CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018 PARK NAME PARK NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS YEAR COMPLETE ABBOTT (ROBERT) 259 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012 ABBOTT (ROBERT) 259 SI Playground Chicago Plays! - new equipment COMPLETE 2013 ABBOTT (ROBERT) 259 FR Swimming Pool Pool - rehab COMPLETE 2016 ABBOTT (ROBERT) 259 FR Minor Rehab Misc. pool stairs COMPLETE 2015 ABBOTT (ROBERT) 259 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN ABBOTT (ROBERT) 259 SI Paving Paving - pathways COMPLETE 2017 ABBOTT (ROBERT) 259 SI Landscape Tree planting COMPLETE 2018 ABBOTT (ROBERT) 259 SI Site Improvement Park improvements PRE-DESIGN ADA (SAWYER GARRETT) 45 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012 ADA (SAWYER GARRETT) 45 FR Minor Rehab Entrance and washrooms COMPLETE 2012 ADA (SAWYER GARRETT) 45 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ADA (SAWYER GARRETT) 45 SI Playground Chicago Plays! - new equipment COMPLETE 2013 ADA (SAWYER GARRETT) 45 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013 ADA (SAWYER GARRETT) 45 FR Swimming Pool Misc. rehab COMPLETE 2015 ADA (SAWYER GARRETT) 45 FR Concrete Masonry Structural Field house - masonry and tuckpointing COMPLETE 2017 ADA (SAWYER GARRETT) 45 SI Athletic Field Athletic field - rehab DESIGN ADA (SAWYER GARRETT) 45 SI Paving Paving - playground COMPLETE 2012 ADA (SAWYER GARRETT) 45 SI Lighting Lighting - parking lot COMPLETE 2012 ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - surfacing COMPLETE 2011 ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - surfacing COMPLETE 2012 ADAMS (GEORGE & ADELE) 1019 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - major rehab COMPLETE 2018 ADDAMS (JANE) 262 SI Lighting Lighting - exterior COMPLETE 2012 ADDAMS (JANE) 262 AD Park Development Site preparation CONSTRUCTION ADDAMS (JANE) 262 AD New Construction Exelon Recreation Center CONSTRUCTION ADDAMS (JANE) MEML. 1224 FR Minor Rehab Misc. lockers and drainage improvements COMPLETE 2014 ADDAMS (JANE) MEML. 1224 SI Site Improvement Ohio St. Underpass - artwork COMPLETE 2011 ADDAMS (JANE) MEML. 1224 AD New Construction CDOT - Flyover Bike Connection CONSTRUCTION ALTGELD (JOHN) 206 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012 ALTGELD (JOHN) 206 SI Site Improvement Misc. fencing, signage, lighting COMPLETE 2017 ALTGELD (JOHN) 206 FR Concrete Masonry Structural Chimney and entrance COMPLETE 2014 ALTGELD (JOHN) 206 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 ALTGELD (JOHN) 206 SI Playground Chicago Plays! - new equipment COMPLETE 2013 ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 ALTGELD (JOHN) 206 FR Minor Rehab Gym floor - rehabs COMPLETE 2018 ALTGELD (JOHN) 206 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2017 1 of 59

CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

ABBOTT (ROBERT) 259 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

ABBOTT (ROBERT) 259 SI Playground Chicago Plays! - new equipment COMPLETE 2013

ABBOTT (ROBERT) 259 FR Swimming Pool Pool - rehab COMPLETE 2016

ABBOTT (ROBERT) 259 FR Minor Rehab Misc. pool stairs COMPLETE 2015

ABBOTT (ROBERT) 259 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN

ABBOTT (ROBERT) 259 SI Paving Paving - pathways COMPLETE 2017

ABBOTT (ROBERT) 259 SI Landscape Tree planting COMPLETE 2018

ABBOTT (ROBERT) 259 SI Site Improvement Park improvements PRE-DESIGN

ADA (SAWYER GARRETT) 45 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

ADA (SAWYER GARRETT) 45 FR Minor Rehab Entrance and washrooms COMPLETE 2012

ADA (SAWYER GARRETT) 45 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

ADA (SAWYER GARRETT) 45 SI Playground Chicago Plays! - new equipment COMPLETE 2013

ADA (SAWYER GARRETT) 45 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013

ADA (SAWYER GARRETT) 45 FR Swimming Pool Misc. rehab COMPLETE 2015

ADA (SAWYER GARRETT) 45 FR Concrete Masonry Structural Field house - masonry and tuckpointing COMPLETE 2017

ADA (SAWYER GARRETT) 45 SI Athletic Field Athletic field - rehab DESIGN

ADA (SAWYER GARRETT) 45 SI Paving Paving - playground COMPLETE 2012

ADA (SAWYER GARRETT) 45 SI Lighting Lighting - parking lot COMPLETE 2012

ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - surfacing COMPLETE 2011

ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - surfacing COMPLETE 2012

ADAMS (GEORGE & ADELE) 1019 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - major rehab COMPLETE 2018

ADDAMS (JANE) 262 SI Lighting Lighting - exterior COMPLETE 2012

ADDAMS (JANE) 262 AD Park Development Site preparation CONSTRUCTION

ADDAMS (JANE) 262 AD New Construction Exelon Recreation Center CONSTRUCTION

ADDAMS (JANE) MEML. 1224 FR Minor Rehab Misc. lockers and drainage improvements COMPLETE 2014

ADDAMS (JANE) MEML. 1224 SI Site Improvement Ohio St. Underpass - artwork COMPLETE 2011

ADDAMS (JANE) MEML. 1224 AD New Construction CDOT - Flyover Bike Connection CONSTRUCTION

ALTGELD (JOHN) 206 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

ALTGELD (JOHN) 206 SI Site Improvement Misc. fencing, signage, lighting COMPLETE 2017

ALTGELD (JOHN) 206 FR Concrete Masonry Structural Chimney and entrance COMPLETE 2014

ALTGELD (JOHN) 206 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

ALTGELD (JOHN) 206 SI Playground Chicago Plays! - new equipment COMPLETE 2013

ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

ALTGELD (JOHN) 206 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012

ALTGELD (JOHN) 206 FR Minor Rehab Gym floor - rehabs COMPLETE 2018

ALTGELD (JOHN) 206 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2017

1 of 59

Page 2: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

AMUNDSEN (ROALD) 129 FR Fitness Center Fitness center - upgrade COMPLETE 2011

AMUNDSEN (ROALD) 129 SI Paving Paving - paths COMPLETE 2013

AMUNDSEN (ROALD) 129 SI Athletic Field Artificial turf athletic field and track - new COMPLETE 2016

AMUNDSEN (ROALD) 129 FR Roof Roof CONSTRUCTION

ANDERSON (FRED) 561 AD Acquisition 16th St. and Wabash Ave. COMPLETE 2015

ANDERSON (FRED) 561 AD Park Development Park development - 16th St. and Wabash Ave. COMPLETE 2014

ANDERSON (FRED) 561 SI Site Improvement Park improvements CONSTRUCTION

ANDERSON (LOUIS) 1020 SI Playground Chicago Plays! - new equipment COMPLETE 2014

ANDERSON (LOUIS) 1020 SI Site Improvement Water main - new COMPLETE 2017

ANDERSONVILLE 1078 SI Playground Chicago Plays! - new equipment COMPLETE 2015

ARCHER (WILLIAM BEATTY) 250 SI Lighting Athletic field - lighting PRE-DESIGN

ARCHER (WILLIAM BEATTY) 250 SI Fencing Misc. gates COMPLETE 2011

ARCHER (WILLIAM BEATTY) 250 SI Spray Pool Water play feature - surfacing COMPLETE 2012

ARCHER (WILLIAM BEATTY) 250 SI Lighting Lighting - ballfield COMPLETE 2013

ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012

ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012

ARCHER (WILLIAM BEATTY) 250 SI Paving Paving - pathways COMPLETE 2015

ARCHER (WILLIAM BEATTY) 250 SI Athletic Field Athletic field - scoreboard and bleachers COMPLETE 2017

ARCHER (WILLIAM BEATTY) 250 FR Major Rehab Field house - major rehab CONSTRUCTION

ARCHER (WILLIAM BEATTY) 250 SI Courts Artificial turf court - rehab COMPLETE 2016

ARCHER (WILLIAM BEATTY) 250 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018

ARMOUR (PHILIP) SQUARE 3 SI Athletic Field Ballfield - rehab COMPLETE 2012

ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Gym floor - rehab COMPLETE 2012

ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Field house - exterior painting COMPLETE 2012

ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool - liner and filter COMPLETE 2015

ARMOUR (PHILIP) SQUARE 3 FR Major Rehab Transition plan - access improvements COMPLETE 2012

ARMOUR (PHILIP) SQUARE 3 SI Courts Court - conversion to roller hockey COMPLETE 2013

ARMOUR (PHILIP) SQUARE 3 SI Playground Chicago Plays! - new equipment COMPLETE 2013

ARMOUR (PHILIP) SQUARE 3 SI Paving Entrance - access paving COMPLETE 2011

ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool ADA - pool stairs COMPLETE 2017

ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Misc. pathway lighting and paving COMPLETE 2013

ARMSTRONG (LILLIAN HARDIN) 492 SI Playground Chicago Plays! - new equipment COMPLETE 2013

ARMSTRONG (LILLIAN HARDIN) 492 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013

ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Track and walkway - surfacing COMPLETE 2016

ARRIGO (VICTOR) 215 SI Paving Paving - pathways COMPLETE 2017

ASHMORE 427 SI Playground Chicago Plays! - new equipment COMPLETE 2015

2 of 59

Page 3: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

ASPEN 321 SI Playground Chicago Plays! - new equipment COMPLETE 2016

ASTER 343 SI Playground Chicago Plays! - new equipment COMPLETE 2014

ATHLETIC FIELD 80 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2011

ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2014

ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2017

ATHLETIC FIELD 80 SI Paving Paving - pathways COMPLETE 2017

ATHLETIC FIELD 80 FR Major Rehab Ceramic Building - major rehab CONSTRUCTION

AUGUSTA (CARPENTER) 1021 SI Playground Playground - new COMPLETE 2011

AUSTIN (HENRY) 1204 SI Spray Pool Water play feature - rehab COMPLETE 2016

AUSTIN (HENRY) 1204 SI Playground Chicago Plays! - new equipment COMPLETE 2016

AUSTIN FOSTER 285 SI Playground Chicago Plays! - new equipment COMPLETE 2016

AUSTIN TOWN HALL 207 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

AUSTIN TOWN HALL 207 FR Major Rehab Transition plan - access improvements CONSTRUCTION

AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2011

AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2013

AUSTIN TOWN HALL 207 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

AUSTIN TOWN HALL 207 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

AUSTIN TOWN HALL 207 SI Playground Chicago Plays! - new equipment COMPLETE 2014

AVALON 29 FR HVAC and Energy Efficiency Boilers - new BID/AWARD

AVALON 29 SI Fencing Misc. traffic control gates COMPLETE 2013

AVALON 29 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

AVALON 29 FR Major Rehab Transition plan - access improvements COMPLETE 2012

AVALON 29 FR Swimming Pool Pool - controls COMPLETE 2018

AVALON 29 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

AVALON 29 SI Site Improvement Benches COMPLETE 2012

AVALON 29 SI Paving Track - surfacing COMPLETE 2012

AVALON 29 SI Spray Pool Water play feature - rehab COMPLETE 2015

AVALON 29 SI Playground Chicago Plays! - new equipment COMPLETE 2016

AVALON 29 FR Concrete Masonry Structural Field house - tuckpointing COMPLETE 2017

AVALON 29 SI Paving Paving - pathways COMPLETE 2016

AVONDALE 81 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN

AVONDALE 81 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

AVONDALE 81 FR Concrete Masonry Structural Misc. balcony reconstruction COMPLETE 2014

AVONDALE 81 SI Playground Chicago Plays! - new equipment COMPLETE 2013

AVONDALE 81 SI Paving Paving - pathways COMPLETE 2017

AVONDALE 81 FR Roof Roof - rehab PRE-DESIGN

BACK OF THE YARDS 1063 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

3 of 59

Page 4: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

BACK OF THE YARDS 1063 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BARAGA (FREDERICK) 295 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BARAGA (FREDERICK) 295 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

BARBERRY 332 AD Acquisition Expansion COMPLETE 2012

BARNARD (ERASTUS) 1205 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BARRETT (CHARLES) 1022 SI Playground Chicago Plays! - new equipment COMPLETE 2013

BARTELME (MARY) 542 AD Acquisition Sangamon St. and Adams St. - expansion COMPLETE 2011

BAULER (MATHIAS) 365 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BEEHIVE 328 AD Acquisition Expansion COMPLETE 2014

BEEHIVE 328 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BEILFUSS (ALBERT W.) 1003 SI Playground Chicago Plays! - new equipment COMPLETE 2015

BELL (GEORGE,JR.) 121 SI Playground Chicago Plays! - new equipment COMPLETE 2015

BELL (GEORGE,JR.) 121 SI Spray Pool Water play feature - rehab COMPLETE 2018

BELL (GEORGE,JR.) 121 SI Paving Park improvements - volleyball and pathways PRE-DESIGN

BELL (GEORGE,JR.) 121 SI Courts Tennis and multi-use court - rehab COMPLETE 2017

Beniac (John “Beans”) Greenway 499 AD Acquisition Expansion COMPLETE 2011

BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013

BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

BERGER (ALBERT) 1255 FR Concrete Masonry Structural All Buildings - concrete, structural, masonry COMPLETE 2015

BERGER (ALBERT) 1255 SI Landscape Historic landscape restoration COMPLETE 2016

BESSEMER (HENRY) 12 SI Fencing Misc. gates COMPLETE 2011

BESSEMER (HENRY) 12 FR Concrete Masonry Structural Chimney COMPLETE 2013

BESSEMER (HENRY) 12 SI Paving Paving - driveway COMPLETE 2011

BESSEMER (HENRY) 12 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

BESSEMER (HENRY) 12 FR Swimming Pool Pool - filter COMPLETE 2017

BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

BESSEMER (HENRY) 12 FR Minor Rehab Misc. washrooms COMPLETE 2013

BESSEMER (HENRY) 12 FR Minor Rehab Field house - locker room improvements COMPLETE 2012

BESSEMER (HENRY) 12 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015

BESSEMER (HENRY) 12 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BESSEMER (HENRY) 12 SI Paving Paving - pathways COMPLETE 2016

BESSEMER (HENRY) 12 SI Courts Basketball court - rehab COMPLETE 2016

BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017

BESSEMER (HENRY) 12 FR Minor Rehab Field house - interior rehab including kitchen, bathrooms COMPLETE 2018

BESSEMER (HENRY) 12 SI Site Improvement Running track - surfacing COMPLETE 2018

BEVERLY 254 FR Sculpture and Monument Memorial Sculpture - new COMPLETE 2012

BEVERLY 254 SI Courts In-line hockey - new COMPLETE 2014

4 of 59

Page 5: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

BEVERLY 254 SI Playground Playground - new COMPLETE 2018

BIRCH 322 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BIXLER (RAY) 1083 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BIXLER (RAY) 1083 SI Site Improvement Chess table - new COMPLETE 2018

BLACKHAWK 122 SI Courts Basketball court - rehab CONSTRUCTION

BLACKHAWK 122 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

BLACKHAWK 122 SI Courts Tennis court - rehab and conversion to artificial turf COMPLETE 2016

BLACKHAWK 122 SI Athletic Field Athletic field - rehab COMPLETE 2012

BLACKHAWK 122 FR Swimming Pool Pool - rehab COMPLETE 2013

BLACKHAWK 122 SI Playground Chicago Plays! - new equipment COMPLETE 2015

BLACKHAWK 122 FR Roof Roof PRE-DESIGN

BLACKWELDER (I.S., GERTRUDE) 373 AD Park Development Park development including new playground COMPLETE 2011

BOGAN (WILLIAM) 264 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2013

BOGAN (WILLIAM) 264 SI Playground Chicago Plays! - new equipment COMPLETE 2015

BOGAN (WILLIAM) 264 SI Paving Paving - pathways COMPLETE 2016

BOLER (LEO ROSCOE, SR.) 496 SI Site Improvement Misc. site improvements COMPLETE 2015

BOLER (LEO ROSCOE, SR.) 496 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BOSLEY (WILLIAM) 1024 FR Roof Roof COMPLETE 2016

BOSLEY (WILLIAM) 1024 SI Athletic Field Athletic field - rehab COMPLETE 2015

BOSWELL (ARNITA YOUNG) 340 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BRADLEY (JOSEPHINE) 1004 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BRADLEY (JOSEPHINE) 1004 SI Playground Playground - concept design COMPLETE 2013

BRADLEY (JOSEPHINE) 1004 FR Minor Rehab Field house - rehab PRE-DESIGN

BRADLEY (JOSEPHINE) 1004 FR Major Rehab Field House - fire damage COMPLETE 2016

BRAINERD 177 FR Sculpture and Monument Monument - restoration PRE-DESIGN

BRAINERD 177 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

BRANDS 187 SI Athletic Field Ballfield - rehab COMPLETE 2015

BRANDS 187 FR Roof Field house - roof CONSTRUCTION

BRIGHTON 426 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

BROADWAY ARMORY 462 FR Major Rehab Field house - rehab COMPLETE 2012

BROADWAY ARMORY 462 AD Planning Indoor track - feasibility study COMPLETE 2012

BROADWAY ARMORY 462 FR Minor Rehab Misc. elevator COMPLETE 2016

BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2013

BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014

BROADWAY ARMORY 462 FR Roof Boiler room - rehab COMPLETE 2013

BROADWAY ARMORY 462 FR Major Rehab Misc. fire escape rehab COMPLETE 2015

5 of 59

Page 6: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

BROADWAY ARMORY 462 FR Concrete Masonry Structural Facility Rehab - masonry and parapet DESIGN

BROADWAY ARMORY 462 FR Minor Rehab Teen center - new CONSTRUCTION

BROOKS (GWENDOLYN) 362 SI Playground Chicago Plays! - new equipment COMPLETE 2013

BROOKS (GWENDOLYN) 362 SI Courts Court - conversion to pickleball COMPLETE 2018

BROOKS (OSCAR) 61 SI Site Improvement Tennis court - rehab COMPLETE 2012

BROOKS (OSCAR) 61 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

BROOKS (OSCAR) 61 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BROOKS (OSCAR) 61 SI Athletic Field Athletic field - rehab COMPLETE 2013

BROWN (SIDNEY) MEML. 289 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BROWN (SIDNEY) MEML. 289 SI Athletic Field Athletic field - rehab COMPLETE 2016

BROWN (SIDNEY) MEML. 289 SI Landscape Tree planting COMPLETE 2018

BROWN (SIDNEY) MEML. 289 AD Park Development Park expansion - site improvements DESIGN

BRYNFORD 1141 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BUENA CIRCLE 1084 SI Playground Chicago Plays! - new equipment COMPLETE 2016

BURNHAM (DANIEL) 27 SI Paving Museum Campus - permeable paving COMPLETE 2013

BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 41st St. CONSTRUCTION

BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 43rd St. DESIGN

BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 39th St. CONSTRUCTION

BURNHAM (DANIEL) 27 SI Site Improvement Judd Goldman Sailing Center - shade structure COMPLETE 2015

BURNHAM (DANIEL) 27 FR Roof 39th St. Trade Yard - roof COMPLETE 2011

BURNHAM (DANIEL) 27 FR Concrete Masonry Structural 39th Street Trades Yard - emergency rehab CONSTRUCTION

BURNHAM (DANIEL) 27 AD New Construction New Harbor Development - 31st St. COMPLETE 2014

BURNHAM (DANIEL) 27 SI Playground Soldier Field - playground expansion - study COMPLETE 2011

BURNHAM (DANIEL) 27 FR Concrete Masonry Structural Promontory Point - concrete and structural COMPLETE 2014

BURNHAM (DANIEL) 27 SI Paving Landscape yard - paving COMPLETE 2018

BURNHAM (DANIEL) 27 SI Lighting Exterior - pathways COMPLETE 2013

BURNHAM (DANIEL) 27 SI Landscape Burnham Wildlife Corridor - improvements COMPLETE 2016

BURNHAM (DANIEL) 27 FR Minor Rehab Misc. improvements COMPLETE 2013

BURNHAM (DANIEL) 27 SI Landscape Burnham Wildlife Corridor - improvements CONSTRUCTION

BURNHAM (DANIEL) 27 AD Planning Morgan Shoal - concept planning COMPLETE 2015

BURNHAM (DANIEL) 27 AD New Construction Shoreline Protection with U.S. Army Corps (43rd St. - 45th St.) COMPLETE 2013

BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 35th St. COMPLETE 2017

BURNHAM (DANIEL) 27 SI Site Improvement 31st St. Harbor - Special Event Deck COMPLETE 2015

BURNHAM (DANIEL) 27 FR Fitness Center 39th St. Beach - Outdoor Fitness Course COMPLETE 2016

BURNHAM (DANIEL) 27 AD Planning 18th St. Parking Garage - new COMPLETE 2016

BURNHAM (DANIEL) 27 SI Paving 31st St. Parking Lot - expansion (west lot) COMPLETE 2017

BURNHAM (DANIEL) 27 AD New Construction Promontory Point - shoreline revetment COMPLETE 2015

6 of 59

Page 7: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment at 47th St. COMPLETE 2016

BURNHAM (DANIEL) 27 SI Site Improvement Misc. brick wall rehab COMPLETE 2017

BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 41st St. to 55th St. CONSTRUCTION

BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 35th St. to 41st St. COMPLETE 2017

BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 31st St. to 35th St. COMPLETE 2016

BURNHAM (DANIEL) 27 FR Minor Rehab Promontory Point - new flooring COMPLETE 2018

BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment COMPLETE 2015

BURNHAM (DANIEL) 27 FR Sculpture and Monument "David Wallach Memorial Fountain" - restoration COMPLETE 2016

BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - Roosevelt Rd. to 31st St. CONSTRUCTION

BURNSIDE (AMBROSE) 363 SI Playground Chicago Plays! - new equipment COMPLETE 2014

BUTTERCUP 385 SI Playground Playground - new COMPLETE 2013

BUTTERNUT 1272 SI Playground Chicago Plays! - new equipment COMPLETE 2016

CALIFORNIA 189 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

CALIFORNIA 189 FR HVAC and Energy Efficiency McFetridge - major rehab including HVAC COMPLETE 2012

CALIFORNIA 189 SI Paving Parking lot - rehab COMPLETE 2011

CALIFORNIA 189 SI Courts Softball court - rehab COMPLETE 2012

CALIFORNIA 189 SI Courts Courts - rehab including drainage COMPLETE 2012

CALIFORNIA 189 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

CALIFORNIA 189 SI Fencing Fencing COMPLETE 2014

CALIFORNIA 189 FR Minor Rehab Misc. interior rehab at McFetridge COMPLETE 2015

CALIFORNIA 189 FR Swimming Pool Pool - filter COMPLETE 2017

CALIFORNIA 189 SI Playground Chicago Plays! - new equipment and water play feature COMPLETE 2017

CALIFORNIA 189 AD New Construction McFetridge - ice rink expansion CONSTRUCTION

CALIFORNIA 189 AD Park Development Park expansion - site improvements BID/AWARD

CALIFORNIA 189 SI Courts Courts - tennis and basketball CONSTRUCTION

CALUMET 11 FR Concrete Masonry Structural Power house - chimney COMPLETE 2013

CALUMET 11 FR Minor Rehab Misc. bathroom improvements COMPLETE 2011

CALUMET 11 SI Site Improvement Outdoor fitness station - new COMPLETE 2016

CALUMET 11 FR Minor Rehab Landscape yard - rehab COMPLETE 2011

CALUMET 11 FR Minor Rehab Lobby - rehab COMPLETE 2011

CALUMET 11 FR Concrete Masonry Structural Field house - major rehab COMPLETE 2014

CALUMET 11 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

CALUMET 11 FR Roof Roof - rehab COMPLETE 2014

CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2012

CALUMET 11 SI Lighting Lighting - exterior COMPLETE 2014

CALUMET 11 SI Playground Chicago Plays! - new equipment COMPLETE 2015

CALUMET 11 FR Roof Landscape yard - roof and masonry PRE-DESIGN

7 of 59

Page 8: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2015

CALUMET 11 SI Site Improvement Dog friendly area - new COMPLETE 2018

CARMEN 1085 SI Playground Chicago Plays! - new equipment COMPLETE 2016

CARPENTER (PHILO) 1086 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Misc. exhaust fans COMPLETE 2013

CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - filter system COMPLETE 2011

CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

CARVER (GEORGE WASHINGTON) 255 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

CARVER (GEORGE WASHINGTON) 255 FR Minor Rehab Outdoor fitness center - new COMPLETE 2015

CARVER (GEORGE WASHINGTON) 255 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CARVER (GEORGE WASHINGTON) 255 FR Roof Roof COMPLETE 2014

CARVER (GEORGE WASHINGTON) 255 SI Landscape Tree planting COMPLETE 2018

CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - rehab COMPLETE 2018

CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Pool boiler - rehab COMPLETE 2017

CARVER (GEORGE WASHINGTON) 255 SI Athletic Field Batting cage and scoreboard - new COMPLETE 2018

CATALPA 372 SI Playground Chicago Plays! - new equipment COMPLETE 2015

CEDAR 1279 SI Playground Playground -rehab COMPLETE 2018

CENTENNIAL 1238 SI Site Improvement Identity signage CONSTRUCTION

CENTRAL 1087 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CHALLENGER 488 SI Lighting Lighting - parking lot COMPLETE 2013

CHASE (SALMON) 103 SI Athletic Field Artificial turf athletic field - new PRE-DESIGN

CHASE (SALMON) 103 FR Swimming Pool Pool retrofit - compliance and liner COMPLETE 2012

CHASE (SALMON) 103 FR Minor Rehab Field house - assessment COMPLETE 2018

CHASE (SALMON) 103 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011

CHASE (SALMON) 103 FR Swimming Pool Pool - filter COMPLETE 2014

CHASE (SALMON) 103 FR Roof Roof PRE-DESIGN

CHASE (SALMON) 103 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015

CHASE (SALMON) 103 FR Major Rehab Field house - mural COMPLETE 2012

CHESTNUT 1275 SI Playground Chicago Plays! - new equipment COMPLETE 2016

CHICAGO WOMEN'S PARK AND GARDENS 550 FR Sculpture and Monument "Helping Hands" - installation COMPLETE 2011

CHICAGO WOMEN'S PARK AND GARDENS 550 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

CHICAGO WOMEN'S PARK AND GARDENS 550 FR Major Rehab Field house - major rehab COMPLETE 2014

CHICAGO WOMEN'S PARK AND GARDENS 550 FR Minor Rehab Park improvements COMPLETE 2017

CHICAGO WOMEN'S PARK AND GARDENS 550 SI Site Improvement Park drainage CONSTRUCTION

CHIPPEWA 167 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CHIPPEWA 167 FR Concrete Masonry Structural Chimney and tuckpointing COMPLETE 2015

CHOPIN (FREDERIC) 146 SI Site Improvement Drainage improvements COMPLETE 2013

8 of 59

Page 9: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

CHOPIN (FREDERIC) 146 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CHOPIN (FREDERIC) 146 SI Site Improvement Park improvements COMPLETE 2013

CHOPIN (FREDERIC) 146 FR Roof Field house - roof PRE-DESIGN

CHOPIN (FREDERIC) 146 SI Courts Tennis court - rehab COMPLETE 2018

CHOPIN (FREDERIC) 146 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION

CHRISTIANA 1089 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CHRISTIANA 1089 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

CHRISTIANA 1089 SI Site Improvement Expansion - site improvements PRE-DESIGN

CHURCHILL FIELD 412 SI Site Improvement Misc. drainage COMPLETE 2016

CHURCHILL FIELD 412 SI Athletic Field Athletic field - rehab COMPLETE 2016

CLAREMONT 400 SI Site Improvement Landscape and site improvement COMPLETE 2012

CLAREMONT 400 SI Playground Misc. park improvement COMPLETE 2011

CLAREMONT 400 SI Playground Playground - new COMPLETE 2012

CLARENDON COMM. CTR. 1002 SI Lighting Lighting - ballfield COMPLETE 2012

CLARENDON COMM. CTR. 1002 SI Site Improvement Dog friendly area - new COMPLETE 2012

CLARENDON COMM. CTR. 1002 SI Fencing Misc. rehab COMPLETE 2013

CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major rehab COMPLETE 2015

CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major restoration DESIGN

CLARENDON COMM. CTR. 1002 SI Landscape Athletic field - rehab CONSTRUCTION

CLARENDON COMM. CTR. 1002 FR HVAC and Energy Efficiency Boiler - new BID/AWARD

CLARENDON COMM. CTR. 1002 SI Courts Basketball court - rehab COMPLETE 2016

CLARENDON COMM. CTR. 1002 AD New Construction Field house - study COMPLETE 2016

CLARK (JOHN) 1026 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

CLARK (JOHN) 1026 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CLARK (RICHARD) 457 SI Athletic Field Artificial turf athletic field - new COMPLETE 2017

CLARK (RICHARD) 457 AD New Construction New Chicago River Boat House COMPLETE 2013

CLARK (RICHARD) 457 FR Major Rehab Lane Tech Stadium - interior COMPLETE 2011

CLARK (RICHARD) 457 AD New Construction Kerry Wood Cubs Field - new stadium COMPLETE 2015

CLOVER 1277 SI Playground Chicago Plays! - new equipment COMPLETE 2016

CLYBOURN (ARCHIBALD) 1091 SI Playground Chicago Plays! - new equipment COMPLETE 2013

CLYBOURN (ARCHIBALD) 1091 SI Courts Basketball court - rehab COMPLETE 2016

COCHRAN (JOHN) 420 SI Playground Playground - surfacing COMPLETE 2014

COLE (NAT KING) 270 AD Park Development Park development - including playground COMPLETE 2011

COLE (NAT KING) 270 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

COLEMAN (BESSIE) 292 SI Playground Chicago Plays! - new equipment COMPLETE 2013

COLISEUM 507 SI Lighting Lighting - exterior COMPLETE 2013

COLISEUM 507 SI Site Improvement Misc. site improvements COMPLETE 2013

9 of 59

Page 10: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013

COLUMBUS (CHRISTOPHER) 209 FR Windows and Doors Field house - doors COMPLETE 2011

COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013

COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Misc. sump pump COMPLETE 2011

COLUMBUS (CHRISTOPHER) 209 FR Fitness Center Fitness center - upgrade COMPLETE 2011

COLUMBUS (CHRISTOPHER) 209 FR Concrete Masonry Structural Chimney COMPLETE 2012

COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Lagoon and drainage COMPLETE 2013

COLUMBUS (CHRISTOPHER) 209 FR Major Rehab Field house and Refectory - major rehab CONSTRUCTION

COLUMBUS (CHRISTOPHER) 209 SI Playground Chicago Plays! - new equipment COMPLETE 2015

COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - column restoration COMPLETE 2018

COLUMBUS (CHRISTOPHER) 209 SI Paving Paving - refectory entrance COMPLETE 2016

COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency Gymnasium - heaters CONSTRUCTION

COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - controls, water line COMPLETE 2018

COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Athletic Field - scoreboard COMPLETE 2016

COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - remediation COMPLETE 2016

COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - sump pumps and filter COMPLETE 2017

COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Concrete Masonry Structural Field house - chimney BID/AWARD

COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Windows and Doors Field house - windows and doors BID/AWARD

CONNORS (WILLIAM) 1200 SI Site Improvement Misc. fencing COMPLETE 2013

CONNORS (WILLIAM) 1200 AD New Construction Concession building - new COMPLETE 2013

COOPER (JACK) 287 SI Paving Paving COMPLETE 2011

CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

CORNELL (PAUL) SQUARE 5 SI Landscape Historic landscape restoration COMPLETE 2016

CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

CORNELL (PAUL) SQUARE 5 SI Playground Playground with water feature - new COMPLETE 2014

CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2014

CORNELL (PAUL) SQUARE 5 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

CORNELL (PAUL) SQUARE 5 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

CORNELL (PAUL) SQUARE 5 FR Roof Roof COMPLETE 2011

CORNELL (PAUL) SQUARE 5 FR Major Rehab Field house - major rehab PRE-DESIGN

CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool - filter PRE-DESIGN

COSME (MARGARET) 176 SI Playground Chicago Plays! - new equipment COMPLETE 2014

COSME (MARGARET) 176 SI Courts Tennis court - rehab COMPLETE 2018

COTTON TAIL 480 SI Lighting Exterior - lighting COMPLETE 2013

COTTON TAIL 480 SI Site Improvement Misc. benches and fencing COMPLETE 2012

COTTONWOOD 416 SI Playground Chicago Plays! - new equipment COMPLETE 2013

10 of 59

Page 11: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

CRAGIN 131 SI Courts Court - conversion to sport court COMPLETE 2014

CRAGIN 131 SI Playground Chicago Plays! - new equipment COMPLETE 2014

CRAWFORD (PETER) 359 SI Playground Chicago Plays! - new equipment COMPLETE 2016

CRESCENT 47 SI Courts Tennis court - rehab CONSTRUCTION

DAVIS (DR. NATHAN) SQUARE 14 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Chimney COMPLETE 2013

DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2012

DAVIS (DR. NATHAN) SQUARE 14 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012

DAVIS (DR. NATHAN) SQUARE 14 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

DAVIS (DR. NATHAN) SQUARE 14 FR Roof Roof COMPLETE 2011

DAVIS (DR. NATHAN) SQUARE 14 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DAVIS (DR. NATHAN) SQUARE 14 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

DAVIS (DR. NATHAN) SQUARE 14 SI Lighting Lighting - interior gym COMPLETE 2013

DAVIS (DR. NATHAN) SQUARE 14 SI Site Improvement Misc. bleachers and scoreboards COMPLETE 2016

DAVIS (DR. NATHAN) SQUARE 14 FR Roof Pool Building - roof COMPLETE 2016

DAVIS (DR. NATHAN) SQUARE 14 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION

DAVIS (MARGARET) 1092 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011

DAVIS (MARGARET) 1092 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DAWES (CHARLES G.) 239 FR Roof Roof COMPLETE 2012

DAWES (CHARLES G.) 239 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab COMPLETE 2015

DAWES (CHARLES G.) 239 SI Spray Pool Water play feature - rehab COMPLETE 2017

DAWES (CHARLES G.) 239 SI Paving Paving - pathways COMPLETE 2016

DAWES (CHARLES G.) 239 SI Courts Basketball court - rehab COMPLETE 2016

DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab CONSTRUCTION

De Burgos (Julia) 554 AD Acquisition The 606 access park - Whipple St. and Albany Ave. COMPLETE 2011

De Burgos (Julia) 554 SI Playground Park improvements DESIGN

De Burgos (Julia) 554 AD Park Development Bloomingdale Access - new park development COMPLETE 2011

DEARBORN (HENRY) 465 SI Lighting Exterior lighting - upgrade COMPLETE 2018

DEBOW (RUSSELL) 405 SI Playground Chicago Plays! - new equipment COMPLETE 2015

DEGEORGE (BERNICE) 1093 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DEJULIO (ANTHONY) 366 SI Playground Chicago Plays! - new equipment COMPLETE 2014

D'ELIA (AILEEN) 390 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DIXON (LORRAINE) 1210 SI Site Improvement Landscape and site improvement COMPLETE 2011

DIXON (LORRAINE) 1210 SI Site Improvement Park improvements including playground COMPLETE 2015

DIXON (LORRAINE) 1210 SI Site Improvement Park improvements - south entranceway COMPLETE 2017

DOBSON 1094 SI Playground Chicago Plays! - new equipment COMPLETE 2015

11 of 59

Page 12: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

DOGWOOD 344 SI Playground Chicago Plays! - new equipment COMPLETE 2013

Donahue (Margaret) 570 AD Park Development New park development including playground COMPLETE 2015

Donahue (Margaret) 570 AD Acquisition 1230 W. School St. COMPLETE 2013

DONOVAN (GEORGE) 1029 SI Playground Chicago Plays! - new equipment COMPLETE 2013

DONOVAN (GEORGE) 1029 SI Athletic Field Athletic field - scoreboard COMPLETE 2017

DOUGLAS (STEPHEN) 218 SI Site Improvement Misc. bleachers COMPLETE 2013

DOUGLAS (STEPHEN) 218 FR Major Rehab Field house - locker room improvements COMPLETE 2012

DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

DOUGLAS (STEPHEN) 218 SI Site Improvement Athletic field - drainage COMPLETE 2013

DOUGLAS (STEPHEN) 218 SI Lighting Lighting - exterior COMPLETE 2012

DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool - rehab COMPLETE 2016

DOUGLAS (STEPHEN) 218 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012

DOUGLAS (STEPHEN) 218 SI Athletic Field Artificial turf athletic field - major rehab DESIGN

DOUGLAS (STEPHEN) 218 SI Lighting Lighting - pathway COMPLETE 2017

DOUGLAS (STEPHEN) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013

DOUGLAS (STEPHEN) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013

DOUGLAS (STEPHEN) 218 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

DOUGLAS (STEPHEN) 218 FR Concrete Masonry Structural Field house - framing and plastering COMPLETE 2011

DOUGLAS (STEPHEN) 218 SI Paving Paving - paths COMPLETE 2016

DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at 18th St.) COMPLETE 2014

DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at Albany Ave.) with water feature COMPLETE 2016

DOUGLAS (STEPHEN) 218 FR Roof Landscape yard - roof COMPLETE 2011

DOUGLAS (STEPHEN) 218 SI Athletic Field Athletic field - rehab COMPLETE 2013

DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool - rehab COMPLETE 2015

DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at California Ave.) COMPLETE 2015

DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment at Albany Dr. COMPLETE 2016

DOUGLAS (STEPHEN) 218 SI Fencing Pergola - security fencing COMPLETE 2018

DOUGLAS (STEPHEN) 218 FR Major Rehab Field house - major rehab CONSTRUCTION

DOUGLAS (STEPHEN) 218 SI Courts Tennis court - rehab COMPLETE 2018

DOUGLAS (STEPHEN) 218 FR Minor Rehab Misc. boiler COMPLETE 2017

DOUGLAS (STEPHEN) 218 SI Site Improvement Cultural Venue - assessment PLANNING

DOUGLAS (STEPHEN) 218 SI Playground Playground - new equipment at Sacramento Dr. COMPLETE 2017

DREXEL (FRANCIS) 441 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DUBKIN (LEONARD) 306 SI Site Improvement Misc. garden beds COMPLETE 2012

DUBKIN (LEONARD) 306 SI Paving Paving - entryway COMPLETE 2016

DUNBAR (PAUL LAURENCE) 267 FR Sculpture and Monument Sculpture - new COMPLETE 2014

DUNBAR (PAUL LAURENCE) 267 SI Courts Basketball court - rehab COMPLETE 2013

12 of 59

Page 13: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

DUNBAR (PAUL LAURENCE) 267 SI Lighting Exterior - upgrade COMPLETE 2013

DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Artificial turf athletic field - new DESIGN

DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Athletic field - rehab COMPLETE 2014

DUNBAR (PAUL LAURENCE) 267 SI Playground Chicago Plays! - new equipment COMPLETE 2016

DUNBAR (PAUL LAURENCE) 267 SI Courts Tennis court - rehab COMPLETE 2016

DUNHAM (ROBERT) 258 SI Courts Tennis court - rehab COMPLETE 2013

DUNHAM (ROBERT) 258 FR Fitness Center Fitness center - new COMPLETE 2011

DUNHAM (ROBERT) 258 SI Athletic Field Athletic field - rehab COMPLETE 2013

DUNHAM (ROBERT) 258 FR Minor Rehab Gym - bleachers CONSTRUCTION

DURKIN (MARTIN) 268 SI Playground Chicago Plays! - new equipment COMPLETE 2014

DURKIN (MARTIN) 268 SI Site Improvement Outdoor fitness station - new BID/AWARD

DURKIN (MARTIN) 268 SI Paving Paving - pathways COMPLETE 2016

DURSO (JOHN) 1037 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Environmental remediation CONSTRUCTION

DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - clean and green COMPLETE 2016

DUSABLE (JEAN BAPTISTE POINTE) 478 AD New Construction New Harbor Development - Gateway COMPLETE 2011

DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Landscape improvements COMPLETE 2013

DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - new DESIGN

DVORAK (ANTON) 216 FR Minor Rehab Field house and perimeter drainage COMPLETE 2011

DVORAK (ANTON) 216 FR Minor Rehab Misc. locker rooms COMPLETE 2014

DVORAK (ANTON) 216 SI Site Improvement Drinking fountain - rehab COMPLETE 2012

DVORAK (ANTON) 216 FR Major Rehab Field house - locker room improvements COMPLETE 2012

DVORAK (ANTON) 216 SI Paving Paving - paths COMPLETE 2011

DVORAK (ANTON) 216 FR Major Rehab Transition plan - access improvements COMPLETE 2012

DVORAK (ANTON) 216 FR Minor Rehab Misc. entrance accessibility COMPLETE 2011

DVORAK (ANTON) 216 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

DVORAK (ANTON) 216 SI Playground Chicago Plays! - new equipment COMPLETE 2015

DVORAK (ANTON) 216 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015

DVORAK (ANTON) 216 SI Athletic Field Ballfield - rehab COMPLETE 2013

DVORAK (ANTON) 216 SI Spray Pool Water play feature - rehab COMPLETE 2018

DVORAK (ANTON) 216 FR Swimming Pool Pool - filter COMPLETE 2016

DVORAK (ANTON) 216 FR Major Rehab Field house and pool house - major rehab COMPLETE 2018

ECKERSALL (WALTER HERBERT) 232 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

ECKERSALL (WALTER HERBERT) 232 SI Playground Chicago Plays! - new equipment COMPLETE 2016

ECKHART (BERNARD) 208 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

ECKHART (BERNARD) 208 FR Major Rehab Transition plan - access improvements COMPLETE 2011

ECKHART (BERNARD) 208 SI Playground Playground with water feature - new COMPLETE 2014

13 of 59

Page 14: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

ECKHART (BERNARD) 208 FR Swimming Pool Pool - tile and grout COMPLETE 2014

ECKHART (BERNARD) 208 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

ECKHART (BERNARD) 208 SI Athletic Field Athletic Field - rehab COMPLETE 2017

ECKHART (BERNARD) 208 FR Minor Rehab Misc. boiler COMPLETE 2017

ECKHART (BERNARD) 208 FR Major Rehab Field house - major rehab COMPLETE 2017

ECKHART (BERNARD) 208 FR Major Rehab Pool dehumidifier - new PRE-DESIGN

EDGEBROOK 335 SI Athletic Field Athletic field - rehab PRE-DESIGN

EDISON (THOMAS ALVA) 62 SI Playground Chicago Plays! - new equipment COMPLETE 2015

EDISON (THOMAS ALVA) 62 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN

EDMONDS (MOLLY) 391 AD Acquisition Expansion COMPLETE 2012

EDMONDS (MOLLY) 391 SI Playground Chicago Plays! - new equipment COMPLETE 2014

ELLIS (SAMUEL) 1213 SI Site Improvement Misc. fencing and lighting COMPLETE 2014

ELLIS (SAMUEL) 1213 AD New Construction Quad Communities Arts Recreation and Health Center COMPLETE 2016

ELLIS (SAMUEL) 1213 SI Courts Basketball court - rehab COMPLETE 2016

ELLIS (SAMUEL) 1213 SI Playground Playground - surfacing COMPLETE 2016

ELM 279 SI Site Improvement Misc. paving and fencing COMPLETE 2012

ELSTON (DANIEL) 1097 SI Playground Chicago Plays! - new equipment COMPLETE 2015

EMERALD 1098 SI Fencing Fencing - perimeter PRE-DESIGN

EMMERSON (LOUIS) 104 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

EMMERSON (LOUIS) 104 SI Playground Chicago Plays! - new equipment COMPLETE 2015

EMMERSON (LOUIS) 104 FR Roof Roof - new PRE-DESIGN

ESSEX 434 SI Playground Playground - new COMPLETE 2013

EUCLID 66 FR Minor Rehab Transition plan - access improvements COMPLETE 2011

EUCLID 66 SI Playground Chicago Plays! - new equipment COMPLETE 2013

EVERGREEN 1276 SI Playground Playground - surfacing COMPLETE 2017

FELLGER (CHARLES) 1100 SI Spray Pool Water play feature - rehab COMPLETE 2017

FERNWOOD 65 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

FERNWOOD 65 FR Minor Rehab Field house - interior COMPLETE 2012

FERNWOOD 65 FR Major Rehab Pool building - major rehab PRE-DESIGN

FERNWOOD 65 SI Playground Chicago Plays! - new equipment COMPLETE 2013

FERNWOOD 65 FR HVAC and Energy Efficiency HVAC - exhaust fans COMPLETE 2013

FERNWOOD 65 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

FERNWOOD 65 SI Athletic Field Ballfield - rehab COMPLETE 2011

FERNWOOD 65 FR Swimming Pool Pool - liner CONSTRUCTION

FERNWOOD 65 SI Landscape Tree planting COMPLETE 2018

FIELD (EUGENE) 41 SI Athletic Field Athletic field - rehab COMPLETE 2017

FIELD (EUGENE) 41 FR Minor Rehab Misc. sump pump COMPLETE 2011

14 of 59

Page 15: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

FIELD (EUGENE) 41 FR Concrete Masonry Structural Concrete and structural - basement COMPLETE 2015

FIELD (EUGENE) 41 FR Major Rehab Transition plan - access improvements COMPLETE 2012

FIELD (EUGENE) 41 SI Fencing Fencing - at Chicago River COMPLETE 2013

FIELD (EUGENE) 41 FR Roof Roof - rehab COMPLETE 2014

FIELD (EUGENE) 41 SI Site Improvement Misc. fencing, landscaping, utilities DESIGN

FIELD (EUGENE) 41 AD Acquisition 5056 N. Monticello Ave. COMPLETE 2015

FIELD (EUGENE) 41 SI Spray Pool Water play feature - rehab COMPLETE 2014

FIELD (EUGENE) 41 AD Park Development Aquatic restoration COMPLETE 2013

FILBERT 1281 SI Playground Playground - new COMPLETE 2012

FLOWER (LUCY) 431 SI Playground Playground with water feature- new COMPLETE 2014

FLYING SQUIRREL 331 SI Playground Chicago Plays! - new equipment COMPLETE 2013

FLYING SQUIRREL 331 SI Fencing Expansion and perimeter fencing COMPLETE 2015

FOSCO (PETER) 1030 AD Acquisition Expansion COMPLETE 2015

FOSCO (PETER) 1030 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

FOSCO (PETER) 1030 SI Spray Pool Water play feature - rehab COMPLETE 2016

FOSCO (PETER) 1030 FR Windows and Doors Pool building - window security COMPLETE 2012

FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012

FOSCO (PETER) 1030 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

FOSCO (PETER) 1030 AD Park Development Park expansion COMPLETE 2013

FOSCO (PETER) 1030 FR Swimming Pool Pool - rehab COMPLETE 2016

FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. compressor DESIGN

FOSCO (PETER) 1030 FR Major Rehab Roof and masonry CONSTRUCTION

FOSTER (J. FRANK) 26 SI Lighting Lighting - gym COMPLETE 2011

FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2013

FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011

FOSTER (J. FRANK) 26 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

FOSTER (J. FRANK) 26 FR Windows and Doors Natatorium - doors COMPLETE 2011

FOSTER (J. FRANK) 26 FR Major Rehab Transition plan - access improvements COMPLETE 2012

FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

FOSTER (J. FRANK) 26 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015

FOSTER (J. FRANK) 26 SI Playground Chicago Plays! - new equipment COMPLETE 2015

FOSTER (J. FRANK) 26 FR Swimming Pool Pool - controls COMPLETE 2018

FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2017

FOSTER (J. FRANK) 26 SI Courts Basketball court - rehab COMPLETE 2016

FOSTER (J. FRANK) 26 SI Spray Pool Water play feature - rehab COMPLETE 2017

FRANKLIN (BENJAMIN) 202 SI Athletic Field Ballfield - rehab COMPLETE 2011

FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2013

15 of 59

Page 16: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

FRANKLIN (BENJAMIN) 202 SI Site Improvement Drinking fountain - new COMPLETE 2013

FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013

FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Misc. rehab COMPLETE 2012

FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

FRANKLIN (BENJAMIN) 202 SI Playground Chicago Plays! - new equipment COMPLETE 2013

FRANKLIN (BENJAMIN) 202 SI Spray Pool Water play feature - rehab COMPLETE 2016

FRANKLIN (BENJAMIN) 202 FR Minor Rehab Gym floor - rehab CONSTRUCTION

FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Roof/HVAC - rehab PRE-DESIGN

FRANKLIN (BENJAMIN) 202 SI Courts Basketball court - rehab COMPLETE 2016

FULLER (MELVILLE) 4 FR Swimming Pool Pool - liner and water line COMPLETE 2013

FULLER (MELVILLE) 4 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

FULLER (MELVILLE) 4 FR Minor Rehab Fitness center - roof COMPLETE 2011

FULLER (MELVILLE) 4 FR Swimming Pool Pool - filter and gutter PRE-DESIGN

FULLER (MELVILLE) 4 FR Major Rehab Park Improvements including field house and playground COMPLETE 2016

FULLER (MELVILLE) 4 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

FULLER (MELVILLE) 4 FR Roof Field house and gym - roof COMPLETE 2011

GAGE (GEORGE) 22 FR Minor Rehab Access chair lift - new COMPLETE 2018

GAGE (GEORGE) 22 FR Minor Rehab Field house - basement COMPLETE 2013

GAGE (GEORGE) 22 FR Concrete Masonry Structural Concrete porch - rehab COMPLETE 2014

GAGE (GEORGE) 22 FR Minor Rehab Misc. boiler COMPLETE 2017

GAGE (GEORGE) 22 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

GAGE (GEORGE) 22 FR Swimming Pool Pool - liner and water line COMPLETE 2013

GAGE (GEORGE) 22 FR Roof Power house - roof COMPLETE 2011

GAGE (GEORGE) 22 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

GAGE (GEORGE) 22 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

GAGE (GEORGE) 22 FR Swimming Pool Pool - filter and gutters COMPLETE 2018

GAGE (GEORGE) 22 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2017

GALEWOOD 130 FR Minor Rehab Misc. rehab after fire COMPLETE 2012

GALEWOOD 130 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

GALEWOOD 130 SI Site Improvement Park improvements CONSTRUCTION

GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - steam line COMPLETE 2018

GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - Show House steam lines COMPLETE 2014

GARFIELD (JAMES) 204 SI Lighting Lighting - lagoon COMPLETE 2011

GARFIELD (JAMES) 204 FR Minor Rehab Misc. generator COMPLETE 2011

GARFIELD (JAMES) 204 SI Site Improvement Misc. electric service COMPLETE 2011

GARFIELD (JAMES) 204 FR Minor Rehab Field house - lockers and bathrooms COMPLETE 2012

GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - shade cloth system COMPLETE 2012

16 of 59

Page 17: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

GARFIELD (JAMES) 204 SI Fencing Conservatory - fencing COMPLETE 2012

GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Gold Dome - boiler - upgrade COMPLETE 2013

GARFIELD (JAMES) 204 SI Site Improvement Misc. site drainage COMPLETE 2011

GARFIELD (JAMES) 204 FR Sculpture and Monument Cornwall War Memorial - restoration PRE-DESIGN

GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab COMPLETE 2017

GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - front steps and building apron COMPLETE 2015

GARFIELD (JAMES) 204 FR Minor Rehab Misc. sump pump COMPLETE 2012

GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - flooring COMPLETE 2011

GARFIELD (JAMES) 204 FR Minor Rehab Gold Dome - fire escapes COMPLETE 2018

GARFIELD (JAMES) 204 SI Lighting Exterior lighting COMPLETE 2012

GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - concrete and structural COMPLETE 2011

GARFIELD (JAMES) 204 SI Paving Paving - pathways PLANNING

GARFIELD (JAMES) 204 FR Major Rehab Gym floor - rehab COMPLETE 2011

GARFIELD (JAMES) 204 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

GARFIELD (JAMES) 204 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - HVAC - Jensen Room COMPLETE 2012

GARFIELD (JAMES) 204 FR Minor Rehab Trades Building - rehab COMPLETE 2015

GARFIELD (JAMES) 204 SI Landscape Conservatory - exterior pond liners COMPLETE 2013

GARFIELD (JAMES) 204 FR Roof Power house - rehab COMPLETE 2015

GARFIELD (JAMES) 204 SI Site Improvement Conservatory - Wild Exploration Garden - design CONSTRUCTION

GARFIELD (JAMES) 204 FR Swimming Pool Pool - filter, liner and gutter COMPLETE 2018

GARFIELD (JAMES) 204 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot - rehab COMPLETE 2012

GARFIELD (JAMES) 204 FR Major Rehab Conservatory - Elizabeth Morse Children's Garden PRE-DESIGN

GARFIELD (JAMES) 204 FR Minor Rehab Misc. conservatory improvement COMPLETE 2011

GARFIELD (JAMES) 204 FR Sculpture and Monument Conservatory - Solarise Exhibit COMPLETE 2015

GARFIELD (JAMES) 204 FR Major Rehab Conservatory - major rehab from storm damage COMPLETE 2014

GARFIELD (JAMES) 204 SI Playground Chicago Plays! - new equipment at Madison St. COMPLETE 2016

GARFIELD (JAMES) 204 FR Major Rehab Conservatory - tempered water system COMPLETE 2018

GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab and batting tunnel COMPLETE 2017

GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - doors CONSTRUCTION

GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - boiler COMPLETE 2017

GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - boiler CONSTRUCTION

GARFIELD (JAMES) 204 FR Major Rehab Stables - restoration COMPLETE 2015

GARFIELD (JAMES) 204 SI Landscape Tree planting COMPLETE 2018

GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot COMPLETE 2017

GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Horticulture Hall - vacuum system CONSTRUCTION

17 of 59

Page 18: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

GARFIELD (JAMES) 204 FR Major Rehab Trades Building - structural COMPLETE 2018

GARFIELD (JAMES) 204 FR Roof Conservatory - entry roof rehab COMPLETE 2016

GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - plant cooler COMPLETE 2017

GARFIELD (JAMES) 204 SI Courts Tennis courts - rehab COMPLETE 2018

GARIBALDI (GIUSEPPI) 1047 FR Sculpture and Monument "Garibaldi" - restoration PRE-DESIGN

GARIBALDI (GIUSEPPI) 1047 SI Playground Chicago Plays! - new equipment COMPLETE 2015

GATELY (JAMES) 244 SI Site Improvement Misc. drainage COMPLETE 2012

GATELY (JAMES) 244 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

GATELY (JAMES) 244 AD New Construction Field house with indoor track and field - new CONSTRUCTION

GILL (JOSEPH) 364 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

GILL (JOSEPH) 364 SI Playground Playground - new COMPLETE 2018

GILL (JOSEPH) 364 FR Concrete Masonry Structural Concrete and structural - doorway to pool COMPLETE 2016

GILL (JOSEPH) 364 FR Swimming Pool Pool - filter COMPLETE 2014

GILL (JOSEPH) 364 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013

GILL (JOSEPH) 364 FR Minor Rehab Misc. sump pump COMPLETE 2011

GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012

GILL (JOSEPH) 364 FR Swimming Pool Pool - new boiler COMPLETE 2013

GILL (JOSEPH) 364 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012

GILL (JOSEPH) 364 FR Major Rehab Transition plan - access improvements COMPLETE 2011

GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012

GILL (JOSEPH) 364 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

GILL (JOSEPH) 364 SI Athletic Field Ballfield - rehab COMPLETE 2015

GILL (JOSEPH) 364 SI Site Improvement Playground - benches PRE-DESIGN

GINKGO 347 SI Playground Chicago Plays! - new equipment COMPLETE 2016

GLADSTONE (WILLIAM) 93 SI Athletic Field Ballfield - rehab COMPLETE 2018

GLADYS (GUNDERSON) 1102 SI Courts Basketball court - rehab COMPLETE 2015

GLADYS (GUNDERSON) 1102 AD Acquisition Expansion COMPLETE 2012

GLADYS (GUNDERSON) 1102 SI Playground Chicago Plays! - new equipment COMPLETE 2016

GOLDBERG (LOUIS) 384 SI Playground Chicago Plays! - new equipment COMPLETE 2013

GOLDBERG (LOUIS) 384 SI Site Improvement Misc. fencing and drinking fountain COMPLETE 2016

GOLDEN GATE 288 SI Playground Chicago Plays! - new equipment COMPLETE 2013

GOLDEN GATE 288 SI Paving Misc. pathway and fitness course COMPLETE 2014

GOMPERS (SAMUEL) 40 FR Minor Rehab Field house - locker room improvements COMPLETE 2012

GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - liner COMPLETE 2011

GOMPERS (SAMUEL) 40 SI Playground Park Development - playground and athletic field COMPLETE 2012

GOMPERS (SAMUEL) 40 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

GOMPERS (SAMUEL) 40 SI Lighting Lighting - ballfield COMPLETE 2015

18 of 59

Page 19: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

GOMPERS (SAMUEL) 40 FR Windows and Doors Misc. windows COMPLETE 2014

GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - filter room drainage COMPLETE 2014

GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - deck COMPLETE 2015

GOMPERS (SAMUEL) 40 SI Lighting Lighting - exterior COMPLETE 2015

GOMPERS (SAMUEL) 40 SI Paving Paving - pathways COMPLETE 2017

GOMPERS (SAMUEL) 40 FR Roof Roof PRE-DESIGN

GOOSEBERRY 348 SI Playground Chicago Plays! - new equipment COMPLETE 2016

GOUDY (WILLIAM) SQUARE 105 SI Playground Playground with water feature - new COMPLETE 2014

GOUDY (WILLIAM) SQUARE 105 SI Fencing Fencing - planter beds COMPLETE 2015

GRAND 1103 SI Playground Chicago Plays! - new equipment COMPLETE 2014

GRAND CROSSING 15 FR Major Rehab Locker room improvements - men and women DESIGN

GRAND CROSSING 15 FR Concrete Masonry Structural Power house - chimney COMPLETE 2012

GRAND CROSSING 15 FR Roof Landscape building - roof PRE-DESIGN

GRAND CROSSING 15 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

GRAND CROSSING 15 FR Swimming Pool Pool - controls COMPLETE 2018

GRAND CROSSING 15 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

GRAND CROSSING 15 SI Athletic Field Misc. drainage COMPLETE 2013

GRAND CROSSING 15 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

GRAND CROSSING 15 FR Roof Power house - roof COMPLETE 2011

GRAND CROSSING 15 SI Athletic Field Ballfield - rehab COMPLETE 2013

GRAND CROSSING 15 SI Playground Playground - community pilot COMPLETE 2015

GRAND CROSSING 15 SI Courts Tennis court - conversion to multipurpose COMPLETE 2016

GRANDPARENTS 472 SI Playground Chicago Plays! - new equipment COMPLETE 2014

GRANDPARENTS 472 SI Fencing Fencing - at playground COMPLETE 2018

GRANT (ULYSSES) 24 FR Sculpture and Monument "Logan" - restoration PRE-DESIGN

GRANT (ULYSSES) 24 FR Minor Rehab Comfort station - rehab DESIGN

GRANT (ULYSSES) 24 FR Sculpture and Monument "Mestrovic" - restoration COMPLETE 2017

GRANT (ULYSSES) 24 SI Lighting Lighting - parking lot COMPLETE 2011

GRANT (ULYSSES) 24 FR HVAC and Energy Efficiency Landscape building - boiler DESIGN

GRANT (ULYSSES) 24 FR Minor Rehab Landscape yard - rehab COMPLETE 2011

GRANT (ULYSSES) 24 FR Major Rehab 9th St. pump station - renovation COMPLETE 2012

GRANT (ULYSSES) 24 SI Paving Shoreline - concrete restoration COMPLETE 2017

GRANT (ULYSSES) 24 SI Paving Butler Field - drainage and paving COMPLETE 2013

GRANT (ULYSSES) 24 SI Landscape Trees - Dutch Elm Disease management COMPLETE 2011

GRANT (ULYSSES) 24 SI Lighting Lighting - Museum Campus COMPLETE 2012

GRANT (ULYSSES) 24 FR Major Rehab Van Buren Pedestrian Bridge - renovation COMPLETE 2014

GRANT (ULYSSES) 24 SI Paving Paving - permeable COMPLETE 2013

19 of 59

Page 20: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

GRANT (ULYSSES) 24 FR Roof Buckingham Fountain - concessions COMPLETE 2016

GRANT (ULYSSES) 24 SI Landscape Hutchinson Field - study COMPLETE 2012

GRANT (ULYSSES) 24 FR Sculpture and Monument "Eagle Fountains" - restoration DESIGN

GRANT (ULYSSES) 24 FR Major Rehab Daley Bicentennial Field House - major rehab COMPLETE 2014

GRANT (ULYSSES) 24 AD Park Development Park expansion at Roosevelt Rd. including new skate park COMPLETE 2014

GRANT (ULYSSES) 24 FR Concrete Masonry Structural Queen's Landing - study COMPLETE 2014

GRANT (ULYSSES) 24 AD Park Development Maggie Daley Park - new COMPLETE 2015

GRANT (ULYSSES) 24 FR Major Rehab Cancer Survivor Garden - renovation COMPLETE 2015

GRANT (ULYSSES) 24 SI Site Improvement Museum Campus - paving and drainage COMPLETE 2011

GRANT (ULYSSES) 24 SI Site Improvement Queen's Landing - restoration COMPLETE 2018

GRANT (ULYSSES) 24 FR Sculpture and Monument Buckingham Fountain - restoration COMPLETE 2015

GRANT (ULYSSES) 24 FR Concrete Masonry Structural Buckingham Fountain- concrete restoration CONSTRUCTION

GRANT (ULYSSES) 24 FR Sculpture and Monument John Alexander Logan Monument - paving COMPLETE 2016

GRANT (ULYSSES) 24 SI Landscape Cubs Rally - Landscape damages COMPLETE 2017

GRANT (ULYSSES) 24 SI Site Improvement Maggie Daley - park improvements COMPLETE 2018

GRANT (ULYSSES) 24 SI Paving Landscape yard - paving COMPLETE 2018

GRANT (ULYSSES) 24 SI Site Improvement Buckingham Fountain - plaza and fencing rehab COMPLETE 2017

GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - improvements COMPLETE 2017

GRANT (ULYSSES) 24 SI Site Improvement Hutchinson Field - site improvements COMPLETE 2016

GRANT (ULYSSES) 24 SI Site Improvement Lakefront Trail Separation - Chicago River to Roosevelt Rd. CONSTRUCTION

GRANT (ULYSSES) 24 SI Lighting Skate Park - lighting and security CONSTRUCTION

GRANT (ULYSSES) 24 SI Athletic Field Maggie Daley - pickleball courts COMPLETE 2018

GRAPE 381 SI Playground Chicago Plays! - new equipment COMPLETE 2015

GRAVER (PHILIP) 179 FR Minor Rehab Misc. bathroom improvements COMPLETE 2015

GRAVER (PHILIP) 179 SI Lighting Lighting - security COMPLETE 2011

GRAVER (PHILIP) 179 FR Minor Rehab Field house - dome restoration COMPLETE 2013

GRAVER (PHILIP) 179 SI Playground Chicago Plays! - new equipment COMPLETE 2013

GRAVER (PHILIP) 179 SI Spray Pool Water play feature - major rehab COMPLETE 2018

GREEN (JEFFREY) 1212 SI Playground Chicago Plays! - new equipment COMPLETE 2014

GREEN BRIAR 188 FR Minor Rehab Misc. rehab COMPLETE 2012

GREEN BRIAR 188 SI Playground Chicago Plays! - new equipment COMPLETE 2014

GREEN BRIAR 188 FR Roof Roof - rehab COMPLETE 2017

GREEN BRIAR 188 FR HVAC and Energy Efficiency Boiler - new CONSTRUCTION

GREENEBAUM (HENRY) 132 AD Park Development Park development including playground, artificial turf field COMPLETE 2012

Griffin (Marion Mahony) 1257 SI Site Improvement Misc. beach access COMPLETE 2012

GROSS (THEODORE) 1031 SI Site Improvement Fencing and athletic field COMPLETE 2015

HAAS (JOSEPH) 1032 FR Fitness Center Fitness center - new COMPLETE 2012

20 of 59

Page 21: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

HAAS (JOSEPH) 1032 AD New Construction Field house and park development COMPLETE 2011

HAAS (JOSEPH) 1032 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012

HALE (NATHAN) 234 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

HALE (NATHAN) 234 SI Spray Pool Water play feature - rehab COMPLETE 2018

HALE (NATHAN) 234 SI Site Improvement Benches and warm-up cage COMPLETE 2011

HALE (NATHAN) 234 FR Swimming Pool Pool - liner and gutter COMPLETE 2012

HALE (NATHAN) 234 SI Lighting Athletic field - rehabs COMPLETE 2015

HALE (NATHAN) 234 SI Playground Chicago Plays! - new equipment COMPLETE 2015

HALE (NATHAN) 234 SI Spray Pool Water play feature - rehab COMPLETE 2017

HALE (NATHAN) 234 SI Courts Tennis courts - rehab COMPLETE 2017

HALE (NATHAN) 234 FR Concrete Masonry Structural Field house - foundation COMPLETE 2018

HALE (NATHAN) 234 FR Minor Rehab Misc. bathroom partitions COMPLETE 2017

HAMILTON (ALEXANDER) 9 FR Minor Rehab Gym floor - rehab COMPLETE 2011

HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

HAMILTON (ALEXANDER) 9 FR Minor Rehab Misc. basement flooring COMPLETE 2011

HAMILTON (ALEXANDER) 9 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2013

HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - liner COMPLETE 2016

HAMILTON (ALEXANDER) 9 FR Major Rehab Field house - major rehab DESIGN

HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - rehab COMPLETE 2015

HAMILTON (ALEXANDER) 9 SI Paving Paving - pathways COMPLETE 2017

HAMILTON (ALEXANDER) 9 SI Athletic Field Athletic Field - rehab COMPLETE 2017

HAMILTON (ALEXANDER) 9 SI Courts Basketball court - rehab COMPLETE 2016

HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

HAMLIN (HANNIBAL) 106 SI Courts Tennis court - rehab COMPLETE 2011

HAMLIN (HANNIBAL) 106 FR Roof Roof COMPLETE 2016

HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

HAMLIN (HANNIBAL) 106 SI Playground Chicago Plays! - new equipment COMPLETE 2015

HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool - rehab COMPLETE 2014

HAMLIN (HANNIBAL) 106 SI Paving Paving - pathways COMPLETE 2016

HAMLIN (HANNIBAL) 106 FR Minor Rehab Lobby - new flooring CONSTRUCTION

HANSBERRY (LORRAINE) 1111 AD Acquisition Expansion COMPLETE 2012

HANSBERRY (LORRAINE) 1111 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HARDING (FREDERICK) 1106 SI Fencing Fencing - perimeter COMPLETE 2014

HARDING (FREDERICK) 1106 SI Playground Chicago Plays! - new equipment COMPLETE 2013

HARDING (GEORGE) 1033 SI Playground Chicago Plays! - new equipment COMPLETE 2013

HARRIS (HARRIET) 524 FR Minor Rehab Misc. backboards COMPLETE 2012

21 of 59

Page 22: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC improvements COMPLETE 2013

HARRIS (HARRIET) 524 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2011

HARRIS (HARRIET) 524 FR Swimming Pool Pool rehab COMPLETE 2018

HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency Field house - boiler room ventilation COMPLETE 2017

HARRIS (RYAN) MEMORIAL 1225 SI Playground Playground - new COMPLETE 2016

HARRISON (CARTER) 213 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

HARRISON (CARTER) 213 SI Paving Paving - paths and driveway COMPLETE 2016

HARRISON (CARTER) 213 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012

HARRISON (CARTER) 213 FR Fitness Center Fitness center - upgrade COMPLETE 2011

HARRISON (CARTER) 213 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

HARRISON (CARTER) 213 FR HVAC and Energy Efficiency Misc. for senior center COMPLETE 2014

HARRISON (CARTER) 213 FR Major Rehab Field house - major rehab CONSTRUCTION

HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

HARRISON (CARTER) 213 SI Courts Tennis court - rehab COMPLETE 2018

HARRISON (CARTER) 213 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HARRISON (CARTER) 213 FR Swimming Pool Pool - rehab COMPLETE 2016

HARRISON (CARTER) 213 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION

HARRISON (CARTER) 213 FR Roof Roof rehab and security COMPLETE 2016

HARRISON (CARTER) 213 SI Paving Paving - pathways COMPLETE 2016

HARSH (VIVIAN G.) 324 SI Spray Pool Water play feature - surfacing COMPLETE 2011

HARSH (VIVIAN G.) 324 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HARTIGAN (DAVID) BEACH 1248 SI Site Improvement Misc. fencing, lighting, landscape, benches COMPLETE 2014

HARTIGAN (DAVID) BEACH 1248 SI Paving Misc. pathway extension COMPLETE 2015

HARTIGAN (DAVID) BEACH 1248 SI Playground Chicago Plays! - new equipment COMPLETE 2015

HASAN (ELLIOT) 294 SI Playground Chicago Plays! - new equipment COMPLETE 2015

HAYES (FRANCIS) 242 FR Minor Rehab Natatorium - hot water heater COMPLETE 2018

HAYES (FRANCIS) 242 FR Minor Rehab Misc. windows and benches COMPLETE 2013

HAYES (FRANCIS) 242 SI Lighting Lighting - athletic field COMPLETE 2014

HAYES (FRANCIS) 242 FR Minor Rehab Misc. kitchen renovation COMPLETE 2013

HAYES (FRANCIS) 242 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013

HAYES (FRANCIS) 242 FR Fitness Center Fitness center - upgrade COMPLETE 2012

HAYES (FRANCIS) 242 SI Playground Chicago Plays! - new equipment COMPLETE 2013

HAYES (FRANCIS) 242 FR Windows and Doors Field house - window drainage COMPLETE 2016

HAZELNUT 417 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - 13000 S. Torrence Ave. COMPLETE 2012

22 of 59

Page 23: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - expansion COMPLETE 2014

HEGEWISCH MARSH 563 SI Site Improvement Park improvements - trails and benches COMPLETE 2018

HEGEWISCH MARSH 563 AD Planning Hegewisch Marsh - planning study COMPLETE 2015

HERMITAGE 1008 SI Playground Playground - new COMPLETE 2012

HERMOSA 125 FR Roof Roof PRE-DESIGN

HERMOSA 125 SI Courts Misc. landscape restoration COMPLETE 2012

HERMOSA 125 FR Concrete Masonry Structural Field house - basement COMPLETE 2011

HERMOSA 125 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

HERMOSA 125 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HERMOSA 125 SI Fencing Fencing - perimeter COMPLETE 2016

HERMOSA 125 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018

HIAWATHA 229 FR Fitness Center Fitness center - upgrade COMPLETE 2011

HIAWATHA 229 SI Paving Parking lot - paving and drainage COMPLETE 2012

HIAWATHA 229 FR Fitness Center Fitness center - new equipment COMPLETE 2012

HIAWATHA 229 SI Playground Playground - new COMPLETE 2014

HICKORY 299 SI Playground Playground - surfacing COMPLETE 2018

HOARD (EDISON) 387 SI Athletic Field Ballfield - rehab COMPLETE 2014

HOARD (EDISON) 387 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HOLLY 325 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HOLLYWOOD 75 SI Playground Chicago Plays! - new equipment COMPLETE 2014

HOLLYWOOD 75 SI Landscape Tree planting COMPLETE 2018

HOLSTEIN 203 FR Swimming Pool Wading Pool - filter COMPLETE 2016

HOLSTEIN 203 FR Minor Rehab Misc. chimney replacement COMPLETE 2013

HOLSTEIN 203 SI Spray Pool Water play feature - surfacing COMPLETE 2016

HOLSTEIN 203 FR Swimming Pool Pool - filter COMPLETE 2018

HOLSTEIN 203 FR Roof Roof - new COMPLETE 2018

HOLSTEIN 203 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

HOLSTEIN 203 FR Major Rehab Field house - major rehab - design COMPLETE 2018

HOLSTEIN 203 SI Athletic Field Ballfield - rehab COMPLETE 2015

HOLSTEIN 203 FR Swimming Pool Pool - deck COMPLETE 2016

HOLSTEIN 203 FR Major Rehab Field house - major rehab COMPLETE 2018

HOLSTEIN 203 FR Swimming Pool Wading pool - water main CONSTRUCTION

HOMAN (JOSEPH) 1108 SI Playground Playground - design only COMPLETE 2011

HOMAN (JOSEPH) 1108 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HOMAN SQUARE COMM. CTR. 515 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2013

HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. boiler tubes COMPLETE 2017

23 of 59

Page 24: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. compressor CONSTRUCTION

HONEYSUCKLE 351 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HORAN (ALBERT) 1035 SI Courts Basketball court - rehab COMPLETE 2015

HORAN (ALBERT) 1035 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HORNBEAM 353 SI Playground Chicago Plays! - new equipment COMPLETE 2013

HORNER (HENRY) 228 AD New Construction Underpass at Irving Park Rd. (CDOT) CONSTRUCTION

HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2011

HORNER (HENRY) 228 AD Park Development Riverbank development with Army Corps COMPLETE 2018

HORNER (HENRY) 228 FR Minor Rehab Misc. gym bleachers COMPLETE 2011

HORNER (HENRY) 228 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2013

HORNER (HENRY) 228 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

HORNER (HENRY) 228 FR Concrete Masonry Structural Field house - stairs and masonry COMPLETE 2012

HORNER (HENRY) 228 FR Major Rehab Transition plan - access improvements COMPLETE 2012

HORNER (HENRY) 228 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HORNER (HENRY) 228 SI Site Improvement Dog friendly area - new COMPLETE 2018

HORNER (HENRY) 228 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018

HORNER (HENRY) 228 SI Landscape Pathways - LED upgrade CONSTRUCTION

HORNER (HENRY) 228 SI Courts Tennis court -rehab COMPLETE 2018

HORNER (HENRY) 228 SI Fencing Perimeter fencing along Irving Park Rd. DESIGN

HOUSTON (JESSIE "MA") 278 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

HOUSTON (JESSIE "MA") 278 SI Playground Chicago Plays! - new equipment COMPLETE 2015

HOWARD (URE) BEACH 1256 SI Playground Chicago Plays! - new equipment COMPLETE 2015

HOWARD (URE) BEACH 1256 SI Site Improvement Site restoration COMPLETE 2018

HOYNE (THOMAS) 1036 SI Playground Chicago Plays! - new equipment COMPLETE 2014

HUBBARD (GURDON) 1109 SI Playground Chicago Plays! - new equipment COMPLETE 2013

HUCKLEBERRY 336 SI Playground Chicago Plays! - new equipment COMPLETE 2016

HUMBERT (JAMES) 1121 SI Playground Chicago Plays! - new equipment COMPLETE 2014

HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

HUMBOLDT (ALEXANDER VON) 219 SI Paving Parking lot - rehab COMPLETE 2012

HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Batting cages - new COMPLETE 2017

HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground at California Ave. - surfacing COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Misc. water main COMPLETE 2012

HUMBOLDT (ALEXANDER VON) 219 AD Planning Lagoon management - study COMPLETE 2015

HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - filter COMPLETE 2013

HUMBOLDT (ALEXANDER VON) 219 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - water line rehab COMPLETE 2013

24 of 59

Page 25: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground - additional equipment COMPLETE 2012

HUMBOLDT (ALEXANDER VON) 219 FR Windows and Doors Landscape yard - doors COMPLETE 2014

HUMBOLDT (ALEXANDER VON) 219 FR Major Rehab Field house - major rehab COMPLETE 2014

HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment at Augusta Ave. COMPLETE 2014

HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Misc. pergola rehab COMPLETE 2014

HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment at the lagoon COMPLETE 2015

HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - electric power COMPLETE 2015

HUMBOLDT (ALEXANDER VON) 219 SI Landscape Formal garden - restoration study COMPLETE 2015

HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Ballfield - rehab COMPLETE 2018

HUMBOLDT (ALEXANDER VON) 219 FR Roof Stables - roof COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - athletic field COMPLETE 2017

HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Gym floor - rehab COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Boat House - remediation COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION

HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Lagoon - natural swimming pond COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment at North Ave. COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 SI Paving Paving - pathways COMPLETE 2016

HUMBOLDT (ALEXANDER VON) 219 FR Roof Comfort stations - rehabs COMPLETE 2017

INDEPENDENCE 83 FR Swimming Pool Pool - filter system and gutter COMPLETE 2017

INDEPENDENCE 83 SI Athletic Field Tree planting COMPLETE 2018

INDEPENDENCE 83 FR Major Rehab Bungalow - major rehab and green initiative COMPLETE 2013

INDEPENDENCE 83 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

INDEPENDENCE 83 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011

INDEPENDENCE 83 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012

INDEPENDENCE 83 FR Minor Rehab Gym floor - new COMPLETE 2013

INDEPENDENCE 83 FR Windows and Doors Field House and Pool building - windows PRE-DESIGN

INDEPENDENCE 83 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2015

INDEPENDENCE 83 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

INDEPENDENCE 83 SI Paving Paving - pathways COMPLETE 2017

INDEPENDENCE 83 SI Playground Signature Playground - new COMPLETE 2016

INDIAN BOUNDARY 165 FR Minor Rehab Misc. downspouts COMPLETE 2012

INDIAN BOUNDARY 165 FR Minor Rehab Misc. sump pump COMPLETE 2011

INDIAN BOUNDARY 165 SI Courts Tennis court - rehab COMPLETE 2011

INDIAN BOUNDARY 165 FR Major Rehab Transition plan - access improvements COMPLETE 2011

INDIAN BOUNDARY 165 FR Major Rehab Nature center - rehab COMPLETE 2014

INDIAN BOUNDARY 165 SI Spray Pool Water play feature - rehab COMPLETE 2014

25 of 59

Page 26: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

INDIAN BOUNDARY 165 FR Major Rehab Field house - foundation and drainage COMPLETE 2014

INDIAN BOUNDARY 165 FR Major Rehab Field house - major rehab COMPLETE 2013

JACKSON (ANDREW) 19 SI Spray Pool Water play feature at 63rd St. Beach - rehab COMPLETE 2017

JACKSON (ANDREW) 19 FR Minor Rehab Landscape yard - rehab COMPLETE 2011

JACKSON (ANDREW) 19 SI Paving Paving - 67th St. Pathway COMPLETE 2016

JACKSON (ANDREW) 19 SI Landscape 63rd St. Beach - dune restoration COMPLETE 2011

JACKSON (ANDREW) 19 SI Lighting Lighting - exterior COMPLETE 2013

JACKSON (ANDREW) 19 SI Site Improvement Multi-use trail - Marquette Drive COMPLETE 2011

JACKSON (ANDREW) 19 FR Major Rehab Field house - locker room improvements COMPLETE 2011

JACKSON (ANDREW) 19 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

JACKSON (ANDREW) 19 SI Landscape Osaka Garden - restoration COMPLETE 2013

JACKSON (ANDREW) 19 SI Fencing Misc. gate COMPLETE 2013

JACKSON (ANDREW) 19 AD New Construction Water quality - pilot beach barrier COMPLETE 2013

JACKSON (ANDREW) 19 AD Park Development Olmsted Historic Restoration CONSTRUCTION

JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013

JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (at 64th St. COMPLETE 2014

JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (Chrysalis) COMPLETE 2014

JACKSON (ANDREW) 19 SI Lighting Misc. electric transformer COMPLETE 2013

JACKSON (ANDREW) 19 SI Site Improvement Misc. new waterlines COMPLETE 2011

JACKSON (ANDREW) 19 SI Athletic Field Misc. croquet field COMPLETE 2014

JACKSON (ANDREW) 19 FR Minor Rehab 63rd St. Beach House - electric upgrade COMPLETE 2013

JACKSON (ANDREW) 19 SI Courts Basketball court - rehab COMPLETE 2014

JACKSON (ANDREW) 19 SI Athletic Field Athletic field - rehab COMPLETE 2011

JACKSON (ANDREW) 19 SI Site Improvement Water conservation - study COMPLETE 2016

JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment at 67th St. COMPLETE 2016

JACKSON (ANDREW) 19 SI Athletic Field Artificial turf field and track - relocation CONSTRUCTION

JACKSON (ANDREW) 19 SI Site Improvement Lakefront Trail Separation - 55th St. to 67th St. CONSTRUCTION

JACKSON (ANDREW) 19 SI Paving Landscape yard - paving COMPLETE 2018

JACKSON (ANDREW) 19 FR Minor Rehab Bowling Green Club House - rehab COMPLETE 2013

JACKSON (ANDREW) 19 FR Sculpture and Monument "Skylanding" - installation COMPLETE 2016

JACKSON (ANDREW) 19 FR Minor Rehab Misc. water meter DESIGN

JACKSON (ANDREW) 19 SI Site Improvement Osaka Garden - site improvements COMPLETE 2017

JACKSON (MAHALIA) 386 FR Major Rehab Building demolition COMPLETE 2011

JACKSON (MAHALIA) 386 SI Lighting Lighting - athletic field COMPLETE 2012

JACOB 156 SI Playground Chicago Plays! - new equipment COMPLETE 2013

JACOB 156 SI Site Improvement Misc. site improvements COMPLETE 2015

JACOB 156 AD Acquisition Expansion COMPLETE 2014

26 of 59

Page 27: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

JACOLIK (FLORIAN S.) 1288 SI Playground Chicago Plays! - new equipment COMPLETE 2016

JEFFERSON (NANCY) 338 SI Courts Misc. game court graphics COMPLETE 2014

JEFFERSON (NANCY) 338 SI Playground Chicago Plays! - new equipment COMPLETE 2013

JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

JEFFERSON (THOMAS) MEML. 94 FR Roof Pool building - roof COMPLETE 2012

JEFFERSON (THOMAS) MEML. 94 FR Minor Rehab Field house - locker room improvements COMPLETE 2016

JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool - deck and liner PRE-DESIGN

JONES (MARY RICHARDSON) 479 SI Playground Playground - surfacing COMPLETE 2013

JONES (MARY RICHARDSON) 479 SI Fencing Misc. maintenance gate CONSTRUCTION

JONQUIL 1270 SI Courts Tennis court- rehab COMPLETE 2015

JUNCTION GROVE 415 SI Playground Chicago Plays! - new equipment COMPLETE 2016

JUNEWAY BEACH 1258 SI Site Improvement Site restoration COMPLETE 2018

JUNIPER 392 SI Playground Playground with water feature - new COMPLETE 2018

KEELER (CYRUS) 1114 SI Playground Chicago Plays! - new equipment COMPLETE 2016

KELLS (GEORGE) 1040 SI Playground Chicago Plays! - new equipment COMPLETE 2014

KELLY (EDWARD) 260 SI Paving Paving - pathways COMPLETE 2012

KELLY (EDWARD) 260 SI Playground Chicago Plays! - new equipment COMPLETE 2015

KELLY (EDWARD) 260 SI Athletic Field Artificial turf athletic field - new COMPLETE 2015

KELLY (EDWARD) 260 SI Athletic Field Athletic field and basketball court- rehab COMPLETE 2017

KELLY (EDWARD) 260 SI Athletic Field Athletic field - scoreboard COMPLETE 2017

KELLY (JOHN) 493 SI Playground Chicago Plays! - new equipment COMPLETE 2016

KELVYN (WILLIAM) 126 SI Fencing Misc. gates COMPLETE 2011

KELVYN (WILLIAM) 126 FR Roof Roof COMPLETE 2015

KELVYN (WILLIAM) 126 SI Playground Chicago Plays! - new equipment COMPLETE 2014

KELVYN (WILLIAM) 126 FR Minor Rehab Drainage improvements and new gym floor COMPLETE 2015

KENMORE 1115 SI Playground Chicago Plays! - new equipment COMPLETE 2013

KENNEDY (DENNIS) 48 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

KENNEDY (DENNIS) 48 SI Paving Paving at entrance COMPLETE 2011

KENNEDY (DENNIS) 48 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

KENNEDY (DENNIS) 48 SI Courts Court - conversion to roller hockey and jr. tennis COMPLETE 2014

KENNEDY (DENNIS) 48 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

KENNEDY (DENNIS) 48 SI Lighting Lighting - athletic field COMPLETE 2015

KENNEDY (DENNIS) 48 FR Swimming Pool Pool - filter COMPLETE 2018

KENNEDY (DENNIS) 48 FR Swimming Pool Pool - controls COMPLETE 2018

KENNEDY (DENNIS) 48 SI Paving Paving - pathways COMPLETE 2016

KENNEDY (DENNIS) 48 FR Swimming Pool Pool - rehab COMPLETE 2017

KENNEDY (DENNIS) 48 SI Courts Hockey roller court - new COMPLETE 2017

27 of 59

Page 28: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

KENNICOTT (JONATHAN) 485 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

KENNICOTT (JONATHAN) 485 FR Major Rehab Transition plan - access improvements COMPLETE 2012

KENNICOTT (JONATHAN) 485 SI Playground Chicago Plays! - new equipment COMPLETE 2014

KENNICOTT (JONATHAN) 485 SI Site Improvement Paving, fencing, lighting, alley closure COMPLETE 2016

KENSINGTON 1041 SI Site Improvement Site and facility improvements COMPLETE 2012

KENSINGTON 1041 SI Athletic Field Athletic field - rehab COMPLETE 2012

KENSINGTON 1041 SI Lighting Lighting - exterior COMPLETE 2017

KEN-WELL 1042 SI Paving Paving - entrance COMPLETE 2014

KEN-WELL 1042 SI Playground Chicago Plays! - new equipment COMPLETE 2014

KEN-WELL 1042 SI Spray Pool Water play feature - rehab COMPLETE 2017

KENWOOD COMM. 1010 SI Paving Paving - pathways COMPLETE 2016

KEYSTONE 1116 SI Playground Chicago Plays! - new equipment COMPLETE 2015

KILBOURN 84 SI Paving Landscape yard - paving COMPLETE 2011

KILBOURN 84 SI Fencing Misc. gates COMPLETE 2011

KILBOURN 84 FR Major Rehab Greenhouse - restoration COMPLETE 2014

KILBOURN 84 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

KILBOURN 84 SI Playground Chicago Plays! - new equipment COMPLETE 2013

KILBOURN 84 SI Site Improvement Misc. scoreboard COMPLETE 2014

KILBOURN 84 FR Roof Maintenance building - roof COMPLETE 2017

KILBOURN 84 SI Playground Nature playground - new PRE-DESIGN

KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Bowling alley - restoration COMPLETE 2011

KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling Alley - roof COMPLETE 2016

KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling alley - roof COMPLETE 2013

KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Misc. bowling alley supplies COMPLETE 2016

KING (MARTIN LUTHER, JR.) 334 FR Sculpture and Monument Monument - restoration COMPLETE 2013

KING (MARTIN LUTHER, JR.) 334 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2017

King-Lockhart (Patrick, Anthony) 558 AD Park Development Park development - 106th St. and Western Ave. COMPLETE 2011

King-Lockhart (Patrick, Anthony) 558 SI Site Improvement Sculpture and entrance columns COMPLETE 2013

KIWANIS 42 SI Lighting Lighting - exterior COMPLETE 2015

KLEIN (LOIS) 544 AD Acquisition Lincoln Ave. and Addison St. COMPLETE 2011

KLEIN (LOIS) 544 SI Playground Misc. kiosk COMPLETE 2013

KOLMAR 85 SI Playground Chicago Plays! - new equipment COMPLETE 2013

KORCZAK (JANUSZ) 1090 SI Playground Chicago Plays! - new equipment COMPLETE 2015

KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool - rehab COMPLETE 2015

KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. window screens COMPLETE 2011

KOSCIUSZKO (THADEUZ) 120 FR Roof Natatorium - roof COMPLETE 2011

KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

28 of 59

Page 29: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. floor restoration design COMPLETE 2015

KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

KOSCIUSZKO (THADEUZ) 120 FR Major Rehab Transition plan - access improvements COMPLETE 2012

KOSCIUSZKO (THADEUZ) 120 FR Concrete Masonry Structural Field house and Natatorium - concrete, plaster, masonry COMPLETE 2015

KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2014

KOSCIUSZKO (THADEUZ) 120 SI Paving Pathways and parking lot COMPLETE 2013

KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool Building - exterior doors CONSTRUCTION

KRAUSE (FRANCIS VERNON) 1079 SI Playground Playground with water feature - new COMPLETE 2013

KUCINSKI-MURPHY (VICKI, ROSEBETH) 1062 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LA FOLLETTE (ROBERT) 201 SI Paving Paving - paths COMPLETE 2011

LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC improvements DESIGN

LA FOLLETTE (ROBERT) 201 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2015

LA FOLLETTE (ROBERT) 201 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

LA FOLLETTE (ROBERT) 201 SI Site Improvement Track - new COMPLETE 2011

LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014

LA FOLLETTE (ROBERT) 201 FR Major Rehab Field house and Natatorium - major rehab CONSTRUCTION

LA FOLLETTE (ROBERT) 201 SI Spray Pool Water play feature - rehab COMPLETE 2017

LA FOLLETTE (ROBERT) 201 FR Minor Rehab Field house - painting, plastering, drainage COMPLETE 2012

LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

LA FOLLETTE (ROBERT) 201 SI Courts Basketball court - rehab COMPLETE 2016

LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool - rehab COMPLETE 2017

La Villita 553 AD Acquisition Celotex - 2800-3024 S. Sacramento Ave. COMPLETE 2012

La Villita 553 AD Park Development Park development - "The Big Park in Little Village" COMPLETE 2015

LAKE MEADOWS 263 SI Paving Parking lot - rehab COMPLETE 2011

LAKE MEADOWS 263 FR Minor Rehab Field house - rehab COMPLETE 2011

LAKE MEADOWS 263 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

LAKE MEADOWS 263 SI Playground Chicago Plays! - new equipment COMPLETE 2016

LAKE SHORE 107 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

LAKE SHORE 107 SI Site Improvement Track - rehab COMPLETE 2015

LAKE SHORE 107 FR Fitness Center Fitness center - equipment COMPLETE 2014

LAKE SHORE 107 AD Park Development Park improvements - design only COMPLETE 2016

LAKE SHORE 107 SI Athletic Field Landscape irrigation system - new CONSTRUCTION

LAKE SHORE 107 SI Athletic Field Athletic field - improvements COMPLETE 2017

LAKE SHORE 107 AD Planning Framework plan and building assessment PLANNING

LAMB (HAROLD) 446 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LANGDON (MARY MARGARET) 1077 SI Playground Chicago Plays! new equipment including court conversion COMPLETE 2015

29 of 59

Page 30: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

LAWLER (MICHAEL) 1011 SI Playground Playground with water feature - new COMPLETE 2013

LAWLER (MICHAEL) 1011 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

LAZARUS (EMMA) 450 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LE CLAIRE COURTS - HEARST COMM. CTR 305 FR Roof Roof COMPLETE 2011

LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015

LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Spray Pool Water play feature - rehab COMPLETE 2017

LEE (JOHN) 1286 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LEGION 274 FR Sculpture and Monument Misc.- fountain restoration COMPLETE 2013

LEGION 274 SI Playground Chicago Plays! - new equipment at Catalpa Ave. COMPLETE 2014

LEGION 274 SI Playground Chicago Plays! - new equipment at Catalpa Ave. COMPLETE 2014

LEGION 274 SI Playground Chicago Plays! - new equipment at Thorndale Ave. COMPLETE 2015

LEGION 274 SI Playground Chicago Plays! - new equipment at Hollywood Ave. COMPLETE 2015

LELAND GIANTS 395 SI Playground Chicago Plays! - new equipment COMPLETE 2015

LEONE (SAM) BEACH 1013 SI Paving Lighting - exterior COMPLETE 2012

LEONE (SAM) BEACH 1013 SI Playground Chicago Plays! - new equipment COMPLETE 2016

LEONE (SAM) BEACH 1013 SI Athletic Field Natural area - new CONSTRUCTION

LEONE (SAM) BEACH 1013 FR Major Rehab Lifeguard Station - framework plan PLANNING

LERNER (LEO) 273 SI Playground Playground - equipment COMPLETE 2012

LERNER (LEO) 273 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LERNER (LEO) 273 SI Athletic Field Athletic field - rehab COMPLETE 2014

LEVIN (JOHN) 1220 SI Playground Chicago Plays! - new equipment COMPLETE 2013

LILY GARDENS 1218 SI Playground Chicago Plays! - new equipment COMPLETE 2013

LIMAS (JULIANN HOPE) 1066 AD Acquisition Expansion - 2422 S. Trumbull Ave. COMPLETE 2015

LIMAS (JULIANN HOPE) 1066 SI Playground Chicago Plays! - new equipment COMPLETE 2015

LIN (MARGARET HIE DING) 360 SI Site Improvement Park improvements DESIGN

LINCOLN (ABRAHAM) 100 SI Site Improvement Diversey Rowing Lagoon - infrastructure PRE-DESIGN

LINCOLN (ABRAHAM) 100 FR Major Rehab Conservatory - steam tunnel COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. electric transclosures COMPLETE 2015

LINCOLN (ABRAHAM) 100 AD New Construction Shoreline Protection with U.S. Army Corps (Fullerton Ave.) COMPLETE 2015

LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Oak St. to Ohio St. COMPLETE 2017

LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Swedenborg" - restoration COMPLETE 2012

LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Totem Pole" - restoration COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Site Improvement Ohio Street Beach - triathlon training station PRE-DESIGN

LINCOLN (ABRAHAM) 100 SI Site Improvement Ohio Street Beach - line sewer replacement CONSTRUCTION

LINCOLN (ABRAHAM) 100 FR Minor Rehab Shore Club - plumbing and electrical CONSTRUCTION

LINCOLN (ABRAHAM) 100 SI Athletic Field Athletic field - rehab COMPLETE 2011

30 of 59

Page 31: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Benjamin Franklin" - restoration PRE-DESIGN

LINCOLN (ABRAHAM) 100 FR Major Rehab Margate Field House - locker room improvements COMPLETE 2012

LINCOLN (ABRAHAM) 100 SI Site Improvement Fountain Girl Garden - installation DESIGN

LINCOLN (ABRAHAM) 100 SI Site Improvement North Pond - signage COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Charitas" - restoration COMPLETE 2016

LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Fullerton Ave. to North Ave. COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Paving Landscape yard - paving COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Osterman Beach House - rehab COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Belmont Ave. - improvements COMPLETE 2013

LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Promenade restoration - Diversey Ave. to Belmont Ave. COMPLETE 2012

LINCOLN (ABRAHAM) 100 AD New Construction Shoreline Protection with U.S. Army Corps (Montrose Dr. to Irving Park Dr.)COMPLETE 2014

LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - near Berwyn Ave. COMPLETE 2012

LINCOLN (ABRAHAM) 100 SI Lighting Diversey Ave. to Fullerton Dr. - lighting COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Minor Rehab Comfort station at Montrose Ave. - entrance and washrooms COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Roof Cultural Center - clay tile roof restoration CONSTRUCTION

LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. benches at North Pond COMPLETE 2013

LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Conservatory - HVAC energy management COMPLETE 2012

LINCOLN (ABRAHAM) 100 FR Minor Rehab Landscape yard - rehab COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Lighting Misc. electric service near Zoo COMPLETE 2012

LINCOLN (ABRAHAM) 100 FR Minor Rehab South Field House - rehab CONSTRUCTION

LINCOLN (ABRAHAM) 100 FR Roof Conservatory - glass roof assessment COMPLETE 2017

LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - concrete and drainage COMPLETE 2016

LINCOLN (ABRAHAM) 100 SI Courts Tennis court - rehab COMPLETE 2012

LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - south COMPLETE 2015

LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. navigation beacon COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Site Improvement Pathways and drainage COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Roof Comfort station at Diversey Ave. - roof COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Site Improvement Montrose Point - restoration COMPLETE 2015

LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - doors COMPLETE 2015

LINCOLN (ABRAHAM) 100 SI Lighting Lighting - lagoon COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Lighting Lighting - ballfield COMPLETE 2014

LINCOLN (ABRAHAM) 100 SI Lighting Lighting - Roscoe St. and Barry St. underpass COMPLETE 2012

LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Montrose Ave. to Addison Ave. COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Landscape Montrose Point Bird Sanctuary - design DESIGN

LINCOLN (ABRAHAM) 100 SI Landscape Montrose Butterfly Garden CONSTRUCTION

LINCOLN (ABRAHAM) 100 AD Planning Diversey Driving Range - planning study COMPLETE 2014

LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - glass restoration - Annual Program COMPLETE 2015

31 of 59

Page 32: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field - new COMPLETE 2014

LINCOLN (ABRAHAM) 100 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2012

LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Cultural Center COMPLETE 2012

LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2012

LINCOLN (ABRAHAM) 100 FR Minor Rehab Cultural Center - rehab COMPLETE 2013

LINCOLN (ABRAHAM) 100 FR Major Rehab North Avenue Pier - rehab COMPLETE 2013

LINCOLN (ABRAHAM) 100 SI Paving Belmont Harbor - sidewalk COMPLETE 2012

LINCOLN (ABRAHAM) 100 AD Planning Montrose Point - ecological management plan COMPLETE 2014

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment COMPLETE 2013

LINCOLN (ABRAHAM) 100 SI Site Improvement Osterman Beach - beach access COMPLETE 2017

LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - masonry PRE-DESIGN

LINCOLN (ABRAHAM) 100 SI Paving Green infrastructure renovation - Wilson Parking Lot COMPLETE 2016

LINCOLN (ABRAHAM) 100 FR Major Rehab Theater on the Lake - major rehab COMPLETE 2017

LINCOLN (ABRAHAM) 100 AD Planning North Ave. Beach - planning study COMPLETE 2014

LINCOLN (ABRAHAM) 100 SI Playground Playground with water feature - new COMPLETE 2015

LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Montrose Beach - improvements COMPLETE 2014

LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. water main rehab at lagoon COMPLETE 2014

LINCOLN (ABRAHAM) 100 SI Paving Paving - Diversey Driving Range COMPLETE 2015

LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2014

LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Grant" - concrete and structural PRE-DESIGN

LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Fountain Girl" and Rustic Pavillion- restoration COMPLETE 2014

LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Boat Club COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Roof Conservatory - rehab COMPLETE 2013

LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Ardmore Ave. to Montrose Ave. CONSTRUCTION

LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - North Ave. to Oak St. CONSTRUCTION

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment (Morrie Mages) COMPLETE 2015

LINCOLN (ABRAHAM) 100 FR Major Rehab South Field House - renovation and court rehab COMPLETE 2013

LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - signage COMPLETE 2018

LINCOLN (ABRAHAM) 100 SI Landscape Montrose Beach Dunes - planning study COMPLETE 2015

LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. pumps at North Ave. COMPLETE 2016

LINCOLN (ABRAHAM) 100 FR Roof Margate Field House - roof and gutters PRE-DESIGN

LINCOLN (ABRAHAM) 100 SI Fencing Dog friendly area at Montrose Beach - fencing COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Stockton Dr. COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Simonds Dr. COMPLETE 2016

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Cannon Dr. DESIGN

LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field at Montrose Ave. - major rehab COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Briar St. to Fullerton Ave. CONSTRUCTION

32 of 59

Page 33: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

LINCOLN (ABRAHAM) 100 SI Site Improvement Outdoor fitness station at Diversey Ave. - new COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Paving Paving - pathways COMPLETE 2016

LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Bryn Mawr COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - bike racks PRE-DESIGN

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Diversey Pkwy. COMPLETE 2017

LINCOLN (ABRAHAM) 100 FR Minor Rehab Waveland - 1st Tee Junior Clubhouse DESIGN

LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Boat House - furnace PRE-DESIGN

LINCOLN (ABRAHAM) 100 SI Site Improvement LFT Separation - Addison St. to Briar Ave. CONSTRUCTION

LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Power House - boiler BID/AWARD

LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - terrace walls COMPLETE 2011

LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - terrace walls additional COMPLETE 2011

LINCOLN (ABRAHAM) 100 FR Minor Rehab Theater on the Lake Comfort Station - Rehab COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Sunnyside Ave. COMPLETE 2016

LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Water main at Foster Ave. COMPLETE 2017

LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf field at Diversey Ave. - new PLANNING

LINCOLN (ABRAHAM) 100 SI Site Improvement Paving - running paths COMPLETE 2016

LINCOLN (ABRAHAM) 100 SI Courts Foster Beach - basketball court PRE-DESIGN

LINDBLOM (ROBERT) 243 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

LINDBLOM (ROBERT) 243 FR Roof Skylights - new DESIGN

LINDBLOM (ROBERT) 243 FR Fitness Center Fitness center -upgrade COMPLETE 2011

LINDBLOM (ROBERT) 243 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

LINDBLOM (ROBERT) 243 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LINDBLOM (ROBERT) 243 SI Athletic Field Artificial turf field and track - new COMPLETE 2015

LINDEN 308 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

LINDEN 308 SI Playground Chicago Plays! - new equipment COMPLETE 2015

LITTLE VENICE 1055 SI Playground Chicago Plays! - new equipment COMPLETE 2016

LIVINGSTON FIELD 510 AD Acquisition Park expansion COMPLETE 2011

LIVINGSTON FIELD 510 AD Park Development Park development including artificial turf field COMPLETE 2013

LONDON (LOUIS) 1120 SI Playground Chicago Plays! - new equipment COMPLETE 2016

LONDON (LOUIS) 1120 AD Park Development Park expansion - site improvements COMPLETE 2016

LOWE (SAMUEL) 1044 SI Courts Basketball court - rehab and drainage COMPLETE 2012

LOWE (SAMUEL) 1044 SI Site Improvement Park improvements - fencing, lighting COMPLETE 2014

LOWE (SAMUEL) 1044 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LOWE (SAMUEL) 1044 AD New Construction Field house - expansion COMPLETE 2014

LOYOLA 115 SI Paving Paving - paths COMPLETE 2013

LOYOLA 115 SI Site Improvement Misc. beach access COMPLETE 2012

LOYOLA 115 SI Playground Chicago Plays! - new equipment COMPLETE 2016

33 of 59

Page 34: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

LOYOLA 115 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017

LOYOLA 115 FR Minor Rehab Access - chair lift CONSTRUCTION

LOYOLA 115 SI Athletic Field Athletic field - batting cage COMPLETE 2018

LUNA 440 SI Playground Chicago Plays! - new equipment COMPLETE 2016

LUNT (ORRINGTON, STEPHEN) 1123 SI Playground Chicago Plays! - new equipment COMPLETE 2014

LYLE (JOHN) 1267 SI Playground Chicago Plays! - new equipment COMPLETE 2016

MADIGAN (MICHAEL J., SR.) 484 SI Lighting Lighting - exterior COMPLETE 2013

MAGNOLIA 333 SI Playground Chicago Plays! - new equipment COMPLETE 2016

MAJOR TAYLOR BIKE TRAIL 548 SI Site Improvement Signage COMPLETE 2011

MAJOR TAYLOR BIKE TRAIL 548 SI Lighting Lighting and seating - trail CONSTRUCTION

MALUS 394 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MANDRAKE (HENRY BROWN) 504 AD Acquisition Expansion ACQUISITION

MANDRAKE (HENRY BROWN) 504 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013

MANDRAKE (HENRY BROWN) 504 SI Playground Playground - surfacing COMPLETE 2012

MANDRAKE (HENRY BROWN) 504 SI Courts Tennis courts - rehab COMPLETE 2016

MANDRAKE (HENRY BROWN) 504 SI Site Improvement Athletic field - new scoreboard COMPLETE 2017

MANDRAKE (HENRY BROWN) 504 SI Paving Paving - entrance COMPLETE 2018

MANN (JAMES) 17 FR Minor Rehab Field house - wall repair COMPLETE 2013

MANN (JAMES) 17 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

MANN (JAMES) 17 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

MANN (JAMES) 17 SI Courts Court - conversion to inline skating COMPLETE 2011

MANN (JAMES) 17 FR HVAC and Energy Efficiency Pool - new boiler COMPLETE 2012

MANN (JAMES) 17 SI Site Improvement Drainage improvements COMPLETE 2014

MANN (JAMES) 17 FR Major Rehab Transition plan - access improvements COMPLETE 2011

MANN (JAMES) 17 FR Windows and Doors Natatorium - sliding doors COMPLETE 2011

MANN (JAMES) 17 FR Minor Rehab Misc. Veteran's Memorial Plaza COMPLETE 2015

MANN (JAMES) 17 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

MANN (JAMES) 17 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MANN (JAMES) 17 FR Concrete Masonry Structural Natatorium - major rehab COMPLETE 2017

MANN (JAMES) 17 SI Athletic Field Ballfield - rehab COMPLETE 2014

MANN (JAMES) 17 SI Landscape Tree planting COMPLETE 2018

MAPLE 1283 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MAPLEWOOD 1045 SI Athletic Field Athletic field - rehab COMPLETE 2017

MAPLEWOOD 1045 AD New Construction Field house - expansion CONSTRUCTION

MARIANO (LOUIS) 1239 FR Sculpture and Monument Fountain and plaza - restoration COMPLETE 2016

MARQUETTE (JACQUES) 10 SI Paving Landscape yard - paving COMPLETE 2011

MARQUETTE (JACQUES) 10 FR Minor Rehab Misc. locker room COMPLETE 2014

34 of 59

Page 35: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

MARQUETTE (JACQUES) 10 FR Minor Rehab Landscape yard - rehab COMPLETE 2011

MARQUETTE (JACQUES) 10 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2013

MARQUETTE (JACQUES) 10 SI Playground Chicago Plays! - new equipment COMPLETE 2013

MARQUETTE (JACQUES) 10 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

MARQUETTE (JACQUES) 10 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013

MARQUETTE (JACQUES) 10 FR Minor Rehab Field house - interior restoration COMPLETE 2016

MARQUETTE (JACQUES) 10 FR Roof Landscape yard - roof and masonry PRE-DESIGN

MARQUETTE (JACQUES) 10 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2015

MARQUETTE (JACQUES) 10 FR Sculpture and Monument MLK Monument COMPLETE 2016

MARQUETTE (JACQUES) 10 SI Paving Paving - pathways COMPLETE 2016

MARSHFIELD 1046 SI Site Improvement Misc. new water line COMPLETE 2012

MARSHFIELD 1046 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MARTIN (JOHNNY) 447 SI Playground Chicago Plays! - new equipment COMPLETE 2016

MASON (ELIZABETH) 1164 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MASON (ELIZABETH) 1164 SI Athletic Field Fencing - perimeter DESIGN

MATANKY (EUGENE) 168 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MATHER (STEPHEN TYNG) 241 SI Playground Playground - new COMPLETE 2012

MATHER (STEPHEN TYNG) 241 FR Roof Roof - rehab COMPLETE 2017

MATHER (STEPHEN TYNG) 241 SI Athletic Field Athletic field - rehab COMPLETE 2016

MATHER (STEPHEN TYNG) 241 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION

MATHER (STEPHEN TYNG) 241 SI Landscape Tree planting COMPLETE 2018

MAYFAIR 86 SI Paving Paving - pathways COMPLETE 2017

MAYFAIR 86 SI Athletic Field Athletic field - rehab CONSTRUCTION

MCGUANE (JOHN) 2 AD Planning Field House - feasibility study COMPLETE 2018

MCGUANE (JOHN) 2 FR Major Rehab Transition plan - access improvements COMPLETE 2012

MCGUANE (JOHN) 2 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

MCGUANE (JOHN) 2 SI Playground Chicago Plays! - new equipment COMPLETE 2013

MCGUANE (JOHN) 2 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

MCGUANE (JOHN) 2 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

MCGUANE (JOHN) 2 FR Major Rehab Field house - major restoration DESIGN

MCGUANE (JOHN) 2 SI Courts Tennis courts - rehab COMPLETE 2016

MCINERNEY (THOMAS) 443 SI Site Improvement Park improvements COMPLETE 2017

MCINERNEY (THOMAS) 443 SI Site Improvement Park improvements PLANNING

MCKEON (JOSEPH) 1162 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MCKIERNAN (DAVID) 1060 FR Minor Rehab Accessibility improvements COMPLETE 2013

MCKIERNAN (DAVID) 1060 SI Athletic Field Athletic field - rehab COMPLETE 2016

MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool - rehab COMPLETE 2013

35 of 59

Page 36: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

MCKINLEY (WILLIAM) 23 FR Roof Power house - roof PRE-DESIGN

MCKINLEY (WILLIAM) 23 FR Windows and Doors Field house - doors COMPLETE 2014

MCKINLEY (WILLIAM) 23 FR Sculpture and Monument "McKinley" - restoration PRE-DESIGN

MCKINLEY (WILLIAM) 23 FR Major Rehab Field house - major rehab CONSTRUCTION

MCKINLEY (WILLIAM) 23 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MCKINLEY (WILLIAM) 23 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

MCKINLEY (WILLIAM) 23 SI Courts Tennis court - rehab COMPLETE 2012

MCKINLEY (WILLIAM) 23 FR Minor Rehab Landscape yard - removal COMPLETE 2016

MCKINLEY (WILLIAM) 23 SI Site Improvement Landscape yard - paving and drainage COMPLETE 2018

MCKINLEY (WILLIAM) 23 SI Paving Paving - pathways COMPLETE 2016

MCKINLEY (WILLIAM) 23 SI Spray Pool Water play feature - rehab COMPLETE 2018

MCKINLEY (WILLIAM) 23 SI Site Improvement Dog friendly area -new PRE-DESIGN

MELLIN (CURTIS, SR.) 1219 SI Playground Playground - new COMPLETE 2013

MEMORIAL 1048 SI Courts Basketball - rehab COMPLETE 2011

MERRILL (GEORGE) 1126 SI Courts Site improvement COMPLETE 2013

MERRILL (GEORGE) 1126 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MERRILL (GEORGE) 1126 SI Courts Court -rehab COMPLETE 2014

MERRIMAC 256 SI Playground Playground with water feature - new COMPLETE 2013

MERRIMAC 256 FR Minor Rehab Gym floor - rehab COMPLETE 2014

MERRIMAC 256 SI Site Improvement Misc. flag poles COMPLETE 2012

MERRIMAC 256 SI Site Improvement Site improvements including paving COMPLETE 2013

MERRYMAN (THERON) 1124 SI Playground Playground - new COMPLETE 2013

METCALFE (RALPH) 448 SI Courts Tennis court - rehab COMPLETE 2011

METCALFE (RALPH) 448 SI Athletic Field Athletic field - lighting and scoreboard COMPLETE 2015

METCALFE (RALPH) 448 SI Playground Chicago Plays! - new equipment COMPLETE 2016

MEYERING (WILLIAM) 1049 SI Playground Playground - surfacing PRE-DESIGN

MEYERING (WILLIAM) 1049 SI Courts Basketball court - rehab COMPLETE 2013

MEYERING (WILLIAM) 1049 SI Paving Paving - track COMPLETE 2013

MEYERING (WILLIAM) 1049 SI Spray Pool Water play feature - rehab COMPLETE 2018

MICEK (FRANK) 1028 SI Fencing Fencing - basketball court COMPLETE 2014

MICEK (FRANK) 1028 SI Playground Playground with water feature - new COMPLETE 2013

MICEK (FRANK) 1028 SI Courts Basketball court - rehab COMPLETE 2013

MIDWAY PLAISANCE 1268 FR Minor Rehab Misc. HVAC rehab COMPLETE 2011

MILLARD (ALDEN) 1127 SI Playground Chicago Plays! - new equipment COMPLETE 2013

MILLARD (ALDEN) 1127 SI Site Improvement Expansion - site improvements COMPLETE 2017

MILLER (SAMUEL) 1128 SI Playground Chicago Plays! - new equipment COMPLETE 2014

36 of 59

Page 37: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

MINUTEMAN 307 SI Playground Playground - new COMPLETE 2012

MINUTEMAN 307 SI Paving Paving - paths COMPLETE 2012

MINUTEMAN 307 FR Roof Roof - rehab COMPLETE 2015

MINUTEMAN 307 SI Fencing Ballfield - perimeter fencing CONSTRUCTION

MOCCASIN RANCH 337 SI Playground Chicago Plays! - new equipment COMPLETE 2016

MONTGOMERY (MABEL) 1129 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MONTICELLO 1130 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MONUMENT 57 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MOORE (MAURICE) 1050 SI Courts Misc. new backboards COMPLETE 2011

MOORE (MAURICE) 1050 AD Park Development Park development - including playground COMPLETE 2011

MOORE (MAURICE) 1050 AD New Construction Expansion and access improvements COMPLETE 2015

MORAN (TERRANCE) 1051 FR Roof Roof - rehab COMPLETE 2014

MORAN (TERRANCE) 1051 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

MORAN (TERRANCE) 1051 SI Playground Chicago Plays! - new equipment COMPLETE 2013

MORGAN (THOMAS LEEDS) FIELD 1132 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MOUNT GREENWOOD 251 SI Athletic Field Miracle Field - rehab COMPLETE 2016

MOUNT GREENWOOD 251 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2011

MOUNT GREENWOOD 251 FR Swimming Pool Pool - liner and gutter COMPLETE 2016

MOUNT GREENWOOD 251 FR Major Rehab Transition plan - access improvements COMPLETE 2011

MOUNT GREENWOOD 251 SI Site Improvement Outdoor fitness station - new COMPLETE 2016

MOUNT GREENWOOD 251 SI Playground Playground - fencing and mosaic COMPLETE 2017

MOUNT GREENWOOD 251 FR Minor Rehab Gym floor - rehab DESIGN

MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2017

MOUNT GREENWOOD 251 SI Athletic Field Athletic fields- drainage CONSTRUCTION

MOZART (AMADEUS) 128 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

MOZART (AMADEUS) 128 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MOZART (AMADEUS) 128 FR Roof Roof - rehab COMPLETE 2014

MULBERRY 1284 SI Playground Chicago Plays! - new equipment COMPLETE 2015

MUNROE (ROY) 1052 SI Paving Paving - paths and drainage COMPLETE 2013

MUNROE (ROY) 1052 SI Playground Playground and spray feature - new CONSTRUCTION

MURRAY (DAVID) 1053 SI Courts Basketball court - new COMPLETE 2012

MURRAY (DAVID) 1053 SI Playground Chicago Plays! - new equipment COMPLETE 2014

MURRAY (DAVID) 1053 FR Minor Rehab Bathroom - plumbing COMPLETE 2018

NASH (DON) COMM. CTR. 482 FR Fitness Center Fitness center - upgrade COMPLETE 2011

NASH (DON) COMM. CTR. 482 FR Roof Roof COMPLETE 2012

NASH (DON) COMM. CTR. 482 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

37 of 59

Page 38: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

NASH (DON) COMM. CTR. 482 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014

NASH (DON) COMM. CTR. 482 FR Windows and Doors Field house - doors COMPLETE 2013

NASH (DON) COMM. CTR. 482 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

NASH (DON) COMM. CTR. 482 SI Playground Park improvement COMPLETE 2017

NELSON (ANDREW) 1133 SI Playground Chicago Plays! - new equipment COMPLETE 2015

NICHOLS (JOHN FOUNTAIN) 277 SI Site Improvement Misc. fountain plumbing COMPLETE 2013

NICHOLS (JOHN FOUNTAIN) 277 SI Courts Tennis court - rehab COMPLETE 2016

NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kenwood Ave. COMPLETE 2016

NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kimbark Ave. COMPLETE 2016

NINEBARK 355 SI Playground Chicago Plays! - new equipment COMPLETE 2013

NINEBARK 355 SI Site Improvement Expansion - site improvements COMPLETE 2017

NOETHLING (GRACE) 425 SI Site Improvement Dog friendly area - improvements COMPLETE 2013

North Boundary 557 AD Acquisition Kedzie Ave. and Touhy Ave. COMPLETE 2011

North Boundary 557 SI Site Improvement Pathways and benches COMPLETE 2011

North Boundary 557 SI Lighting Lighting - exterior COMPLETE 2014

NORTH MAYFAIR 90 SI Playground Chicago Plays! - new equipment COMPLETE 2013

NORTH PARK VILLAGE NATURE CENTER 533 FR Minor Rehab Staff offices - new COMPLETE 2017

NORTHERLY ISLAND 34 FR Minor Rehab Solar charging station COMPLETE 2011

NORTHERLY ISLAND 34 FR Major Rehab Tent - major restoration COMPLETE 2016

NORTHERLY ISLAND 34 SI Fencing Misc. fencing COMPLETE 2011

NORTHERLY ISLAND 34 AD New Construction New Concert and Event Venue COMPLETE 2013

NORTHERLY ISLAND 34 AD Planning Framework plan COMPLETE 2011

NORTHERLY ISLAND 34 FR Roof Landscape yard - roof PRE-DESIGN

NORTHERLY ISLAND 34 SI Site Improvement Rotary Garden - benches COMPLETE 2015

NORTHERLY ISLAND 34 FR Roof Terminal - roof rehab PRE-DESIGN

NORTHERLY ISLAND 34 SI Paving Lynn White Dr. - curb and asphalt COMPLETE 2016

NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Landscape yard - boiler COMPLETE 2017

NORTHERLY ISLAND 34 SI Paving Adler Parking Lot - rehab COMPLETE 2017

NORTHERLY ISLAND 34 AD Park Development Park development - shoreline and natural area COMPLETE 2015

NORTHERLY ISLAND 34 SI Site Improvement Hamilton Exhibit - park improvements CONSTRUCTION

NORWOOD 141 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

NORWOOD 141 FR Roof Landscape yard - roof COMPLETE 2011

NORWOOD 141 SI Site Improvement Dog friendly area - new COMPLETE 2013

NORWOOD 141 FR Roof Roof COMPLETE 2013

NORWOOD 141 SI Site Improvement Misc. site drainage COMPLETE 2013

NORWOOD 141 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

NORWOOD 141 SI Playground Chicago Plays! - new equipment COMPLETE 2013

38 of 59

Page 39: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

NORWOOD 141 FR Windows and Doors Field house - windows PRE-DESIGN

NORWOOD 141 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

NORWOOD 141 FR Swimming Pool Pool -deck COMPLETE 2016

NORWOOD 141 FR Swimming Pool Pool - liner PRE-DESIGN

NORWOOD 141 SI Site Improvement Bocce ball court - rehab COMPLETE 2017

NORWOOD 141 SI Paving Paving - pathways COMPLETE 2017

NORWOOD 141 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017

NORWOOD 141 SI Site Improvement Hockey rink - new COMPLETE 2018

OAKDALE 235 FR Minor Rehab Misc. hot water tank COMPLETE 2012

OAKDALE 235 FR HVAC and Energy Efficiency Park improvements CONSTRUCTION

OAKDALE 235 FR Minor Rehab Locker room - rehab COMPLETE 2015

OAKDALE 235 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

OAKDALE 235 FR Minor Rehab Misc. washrooms COMPLETE 2012

OAKDALE 235 SI Landscape Tree planting COMPLETE 2018

OAKDALE 235 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

OAKLEY 1137 SI Playground Chicago Plays! - new equipment COMPLETE 2015

OGDEN (WILLIAM) 8 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

OGDEN (WILLIAM) 8 FR Minor Rehab Access improvements COMPLETE 2011

OGDEN (WILLIAM) 8 SI Spray Pool Water play feature - rehab COMPLETE 2013

OGDEN (WILLIAM) 8 FR Fitness Center Fitness center - upgrade COMPLETE 2011

OGDEN (WILLIAM) 8 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013

OGDEN (WILLIAM) 8 FR Roof Roof COMPLETE 2014

OGDEN (WILLIAM) 8 SI Athletic Field Artificial turf field and track - new DESIGN

OGDEN (WILLIAM) 8 FR Major Rehab Elevator COMPLETE 2012

OGDEN (WILLIAM) 8 FR Minor Rehab Misc. field house improvements COMPLETE 2016

OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2014

OGDEN (WILLIAM) 8 FR Swimming Pool Pool - liner PRE-DESIGN

OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2016

OGDEN (WILLIAM) 8 SI Site Improvement Park improvement COMPLETE 2016

OGDEN (WILLIAM) PLAZA 477 SI Site Improvement Park improvements PLANNING

O'HALLAREN (BERNARD) 1012 SI Courts Tennis court - conversion and rehab COMPLETE 2013

OHIO 1139 SI Playground Chicago Plays! - new equipment COMPLETE 2016

OHIO & HARDING 1138 SI Playground Chicago Plays! - new equipment COMPLETE 2013

OLYMPIA 60 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012

OLYMPIA 60 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

OLYMPIA 60 SI Playground Chicago Plays! - new equipment COMPLETE 2014

OLYMPIA 60 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

39 of 59

Page 40: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

OLYMPIA 60 FR Roof Roof - new PRE-DESIGN

OLYMPIA 60 SI Athletic Field Athletic field - rehab COMPLETE 2013

ORIOLE 59 SI Athletic Field Athletic field - rehab COMPLETE 2014

ORIOLE 59 SI Lighting Lighting - ballfield COMPLETE 2011

ORIOLE 59 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

ORIOLE 59 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

ORIOLE 59 SI Playground Chicago Plays! - new equipment at Balmoral Ave. COMPLETE 2014

ORIOLE 59 SI Playground Chicago Plays! - new equipment at Gregory St. COMPLETE 2014

ORIOLE 59 FR Roof Misc. gutters and downspouts PRE-DESIGN

ORIOLE 59 SI Spray Pool Water play feature - surfacing COMPLETE 2016

ORIOLE 59 SI Paving Paving - pathways COMPLETE 2017

ORIOLE 59 SI Site Improvement Outdoor fitness station - new BID/AWARD

OWENS (JESSE) 237 FR HVAC and Energy Efficiency Boiler - automation system COMPLETE 2012

OWENS (JESSE) 237 SI Athletic Field Athletic field - study COMPLETE 2011

OWENS (JESSE) 237 FR Windows and Doors Windows - drainage PRE-DESIGN

OWENS (JESSE) 237 SI Athletic Field Ballfield - rehab COMPLETE 2015

OZ 423 SI Playground Playground - rehab including new surfacing COMPLETE 2015

OZ 423 SI Athletic Field Athletic field - rehab CONSTRUCTION

PACKINGTOWN 404 SI Playground Chicago Plays! - new equipment COMPLETE 2016

PALMER (BERTHA HONORÉ) 520 SI Playground Chicago Plays! - new equipment COMPLETE 2014

PALMER (JOHN MCAULEY) SQUARE 539 AD Acquisition Palmer Blvd. COMPLETE 2014

PALMER (JOHN MCAULEY) SQUARE 539 SI Landscape Tree planting COMPLETE 2018

PALMER (POTTER) 13 SI Athletic Field Ballfield - rehab COMPLETE 2011

PALMER (POTTER) 13 FR Windows and Doors Field house - windows and doors COMPLETE 2013

PALMER (POTTER) 13 FR Swimming Pool Pool - filter COMPLETE 2013

PALMER (POTTER) 13 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

PALMER (POTTER) 13 FR Roof Field house - roof COMPLETE 2015

PALMER (POTTER) 13 FR Minor Rehab Gym floor - rehab COMPLETE 2011

PALMER (POTTER) 13 SI Paving Track - asphalt and lane lines COMPLETE 2011

PALMER (POTTER) 13 SI Paving Paving - pathways COMPLETE 2012

PALMER (POTTER) 13 FR Fitness Center Fitness center - equipment COMPLETE 2011

PALMER (POTTER) 13 FR Fitness Center Fitness center - upgrade COMPLETE 2011

PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements COMPLETE 2012

PALMER (POTTER) 13 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements DESIGN

PALMER (POTTER) 13 SI Playground Chicago Plays! - new equipment COMPLETE 2014

PALMER (POTTER) 13 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

40 of 59

Page 41: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

PALMER (POTTER) 13 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015

PALMER (POTTER) 13 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2016

PALMER (POTTER) 13 SI Paving Paving - pathways COMPLETE 2017

PALMISANO (HENRY) 531 AD Acquisition Environmental monitoring ONGOING

PALMISANO (HENRY) 531 SI Fencing Misc. security fencing COMPLETE 2014

PALMISANO (HENRY) 531 SI Site Improvement Misc. circulation pond CONSTRUCTION

PALMISANO (HENRY) 531 SI Landscape Pollinator nature area - new DESIGN

PARK NO. 326 326 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 382 382 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 414 414 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 419 419 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 421 421 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 422 422 SI Lighting Lighting - exterior COMPLETE 2011

PARK NO. 422 422 SI Playground Chicago Plays! - new equipment COMPLETE 2016

PARK NO. 432 432 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 437 437 SI Fencing Misc. perimeter fencing COMPLETE 2014

PARK NO. 468 468 SI Site Improvement Park improvements including fencing, signage COMPLETE 2018

PARK NO. 500 500 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

PARK NO. 500 500 SI Playground Chicago Plays! - new equipment COMPLETE 2016

PARK NO. 512 512 FR Roof Landscape yard - roof COMPLETE 2011

PARK NO. 512 512 AD Park Development The 606 access park - park development COMPLETE 2012

PARK NO. 517 517 SI Lighting Lighting - exterior COMPLETE 2013

PARK NO. 527 527 AD Planning Trades relocation - study COMPLETE 2011

PARK NO. 527 527 FR Minor Rehab Candle Factory- emergency rehab COMPLETE 2017

PARK NO. 538 538 SI Landscape Natural area - new CONSTRUCTION

PARK NO. 540 540 AD Acquisition Federal St. and 24th St. COMPLETE 2014

PARK NO. 543 543 AD Acquisition Printers Row Park COMPLETE 2014

PARK NO. 543 543 SI Lighting Exterior lighting - upgrades COMPLETE 2018

PARK NO. 551 551 SI Site Improvement Park improvements COMPLETE 2018

PARK NO. 552 552 AD Acquisition 4901-09 W. Belmont Ave. COMPLETE 2014

PARK NO. 556 556 AD Acquisition Artesian Ave. and Western Ave. COMPLETE 2013

PARK NO. 556 556 AD Planning Artesian Ave. and Western Ave. - study COMPLETE 2011

PARK NO. 556 556 AD Park Development Park development - Artesian Ave. and Western Ave. COMPLETE 2015

PARK NO. 559 559 SI Site Improvement Park improvements PLANNING

PARK NO. 559 559 AD Acquisition 6151 N. Sheridan - acquisition COMPLETE 2011

PARK NO. 562 (MARIAN BYRNES) 562 AD Acquisition 1735-37 E. 96th St. COMPLETE 2012

PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Nature area - new COMPLETE 2015

41 of 59

Page 42: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

PARK NO. 562 (MARIAN BYRNES) 562 SI Site Improvement Multi-use trail system - new CONSTRUCTION

PARK NO. 562 (MARIAN BYRNES) 562 AD Park Development Park Development - trails and wetland CONSTRUCTION

PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Habitat enhancement CONSTRUCTION

PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Costal woodland - restoration CONSTRUCTION

PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Wetland bird habitat - restoration CONSTRUCTION

PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - wetland restoration COMPLETE 2016

PARK NO. 564 (BIG MARSH) 564 AD Acquisition Big Marsh - expansion ACQUISITION

PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - trail improvements CONSTRUCTION

PARK NO. 564 (BIG MARSH) 564 AD Planning Habitat Plan - Big Marsh COMPLETE 2015

PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - water control structure COMPLETE 2015

PARK NO. 564 (BIG MARSH) 564 AD Park Development Big Marsh - Trail System DESIGN

PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - western access CONSTRUCTION

PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - upland habitat CONSTRUCTION

PARK NO. 564 (BIG MARSH) 564 AD Park Development Park Development - Big Marsh COMPLETE 2016

PARK NO. 564 (BIG MARSH) 564 AD New Construction Ford Calumet Environmental Center BID/AWARD

PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - habitat restoration CONSTRUCTION

PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Calumet Area - signage COMPLETE 2017

PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - east side trail expansion CONSTRUCTION

PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - hydrology and riparian habitat CONSTRUCTION

PARK NO. 565 565 SI Landscape Habitat restoration CONSTRUCTION

PARK NO. 565 565 AD Acquisition Indian Ridge - 116th St. and Torrence Ave. COMPLETE 2015

PARK NO. 565 565 AD Acquisition Indian Ridge - expansion ACQUISITION

PARK NO. 566 566 SI Landscape Natural area - new PRE-DESIGN

PARK NO. 566 566 AD Acquisition USX - 79th St. and Lake Michigan COMPLETE 2014

PARK NO. 566 566 SI Site Improvement Misc. access road COMPLETE 2014

PARK NO. 567 567 AD Acquisition The 606 access park - Milwaukee Ave. and Leavitt St. COMPLETE 2012

PARK NO. 567 567 SI Lighting Lighting - exterior COMPLETE 2012

PARK NO. 567 567 AD Park Development Bloomingdale Access - new park at Milwaukee Ave. and Leavitt St. COMPLETE 2013

PARK NO. 568 568 AD Acquisition Western Ave. and Peterson Ave. COMPLETE 2012

PARK NO. 568 568 AD Park Development Park development - West Ridge Nature Preserve COMPLETE 2015

PARK NO. 568 568 SI Playground Nature play area -new DESIGN

PARK NO. 569 569 AD Park Development Dog friendly area - Monroe St. and Loomis St. COMPLETE 2014

PARK NO. 569 569 AD Acquisition 1358 W. Monroe St. COMPLETE 2015

PARK NO. 571 571 AD New Construction New Chicago River Boat House COMPLETE 2016

PARK NO. 571 571 AD Acquisition Eleanor Street Park COMPLETE 2012

PARK NO. 571 571 SI Fencing Misc. site improvements COMPLETE 2014

PARK NO. 572 572 AD Park Development Bloomingdale Line - planning COMPLETE 2013

42 of 59

Page 43: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

PARK NO. 572 572 AD Acquisition Bloomingdale Park and Trail - various sites COMPLETE 2014

PARK NO. 572 572 AD Park Development The 606- new park and trail development COMPLETE 2015

PARK NO. 573 573 AD Park Development Misc. new water source PRE-DESIGN

PARK NO. 573 573 AD Acquisition 114th St. and Champlain Ave. COMPLETE 2016

PARK NO. 574 574 AD Acquisition Jackson Blvd. and Maplewood Ave. COMPLETE 2015

PARK NO. 574 574 AD Park Development Park development - "Rockwell Gardens" COMPLETE 2014

PARK NO. 575 575 AD Acquisition Wacker Clover - Congress Pkwy. and Wells St. ACQUISITION

PARK NO. 575 575 AD Park Development Park development - Wacker Interchange COMPLETE 2012

PARK NO. 576 576 AD Acquisition Whitford Pond - 2113 E. 134th St. COMPLETE 2012

PARK NO. 576 576 AD Park Development Park Development - Whitford Pond PLANNING

PARK NO. 577 577 AD Acquisition 115th St. and Western Ave. COMPLETE 2014

PARK NO. 577 577 AD Park Development Morgan Park Sports Complex COMPLETE 2015

PARK NO. 578 578 AD Park Development Park development - Washington Blvd. and Wolcott Ave. COMPLETE 2016

PARK NO. 578 578 AD Acquisition New park - 1919 W. Maypole Ave. COMPLETE 2016

PARK NO. 579 579 AD Park Development The 606 access park - environmental assessment COMPLETE 2016

PARK NO. 580 580 AD Park Development New park development including artificial turf field CONSTRUCTION

PARK NO. 580 580 AD Acquisition 4139 N. Oak Park Ave. COMPLETE 2016

PARK NO. 581 581 AD Acquisition New park - 11625 S. Oakley Ave. COMPLETE 2016

PARK NO. 581 581 SI Athletic Field New Park Development - 116th St. and Oakley Ave. COMPLETE 2017

PARK NO. 582 582 AD Park Development New park -site improvements PRE-DESIGN

PARK NO. 582 582 AD Acquisition 9202-35 S. Vanderpoel Ave. - new park COMPLETE 2017

PARK NO. 583 583 AD Acquisition 10108 S. Exchange Ave. - new park COMPLETE 2017

PARK NO. 583 583 AD Park Development New park -site improvements PRE-DESIGN

PARK NO. 584 584 AD Park Development New park development PRE-DESIGN

PARK NO. 584 584 AD Acquisition 134 W. 119th St. - new park COMPLETE 2017

PARK NO. 585 585 AD Acquisition 6049 S. Whipple St. - new park COMPLETE 2017

PARK NO. 585 585 AD Park Development New park -site improvements PRE-DESIGN

PARK NO. 586 586 AD Acquisition 7208 S. Maplewood Ave. - new park COMPLETE 2017

PARK NO. 586 586 SI Fencing Fencing - perimeter PRE-DESIGN

PARK NO. 587 587 AD Acquisition 658 E. 95th St. - new park COMPLETE 2017

PARK NO. 587 587 AD Park Development Park improvements PRE-DESIGN

PARK NO. 588 588 AD Park Development New park with playground - with Kaboom COMPLETE 2018

PARK NO. 589 589 SI Fencing Fencing - perimeter PRE-DESIGN

PARK NO. 589 589 AD Acquisition 227 W. 110th Pl. ACQUISITION

PARK NO. 590 590 AD Park Development 3940 S. Indiana Ave. - new dog friendly area CONSTRUCTION

PARK NO. 591 591 AD Park Development 3906 S Lake Park Ave. - new dog friendly area BID/AWARD

PARK NO. 592 592 AD Park Development 4153 S. Vincennes Ave. - new dog friendly area BID/AWARD

43 of 59

Page 44: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

PARK NO. 593 593 AD Acquisition 4546 N. Kedvale Ave. - new park ACQUISITION

PARK NO. 593 593 SI Site Improvement Park improvements PRE-DESIGN

PARK NO. 594 594 AD Park Development New park with dog friendly area PRE-DESIGN

PARK-VIEW 1056 SI Playground Chicago Plays! - new equipment COMPLETE 2014

PARSONS (LUCY) 501 SI Playground Playground - expansion CONSTRUCTION

PASCHEN (CHRISTIAN) 1057 FR Concrete Masonry Structural Field house - tuckpointing PRE-DESIGN

PASCHEN (CHRISTIAN) 1057 SI Playground Chicago Plays! - new equipment COMPLETE 2014

PASCHEN (CHRISTIAN) 1057 SI Fencing Fencing at basketball court COMPLETE 2016

PASTEUR (LOUIS) 247 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011

PASTEUR (LOUIS) 247 SI Fencing Misc. fencing COMPLETE 2014

PASTEUR (LOUIS) 247 SI Playground Chicago Plays! - new equipment COMPLETE 2015

PASTEUR (LOUIS) 247 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018

PENDLETON (HADIYA) 339 AD Acquisition Expansion COMPLETE 2016

PENDLETON (HADIYA) 339 AD Park Development Park development - including playground COMPLETE 2016

PERIWINKLE 436 SI Playground Chicago Plays! - new equipment COMPLETE 2015

PETERSON (PEHR SAMUEL) 452 SI Playground Park improvement COMPLETE 2016

PETERSON (PEHR SAMUEL) 452 SI Paving Paving - paths COMPLETE 2012

PETERSON (PEHR SAMUEL) 452 FR Major Rehab Elevator - rehab COMPLETE 2012

PETERSON (PEHR SAMUEL) 452 FR Minor Rehab Field house - major rehab COMPLETE 2014

PETERSON (PEHR SAMUEL) 452 SI Courts Tennis court - rehab COMPLETE 2011

PETERSON (PEHR SAMUEL) 452 SI Playground Chicago Plays! - new equipment at Central Park Ave. COMPLETE 2016

PETERSON (PEHR SAMUEL) 452 SI Paving Parking lot - rehab COMPLETE 2018

PETERSON (PEHR SAMUEL) 452 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN

PIETROWSKI (SYLVESTER) 1058 SI Playground Chicago Plays! - new equipment COMPLETE 2015

PINE 1287 SI Playground Chicago Plays! - new equipment COMPLETE 2014

PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

PIOTROWSKI (LILLIAN) 230 SI Site Improvement Misc. lighting and drinking fountain COMPLETE 2011

PIOTROWSKI (LILLIAN) 230 FR Major Rehab Transition plan - access improvements COMPLETE 2012

PIOTROWSKI (LILLIAN) 230 SI Lighting Lighting - athletic field and pathways COMPLETE 2015

PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Swimming pool - dome COMPLETE 2014

PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool - filter and controls COMPLETE 2017

PIOTROWSKI (LILLIAN) 230 SI Athletic Field Athletic field - rehab COMPLETE 2016

PIOTROWSKI (LILLIAN) 230 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2015

PIOTROWSKI (LILLIAN) 230 FR Concrete Masonry Structural Field house - masonry and roof COMPLETE 2017

PIOTROWSKI (LILLIAN) 230 FR Minor Rehab Pool Building - covered walkway COMPLETE 2017

PLEASANT POINT 140 SI Playground Playground - new COMPLETE 2014

POPLAR 323 SI Playground Chicago Plays! - new equipment COMPLETE 2016

44 of 59

Page 45: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

PORTAGE 147 SI Paving Landscape yard - paving COMPLETE 2018

PORTAGE 147 FR Minor Rehab Field house - locker room improvements COMPLETE 2013

PORTAGE 147 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

PORTAGE 147 FR Roof Landscape yard - roof COMPLETE 2011

PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2016

PORTAGE 147 FR Roof Roof and skylight - rehab COMPLETE 2017

PORTAGE 147 SI Site Improvement Misc. scoreboard COMPLETE 2011

PORTAGE 147 FR Concrete Masonry Structural Field house and landscape building - masonry COMPLETE 2013

PORTAGE 147 FR Swimming Pool Deck - drainage improvements COMPLETE 2013

PORTAGE 147 FR Sculpture and Monument Misc. fountain planters COMPLETE 2014

PORTAGE 147 SI Site Improvement Misc. landscaping and drainage COMPLETE 2013

PORTAGE 147 FR Windows and Doors Landscape yard - doors COMPLETE 2014

PORTAGE 147 FR Minor Rehab Field house - gym and community room floors COMPLETE 2011

PORTAGE 147 FR Minor Rehab Facility rehab - minor COMPLETE 2013

PORTAGE 147 FR Concrete Masonry Structural Pool house - concrete and masonry COMPLETE 2013

PORTAGE 147 SI Site Improvement Dog friendly area - expansion COMPLETE 2013

PORTAGE 147 FR Minor Rehab Misc. Indoor pool stair renovation COMPLETE 2015

PORTAGE 147 SI Paving Paving - paths COMPLETE 2015

PORTAGE 147 SI Paving Paving - parking lot and pathways COMPLETE 2014

PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2015

PORTAGE 147 SI Athletic Field Athletic field - rehab COMPLETE 2011

PORTAGE 147 SI Spray Pool Water play feature - rehab COMPLETE 2017

PORTAGE 147 SI Paving Paving - pathways COMPLETE 2017

PORTAGE 147 SI Lighting Athletic field - lighting DESIGN

POTTAWATTOMIE 166 SI Site Improvement Dog friendly area - new COMPLETE 2011

POTTAWATTOMIE 166 FR Fitness Center Fitness center - new equipment COMPLETE 2011

POTTAWATTOMIE 166 FR Roof Roof PRE-DESIGN

POTTAWATTOMIE 166 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

POTTAWATTOMIE 166 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

POTTAWATTOMIE 166 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015

POTTAWATTOMIE 166 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013

POTTAWATTOMIE 166 SI Athletic Field Ballfield - rehab COMPLETE 2011

POTTAWATTOMIE 166 FR Minor Rehab Misc. drinking fountain COMPLETE 2016

PRAIRIE WOLF 329 SI Playground Chicago Plays! - new equipment COMPLETE 2016

PRITZKER 541 AD Acquisition Pritzker Park COMPLETE 2011

PRIVET 375 SI Playground Chicago Plays! - new equipment COMPLETE 2016

PULASKI (CASIMER) 217 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

45 of 59

Page 46: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

PULASKI (CASIMER) 217 FR Concrete Masonry Structural Pool deck - rehab COMPLETE 2011

PULASKI (CASIMER) 217 SI Spray Pool Water play feature - rehab COMPLETE 2018

PULASKI (CASIMER) 217 FR Minor Rehab Field house - fire escape rehab COMPLETE 2012

PULASKI (CASIMER) 217 FR Minor Rehab Field house - rehab COMPLETE 2013

PULASKI (CASIMER) 217 FR Major Rehab Transition plan - access improvements PRE-DESIGN

PULASKI (CASIMER) 217 SI Athletic Field Ballfield - rehab COMPLETE 2015

PULASKI (CASIMER) 217 FR Minor Rehab Field house- interior COMPLETE 2014

PULASKI (CASIMER) 217 FR Swimming Pool Pool - filter PRE-DESIGN

PULASKI (CASIMER) 217 FR Swimming Pool Pool - miami tank COMPLETE 2018

RAILROAD JUNCTION 354 SI Playground Chicago Plays! - new equipment COMPLETE 2014

RAINBOW BEACH 1001 SI Site Improvement Lakefront Kiosk - installation COMPLETE 2017

RAINBOW BEACH 1001 SI Playground Chicago Plays! - new equipment COMPLETE 2015

RAINBOW BEACH 1001 FR Minor Rehab Field house - water heaters DESIGN

RAINBOW BEACH 1001 FR Roof Roof COMPLETE 2012

RAINBOW BEACH 1001 SI Paving Paving - paths COMPLETE 2016

RAINBOW BEACH 1001 SI Site Improvement Water quality COMPLETE 2015

RAINBOW BEACH 1001 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

RAINBOW BEACH 1001 FR Minor Rehab Beach House - rehab COMPLETE 2014

RAINBOW BEACH 1001 SI Paving Paving - pathways COMPLETE 2016

RAINBOW BEACH 1001 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017

RAINBOW BEACH 1001 SI Landscape Tree planting COMPLETE 2018

RAINEY (EDWARD) 33 SI Playground Chicago Plays! - new equipment COMPLETE 2015

RAINEY (EDWARD) 33 SI Courts Court conversion - Cruyff Court COMPLETE 2016

RAVENSWOOD MANOR 159 SI Playground Chicago Plays! - new equipment COMPLETE 2015

REVERE (PAUL) 185 FR Minor Rehab Misc. plumbing COMPLETE 2011

REVERE (PAUL) 185 SI Paving Pathways - walking track COMPLETE 2015

REVERE (PAUL) 185 SI Site Improvement Site improvements COMPLETE 2017

REVERE (PAUL) 185 FR Minor Rehab Misc. flooring DESIGN

REVERE (PAUL) 185 FR Minor Rehab Facility assessments COMPLETE 2018

REVERE (PAUL) 185 SI Athletic Field Athletic Field - rehab COMPLETE 2017

REVERE (PAUL) 185 FR Major Rehab Field House - major restoration PRE-DESIGN

REVERE (PAUL) 185 FR Major Rehab Boys and Girls Club - major restoration PRE-DESIGN

REYES (GUADALUPE) 352 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

RIDGE 175 SI Courts Park improvements including paving and lighting COMPLETE 2013

RIDGE 175 FR Minor Rehab Field house - lobby improvements COMPLETE 2014

RIDGE 175 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

RIDGE 175 SI Paving Site improvements - paving COMPLETE 2016

46 of 59

Page 47: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

RIDGE 175 SI Paving Parking lot - rehab for accessibility COMPLETE 2013

RIDGE 175 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2015

RIDGE 175 SI Playground Chicago Plays! - new equipment COMPLETE 2013

RIDGE 175 FR Roof Field house and Ceramic Building - roof COMPLETE 2017

RIDGE 175 SI Athletic Field Athletic field - rehab COMPLETE 2014

RIDGE 175 FR Roof Ceramic Building - major rehab COMPLETE 2015

RIDGE 175 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

RIDGE 175 FR Swimming Pool Pool - filter COMPLETE 2016

RIDGE 175 FR Swimming Pool Pool - boiler CONSTRUCTION

RIDGE 175 FR Windows and Doors Field house - windows CONSTRUCTION

RIDGE 175 FR Major Rehab Field house - building assessment COMPLETE 2018

RIIS (JACOB) 123 SI Site Improvement Water service COMPLETE 2011

RIIS (JACOB) 123 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

RIIS (JACOB) 123 FR Minor Rehab Ice skating rink - rehab COMPLETE 2011

RIIS (JACOB) 123 SI Spray Pool Water play feature - surfacing COMPLETE 2012

RIIS (JACOB) 123 FR Roof Natatorium - roof COMPLETE 2014

RIIS (JACOB) 123 FR Roof Field house - roof PRE-DESIGN

RIIS (JACOB) 123 SI Playground Signature Playground - new COMPLETE 2014

RIIS (JACOB) 123 SI Paving Paving - paths and parking lot COMPLETE 2011

RIIS (JACOB) 123 SI Playground Playground - design COMPLETE 2013

RIIS (JACOB) 123 FR HVAC and Energy Efficiency Field house boiler - rehab COMPLETE 2016

RIIS (JACOB) 123 SI Courts Tennis court - rehab COMPLETE 2017

RIIS (JACOB) 123 SI Site Improvement Track - rehab COMPLETE 2017

RIIS (JACOB) 123 FR Swimming Pool Filter - motor and pump COMPLETE 2017

RIIS (JACOB) 123 SI Spray Pool Water play feature - major rehab PRE-DESIGN

RIVER 186 SI Spray Pool Water play feature - rehab COMPLETE 2011

RIVER 186 FR Roof Field house - roof and tuckpointing BID/AWARD

RIVER 186 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

RIVER 186 AD New Construction New Chicago River Boat House COMPLETE 2014

RIVER 186 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

RIVER 186 FR Swimming Pool Pool - drainage COMPLETE 2015

RIVER 186 SI Site Improvement Ballfield - major restorations (CDOT) COMPLETE 2018

RIVER 186 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2013

RIVER 186 FR Swimming Pool Pool - rehab COMPLETE 2018

RIVER 186 SI Courts Tennis court - rehab COMPLETE 2018

ROBERTS (DANIEL) SQUARE 95 SI Playground Chicago Plays! - new equipment COMPLETE 2014

ROBICHAUX (JOSEPH) 320 FR Major Rehab Field house - major rehab CONSTRUCTION

47 of 59

Page 48: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

ROBICHAUX (JOSEPH) 320 FR HVAC and Energy Efficiency HVAC - new roof units CONSTRUCTION

ROBICHAUX (JOSEPH) 320 SI Playground Chicago Plays! - new equipment COMPLETE 2015

ROBICHAUX (JOSEPH) 320 SI Courts Basketball court - rehab COMPLETE 2016

ROBINSON (JACKIE) 236 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

ROBINSON (JACKIE) 236 SI Playground Playground - new COMPLETE 2014

ROBINSON (JACKIE) 236 FR Minor Rehab Field house - improvements PRE-DESIGN

ROGERS (PHILLIP) 240 SI Playground Chicago Plays! - new equipment COMPLETE 2014

ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2012

ROGERS (PHILLIP) 240 SI Paving Paving - pathways COMPLETE 2016

ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2016

ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Misc. site improvements COMPLETE 2016

ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Site restoration COMPLETE 2018

RONAN (GEORGE) 275 AD Acquisition Expansion ACQUISITION

RONAN (GEORGE) 275 SI Landscape Riverbank - habitat restoration COMPLETE 2015

RONAN (GEORGE) 275 SI Playground Chicago Plays! - new equipment COMPLETE 2014

RONAN (GEORGE) 275 SI Landscape Tree planting COMPLETE 2018

ROSEDALE 91 FR Roof Roof COMPLETE 2012

ROSEDALE 91 SI Playground Chicago Plays! - new equipment COMPLETE 2016

ROSENBLUM (J. LESLIE) 231 AD Park Development Park development - including artificial turf field COMPLETE 2012

ROWAN (WILLIAM) 248 FR Minor Rehab Field house - locker room improvements COMPLETE 2014

ROWAN (WILLIAM) 248 SI Fencing Fencing - ballfield COMPLETE 2011

ROWAN (WILLIAM) 248 FR HVAC and Energy Efficiency Misc. HVAC improvement COMPLETE 2014

ROWAN (WILLIAM) 248 SI Playground Chicago Plays! - new equipment COMPLETE 2016

ROWAN (WILLIAM) 248 SI Athletic Field Athletic fields - rehab DESIGN

ROWAN (WILLIAM) 248 SI Paving Paving - pathways COMPLETE 2017

RUIZ (IRMA C.) 1278 SI Playground Chicago Plays! - new equipment COMPLETE 2015

RUIZ (IRMA C.) 1278 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018

RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Field house - exterior wall COMPLETE 2017

RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2016

RUSSELL (MARTIN) SQUARE 6 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017

RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

RUSSELL (MARTIN) SQUARE 6 SI Playground Playground - surfacing COMPLETE 2011

RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - plumbing COMPLETE 2015

RUSSELL (MARTIN) SQUARE 6 SI Landscape Tree planting COMPLETE 2018

RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Gym floor - rehab COMPLETE 2012

RUSSELL (MARTIN) SQUARE 6 FR Fitness Center Fitness center - new equipment COMPLETE 2012

RUSSELL (MARTIN) SQUARE 6 FR Windows and Doors Field house - windows and doors COMPLETE 2011

48 of 59

Page 49: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

RUSSELL (MARTIN) SQUARE 6 SI Courts Tennis court - conversion to artificial turf COMPLETE 2016

RUSSELL (MARTIN) SQUARE 6 SI Paving Paving - pathways COMPLETE 2016

RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - masonry COMPLETE 2011

RUTHERFORD SAYRE 127 SI Site Improvement Misc. flag pole COMPLETE 2016

RUTHERFORD SAYRE 127 SI Paving Paving COMPLETE 2012

RUTHERFORD SAYRE 127 SI Courts Court - improvements COMPLETE 2012

RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - concrete COMPLETE 2014

RUTHERFORD SAYRE 127 SI Lighting Lighting - exterior COMPLETE 2013

RUTHERFORD SAYRE 127 SI Site Improvement Outdoor fitness station - new COMPLETE 2018

SACRAMENTO 1147 SI Lighting Lighting - playground - upgrade COMPLETE 2011

SACRAMENTO 1147 SI Playground Chicago Plays! - new equipment COMPLETE 2013

SAINT LOUIS 1149 SI Site Improvement Misc. drainage improvement COMPLETE 2011

SAINT LOUIS 1149 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SAUGANASH 195 FR Minor Rehab Misc. radiator covers COMPLETE 2012

SAUGANASH 195 SI Site Improvement Outdoor fitness station - new COMPLETE 2016

SAUGANASH 195 SI Courts Tennis courts - rehab and conversion COMPLETE 2016

SCHAEFER (EDWARD) 1148 SI Playground Chicago Plays! - new equipment COMPLETE 2014

Schafer (Clara D.) 503 AD Acquisition 8900 S. Green Bay Ave. ACQUISITION

Schafer (Clara D.) 503 AD Park Development Site environmental and landscape COMPLETE 2012

Schafer (Clara D.) 503 AD Park Development Park development COMPLETE 2014

SCHREIBER 1061 SI Site Improvement Landscape and site improvement COMPLETE 2011

SCHREIBER 1061 SI Playground Playground - new with water feature COMPLETE 2011

SCHREIBER 1061 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

SCHREIBER 1061 FR Roof Roof PRE-DESIGN

SCOTTSDALE 265 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SENECA 1242 FR Sculpture and Monument "Ben" - restoration COMPLETE 2012

SENECA 1242 AD Park Development Park improvements including playground DESIGN

SENKA (EDWARD "DUKE") 309 SI Fencing Misc. perimeter fencing COMPLETE 2012

SENKA (EDWARD "DUKE") 309 SI Spray Pool Water play feature - surfacing COMPLETE 2012

SENKA (EDWARD "DUKE") 309 SI Site Improvement Park improvements including pathways, lighting, courts COMPLETE 2013

SENKA (EDWARD "DUKE") 309 SI Playground Playground - surfacing COMPLETE 2018

SENN (NICHOLAS) 227 SI Playground Playground and spray feature - new COMPLETE 2017

SENN (NICHOLAS) 227 SI Site Improvement Misc. kiosk CONSTRUCTION

SEWARD (WILLIAM) 108 FR Minor Rehab Field house - lobby improvements COMPLETE 2013

SEWARD (WILLIAM) 108 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

SEWARD (WILLIAM) 108 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

SEWARD (WILLIAM) 108 FR Major Rehab Field house - major rehab DESIGN

49 of 59

Page 50: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

SEWARD (WILLIAM) 108 SI Athletic Field Ballfield - rehab COMPLETE 2015

SEWARD (WILLIAM) 108 SI Courts Basketball court - drainage COMPLETE 2017

SHABBONA 148 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011

SHABBONA 148 SI Paving Paving - accessibility COMPLETE 2011

SHABBONA 148 SI Playground Playground with water feature- new COMPLETE 2013

SHABBONA 148 FR Swimming Pool Misc. restoration COMPLETE 2014

SHABBONA 148 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014

SHABBONA 148 FR Minor Rehab Misc. Stair renovation COMPLETE 2015

SHABBONA 148 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2014

SHABBONA 148 FR Roof Roof and drainage COMPLETE 2014

SHABBONA 148 FR HVAC and Energy Efficiency Boiler - tubes DESIGN

SHABBONA 148 FR Swimming Pool Pool - ladders COMPLETE 2017

SHABBONA 148 SI Paving Paving - pathways COMPLETE 2018

SHEDD (JOHN G.) 212 SI Courts Basketball court and pathway - surfacing COMPLETE 2013

SHEDD (JOHN G.) 212 SI Fencing Fencing - ballfield COMPLETE 2011

SHEDD (JOHN G.) 212 FR Minor Rehab Gym floor - rehab COMPLETE 2013

SHEDD (JOHN G.) 212 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

SHEDD (JOHN G.) 212 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SHEIL (BERNARD) COMM. CTR. 398 FR Concrete Masonry Structural Field house - masonry and lintels PRE-DESIGN

SHEIL (BERNARD) COMM. CTR. 398 FR Minor Rehab Access improvements - entrance, lobby, bathrooms COMPLETE 2015

SHEIL (BERNARD) COMM. CTR. 398 FR HVAC and Energy Efficiency HVAC - new system COMPLETE 2017

SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Artificial turf baseball and multipurpose field - new COMPLETE 2011

SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012

SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

SHERIDAN (PHILIP HENRY) 205 FR Fitness Center Fitness center - new COMPLETE 2013

SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Field house - windows, doors, tuckpointing COMPLETE 2014

SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016

SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016

SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - new boiler COMPLETE 2012

SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Paving - concrete COMPLETE 2017

SHERIDAN (PHILIP HENRY) 205 SI Courts Court conversion to inline hockey COMPLETE 2015

SHERMAN (JOHN) 7 FR Minor Rehab Field house - kitchen COMPLETE 2013

SHERMAN (JOHN) 7 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

SHERMAN (JOHN) 7 SI Site Improvement Misc. water main COMPLETE 2012

SHERMAN (JOHN) 7 FR Swimming Pool Pool - liner, filter, water line COMPLETE 2015

SHERMAN (JOHN) 7 FR Major Rehab Field house - major rehab DESIGN

50 of 59

Page 51: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

SHERMAN (JOHN) 7 FR Minor Rehab Gym and auditorium floors - rehab COMPLETE 2016

SHERMAN (JOHN) 7 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011

SHERMAN (JOHN) 7 FR Concrete Masonry Structural Gym - walls COMPLETE 2011

SHERMAN (JOHN) 7 FR Roof Gym - roof COMPLETE 2012

SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SHERMAN (JOHN) 7 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

SHERMAN (JOHN) 7 SI Athletic Field Athletic field - rehab DESIGN

SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - kitchen COMPLETE 2013

SHERWOOD (JESSE) 1014 FR Roof Misc. roof BID/AWARD

SHERWOOD (JESSE) 1014 SI Spray Pool Water play feature - surfacing COMPLETE 2012

SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - locker room improvements COMPLETE 2015

SIMONS (ALMIRA) 124 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SINTIC (GREGORY) 1155 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SKINNER (MARK) 211 SI Athletic Field Athletic field - rehab COMPLETE 2017

SKINNER (MARK) 211 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

SKINNER (MARK) 211 SI Landscape Community garden COMPLETE 2015

SKINNER (MARK) 211 SI Site Improvement Park improvements including playground, garden, and dfa COMPLETE 2014

SKINNER (MARK) 211 AD New Construction Field House - feasibility study PLANNING

SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Misc. pool benches and tables COMPLETE 2013

SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool - liner COMPLETE 2018

SMITH (JOSEPH HIGGINS) 1015 SI Athletic Field Athletic field - rehab COMPLETE 2012

SMITH (JOSEPH HIGGINS) 1015 SI Courts Tennis court - rehab and drainage COMPLETE 2012

SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Walkway - new COMPLETE 2012

SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Misc. interior bleachers COMPLETE 2012

SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Field House and Pool building - access improvements COMPLETE 2017

SMITH (JOSEPH HIGGINS) 1015 FR Concrete Masonry Structural Ceramic Building - major rehab COMPLETE 2013

SMITH (WENDELL) 272 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SNAPPING TURTLE 396 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SNOWBERRY 389 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SOUTH LAKEVIEW 290 SI Fencing Fencing - rehab COMPLETE 2013

SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Field house - interior painting COMPLETE 2013

SOUTH SHORE CULTL. CTR. 429 FR Major Rehab Major rehab - exterior COMPLETE 2012

SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Misc. environmental COMPLETE 2011

SOUTH SHORE CULTL. CTR. 429 FR Major Rehab Major Rehab - interior CONSTRUCTION

SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Auditorium floor - rehab or replace COMPLETE 2012

51 of 59

Page 52: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

SOUTH SHORE CULTL. CTR. 429 FR Concrete Masonry Structural Misc. entrance column restoration COMPLETE 2015

SOUTH SHORE CULTL. CTR. 429 FR HVAC and Energy Efficiency Misc. HVAC rehabs COMPLETE 2014

SOUTH SHORE CULTL. CTR. 429 SI Site Improvement Lakefront Trail Separation - 67th St. to 71st St. CONSTRUCTION

SOUTH SHORE CULTL. CTR. 429 SI Paving Entrance rehab COMPLETE 2018

SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Access - chair lift CONSTRUCTION

SOUTH SHORE CULTL. CTR. 429 FR HVAC and Energy Efficiency Air handler - new CONSTRUCTION

SOUTH SHORE CULTL. CTR. 429 AD Park Development Golf Course - major renovation DESIGN

SPIKINGS FARM 424 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SPRUCE 280 SI Playground Chicago Plays! - new equipment COMPLETE 2015

STANTON (EDWIN) 109 FR Swimming Pool Pool retrofit -compliance and filter COMPLETE 2011

STANTON (EDWIN) 109 FR Major Rehab Major rehab - interior COMPLETE 2012

STANTON (EDWIN) 109 FR Major Rehab Major rehab - exterior COMPLETE 2013

STANTON (EDWIN) 109 FR HVAC and Energy Efficiency Field house - dehumidifier COMPLETE 2014

STANTON (EDWIN) 109 AD Park Development Park development COMPLETE 2012

STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014

STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2013

STANTON (EDWIN) 109 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2015

STANTON (EDWIN) 109 SI Playground Playground and spray feature - new COMPLETE 2017

STARR (ELLEN GATES) 497 AD Park Development Park Development including playground COMPLETE 2016

STARS & STRIPES 370 SI Playground Playground - new COMPLETE 2014

STARS & STRIPES 370 SI Athletic Field Ballfield - fencing COMPLETE 2015

STARS & STRIPES 370 SI Athletic Field Artificial turf - diamond infield COMPLETE 2017

Steelworkers 523 FR Sculpture and Monument Steelworker sculpture - new COMPLETE 2015

Steelworkers 523 AD Park Development USX site - Phase II - Lake Peoria Sediment Muds to Parks COMPLETE 2014

Steelworkers 523 AD Park Development Park Development CONSTRUCTION

Steelworkers 523 SI Landscape Natural area - restoration DESIGN

Steelworkers 523 AD Planning Concept planning COMPLETE 2015

STONE (BERNARD) 526 SI Site Improvement Park development - passive park along Chicago River COMPLETE 2017

STOUT (FLORENCE) 291 SI Playground Chicago Plays! - new equipment COMPLETE 2016

STROHACKER (HOWARD) 1016 SI Playground Chicago Plays! - new equipment at Kolin Ave. COMPLETE 2014

STROHACKER (HOWARD) 1016 SI Spray Pool Water play feature - rehab CONSTRUCTION

SUMAC 1273 AD Acquisition Expansion COMPLETE 2012

SUMAC 1273 SI Fencing Site Improvements - expansion parcel DESIGN

SUMAC 1273 SI Playground Playground - new COMPLETE 2012

52 of 59

Page 53: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

SUMMERDALE 1151 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SUN YAT-SEN 451 SI Playground Chicago Plays! - new equipment COMPLETE 2015

SUPERIOR 1150 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SWEET CLOVER 430 SI Playground Chicago Plays! - new equipment COMPLETE 2014

SYCAMORE 1274 SI Playground Chicago Plays! - new equipment COMPLETE 2014

TAYLOR (ROBERT ROCHON) 271 SI Courts Basketball court - rehab BID/AWARD

TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Misc. washrooms COMPLETE 2013

TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

TAYLOR (ROBERT ROCHON) 271 SI Lighting Lighting - interior gym COMPLETE 2012

TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Gym floor - rehab COMPLETE 2012

TAYLOR (ROBERT ROCHON) 271 SI Athletic Field Ballfield - rehab COMPLETE 2012

TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool - rehab COMPLETE 2016

TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Athletic Field Athletic field - rehab COMPLETE 2015

TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Site Improvement Parking lot - accessibility COMPLETE 2017

THE GROVE 397 SI Playground Chicago Plays! - new equipment COMPLETE 2014

THROOP (AMOS GAGER) 1159 SI Spray Pool Water play feature - rehab COMPLETE 2011

THROOP (AMOS GAGER) 1159 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

THROOP (AMOS GAGER) 1159 SI Playground Chicago Plays! - new equipment COMPLETE 2014

THUIS (GRACE ZWIEFKA) 1119 AD Acquisition Expansion COMPLETE 2012

THUIS (GRACE ZWIEFKA) 1119 SI Playground Chicago Plays! - new equipment COMPLETE 2014

TILL-MOBLEY (MAMIE) 1154 AD Acquisition Expansion COMPLETE 2014

TILL-MOBLEY (MAMIE) 1154 SI Playground Chicago Plays! - new equipment COMPLETE 2016

TILTON (GEORGE) 1064 SI Playground Playground - surfacing COMPLETE 2012

TILTON (GEORGE) 1064 FR Major Rehab Camelot School - joint use facility COMPLETE 2016

TILTON (GEORGE) 1064 FR Minor Rehab Building demolition COMPLETE 2017

TOM (PING) MEML. 481 AD Park Development Park development - shoreline and athletic field COMPLETE 2011

TOM (PING) MEML. 481 SI Playground Playground - surfacing COMPLETE 2013

TOM (PING) MEML. 481 AD New Construction New Chicago River Boat House COMPLETE 2013

TOM (PING) MEML. 481 AD New Construction New Field house COMPLETE 2013

TOM (PING) MEML. 481 FR Minor Rehab Pavillion - roof PRE-DESIGN

TOM (PING) MEML. 481 SI Athletic Field Ballfield - rehab COMPLETE 2014

TOUHY (PATRICK) 246 SI Playground Playground - new COMPLETE 2013

TOUHY (PATRICK) 246 FR Minor Rehab Field house - rehab COMPLETE 2017

TOUHY (PATRICK) 246 SI Site Improvement Misc. drinking fountain and trees COMPLETE 2014

TOUHY (PATRICK) 246 SI Athletic Field Athletic field - rehab COMPLETE 2016

TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Playground Chicago Plays! - new equipment COMPLETE 2016

53 of 59

Page 54: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

TOUHY-HERBERT (JOHN, VICTOR) 1065 AD Planning Framework Plan COMPLETE 2018

TREBES (ROBERT) 1017 SI Site Improvement Park drainage COMPLETE 2018

TRIANGLE 518 SI Landscape Tree planting COMPLETE 2018

TRUMBULL (LYMAN) 16 FR Concrete Masonry Structural Chimney COMPLETE 2013

TRUMBULL (LYMAN) 16 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

TRUMBULL (LYMAN) 16 FR Roof Power house - roof COMPLETE 2011

TRUMBULL (LYMAN) 16 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

TRUMBULL (LYMAN) 16 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

TRUMBULL (LYMAN) 16 FR Swimming Pool Pool - liner and controls COMPLETE 2018

TRUMBULL (LYMAN) 16 SI Playground Chicago Plays! - new equipment COMPLETE 2016

TULEY (MURRAY) 18 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

TULEY (MURRAY) 18 FR Concrete Masonry Structural Concrete and structural - stairs COMPLETE 2011

TULEY (MURRAY) 18 SI Site Improvement Misc. bollards COMPLETE 2011

TULEY (MURRAY) 18 FR Concrete Masonry Structural Field house - foundation restoration PRE-DESIGN

TULEY (MURRAY) 18 FR Minor Rehab Field house - assessment COMPLETE 2014

TULEY (MURRAY) 18 SI Fencing Tennis court - fencing rehab COMPLETE 2015

TULEY (MURRAY) 18 FR Swimming Pool Pool - controls COMPLETE 2016

TULEY (MURRAY) 18 SI Courts Tennis court - rehab COMPLETE 2017

TULEY (MURRAY) 18 FR Sculpture and Monument Field house - decorative scroll rehab PRE-DESIGN

TULEY (MURRAY) 18 SI Athletic Field Athletic field - batting cage COMPLETE 2016

TULEY (MURRAY) 18 FR Roof Roof - new PRE-DESIGN

UNION 210 SI Lighting Lighting - interior - upgrade COMPLETE 2011

UNION 210 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

UNION 210 FR Swimming Pool Pool - filter COMPLETE 2012

UNION 210 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011

UNION 210 FR Minor Rehab Landscape yard - rehab COMPLETE 2013

UNION 210 FR Roof Gym - roof COMPLETE 2011

UNION 210 FR Fitness Center Fitness center - upgrade COMPLETE 2011

UNION 210 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

UNION 210 SI Playground Playground with water feature - new COMPLETE 2012

UNION 210 FR Major Rehab Field house and pool house - major rehab COMPLETE 2015

UNION 210 FR Concrete Masonry Structural Field house - drainage improvements BID/AWARD

UNION 210 FR Swimming Pool Pool - rehab COMPLETE 2016

UNITY 293 SI Playground Chicago Plays! - new equipment COMPLETE 2013

UNITY 293 SI Site Improvement Misc. gazebo and flower beds COMPLETE 2017

VALLEY FORGE 371 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

VALLEY FORGE 371 SI Site Improvement Misc. flag pole COMPLETE 2014

54 of 59

Page 55: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

VALLEY FORGE 371 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

VIOLET 361 SI Playground Chicago Plays! - new equipment COMPLETE 2016

VITTUM (HARRIET ELIZABETH) 233 FR Minor Rehab Elevator - rehab COMPLETE 2013

VITTUM (HARRIET ELIZABETH) 233 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

VITTUM (HARRIET ELIZABETH) 233 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015

VITTUM (HARRIET ELIZABETH) 233 SI Paving Paving - pathways COMPLETE 2016

VITTUM (HARRIET ELIZABETH) 233 SI Site Improvement Misc. water main COMPLETE 2016

VITTUM (HARRIET ELIZABETH) 233 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2016

VOGLE (HENRY JR.) 402 SI Playground Chicago Plays! - new equipment COMPLETE 2015

WAGNER (CLARENCE) 1068 SI Playground Chicago Plays! - new equipment COMPLETE 2016

WALLACE 1069 SI Playground Chicago Plays! - new equipment COMPLETE 2016

WALSH (JOHN) 393 AD Park Development The 606 access park - park development DESIGN

WANG (CHI CHE) 522 SI Athletic Field Athletic field - rehab COMPLETE 2016

WARD (A. MONTGOMERY) 511 SI Playground Playground - expansion COMPLETE 2012

WARD (A. MONTGOMERY) 511 SI Site Improvement Dog friendly area - rehab COMPLETE 2014

WARD (A. MONTGOMERY) 511 AD Park Development Site and Facility Improvements COMPLETE 2012

WARD (A. MONTGOMERY) 511 SI Paving Misc. site improvement COMPLETE 2016

WARD (A. MONTGOMERY) 511 SI Lighting Dog friendly area - lighting COMPLETE 2018

WARREN (LAURENCE) 428 SI Paving Parking lot - drainage improvements COMPLETE 2011

WARREN (LAURENCE) 428 SI Courts Tennis court - rehab COMPLETE 2011

WARREN (LAURENCE) 428 FR Roof Gym - roof COMPLETE 2012

WARREN (LAURENCE) 428 SI Site Improvement Golf Course - drainage improvements COMPLETE 2013

WARREN (LAURENCE) 428 SI Fencing Misc. fencing and gates COMPLETE 2014

WARREN (LAURENCE) 428 SI Site Improvement Misc. Cricket Pitch COMPLETE 2014

WARREN (LAURENCE) 428 FR Roof Roof - rehab COMPLETE 2012

WARREN (LAURENCE) 428 FR Minor Rehab Misc. ice rink rehab COMPLETE 2013

WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment at Seeley Ave. COMPLETE 2014

WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment at Claremont Ave. COMPLETE 2014

WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment at Pratt Blvd. COMPLETE 2014

WARREN (LAURENCE) 428 FR Concrete Masonry Structural Field house - tuckpointing DESIGN

WARREN (LAURENCE) 428 SI Paving Parking lot COMPLETE 2017

WARREN (LAURENCE) 428 FR Minor Rehab Field house - water damage rehab COMPLETE 2017

WARREN (LAURENCE) 428 SI Athletic Field Athletic field - rehab CONSTRUCTION

WARREN (LAURENCE) 428 SI Site Improvement Outdoor fitness station - new CONSTRUCTION

WARREN (LAURENCE) 428 SI Athletic Field Athletic field - lighting COMPLETE 2017

WARREN (LAURENCE) 428 SI Paving Pathways COMPLETE 2017

WASHINGTON (DINAH) 388 SI Playground Chicago Plays! - new equipment COMPLETE 2015

55 of 59

Page 56: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

WASHINGTON (GEORGE) 21 FR Minor Rehab Misc. gym bleachers COMPLETE 2012

WASHINGTON (GEORGE) 21 FR Minor Rehab Field house - locker room improvements COMPLETE 2013

WASHINGTON (GEORGE) 21 SI Fencing Fencing - Bynum Island COMPLETE 2011

WASHINGTON (GEORGE) 21 SI Lighting Lighting - exterior COMPLETE 2012

WASHINGTON (GEORGE) 21 FR Major Rehab DuSable Museum - Roundhouse Building COMPLETE 2011

WASHINGTON (GEORGE) 21 FR Major Rehab Swiss Chalet - feasibility study COMPLETE 2011

WASHINGTON (GEORGE) 21 SI Fencing Fencing - Green Youth Farm COMPLETE 2011

WASHINGTON (GEORGE) 21 FR Minor Rehab Trades Yard - rehab CONSTRUCTION

WASHINGTON (GEORGE) 21 FR Swimming Pool Pool - liner and gutter COMPLETE 2017

WASHINGTON (GEORGE) 21 SI Lighting Lighting - athletic field COMPLETE 2016

WASHINGTON (GEORGE) 21 FR Concrete Masonry Structural Pool Bleachers - concrete rehab BID/AWARD

WASHINGTON (GEORGE) 21 SI Site Improvement Water service COMPLETE 2015

WASHINGTON (GEORGE) 21 SI Site Improvement Misc. Allison Davis Garden - rehab COMPLETE 2014

WASHINGTON (GEORGE) 21 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

WASHINGTON (GEORGE) 21 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment COMPLETE 2015

WASHINGTON (GEORGE) 21 SI Athletic Field Ballfield - rehab COMPLETE 2014

WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab COMPLETE 2012

WASHINGTON (GEORGE) 21 FR Minor Rehab Lockers - new DESIGN

WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment at 54th St. COMPLETE 2016

WASHINGTON (GEORGE) 21 SI Site Improvement DuSable Museum - plaza improvements COMPLETE 2017

WASHINGTON (HAROLD) 494 SI Spray Pool Water play feature - rehab COMPLETE 2011

WASHINGTON (HAROLD) 494 SI Playground Chicago Plays! - new equipment COMPLETE 2014

WASHINGTON (HAROLD) 494 SI Courts Tennis court - rehab COMPLETE 2017

WASHINGTON (HAROLD) 494 SI Paving Paving - pathways COMPLETE 2016

WASHINGTON (HAROLD) MEM. 506 SI Fencing Misc. gates COMPLETE 2015

WASHINGTON SQUARE 1244 SI Site Improvement Park improvements CONSTRUCTION

WASHTENAW 1070 SI Paving Lighting - exterior COMPLETE 2012

WASHTENAW 1070 SI Playground Chicago Plays! - new equipment COMPLETE 2013

WASHTENAW 1070 SI Athletic Field Athletic Field - rehab COMPLETE 2016

WEBSTER (DANIEL) 513 SI Site Improvement Site improvements COMPLETE 2017

WEISMAN (ALBERT) 1135 SI Paving Misc. concrete curb COMPLETE 2014

WELLES (GIDEON) 110 FR Minor Rehab Field house - lobby improvements COMPLETE 2012

WELLES (GIDEON) 110 SI Playground Nature Play Area COMPLETE 2018

WELLES (GIDEON) 110 FR Minor Rehab Pool house - rehab COMPLETE 2013

WELLES (GIDEON) 110 FR Fitness Center Fitness center - upgrade COMPLETE 2011

WELLES (GIDEON) 110 FR Major Rehab Transition plan - access improvements COMPLETE 2012

56 of 59

Page 57: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

WELLES (GIDEON) 110 FR Minor Rehab Locker rooms - rehab COMPLETE 2015

WELLES (GIDEON) 110 FR Fitness Center Misc. new equipment COMPLETE 2013

WELLES (GIDEON) 110 SI Courts Tennis court - rehab COMPLETE 2015

WELLES (GIDEON) 110 FR Concrete Masonry Structural Gym Building - drainage improvements COMPLETE 2016

WELLES (GIDEON) 110 FR Roof Roof COMPLETE 2017

WELLES (GIDEON) 110 SI Playground Playground - expansion COMPLETE 2015

WELLES (GIDEON) 110 FR Swimming Pool Pool - filter system COMPLETE 2015

WELLES (GIDEON) 110 SI Paving Paving - pathways COMPLETE 2017

WELLES (GIDEON) 110 SI Athletic Field Athletic field - scoreboard COMPLETE 2017

WENDT (KENNETH) 1145 SI Playground Chicago Plays! - new equipment COMPLETE 2013

WENTWORTH (JOHN) 238 FR Minor Rehab Landscape building - minor rehab COMPLETE 2014

WENTWORTH (JOHN) 238 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

WENTWORTH (JOHN) 238 SI Site Improvement Ice rink - new COMPLETE 2013

WENTWORTH (JOHN) 238 FR Concrete Masonry Structural Misc. entrance improvements COMPLETE 2016

WENTWORTH (JOHN) 238 SI Athletic Field Ballfield - rehab COMPLETE 2015

WENTWORTH (JOHN) 238 SI Paving Parking lot COMPLETE 2018

WENTWORTH (JOHN) 238 SI Athletic Field Artificial turf - diamond infield COMPLETE 2017

WENTWORTH (JOHN) 238 SI Paving Pathways COMPLETE 2018

WENTWORTH (JOHN) 238 SI Athletic Field Scoreboard - new COMPLETE 2018

WENTWORTH (JOHN) GARDENS 286 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

WESOLEK (MARLENE) 1080 SI Playground Chicago Plays! - new equipment COMPLETE 2016

WEST CHATHAM 249 SI Fencing Fencing - ballfield COMPLETE 2011

WEST CHATHAM 249 SI Courts Basketball court - rehab COMPLETE 2012

WEST CHATHAM 249 SI Athletic Field Artificial turf field - football and baseball COMPLETE 2018

WEST CHATHAM 249 SI Playground Chicago Plays! - new equipment COMPLETE 2014

WEST CHATHAM 249 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

WEST CHATHAM 249 SI Fencing Misc. fencing COMPLETE 2011

WEST CHATHAM 249 SI Spray Pool Water play feature - rehab COMPLETE 2018

WEST LAWN 245 FR Concrete Masonry Structural Field house - parapet walls, drainage, interior restoration COMPLETE 2015

WEST LAWN 245 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013

WEST LAWN 245 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011

WEST LAWN 245 FR Fitness Center Fitness center - upgrade COMPLETE 2011

WEST LAWN 245 FR Major Rehab Transition plan - access improvements COMPLETE 2011

WEST LAWN 245 FR Minor Rehab Misc. access improvements COMPLETE 2011

WEST LAWN 245 SI Lighting Athletic field - lighting COMPLETE 2015

WEST LAWN 245 SI Playground Chicago Plays! - new equipment COMPLETE 2015

WEST LAWN 245 SI Site Improvement Misc. water main COMPLETE 2015

57 of 59

Page 58: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

WEST LAWN 245 SI Paving Parking lot - rehab COMPLETE 2018

WEST LAWN 245 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION

WEST LAWN 245 SI Paving Paving - pathways COMPLETE 2016

WEST PULLMAN 225 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

WEST PULLMAN 225 FR Minor Rehab Misc. bleachers COMPLETE 2013

WEST PULLMAN 225 FR Swimming Pool Pool - filter and liner COMPLETE 2014

WEST PULLMAN 225 FR Major Rehab Transition plan - access improvements COMPLETE 2012

WEST PULLMAN 225 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015

WEST PULLMAN 225 FR Minor Rehab Misc. insulation COMPLETE 2011

WEST PULLMAN 225 SI Paving Paving - pathways COMPLETE 2016

WEST PULLMAN 225 FR Minor Rehab Misc. sump pump COMPLETE 2012

WEST PULLMAN 225 FR Roof Roof - rehab COMPLETE 2012

WEST PULLMAN 225 FR Concrete Masonry Structural Fieldhouse - emergency masonry COMPLETE 2016

WEST PULLMAN 225 FR Major Rehab Field house - major rehab PRE-DESIGN

WEST PULLMAN 225 FR Minor Rehab Boiler - new PRE-DESIGN

WESTERN 1165 SI Playground Chicago Plays! - new equipment COMPLETE 2014

WHITE (WILLYE B.) 1043 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012

WHITE (WILLYE B.) 1043 SI Fencing Misc. fencing along Ashland Ave. COMPLETE 2014

WHITE (WILLYE B.) 1043 FR Minor Rehab Security camera - new COMPLETE 2018

WHITE (WILLYE B.) 1043 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018

WHITE (WILLYE B.) 1043 SI Playground Chicago Plays! - new equipment COMPLETE 2015

WHITE (EDWARD) 379 SI Playground Chicago Plays! - new equipment COMPLETE 2014

White (Jesse) 560 AD Acquisition 410 W. Chicago Ave. COMPLETE 2011

White (Jesse) 560 AD New Construction New Community Center COMPLETE 2014

WICKER (CHARLES, JOEL) 214 FR Concrete Masonry Structural Field house - entranceways COMPLETE 2015

WICKER (CHARLES, JOEL) 214 FR Roof Roof COMPLETE 2011

WICKER (CHARLES, JOEL) 214 FR Sculpture and Monument "Wicker" - restoration COMPLETE 2011

WICKER (CHARLES, JOEL) 214 SI Site Improvement Misc. benches, tables, and paving COMPLETE 2013

WICKER (CHARLES, JOEL) 214 FR Minor Rehab Misc. building security COMPLETE 2014

WICKER (CHARLES, JOEL) 214 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

WICKER (CHARLES, JOEL) 214 SI Athletic Field Field - major restoration COMPLETE 2016

WIEBOLDT (WILLIAM) 449 SI Playground Chicago Plays! - new equipment COMPLETE 2014

WILDWOOD 257 SI Courts Tennis court - rehab COMPLETE 2013

WILDWOOD 257 SI Playground Signature Playground - new COMPLETE 2018

WILLIAMS (DANIEL HALE) 261 AD New Construction Field house - new CONSTRUCTION

WILSON (FRANK) 145 SI Playground Playground - new COMPLETE 2011

WILSON (FRANK) 145 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2013

58 of 59

Page 59: CHICAGO PARK DISTRICT PARK CAPITAL PROJECTS 2011 …...ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012 ALTGELD (JOHN) 206 SI Athletic Field Artificial

CHICAGO PARK DISTRICT

PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018

PARK NAME

PARK

NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS

YEAR

COMPLETE

WILSON (FRANK) 145 SI Courts Tennis courts and paving - rehab COMPLETE 2015

WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2011

WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Masonry PRE-DESIGN

WINNEMAC 486 SI Athletic Field Athletic field - rehab COMPLETE 2013

WINNEMAC 486 SI Athletic Field Athletic field - rehab COMPLETE 2016

WINNEMAC 486 SI Athletic Field Athletic Field - rehab COMPLETE 2017

WOLCOTT (ALEXANDER) 403 AD Acquisition Expansion COMPLETE 2012

WOLCOTT (ALEXANDER) 403 SI Playground Chicago Plays! - new equipment COMPLETE 2016

WOLFE (RICHARD) 1072 SI Spray Pool Water play feature - rehab COMPLETE 2012

WOLFE (RICHARD) 1072 SI Lighting Lighting - exterior COMPLETE 2012

WOLFE (RICHARD) 1072 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012

WOLFE (RICHARD) 1072 SI Playground Chicago Plays! - new equipment COMPLETE 2015

WOOD (ELIZABETH) 316 AD Park Development Lathrop Homes Park Development (CHA) CONSTRUCTION

WOODHULL (ROSS) 1073 SI Playground Playground - surfacing COMPLETE 2011

WOODHULL (ROSS) 1073 FR Major Rehab Transition plan - access improvements COMPLETE 2011

WOODHULL (ROSS) 1073 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012

WRIGHTWOOD 1074 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012

WRIGHTWOOD 1074 FR Roof Roof PRE-DESIGN

WRIGHTWOOD 1074 FR Swimming Pool Pool - deck COMPLETE 2016

WRIGHTWOOD 1074 SI Paving Paving - pathways COMPLETE 2016

ZATTERBERG (HELEN) 1107 SI Playground Chicago Plays! - new equipment COMPLETE 2016

** Program definitions: AD= acquisition and development, SI=site improvements, FR=facility rehab

* Report as of October 1, 2018. The capital plan is a living document that is subject to change. Project listing includes capital projects and not general maintenance; does not include District-Wide Programs.

This document is for public information and is not auditable.