

16.3

7.20

4.9

12.8

7.376.2

12.9

7.316.3

15.2

7.38

0.0

5.0

10.0

15.0

20.0

25.0

% Fines CEC (meq/100g) pH

July 18, 2011 July 19, 2011

July 25, 2011 July 26, 2011

Page 15: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Infiltration Testing During Construction: 50-75mm/hr

Page 16: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 17: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 18: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 19: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 20: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 21: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 22: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 23: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Washed

Un-washed

Page 24: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 25: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 26: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 27: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 28: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 29: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 30: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 31: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

April 2012

Page 32: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

June 2012

Page 33: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 34: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Bioretention Unit Retrofit

Mississauga, ON Constructed in

2011 Facility- 11m2

Accepts 0.03ha road & roof drainage

25mm event

Page 35: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Drainage Area

Retrofit Area

Page 36: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Pilot Project - Retrofit

Accept runoff from the small flat roof above the building’s front entrance as well as a portion of the parking lot area

Existing Issues◦ Iced sidewalk - Flat roof drainage flowed over

sidewalk area ◦ Settlement of asphalt area at pedestrian cross-walk

created nuisance ponding and icy conditions

Page 37: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Guelph Permeameter – In-situ infiltration testing Sub-surface soils investigation – hand auger

Soil Stratigraphy10‐15cm of topsoil 

0.8‐1.0m of Silty, Fine sand (approx 10% silt)>2m of Fine sand 

Hydraulic ConductivityAt 1.5m depth below surface‐ hydraulic conductivity 

of native soils  = 2.03x10‐3 cm/s or 73mm/hr

Groundwater  Table Elevation No water table encountered  at depths greater than 

2.5m throughout  testing (June –August)

Page 38: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Bioretention Facility

Dry River Bed

Inlet Grate

Outlet Grate

Existing Electrical Trench

Page 39: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Existing Electrical Trench

Preliminary Design Revised Design

Page 40: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 41: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 42: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 43: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

For Construction – Small Site

7.7

15.6

7.5

25.9

15.2

7.5

13.414.8

7.6

0.0

5.0

10.0

15.0

20.0

25.0

30.0

% Fines CEC (meq/100g) pH

Approved Media Mix (Mechanically Mixed)

Refuted Sample (High)

Refuted Sample (Low)

Page 44: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 45: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 46: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Before

Page 47: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

After

Page 48: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 49: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

ROW Retrofit within older residential area◦ Bioswales & Perforated

Pipe System◦ Permeable pavement◦ Bioretention media for

filtration and infiltration

Mississauga, ON

Construction – Spring 2012

Accepts road & property drainage

Page 50: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 51: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

0.0

2.0

4.0

6.0

8.0

10.0

Alt

erna

tive

Ratin

g

A l ternatives

Public Responses to Presented Alternatives

Support forEnviron. Project

Grassed Swale

Vegetated Swale

DitchImprovements

Page 52: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

(Most Important to least important)1) Parking 2) Water Quality 3) Environmental Benefits4) Prevent Flooding  5) Integration with the Environment6) Improve Conveyance 7) Integration with Existing 

Infrastructure 8) Aesthetics 

Other results 

•No Sidewalks• Cost not important • Same Driveway width after construction • 50% want perennial plants •Willing to do maintenance 

Page 53: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 54: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 55: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 56: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 57: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 58: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Third St.

Page 59: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 60: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

7.2m widths provides access but is less than current City Standard (8.0m)

Selected to reduce impervious cover and allow for additional area for bioswales

Page 61: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 62: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 63: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Geotechnical investigation undertaken within the existing ROW/ditches

Soil Stratigraphy5‐30cm of topsoil 

0.2‐1.5m of Clayey Silty Fill with some sand & gravel Clayey Silt Till deposits at depth 

Hydraulic ConductivityAt 1.0‐1.2m depth below surface‐ design infiltration rate was determined to be 5.45mm/hr  (2.5 SF) –

5mm/hr used in the design 

Groundwater  Table Elevation 

Observations included generally no GW  (GW observed at surface  in some locations ‐

attributed to water perched  in the ditches and fill stratum)

Page 64: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 65: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 66: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 67: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 68: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

WaterService Line Punctured

Bell Line Damaged (BellService Onsite)

Page 69: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

To avoid an existing gas line, a section of perforated underdrain was notched to allow the gas line to transect the pipe

Page 70: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 71: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Materials not identified in the geotechnical reports!

Page 72: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 73: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 74: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Re-grading of properties; Infil-development (3 homes); Abandoned and/or unmarked utilities; Sump-pump and property drainage

connections; No trees;

Page 75: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Sacrificial Geotextile

Page 76: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Inlet ESC Controls

Page 77: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 78: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 79: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Soakaway Pit Park Redevelopment of

vacant land Hamilton, ON Constructed 2011 Accepts parking lot

drainage for up to 100 year storm (full infiltration)

Combined and separated storm sewers – City desire to minimize flows resulting from infill developments

Page 80: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Groundwater –Seasonally High Infiltration Testing Sands and Gravel

Seasonally high (March-April) groundwater elevation of 1.28m below the ground surface at an elevation of approximately 75.0m was determined

Page 81: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created

Groundwater – Seasonally High = Major Design Concern due to site location

Page 82: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 83: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 84: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created
Page 85: Chris Denich, M.Sc., P.Eng Aquafor Beech Ltd · 7/18/2011  · Iced sidewalk - Flat roof drainage flowed over sidewalk area Settlement of asphalt area at pedestrian cross-walk created