1 November 20, 2008 Chief Capital Management Officer Report Chief Capital Management Officer Report Item # 28

Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

1

November 20, 2008

Chief Capital Management Officer ReportChief Capital Management Officer Report

Item # 28

Page 2: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

2

• 6 Mile Alignment

• 1.7 Miles of Tunnel

• 8 Stations (6 At-grade & 2 Underground)

• Park & Ride Facility

• Direct Connection to the Pasadena Metro Gold Line

• $898.8 million

• On-Time/Within Budget

• Opens in 2009

Metro Gold Line Eastside Extension Project Update November 2008

Metro Gold Line Eastside Extension Project Update November 2008

Gold Line

Page 3: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

3

Metro Gold Line Eastside Extension Overall Construction Progress

Metro Gold Line Eastside Extension Overall Construction Progress

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J

2008 2009 2010ACTIVITY

Pre-Revenue Operations

Systems Installation & Integration Testing (Phases I & II)

Atlantic Station

Maravilla Station

Indiana Station

Pico/Aliso Station

Little Tokyo/Arts District Station1st/Alameda

Boyle Heights/Mariachi Plaza & Soto Stations1st/Boyle & 1st/Soto

Pomona/Atlantic

3rd/MednikEast LA Civic Station

1st/Utah

TrackworkMajorConstructionActivities

Indiana

3rd/Ford

LAUSD Re-Build Ramona Opportunity High SchoolThird PartyInterfaces

Systems Installation & Testing/Pre-Revenue

Revenue Operations Date

1st Street Bridge Widening

Station Architecture and Site Finishes

Page 4: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

4

• Construction began in July 2004. As of mid-November 2008, the Project is over 90% complete.

• The Contractor has worked over 3.6 million hours without a lost-time accident.

• Trackwork installation along the entire six-mile alignment is complete.

• Construction of the two underground stations at 1st/Boyle and 1st/Soto is 84% complete.

• Construction of the six at-grade stations is 68% complete.

• Systems installation is 80% complete.

Metro Gold Line Eastside Extension Overall Construction Progress

Metro Gold Line Eastside Extension Overall Construction Progress

Gold Line

Page 5: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

5

View looking southwest from Union Station towards Downtown Los Angeles.

Metro Gold Line Eastside Extension 101 Freeway Light Rail Transit Bridge

Union Station

Metro Gold Line Eastside Extension 101 Freeway Light Rail Transit Bridge

Union Station

Gold Line

The tie-in to the Pasadena Gold Line tracks was completed in September 2008.

Installation of all the trackwork along the entire six-mile alignment is complete.

Page 6: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

6

Maravilla

Boyle Heights/ Mariachi Plaza

1st/Soto

Pomona/Atlantic

Pico/AlisoLittleTokyo/ Arts District

East Los Angeles Civic Center

Indiana Station

Metro Gold Line Eastside Extension Light Rail Transit Stations

Metro Gold Line Eastside Extension Light Rail Transit Stations

Gold Line

Page 7: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

7

Metro Gold Line Eastside ExtensionAt-Grade Station Construction

1st/Alameda and 1st/Utah

Metro Gold Line Eastside ExtensionAt-Grade Station Construction

1st/Alameda and 1st/Utah

Little Tokyo/Arts District Station - Northeast corner of 1st/Alameda.

Gold Line

Pico/Aliso Station – View east near 1st/Utah towards Boyle Heights.

Construction of the at-grade stations along the west side of the alignment includes concrete site work, canopy installation and systems installation.

Page 8: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

8

Metro Gold Line Eastside ExtensionUnderground Station Construction

Boyle Heights/Mariachi Plaza Station

Metro Gold Line Eastside ExtensionUnderground Station Construction

Boyle Heights/Mariachi Plaza Station

Decorative concrete masonry walls are being constructed on the plaza along the adjacent property.

Gold Line

A portion of the Station Entrance Plaza near the Mariachi Kiosk is being constructed prior to the November Annual Mariachi Festival.

Page 9: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

9

Metro Gold Line Eastside ExtensionUnderground Station Construction

Boyle Heights/Mariachi Plaza Station

Metro Gold Line Eastside ExtensionUnderground Station Construction

Boyle Heights/Mariachi Plaza Station

Station entrance stairs are being constructed from the plaza to the mezzanine levels.

Gold Line

Escalators are being installed to connect the various underground levels. Elevators will be installed within the next few months.

Page 10: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

10

Metro Gold Line Eastside ExtensionUnderground Station Construction

1st/Soto Station

Metro Gold Line Eastside ExtensionUnderground Station Construction

1st/Soto Station

Soto Station - Southwest corner of 1st/Soto where the station entrance is being constructed on the plaza level.

Gold Line

Soto Station – Interior work in the underground rooms progresses as work on the surface structures continues.

Page 11: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

11

Pomona/Atlantic Station

Indiana Station

Construction of the stations from 1st/Indiana and along 3rd Street in East Los Angeles is well underway where the erection of canopies and the installation architectural finishes has begun.

Metro Gold Line Eastside Extension At-Grade Station Construction

Metro Gold Line Eastside Extension At-Grade Station Construction

East LA Civic Center Station

Maravilla Station

Gold Line

Page 12: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

12

Gold Line

Metro Gold Line Eastside Extension Pomona/Atlantic

Construction Mitigation and Potential Parking Sites

Metro Gold Line Eastside Extension Pomona/Atlantic

Construction Mitigation and Potential Parking Sites

Vacant Church

Parking Lot

Pep Boys Auto Parts

Vacant National

Core

Kaiser Permanente

Pomona/Atlantic Station

ELA Civic Center Station

Pomona/Atlantic Parking Site

Page 13: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

13

Metro Gold Line Eastside Extension Pomona/Atlantic Station Parking

Metro Gold Line Eastside Extension Pomona/Atlantic Station Parking

Gold Line

• A design-build solicitation package for a 258 car parking structure was advertised on July 15, 2008. Three bids were received on September 30, 2008 as follows:

1. W. M. Klorman Construction $8,145,1502. ARB Structures, Inc. $8,218,5323. Bomel Construction Company, Inc. $8,445,000

• The recommendation is to award the contract to the lowest responsible/responsive bidder, W. M. Klorman Construction in the amount of $8,145,150 was presented to the Metro Board on October 23,2008. However, due to the lack of voting members the Board Item is being carried over for Metro Board approval in December 2008.

• Construction NTP is scheduled for December 2008.• The parking structure will not be completed until after the forecast July 2009

Revenue Operations Date (ROD) for the Metro Gold Line Eastside Extension Project. Based on our current schedule the parking structure will open up six months after the July 2009 ROD. A contingency plan for interim temporary parking is being established to lease spaces from nearby property owners.

Page 14: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

14

Metro Gold Line Eastside ExtensionDivision 21 – Metro Gold Line Midway Yard

Body Repair Shop

Metro Gold Line Eastside ExtensionDivision 21 – Metro Gold Line Midway Yard

Body Repair Shop

Gold Line

NORTH

Conversion of Existing Storage Building to Body

Repair Shop

Los Angeles River

Division 21 Midway Yard and

Shops

Elysian Park

• The existing Storage Building at the Division 21 – Metro Gold Line Midway Yard will be converted into a Body Repair Shop for the new 2550 Light Rail Transit Vehicles. The modifications are being planned within the building footprint area.

• A replacement Storage Building will be constructed at the Division 20 Metro Red Line Yards and Shops site.

Cornfield

Page 15: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

15

I-405 Sepulveda Pass Widening ProjectProject UpdateNovember 2008

Page 16: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

16

I-405 Sepulveda Pass ProjectSummary Schedule

ROW Acquisitions

Calendar Year

2008 2009 2010 2011 2012

Environmental

2013

PreliminaryEngineering

D/B Procurement

Utility Relocations

D/B Construction

ROD

Contract AwardIFB

Complete ROWStart ROW

NTP Complete Construction

RFQ

PE Complete

Start Relocations Complete Relocations

2014

11/08

LegendCompleted

Planned

Page 17: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

I-405 Sepulveda Pass ProjectRecent Accomplishments

17

Issued IFB on October 10, 2008.Issued Amendment No. 1 to the IFB on November 7, 2008.Continue informal meetings with qualified bidders to address areas of concern.Selected Metro Project Director, subject to Board approval.Negotiating with Caltrans to finalize field staffing levels.

Page 18: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

18

I-405 Sepulveda Pass ProjectAreas of Concern

Significant utility issues (i.e., MWD water line).

Estimated Project Budget may exceed funding.

FHWA/Caltrans design approval process may cause schedule delays.

Contractor’s concerns about Caltrans/LACMTA. processes could result in more expensive bids.

Lawsuits could delay project.

Page 19: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

19

Expo Line Transit Project

Exposition Light Rail Transit Project

Expo Board PresentationMonthly Project Status Update

November 20, 2008

Page 20: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

20

Expo Line Transit Project

PHASE 1

Page 21: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

21

Expo Line Transit Project

DesignBaseline Design is approximately 95% completeVenice/Robertson design is approximately 40% complete

ConstructionConstruction is approximately 20% complete

Construction PackagesNegotiated 14 of the 19 construction packages

Third Party AgreementsExecuted 5 of the 8 third party agreements

Phase 1 Project Status

Page 22: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

22

Expo Line Transit Project

CPUC Grade Crossing Applications

October 22nd: ALJ issued his proposed decision denying the pending applications at Harvard and Farmdale in favor of constructing pedestrian overcrossings at these two locations.

November 21st: CPUC Commission Decision

Phase 1 Project Status

Page 23: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

23

Expo Line Transit Project Construction Progress

Continued Excavation of Trench Structure

Page 24: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

24

Expo Line Transit Project

Trench Structure Roof Slab Concrete Placement

Construction Progress

Page 25: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

25

Expo Line Transit Project

National Blvd Bridge Abutment 1 Concrete Placement

Construction Progress

Page 26: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

26

Expo Line Transit Project Construction Progress

La Brea Aerial Structure CIDH Pile Installation

Page 27: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

27

Expo Line Transit Project

Installation of 6-Way Ductbank in Segment B

Construction Progress

Page 28: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

28

Expo Line Transit Project Phase 1 Project Status

Construction Budget• 14 of 19 construction packages have been negotiated in an amount

totaling $347 million

• Currently within the revised construction budget

Project Budget• All tasks are within the overall project budget

• Remaining significant risks to the budget include:- Contracts yet to be negotiated (including Storage and

Inspection Facility)- Any significant contractor claims- Changes to the Farmdale and Harvard crossings- Any significant owner related project delays

Project Budget Summary

Page 29: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

29

Expo Line Transit Project

PHASE 2

Page 30: Chief Capital Management Officer Reportmedia.metro.net/board/Items/2008/11_november/20081120CONItem… · Atlantic Station Maravilla Station Indiana Station Pico/Aliso Station

30

Expo Line Transit Project

Phase 2 MilestonesActivity Scheduled

Completion DateForecast

Completion DateStatus Comments

Scoping Meetings & Report Mar-07 May-07 Complete

Screening of Alternatives May-07 Oct-07 Complete Delay in receiving ridership model from Metro

Administrative Draft to FTA Oct-07 Nov-08 Delay due to need to recalibrate model received from Metro. Additional delays in grade crossing and other technical analyses as well as in preparing the Draft document.

Start Public Hearings on Draft DEIS/DEIR

Feb-08 Winter-09 FTA must sign off on Draft DEIS before document can be circulated

Board Adoption of LPA May-08 Winter-09

Request to enter Preliminary Engineering (PE)

May-08 Winter-09

Phase 2 Project Status