15
Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Embed Size (px)

Citation preview

Page 1: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Chief, Transport Infrastructure SectionTransport and Tourism Division

Ha Dongwoo

Best PracticesAsian Highway and Trans-Asian Railway

Page 2: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Islamic Republic of Iran All AH are included in fourth Five Year

Development PlanAfghanistanAlmost all AH routes are under study or

under rehabilitationIndiaNational Highway Development Project

(US $38 billion) includes upgrading of most of AH routes to 4 lanes.

Asian Highway: Priority Asian Highway: Priority AssignedAssigned

Asian Highway: Priority Asian Highway: Priority AssignedAssigned

Page 3: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Mongolia National development plan including

the Millennium Road Project (AH32)China35,000 km of high standard national

trunk highway system including majority of AH

ASEAN Indonesia, Malaysia, Singapore and

Thailand: conform AH standardsAll AH in Cambodia and Lao PDR

upgrading in progress

Asian Highway: Priority Asian Highway: Priority AssignedAssigned

Asian Highway: Priority Asian Highway: Priority AssignedAssigned

Page 4: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

International Financial InstitutionsBilateral donorsCo-financing among neighboring countries Enhanced cooperation among

neighboring countries – investment not only within their own territories but across borders

Asian Highway: FinancingAsian Highway: FinancingAsian Highway: FinancingAsian Highway: Financing

Page 5: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

AH3:

Zaamin Uud-Ulaanbaatar,

China, ROK, ADB, Mongolia

US$ 63m

AH32:

Numrug-Choybalsan-Ondorhaan

Prefeasibility study

ESCAP

AH4:

Yarantai-Hovd-Ulaanbaishint

750 Km

ADB, Mongolia

Page 6: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

AH48: Widening

Phuentsholing-Thimphu

India

Page 7: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

AH11: Rehabilitation

Kratie-Border of Lao PDR

China

Page 8: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

AH3:

Houayxay-Boten

China, Thailand,

Lao PDR and ADB

US $30 m

Page 9: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

AH16:

Second Mekong Bridge

Thailand, Lao PDR and Japan,

4 billion Yen

Page 10: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Moscow

TianjinUlaan baatar

8-11 November 2003

1,700 km - 75 hours 20 min.

1

22.5 km/h - 541 km/day

Vostochny

Malaszewicze

July 2004

10,350 km - 12 days 8 hours

4

35 km/h - 837 km/day

Brest

Ulaan 15-24 June 2004

7,200 km - 8 days 16 hours

3

35 km/h - 830 km/day

Almaty

Lianyungang

22-29 April 2004

5,020 km - 7 days 6 hours

2

29 km/h - 692 km/day

Demonstration Runs-ImplementationDemonstration Runs-Implementation

Page 11: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Successful launch & regular operation

Friendship Express (Tianjin – Ulaanbaatar)

Mongolian Vector (Ulaanbaatar – Brest)

Page 12: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Container block-train services from Lianyungang/Qingdao/Tianjin to Alashanko

From 152 trains (2004) to 278 trains (Jan-Aug 2006)

Page 13: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Trial runs for development of new services

From Hohhot to Frankfurt

From Tianjin to Kouvola, Finlkand

From Urumqi to Novorossisk

Page 14: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

Assessing impact of measures

0

100

200

300

400

500

0 2000 4000 6000 8000

Distance (km)

Tim

e (

hou

rs)

Measure the efficiency of policy / infrastructure improvements

(6,798 km) Sukhbaatar

(6,778 km) Naushki

(7,200 km) Ulaanbaatar

(6,798 km) Sukhbaatar

(6,778 km) Naushki

(7,200 km) Ulaanbaatar 2004

8 days 16 hrs(demonstration run)

200215 days(statistics)

(610 km) Krasnoe

Brest

Page 15: Chief, Transport Infrastructure Section Transport and Tourism Division Ha Dongwoo Best Practices Asian Highway and Trans-Asian Railway

More informationMore information

Further contactFurther contact

Tel.Fax.E-mail.

66-2-288 151566-2-288 [email protected]

Ha Dongwoo

www.unescap.org/ttdw/index.asp

United Nations ESCAP