CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
ABBOTT (ROBERT) 259 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
ABBOTT (ROBERT) 259 SI Playground Chicago Plays! - new equipment COMPLETE 2013
ABBOTT (ROBERT) 259 FR Swimming Pool Pool - rehab COMPLETE 2016
ABBOTT (ROBERT) 259 FR Minor Rehab Misc. pool stairs COMPLETE 2015
ABBOTT (ROBERT) 259 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN
ABBOTT (ROBERT) 259 SI Paving Paving - pathways COMPLETE 2017
ABBOTT (ROBERT) 259 SI Landscape Tree planting COMPLETE 2018
ABBOTT (ROBERT) 259 SI Site Improvement Park improvements PRE-DESIGN
ADA (SAWYER GARRETT) 45 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
ADA (SAWYER GARRETT) 45 FR Minor Rehab Entrance and washrooms COMPLETE 2012
ADA (SAWYER GARRETT) 45 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ADA (SAWYER GARRETT) 45 SI Playground Chicago Plays! - new equipment COMPLETE 2013
ADA (SAWYER GARRETT) 45 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013
ADA (SAWYER GARRETT) 45 FR Swimming Pool Misc. rehab COMPLETE 2015
ADA (SAWYER GARRETT) 45 FR Concrete Masonry Structural Field house - masonry and tuckpointing COMPLETE 2017
ADA (SAWYER GARRETT) 45 SI Athletic Field Athletic field - rehab DESIGN
ADA (SAWYER GARRETT) 45 SI Paving Paving - playground COMPLETE 2012
ADA (SAWYER GARRETT) 45 SI Lighting Lighting - parking lot COMPLETE 2012
ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - surfacing COMPLETE 2011
ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - surfacing COMPLETE 2012
ADAMS (GEORGE & ADELE) 1019 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - major rehab COMPLETE 2018
ADDAMS (JANE) 262 SI Lighting Lighting - exterior COMPLETE 2012
ADDAMS (JANE) 262 AD Park Development Site preparation CONSTRUCTION
ADDAMS (JANE) 262 AD New Construction Exelon Recreation Center CONSTRUCTION
ADDAMS (JANE) MEML. 1224 FR Minor Rehab Misc. lockers and drainage improvements COMPLETE 2014
ADDAMS (JANE) MEML. 1224 SI Site Improvement Ohio St. Underpass - artwork COMPLETE 2011
ADDAMS (JANE) MEML. 1224 AD New Construction CDOT - Flyover Bike Connection CONSTRUCTION
ALTGELD (JOHN) 206 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
ALTGELD (JOHN) 206 SI Site Improvement Misc. fencing, signage, lighting COMPLETE 2017
ALTGELD (JOHN) 206 FR Concrete Masonry Structural Chimney and entrance COMPLETE 2014
ALTGELD (JOHN) 206 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ALTGELD (JOHN) 206 SI Playground Chicago Plays! - new equipment COMPLETE 2013
ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ALTGELD (JOHN) 206 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012
ALTGELD (JOHN) 206 FR Minor Rehab Gym floor - rehabs COMPLETE 2018
ALTGELD (JOHN) 206 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2017
1 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
AMUNDSEN (ROALD) 129 FR Fitness Center Fitness center - upgrade COMPLETE 2011
AMUNDSEN (ROALD) 129 SI Paving Paving - paths COMPLETE 2013
AMUNDSEN (ROALD) 129 SI Athletic Field Artificial turf athletic field and track - new COMPLETE 2016
AMUNDSEN (ROALD) 129 FR Roof Roof CONSTRUCTION
ANDERSON (FRED) 561 AD Acquisition 16th St. and Wabash Ave. COMPLETE 2015
ANDERSON (FRED) 561 AD Park Development Park development - 16th St. and Wabash Ave. COMPLETE 2014
ANDERSON (FRED) 561 SI Site Improvement Park improvements CONSTRUCTION
ANDERSON (LOUIS) 1020 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ANDERSON (LOUIS) 1020 SI Site Improvement Water main - new COMPLETE 2017
ANDERSONVILLE 1078 SI Playground Chicago Plays! - new equipment COMPLETE 2015
ARCHER (WILLIAM BEATTY) 250 SI Lighting Athletic field - lighting PRE-DESIGN
ARCHER (WILLIAM BEATTY) 250 SI Fencing Misc. gates COMPLETE 2011
ARCHER (WILLIAM BEATTY) 250 SI Spray Pool Water play feature - surfacing COMPLETE 2012
ARCHER (WILLIAM BEATTY) 250 SI Lighting Lighting - ballfield COMPLETE 2013
ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012
ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012
ARCHER (WILLIAM BEATTY) 250 SI Paving Paving - pathways COMPLETE 2015
ARCHER (WILLIAM BEATTY) 250 SI Athletic Field Athletic field - scoreboard and bleachers COMPLETE 2017
ARCHER (WILLIAM BEATTY) 250 FR Major Rehab Field house - major rehab CONSTRUCTION
ARCHER (WILLIAM BEATTY) 250 SI Courts Artificial turf court - rehab COMPLETE 2016
ARCHER (WILLIAM BEATTY) 250 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018
ARMOUR (PHILIP) SQUARE 3 SI Athletic Field Ballfield - rehab COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Gym floor - rehab COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Field house - exterior painting COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool - liner and filter COMPLETE 2015
ARMOUR (PHILIP) SQUARE 3 FR Major Rehab Transition plan - access improvements COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 SI Courts Court - conversion to roller hockey COMPLETE 2013
ARMOUR (PHILIP) SQUARE 3 SI Playground Chicago Plays! - new equipment COMPLETE 2013
ARMOUR (PHILIP) SQUARE 3 SI Paving Entrance - access paving COMPLETE 2011
ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool ADA - pool stairs COMPLETE 2017
ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Misc. pathway lighting and paving COMPLETE 2013
ARMSTRONG (LILLIAN HARDIN) 492 SI Playground Chicago Plays! - new equipment COMPLETE 2013
ARMSTRONG (LILLIAN HARDIN) 492 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013
ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Track and walkway - surfacing COMPLETE 2016
ARRIGO (VICTOR) 215 SI Paving Paving - pathways COMPLETE 2017
ASHMORE 427 SI Playground Chicago Plays! - new equipment COMPLETE 2015
2 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
ASPEN 321 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ASTER 343 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ATHLETIC FIELD 80 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2011
ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2014
ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2017
ATHLETIC FIELD 80 SI Paving Paving - pathways COMPLETE 2017
ATHLETIC FIELD 80 FR Major Rehab Ceramic Building - major rehab CONSTRUCTION
AUGUSTA (CARPENTER) 1021 SI Playground Playground - new COMPLETE 2011
AUSTIN (HENRY) 1204 SI Spray Pool Water play feature - rehab COMPLETE 2016
AUSTIN (HENRY) 1204 SI Playground Chicago Plays! - new equipment COMPLETE 2016
AUSTIN FOSTER 285 SI Playground Chicago Plays! - new equipment COMPLETE 2016
AUSTIN TOWN HALL 207 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
AUSTIN TOWN HALL 207 FR Major Rehab Transition plan - access improvements CONSTRUCTION
AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2011
AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2013
AUSTIN TOWN HALL 207 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
AUSTIN TOWN HALL 207 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
AUSTIN TOWN HALL 207 SI Playground Chicago Plays! - new equipment COMPLETE 2014
AVALON 29 FR HVAC and Energy Efficiency Boilers - new BID/AWARD
AVALON 29 SI Fencing Misc. traffic control gates COMPLETE 2013
AVALON 29 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
AVALON 29 FR Major Rehab Transition plan - access improvements COMPLETE 2012
AVALON 29 FR Swimming Pool Pool - controls COMPLETE 2018
AVALON 29 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
AVALON 29 SI Site Improvement Benches COMPLETE 2012
AVALON 29 SI Paving Track - surfacing COMPLETE 2012
AVALON 29 SI Spray Pool Water play feature - rehab COMPLETE 2015
AVALON 29 SI Playground Chicago Plays! - new equipment COMPLETE 2016
AVALON 29 FR Concrete Masonry Structural Field house - tuckpointing COMPLETE 2017
AVALON 29 SI Paving Paving - pathways COMPLETE 2016
AVONDALE 81 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN
AVONDALE 81 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
AVONDALE 81 FR Concrete Masonry Structural Misc. balcony reconstruction COMPLETE 2014
AVONDALE 81 SI Playground Chicago Plays! - new equipment COMPLETE 2013
AVONDALE 81 SI Paving Paving - pathways COMPLETE 2017
AVONDALE 81 FR Roof Roof - rehab PRE-DESIGN
BACK OF THE YARDS 1063 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
3 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
BACK OF THE YARDS 1063 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BARAGA (FREDERICK) 295 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BARAGA (FREDERICK) 295 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
BARBERRY 332 AD Acquisition Expansion COMPLETE 2012
BARNARD (ERASTUS) 1205 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BARRETT (CHARLES) 1022 SI Playground Chicago Plays! - new equipment COMPLETE 2013
BARTELME (MARY) 542 AD Acquisition Sangamon St. and Adams St. - expansion COMPLETE 2011
BAULER (MATHIAS) 365 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BEEHIVE 328 AD Acquisition Expansion COMPLETE 2014
BEEHIVE 328 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BEILFUSS (ALBERT W.) 1003 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BELL (GEORGE,JR.) 121 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BELL (GEORGE,JR.) 121 SI Spray Pool Water play feature - rehab COMPLETE 2018
BELL (GEORGE,JR.) 121 SI Paving Park improvements - volleyball and pathways PRE-DESIGN
BELL (GEORGE,JR.) 121 SI Courts Tennis and multi-use court - rehab COMPLETE 2017
Beniac (John “Beans”) Greenway 499 AD Acquisition Expansion COMPLETE 2011
BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BERGER (ALBERT) 1255 FR Concrete Masonry Structural All Buildings - concrete, structural, masonry COMPLETE 2015
BERGER (ALBERT) 1255 SI Landscape Historic landscape restoration COMPLETE 2016
BESSEMER (HENRY) 12 SI Fencing Misc. gates COMPLETE 2011
BESSEMER (HENRY) 12 FR Concrete Masonry Structural Chimney COMPLETE 2013
BESSEMER (HENRY) 12 SI Paving Paving - driveway COMPLETE 2011
BESSEMER (HENRY) 12 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
BESSEMER (HENRY) 12 FR Swimming Pool Pool - filter COMPLETE 2017
BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BESSEMER (HENRY) 12 FR Minor Rehab Misc. washrooms COMPLETE 2013
BESSEMER (HENRY) 12 FR Minor Rehab Field house - locker room improvements COMPLETE 2012
BESSEMER (HENRY) 12 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015
BESSEMER (HENRY) 12 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BESSEMER (HENRY) 12 SI Paving Paving - pathways COMPLETE 2016
BESSEMER (HENRY) 12 SI Courts Basketball court - rehab COMPLETE 2016
BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017
BESSEMER (HENRY) 12 FR Minor Rehab Field house - interior rehab including kitchen, bathrooms COMPLETE 2018
BESSEMER (HENRY) 12 SI Site Improvement Running track - surfacing COMPLETE 2018
BEVERLY 254 FR Sculpture and Monument Memorial Sculpture - new COMPLETE 2012
BEVERLY 254 SI Courts In-line hockey - new COMPLETE 2014
4 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
BEVERLY 254 SI Playground Playground - new COMPLETE 2018
BIRCH 322 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BIXLER (RAY) 1083 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BIXLER (RAY) 1083 SI Site Improvement Chess table - new COMPLETE 2018
BLACKHAWK 122 SI Courts Basketball court - rehab CONSTRUCTION
BLACKHAWK 122 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
BLACKHAWK 122 SI Courts Tennis court - rehab and conversion to artificial turf COMPLETE 2016
BLACKHAWK 122 SI Athletic Field Athletic field - rehab COMPLETE 2012
BLACKHAWK 122 FR Swimming Pool Pool - rehab COMPLETE 2013
BLACKHAWK 122 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BLACKHAWK 122 FR Roof Roof PRE-DESIGN
BLACKWELDER (I.S., GERTRUDE) 373 AD Park Development Park development including new playground COMPLETE 2011
BOGAN (WILLIAM) 264 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2013
BOGAN (WILLIAM) 264 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BOGAN (WILLIAM) 264 SI Paving Paving - pathways COMPLETE 2016
BOLER (LEO ROSCOE, SR.) 496 SI Site Improvement Misc. site improvements COMPLETE 2015
BOLER (LEO ROSCOE, SR.) 496 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BOSLEY (WILLIAM) 1024 FR Roof Roof COMPLETE 2016
BOSLEY (WILLIAM) 1024 SI Athletic Field Athletic field - rehab COMPLETE 2015
BOSWELL (ARNITA YOUNG) 340 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BRADLEY (JOSEPHINE) 1004 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BRADLEY (JOSEPHINE) 1004 SI Playground Playground - concept design COMPLETE 2013
BRADLEY (JOSEPHINE) 1004 FR Minor Rehab Field house - rehab PRE-DESIGN
BRADLEY (JOSEPHINE) 1004 FR Major Rehab Field House - fire damage COMPLETE 2016
BRAINERD 177 FR Sculpture and Monument Monument - restoration PRE-DESIGN
BRAINERD 177 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
BRANDS 187 SI Athletic Field Ballfield - rehab COMPLETE 2015
BRANDS 187 FR Roof Field house - roof CONSTRUCTION
BRIGHTON 426 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
BROADWAY ARMORY 462 FR Major Rehab Field house - rehab COMPLETE 2012
BROADWAY ARMORY 462 AD Planning Indoor track - feasibility study COMPLETE 2012
BROADWAY ARMORY 462 FR Minor Rehab Misc. elevator COMPLETE 2016
BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2013
BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
BROADWAY ARMORY 462 FR Roof Boiler room - rehab COMPLETE 2013
BROADWAY ARMORY 462 FR Major Rehab Misc. fire escape rehab COMPLETE 2015
5 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
BROADWAY ARMORY 462 FR Concrete Masonry Structural Facility Rehab - masonry and parapet DESIGN
BROADWAY ARMORY 462 FR Minor Rehab Teen center - new CONSTRUCTION
BROOKS (GWENDOLYN) 362 SI Playground Chicago Plays! - new equipment COMPLETE 2013
BROOKS (GWENDOLYN) 362 SI Courts Court - conversion to pickleball COMPLETE 2018
BROOKS (OSCAR) 61 SI Site Improvement Tennis court - rehab COMPLETE 2012
BROOKS (OSCAR) 61 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BROOKS (OSCAR) 61 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BROOKS (OSCAR) 61 SI Athletic Field Athletic field - rehab COMPLETE 2013
BROWN (SIDNEY) MEML. 289 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BROWN (SIDNEY) MEML. 289 SI Athletic Field Athletic field - rehab COMPLETE 2016
BROWN (SIDNEY) MEML. 289 SI Landscape Tree planting COMPLETE 2018
BROWN (SIDNEY) MEML. 289 AD Park Development Park expansion - site improvements DESIGN
BRYNFORD 1141 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BUENA CIRCLE 1084 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BURNHAM (DANIEL) 27 SI Paving Museum Campus - permeable paving COMPLETE 2013
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 41st St. CONSTRUCTION
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 43rd St. DESIGN
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 39th St. CONSTRUCTION
BURNHAM (DANIEL) 27 SI Site Improvement Judd Goldman Sailing Center - shade structure COMPLETE 2015
BURNHAM (DANIEL) 27 FR Roof 39th St. Trade Yard - roof COMPLETE 2011
BURNHAM (DANIEL) 27 FR Concrete Masonry Structural 39th Street Trades Yard - emergency rehab CONSTRUCTION
BURNHAM (DANIEL) 27 AD New Construction New Harbor Development - 31st St. COMPLETE 2014
BURNHAM (DANIEL) 27 SI Playground Soldier Field - playground expansion - study COMPLETE 2011
BURNHAM (DANIEL) 27 FR Concrete Masonry Structural Promontory Point - concrete and structural COMPLETE 2014
BURNHAM (DANIEL) 27 SI Paving Landscape yard - paving COMPLETE 2018
BURNHAM (DANIEL) 27 SI Lighting Exterior - pathways COMPLETE 2013
BURNHAM (DANIEL) 27 SI Landscape Burnham Wildlife Corridor - improvements COMPLETE 2016
BURNHAM (DANIEL) 27 FR Minor Rehab Misc. improvements COMPLETE 2013
BURNHAM (DANIEL) 27 SI Landscape Burnham Wildlife Corridor - improvements CONSTRUCTION
BURNHAM (DANIEL) 27 AD Planning Morgan Shoal - concept planning COMPLETE 2015
BURNHAM (DANIEL) 27 AD New Construction Shoreline Protection with U.S. Army Corps (43rd St. - 45th St.) COMPLETE 2013
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 35th St. COMPLETE 2017
BURNHAM (DANIEL) 27 SI Site Improvement 31st St. Harbor - Special Event Deck COMPLETE 2015
BURNHAM (DANIEL) 27 FR Fitness Center 39th St. Beach - Outdoor Fitness Course COMPLETE 2016
BURNHAM (DANIEL) 27 AD Planning 18th St. Parking Garage - new COMPLETE 2016
BURNHAM (DANIEL) 27 SI Paving 31st St. Parking Lot - expansion (west lot) COMPLETE 2017
BURNHAM (DANIEL) 27 AD New Construction Promontory Point - shoreline revetment COMPLETE 2015
6 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment at 47th St. COMPLETE 2016
BURNHAM (DANIEL) 27 SI Site Improvement Misc. brick wall rehab COMPLETE 2017
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 41st St. to 55th St. CONSTRUCTION
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 35th St. to 41st St. COMPLETE 2017
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 31st St. to 35th St. COMPLETE 2016
BURNHAM (DANIEL) 27 FR Minor Rehab Promontory Point - new flooring COMPLETE 2018
BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BURNHAM (DANIEL) 27 FR Sculpture and Monument "David Wallach Memorial Fountain" - restoration COMPLETE 2016
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - Roosevelt Rd. to 31st St. CONSTRUCTION
BURNSIDE (AMBROSE) 363 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BUTTERCUP 385 SI Playground Playground - new COMPLETE 2013
BUTTERNUT 1272 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CALIFORNIA 189 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
CALIFORNIA 189 FR HVAC and Energy Efficiency McFetridge - major rehab including HVAC COMPLETE 2012
CALIFORNIA 189 SI Paving Parking lot - rehab COMPLETE 2011
CALIFORNIA 189 SI Courts Softball court - rehab COMPLETE 2012
CALIFORNIA 189 SI Courts Courts - rehab including drainage COMPLETE 2012
CALIFORNIA 189 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
CALIFORNIA 189 SI Fencing Fencing COMPLETE 2014
CALIFORNIA 189 FR Minor Rehab Misc. interior rehab at McFetridge COMPLETE 2015
CALIFORNIA 189 FR Swimming Pool Pool - filter COMPLETE 2017
CALIFORNIA 189 SI Playground Chicago Plays! - new equipment and water play feature COMPLETE 2017
CALIFORNIA 189 AD New Construction McFetridge - ice rink expansion CONSTRUCTION
CALIFORNIA 189 AD Park Development Park expansion - site improvements BID/AWARD
CALIFORNIA 189 SI Courts Courts - tennis and basketball CONSTRUCTION
CALUMET 11 FR Concrete Masonry Structural Power house - chimney COMPLETE 2013
CALUMET 11 FR Minor Rehab Misc. bathroom improvements COMPLETE 2011
CALUMET 11 SI Site Improvement Outdoor fitness station - new COMPLETE 2016
CALUMET 11 FR Minor Rehab Landscape yard - rehab COMPLETE 2011
CALUMET 11 FR Minor Rehab Lobby - rehab COMPLETE 2011
CALUMET 11 FR Concrete Masonry Structural Field house - major rehab COMPLETE 2014
CALUMET 11 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CALUMET 11 FR Roof Roof - rehab COMPLETE 2014
CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2012
CALUMET 11 SI Lighting Lighting - exterior COMPLETE 2014
CALUMET 11 SI Playground Chicago Plays! - new equipment COMPLETE 2015
CALUMET 11 FR Roof Landscape yard - roof and masonry PRE-DESIGN
7 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2015
CALUMET 11 SI Site Improvement Dog friendly area - new COMPLETE 2018
CARMEN 1085 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CARPENTER (PHILO) 1086 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Misc. exhaust fans COMPLETE 2013
CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - filter system COMPLETE 2011
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CARVER (GEORGE WASHINGTON) 255 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
CARVER (GEORGE WASHINGTON) 255 FR Minor Rehab Outdoor fitness center - new COMPLETE 2015
CARVER (GEORGE WASHINGTON) 255 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CARVER (GEORGE WASHINGTON) 255 FR Roof Roof COMPLETE 2014
CARVER (GEORGE WASHINGTON) 255 SI Landscape Tree planting COMPLETE 2018
CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - rehab COMPLETE 2018
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Pool boiler - rehab COMPLETE 2017
CARVER (GEORGE WASHINGTON) 255 SI Athletic Field Batting cage and scoreboard - new COMPLETE 2018
CATALPA 372 SI Playground Chicago Plays! - new equipment COMPLETE 2015
CEDAR 1279 SI Playground Playground -rehab COMPLETE 2018
CENTENNIAL 1238 SI Site Improvement Identity signage CONSTRUCTION
CENTRAL 1087 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHALLENGER 488 SI Lighting Lighting - parking lot COMPLETE 2013
CHASE (SALMON) 103 SI Athletic Field Artificial turf athletic field - new PRE-DESIGN
CHASE (SALMON) 103 FR Swimming Pool Pool retrofit - compliance and liner COMPLETE 2012
CHASE (SALMON) 103 FR Minor Rehab Field house - assessment COMPLETE 2018
CHASE (SALMON) 103 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011
CHASE (SALMON) 103 FR Swimming Pool Pool - filter COMPLETE 2014
CHASE (SALMON) 103 FR Roof Roof PRE-DESIGN
CHASE (SALMON) 103 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015
CHASE (SALMON) 103 FR Major Rehab Field house - mural COMPLETE 2012
CHESTNUT 1275 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CHICAGO WOMEN'S PARK AND GARDENS 550 FR Sculpture and Monument "Helping Hands" - installation COMPLETE 2011
CHICAGO WOMEN'S PARK AND GARDENS 550 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CHICAGO WOMEN'S PARK AND GARDENS 550 FR Major Rehab Field house - major rehab COMPLETE 2014
CHICAGO WOMEN'S PARK AND GARDENS 550 FR Minor Rehab Park improvements COMPLETE 2017
CHICAGO WOMEN'S PARK AND GARDENS 550 SI Site Improvement Park drainage CONSTRUCTION
CHIPPEWA 167 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHIPPEWA 167 FR Concrete Masonry Structural Chimney and tuckpointing COMPLETE 2015
CHOPIN (FREDERIC) 146 SI Site Improvement Drainage improvements COMPLETE 2013
8 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
CHOPIN (FREDERIC) 146 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHOPIN (FREDERIC) 146 SI Site Improvement Park improvements COMPLETE 2013
CHOPIN (FREDERIC) 146 FR Roof Field house - roof PRE-DESIGN
CHOPIN (FREDERIC) 146 SI Courts Tennis court - rehab COMPLETE 2018
CHOPIN (FREDERIC) 146 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION
CHRISTIANA 1089 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHRISTIANA 1089 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
CHRISTIANA 1089 SI Site Improvement Expansion - site improvements PRE-DESIGN
CHURCHILL FIELD 412 SI Site Improvement Misc. drainage COMPLETE 2016
CHURCHILL FIELD 412 SI Athletic Field Athletic field - rehab COMPLETE 2016
CLAREMONT 400 SI Site Improvement Landscape and site improvement COMPLETE 2012
CLAREMONT 400 SI Playground Misc. park improvement COMPLETE 2011
CLAREMONT 400 SI Playground Playground - new COMPLETE 2012
CLARENDON COMM. CTR. 1002 SI Lighting Lighting - ballfield COMPLETE 2012
CLARENDON COMM. CTR. 1002 SI Site Improvement Dog friendly area - new COMPLETE 2012
CLARENDON COMM. CTR. 1002 SI Fencing Misc. rehab COMPLETE 2013
CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major rehab COMPLETE 2015
CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major restoration DESIGN
CLARENDON COMM. CTR. 1002 SI Landscape Athletic field - rehab CONSTRUCTION
CLARENDON COMM. CTR. 1002 FR HVAC and Energy Efficiency Boiler - new BID/AWARD
CLARENDON COMM. CTR. 1002 SI Courts Basketball court - rehab COMPLETE 2016
CLARENDON COMM. CTR. 1002 AD New Construction Field house - study COMPLETE 2016
CLARK (JOHN) 1026 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
CLARK (JOHN) 1026 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CLARK (RICHARD) 457 SI Athletic Field Artificial turf athletic field - new COMPLETE 2017
CLARK (RICHARD) 457 AD New Construction New Chicago River Boat House COMPLETE 2013
CLARK (RICHARD) 457 FR Major Rehab Lane Tech Stadium - interior COMPLETE 2011
CLARK (RICHARD) 457 AD New Construction Kerry Wood Cubs Field - new stadium COMPLETE 2015
CLOVER 1277 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CLYBOURN (ARCHIBALD) 1091 SI Playground Chicago Plays! - new equipment COMPLETE 2013
CLYBOURN (ARCHIBALD) 1091 SI Courts Basketball court - rehab COMPLETE 2016
COCHRAN (JOHN) 420 SI Playground Playground - surfacing COMPLETE 2014
COLE (NAT KING) 270 AD Park Development Park development - including playground COMPLETE 2011
COLE (NAT KING) 270 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
COLEMAN (BESSIE) 292 SI Playground Chicago Plays! - new equipment COMPLETE 2013
COLISEUM 507 SI Lighting Lighting - exterior COMPLETE 2013
COLISEUM 507 SI Site Improvement Misc. site improvements COMPLETE 2013
9 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013
COLUMBUS (CHRISTOPHER) 209 FR Windows and Doors Field house - doors COMPLETE 2011
COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Misc. sump pump COMPLETE 2011
COLUMBUS (CHRISTOPHER) 209 FR Fitness Center Fitness center - upgrade COMPLETE 2011
COLUMBUS (CHRISTOPHER) 209 FR Concrete Masonry Structural Chimney COMPLETE 2012
COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Lagoon and drainage COMPLETE 2013
COLUMBUS (CHRISTOPHER) 209 FR Major Rehab Field house and Refectory - major rehab CONSTRUCTION
COLUMBUS (CHRISTOPHER) 209 SI Playground Chicago Plays! - new equipment COMPLETE 2015
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - column restoration COMPLETE 2018
COLUMBUS (CHRISTOPHER) 209 SI Paving Paving - refectory entrance COMPLETE 2016
COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency Gymnasium - heaters CONSTRUCTION
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - controls, water line COMPLETE 2018
COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Athletic Field - scoreboard COMPLETE 2016
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - remediation COMPLETE 2016
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - sump pumps and filter COMPLETE 2017
COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Concrete Masonry Structural Field house - chimney BID/AWARD
COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Windows and Doors Field house - windows and doors BID/AWARD
CONNORS (WILLIAM) 1200 SI Site Improvement Misc. fencing COMPLETE 2013
CONNORS (WILLIAM) 1200 AD New Construction Concession building - new COMPLETE 2013
COOPER (JACK) 287 SI Paving Paving COMPLETE 2011
CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
CORNELL (PAUL) SQUARE 5 SI Landscape Historic landscape restoration COMPLETE 2016
CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CORNELL (PAUL) SQUARE 5 SI Playground Playground with water feature - new COMPLETE 2014
CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2014
CORNELL (PAUL) SQUARE 5 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
CORNELL (PAUL) SQUARE 5 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
CORNELL (PAUL) SQUARE 5 FR Roof Roof COMPLETE 2011
CORNELL (PAUL) SQUARE 5 FR Major Rehab Field house - major rehab PRE-DESIGN
CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool - filter PRE-DESIGN
COSME (MARGARET) 176 SI Playground Chicago Plays! - new equipment COMPLETE 2014
COSME (MARGARET) 176 SI Courts Tennis court - rehab COMPLETE 2018
COTTON TAIL 480 SI Lighting Exterior - lighting COMPLETE 2013
COTTON TAIL 480 SI Site Improvement Misc. benches and fencing COMPLETE 2012
COTTONWOOD 416 SI Playground Chicago Plays! - new equipment COMPLETE 2013
10 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
CRAGIN 131 SI Courts Court - conversion to sport court COMPLETE 2014
CRAGIN 131 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CRAWFORD (PETER) 359 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CRESCENT 47 SI Courts Tennis court - rehab CONSTRUCTION
DAVIS (DR. NATHAN) SQUARE 14 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Chimney COMPLETE 2013
DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 FR Roof Roof COMPLETE 2011
DAVIS (DR. NATHAN) SQUARE 14 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DAVIS (DR. NATHAN) SQUARE 14 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 SI Lighting Lighting - interior gym COMPLETE 2013
DAVIS (DR. NATHAN) SQUARE 14 SI Site Improvement Misc. bleachers and scoreboards COMPLETE 2016
DAVIS (DR. NATHAN) SQUARE 14 FR Roof Pool Building - roof COMPLETE 2016
DAVIS (DR. NATHAN) SQUARE 14 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION
DAVIS (MARGARET) 1092 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
DAVIS (MARGARET) 1092 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DAWES (CHARLES G.) 239 FR Roof Roof COMPLETE 2012
DAWES (CHARLES G.) 239 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab COMPLETE 2015
DAWES (CHARLES G.) 239 SI Spray Pool Water play feature - rehab COMPLETE 2017
DAWES (CHARLES G.) 239 SI Paving Paving - pathways COMPLETE 2016
DAWES (CHARLES G.) 239 SI Courts Basketball court - rehab COMPLETE 2016
DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab CONSTRUCTION
De Burgos (Julia) 554 AD Acquisition The 606 access park - Whipple St. and Albany Ave. COMPLETE 2011
De Burgos (Julia) 554 SI Playground Park improvements DESIGN
De Burgos (Julia) 554 AD Park Development Bloomingdale Access - new park development COMPLETE 2011
DEARBORN (HENRY) 465 SI Lighting Exterior lighting - upgrade COMPLETE 2018
DEBOW (RUSSELL) 405 SI Playground Chicago Plays! - new equipment COMPLETE 2015
DEGEORGE (BERNICE) 1093 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DEJULIO (ANTHONY) 366 SI Playground Chicago Plays! - new equipment COMPLETE 2014
D'ELIA (AILEEN) 390 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DIXON (LORRAINE) 1210 SI Site Improvement Landscape and site improvement COMPLETE 2011
DIXON (LORRAINE) 1210 SI Site Improvement Park improvements including playground COMPLETE 2015
DIXON (LORRAINE) 1210 SI Site Improvement Park improvements - south entranceway COMPLETE 2017
DOBSON 1094 SI Playground Chicago Plays! - new equipment COMPLETE 2015
11 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
DOGWOOD 344 SI Playground Chicago Plays! - new equipment COMPLETE 2013
Donahue (Margaret) 570 AD Park Development New park development including playground COMPLETE 2015
Donahue (Margaret) 570 AD Acquisition 1230 W. School St. COMPLETE 2013
DONOVAN (GEORGE) 1029 SI Playground Chicago Plays! - new equipment COMPLETE 2013
DONOVAN (GEORGE) 1029 SI Athletic Field Athletic field - scoreboard COMPLETE 2017
DOUGLAS (STEPHEN) 218 SI Site Improvement Misc. bleachers COMPLETE 2013
DOUGLAS (STEPHEN) 218 FR Major Rehab Field house - locker room improvements COMPLETE 2012
DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
DOUGLAS (STEPHEN) 218 SI Site Improvement Athletic field - drainage COMPLETE 2013
DOUGLAS (STEPHEN) 218 SI Lighting Lighting - exterior COMPLETE 2012
DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool - rehab COMPLETE 2016
DOUGLAS (STEPHEN) 218 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012
DOUGLAS (STEPHEN) 218 SI Athletic Field Artificial turf athletic field - major rehab DESIGN
DOUGLAS (STEPHEN) 218 SI Lighting Lighting - pathway COMPLETE 2017
DOUGLAS (STEPHEN) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
DOUGLAS (STEPHEN) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
DOUGLAS (STEPHEN) 218 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
DOUGLAS (STEPHEN) 218 FR Concrete Masonry Structural Field house - framing and plastering COMPLETE 2011
DOUGLAS (STEPHEN) 218 SI Paving Paving - paths COMPLETE 2016
DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at 18th St.) COMPLETE 2014
DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at Albany Ave.) with water feature COMPLETE 2016
DOUGLAS (STEPHEN) 218 FR Roof Landscape yard - roof COMPLETE 2011
DOUGLAS (STEPHEN) 218 SI Athletic Field Athletic field - rehab COMPLETE 2013
DOUGLAS (STEPHEN) 218 FR Swimming Pool Pool - rehab COMPLETE 2015
DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment (at California Ave.) COMPLETE 2015
DOUGLAS (STEPHEN) 218 SI Playground Chicago Plays! - new equipment at Albany Dr. COMPLETE 2016
DOUGLAS (STEPHEN) 218 SI Fencing Pergola - security fencing COMPLETE 2018
DOUGLAS (STEPHEN) 218 FR Major Rehab Field house - major rehab CONSTRUCTION
DOUGLAS (STEPHEN) 218 SI Courts Tennis court - rehab COMPLETE 2018
DOUGLAS (STEPHEN) 218 FR Minor Rehab Misc. boiler COMPLETE 2017
DOUGLAS (STEPHEN) 218 SI Site Improvement Cultural Venue - assessment PLANNING
DOUGLAS (STEPHEN) 218 SI Playground Playground - new equipment at Sacramento Dr. COMPLETE 2017
DREXEL (FRANCIS) 441 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DUBKIN (LEONARD) 306 SI Site Improvement Misc. garden beds COMPLETE 2012
DUBKIN (LEONARD) 306 SI Paving Paving - entryway COMPLETE 2016
DUNBAR (PAUL LAURENCE) 267 FR Sculpture and Monument Sculpture - new COMPLETE 2014
DUNBAR (PAUL LAURENCE) 267 SI Courts Basketball court - rehab COMPLETE 2013
12 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
DUNBAR (PAUL LAURENCE) 267 SI Lighting Exterior - upgrade COMPLETE 2013
DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Artificial turf athletic field - new DESIGN
DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Athletic field - rehab COMPLETE 2014
DUNBAR (PAUL LAURENCE) 267 SI Playground Chicago Plays! - new equipment COMPLETE 2016
DUNBAR (PAUL LAURENCE) 267 SI Courts Tennis court - rehab COMPLETE 2016
DUNHAM (ROBERT) 258 SI Courts Tennis court - rehab COMPLETE 2013
DUNHAM (ROBERT) 258 FR Fitness Center Fitness center - new COMPLETE 2011
DUNHAM (ROBERT) 258 SI Athletic Field Athletic field - rehab COMPLETE 2013
DUNHAM (ROBERT) 258 FR Minor Rehab Gym - bleachers CONSTRUCTION
DURKIN (MARTIN) 268 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DURKIN (MARTIN) 268 SI Site Improvement Outdoor fitness station - new BID/AWARD
DURKIN (MARTIN) 268 SI Paving Paving - pathways COMPLETE 2016
DURSO (JOHN) 1037 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Environmental remediation CONSTRUCTION
DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - clean and green COMPLETE 2016
DUSABLE (JEAN BAPTISTE POINTE) 478 AD New Construction New Harbor Development - Gateway COMPLETE 2011
DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Landscape improvements COMPLETE 2013
DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - new DESIGN
DVORAK (ANTON) 216 FR Minor Rehab Field house and perimeter drainage COMPLETE 2011
DVORAK (ANTON) 216 FR Minor Rehab Misc. locker rooms COMPLETE 2014
DVORAK (ANTON) 216 SI Site Improvement Drinking fountain - rehab COMPLETE 2012
DVORAK (ANTON) 216 FR Major Rehab Field house - locker room improvements COMPLETE 2012
DVORAK (ANTON) 216 SI Paving Paving - paths COMPLETE 2011
DVORAK (ANTON) 216 FR Major Rehab Transition plan - access improvements COMPLETE 2012
DVORAK (ANTON) 216 FR Minor Rehab Misc. entrance accessibility COMPLETE 2011
DVORAK (ANTON) 216 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
DVORAK (ANTON) 216 SI Playground Chicago Plays! - new equipment COMPLETE 2015
DVORAK (ANTON) 216 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015
DVORAK (ANTON) 216 SI Athletic Field Ballfield - rehab COMPLETE 2013
DVORAK (ANTON) 216 SI Spray Pool Water play feature - rehab COMPLETE 2018
DVORAK (ANTON) 216 FR Swimming Pool Pool - filter COMPLETE 2016
DVORAK (ANTON) 216 FR Major Rehab Field house and pool house - major rehab COMPLETE 2018
ECKERSALL (WALTER HERBERT) 232 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ECKERSALL (WALTER HERBERT) 232 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ECKHART (BERNARD) 208 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
ECKHART (BERNARD) 208 FR Major Rehab Transition plan - access improvements COMPLETE 2011
ECKHART (BERNARD) 208 SI Playground Playground with water feature - new COMPLETE 2014
13 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
ECKHART (BERNARD) 208 FR Swimming Pool Pool - tile and grout COMPLETE 2014
ECKHART (BERNARD) 208 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ECKHART (BERNARD) 208 SI Athletic Field Athletic Field - rehab COMPLETE 2017
ECKHART (BERNARD) 208 FR Minor Rehab Misc. boiler COMPLETE 2017
ECKHART (BERNARD) 208 FR Major Rehab Field house - major rehab COMPLETE 2017
ECKHART (BERNARD) 208 FR Major Rehab Pool dehumidifier - new PRE-DESIGN
EDGEBROOK 335 SI Athletic Field Athletic field - rehab PRE-DESIGN
EDISON (THOMAS ALVA) 62 SI Playground Chicago Plays! - new equipment COMPLETE 2015
EDISON (THOMAS ALVA) 62 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN
EDMONDS (MOLLY) 391 AD Acquisition Expansion COMPLETE 2012
EDMONDS (MOLLY) 391 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ELLIS (SAMUEL) 1213 SI Site Improvement Misc. fencing and lighting COMPLETE 2014
ELLIS (SAMUEL) 1213 AD New Construction Quad Communities Arts Recreation and Health Center COMPLETE 2016
ELLIS (SAMUEL) 1213 SI Courts Basketball court - rehab COMPLETE 2016
ELLIS (SAMUEL) 1213 SI Playground Playground - surfacing COMPLETE 2016
ELM 279 SI Site Improvement Misc. paving and fencing COMPLETE 2012
ELSTON (DANIEL) 1097 SI Playground Chicago Plays! - new equipment COMPLETE 2015
EMERALD 1098 SI Fencing Fencing - perimeter PRE-DESIGN
EMMERSON (LOUIS) 104 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
EMMERSON (LOUIS) 104 SI Playground Chicago Plays! - new equipment COMPLETE 2015
EMMERSON (LOUIS) 104 FR Roof Roof - new PRE-DESIGN
ESSEX 434 SI Playground Playground - new COMPLETE 2013
EUCLID 66 FR Minor Rehab Transition plan - access improvements COMPLETE 2011
EUCLID 66 SI Playground Chicago Plays! - new equipment COMPLETE 2013
EVERGREEN 1276 SI Playground Playground - surfacing COMPLETE 2017
FELLGER (CHARLES) 1100 SI Spray Pool Water play feature - rehab COMPLETE 2017
FERNWOOD 65 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
FERNWOOD 65 FR Minor Rehab Field house - interior COMPLETE 2012
FERNWOOD 65 FR Major Rehab Pool building - major rehab PRE-DESIGN
FERNWOOD 65 SI Playground Chicago Plays! - new equipment COMPLETE 2013
FERNWOOD 65 FR HVAC and Energy Efficiency HVAC - exhaust fans COMPLETE 2013
FERNWOOD 65 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
FERNWOOD 65 SI Athletic Field Ballfield - rehab COMPLETE 2011
FERNWOOD 65 FR Swimming Pool Pool - liner CONSTRUCTION
FERNWOOD 65 SI Landscape Tree planting COMPLETE 2018
FIELD (EUGENE) 41 SI Athletic Field Athletic field - rehab COMPLETE 2017
FIELD (EUGENE) 41 FR Minor Rehab Misc. sump pump COMPLETE 2011
14 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
FIELD (EUGENE) 41 FR Concrete Masonry Structural Concrete and structural - basement COMPLETE 2015
FIELD (EUGENE) 41 FR Major Rehab Transition plan - access improvements COMPLETE 2012
FIELD (EUGENE) 41 SI Fencing Fencing - at Chicago River COMPLETE 2013
FIELD (EUGENE) 41 FR Roof Roof - rehab COMPLETE 2014
FIELD (EUGENE) 41 SI Site Improvement Misc. fencing, landscaping, utilities DESIGN
FIELD (EUGENE) 41 AD Acquisition 5056 N. Monticello Ave. COMPLETE 2015
FIELD (EUGENE) 41 SI Spray Pool Water play feature - rehab COMPLETE 2014
FIELD (EUGENE) 41 AD Park Development Aquatic restoration COMPLETE 2013
FILBERT 1281 SI Playground Playground - new COMPLETE 2012
FLOWER (LUCY) 431 SI Playground Playground with water feature- new COMPLETE 2014
FLYING SQUIRREL 331 SI Playground Chicago Plays! - new equipment COMPLETE 2013
FLYING SQUIRREL 331 SI Fencing Expansion and perimeter fencing COMPLETE 2015
FOSCO (PETER) 1030 AD Acquisition Expansion COMPLETE 2015
FOSCO (PETER) 1030 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
FOSCO (PETER) 1030 SI Spray Pool Water play feature - rehab COMPLETE 2016
FOSCO (PETER) 1030 FR Windows and Doors Pool building - window security COMPLETE 2012
FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012
FOSCO (PETER) 1030 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
FOSCO (PETER) 1030 AD Park Development Park expansion COMPLETE 2013
FOSCO (PETER) 1030 FR Swimming Pool Pool - rehab COMPLETE 2016
FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. compressor DESIGN
FOSCO (PETER) 1030 FR Major Rehab Roof and masonry CONSTRUCTION
FOSTER (J. FRANK) 26 SI Lighting Lighting - gym COMPLETE 2011
FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2013
FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011
FOSTER (J. FRANK) 26 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
FOSTER (J. FRANK) 26 FR Windows and Doors Natatorium - doors COMPLETE 2011
FOSTER (J. FRANK) 26 FR Major Rehab Transition plan - access improvements COMPLETE 2012
FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
FOSTER (J. FRANK) 26 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015
FOSTER (J. FRANK) 26 SI Playground Chicago Plays! - new equipment COMPLETE 2015
FOSTER (J. FRANK) 26 FR Swimming Pool Pool - controls COMPLETE 2018
FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2017
FOSTER (J. FRANK) 26 SI Courts Basketball court - rehab COMPLETE 2016
FOSTER (J. FRANK) 26 SI Spray Pool Water play feature - rehab COMPLETE 2017
FRANKLIN (BENJAMIN) 202 SI Athletic Field Ballfield - rehab COMPLETE 2011
FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2013
15 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
FRANKLIN (BENJAMIN) 202 SI Site Improvement Drinking fountain - new COMPLETE 2013
FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013
FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Misc. rehab COMPLETE 2012
FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
FRANKLIN (BENJAMIN) 202 SI Playground Chicago Plays! - new equipment COMPLETE 2013
FRANKLIN (BENJAMIN) 202 SI Spray Pool Water play feature - rehab COMPLETE 2016
FRANKLIN (BENJAMIN) 202 FR Minor Rehab Gym floor - rehab CONSTRUCTION
FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Roof/HVAC - rehab PRE-DESIGN
FRANKLIN (BENJAMIN) 202 SI Courts Basketball court - rehab COMPLETE 2016
FULLER (MELVILLE) 4 FR Swimming Pool Pool - liner and water line COMPLETE 2013
FULLER (MELVILLE) 4 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
FULLER (MELVILLE) 4 FR Minor Rehab Fitness center - roof COMPLETE 2011
FULLER (MELVILLE) 4 FR Swimming Pool Pool - filter and gutter PRE-DESIGN
FULLER (MELVILLE) 4 FR Major Rehab Park Improvements including field house and playground COMPLETE 2016
FULLER (MELVILLE) 4 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
FULLER (MELVILLE) 4 FR Roof Field house and gym - roof COMPLETE 2011
GAGE (GEORGE) 22 FR Minor Rehab Access chair lift - new COMPLETE 2018
GAGE (GEORGE) 22 FR Minor Rehab Field house - basement COMPLETE 2013
GAGE (GEORGE) 22 FR Concrete Masonry Structural Concrete porch - rehab COMPLETE 2014
GAGE (GEORGE) 22 FR Minor Rehab Misc. boiler COMPLETE 2017
GAGE (GEORGE) 22 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
GAGE (GEORGE) 22 FR Swimming Pool Pool - liner and water line COMPLETE 2013
GAGE (GEORGE) 22 FR Roof Power house - roof COMPLETE 2011
GAGE (GEORGE) 22 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GAGE (GEORGE) 22 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
GAGE (GEORGE) 22 FR Swimming Pool Pool - filter and gutters COMPLETE 2018
GAGE (GEORGE) 22 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2017
GALEWOOD 130 FR Minor Rehab Misc. rehab after fire COMPLETE 2012
GALEWOOD 130 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
GALEWOOD 130 SI Site Improvement Park improvements CONSTRUCTION
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - steam line COMPLETE 2018
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - Show House steam lines COMPLETE 2014
GARFIELD (JAMES) 204 SI Lighting Lighting - lagoon COMPLETE 2011
GARFIELD (JAMES) 204 FR Minor Rehab Misc. generator COMPLETE 2011
GARFIELD (JAMES) 204 SI Site Improvement Misc. electric service COMPLETE 2011
GARFIELD (JAMES) 204 FR Minor Rehab Field house - lockers and bathrooms COMPLETE 2012
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - shade cloth system COMPLETE 2012
16 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
GARFIELD (JAMES) 204 SI Fencing Conservatory - fencing COMPLETE 2012
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Gold Dome - boiler - upgrade COMPLETE 2013
GARFIELD (JAMES) 204 SI Site Improvement Misc. site drainage COMPLETE 2011
GARFIELD (JAMES) 204 FR Sculpture and Monument Cornwall War Memorial - restoration PRE-DESIGN
GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab COMPLETE 2017
GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - front steps and building apron COMPLETE 2015
GARFIELD (JAMES) 204 FR Minor Rehab Misc. sump pump COMPLETE 2012
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - flooring COMPLETE 2011
GARFIELD (JAMES) 204 FR Minor Rehab Gold Dome - fire escapes COMPLETE 2018
GARFIELD (JAMES) 204 SI Lighting Exterior lighting COMPLETE 2012
GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - concrete and structural COMPLETE 2011
GARFIELD (JAMES) 204 SI Paving Paving - pathways PLANNING
GARFIELD (JAMES) 204 FR Major Rehab Gym floor - rehab COMPLETE 2011
GARFIELD (JAMES) 204 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
GARFIELD (JAMES) 204 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - HVAC - Jensen Room COMPLETE 2012
GARFIELD (JAMES) 204 FR Minor Rehab Trades Building - rehab COMPLETE 2015
GARFIELD (JAMES) 204 SI Landscape Conservatory - exterior pond liners COMPLETE 2013
GARFIELD (JAMES) 204 FR Roof Power house - rehab COMPLETE 2015
GARFIELD (JAMES) 204 SI Site Improvement Conservatory - Wild Exploration Garden - design CONSTRUCTION
GARFIELD (JAMES) 204 FR Swimming Pool Pool - filter, liner and gutter COMPLETE 2018
GARFIELD (JAMES) 204 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot - rehab COMPLETE 2012
GARFIELD (JAMES) 204 FR Major Rehab Conservatory - Elizabeth Morse Children's Garden PRE-DESIGN
GARFIELD (JAMES) 204 FR Minor Rehab Misc. conservatory improvement COMPLETE 2011
GARFIELD (JAMES) 204 FR Sculpture and Monument Conservatory - Solarise Exhibit COMPLETE 2015
GARFIELD (JAMES) 204 FR Major Rehab Conservatory - major rehab from storm damage COMPLETE 2014
GARFIELD (JAMES) 204 SI Playground Chicago Plays! - new equipment at Madison St. COMPLETE 2016
GARFIELD (JAMES) 204 FR Major Rehab Conservatory - tempered water system COMPLETE 2018
GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab and batting tunnel COMPLETE 2017
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - doors CONSTRUCTION
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - boiler COMPLETE 2017
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - boiler CONSTRUCTION
GARFIELD (JAMES) 204 FR Major Rehab Stables - restoration COMPLETE 2015
GARFIELD (JAMES) 204 SI Landscape Tree planting COMPLETE 2018
GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot COMPLETE 2017
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Horticulture Hall - vacuum system CONSTRUCTION
17 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
GARFIELD (JAMES) 204 FR Major Rehab Trades Building - structural COMPLETE 2018
GARFIELD (JAMES) 204 FR Roof Conservatory - entry roof rehab COMPLETE 2016
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - plant cooler COMPLETE 2017
GARFIELD (JAMES) 204 SI Courts Tennis courts - rehab COMPLETE 2018
GARIBALDI (GIUSEPPI) 1047 FR Sculpture and Monument "Garibaldi" - restoration PRE-DESIGN
GARIBALDI (GIUSEPPI) 1047 SI Playground Chicago Plays! - new equipment COMPLETE 2015
GATELY (JAMES) 244 SI Site Improvement Misc. drainage COMPLETE 2012
GATELY (JAMES) 244 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
GATELY (JAMES) 244 AD New Construction Field house with indoor track and field - new CONSTRUCTION
GILL (JOSEPH) 364 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GILL (JOSEPH) 364 SI Playground Playground - new COMPLETE 2018
GILL (JOSEPH) 364 FR Concrete Masonry Structural Concrete and structural - doorway to pool COMPLETE 2016
GILL (JOSEPH) 364 FR Swimming Pool Pool - filter COMPLETE 2014
GILL (JOSEPH) 364 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013
GILL (JOSEPH) 364 FR Minor Rehab Misc. sump pump COMPLETE 2011
GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012
GILL (JOSEPH) 364 FR Swimming Pool Pool - new boiler COMPLETE 2013
GILL (JOSEPH) 364 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012
GILL (JOSEPH) 364 FR Major Rehab Transition plan - access improvements COMPLETE 2011
GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012
GILL (JOSEPH) 364 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
GILL (JOSEPH) 364 SI Athletic Field Ballfield - rehab COMPLETE 2015
GILL (JOSEPH) 364 SI Site Improvement Playground - benches PRE-DESIGN
GINKGO 347 SI Playground Chicago Plays! - new equipment COMPLETE 2016
GLADSTONE (WILLIAM) 93 SI Athletic Field Ballfield - rehab COMPLETE 2018
GLADYS (GUNDERSON) 1102 SI Courts Basketball court - rehab COMPLETE 2015
GLADYS (GUNDERSON) 1102 AD Acquisition Expansion COMPLETE 2012
GLADYS (GUNDERSON) 1102 SI Playground Chicago Plays! - new equipment COMPLETE 2016
GOLDBERG (LOUIS) 384 SI Playground Chicago Plays! - new equipment COMPLETE 2013
GOLDBERG (LOUIS) 384 SI Site Improvement Misc. fencing and drinking fountain COMPLETE 2016
GOLDEN GATE 288 SI Playground Chicago Plays! - new equipment COMPLETE 2013
GOLDEN GATE 288 SI Paving Misc. pathway and fitness course COMPLETE 2014
GOMPERS (SAMUEL) 40 FR Minor Rehab Field house - locker room improvements COMPLETE 2012
GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - liner COMPLETE 2011
GOMPERS (SAMUEL) 40 SI Playground Park Development - playground and athletic field COMPLETE 2012
GOMPERS (SAMUEL) 40 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GOMPERS (SAMUEL) 40 SI Lighting Lighting - ballfield COMPLETE 2015
18 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
GOMPERS (SAMUEL) 40 FR Windows and Doors Misc. windows COMPLETE 2014
GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - filter room drainage COMPLETE 2014
GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - deck COMPLETE 2015
GOMPERS (SAMUEL) 40 SI Lighting Lighting - exterior COMPLETE 2015
GOMPERS (SAMUEL) 40 SI Paving Paving - pathways COMPLETE 2017
GOMPERS (SAMUEL) 40 FR Roof Roof PRE-DESIGN
GOOSEBERRY 348 SI Playground Chicago Plays! - new equipment COMPLETE 2016
GOUDY (WILLIAM) SQUARE 105 SI Playground Playground with water feature - new COMPLETE 2014
GOUDY (WILLIAM) SQUARE 105 SI Fencing Fencing - planter beds COMPLETE 2015
GRAND 1103 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GRAND CROSSING 15 FR Major Rehab Locker room improvements - men and women DESIGN
GRAND CROSSING 15 FR Concrete Masonry Structural Power house - chimney COMPLETE 2012
GRAND CROSSING 15 FR Roof Landscape building - roof PRE-DESIGN
GRAND CROSSING 15 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
GRAND CROSSING 15 FR Swimming Pool Pool - controls COMPLETE 2018
GRAND CROSSING 15 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GRAND CROSSING 15 SI Athletic Field Misc. drainage COMPLETE 2013
GRAND CROSSING 15 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
GRAND CROSSING 15 FR Roof Power house - roof COMPLETE 2011
GRAND CROSSING 15 SI Athletic Field Ballfield - rehab COMPLETE 2013
GRAND CROSSING 15 SI Playground Playground - community pilot COMPLETE 2015
GRAND CROSSING 15 SI Courts Tennis court - conversion to multipurpose COMPLETE 2016
GRANDPARENTS 472 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GRANDPARENTS 472 SI Fencing Fencing - at playground COMPLETE 2018
GRANT (ULYSSES) 24 FR Sculpture and Monument "Logan" - restoration PRE-DESIGN
GRANT (ULYSSES) 24 FR Minor Rehab Comfort station - rehab DESIGN
GRANT (ULYSSES) 24 FR Sculpture and Monument "Mestrovic" - restoration COMPLETE 2017
GRANT (ULYSSES) 24 SI Lighting Lighting - parking lot COMPLETE 2011
GRANT (ULYSSES) 24 FR HVAC and Energy Efficiency Landscape building - boiler DESIGN
GRANT (ULYSSES) 24 FR Minor Rehab Landscape yard - rehab COMPLETE 2011
GRANT (ULYSSES) 24 FR Major Rehab 9th St. pump station - renovation COMPLETE 2012
GRANT (ULYSSES) 24 SI Paving Shoreline - concrete restoration COMPLETE 2017
GRANT (ULYSSES) 24 SI Paving Butler Field - drainage and paving COMPLETE 2013
GRANT (ULYSSES) 24 SI Landscape Trees - Dutch Elm Disease management COMPLETE 2011
GRANT (ULYSSES) 24 SI Lighting Lighting - Museum Campus COMPLETE 2012
GRANT (ULYSSES) 24 FR Major Rehab Van Buren Pedestrian Bridge - renovation COMPLETE 2014
GRANT (ULYSSES) 24 SI Paving Paving - permeable COMPLETE 2013
19 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
GRANT (ULYSSES) 24 FR Roof Buckingham Fountain - concessions COMPLETE 2016
GRANT (ULYSSES) 24 SI Landscape Hutchinson Field - study COMPLETE 2012
GRANT (ULYSSES) 24 FR Sculpture and Monument "Eagle Fountains" - restoration DESIGN
GRANT (ULYSSES) 24 FR Major Rehab Daley Bicentennial Field House - major rehab COMPLETE 2014
GRANT (ULYSSES) 24 AD Park Development Park expansion at Roosevelt Rd. including new skate park COMPLETE 2014
GRANT (ULYSSES) 24 FR Concrete Masonry Structural Queen's Landing - study COMPLETE 2014
GRANT (ULYSSES) 24 AD Park Development Maggie Daley Park - new COMPLETE 2015
GRANT (ULYSSES) 24 FR Major Rehab Cancer Survivor Garden - renovation COMPLETE 2015
GRANT (ULYSSES) 24 SI Site Improvement Museum Campus - paving and drainage COMPLETE 2011
GRANT (ULYSSES) 24 SI Site Improvement Queen's Landing - restoration COMPLETE 2018
GRANT (ULYSSES) 24 FR Sculpture and Monument Buckingham Fountain - restoration COMPLETE 2015
GRANT (ULYSSES) 24 FR Concrete Masonry Structural Buckingham Fountain- concrete restoration CONSTRUCTION
GRANT (ULYSSES) 24 FR Sculpture and Monument John Alexander Logan Monument - paving COMPLETE 2016
GRANT (ULYSSES) 24 SI Landscape Cubs Rally - Landscape damages COMPLETE 2017
GRANT (ULYSSES) 24 SI Site Improvement Maggie Daley - park improvements COMPLETE 2018
GRANT (ULYSSES) 24 SI Paving Landscape yard - paving COMPLETE 2018
GRANT (ULYSSES) 24 SI Site Improvement Buckingham Fountain - plaza and fencing rehab COMPLETE 2017
GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - improvements COMPLETE 2017
GRANT (ULYSSES) 24 SI Site Improvement Hutchinson Field - site improvements COMPLETE 2016
GRANT (ULYSSES) 24 SI Site Improvement Lakefront Trail Separation - Chicago River to Roosevelt Rd. CONSTRUCTION
GRANT (ULYSSES) 24 SI Lighting Skate Park - lighting and security CONSTRUCTION
GRANT (ULYSSES) 24 SI Athletic Field Maggie Daley - pickleball courts COMPLETE 2018
GRAPE 381 SI Playground Chicago Plays! - new equipment COMPLETE 2015
GRAVER (PHILIP) 179 FR Minor Rehab Misc. bathroom improvements COMPLETE 2015
GRAVER (PHILIP) 179 SI Lighting Lighting - security COMPLETE 2011
GRAVER (PHILIP) 179 FR Minor Rehab Field house - dome restoration COMPLETE 2013
GRAVER (PHILIP) 179 SI Playground Chicago Plays! - new equipment COMPLETE 2013
GRAVER (PHILIP) 179 SI Spray Pool Water play feature - major rehab COMPLETE 2018
GREEN (JEFFREY) 1212 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GREEN BRIAR 188 FR Minor Rehab Misc. rehab COMPLETE 2012
GREEN BRIAR 188 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GREEN BRIAR 188 FR Roof Roof - rehab COMPLETE 2017
GREEN BRIAR 188 FR HVAC and Energy Efficiency Boiler - new CONSTRUCTION
GREENEBAUM (HENRY) 132 AD Park Development Park development including playground, artificial turf field COMPLETE 2012
Griffin (Marion Mahony) 1257 SI Site Improvement Misc. beach access COMPLETE 2012
GROSS (THEODORE) 1031 SI Site Improvement Fencing and athletic field COMPLETE 2015
HAAS (JOSEPH) 1032 FR Fitness Center Fitness center - new COMPLETE 2012
20 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
HAAS (JOSEPH) 1032 AD New Construction Field house and park development COMPLETE 2011
HAAS (JOSEPH) 1032 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012
HALE (NATHAN) 234 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
HALE (NATHAN) 234 SI Spray Pool Water play feature - rehab COMPLETE 2018
HALE (NATHAN) 234 SI Site Improvement Benches and warm-up cage COMPLETE 2011
HALE (NATHAN) 234 FR Swimming Pool Pool - liner and gutter COMPLETE 2012
HALE (NATHAN) 234 SI Lighting Athletic field - rehabs COMPLETE 2015
HALE (NATHAN) 234 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HALE (NATHAN) 234 SI Spray Pool Water play feature - rehab COMPLETE 2017
HALE (NATHAN) 234 SI Courts Tennis courts - rehab COMPLETE 2017
HALE (NATHAN) 234 FR Concrete Masonry Structural Field house - foundation COMPLETE 2018
HALE (NATHAN) 234 FR Minor Rehab Misc. bathroom partitions COMPLETE 2017
HAMILTON (ALEXANDER) 9 FR Minor Rehab Gym floor - rehab COMPLETE 2011
HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
HAMILTON (ALEXANDER) 9 FR Minor Rehab Misc. basement flooring COMPLETE 2011
HAMILTON (ALEXANDER) 9 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2013
HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - liner COMPLETE 2016
HAMILTON (ALEXANDER) 9 FR Major Rehab Field house - major rehab DESIGN
HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - rehab COMPLETE 2015
HAMILTON (ALEXANDER) 9 SI Paving Paving - pathways COMPLETE 2017
HAMILTON (ALEXANDER) 9 SI Athletic Field Athletic Field - rehab COMPLETE 2017
HAMILTON (ALEXANDER) 9 SI Courts Basketball court - rehab COMPLETE 2016
HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
HAMLIN (HANNIBAL) 106 SI Courts Tennis court - rehab COMPLETE 2011
HAMLIN (HANNIBAL) 106 FR Roof Roof COMPLETE 2016
HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HAMLIN (HANNIBAL) 106 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool - rehab COMPLETE 2014
HAMLIN (HANNIBAL) 106 SI Paving Paving - pathways COMPLETE 2016
HAMLIN (HANNIBAL) 106 FR Minor Rehab Lobby - new flooring CONSTRUCTION
HANSBERRY (LORRAINE) 1111 AD Acquisition Expansion COMPLETE 2012
HANSBERRY (LORRAINE) 1111 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HARDING (FREDERICK) 1106 SI Fencing Fencing - perimeter COMPLETE 2014
HARDING (FREDERICK) 1106 SI Playground Chicago Plays! - new equipment COMPLETE 2013
HARDING (GEORGE) 1033 SI Playground Chicago Plays! - new equipment COMPLETE 2013
HARRIS (HARRIET) 524 FR Minor Rehab Misc. backboards COMPLETE 2012
21 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC improvements COMPLETE 2013
HARRIS (HARRIET) 524 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2011
HARRIS (HARRIET) 524 FR Swimming Pool Pool rehab COMPLETE 2018
HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency Field house - boiler room ventilation COMPLETE 2017
HARRIS (RYAN) MEMORIAL 1225 SI Playground Playground - new COMPLETE 2016
HARRISON (CARTER) 213 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
HARRISON (CARTER) 213 SI Paving Paving - paths and driveway COMPLETE 2016
HARRISON (CARTER) 213 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012
HARRISON (CARTER) 213 FR Fitness Center Fitness center - upgrade COMPLETE 2011
HARRISON (CARTER) 213 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
HARRISON (CARTER) 213 FR HVAC and Energy Efficiency Misc. for senior center COMPLETE 2014
HARRISON (CARTER) 213 FR Major Rehab Field house - major rehab CONSTRUCTION
HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
HARRISON (CARTER) 213 SI Courts Tennis court - rehab COMPLETE 2018
HARRISON (CARTER) 213 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HARRISON (CARTER) 213 FR Swimming Pool Pool - rehab COMPLETE 2016
HARRISON (CARTER) 213 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION
HARRISON (CARTER) 213 FR Roof Roof rehab and security COMPLETE 2016
HARRISON (CARTER) 213 SI Paving Paving - pathways COMPLETE 2016
HARSH (VIVIAN G.) 324 SI Spray Pool Water play feature - surfacing COMPLETE 2011
HARSH (VIVIAN G.) 324 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HARTIGAN (DAVID) BEACH 1248 SI Site Improvement Misc. fencing, lighting, landscape, benches COMPLETE 2014
HARTIGAN (DAVID) BEACH 1248 SI Paving Misc. pathway extension COMPLETE 2015
HARTIGAN (DAVID) BEACH 1248 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HASAN (ELLIOT) 294 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HAYES (FRANCIS) 242 FR Minor Rehab Natatorium - hot water heater COMPLETE 2018
HAYES (FRANCIS) 242 FR Minor Rehab Misc. windows and benches COMPLETE 2013
HAYES (FRANCIS) 242 SI Lighting Lighting - athletic field COMPLETE 2014
HAYES (FRANCIS) 242 FR Minor Rehab Misc. kitchen renovation COMPLETE 2013
HAYES (FRANCIS) 242 FR Swimming Pool Pool retrofit - compliance COMPLETE 2013
HAYES (FRANCIS) 242 FR Fitness Center Fitness center - upgrade COMPLETE 2012
HAYES (FRANCIS) 242 SI Playground Chicago Plays! - new equipment COMPLETE 2013
HAYES (FRANCIS) 242 FR Windows and Doors Field house - window drainage COMPLETE 2016
HAZELNUT 417 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - 13000 S. Torrence Ave. COMPLETE 2012
22 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - expansion COMPLETE 2014
HEGEWISCH MARSH 563 SI Site Improvement Park improvements - trails and benches COMPLETE 2018
HEGEWISCH MARSH 563 AD Planning Hegewisch Marsh - planning study COMPLETE 2015
HERMITAGE 1008 SI Playground Playground - new COMPLETE 2012
HERMOSA 125 FR Roof Roof PRE-DESIGN
HERMOSA 125 SI Courts Misc. landscape restoration COMPLETE 2012
HERMOSA 125 FR Concrete Masonry Structural Field house - basement COMPLETE 2011
HERMOSA 125 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
HERMOSA 125 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HERMOSA 125 SI Fencing Fencing - perimeter COMPLETE 2016
HERMOSA 125 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018
HIAWATHA 229 FR Fitness Center Fitness center - upgrade COMPLETE 2011
HIAWATHA 229 SI Paving Parking lot - paving and drainage COMPLETE 2012
HIAWATHA 229 FR Fitness Center Fitness center - new equipment COMPLETE 2012
HIAWATHA 229 SI Playground Playground - new COMPLETE 2014
HICKORY 299 SI Playground Playground - surfacing COMPLETE 2018
HOARD (EDISON) 387 SI Athletic Field Ballfield - rehab COMPLETE 2014
HOARD (EDISON) 387 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HOLLY 325 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HOLLYWOOD 75 SI Playground Chicago Plays! - new equipment COMPLETE 2014
HOLLYWOOD 75 SI Landscape Tree planting COMPLETE 2018
HOLSTEIN 203 FR Swimming Pool Wading Pool - filter COMPLETE 2016
HOLSTEIN 203 FR Minor Rehab Misc. chimney replacement COMPLETE 2013
HOLSTEIN 203 SI Spray Pool Water play feature - surfacing COMPLETE 2016
HOLSTEIN 203 FR Swimming Pool Pool - filter COMPLETE 2018
HOLSTEIN 203 FR Roof Roof - new COMPLETE 2018
HOLSTEIN 203 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
HOLSTEIN 203 FR Major Rehab Field house - major rehab - design COMPLETE 2018
HOLSTEIN 203 SI Athletic Field Ballfield - rehab COMPLETE 2015
HOLSTEIN 203 FR Swimming Pool Pool - deck COMPLETE 2016
HOLSTEIN 203 FR Major Rehab Field house - major rehab COMPLETE 2018
HOLSTEIN 203 FR Swimming Pool Wading pool - water main CONSTRUCTION
HOMAN (JOSEPH) 1108 SI Playground Playground - design only COMPLETE 2011
HOMAN (JOSEPH) 1108 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HOMAN SQUARE COMM. CTR. 515 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2013
HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. boiler tubes COMPLETE 2017
23 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. compressor CONSTRUCTION
HONEYSUCKLE 351 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HORAN (ALBERT) 1035 SI Courts Basketball court - rehab COMPLETE 2015
HORAN (ALBERT) 1035 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HORNBEAM 353 SI Playground Chicago Plays! - new equipment COMPLETE 2013
HORNER (HENRY) 228 AD New Construction Underpass at Irving Park Rd. (CDOT) CONSTRUCTION
HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2011
HORNER (HENRY) 228 AD Park Development Riverbank development with Army Corps COMPLETE 2018
HORNER (HENRY) 228 FR Minor Rehab Misc. gym bleachers COMPLETE 2011
HORNER (HENRY) 228 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2013
HORNER (HENRY) 228 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
HORNER (HENRY) 228 FR Concrete Masonry Structural Field house - stairs and masonry COMPLETE 2012
HORNER (HENRY) 228 FR Major Rehab Transition plan - access improvements COMPLETE 2012
HORNER (HENRY) 228 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HORNER (HENRY) 228 SI Site Improvement Dog friendly area - new COMPLETE 2018
HORNER (HENRY) 228 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018
HORNER (HENRY) 228 SI Landscape Pathways - LED upgrade CONSTRUCTION
HORNER (HENRY) 228 SI Courts Tennis court -rehab COMPLETE 2018
HORNER (HENRY) 228 SI Fencing Perimeter fencing along Irving Park Rd. DESIGN
HOUSTON (JESSIE "MA") 278 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
HOUSTON (JESSIE "MA") 278 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HOWARD (URE) BEACH 1256 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HOWARD (URE) BEACH 1256 SI Site Improvement Site restoration COMPLETE 2018
HOYNE (THOMAS) 1036 SI Playground Chicago Plays! - new equipment COMPLETE 2014
HUBBARD (GURDON) 1109 SI Playground Chicago Plays! - new equipment COMPLETE 2013
HUCKLEBERRY 336 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HUMBERT (JAMES) 1121 SI Playground Chicago Plays! - new equipment COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 SI Paving Parking lot - rehab COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Batting cages - new COMPLETE 2017
HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground at California Ave. - surfacing COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Misc. water main COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 AD Planning Lagoon management - study COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - filter COMPLETE 2013
HUMBOLDT (ALEXANDER VON) 219 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - water line rehab COMPLETE 2013
24 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground - additional equipment COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 FR Windows and Doors Landscape yard - doors COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 FR Major Rehab Field house - major rehab COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment at Augusta Ave. COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Misc. pergola rehab COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment at the lagoon COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - electric power COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Landscape Formal garden - restoration study COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Ballfield - rehab COMPLETE 2018
HUMBOLDT (ALEXANDER VON) 219 FR Roof Stables - roof COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - athletic field COMPLETE 2017
HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Gym floor - rehab COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Boat House - remediation COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Lagoon - natural swimming pond COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment at North Ave. COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Paving Paving - pathways COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 FR Roof Comfort stations - rehabs COMPLETE 2017
INDEPENDENCE 83 FR Swimming Pool Pool - filter system and gutter COMPLETE 2017
INDEPENDENCE 83 SI Athletic Field Tree planting COMPLETE 2018
INDEPENDENCE 83 FR Major Rehab Bungalow - major rehab and green initiative COMPLETE 2013
INDEPENDENCE 83 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
INDEPENDENCE 83 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
INDEPENDENCE 83 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012
INDEPENDENCE 83 FR Minor Rehab Gym floor - new COMPLETE 2013
INDEPENDENCE 83 FR Windows and Doors Field House and Pool building - windows PRE-DESIGN
INDEPENDENCE 83 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2015
INDEPENDENCE 83 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
INDEPENDENCE 83 SI Paving Paving - pathways COMPLETE 2017
INDEPENDENCE 83 SI Playground Signature Playground - new COMPLETE 2016
INDIAN BOUNDARY 165 FR Minor Rehab Misc. downspouts COMPLETE 2012
INDIAN BOUNDARY 165 FR Minor Rehab Misc. sump pump COMPLETE 2011
INDIAN BOUNDARY 165 SI Courts Tennis court - rehab COMPLETE 2011
INDIAN BOUNDARY 165 FR Major Rehab Transition plan - access improvements COMPLETE 2011
INDIAN BOUNDARY 165 FR Major Rehab Nature center - rehab COMPLETE 2014
INDIAN BOUNDARY 165 SI Spray Pool Water play feature - rehab COMPLETE 2014
25 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
INDIAN BOUNDARY 165 FR Major Rehab Field house - foundation and drainage COMPLETE 2014
INDIAN BOUNDARY 165 FR Major Rehab Field house - major rehab COMPLETE 2013
JACKSON (ANDREW) 19 SI Spray Pool Water play feature at 63rd St. Beach - rehab COMPLETE 2017
JACKSON (ANDREW) 19 FR Minor Rehab Landscape yard - rehab COMPLETE 2011
JACKSON (ANDREW) 19 SI Paving Paving - 67th St. Pathway COMPLETE 2016
JACKSON (ANDREW) 19 SI Landscape 63rd St. Beach - dune restoration COMPLETE 2011
JACKSON (ANDREW) 19 SI Lighting Lighting - exterior COMPLETE 2013
JACKSON (ANDREW) 19 SI Site Improvement Multi-use trail - Marquette Drive COMPLETE 2011
JACKSON (ANDREW) 19 FR Major Rehab Field house - locker room improvements COMPLETE 2011
JACKSON (ANDREW) 19 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
JACKSON (ANDREW) 19 SI Landscape Osaka Garden - restoration COMPLETE 2013
JACKSON (ANDREW) 19 SI Fencing Misc. gate COMPLETE 2013
JACKSON (ANDREW) 19 AD New Construction Water quality - pilot beach barrier COMPLETE 2013
JACKSON (ANDREW) 19 AD Park Development Olmsted Historic Restoration CONSTRUCTION
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (at 64th St. COMPLETE 2014
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (Chrysalis) COMPLETE 2014
JACKSON (ANDREW) 19 SI Lighting Misc. electric transformer COMPLETE 2013
JACKSON (ANDREW) 19 SI Site Improvement Misc. new waterlines COMPLETE 2011
JACKSON (ANDREW) 19 SI Athletic Field Misc. croquet field COMPLETE 2014
JACKSON (ANDREW) 19 FR Minor Rehab 63rd St. Beach House - electric upgrade COMPLETE 2013
JACKSON (ANDREW) 19 SI Courts Basketball court - rehab COMPLETE 2014
JACKSON (ANDREW) 19 SI Athletic Field Athletic field - rehab COMPLETE 2011
JACKSON (ANDREW) 19 SI Site Improvement Water conservation - study COMPLETE 2016
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment at 67th St. COMPLETE 2016
JACKSON (ANDREW) 19 SI Athletic Field Artificial turf field and track - relocation CONSTRUCTION
JACKSON (ANDREW) 19 SI Site Improvement Lakefront Trail Separation - 55th St. to 67th St. CONSTRUCTION
JACKSON (ANDREW) 19 SI Paving Landscape yard - paving COMPLETE 2018
JACKSON (ANDREW) 19 FR Minor Rehab Bowling Green Club House - rehab COMPLETE 2013
JACKSON (ANDREW) 19 FR Sculpture and Monument "Skylanding" - installation COMPLETE 2016
JACKSON (ANDREW) 19 FR Minor Rehab Misc. water meter DESIGN
JACKSON (ANDREW) 19 SI Site Improvement Osaka Garden - site improvements COMPLETE 2017
JACKSON (MAHALIA) 386 FR Major Rehab Building demolition COMPLETE 2011
JACKSON (MAHALIA) 386 SI Lighting Lighting - athletic field COMPLETE 2012
JACOB 156 SI Playground Chicago Plays! - new equipment COMPLETE 2013
JACOB 156 SI Site Improvement Misc. site improvements COMPLETE 2015
JACOB 156 AD Acquisition Expansion COMPLETE 2014
26 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
JACOLIK (FLORIAN S.) 1288 SI Playground Chicago Plays! - new equipment COMPLETE 2016
JEFFERSON (NANCY) 338 SI Courts Misc. game court graphics COMPLETE 2014
JEFFERSON (NANCY) 338 SI Playground Chicago Plays! - new equipment COMPLETE 2013
JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
JEFFERSON (THOMAS) MEML. 94 FR Roof Pool building - roof COMPLETE 2012
JEFFERSON (THOMAS) MEML. 94 FR Minor Rehab Field house - locker room improvements COMPLETE 2016
JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool - deck and liner PRE-DESIGN
JONES (MARY RICHARDSON) 479 SI Playground Playground - surfacing COMPLETE 2013
JONES (MARY RICHARDSON) 479 SI Fencing Misc. maintenance gate CONSTRUCTION
JONQUIL 1270 SI Courts Tennis court- rehab COMPLETE 2015
JUNCTION GROVE 415 SI Playground Chicago Plays! - new equipment COMPLETE 2016
JUNEWAY BEACH 1258 SI Site Improvement Site restoration COMPLETE 2018
JUNIPER 392 SI Playground Playground with water feature - new COMPLETE 2018
KEELER (CYRUS) 1114 SI Playground Chicago Plays! - new equipment COMPLETE 2016
KELLS (GEORGE) 1040 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KELLY (EDWARD) 260 SI Paving Paving - pathways COMPLETE 2012
KELLY (EDWARD) 260 SI Playground Chicago Plays! - new equipment COMPLETE 2015
KELLY (EDWARD) 260 SI Athletic Field Artificial turf athletic field - new COMPLETE 2015
KELLY (EDWARD) 260 SI Athletic Field Athletic field and basketball court- rehab COMPLETE 2017
KELLY (EDWARD) 260 SI Athletic Field Athletic field - scoreboard COMPLETE 2017
KELLY (JOHN) 493 SI Playground Chicago Plays! - new equipment COMPLETE 2016
KELVYN (WILLIAM) 126 SI Fencing Misc. gates COMPLETE 2011
KELVYN (WILLIAM) 126 FR Roof Roof COMPLETE 2015
KELVYN (WILLIAM) 126 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KELVYN (WILLIAM) 126 FR Minor Rehab Drainage improvements and new gym floor COMPLETE 2015
KENMORE 1115 SI Playground Chicago Plays! - new equipment COMPLETE 2013
KENNEDY (DENNIS) 48 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
KENNEDY (DENNIS) 48 SI Paving Paving at entrance COMPLETE 2011
KENNEDY (DENNIS) 48 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KENNEDY (DENNIS) 48 SI Courts Court - conversion to roller hockey and jr. tennis COMPLETE 2014
KENNEDY (DENNIS) 48 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
KENNEDY (DENNIS) 48 SI Lighting Lighting - athletic field COMPLETE 2015
KENNEDY (DENNIS) 48 FR Swimming Pool Pool - filter COMPLETE 2018
KENNEDY (DENNIS) 48 FR Swimming Pool Pool - controls COMPLETE 2018
KENNEDY (DENNIS) 48 SI Paving Paving - pathways COMPLETE 2016
KENNEDY (DENNIS) 48 FR Swimming Pool Pool - rehab COMPLETE 2017
KENNEDY (DENNIS) 48 SI Courts Hockey roller court - new COMPLETE 2017
27 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
KENNICOTT (JONATHAN) 485 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KENNICOTT (JONATHAN) 485 FR Major Rehab Transition plan - access improvements COMPLETE 2012
KENNICOTT (JONATHAN) 485 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KENNICOTT (JONATHAN) 485 SI Site Improvement Paving, fencing, lighting, alley closure COMPLETE 2016
KENSINGTON 1041 SI Site Improvement Site and facility improvements COMPLETE 2012
KENSINGTON 1041 SI Athletic Field Athletic field - rehab COMPLETE 2012
KENSINGTON 1041 SI Lighting Lighting - exterior COMPLETE 2017
KEN-WELL 1042 SI Paving Paving - entrance COMPLETE 2014
KEN-WELL 1042 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KEN-WELL 1042 SI Spray Pool Water play feature - rehab COMPLETE 2017
KENWOOD COMM. 1010 SI Paving Paving - pathways COMPLETE 2016
KEYSTONE 1116 SI Playground Chicago Plays! - new equipment COMPLETE 2015
KILBOURN 84 SI Paving Landscape yard - paving COMPLETE 2011
KILBOURN 84 SI Fencing Misc. gates COMPLETE 2011
KILBOURN 84 FR Major Rehab Greenhouse - restoration COMPLETE 2014
KILBOURN 84 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KILBOURN 84 SI Playground Chicago Plays! - new equipment COMPLETE 2013
KILBOURN 84 SI Site Improvement Misc. scoreboard COMPLETE 2014
KILBOURN 84 FR Roof Maintenance building - roof COMPLETE 2017
KILBOURN 84 SI Playground Nature playground - new PRE-DESIGN
KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Bowling alley - restoration COMPLETE 2011
KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling Alley - roof COMPLETE 2016
KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling alley - roof COMPLETE 2013
KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Misc. bowling alley supplies COMPLETE 2016
KING (MARTIN LUTHER, JR.) 334 FR Sculpture and Monument Monument - restoration COMPLETE 2013
KING (MARTIN LUTHER, JR.) 334 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2017
King-Lockhart (Patrick, Anthony) 558 AD Park Development Park development - 106th St. and Western Ave. COMPLETE 2011
King-Lockhart (Patrick, Anthony) 558 SI Site Improvement Sculpture and entrance columns COMPLETE 2013
KIWANIS 42 SI Lighting Lighting - exterior COMPLETE 2015
KLEIN (LOIS) 544 AD Acquisition Lincoln Ave. and Addison St. COMPLETE 2011
KLEIN (LOIS) 544 SI Playground Misc. kiosk COMPLETE 2013
KOLMAR 85 SI Playground Chicago Plays! - new equipment COMPLETE 2013
KORCZAK (JANUSZ) 1090 SI Playground Chicago Plays! - new equipment COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool - rehab COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. window screens COMPLETE 2011
KOSCIUSZKO (THADEUZ) 120 FR Roof Natatorium - roof COMPLETE 2011
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
28 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. floor restoration design COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KOSCIUSZKO (THADEUZ) 120 FR Major Rehab Transition plan - access improvements COMPLETE 2012
KOSCIUSZKO (THADEUZ) 120 FR Concrete Masonry Structural Field house and Natatorium - concrete, plaster, masonry COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2014
KOSCIUSZKO (THADEUZ) 120 SI Paving Pathways and parking lot COMPLETE 2013
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool Building - exterior doors CONSTRUCTION
KRAUSE (FRANCIS VERNON) 1079 SI Playground Playground with water feature - new COMPLETE 2013
KUCINSKI-MURPHY (VICKI, ROSEBETH) 1062 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LA FOLLETTE (ROBERT) 201 SI Paving Paving - paths COMPLETE 2011
LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC improvements DESIGN
LA FOLLETTE (ROBERT) 201 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2015
LA FOLLETTE (ROBERT) 201 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
LA FOLLETTE (ROBERT) 201 SI Site Improvement Track - new COMPLETE 2011
LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
LA FOLLETTE (ROBERT) 201 FR Major Rehab Field house and Natatorium - major rehab CONSTRUCTION
LA FOLLETTE (ROBERT) 201 SI Spray Pool Water play feature - rehab COMPLETE 2017
LA FOLLETTE (ROBERT) 201 FR Minor Rehab Field house - painting, plastering, drainage COMPLETE 2012
LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
LA FOLLETTE (ROBERT) 201 SI Courts Basketball court - rehab COMPLETE 2016
LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool - rehab COMPLETE 2017
La Villita 553 AD Acquisition Celotex - 2800-3024 S. Sacramento Ave. COMPLETE 2012
La Villita 553 AD Park Development Park development - "The Big Park in Little Village" COMPLETE 2015
LAKE MEADOWS 263 SI Paving Parking lot - rehab COMPLETE 2011
LAKE MEADOWS 263 FR Minor Rehab Field house - rehab COMPLETE 2011
LAKE MEADOWS 263 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
LAKE MEADOWS 263 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LAKE SHORE 107 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
LAKE SHORE 107 SI Site Improvement Track - rehab COMPLETE 2015
LAKE SHORE 107 FR Fitness Center Fitness center - equipment COMPLETE 2014
LAKE SHORE 107 AD Park Development Park improvements - design only COMPLETE 2016
LAKE SHORE 107 SI Athletic Field Landscape irrigation system - new CONSTRUCTION
LAKE SHORE 107 SI Athletic Field Athletic field - improvements COMPLETE 2017
LAKE SHORE 107 AD Planning Framework plan and building assessment PLANNING
LAMB (HAROLD) 446 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LANGDON (MARY MARGARET) 1077 SI Playground Chicago Plays! new equipment including court conversion COMPLETE 2015
29 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
LAWLER (MICHAEL) 1011 SI Playground Playground with water feature - new COMPLETE 2013
LAWLER (MICHAEL) 1011 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
LAZARUS (EMMA) 450 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LE CLAIRE COURTS - HEARST COMM. CTR 305 FR Roof Roof COMPLETE 2011
LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015
LE CLAIRE COURTS - HEARST COMM. CTR 305 SI Spray Pool Water play feature - rehab COMPLETE 2017
LEE (JOHN) 1286 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LEGION 274 FR Sculpture and Monument Misc.- fountain restoration COMPLETE 2013
LEGION 274 SI Playground Chicago Plays! - new equipment at Catalpa Ave. COMPLETE 2014
LEGION 274 SI Playground Chicago Plays! - new equipment at Catalpa Ave. COMPLETE 2014
LEGION 274 SI Playground Chicago Plays! - new equipment at Thorndale Ave. COMPLETE 2015
LEGION 274 SI Playground Chicago Plays! - new equipment at Hollywood Ave. COMPLETE 2015
LELAND GIANTS 395 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LEONE (SAM) BEACH 1013 SI Paving Lighting - exterior COMPLETE 2012
LEONE (SAM) BEACH 1013 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LEONE (SAM) BEACH 1013 SI Athletic Field Natural area - new CONSTRUCTION
LEONE (SAM) BEACH 1013 FR Major Rehab Lifeguard Station - framework plan PLANNING
LERNER (LEO) 273 SI Playground Playground - equipment COMPLETE 2012
LERNER (LEO) 273 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LERNER (LEO) 273 SI Athletic Field Athletic field - rehab COMPLETE 2014
LEVIN (JOHN) 1220 SI Playground Chicago Plays! - new equipment COMPLETE 2013
LILY GARDENS 1218 SI Playground Chicago Plays! - new equipment COMPLETE 2013
LIMAS (JULIANN HOPE) 1066 AD Acquisition Expansion - 2422 S. Trumbull Ave. COMPLETE 2015
LIMAS (JULIANN HOPE) 1066 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LIN (MARGARET HIE DING) 360 SI Site Improvement Park improvements DESIGN
LINCOLN (ABRAHAM) 100 SI Site Improvement Diversey Rowing Lagoon - infrastructure PRE-DESIGN
LINCOLN (ABRAHAM) 100 FR Major Rehab Conservatory - steam tunnel COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. electric transclosures COMPLETE 2015
LINCOLN (ABRAHAM) 100 AD New Construction Shoreline Protection with U.S. Army Corps (Fullerton Ave.) COMPLETE 2015
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Oak St. to Ohio St. COMPLETE 2017
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Swedenborg" - restoration COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Totem Pole" - restoration COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Site Improvement Ohio Street Beach - triathlon training station PRE-DESIGN
LINCOLN (ABRAHAM) 100 SI Site Improvement Ohio Street Beach - line sewer replacement CONSTRUCTION
LINCOLN (ABRAHAM) 100 FR Minor Rehab Shore Club - plumbing and electrical CONSTRUCTION
LINCOLN (ABRAHAM) 100 SI Athletic Field Athletic field - rehab COMPLETE 2011
30 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Benjamin Franklin" - restoration PRE-DESIGN
LINCOLN (ABRAHAM) 100 FR Major Rehab Margate Field House - locker room improvements COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Site Improvement Fountain Girl Garden - installation DESIGN
LINCOLN (ABRAHAM) 100 SI Site Improvement North Pond - signage COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Charitas" - restoration COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Fullerton Ave. to North Ave. COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Paving Landscape yard - paving COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Osterman Beach House - rehab COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Belmont Ave. - improvements COMPLETE 2013
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Promenade restoration - Diversey Ave. to Belmont Ave. COMPLETE 2012
LINCOLN (ABRAHAM) 100 AD New Construction Shoreline Protection with U.S. Army Corps (Montrose Dr. to Irving Park Dr.)COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - near Berwyn Ave. COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Lighting Diversey Ave. to Fullerton Dr. - lighting COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Minor Rehab Comfort station at Montrose Ave. - entrance and washrooms COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Roof Cultural Center - clay tile roof restoration CONSTRUCTION
LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. benches at North Pond COMPLETE 2013
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Conservatory - HVAC energy management COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Minor Rehab Landscape yard - rehab COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Lighting Misc. electric service near Zoo COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Minor Rehab South Field House - rehab CONSTRUCTION
LINCOLN (ABRAHAM) 100 FR Roof Conservatory - glass roof assessment COMPLETE 2017
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - concrete and drainage COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Courts Tennis court - rehab COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - south COMPLETE 2015
LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. navigation beacon COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Pathways and drainage COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Roof Comfort station at Diversey Ave. - roof COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Montrose Point - restoration COMPLETE 2015
LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - doors COMPLETE 2015
LINCOLN (ABRAHAM) 100 SI Lighting Lighting - lagoon COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Lighting Lighting - ballfield COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Lighting Lighting - Roscoe St. and Barry St. underpass COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Montrose Ave. to Addison Ave. COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Landscape Montrose Point Bird Sanctuary - design DESIGN
LINCOLN (ABRAHAM) 100 SI Landscape Montrose Butterfly Garden CONSTRUCTION
LINCOLN (ABRAHAM) 100 AD Planning Diversey Driving Range - planning study COMPLETE 2014
LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - glass restoration - Annual Program COMPLETE 2015
31 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field - new COMPLETE 2014
LINCOLN (ABRAHAM) 100 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Cultural Center COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Minor Rehab Cultural Center - rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 FR Major Rehab North Avenue Pier - rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 SI Paving Belmont Harbor - sidewalk COMPLETE 2012
LINCOLN (ABRAHAM) 100 AD Planning Montrose Point - ecological management plan COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment COMPLETE 2013
LINCOLN (ABRAHAM) 100 SI Site Improvement Osterman Beach - beach access COMPLETE 2017
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - masonry PRE-DESIGN
LINCOLN (ABRAHAM) 100 SI Paving Green infrastructure renovation - Wilson Parking Lot COMPLETE 2016
LINCOLN (ABRAHAM) 100 FR Major Rehab Theater on the Lake - major rehab COMPLETE 2017
LINCOLN (ABRAHAM) 100 AD Planning North Ave. Beach - planning study COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Playground Playground with water feature - new COMPLETE 2015
LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Montrose Beach - improvements COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. water main rehab at lagoon COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Paving Paving - Diversey Driving Range COMPLETE 2015
LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2014
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Grant" - concrete and structural PRE-DESIGN
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Fountain Girl" and Rustic Pavillion- restoration COMPLETE 2014
LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Boat Club COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Roof Conservatory - rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Ardmore Ave. to Montrose Ave. CONSTRUCTION
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - North Ave. to Oak St. CONSTRUCTION
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment (Morrie Mages) COMPLETE 2015
LINCOLN (ABRAHAM) 100 FR Major Rehab South Field House - renovation and court rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - signage COMPLETE 2018
LINCOLN (ABRAHAM) 100 SI Landscape Montrose Beach Dunes - planning study COMPLETE 2015
LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. pumps at North Ave. COMPLETE 2016
LINCOLN (ABRAHAM) 100 FR Roof Margate Field House - roof and gutters PRE-DESIGN
LINCOLN (ABRAHAM) 100 SI Fencing Dog friendly area at Montrose Beach - fencing COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Stockton Dr. COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Simonds Dr. COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Cannon Dr. DESIGN
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field at Montrose Ave. - major rehab COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Briar St. to Fullerton Ave. CONSTRUCTION
32 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
LINCOLN (ABRAHAM) 100 SI Site Improvement Outdoor fitness station at Diversey Ave. - new COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Paving Paving - pathways COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Bryn Mawr COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - bike racks PRE-DESIGN
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Diversey Pkwy. COMPLETE 2017
LINCOLN (ABRAHAM) 100 FR Minor Rehab Waveland - 1st Tee Junior Clubhouse DESIGN
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Boat House - furnace PRE-DESIGN
LINCOLN (ABRAHAM) 100 SI Site Improvement LFT Separation - Addison St. to Briar Ave. CONSTRUCTION
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Power House - boiler BID/AWARD
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - terrace walls COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - terrace walls additional COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Minor Rehab Theater on the Lake Comfort Station - Rehab COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Sunnyside Ave. COMPLETE 2016
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Water main at Foster Ave. COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf field at Diversey Ave. - new PLANNING
LINCOLN (ABRAHAM) 100 SI Site Improvement Paving - running paths COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Courts Foster Beach - basketball court PRE-DESIGN
LINDBLOM (ROBERT) 243 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
LINDBLOM (ROBERT) 243 FR Roof Skylights - new DESIGN
LINDBLOM (ROBERT) 243 FR Fitness Center Fitness center -upgrade COMPLETE 2011
LINDBLOM (ROBERT) 243 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
LINDBLOM (ROBERT) 243 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LINDBLOM (ROBERT) 243 SI Athletic Field Artificial turf field and track - new COMPLETE 2015
LINDEN 308 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
LINDEN 308 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LITTLE VENICE 1055 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LIVINGSTON FIELD 510 AD Acquisition Park expansion COMPLETE 2011
LIVINGSTON FIELD 510 AD Park Development Park development including artificial turf field COMPLETE 2013
LONDON (LOUIS) 1120 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LONDON (LOUIS) 1120 AD Park Development Park expansion - site improvements COMPLETE 2016
LOWE (SAMUEL) 1044 SI Courts Basketball court - rehab and drainage COMPLETE 2012
LOWE (SAMUEL) 1044 SI Site Improvement Park improvements - fencing, lighting COMPLETE 2014
LOWE (SAMUEL) 1044 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LOWE (SAMUEL) 1044 AD New Construction Field house - expansion COMPLETE 2014
LOYOLA 115 SI Paving Paving - paths COMPLETE 2013
LOYOLA 115 SI Site Improvement Misc. beach access COMPLETE 2012
LOYOLA 115 SI Playground Chicago Plays! - new equipment COMPLETE 2016
33 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
LOYOLA 115 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017
LOYOLA 115 FR Minor Rehab Access - chair lift CONSTRUCTION
LOYOLA 115 SI Athletic Field Athletic field - batting cage COMPLETE 2018
LUNA 440 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LUNT (ORRINGTON, STEPHEN) 1123 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LYLE (JOHN) 1267 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MADIGAN (MICHAEL J., SR.) 484 SI Lighting Lighting - exterior COMPLETE 2013
MAGNOLIA 333 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MAJOR TAYLOR BIKE TRAIL 548 SI Site Improvement Signage COMPLETE 2011
MAJOR TAYLOR BIKE TRAIL 548 SI Lighting Lighting and seating - trail CONSTRUCTION
MALUS 394 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MANDRAKE (HENRY BROWN) 504 AD Acquisition Expansion ACQUISITION
MANDRAKE (HENRY BROWN) 504 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013
MANDRAKE (HENRY BROWN) 504 SI Playground Playground - surfacing COMPLETE 2012
MANDRAKE (HENRY BROWN) 504 SI Courts Tennis courts - rehab COMPLETE 2016
MANDRAKE (HENRY BROWN) 504 SI Site Improvement Athletic field - new scoreboard COMPLETE 2017
MANDRAKE (HENRY BROWN) 504 SI Paving Paving - entrance COMPLETE 2018
MANN (JAMES) 17 FR Minor Rehab Field house - wall repair COMPLETE 2013
MANN (JAMES) 17 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
MANN (JAMES) 17 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
MANN (JAMES) 17 SI Courts Court - conversion to inline skating COMPLETE 2011
MANN (JAMES) 17 FR HVAC and Energy Efficiency Pool - new boiler COMPLETE 2012
MANN (JAMES) 17 SI Site Improvement Drainage improvements COMPLETE 2014
MANN (JAMES) 17 FR Major Rehab Transition plan - access improvements COMPLETE 2011
MANN (JAMES) 17 FR Windows and Doors Natatorium - sliding doors COMPLETE 2011
MANN (JAMES) 17 FR Minor Rehab Misc. Veteran's Memorial Plaza COMPLETE 2015
MANN (JAMES) 17 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
MANN (JAMES) 17 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MANN (JAMES) 17 FR Concrete Masonry Structural Natatorium - major rehab COMPLETE 2017
MANN (JAMES) 17 SI Athletic Field Ballfield - rehab COMPLETE 2014
MANN (JAMES) 17 SI Landscape Tree planting COMPLETE 2018
MAPLE 1283 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MAPLEWOOD 1045 SI Athletic Field Athletic field - rehab COMPLETE 2017
MAPLEWOOD 1045 AD New Construction Field house - expansion CONSTRUCTION
MARIANO (LOUIS) 1239 FR Sculpture and Monument Fountain and plaza - restoration COMPLETE 2016
MARQUETTE (JACQUES) 10 SI Paving Landscape yard - paving COMPLETE 2011
MARQUETTE (JACQUES) 10 FR Minor Rehab Misc. locker room COMPLETE 2014
34 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
MARQUETTE (JACQUES) 10 FR Minor Rehab Landscape yard - rehab COMPLETE 2011
MARQUETTE (JACQUES) 10 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2013
MARQUETTE (JACQUES) 10 SI Playground Chicago Plays! - new equipment COMPLETE 2013
MARQUETTE (JACQUES) 10 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
MARQUETTE (JACQUES) 10 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013
MARQUETTE (JACQUES) 10 FR Minor Rehab Field house - interior restoration COMPLETE 2016
MARQUETTE (JACQUES) 10 FR Roof Landscape yard - roof and masonry PRE-DESIGN
MARQUETTE (JACQUES) 10 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2015
MARQUETTE (JACQUES) 10 FR Sculpture and Monument MLK Monument COMPLETE 2016
MARQUETTE (JACQUES) 10 SI Paving Paving - pathways COMPLETE 2016
MARSHFIELD 1046 SI Site Improvement Misc. new water line COMPLETE 2012
MARSHFIELD 1046 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MARTIN (JOHNNY) 447 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MASON (ELIZABETH) 1164 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MASON (ELIZABETH) 1164 SI Athletic Field Fencing - perimeter DESIGN
MATANKY (EUGENE) 168 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MATHER (STEPHEN TYNG) 241 SI Playground Playground - new COMPLETE 2012
MATHER (STEPHEN TYNG) 241 FR Roof Roof - rehab COMPLETE 2017
MATHER (STEPHEN TYNG) 241 SI Athletic Field Athletic field - rehab COMPLETE 2016
MATHER (STEPHEN TYNG) 241 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION
MATHER (STEPHEN TYNG) 241 SI Landscape Tree planting COMPLETE 2018
MAYFAIR 86 SI Paving Paving - pathways COMPLETE 2017
MAYFAIR 86 SI Athletic Field Athletic field - rehab CONSTRUCTION
MCGUANE (JOHN) 2 AD Planning Field House - feasibility study COMPLETE 2018
MCGUANE (JOHN) 2 FR Major Rehab Transition plan - access improvements COMPLETE 2012
MCGUANE (JOHN) 2 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
MCGUANE (JOHN) 2 SI Playground Chicago Plays! - new equipment COMPLETE 2013
MCGUANE (JOHN) 2 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
MCGUANE (JOHN) 2 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
MCGUANE (JOHN) 2 FR Major Rehab Field house - major restoration DESIGN
MCGUANE (JOHN) 2 SI Courts Tennis courts - rehab COMPLETE 2016
MCINERNEY (THOMAS) 443 SI Site Improvement Park improvements COMPLETE 2017
MCINERNEY (THOMAS) 443 SI Site Improvement Park improvements PLANNING
MCKEON (JOSEPH) 1162 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MCKIERNAN (DAVID) 1060 FR Minor Rehab Accessibility improvements COMPLETE 2013
MCKIERNAN (DAVID) 1060 SI Athletic Field Athletic field - rehab COMPLETE 2016
MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool - rehab COMPLETE 2013
35 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
MCKINLEY (WILLIAM) 23 FR Roof Power house - roof PRE-DESIGN
MCKINLEY (WILLIAM) 23 FR Windows and Doors Field house - doors COMPLETE 2014
MCKINLEY (WILLIAM) 23 FR Sculpture and Monument "McKinley" - restoration PRE-DESIGN
MCKINLEY (WILLIAM) 23 FR Major Rehab Field house - major rehab CONSTRUCTION
MCKINLEY (WILLIAM) 23 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MCKINLEY (WILLIAM) 23 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
MCKINLEY (WILLIAM) 23 SI Courts Tennis court - rehab COMPLETE 2012
MCKINLEY (WILLIAM) 23 FR Minor Rehab Landscape yard - removal COMPLETE 2016
MCKINLEY (WILLIAM) 23 SI Site Improvement Landscape yard - paving and drainage COMPLETE 2018
MCKINLEY (WILLIAM) 23 SI Paving Paving - pathways COMPLETE 2016
MCKINLEY (WILLIAM) 23 SI Spray Pool Water play feature - rehab COMPLETE 2018
MCKINLEY (WILLIAM) 23 SI Site Improvement Dog friendly area -new PRE-DESIGN
MELLIN (CURTIS, SR.) 1219 SI Playground Playground - new COMPLETE 2013
MEMORIAL 1048 SI Courts Basketball - rehab COMPLETE 2011
MERRILL (GEORGE) 1126 SI Courts Site improvement COMPLETE 2013
MERRILL (GEORGE) 1126 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MERRILL (GEORGE) 1126 SI Courts Court -rehab COMPLETE 2014
MERRIMAC 256 SI Playground Playground with water feature - new COMPLETE 2013
MERRIMAC 256 FR Minor Rehab Gym floor - rehab COMPLETE 2014
MERRIMAC 256 SI Site Improvement Misc. flag poles COMPLETE 2012
MERRIMAC 256 SI Site Improvement Site improvements including paving COMPLETE 2013
MERRYMAN (THERON) 1124 SI Playground Playground - new COMPLETE 2013
METCALFE (RALPH) 448 SI Courts Tennis court - rehab COMPLETE 2011
METCALFE (RALPH) 448 SI Athletic Field Athletic field - lighting and scoreboard COMPLETE 2015
METCALFE (RALPH) 448 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MEYERING (WILLIAM) 1049 SI Playground Playground - surfacing PRE-DESIGN
MEYERING (WILLIAM) 1049 SI Courts Basketball court - rehab COMPLETE 2013
MEYERING (WILLIAM) 1049 SI Paving Paving - track COMPLETE 2013
MEYERING (WILLIAM) 1049 SI Spray Pool Water play feature - rehab COMPLETE 2018
MICEK (FRANK) 1028 SI Fencing Fencing - basketball court COMPLETE 2014
MICEK (FRANK) 1028 SI Playground Playground with water feature - new COMPLETE 2013
MICEK (FRANK) 1028 SI Courts Basketball court - rehab COMPLETE 2013
MIDWAY PLAISANCE 1268 FR Minor Rehab Misc. HVAC rehab COMPLETE 2011
MILLARD (ALDEN) 1127 SI Playground Chicago Plays! - new equipment COMPLETE 2013
MILLARD (ALDEN) 1127 SI Site Improvement Expansion - site improvements COMPLETE 2017
MILLER (SAMUEL) 1128 SI Playground Chicago Plays! - new equipment COMPLETE 2014
36 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
MINUTEMAN 307 SI Playground Playground - new COMPLETE 2012
MINUTEMAN 307 SI Paving Paving - paths COMPLETE 2012
MINUTEMAN 307 FR Roof Roof - rehab COMPLETE 2015
MINUTEMAN 307 SI Fencing Ballfield - perimeter fencing CONSTRUCTION
MOCCASIN RANCH 337 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MONTGOMERY (MABEL) 1129 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MONTICELLO 1130 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MONUMENT 57 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MOORE (MAURICE) 1050 SI Courts Misc. new backboards COMPLETE 2011
MOORE (MAURICE) 1050 AD Park Development Park development - including playground COMPLETE 2011
MOORE (MAURICE) 1050 AD New Construction Expansion and access improvements COMPLETE 2015
MORAN (TERRANCE) 1051 FR Roof Roof - rehab COMPLETE 2014
MORAN (TERRANCE) 1051 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
MORAN (TERRANCE) 1051 SI Playground Chicago Plays! - new equipment COMPLETE 2013
MORGAN (THOMAS LEEDS) FIELD 1132 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MOUNT GREENWOOD 251 SI Athletic Field Miracle Field - rehab COMPLETE 2016
MOUNT GREENWOOD 251 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2011
MOUNT GREENWOOD 251 FR Swimming Pool Pool - liner and gutter COMPLETE 2016
MOUNT GREENWOOD 251 FR Major Rehab Transition plan - access improvements COMPLETE 2011
MOUNT GREENWOOD 251 SI Site Improvement Outdoor fitness station - new COMPLETE 2016
MOUNT GREENWOOD 251 SI Playground Playground - fencing and mosaic COMPLETE 2017
MOUNT GREENWOOD 251 FR Minor Rehab Gym floor - rehab DESIGN
MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2017
MOUNT GREENWOOD 251 SI Athletic Field Athletic fields- drainage CONSTRUCTION
MOZART (AMADEUS) 128 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
MOZART (AMADEUS) 128 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MOZART (AMADEUS) 128 FR Roof Roof - rehab COMPLETE 2014
MULBERRY 1284 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MUNROE (ROY) 1052 SI Paving Paving - paths and drainage COMPLETE 2013
MUNROE (ROY) 1052 SI Playground Playground and spray feature - new CONSTRUCTION
MURRAY (DAVID) 1053 SI Courts Basketball court - new COMPLETE 2012
MURRAY (DAVID) 1053 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MURRAY (DAVID) 1053 FR Minor Rehab Bathroom - plumbing COMPLETE 2018
NASH (DON) COMM. CTR. 482 FR Fitness Center Fitness center - upgrade COMPLETE 2011
NASH (DON) COMM. CTR. 482 FR Roof Roof COMPLETE 2012
NASH (DON) COMM. CTR. 482 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
37 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
NASH (DON) COMM. CTR. 482 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
NASH (DON) COMM. CTR. 482 FR Windows and Doors Field house - doors COMPLETE 2013
NASH (DON) COMM. CTR. 482 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
NASH (DON) COMM. CTR. 482 SI Playground Park improvement COMPLETE 2017
NELSON (ANDREW) 1133 SI Playground Chicago Plays! - new equipment COMPLETE 2015
NICHOLS (JOHN FOUNTAIN) 277 SI Site Improvement Misc. fountain plumbing COMPLETE 2013
NICHOLS (JOHN FOUNTAIN) 277 SI Courts Tennis court - rehab COMPLETE 2016
NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kenwood Ave. COMPLETE 2016
NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kimbark Ave. COMPLETE 2016
NINEBARK 355 SI Playground Chicago Plays! - new equipment COMPLETE 2013
NINEBARK 355 SI Site Improvement Expansion - site improvements COMPLETE 2017
NOETHLING (GRACE) 425 SI Site Improvement Dog friendly area - improvements COMPLETE 2013
North Boundary 557 AD Acquisition Kedzie Ave. and Touhy Ave. COMPLETE 2011
North Boundary 557 SI Site Improvement Pathways and benches COMPLETE 2011
North Boundary 557 SI Lighting Lighting - exterior COMPLETE 2014
NORTH MAYFAIR 90 SI Playground Chicago Plays! - new equipment COMPLETE 2013
NORTH PARK VILLAGE NATURE CENTER 533 FR Minor Rehab Staff offices - new COMPLETE 2017
NORTHERLY ISLAND 34 FR Minor Rehab Solar charging station COMPLETE 2011
NORTHERLY ISLAND 34 FR Major Rehab Tent - major restoration COMPLETE 2016
NORTHERLY ISLAND 34 SI Fencing Misc. fencing COMPLETE 2011
NORTHERLY ISLAND 34 AD New Construction New Concert and Event Venue COMPLETE 2013
NORTHERLY ISLAND 34 AD Planning Framework plan COMPLETE 2011
NORTHERLY ISLAND 34 FR Roof Landscape yard - roof PRE-DESIGN
NORTHERLY ISLAND 34 SI Site Improvement Rotary Garden - benches COMPLETE 2015
NORTHERLY ISLAND 34 FR Roof Terminal - roof rehab PRE-DESIGN
NORTHERLY ISLAND 34 SI Paving Lynn White Dr. - curb and asphalt COMPLETE 2016
NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Landscape yard - boiler COMPLETE 2017
NORTHERLY ISLAND 34 SI Paving Adler Parking Lot - rehab COMPLETE 2017
NORTHERLY ISLAND 34 AD Park Development Park development - shoreline and natural area COMPLETE 2015
NORTHERLY ISLAND 34 SI Site Improvement Hamilton Exhibit - park improvements CONSTRUCTION
NORWOOD 141 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
NORWOOD 141 FR Roof Landscape yard - roof COMPLETE 2011
NORWOOD 141 SI Site Improvement Dog friendly area - new COMPLETE 2013
NORWOOD 141 FR Roof Roof COMPLETE 2013
NORWOOD 141 SI Site Improvement Misc. site drainage COMPLETE 2013
NORWOOD 141 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
NORWOOD 141 SI Playground Chicago Plays! - new equipment COMPLETE 2013
38 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
NORWOOD 141 FR Windows and Doors Field house - windows PRE-DESIGN
NORWOOD 141 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
NORWOOD 141 FR Swimming Pool Pool -deck COMPLETE 2016
NORWOOD 141 FR Swimming Pool Pool - liner PRE-DESIGN
NORWOOD 141 SI Site Improvement Bocce ball court - rehab COMPLETE 2017
NORWOOD 141 SI Paving Paving - pathways COMPLETE 2017
NORWOOD 141 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017
NORWOOD 141 SI Site Improvement Hockey rink - new COMPLETE 2018
OAKDALE 235 FR Minor Rehab Misc. hot water tank COMPLETE 2012
OAKDALE 235 FR HVAC and Energy Efficiency Park improvements CONSTRUCTION
OAKDALE 235 FR Minor Rehab Locker room - rehab COMPLETE 2015
OAKDALE 235 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
OAKDALE 235 FR Minor Rehab Misc. washrooms COMPLETE 2012
OAKDALE 235 SI Landscape Tree planting COMPLETE 2018
OAKDALE 235 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
OAKLEY 1137 SI Playground Chicago Plays! - new equipment COMPLETE 2015
OGDEN (WILLIAM) 8 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
OGDEN (WILLIAM) 8 FR Minor Rehab Access improvements COMPLETE 2011
OGDEN (WILLIAM) 8 SI Spray Pool Water play feature - rehab COMPLETE 2013
OGDEN (WILLIAM) 8 FR Fitness Center Fitness center - upgrade COMPLETE 2011
OGDEN (WILLIAM) 8 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
OGDEN (WILLIAM) 8 FR Roof Roof COMPLETE 2014
OGDEN (WILLIAM) 8 SI Athletic Field Artificial turf field and track - new DESIGN
OGDEN (WILLIAM) 8 FR Major Rehab Elevator COMPLETE 2012
OGDEN (WILLIAM) 8 FR Minor Rehab Misc. field house improvements COMPLETE 2016
OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2014
OGDEN (WILLIAM) 8 FR Swimming Pool Pool - liner PRE-DESIGN
OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2016
OGDEN (WILLIAM) 8 SI Site Improvement Park improvement COMPLETE 2016
OGDEN (WILLIAM) PLAZA 477 SI Site Improvement Park improvements PLANNING
O'HALLAREN (BERNARD) 1012 SI Courts Tennis court - conversion and rehab COMPLETE 2013
OHIO 1139 SI Playground Chicago Plays! - new equipment COMPLETE 2016
OHIO & HARDING 1138 SI Playground Chicago Plays! - new equipment COMPLETE 2013
OLYMPIA 60 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012
OLYMPIA 60 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
OLYMPIA 60 SI Playground Chicago Plays! - new equipment COMPLETE 2014
OLYMPIA 60 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
39 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
OLYMPIA 60 FR Roof Roof - new PRE-DESIGN
OLYMPIA 60 SI Athletic Field Athletic field - rehab COMPLETE 2013
ORIOLE 59 SI Athletic Field Athletic field - rehab COMPLETE 2014
ORIOLE 59 SI Lighting Lighting - ballfield COMPLETE 2011
ORIOLE 59 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ORIOLE 59 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ORIOLE 59 SI Playground Chicago Plays! - new equipment at Balmoral Ave. COMPLETE 2014
ORIOLE 59 SI Playground Chicago Plays! - new equipment at Gregory St. COMPLETE 2014
ORIOLE 59 FR Roof Misc. gutters and downspouts PRE-DESIGN
ORIOLE 59 SI Spray Pool Water play feature - surfacing COMPLETE 2016
ORIOLE 59 SI Paving Paving - pathways COMPLETE 2017
ORIOLE 59 SI Site Improvement Outdoor fitness station - new BID/AWARD
OWENS (JESSE) 237 FR HVAC and Energy Efficiency Boiler - automation system COMPLETE 2012
OWENS (JESSE) 237 SI Athletic Field Athletic field - study COMPLETE 2011
OWENS (JESSE) 237 FR Windows and Doors Windows - drainage PRE-DESIGN
OWENS (JESSE) 237 SI Athletic Field Ballfield - rehab COMPLETE 2015
OZ 423 SI Playground Playground - rehab including new surfacing COMPLETE 2015
OZ 423 SI Athletic Field Athletic field - rehab CONSTRUCTION
PACKINGTOWN 404 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PALMER (BERTHA HONORÉ) 520 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PALMER (JOHN MCAULEY) SQUARE 539 AD Acquisition Palmer Blvd. COMPLETE 2014
PALMER (JOHN MCAULEY) SQUARE 539 SI Landscape Tree planting COMPLETE 2018
PALMER (POTTER) 13 SI Athletic Field Ballfield - rehab COMPLETE 2011
PALMER (POTTER) 13 FR Windows and Doors Field house - windows and doors COMPLETE 2013
PALMER (POTTER) 13 FR Swimming Pool Pool - filter COMPLETE 2013
PALMER (POTTER) 13 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
PALMER (POTTER) 13 FR Roof Field house - roof COMPLETE 2015
PALMER (POTTER) 13 FR Minor Rehab Gym floor - rehab COMPLETE 2011
PALMER (POTTER) 13 SI Paving Track - asphalt and lane lines COMPLETE 2011
PALMER (POTTER) 13 SI Paving Paving - pathways COMPLETE 2012
PALMER (POTTER) 13 FR Fitness Center Fitness center - equipment COMPLETE 2011
PALMER (POTTER) 13 FR Fitness Center Fitness center - upgrade COMPLETE 2011
PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements COMPLETE 2012
PALMER (POTTER) 13 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements DESIGN
PALMER (POTTER) 13 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PALMER (POTTER) 13 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
40 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
PALMER (POTTER) 13 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015
PALMER (POTTER) 13 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2016
PALMER (POTTER) 13 SI Paving Paving - pathways COMPLETE 2017
PALMISANO (HENRY) 531 AD Acquisition Environmental monitoring ONGOING
PALMISANO (HENRY) 531 SI Fencing Misc. security fencing COMPLETE 2014
PALMISANO (HENRY) 531 SI Site Improvement Misc. circulation pond CONSTRUCTION
PALMISANO (HENRY) 531 SI Landscape Pollinator nature area - new DESIGN
PARK NO. 326 326 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 382 382 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 414 414 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 419 419 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 421 421 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 422 422 SI Lighting Lighting - exterior COMPLETE 2011
PARK NO. 422 422 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PARK NO. 432 432 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 437 437 SI Fencing Misc. perimeter fencing COMPLETE 2014
PARK NO. 468 468 SI Site Improvement Park improvements including fencing, signage COMPLETE 2018
PARK NO. 500 500 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
PARK NO. 500 500 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PARK NO. 512 512 FR Roof Landscape yard - roof COMPLETE 2011
PARK NO. 512 512 AD Park Development The 606 access park - park development COMPLETE 2012
PARK NO. 517 517 SI Lighting Lighting - exterior COMPLETE 2013
PARK NO. 527 527 AD Planning Trades relocation - study COMPLETE 2011
PARK NO. 527 527 FR Minor Rehab Candle Factory- emergency rehab COMPLETE 2017
PARK NO. 538 538 SI Landscape Natural area - new CONSTRUCTION
PARK NO. 540 540 AD Acquisition Federal St. and 24th St. COMPLETE 2014
PARK NO. 543 543 AD Acquisition Printers Row Park COMPLETE 2014
PARK NO. 543 543 SI Lighting Exterior lighting - upgrades COMPLETE 2018
PARK NO. 551 551 SI Site Improvement Park improvements COMPLETE 2018
PARK NO. 552 552 AD Acquisition 4901-09 W. Belmont Ave. COMPLETE 2014
PARK NO. 556 556 AD Acquisition Artesian Ave. and Western Ave. COMPLETE 2013
PARK NO. 556 556 AD Planning Artesian Ave. and Western Ave. - study COMPLETE 2011
PARK NO. 556 556 AD Park Development Park development - Artesian Ave. and Western Ave. COMPLETE 2015
PARK NO. 559 559 SI Site Improvement Park improvements PLANNING
PARK NO. 559 559 AD Acquisition 6151 N. Sheridan - acquisition COMPLETE 2011
PARK NO. 562 (MARIAN BYRNES) 562 AD Acquisition 1735-37 E. 96th St. COMPLETE 2012
PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Nature area - new COMPLETE 2015
41 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
PARK NO. 562 (MARIAN BYRNES) 562 SI Site Improvement Multi-use trail system - new CONSTRUCTION
PARK NO. 562 (MARIAN BYRNES) 562 AD Park Development Park Development - trails and wetland CONSTRUCTION
PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Habitat enhancement CONSTRUCTION
PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Costal woodland - restoration CONSTRUCTION
PARK NO. 562 (MARIAN BYRNES) 562 SI Landscape Wetland bird habitat - restoration CONSTRUCTION
PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - wetland restoration COMPLETE 2016
PARK NO. 564 (BIG MARSH) 564 AD Acquisition Big Marsh - expansion ACQUISITION
PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - trail improvements CONSTRUCTION
PARK NO. 564 (BIG MARSH) 564 AD Planning Habitat Plan - Big Marsh COMPLETE 2015
PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - water control structure COMPLETE 2015
PARK NO. 564 (BIG MARSH) 564 AD Park Development Big Marsh - Trail System DESIGN
PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - western access CONSTRUCTION
PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - upland habitat CONSTRUCTION
PARK NO. 564 (BIG MARSH) 564 AD Park Development Park Development - Big Marsh COMPLETE 2016
PARK NO. 564 (BIG MARSH) 564 AD New Construction Ford Calumet Environmental Center BID/AWARD
PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - habitat restoration CONSTRUCTION
PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Calumet Area - signage COMPLETE 2017
PARK NO. 564 (BIG MARSH) 564 SI Site Improvement Big Marsh - east side trail expansion CONSTRUCTION
PARK NO. 564 (BIG MARSH) 564 SI Landscape Big Marsh - hydrology and riparian habitat CONSTRUCTION
PARK NO. 565 565 SI Landscape Habitat restoration CONSTRUCTION
PARK NO. 565 565 AD Acquisition Indian Ridge - 116th St. and Torrence Ave. COMPLETE 2015
PARK NO. 565 565 AD Acquisition Indian Ridge - expansion ACQUISITION
PARK NO. 566 566 SI Landscape Natural area - new PRE-DESIGN
PARK NO. 566 566 AD Acquisition USX - 79th St. and Lake Michigan COMPLETE 2014
PARK NO. 566 566 SI Site Improvement Misc. access road COMPLETE 2014
PARK NO. 567 567 AD Acquisition The 606 access park - Milwaukee Ave. and Leavitt St. COMPLETE 2012
PARK NO. 567 567 SI Lighting Lighting - exterior COMPLETE 2012
PARK NO. 567 567 AD Park Development Bloomingdale Access - new park at Milwaukee Ave. and Leavitt St. COMPLETE 2013
PARK NO. 568 568 AD Acquisition Western Ave. and Peterson Ave. COMPLETE 2012
PARK NO. 568 568 AD Park Development Park development - West Ridge Nature Preserve COMPLETE 2015
PARK NO. 568 568 SI Playground Nature play area -new DESIGN
PARK NO. 569 569 AD Park Development Dog friendly area - Monroe St. and Loomis St. COMPLETE 2014
PARK NO. 569 569 AD Acquisition 1358 W. Monroe St. COMPLETE 2015
PARK NO. 571 571 AD New Construction New Chicago River Boat House COMPLETE 2016
PARK NO. 571 571 AD Acquisition Eleanor Street Park COMPLETE 2012
PARK NO. 571 571 SI Fencing Misc. site improvements COMPLETE 2014
PARK NO. 572 572 AD Park Development Bloomingdale Line - planning COMPLETE 2013
42 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
PARK NO. 572 572 AD Acquisition Bloomingdale Park and Trail - various sites COMPLETE 2014
PARK NO. 572 572 AD Park Development The 606- new park and trail development COMPLETE 2015
PARK NO. 573 573 AD Park Development Misc. new water source PRE-DESIGN
PARK NO. 573 573 AD Acquisition 114th St. and Champlain Ave. COMPLETE 2016
PARK NO. 574 574 AD Acquisition Jackson Blvd. and Maplewood Ave. COMPLETE 2015
PARK NO. 574 574 AD Park Development Park development - "Rockwell Gardens" COMPLETE 2014
PARK NO. 575 575 AD Acquisition Wacker Clover - Congress Pkwy. and Wells St. ACQUISITION
PARK NO. 575 575 AD Park Development Park development - Wacker Interchange COMPLETE 2012
PARK NO. 576 576 AD Acquisition Whitford Pond - 2113 E. 134th St. COMPLETE 2012
PARK NO. 576 576 AD Park Development Park Development - Whitford Pond PLANNING
PARK NO. 577 577 AD Acquisition 115th St. and Western Ave. COMPLETE 2014
PARK NO. 577 577 AD Park Development Morgan Park Sports Complex COMPLETE 2015
PARK NO. 578 578 AD Park Development Park development - Washington Blvd. and Wolcott Ave. COMPLETE 2016
PARK NO. 578 578 AD Acquisition New park - 1919 W. Maypole Ave. COMPLETE 2016
PARK NO. 579 579 AD Park Development The 606 access park - environmental assessment COMPLETE 2016
PARK NO. 580 580 AD Park Development New park development including artificial turf field CONSTRUCTION
PARK NO. 580 580 AD Acquisition 4139 N. Oak Park Ave. COMPLETE 2016
PARK NO. 581 581 AD Acquisition New park - 11625 S. Oakley Ave. COMPLETE 2016
PARK NO. 581 581 SI Athletic Field New Park Development - 116th St. and Oakley Ave. COMPLETE 2017
PARK NO. 582 582 AD Park Development New park -site improvements PRE-DESIGN
PARK NO. 582 582 AD Acquisition 9202-35 S. Vanderpoel Ave. - new park COMPLETE 2017
PARK NO. 583 583 AD Acquisition 10108 S. Exchange Ave. - new park COMPLETE 2017
PARK NO. 583 583 AD Park Development New park -site improvements PRE-DESIGN
PARK NO. 584 584 AD Park Development New park development PRE-DESIGN
PARK NO. 584 584 AD Acquisition 134 W. 119th St. - new park COMPLETE 2017
PARK NO. 585 585 AD Acquisition 6049 S. Whipple St. - new park COMPLETE 2017
PARK NO. 585 585 AD Park Development New park -site improvements PRE-DESIGN
PARK NO. 586 586 AD Acquisition 7208 S. Maplewood Ave. - new park COMPLETE 2017
PARK NO. 586 586 SI Fencing Fencing - perimeter PRE-DESIGN
PARK NO. 587 587 AD Acquisition 658 E. 95th St. - new park COMPLETE 2017
PARK NO. 587 587 AD Park Development Park improvements PRE-DESIGN
PARK NO. 588 588 AD Park Development New park with playground - with Kaboom COMPLETE 2018
PARK NO. 589 589 SI Fencing Fencing - perimeter PRE-DESIGN
PARK NO. 589 589 AD Acquisition 227 W. 110th Pl. ACQUISITION
PARK NO. 590 590 AD Park Development 3940 S. Indiana Ave. - new dog friendly area CONSTRUCTION
PARK NO. 591 591 AD Park Development 3906 S Lake Park Ave. - new dog friendly area BID/AWARD
PARK NO. 592 592 AD Park Development 4153 S. Vincennes Ave. - new dog friendly area BID/AWARD
43 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
PARK NO. 593 593 AD Acquisition 4546 N. Kedvale Ave. - new park ACQUISITION
PARK NO. 593 593 SI Site Improvement Park improvements PRE-DESIGN
PARK NO. 594 594 AD Park Development New park with dog friendly area PRE-DESIGN
PARK-VIEW 1056 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PARSONS (LUCY) 501 SI Playground Playground - expansion CONSTRUCTION
PASCHEN (CHRISTIAN) 1057 FR Concrete Masonry Structural Field house - tuckpointing PRE-DESIGN
PASCHEN (CHRISTIAN) 1057 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PASCHEN (CHRISTIAN) 1057 SI Fencing Fencing at basketball court COMPLETE 2016
PASTEUR (LOUIS) 247 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
PASTEUR (LOUIS) 247 SI Fencing Misc. fencing COMPLETE 2014
PASTEUR (LOUIS) 247 SI Playground Chicago Plays! - new equipment COMPLETE 2015
PASTEUR (LOUIS) 247 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018
PENDLETON (HADIYA) 339 AD Acquisition Expansion COMPLETE 2016
PENDLETON (HADIYA) 339 AD Park Development Park development - including playground COMPLETE 2016
PERIWINKLE 436 SI Playground Chicago Plays! - new equipment COMPLETE 2015
PETERSON (PEHR SAMUEL) 452 SI Playground Park improvement COMPLETE 2016
PETERSON (PEHR SAMUEL) 452 SI Paving Paving - paths COMPLETE 2012
PETERSON (PEHR SAMUEL) 452 FR Major Rehab Elevator - rehab COMPLETE 2012
PETERSON (PEHR SAMUEL) 452 FR Minor Rehab Field house - major rehab COMPLETE 2014
PETERSON (PEHR SAMUEL) 452 SI Courts Tennis court - rehab COMPLETE 2011
PETERSON (PEHR SAMUEL) 452 SI Playground Chicago Plays! - new equipment at Central Park Ave. COMPLETE 2016
PETERSON (PEHR SAMUEL) 452 SI Paving Parking lot - rehab COMPLETE 2018
PETERSON (PEHR SAMUEL) 452 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN
PIETROWSKI (SYLVESTER) 1058 SI Playground Chicago Plays! - new equipment COMPLETE 2015
PINE 1287 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
PIOTROWSKI (LILLIAN) 230 SI Site Improvement Misc. lighting and drinking fountain COMPLETE 2011
PIOTROWSKI (LILLIAN) 230 FR Major Rehab Transition plan - access improvements COMPLETE 2012
PIOTROWSKI (LILLIAN) 230 SI Lighting Lighting - athletic field and pathways COMPLETE 2015
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Swimming pool - dome COMPLETE 2014
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool - filter and controls COMPLETE 2017
PIOTROWSKI (LILLIAN) 230 SI Athletic Field Athletic field - rehab COMPLETE 2016
PIOTROWSKI (LILLIAN) 230 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2015
PIOTROWSKI (LILLIAN) 230 FR Concrete Masonry Structural Field house - masonry and roof COMPLETE 2017
PIOTROWSKI (LILLIAN) 230 FR Minor Rehab Pool Building - covered walkway COMPLETE 2017
PLEASANT POINT 140 SI Playground Playground - new COMPLETE 2014
POPLAR 323 SI Playground Chicago Plays! - new equipment COMPLETE 2016
44 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
PORTAGE 147 SI Paving Landscape yard - paving COMPLETE 2018
PORTAGE 147 FR Minor Rehab Field house - locker room improvements COMPLETE 2013
PORTAGE 147 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
PORTAGE 147 FR Roof Landscape yard - roof COMPLETE 2011
PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2016
PORTAGE 147 FR Roof Roof and skylight - rehab COMPLETE 2017
PORTAGE 147 SI Site Improvement Misc. scoreboard COMPLETE 2011
PORTAGE 147 FR Concrete Masonry Structural Field house and landscape building - masonry COMPLETE 2013
PORTAGE 147 FR Swimming Pool Deck - drainage improvements COMPLETE 2013
PORTAGE 147 FR Sculpture and Monument Misc. fountain planters COMPLETE 2014
PORTAGE 147 SI Site Improvement Misc. landscaping and drainage COMPLETE 2013
PORTAGE 147 FR Windows and Doors Landscape yard - doors COMPLETE 2014
PORTAGE 147 FR Minor Rehab Field house - gym and community room floors COMPLETE 2011
PORTAGE 147 FR Minor Rehab Facility rehab - minor COMPLETE 2013
PORTAGE 147 FR Concrete Masonry Structural Pool house - concrete and masonry COMPLETE 2013
PORTAGE 147 SI Site Improvement Dog friendly area - expansion COMPLETE 2013
PORTAGE 147 FR Minor Rehab Misc. Indoor pool stair renovation COMPLETE 2015
PORTAGE 147 SI Paving Paving - paths COMPLETE 2015
PORTAGE 147 SI Paving Paving - parking lot and pathways COMPLETE 2014
PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2015
PORTAGE 147 SI Athletic Field Athletic field - rehab COMPLETE 2011
PORTAGE 147 SI Spray Pool Water play feature - rehab COMPLETE 2017
PORTAGE 147 SI Paving Paving - pathways COMPLETE 2017
PORTAGE 147 SI Lighting Athletic field - lighting DESIGN
POTTAWATTOMIE 166 SI Site Improvement Dog friendly area - new COMPLETE 2011
POTTAWATTOMIE 166 FR Fitness Center Fitness center - new equipment COMPLETE 2011
POTTAWATTOMIE 166 FR Roof Roof PRE-DESIGN
POTTAWATTOMIE 166 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
POTTAWATTOMIE 166 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
POTTAWATTOMIE 166 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015
POTTAWATTOMIE 166 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013
POTTAWATTOMIE 166 SI Athletic Field Ballfield - rehab COMPLETE 2011
POTTAWATTOMIE 166 FR Minor Rehab Misc. drinking fountain COMPLETE 2016
PRAIRIE WOLF 329 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PRITZKER 541 AD Acquisition Pritzker Park COMPLETE 2011
PRIVET 375 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PULASKI (CASIMER) 217 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
45 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
PULASKI (CASIMER) 217 FR Concrete Masonry Structural Pool deck - rehab COMPLETE 2011
PULASKI (CASIMER) 217 SI Spray Pool Water play feature - rehab COMPLETE 2018
PULASKI (CASIMER) 217 FR Minor Rehab Field house - fire escape rehab COMPLETE 2012
PULASKI (CASIMER) 217 FR Minor Rehab Field house - rehab COMPLETE 2013
PULASKI (CASIMER) 217 FR Major Rehab Transition plan - access improvements PRE-DESIGN
PULASKI (CASIMER) 217 SI Athletic Field Ballfield - rehab COMPLETE 2015
PULASKI (CASIMER) 217 FR Minor Rehab Field house- interior COMPLETE 2014
PULASKI (CASIMER) 217 FR Swimming Pool Pool - filter PRE-DESIGN
PULASKI (CASIMER) 217 FR Swimming Pool Pool - miami tank COMPLETE 2018
RAILROAD JUNCTION 354 SI Playground Chicago Plays! - new equipment COMPLETE 2014
RAINBOW BEACH 1001 SI Site Improvement Lakefront Kiosk - installation COMPLETE 2017
RAINBOW BEACH 1001 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RAINBOW BEACH 1001 FR Minor Rehab Field house - water heaters DESIGN
RAINBOW BEACH 1001 FR Roof Roof COMPLETE 2012
RAINBOW BEACH 1001 SI Paving Paving - paths COMPLETE 2016
RAINBOW BEACH 1001 SI Site Improvement Water quality COMPLETE 2015
RAINBOW BEACH 1001 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
RAINBOW BEACH 1001 FR Minor Rehab Beach House - rehab COMPLETE 2014
RAINBOW BEACH 1001 SI Paving Paving - pathways COMPLETE 2016
RAINBOW BEACH 1001 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017
RAINBOW BEACH 1001 SI Landscape Tree planting COMPLETE 2018
RAINEY (EDWARD) 33 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RAINEY (EDWARD) 33 SI Courts Court conversion - Cruyff Court COMPLETE 2016
RAVENSWOOD MANOR 159 SI Playground Chicago Plays! - new equipment COMPLETE 2015
REVERE (PAUL) 185 FR Minor Rehab Misc. plumbing COMPLETE 2011
REVERE (PAUL) 185 SI Paving Pathways - walking track COMPLETE 2015
REVERE (PAUL) 185 SI Site Improvement Site improvements COMPLETE 2017
REVERE (PAUL) 185 FR Minor Rehab Misc. flooring DESIGN
REVERE (PAUL) 185 FR Minor Rehab Facility assessments COMPLETE 2018
REVERE (PAUL) 185 SI Athletic Field Athletic Field - rehab COMPLETE 2017
REVERE (PAUL) 185 FR Major Rehab Field House - major restoration PRE-DESIGN
REVERE (PAUL) 185 FR Major Rehab Boys and Girls Club - major restoration PRE-DESIGN
REYES (GUADALUPE) 352 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
RIDGE 175 SI Courts Park improvements including paving and lighting COMPLETE 2013
RIDGE 175 FR Minor Rehab Field house - lobby improvements COMPLETE 2014
RIDGE 175 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
RIDGE 175 SI Paving Site improvements - paving COMPLETE 2016
46 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
RIDGE 175 SI Paving Parking lot - rehab for accessibility COMPLETE 2013
RIDGE 175 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2015
RIDGE 175 SI Playground Chicago Plays! - new equipment COMPLETE 2013
RIDGE 175 FR Roof Field house and Ceramic Building - roof COMPLETE 2017
RIDGE 175 SI Athletic Field Athletic field - rehab COMPLETE 2014
RIDGE 175 FR Roof Ceramic Building - major rehab COMPLETE 2015
RIDGE 175 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
RIDGE 175 FR Swimming Pool Pool - filter COMPLETE 2016
RIDGE 175 FR Swimming Pool Pool - boiler CONSTRUCTION
RIDGE 175 FR Windows and Doors Field house - windows CONSTRUCTION
RIDGE 175 FR Major Rehab Field house - building assessment COMPLETE 2018
RIIS (JACOB) 123 SI Site Improvement Water service COMPLETE 2011
RIIS (JACOB) 123 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
RIIS (JACOB) 123 FR Minor Rehab Ice skating rink - rehab COMPLETE 2011
RIIS (JACOB) 123 SI Spray Pool Water play feature - surfacing COMPLETE 2012
RIIS (JACOB) 123 FR Roof Natatorium - roof COMPLETE 2014
RIIS (JACOB) 123 FR Roof Field house - roof PRE-DESIGN
RIIS (JACOB) 123 SI Playground Signature Playground - new COMPLETE 2014
RIIS (JACOB) 123 SI Paving Paving - paths and parking lot COMPLETE 2011
RIIS (JACOB) 123 SI Playground Playground - design COMPLETE 2013
RIIS (JACOB) 123 FR HVAC and Energy Efficiency Field house boiler - rehab COMPLETE 2016
RIIS (JACOB) 123 SI Courts Tennis court - rehab COMPLETE 2017
RIIS (JACOB) 123 SI Site Improvement Track - rehab COMPLETE 2017
RIIS (JACOB) 123 FR Swimming Pool Filter - motor and pump COMPLETE 2017
RIIS (JACOB) 123 SI Spray Pool Water play feature - major rehab PRE-DESIGN
RIVER 186 SI Spray Pool Water play feature - rehab COMPLETE 2011
RIVER 186 FR Roof Field house - roof and tuckpointing BID/AWARD
RIVER 186 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
RIVER 186 AD New Construction New Chicago River Boat House COMPLETE 2014
RIVER 186 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
RIVER 186 FR Swimming Pool Pool - drainage COMPLETE 2015
RIVER 186 SI Site Improvement Ballfield - major restorations (CDOT) COMPLETE 2018
RIVER 186 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2013
RIVER 186 FR Swimming Pool Pool - rehab COMPLETE 2018
RIVER 186 SI Courts Tennis court - rehab COMPLETE 2018
ROBERTS (DANIEL) SQUARE 95 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ROBICHAUX (JOSEPH) 320 FR Major Rehab Field house - major rehab CONSTRUCTION
47 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
ROBICHAUX (JOSEPH) 320 FR HVAC and Energy Efficiency HVAC - new roof units CONSTRUCTION
ROBICHAUX (JOSEPH) 320 SI Playground Chicago Plays! - new equipment COMPLETE 2015
ROBICHAUX (JOSEPH) 320 SI Courts Basketball court - rehab COMPLETE 2016
ROBINSON (JACKIE) 236 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
ROBINSON (JACKIE) 236 SI Playground Playground - new COMPLETE 2014
ROBINSON (JACKIE) 236 FR Minor Rehab Field house - improvements PRE-DESIGN
ROGERS (PHILLIP) 240 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2012
ROGERS (PHILLIP) 240 SI Paving Paving - pathways COMPLETE 2016
ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2016
ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Misc. site improvements COMPLETE 2016
ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Site restoration COMPLETE 2018
RONAN (GEORGE) 275 AD Acquisition Expansion ACQUISITION
RONAN (GEORGE) 275 SI Landscape Riverbank - habitat restoration COMPLETE 2015
RONAN (GEORGE) 275 SI Playground Chicago Plays! - new equipment COMPLETE 2014
RONAN (GEORGE) 275 SI Landscape Tree planting COMPLETE 2018
ROSEDALE 91 FR Roof Roof COMPLETE 2012
ROSEDALE 91 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ROSENBLUM (J. LESLIE) 231 AD Park Development Park development - including artificial turf field COMPLETE 2012
ROWAN (WILLIAM) 248 FR Minor Rehab Field house - locker room improvements COMPLETE 2014
ROWAN (WILLIAM) 248 SI Fencing Fencing - ballfield COMPLETE 2011
ROWAN (WILLIAM) 248 FR HVAC and Energy Efficiency Misc. HVAC improvement COMPLETE 2014
ROWAN (WILLIAM) 248 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ROWAN (WILLIAM) 248 SI Athletic Field Athletic fields - rehab DESIGN
ROWAN (WILLIAM) 248 SI Paving Paving - pathways COMPLETE 2017
RUIZ (IRMA C.) 1278 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RUIZ (IRMA C.) 1278 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018
RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Field house - exterior wall COMPLETE 2017
RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2016
RUSSELL (MARTIN) SQUARE 6 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017
RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
RUSSELL (MARTIN) SQUARE 6 SI Playground Playground - surfacing COMPLETE 2011
RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - plumbing COMPLETE 2015
RUSSELL (MARTIN) SQUARE 6 SI Landscape Tree planting COMPLETE 2018
RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Gym floor - rehab COMPLETE 2012
RUSSELL (MARTIN) SQUARE 6 FR Fitness Center Fitness center - new equipment COMPLETE 2012
RUSSELL (MARTIN) SQUARE 6 FR Windows and Doors Field house - windows and doors COMPLETE 2011
48 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
RUSSELL (MARTIN) SQUARE 6 SI Courts Tennis court - conversion to artificial turf COMPLETE 2016
RUSSELL (MARTIN) SQUARE 6 SI Paving Paving - pathways COMPLETE 2016
RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - masonry COMPLETE 2011
RUTHERFORD SAYRE 127 SI Site Improvement Misc. flag pole COMPLETE 2016
RUTHERFORD SAYRE 127 SI Paving Paving COMPLETE 2012
RUTHERFORD SAYRE 127 SI Courts Court - improvements COMPLETE 2012
RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - concrete COMPLETE 2014
RUTHERFORD SAYRE 127 SI Lighting Lighting - exterior COMPLETE 2013
RUTHERFORD SAYRE 127 SI Site Improvement Outdoor fitness station - new COMPLETE 2018
SACRAMENTO 1147 SI Lighting Lighting - playground - upgrade COMPLETE 2011
SACRAMENTO 1147 SI Playground Chicago Plays! - new equipment COMPLETE 2013
SAINT LOUIS 1149 SI Site Improvement Misc. drainage improvement COMPLETE 2011
SAINT LOUIS 1149 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SAUGANASH 195 FR Minor Rehab Misc. radiator covers COMPLETE 2012
SAUGANASH 195 SI Site Improvement Outdoor fitness station - new COMPLETE 2016
SAUGANASH 195 SI Courts Tennis courts - rehab and conversion COMPLETE 2016
SCHAEFER (EDWARD) 1148 SI Playground Chicago Plays! - new equipment COMPLETE 2014
Schafer (Clara D.) 503 AD Acquisition 8900 S. Green Bay Ave. ACQUISITION
Schafer (Clara D.) 503 AD Park Development Site environmental and landscape COMPLETE 2012
Schafer (Clara D.) 503 AD Park Development Park development COMPLETE 2014
SCHREIBER 1061 SI Site Improvement Landscape and site improvement COMPLETE 2011
SCHREIBER 1061 SI Playground Playground - new with water feature COMPLETE 2011
SCHREIBER 1061 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
SCHREIBER 1061 FR Roof Roof PRE-DESIGN
SCOTTSDALE 265 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SENECA 1242 FR Sculpture and Monument "Ben" - restoration COMPLETE 2012
SENECA 1242 AD Park Development Park improvements including playground DESIGN
SENKA (EDWARD "DUKE") 309 SI Fencing Misc. perimeter fencing COMPLETE 2012
SENKA (EDWARD "DUKE") 309 SI Spray Pool Water play feature - surfacing COMPLETE 2012
SENKA (EDWARD "DUKE") 309 SI Site Improvement Park improvements including pathways, lighting, courts COMPLETE 2013
SENKA (EDWARD "DUKE") 309 SI Playground Playground - surfacing COMPLETE 2018
SENN (NICHOLAS) 227 SI Playground Playground and spray feature - new COMPLETE 2017
SENN (NICHOLAS) 227 SI Site Improvement Misc. kiosk CONSTRUCTION
SEWARD (WILLIAM) 108 FR Minor Rehab Field house - lobby improvements COMPLETE 2013
SEWARD (WILLIAM) 108 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
SEWARD (WILLIAM) 108 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
SEWARD (WILLIAM) 108 FR Major Rehab Field house - major rehab DESIGN
49 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
SEWARD (WILLIAM) 108 SI Athletic Field Ballfield - rehab COMPLETE 2015
SEWARD (WILLIAM) 108 SI Courts Basketball court - drainage COMPLETE 2017
SHABBONA 148 FR Swimming Pool Pool retrofit - compliance COMPLETE 2011
SHABBONA 148 SI Paving Paving - accessibility COMPLETE 2011
SHABBONA 148 SI Playground Playground with water feature- new COMPLETE 2013
SHABBONA 148 FR Swimming Pool Misc. restoration COMPLETE 2014
SHABBONA 148 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
SHABBONA 148 FR Minor Rehab Misc. Stair renovation COMPLETE 2015
SHABBONA 148 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2014
SHABBONA 148 FR Roof Roof and drainage COMPLETE 2014
SHABBONA 148 FR HVAC and Energy Efficiency Boiler - tubes DESIGN
SHABBONA 148 FR Swimming Pool Pool - ladders COMPLETE 2017
SHABBONA 148 SI Paving Paving - pathways COMPLETE 2018
SHEDD (JOHN G.) 212 SI Courts Basketball court and pathway - surfacing COMPLETE 2013
SHEDD (JOHN G.) 212 SI Fencing Fencing - ballfield COMPLETE 2011
SHEDD (JOHN G.) 212 FR Minor Rehab Gym floor - rehab COMPLETE 2013
SHEDD (JOHN G.) 212 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
SHEDD (JOHN G.) 212 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SHEIL (BERNARD) COMM. CTR. 398 FR Concrete Masonry Structural Field house - masonry and lintels PRE-DESIGN
SHEIL (BERNARD) COMM. CTR. 398 FR Minor Rehab Access improvements - entrance, lobby, bathrooms COMPLETE 2015
SHEIL (BERNARD) COMM. CTR. 398 FR HVAC and Energy Efficiency HVAC - new system COMPLETE 2017
SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Artificial turf baseball and multipurpose field - new COMPLETE 2011
SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012
SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
SHERIDAN (PHILIP HENRY) 205 FR Fitness Center Fitness center - new COMPLETE 2013
SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Field house - windows, doors, tuckpointing COMPLETE 2014
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - new boiler COMPLETE 2012
SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Paving - concrete COMPLETE 2017
SHERIDAN (PHILIP HENRY) 205 SI Courts Court conversion to inline hockey COMPLETE 2015
SHERMAN (JOHN) 7 FR Minor Rehab Field house - kitchen COMPLETE 2013
SHERMAN (JOHN) 7 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
SHERMAN (JOHN) 7 SI Site Improvement Misc. water main COMPLETE 2012
SHERMAN (JOHN) 7 FR Swimming Pool Pool - liner, filter, water line COMPLETE 2015
SHERMAN (JOHN) 7 FR Major Rehab Field house - major rehab DESIGN
50 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
SHERMAN (JOHN) 7 FR Minor Rehab Gym and auditorium floors - rehab COMPLETE 2016
SHERMAN (JOHN) 7 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011
SHERMAN (JOHN) 7 FR Concrete Masonry Structural Gym - walls COMPLETE 2011
SHERMAN (JOHN) 7 FR Roof Gym - roof COMPLETE 2012
SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SHERMAN (JOHN) 7 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
SHERMAN (JOHN) 7 SI Athletic Field Athletic field - rehab DESIGN
SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - kitchen COMPLETE 2013
SHERWOOD (JESSE) 1014 FR Roof Misc. roof BID/AWARD
SHERWOOD (JESSE) 1014 SI Spray Pool Water play feature - surfacing COMPLETE 2012
SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - locker room improvements COMPLETE 2015
SIMONS (ALMIRA) 124 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SINTIC (GREGORY) 1155 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SKINNER (MARK) 211 SI Athletic Field Athletic field - rehab COMPLETE 2017
SKINNER (MARK) 211 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
SKINNER (MARK) 211 SI Landscape Community garden COMPLETE 2015
SKINNER (MARK) 211 SI Site Improvement Park improvements including playground, garden, and dfa COMPLETE 2014
SKINNER (MARK) 211 AD New Construction Field House - feasibility study PLANNING
SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Misc. pool benches and tables COMPLETE 2013
SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool - liner COMPLETE 2018
SMITH (JOSEPH HIGGINS) 1015 SI Athletic Field Athletic field - rehab COMPLETE 2012
SMITH (JOSEPH HIGGINS) 1015 SI Courts Tennis court - rehab and drainage COMPLETE 2012
SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Walkway - new COMPLETE 2012
SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Misc. interior bleachers COMPLETE 2012
SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Field House and Pool building - access improvements COMPLETE 2017
SMITH (JOSEPH HIGGINS) 1015 FR Concrete Masonry Structural Ceramic Building - major rehab COMPLETE 2013
SMITH (WENDELL) 272 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SNAPPING TURTLE 396 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SNOWBERRY 389 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SOUTH LAKEVIEW 290 SI Fencing Fencing - rehab COMPLETE 2013
SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Field house - interior painting COMPLETE 2013
SOUTH SHORE CULTL. CTR. 429 FR Major Rehab Major rehab - exterior COMPLETE 2012
SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Misc. environmental COMPLETE 2011
SOUTH SHORE CULTL. CTR. 429 FR Major Rehab Major Rehab - interior CONSTRUCTION
SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Auditorium floor - rehab or replace COMPLETE 2012
51 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
SOUTH SHORE CULTL. CTR. 429 FR Concrete Masonry Structural Misc. entrance column restoration COMPLETE 2015
SOUTH SHORE CULTL. CTR. 429 FR HVAC and Energy Efficiency Misc. HVAC rehabs COMPLETE 2014
SOUTH SHORE CULTL. CTR. 429 SI Site Improvement Lakefront Trail Separation - 67th St. to 71st St. CONSTRUCTION
SOUTH SHORE CULTL. CTR. 429 SI Paving Entrance rehab COMPLETE 2018
SOUTH SHORE CULTL. CTR. 429 FR Minor Rehab Access - chair lift CONSTRUCTION
SOUTH SHORE CULTL. CTR. 429 FR HVAC and Energy Efficiency Air handler - new CONSTRUCTION
SOUTH SHORE CULTL. CTR. 429 AD Park Development Golf Course - major renovation DESIGN
SPIKINGS FARM 424 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SPRUCE 280 SI Playground Chicago Plays! - new equipment COMPLETE 2015
STANTON (EDWIN) 109 FR Swimming Pool Pool retrofit -compliance and filter COMPLETE 2011
STANTON (EDWIN) 109 FR Major Rehab Major rehab - interior COMPLETE 2012
STANTON (EDWIN) 109 FR Major Rehab Major rehab - exterior COMPLETE 2013
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency Field house - dehumidifier COMPLETE 2014
STANTON (EDWIN) 109 AD Park Development Park development COMPLETE 2012
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2013
STANTON (EDWIN) 109 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2015
STANTON (EDWIN) 109 SI Playground Playground and spray feature - new COMPLETE 2017
STARR (ELLEN GATES) 497 AD Park Development Park Development including playground COMPLETE 2016
STARS & STRIPES 370 SI Playground Playground - new COMPLETE 2014
STARS & STRIPES 370 SI Athletic Field Ballfield - fencing COMPLETE 2015
STARS & STRIPES 370 SI Athletic Field Artificial turf - diamond infield COMPLETE 2017
Steelworkers 523 FR Sculpture and Monument Steelworker sculpture - new COMPLETE 2015
Steelworkers 523 AD Park Development USX site - Phase II - Lake Peoria Sediment Muds to Parks COMPLETE 2014
Steelworkers 523 AD Park Development Park Development CONSTRUCTION
Steelworkers 523 SI Landscape Natural area - restoration DESIGN
Steelworkers 523 AD Planning Concept planning COMPLETE 2015
STONE (BERNARD) 526 SI Site Improvement Park development - passive park along Chicago River COMPLETE 2017
STOUT (FLORENCE) 291 SI Playground Chicago Plays! - new equipment COMPLETE 2016
STROHACKER (HOWARD) 1016 SI Playground Chicago Plays! - new equipment at Kolin Ave. COMPLETE 2014
STROHACKER (HOWARD) 1016 SI Spray Pool Water play feature - rehab CONSTRUCTION
SUMAC 1273 AD Acquisition Expansion COMPLETE 2012
SUMAC 1273 SI Fencing Site Improvements - expansion parcel DESIGN
SUMAC 1273 SI Playground Playground - new COMPLETE 2012
52 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
SUMMERDALE 1151 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SUN YAT-SEN 451 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SUPERIOR 1150 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SWEET CLOVER 430 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SYCAMORE 1274 SI Playground Chicago Plays! - new equipment COMPLETE 2014
TAYLOR (ROBERT ROCHON) 271 SI Courts Basketball court - rehab BID/AWARD
TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Misc. washrooms COMPLETE 2013
TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 SI Lighting Lighting - interior gym COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Gym floor - rehab COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 SI Athletic Field Ballfield - rehab COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool - rehab COMPLETE 2016
TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Athletic Field Athletic field - rehab COMPLETE 2015
TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Site Improvement Parking lot - accessibility COMPLETE 2017
THE GROVE 397 SI Playground Chicago Plays! - new equipment COMPLETE 2014
THROOP (AMOS GAGER) 1159 SI Spray Pool Water play feature - rehab COMPLETE 2011
THROOP (AMOS GAGER) 1159 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
THROOP (AMOS GAGER) 1159 SI Playground Chicago Plays! - new equipment COMPLETE 2014
THUIS (GRACE ZWIEFKA) 1119 AD Acquisition Expansion COMPLETE 2012
THUIS (GRACE ZWIEFKA) 1119 SI Playground Chicago Plays! - new equipment COMPLETE 2014
TILL-MOBLEY (MAMIE) 1154 AD Acquisition Expansion COMPLETE 2014
TILL-MOBLEY (MAMIE) 1154 SI Playground Chicago Plays! - new equipment COMPLETE 2016
TILTON (GEORGE) 1064 SI Playground Playground - surfacing COMPLETE 2012
TILTON (GEORGE) 1064 FR Major Rehab Camelot School - joint use facility COMPLETE 2016
TILTON (GEORGE) 1064 FR Minor Rehab Building demolition COMPLETE 2017
TOM (PING) MEML. 481 AD Park Development Park development - shoreline and athletic field COMPLETE 2011
TOM (PING) MEML. 481 SI Playground Playground - surfacing COMPLETE 2013
TOM (PING) MEML. 481 AD New Construction New Chicago River Boat House COMPLETE 2013
TOM (PING) MEML. 481 AD New Construction New Field house COMPLETE 2013
TOM (PING) MEML. 481 FR Minor Rehab Pavillion - roof PRE-DESIGN
TOM (PING) MEML. 481 SI Athletic Field Ballfield - rehab COMPLETE 2014
TOUHY (PATRICK) 246 SI Playground Playground - new COMPLETE 2013
TOUHY (PATRICK) 246 FR Minor Rehab Field house - rehab COMPLETE 2017
TOUHY (PATRICK) 246 SI Site Improvement Misc. drinking fountain and trees COMPLETE 2014
TOUHY (PATRICK) 246 SI Athletic Field Athletic field - rehab COMPLETE 2016
TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Playground Chicago Plays! - new equipment COMPLETE 2016
53 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
TOUHY-HERBERT (JOHN, VICTOR) 1065 AD Planning Framework Plan COMPLETE 2018
TREBES (ROBERT) 1017 SI Site Improvement Park drainage COMPLETE 2018
TRIANGLE 518 SI Landscape Tree planting COMPLETE 2018
TRUMBULL (LYMAN) 16 FR Concrete Masonry Structural Chimney COMPLETE 2013
TRUMBULL (LYMAN) 16 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
TRUMBULL (LYMAN) 16 FR Roof Power house - roof COMPLETE 2011
TRUMBULL (LYMAN) 16 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
TRUMBULL (LYMAN) 16 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
TRUMBULL (LYMAN) 16 FR Swimming Pool Pool - liner and controls COMPLETE 2018
TRUMBULL (LYMAN) 16 SI Playground Chicago Plays! - new equipment COMPLETE 2016
TULEY (MURRAY) 18 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
TULEY (MURRAY) 18 FR Concrete Masonry Structural Concrete and structural - stairs COMPLETE 2011
TULEY (MURRAY) 18 SI Site Improvement Misc. bollards COMPLETE 2011
TULEY (MURRAY) 18 FR Concrete Masonry Structural Field house - foundation restoration PRE-DESIGN
TULEY (MURRAY) 18 FR Minor Rehab Field house - assessment COMPLETE 2014
TULEY (MURRAY) 18 SI Fencing Tennis court - fencing rehab COMPLETE 2015
TULEY (MURRAY) 18 FR Swimming Pool Pool - controls COMPLETE 2016
TULEY (MURRAY) 18 SI Courts Tennis court - rehab COMPLETE 2017
TULEY (MURRAY) 18 FR Sculpture and Monument Field house - decorative scroll rehab PRE-DESIGN
TULEY (MURRAY) 18 SI Athletic Field Athletic field - batting cage COMPLETE 2016
TULEY (MURRAY) 18 FR Roof Roof - new PRE-DESIGN
UNION 210 SI Lighting Lighting - interior - upgrade COMPLETE 2011
UNION 210 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
UNION 210 FR Swimming Pool Pool - filter COMPLETE 2012
UNION 210 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
UNION 210 FR Minor Rehab Landscape yard - rehab COMPLETE 2013
UNION 210 FR Roof Gym - roof COMPLETE 2011
UNION 210 FR Fitness Center Fitness center - upgrade COMPLETE 2011
UNION 210 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
UNION 210 SI Playground Playground with water feature - new COMPLETE 2012
UNION 210 FR Major Rehab Field house and pool house - major rehab COMPLETE 2015
UNION 210 FR Concrete Masonry Structural Field house - drainage improvements BID/AWARD
UNION 210 FR Swimming Pool Pool - rehab COMPLETE 2016
UNITY 293 SI Playground Chicago Plays! - new equipment COMPLETE 2013
UNITY 293 SI Site Improvement Misc. gazebo and flower beds COMPLETE 2017
VALLEY FORGE 371 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
VALLEY FORGE 371 SI Site Improvement Misc. flag pole COMPLETE 2014
54 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
VALLEY FORGE 371 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
VIOLET 361 SI Playground Chicago Plays! - new equipment COMPLETE 2016
VITTUM (HARRIET ELIZABETH) 233 FR Minor Rehab Elevator - rehab COMPLETE 2013
VITTUM (HARRIET ELIZABETH) 233 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
VITTUM (HARRIET ELIZABETH) 233 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015
VITTUM (HARRIET ELIZABETH) 233 SI Paving Paving - pathways COMPLETE 2016
VITTUM (HARRIET ELIZABETH) 233 SI Site Improvement Misc. water main COMPLETE 2016
VITTUM (HARRIET ELIZABETH) 233 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2016
VOGLE (HENRY JR.) 402 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WAGNER (CLARENCE) 1068 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WALLACE 1069 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WALSH (JOHN) 393 AD Park Development The 606 access park - park development DESIGN
WANG (CHI CHE) 522 SI Athletic Field Athletic field - rehab COMPLETE 2016
WARD (A. MONTGOMERY) 511 SI Playground Playground - expansion COMPLETE 2012
WARD (A. MONTGOMERY) 511 SI Site Improvement Dog friendly area - rehab COMPLETE 2014
WARD (A. MONTGOMERY) 511 AD Park Development Site and Facility Improvements COMPLETE 2012
WARD (A. MONTGOMERY) 511 SI Paving Misc. site improvement COMPLETE 2016
WARD (A. MONTGOMERY) 511 SI Lighting Dog friendly area - lighting COMPLETE 2018
WARREN (LAURENCE) 428 SI Paving Parking lot - drainage improvements COMPLETE 2011
WARREN (LAURENCE) 428 SI Courts Tennis court - rehab COMPLETE 2011
WARREN (LAURENCE) 428 FR Roof Gym - roof COMPLETE 2012
WARREN (LAURENCE) 428 SI Site Improvement Golf Course - drainage improvements COMPLETE 2013
WARREN (LAURENCE) 428 SI Fencing Misc. fencing and gates COMPLETE 2014
WARREN (LAURENCE) 428 SI Site Improvement Misc. Cricket Pitch COMPLETE 2014
WARREN (LAURENCE) 428 FR Roof Roof - rehab COMPLETE 2012
WARREN (LAURENCE) 428 FR Minor Rehab Misc. ice rink rehab COMPLETE 2013
WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment at Seeley Ave. COMPLETE 2014
WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment at Claremont Ave. COMPLETE 2014
WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment at Pratt Blvd. COMPLETE 2014
WARREN (LAURENCE) 428 FR Concrete Masonry Structural Field house - tuckpointing DESIGN
WARREN (LAURENCE) 428 SI Paving Parking lot COMPLETE 2017
WARREN (LAURENCE) 428 FR Minor Rehab Field house - water damage rehab COMPLETE 2017
WARREN (LAURENCE) 428 SI Athletic Field Athletic field - rehab CONSTRUCTION
WARREN (LAURENCE) 428 SI Site Improvement Outdoor fitness station - new CONSTRUCTION
WARREN (LAURENCE) 428 SI Athletic Field Athletic field - lighting COMPLETE 2017
WARREN (LAURENCE) 428 SI Paving Pathways COMPLETE 2017
WASHINGTON (DINAH) 388 SI Playground Chicago Plays! - new equipment COMPLETE 2015
55 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
WASHINGTON (GEORGE) 21 FR Minor Rehab Misc. gym bleachers COMPLETE 2012
WASHINGTON (GEORGE) 21 FR Minor Rehab Field house - locker room improvements COMPLETE 2013
WASHINGTON (GEORGE) 21 SI Fencing Fencing - Bynum Island COMPLETE 2011
WASHINGTON (GEORGE) 21 SI Lighting Lighting - exterior COMPLETE 2012
WASHINGTON (GEORGE) 21 FR Major Rehab DuSable Museum - Roundhouse Building COMPLETE 2011
WASHINGTON (GEORGE) 21 FR Major Rehab Swiss Chalet - feasibility study COMPLETE 2011
WASHINGTON (GEORGE) 21 SI Fencing Fencing - Green Youth Farm COMPLETE 2011
WASHINGTON (GEORGE) 21 FR Minor Rehab Trades Yard - rehab CONSTRUCTION
WASHINGTON (GEORGE) 21 FR Swimming Pool Pool - liner and gutter COMPLETE 2017
WASHINGTON (GEORGE) 21 SI Lighting Lighting - athletic field COMPLETE 2016
WASHINGTON (GEORGE) 21 FR Concrete Masonry Structural Pool Bleachers - concrete rehab BID/AWARD
WASHINGTON (GEORGE) 21 SI Site Improvement Water service COMPLETE 2015
WASHINGTON (GEORGE) 21 SI Site Improvement Misc. Allison Davis Garden - rehab COMPLETE 2014
WASHINGTON (GEORGE) 21 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WASHINGTON (GEORGE) 21 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WASHINGTON (GEORGE) 21 SI Athletic Field Ballfield - rehab COMPLETE 2014
WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab COMPLETE 2012
WASHINGTON (GEORGE) 21 FR Minor Rehab Lockers - new DESIGN
WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment at 54th St. COMPLETE 2016
WASHINGTON (GEORGE) 21 SI Site Improvement DuSable Museum - plaza improvements COMPLETE 2017
WASHINGTON (HAROLD) 494 SI Spray Pool Water play feature - rehab COMPLETE 2011
WASHINGTON (HAROLD) 494 SI Playground Chicago Plays! - new equipment COMPLETE 2014
WASHINGTON (HAROLD) 494 SI Courts Tennis court - rehab COMPLETE 2017
WASHINGTON (HAROLD) 494 SI Paving Paving - pathways COMPLETE 2016
WASHINGTON (HAROLD) MEM. 506 SI Fencing Misc. gates COMPLETE 2015
WASHINGTON SQUARE 1244 SI Site Improvement Park improvements CONSTRUCTION
WASHTENAW 1070 SI Paving Lighting - exterior COMPLETE 2012
WASHTENAW 1070 SI Playground Chicago Plays! - new equipment COMPLETE 2013
WASHTENAW 1070 SI Athletic Field Athletic Field - rehab COMPLETE 2016
WEBSTER (DANIEL) 513 SI Site Improvement Site improvements COMPLETE 2017
WEISMAN (ALBERT) 1135 SI Paving Misc. concrete curb COMPLETE 2014
WELLES (GIDEON) 110 FR Minor Rehab Field house - lobby improvements COMPLETE 2012
WELLES (GIDEON) 110 SI Playground Nature Play Area COMPLETE 2018
WELLES (GIDEON) 110 FR Minor Rehab Pool house - rehab COMPLETE 2013
WELLES (GIDEON) 110 FR Fitness Center Fitness center - upgrade COMPLETE 2011
WELLES (GIDEON) 110 FR Major Rehab Transition plan - access improvements COMPLETE 2012
56 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
WELLES (GIDEON) 110 FR Minor Rehab Locker rooms - rehab COMPLETE 2015
WELLES (GIDEON) 110 FR Fitness Center Misc. new equipment COMPLETE 2013
WELLES (GIDEON) 110 SI Courts Tennis court - rehab COMPLETE 2015
WELLES (GIDEON) 110 FR Concrete Masonry Structural Gym Building - drainage improvements COMPLETE 2016
WELLES (GIDEON) 110 FR Roof Roof COMPLETE 2017
WELLES (GIDEON) 110 SI Playground Playground - expansion COMPLETE 2015
WELLES (GIDEON) 110 FR Swimming Pool Pool - filter system COMPLETE 2015
WELLES (GIDEON) 110 SI Paving Paving - pathways COMPLETE 2017
WELLES (GIDEON) 110 SI Athletic Field Athletic field - scoreboard COMPLETE 2017
WENDT (KENNETH) 1145 SI Playground Chicago Plays! - new equipment COMPLETE 2013
WENTWORTH (JOHN) 238 FR Minor Rehab Landscape building - minor rehab COMPLETE 2014
WENTWORTH (JOHN) 238 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WENTWORTH (JOHN) 238 SI Site Improvement Ice rink - new COMPLETE 2013
WENTWORTH (JOHN) 238 FR Concrete Masonry Structural Misc. entrance improvements COMPLETE 2016
WENTWORTH (JOHN) 238 SI Athletic Field Ballfield - rehab COMPLETE 2015
WENTWORTH (JOHN) 238 SI Paving Parking lot COMPLETE 2018
WENTWORTH (JOHN) 238 SI Athletic Field Artificial turf - diamond infield COMPLETE 2017
WENTWORTH (JOHN) 238 SI Paving Pathways COMPLETE 2018
WENTWORTH (JOHN) 238 SI Athletic Field Scoreboard - new COMPLETE 2018
WENTWORTH (JOHN) GARDENS 286 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
WESOLEK (MARLENE) 1080 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WEST CHATHAM 249 SI Fencing Fencing - ballfield COMPLETE 2011
WEST CHATHAM 249 SI Courts Basketball court - rehab COMPLETE 2012
WEST CHATHAM 249 SI Athletic Field Artificial turf field - football and baseball COMPLETE 2018
WEST CHATHAM 249 SI Playground Chicago Plays! - new equipment COMPLETE 2014
WEST CHATHAM 249 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WEST CHATHAM 249 SI Fencing Misc. fencing COMPLETE 2011
WEST CHATHAM 249 SI Spray Pool Water play feature - rehab COMPLETE 2018
WEST LAWN 245 FR Concrete Masonry Structural Field house - parapet walls, drainage, interior restoration COMPLETE 2015
WEST LAWN 245 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013
WEST LAWN 245 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
WEST LAWN 245 FR Fitness Center Fitness center - upgrade COMPLETE 2011
WEST LAWN 245 FR Major Rehab Transition plan - access improvements COMPLETE 2011
WEST LAWN 245 FR Minor Rehab Misc. access improvements COMPLETE 2011
WEST LAWN 245 SI Lighting Athletic field - lighting COMPLETE 2015
WEST LAWN 245 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WEST LAWN 245 SI Site Improvement Misc. water main COMPLETE 2015
57 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
WEST LAWN 245 SI Paving Parking lot - rehab COMPLETE 2018
WEST LAWN 245 SI Courts Mini-Pitch Soccer Court - new CONSTRUCTION
WEST LAWN 245 SI Paving Paving - pathways COMPLETE 2016
WEST PULLMAN 225 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
WEST PULLMAN 225 FR Minor Rehab Misc. bleachers COMPLETE 2013
WEST PULLMAN 225 FR Swimming Pool Pool - filter and liner COMPLETE 2014
WEST PULLMAN 225 FR Major Rehab Transition plan - access improvements COMPLETE 2012
WEST PULLMAN 225 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
WEST PULLMAN 225 FR Minor Rehab Misc. insulation COMPLETE 2011
WEST PULLMAN 225 SI Paving Paving - pathways COMPLETE 2016
WEST PULLMAN 225 FR Minor Rehab Misc. sump pump COMPLETE 2012
WEST PULLMAN 225 FR Roof Roof - rehab COMPLETE 2012
WEST PULLMAN 225 FR Concrete Masonry Structural Fieldhouse - emergency masonry COMPLETE 2016
WEST PULLMAN 225 FR Major Rehab Field house - major rehab PRE-DESIGN
WEST PULLMAN 225 FR Minor Rehab Boiler - new PRE-DESIGN
WESTERN 1165 SI Playground Chicago Plays! - new equipment COMPLETE 2014
WHITE (WILLYE B.) 1043 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
WHITE (WILLYE B.) 1043 SI Fencing Misc. fencing along Ashland Ave. COMPLETE 2014
WHITE (WILLYE B.) 1043 FR Minor Rehab Security camera - new COMPLETE 2018
WHITE (WILLYE B.) 1043 SI Courts Mini-Pitch Soccer Court - new COMPLETE 2018
WHITE (WILLYE B.) 1043 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WHITE (EDWARD) 379 SI Playground Chicago Plays! - new equipment COMPLETE 2014
White (Jesse) 560 AD Acquisition 410 W. Chicago Ave. COMPLETE 2011
White (Jesse) 560 AD New Construction New Community Center COMPLETE 2014
WICKER (CHARLES, JOEL) 214 FR Concrete Masonry Structural Field house - entranceways COMPLETE 2015
WICKER (CHARLES, JOEL) 214 FR Roof Roof COMPLETE 2011
WICKER (CHARLES, JOEL) 214 FR Sculpture and Monument "Wicker" - restoration COMPLETE 2011
WICKER (CHARLES, JOEL) 214 SI Site Improvement Misc. benches, tables, and paving COMPLETE 2013
WICKER (CHARLES, JOEL) 214 FR Minor Rehab Misc. building security COMPLETE 2014
WICKER (CHARLES, JOEL) 214 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
WICKER (CHARLES, JOEL) 214 SI Athletic Field Field - major restoration COMPLETE 2016
WIEBOLDT (WILLIAM) 449 SI Playground Chicago Plays! - new equipment COMPLETE 2014
WILDWOOD 257 SI Courts Tennis court - rehab COMPLETE 2013
WILDWOOD 257 SI Playground Signature Playground - new COMPLETE 2018
WILLIAMS (DANIEL HALE) 261 AD New Construction Field house - new CONSTRUCTION
WILSON (FRANK) 145 SI Playground Playground - new COMPLETE 2011
WILSON (FRANK) 145 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2013
58 of 59
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2018* As of October 1, 2018
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE
WILSON (FRANK) 145 SI Courts Tennis courts and paving - rehab COMPLETE 2015
WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2011
WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Masonry PRE-DESIGN
WINNEMAC 486 SI Athletic Field Athletic field - rehab COMPLETE 2013
WINNEMAC 486 SI Athletic Field Athletic field - rehab COMPLETE 2016
WINNEMAC 486 SI Athletic Field Athletic Field - rehab COMPLETE 2017
WOLCOTT (ALEXANDER) 403 AD Acquisition Expansion COMPLETE 2012
WOLCOTT (ALEXANDER) 403 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WOLFE (RICHARD) 1072 SI Spray Pool Water play feature - rehab COMPLETE 2012
WOLFE (RICHARD) 1072 SI Lighting Lighting - exterior COMPLETE 2012
WOLFE (RICHARD) 1072 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
WOLFE (RICHARD) 1072 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WOOD (ELIZABETH) 316 AD Park Development Lathrop Homes Park Development (CHA) CONSTRUCTION
WOODHULL (ROSS) 1073 SI Playground Playground - surfacing COMPLETE 2011
WOODHULL (ROSS) 1073 FR Major Rehab Transition plan - access improvements COMPLETE 2011
WOODHULL (ROSS) 1073 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WRIGHTWOOD 1074 FR Swimming Pool Pool retrofit - compliance COMPLETE 2012
WRIGHTWOOD 1074 FR Roof Roof PRE-DESIGN
WRIGHTWOOD 1074 FR Swimming Pool Pool - deck COMPLETE 2016
WRIGHTWOOD 1074 SI Paving Paving - pathways COMPLETE 2016
ZATTERBERG (HELEN) 1107 SI Playground Chicago Plays! - new equipment COMPLETE 2016
** Program definitions: AD= acquisition and development, SI=site improvements, FR=facility rehab
* Report as of October 1, 2018. The capital plan is a living document that is subject to change. Project listing includes capital projects and not general maintenance; does not include District-Wide Programs.
This document is for public information and is not auditable.
59 of 59