Chiller Fans

Embed Size (px)

Citation preview

  • 8/15/2019 Chiller Fans

    1/8

    BROAD Indoor Units have obtained international

    certicates of ISO, CE, ETL and so on

    BROAD Town, 410138,Changsha, China www.broad.com

    Tel: +86-731-84086175 Fax: 84086387 ter [email protected]

    纸80g

    2011.07 First edition NO.:10,000

    BY169-11 C 2011

    In order to protect forests and

    water resources, please follow

    us to use thin, unlaminated

    printing paper.

    100g

    FUNCTION

    Air conditioning, air purication

    STRUCTURE

    Fan coils + electrostatic

    cleaner + intelligent control

    system+ movable metal shell

    COOLING CAPACITY

    2.7kW ~130kW

    (7℃ chilled water and 65OC

    hot water can be supplied)

    UNIQUE ADVANTAGES

    ● Exposed installation of fan

    coils, movable shell which

    enables easy dust cleaning &

    bacteria killing, eliminates the

    "air-conditioning disease"

    ● Equipped with electrostatic

    cleaner purifying indoor air 

    effectively

    ● Equipped with CO2 sensor 

    monitoring oxygen deciency

    ● Inverter-controlled fan, very

    energy efcient

    ● 100% steel structure,

    automobile stylish quality

    baking nish

    ● Plug and play concept

    BROAD AIR CONDITIONING

    INDOOR UNITS

    Design & Model selection Manual

    Central Air Conditioning Terminals

    2011.07 EN

  • 8/15/2019 Chiller Fans

    2/8

    1

    Electrostaticcleaning device

    A / C   W 

    .  o u t  l e t

     C o n d

     e n s a t e

     

     o u t  l e t

    A / C   W 

    .   i n  l e t

    CO2 Sensor 

    UNIQUE TECHNOLOGIES

    BROAD Air Conditioning indoor units are Central Air Conditioning Terminal products. Their unique air quality

    technologies have rewritten the century-old air conditioning history. They have met needs of modern architecture

    with their exquisite & various models, easy installation & maintenance.

    ElectrostaticCleaner 

    ActiveCarbon lter 

    Coarse lter 

    Fan

    Coils

    Electrostatic dust cleaning:Tungsten

    laments of electrostatic cleaners

    continuously release high voltage static

    electricity. All particles in the air are

    positively charged, then adsorbed by

    negative plates. Particles tinier than

    human cells and pollens are ltered,

    which can protect the respiratory system,

    and reduce drastically the cancer risks.

    Electrostatic Bacteria Killing: Tungsten

    laments of electrostatic cleaners

    continuously release high voltage static

    electricity at 6,000v. It kills instantlybacteria, viruses, and can stop all kinds

    of airborne diseases.

    Active Carbon Filter eliminates

    formaldehyde: traps all kinds of toxic

    gases like benzene, nicotine, etc.

    AIR PURIFICATION PRINCIPLE :

    ·

    ·

    ·

    2

    INDOOR UNIT PRODUCT OVERVIEW

    Note: 1.Areas (recommended m2)  need engineers to do detailed calculation, it's for your reference.

    2.Super energy efcient building refers to envelop enclosure with thermal insulations and heat recovery

    fresh air which have reached the highest building levels .

    3.Large Model, Super large Model: areas suitable for a 4~6m height building.

    Mo del C od e A /C cap aci ty Ar ea s (r eco mm end ed) m2 Dimensions

    (L×W×H)

    mm

    Cooling

    kW

    Heating

    kW

    Common

    building

    Energy

    Efcient

    building

    Super energy

    efcient

    building

    Flat   DC3.6 3.6 5.3 20 40 80 520x320x940

    DC5.4 5.4 8.1 30 60 120 520x320x1310

    DC7.2 7.2 10.8 35 75 150 520x320x1500

    DC12 12 18 50 100 200 520x320x2250

    Oval   DQ5.4 5.4 8.1 30 60 120 1670x320x700

    DQ12 12 18 50 100 200 2600x320x840

    Horizontal

    Long-range

    DE12 12 18 70 150 300 2250x360x520

    Vertical

    long-range

    DF12 12 18 60 120 250 520x360x2250

    Curve   AD2.7 2.7 4 12 25 40 1560x195x340

    Large   EH18 18 27 70 150 300 380x840x2590

    EH25 25 37.5 100 200 400 380x840x3200

    EH40 40 60 150 300 650 380x840x5000

    Super large EC60 60 90 250 500 1000 2000x1900x3920

    EC130 130 195 400 800 1600 3800x1900x3920

  • 8/15/2019 Chiller Fans

    3/8

    3

    PRODUCT STRUCTURE

    CONTROLLER

    Outdoor temp

    Indoor temp

    Indoor humidity

    Cooling

    Heating

    Set temp

    A/C W inlet temp

    A/C W outlet temp

    Real-time cooling capacity (heating capacity)

    A/C W ow rate

    Indoor CO2 level (monitor oxygen deciency)

    Fan frequency(10~50Hz)

    Five-position switch

    Infrared window

    Green light - Operation

    Red light – Alarm

    Light off when unit off

    Timer 

    OK

    Remotecontrol

    Controller 

    Clean air outlet

    Auto vent

    Dirty air inlet

    CO2 sensor 

    Humidity sensor 

    Indoor temp sensor 

    Coarse lter

    insect mesh

    Positively chargedtungsten flaments

    Negatively charged

    aluminum plates

    Active carbon lter 

    Coilsthe only shared part withconventional products

    Motor valve

    adjust room temp and avoid A/Cwater circulation when the unit is off

    to save pump electricity

    Stainless steel bellows

    Manual valveadjust ow rate, for shutoff inmaintenance

    A/C W outlet

    A/C W inlet

    Manual valvebalance water system, for shutoff inmaintenance

    Water lter 

    Condensate outlet

    Heat meterconsists of ultrasonic ow meterand thermometer 

    Water pan

    Fan

    Electrostatic

    cleaner 

    Air purication

    system

    Air conditioning

    system

    Inverter fan

    C   H   T1K

    4

    CLEANING ELECTROSTATIC CLEANER

    Easy to take out electrostatic cleaner 

    Open shell by a slight touch

    Use detergent and water to wash

    To maintain constant purication efciency, once the cleaner is very dusty, it has to be taken out and cleaned

    (once per month). Easy to wash with detergent or ultrasonic cleaner. Each time it only takes a few minutes.

  • 8/15/2019 Chiller Fans

    4/8

    5

    LOAD

    QUANTITIES

    ENERGY SAVING

    COMFORT

    OPTIONS

    MODEL SELECTION GUIDANCE

    Load selection cannot be roughly estimated, it is

    closely related to building thermal insulation level

    rather than building areas.

    If a fast model selection is needed, please refer to P 2

    “Areas(recommended m2)”.

    One unit per room is recommended.

    More units might be recommended for spacious room

    with more furniture.

    Inverter-controlled fan cuts energy consumption

    drastically at low load operation.

    Actually, air conditioners are running at low load

    during 90% operation time.

    Optional pre-set energy saving mode saves energy by

    20%~30%.

    Air cannot be blown directly to people.

    Inverter-controlled fan makes the quiet operation.

    Remote control: adjust temperature and air flow,

    USD13/pc. One pc is recommended for one room,

    for a room equipped with multiple fan coils, one is

    recommended for 3 pcs. In public rooms like hotels

    can use control panel instead.

    Color: products have “standard color” please read

    “Rated Parameters”, if customers prefer different colors,

    additional 7% will be billed. It is also optional to choose

    special panels, for instance, stainless steel, titanium, gold-

    plating, price is high, lead time is longer.

    Model Code A/C Capacity A/C water Fan Air owm3 /h

    A/Ctubemm

    Condensate tube mm

    N.W.kg

    Ship. Wkg

    Standardcolor 

    CoolingkW

    HeatingkW

    Circu-lationkg/h

    Resis-tancekPa

    Powerdemand W

    PowerconsumptionW

    Flat DC3.6 3.6 5.3 442 30 130 25~98 650 Φ16 Φ16 33 40 White

    DC5.4 5.4 8.1 663 40 140 30~105 970 Φ22 Φ16 45 54

    DC7.2 7.2 10.8 884 40 140 40~110 1300 Φ22 Φ16 52 63

    DC12 12 18 1473 50 260 60~200 2160 Φ28 Φ16 73 86

    Oval DQ5.4 5.4 8.1 663 40 140 30~105 970 Φ22 Φ16 46 56 Wine red

    DQ12 12 18 1473 50 350 70~280 2160 Φ28 Φ16 88 102

    HorizontalLong-range

    DE12 12 18 1473 50 450 100~360 2160 Φ28 Φ16 79 92 White

    VerticalLong-range

    DF12 12 18 1473 50 450 100~360 2160 Φ28 Φ16 79 92 White

    Curve   AD2.7 2.7 4 331 30 50 15~40 540 Φ16 Φ16 24 28 White

    Large   EH18 18 27 2210 60 450 130~380 2700 Φ28 Φ22 238 252 White

    EH25 25 37.5 3100 6 0 620 180~520 3750 Φ35 Φ22 298 3 15

    EH40 40 60 4960 60 1070 310~850 6000 Φ42 Φ22 478 505

    Super large   EC60 60 90 7440 70 4800 960~4080 10800 Φ 42 Φ22 800 860 Silvergrey

    E C130 130 195 16100 80 6730 1950~5640 23400 Φ 76 Φ28 1300 1410

    RATED PARAMETERS

    1. Rated conditions for cooling: outlet/inlet water temp14/7℃, inlet air dry bulb temp 27℃, wet bulb temp 19.5℃

    Rated conditions for heating: outlet/inlet temp 55 ℃/65℃, inlet air dry bulb temp 21℃.

    2. External residual pressure of Super large series EC60 & EC130: 90Pa and 150Pa respectively(in operation with ducting system).

    3. Standard at model designed as right side air blow, optional to choose “left side air blow” when an order is placed, letter 

    B must be added after the model.

    4. Standard super large series designed as direct blow, optional to choose “ducting”, letter F must be added after the model.

    Notes:

    PERFORMANCE CURVES

    Air ow vs. Air pressure ( for super large series ducting model)

    Chilled water owrate vs. Cooling capacity

     C o ol  i  n g c a p a ci  t   y %

     C o ol  i  n g c a

     p a ci  t   y %

    E x t   er n al   s t   at  i   c pr  e s  s  ur  e (  P  a )  

    Flowrate %

    100

    95

    90

    85

    80

    75

    7050 60 70 80 90 100

    Chilled water temp vs. Cooling capacity

    Return air temp.

    10℃9℃8℃7℃6℃5℃

    140

    120

    100

    8060

    4023   24 25   26 27 28

    Air ow %

    300

    100

    200

    0   60 100   140

    ECF130

    ECF50

    6

    320

           1        0        0     ~        6        0        0

    185

            2        6B

    35

    520

    88        6       5

           1        3        0

    (illustrated model is 5.4kW)

    Air inlet

    Air outlet

    4 bolts M8

           L

    A/C W supply A

    A/C W return A

    Condensate

    Power input

    FLAT MODEL (DC3.6、DC5.4、DC7.2、DC12)

    Magnicent, economic (as per cooling capacity), suitable for all kinds of buildings.

    Model L A B

    DC3.6 940 Φ16 48

    DC5.4 1310 Φ 22 60

    DC7.2 1500 Φ 22 60

    D C1 2 2 25 0 Φ 28 7 0

    Dimensions (mm, the same

    on the following pages)

    Note: If it can’t be wall-mounted,

    choose oor bracket, 5% price more.

  • 8/15/2019 Chiller Fans

    5/8

    7

    1100 2040

    60 70

    2 30 2 22

    368 720

    251259

    1670 2600

            3        0        0

            7        0        0        1

            0        5

            8        2

            2        4        4

            2        8        7

            8        4        0

    Power input 6 bolts M8 A/C W return A/C W supply Condensate

    22 28 22 28 16Air inlet

    Air outlet

           1        4        0        0     ~       1        9        0        0

            3        2        0

    (illustrated model is 5.4kW)

    OVAL Model (DQ5.4,DQ12)

    Magnificent & stylish. Choices with special elegant panel (as mirror-style stainless steel,

    brushed stainless steel, even titanium plate).

    Note: Two data of dimension for DQ5.4 and DQ12 respectively.

    8

    Adjustable nozzles, suitable for densely-stuffed rooms.

    HORIZONTAL LONG-RANGE MODEL (DE12)

    Air outlet(adjustable

    any direction)

    Air inlet 65 Power input A /C W r et ur n 1 30

    26

           1        2        0

           1        8       5

           7        0

            8        8

           1       7        0        0     ~        2        0        0        0

           5        2        0

            3        6        0

    A/C Wsupply

    4 bolts M8

    2250

    Condensate

    28

    16

    28

  • 8/15/2019 Chiller Fans

    6/8

    9

    Air outlet(adjustable

    any direction)

    Air inlet

    70       1        3        0

            2        2       5        0

            2        6 35

    185

            3        0

    4 bolts M8

    520

    88360

           1        0        0     ~       1       5        0        0

            6       5

    Power input

    A/C W supply

    A/C W return

    Condensate

    28

    28

    16

    Adjustable nozzles, suitable for densely-stuffed rooms.

    VERTICAL LONG-RANGE (DF12)

    10

     

    Air outlet direct to the lobby

    (adjustable)

    Return water tube

    28

    Supply water tube

    4 bolts M12

    Condensate

    Power input

    Maintenance access Maintenance access

    35 42

    28 35 42

    20

    70

    135

    342

    380

            2        5        9        0

            3        2        0        0

            5        0        0        0

            8        0

            9        0

            7        7        0

    Air outlet(adjustable) Air inlet

    (illustrated model is 25kW)

     

    840 200

    Suitable for open space, nozzles can be adjusted, especially suitable for airport, supermarket. Either

    placing independently or against the wall, the body can be used for billboards.

    LARGE MODEL (EH18、EH25、EH40)

     Note:There are 3 dimensions:

      EH18,EH25 and EH40

  • 8/15/2019 Chiller Fans

    7/8

    11

    SUPER LARGE MODEL (EC60、EC130)

    Suitable for large open space, nozzles can be adjusted, can be connected to ducting system. Body can

    be used as billboards.

    12

    Note: Two data of dimension for

    EC60 and EC130 respectively.

    Air outlet Air outlet Air outlet Air outlet

    2000 3800 1900

    300

            3        9        2        0

            1        6        0

    Air outlet direct

    to the lobby

    (adjustable)

    Paper filter 

    Coil

    Coarse filter 

    Electrostaticcleaner 

    Air inlet Air inletAir inlet Air inlet

    (illustrated model is EC60)

    Maintenanceaccess

    Maintenanceaccess

    Maintenanceaccess

    Maintenanceaccess

    Power input

    Condensate 22 1 50 20 0Φ 28Φ

    A/C W supply

    A/C W return

    42Φ 76Φ

    42Φ 76Φ

  • 8/15/2019 Chiller Fans

    8/8

    13

    Air inlet

    Air outlet

    A/C W s upply A/C W retur n

    4 bolts M8

    Power input Condensate

    16

    195

    71 1791560

            3        4        0

      1       1       5

            4        8

            2        0        0     ~        3        0        0

    16

    16

    Low position installation, low position air outlet, super energy-efcient

    CURVE MODEL (AD2.7)

    14

    1. Installation procedures

    INSTALLATION TIPS

    Pre-installed piping and wiringDuring the construction, A/C water supply & return tubes (with

    pre-installed valve), condensate tubes, power supply cable,

    signal wire shall be implemented to the location of indoor

    units.Water pumps must be started circulation for 5 days at

    least so that impurities inside tubes can be collected.

    Shell installationIndoor units are to be installed after the room decoration.

    Handle them with care to avoid any damage. Locate and

    drill holes on the wall against the screw holes on the shell

    back rst, then insert expansion bolts and mount the unit.

    (Large model must be equipped with anchor bolts whereas

    super large model may not apply them) .

    Tube connectionConnect the pre-installed water supply tube, water return

    tube and condensate tube to the i ndoor units. Check

    &clean impurities of the water lter.Water return & supply

    tubes can be connected with exible stainless steel bellows

    Power connectionLead power cable from the wiring terminal to indoor power

    supply. The power cable must comply with the local codes

    and standards.

    Controller installation(most models have installedcontrollers before shipment).The controller can be installed on a supporter supplied with

    the unit, or lead 3×0.15mm2 control cable from the wiring

    terminal and install the controller onto the wall nearby. The

    location should be convenient to operate.

    4. Tips for piping connection

    5. Electric wiring(List of site work)

    Item Installationposition

    Material Applicable Materialsource

    Scope

    Externalpower 

    Wiringterminal

    3×1.0mm2

    3×1.5mm2

    3×2.5mm2

    5×4.0mm2

    5×6.0mm2

    2.7~7.2kW

    9~18kW

    25~40kW

    60kW

    130kW

    User  Installer 

    Controller Wiring

    terminal

    3×0.15mm2

    communicationcable

    All BROAD Installer 

    Notes:

    All electric materials and methods for installation must comply

    with the local codes and standards.

    Specific connection refers to “Exterior wiring diagram”

    attached with unit.

    All the units must be of reliable grounding.

    Stainless steel bellows (BROAD supply)

    Outdoor thermometer installationLead a 2×0.3mm2 cable from indoor unit wiring termi nal.

    Install the sensor outside the window and avoid direct

    sunshine. The length of the cable should be less than 30m.

    (If thermometer is separately purchased from BROAD,it must

    be mounted in the sunshade box from BROAD).

    3. Tips for shell installation

    8. Air purication commissioningCompare particles from the outlet and inlet with particle

    detector (or Particles instrument).

    Take out the electrostatic cleaner after operating for a day

    and check dust collection.

    If not, there might be some faults. Please notify BROAD or

    BROAD authorized service provider.

    6. Power on inspection

    7. A/C hydraulic balance commissioningStart up all indoor units in the whole building for cooling or

    heating operation.

    Check that whether the output of each indoor unit is

    consistent. Use an infrared thermometer to test whether the air

    outlet temp from each indoor unit is the same.

    Turn up its ow regulating valve or turn down valves of nearby

    indoor units if the air temp from an indoor unit cannot reach

    the target. Repeat the adjustment till a hydraulic balance is

    reached.

    Generally the valve openness of those indoor units closer to

    the chiller should be smaller.

    After completion of whole building installation, keep the

    chilled water pump running continuously for min. 5 days to

    accumulate impurities at each lter. Wash the l ters before

    indoor units are installed.

    2. Tips for piping and wiring pre-installation

    Pre-installed valve (BROAD supply)

    W. return valve

    Elbow for

    temporary

    circulation

    W. supply valve

    Water lter 

    Note: Please follow the marks to install and make sure not

    to mix up the supply & return W. tubes, otherwise

    coils will be clogged!

    Fix the reserved location of pipeline wire and installation

    height, then Install pipeline.

    Copper tubes must be adopted in supply/ return water

    tubes. Low temperature brazed welding is recommended

    in connecting the tubes (450℃ hot air guns welding). The

    A/C W. tubes should be covered with 30mm-80mm rubber

    plastic cold insulation material and non-metal tubes can

    be used for condensate tubes.

    BROAD pre-installed valve should be installed at the end of

    pipeline(as shown below). Water supply valve is also a ow

    regulating valve which can balance the ow rate of each

    indoor unit. It also has a shutoff function which facilitates

    lter washing. The valve must be reset each time.

    Keep the shell horizontal with no more than 2 mm gradient.

    The expansion bolts should be strong enough to support at

    least 3 times the weight of the shell (as there might be an

    impact when the cover is opened).

    Shut off the pre-installed valves (water return/ supply

    valves), take out and wash water lter, then x them back.

    Take out the bellows for temporary circulation and send it

    back to BROAD.

    Connect the pre-installed valves with indoor units by 2

    stainless steel bellows of proper length.

    The condensate tube must be with a certain gradient.

    After the installation is completed, check the settings in

    indoor unit controller item by item according to “Parameter

    Setting” from User's Manual.

    Pay special attention to the fan motor noise, outdoor/

    indoor temperature and CO2  concentration.

    Check indoor unit and lighting on/off through controller or

    remote control.