Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
China advanced Water-Cooled Reactors
deployment experience
Xue Shanhu
2014.11.26
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
Success Factors and Challenges in nuclear energy
deployment
China advanced Water-Cooled Reactors deployment
experience
Contents
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
Success Factors and Challenges in nuclear energy
deployment
China advanced Water-Cooled Reactors deployment
experience
Contents
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
� National position:energy demand (especially in developing
country, industrialization, urbanization, growing population),
environmental pressure, energy security, political consideration.
� Legal and regulatory framework : completed law and code
system, including national laws, ministerial ordinances and
regulatory guides.
� Nuclear regulatory authority: implement the NPP siting, design,
construction, commissioning, decommissioning, operation safety
review and supervision.
Key elements of nuclear energy deployment
� Nuclear technology: import (such
as turn-key project) or self-reliance
develop
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
� Human Resource: both technical and managerial trained and
experienced personnel as plant designer, researcher,
constructor, operator and regulatory supervisor.
� Fund: capital investment and financing, government encourage,
financial risk due to engineering uncertainty
Key elements of nuclear energy deployment
� Site Preparation: site investigation, selection and evaluation
carry Feasibility Study (FS), Site Safety Evaluation and
Environmental Impact Evaluation, etc
� Electrical Grid: a basis for plant
size selection and development
scale
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
� Equipment & Fuel Supply (Supply Chain
Management): import or local manufacture
� Radioactive Waste: radioactive gaseous and
liquid treatment and discharge, packed solid
waste disposal
� Emergency Planning: onsite and offsite
emergency plan and procedure under nuclear
accident
� Public Acceptance: nuclear power basic
knowledge publicize, information openness,
keep communication
Key elements of nuclear energy deployment
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
Success Factors and Challenges in nuclear energy
deployment
China advanced Water-Cooled Reactors deployment
experience
Contents
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
From 2008, China government initiated Large Advanced PWR Project
� As one of National Science and Technology Major Projects
� Aim to develop and build GIII passive NPP independently
1. China advanced PWR deployment Program
Assimilation and absorption
of AP1000
CAP1400 R&D Demonstration
project
CAP1700 R&D
Generic technology and
critical equipment and material
research
Large Advanced
PWR Project
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
Present Status:
� AP1000 introduction, digestion and absorption has finished.
� CAP1000 plant design and equipment manufacture has
realized localization, and used in several projects.
� CAP1400 R&D has almost completed. CAP1400 demonstration
plant is going to FCD early next year.
1. China advanced PWR deployment program
CAP1400 MilestoneCAP1400 Milestone
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.1 National energy policy
78.40%
17.08%
2.22% 2.30%
Power generation of the 2rd quarter of 2014
� To improve environment, optimize
energy structure and meet energy
demand, nuclear power is significant
option for China.
� Take advantage of energy police, get
greater policy support and financial
support on NPP R&D, construction
and operation (provide research
expenses and government subsidies)
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.2 Interaction with the nuclear safety authority
� Comply with nuclear technical policy. After Fukushima event,
NNSA publishes “Safety requirements of new nuclear power plant
in the 12th Five Year”, requires the new units must meet GEN III
safety standards.
� NNSA involvement in new plant R&D
• Safety Analysis Review
• Experiment witness
• Independent analysis
• independent experiment
CAP1400 IVR test witness
CAP1400 PSAR Review Meeting
CAP1400 CERT test witness
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2.3 Extensive cooperation with nuclear industry
Domestic participants: 100+ organizations involved, covering:
� R&D institute
� Manufacturer
� Construction
� Utility
� Academic
2. Experience to share
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
International participants:
2. Experience to share
Westinghouse(US) provides design consultation
L&M (US) participates in PMS development
OSUs (US) participates in test verification
EMD(US) and KSB (Germany) participate in the development
of Reactor Coolant Pump
GRS (Germany)participates in engineering verification
Laboratories of OECD provide large amounts of test data
Corporate from US, Canada and Japan participate in
equipment material research and test verification
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.4 Standard Design
� Standardization for the System, structure, component, NI/CI design
interface and CI configuration as well as the common specification,
general technical requirement, and design management document.
� Scope of standard design include NI, CI and part of BOP, divide into
three types:
BuildingReactorBuilding
Auxiliary Building
Annex Building
Radioactive Building
Diesel Generator Building
System “A” type system: 48
“B” type system: 60 “C” type system: 13
Item Nonstandard item: 56
General Equipment:317
Structural Module: 84
Mechanical Module:53
Type A
Standardization
Type BRecommended standardization
Type C
Site applicability design
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.4 Standard Design
� With envelop site condition
Standard site parameter Design Value
Atmosphere Temperature -40~46℃
Wind SpeedExtreme wind speed:65m/s
Tornado:134m/s
Seismic SSE=0.3g (applicable for the high seismic area)
Design base flood level Lower than plant elevation (dry site)
Ground Water level -0.6m Lower than plant elevation
Rain 525.8mm (1hr)
Snow / Ice 3.6 kPa
Site exclusion area ≥800m
CAP1400 standard design site parameter
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.5 Equipment localization
� For key equipment, set special research subjects to realize localized
manufacture. If necessary, carry out verified test.
� Equipment for competition:
generally 2~3 suppliers,
decrease risk and avoid
monopoly.
� The key and large-amount
materials must be localized.
� Build qualified supplier chain. China Equipment Manufacturing Base
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.5 Equipment localization - Gen III qualified supplier chain
� Gen III qualified supplier chain were basically formed.
� 88 Chinese companies were qualified.
� Covering mechanical, electrical, material, design and construction.
� Design analysis and test verification capability significantly improved.
RV SG PRHR HXPRZ
RCP test loop RCP motor RCP Heat shield
guide vane
CMT
RCS Pipe
Squib valves
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to share
2.6 Experience feedback management
� Establish experience feedback system
� Set manage organization
� Complete work procedure
� AP1000 self-reliance project experience
feedback
� Build AP1000 DCP implementation
mechanism of feedback to CAP design
� Build AP1000 E&DCR implementation
mechanism of feedback to CAP design
� Build experience feedback channel with
owners, constructors, AE, collect
improvement information.
24
113
499
230
414
0
100
200
300
400
500
600
EDCR处理统计处理统计处理统计处理统计
EDCR处理统计
Success Factors and Challenges in the Deployment of
Advanced Water-Cooled Reactors
2. Experience to Share
2.7 Human Resource & Knowledge Management
� Take nuclear R&D institute for example
Research, Test, Design
Review
Field service
technical supporting
Class Training
On-job Training
Multi-project and Multi-
platform exercises
International
Conference