CHIXOY

Embed Size (px)

Citation preview

  • 8/12/2019 CHIXOY

    1/8

  • 8/12/2019 CHIXOY

    2/8

    reversing time) (contract reversing

    time)

    14 Insulating and way of

    extinction of the arch

    SF6 SF6

    15 Sequence of operation O-0.3 s-CO-3 min. CO/CO-

    15 s-CO

    O-0.3 s-CO-3

    min. Or CO/CO-15

    s-CO

    16 Height of operation of the

    plant

    300 m.s.n.m. 300 m.s.n.m.

    17 Distance of escape 25 mm/Kv, between phases 25 mm/Kv, between

    phases

    18 Type of switch Three-phase Three-phase

    19 Type of control of the

    switch

    Single-pole Single-pole

    20 Type of mechanisms tensioning spring motor and

    manual

    tensioning spring

    motor and manual

    21 Control voltage 110v DC 110v DC

    22 voltage auxiliary circuits 208v AC 208v AC

    23 Level of seismic

    classification

    0.3g 0.3g

    24 Auxiliary connections 6889 mm (25*245=6125

    31*245=7595)

    25 Auxiliary contacts 10 NO y 10 NC (Minimum) 10 NO y 10 NC

    (Minimum)

    26 Capacity of auxiliary

    contacts

    10 amperes minimum 10 amperes

    minimum

    27 Voltage of heating office 208v AC 208v AC

    28 Bobbins of shot Double Double

    29 Bobbin of closing One One

    30 Monitoring pressure of the

    SF6

    With contact of alarm and

    block

    With contact of

    alarm and block

    31 Measurement of pressure local local

  • 8/12/2019 CHIXOY

    3/8

    of the gas

    32 anti-pumping relay included included

    33 Quality of the gas

    according to norm

    IEC 376 IEC 376

    2. Environmental local conditions.

    No Description Local conditions. Offered

    1 Speed of the wind 100 km/h 100 km/h

    2 Seismic force Acceleration, 0.5 g

    horizontal, 0,5 gvertical

    Acceleration, 0.5 g

    horizontal, 0,5 gvertical

    3 Maximum long

    temperature of the

    day

    50 C 50 C

    4 Maximum relative

    humidity

    100% 100%

    5 installation height 300 msnm 300 msnm

    3. Other requirements of the supply.

  • 8/12/2019 CHIXOY

    4/8

    No Requirements Offered

    1 The technical rating plates must be

    in Spanish language, made of steel

    Stainless with inscriptions of low

    relief for outdoor and of easy

    reading.

    Yes

    2 The switches must bring own

    structure of material resistant to

    the environment galvanized in

    warmly, according to procedure

    EN-ISO 1461, CASH 50976 or

    ASTM A153 and with capacity of

    static load and suitable dynamics

    Yes

    3 The stature of every switch will

    have to be adapted to the current

    base of the concrete one

    Yes

    4 The structure of every switch must

    have his point of connection of

    earthing

    Yes

    5 Every switch must bring the

    connectors of high tension,

    necessary and adapted for the

    installation of the equipment

    Yes

    6 The height of every switch must

    be similar to nowadays installed in

    such a way that there are not

    modified in risky form the

    distances and current heights of

    the installation

    Yes

    7 Every switch must rely on

    sufficient auxiliary contacts that

    they allow to connect all the

    circuits of control that allow the

    Yes

  • 8/12/2019 CHIXOY

    5/8

    current operation of the switches

    in sure form and that are fulfilled

    by the scheme of current

    protection

    8 In his offer it must guarantee in

    form written by a company

    qualified and independent from the

    quality of the materials used in the

    switches and the quality of the

    smelting of the fixed parts and

    mobiles of the switch

    Yes

    9 Must be submitted to international

    standards both mechanical and

    electrical applied in the

    manufacture of equipment and

    components, if they use their own

    rules of the country of origin must

    be comparable or better than most

    current international standards

    Yes

    10 In the assembly of the equipment

    the use of adjustments is not

    allowed in the structure that alters

    the quality of the equipment

    Yes

    11 It is necessary to deliver the full

    equipment of SF6 with all the

    accessories

    Yes

    12 It is necessary to deliver a lot of

    minimal supplies, attend to any

    damage that is generated in the

    first operations, this lot must

    include:

    - 3 relays monitoring SF6 gas

    pressure.

    Yes

  • 8/12/2019 CHIXOY

    6/8

    - 3 engines of tightened of spring,

    - 6 bobbins of closing.

    - 6 bobbins of opening.

    - Relays of control.

    - Switchboards.

    - Switches you die of career.

    Bobbins signaling to attend a

    switch

    Motor

    Yes

    Yes

    Yes

    NA

    NA

    NA

    13 Densimeter of SF6 per pole to

    floor height for easy viewing,

    indicating scale shall have

    temperature compensated pressure.

    so it must be Equipped with low-

    stage press indication, the first one

    as alarm and the second for

    blockade.

    Yes

    14 The protections of the elements of

    the switch must effect by means of

    thermomagnetic switch. They

    were not accepted protections by

    means of fuses

    Yes

    15 It must possess a counter of

    operations of the type that does not

    adjust

    Yes

    4. Testing.

  • 8/12/2019 CHIXOY

    7/8

    All switches must bring manufactures testing protocol prior to delivery and receipt

    of the same.

    5. Manuals and documentation.

    No Required Offered

    A) Manuals of technical

    information it completes.

    Dimensions. Torque of

    screws and packing

    protocol of tests with his

    typical values and

    measurements realized

    during the tests. Important

    information for his storage

    and managing during the

    assembly.

    Yes

    B) Manuals of operation and

    maintenance, where it

    includes measurements and

    calibrations and parameters

    of functioning, in Spanish

    language

    Yes

    C) Fault identification manual,

    indicating the most likely

    failures and maintenance

    program to prevent

    Yes

    6. Warranty.

  • 8/12/2019 CHIXOY

    8/8

    The contractor must deliver the original certificate of guarantee of the manufacturer,

    whose term must be equal or bigger than 18 months, from the definitive receipt of the

    supply and service.

    Reply:confirm.

    7. Delivery time.

    With a maximum of 24 months, counted from the day of the notification to the

    beneficiary of the letter of credit. In the same term the contractor has 20 days calendar

    for every field of switches, from the notification in writing of the from date of the works

    for the supervisor of the contract or the chief of plant.

    Reply:confirm.