Upload
doanhanh
View
213
Download
0
Embed Size (px)
Citation preview
Book of PlansDoc Ref: 2.14 Chelsea Embankment ForeshoreAPFP Regulations 2009: Regulation 5(2)(k), (o)
Box 61 Folder C January 2013
Chel
sea
Emba
nkm
ent F
ores
hore
Thames Tideway Tunnel Thames Water Utilities Limited
Application for Development ConsentApplication Reference Number: WWO10001
Hard copy available in
This page is intentionally left blank
Application for Development Consent: Book of Plans
List of Volumes
Box Volume Section Location Drawing type or site location 1 Project-wide drawings Works plan and sections 1 2 Project-wide drawings Land acquisition plans 3 Project-wide drawings Land plans 4 Project-wide drawings Crown and special category land plans 5 Site drawings Acton Storm Tanks 6 Site drawings Hammersmith Pumping Station 2 7 Site drawings Barn Elms
61 8 Site drawings Putney Embankment Foreshore 9 Site drawings Carnwath Road Riverside 10 Site drawings Dormay Street 11 Site drawings King Georges Park 3 12 Site drawings Falconbrook Pumping Station 13 Site drawings Cremorne Wharf Depot 14 Site drawings Chelsea Embankment Foreshore 15 Site drawings Kirtling Street 16 Site drawings Heathwall Pumping Station 4 17 Site drawings Albert Embankment Foreshore 18 Site drawings Victoria Embankment Foreshore 19 Site drawings Blackfriars Bridge Foreshore 20 Site drawings Shad Thames Pumping Station 5 21 Site drawings Chambers Wharf
62 22 Site drawings Earl Pumping Station 23 Site drawings Deptford Church Street 24 Site drawings Greenwich Pumping Station 25 Site drawings King Edward Memorial Park Foreshore 6 26 Site drawings Bekesbourne Street 27 Site drawings Abbey Mils Pumping Station 28 Site drawings Beckton Sewage Treatment Works. 29 Project-wide drawings Ventilation columns
This volume is Volume 3
Volume 3
Drawing Title Sheet No. Drawing number
Section 14: Chelsea Embankment Foreshore Location plan DCO-PP-12X-CHEEF-140001
As existing site features plan DCO-PP-12X-CHEEF-140002
Access plan DCO-PP-12X-CHEEF-140003
Demolition and site clearance 1 of 2 DCO-PP-12X-CHEEF-140004
Demolition and site clearance 2 of 2 DCO-PP-12X-CHEEF-140005
Site works parameter plan DCO-PP-12X-CHEEF-140006
Site works parameter key plan DCO-PP-12X-CHEEF-140007
Permanent works layout 1 of 2 DCO-PP-12X-CHEEF-140008
Permanent works layout 2 of 2 DCO-PP-12X-CHEEF-140009
Proposed landscape plan 1 of 2 DCO-PP-12X-CHEEF-140010
Proposed landscape plan 2 of 2 DCO-PP-12X-CHEEF-140011
Section AA DCO-PP-12X-CHEEF-140012
As existing and proposed south (river) elevation DCO-PP-12X-CHEEF-140013
As existing and proposed west elevation DCO-PP-12X-CHEEF-140014
Proposed east elevation DCO-PP-12X-CHEEF-140015
Proposed north elevation DCO-PP-12X-CHEEF-140016
Kiosk design intent DCO-PP-12X-CHEEF-140017
Typical river wall design intent DCO-PP-12X-CHEEF-140018
Construction phases - phase 1 Site setup DCO-PP-12X-CHEEF-140019
Construction phases - phase 2 Shaft construction and tunnelling DCO-PP-12X-CHEEF-140020
Construction phases - phase 3 Construction of other structures DCO-PP-12X-CHEEF-140021
Construction phases - phase 4 Site demobilisation DCO-PP-12X-CHEEF-140022
Highway layout during construction (Utility diversion phase)* DCO-PP-12X-CHEEF-140027
Highway layout during construction - Phase 1 - 2* DCO-PP-12X-CHEEF-140028
Highway layout during construction - Phase 3* DCO-PP-12X-CHEEF-140029 Highway layout during construction - Bull ring resurfacing* DCO-PP-12X-CHEEF-140030
Permanent highway layout* DCO-PP-12X-CHEEF-140031
* Schedules of associated highway works are located in the Transport Assessment
Battersea Park
Avenue
Central
Cycle Hire Station
GP
PostsSub
way
Post
Post
Post
Central Peninsula
Central Av
enue
Posts
Posts
Posts
Posts
Post
Posts
Posts
Post
Posts
Posts
Posts
Posts
Posts
Dove W
alk
Posts
Posts
Posts
Post
Posts
Posts
Posts
Conveyor
P
Cycle H
ire Station
Cycle H
ire Station
Hire Station
Cycle
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
of Wandsworth
London Borough
Westminster
City of
Chelsea Brid
ge
of Kensington & Chelsea
Royal Borough
Main tunnel
Mean low water
Mean low water
Kirtling Street
tunnel
connection
Ranelagh
Chelsea Embankment Foreshore
Notes:
N
within limits of deviation.
1. The alignment of the tunnels are illustrative
Tunnel
Key:
Local authority boundary
Shaft
Order limits
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR INFORMATION
Location plan
DCO-PP-12X-CHEEF-140001
January 2013
0100m 100m
1:5000 if reproduced at A3
Scale 1:2500 at A1
This drawing
Book of plans - section 14
Festival Pleasure Gardens
Chelsea Em
bankme
nt
Millennium Arena
Battersea Park
Power Station
Battersea
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
College stairs
Grosvenor
Authoris
ed chan
nel
Mean low wa
ter
Chelsea Em
bankme
nt
"Bull Ring"
Hospital
Royal
+ 107.80m
+ 106.00m
+ 104.84m
+ 104.88m
+ 104.25m
+ 104.90m
+ 104.88m
+ 103.71m
+ 104.18m
+ 106.43m
CSO
Ranelagh
Notes:
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
Monum
ent Walk
Gardens
Chelsea Embankment
N
Approximate position of CSO outlet
Authorised channel
(LLAU)
Limits of land to be acquired or used
(shown in metres above tunnel datum)
Existing levels + 105.40m
Listed buildings/structures
Key:
(trunk sizes vary)
Existing trees within surveyed area
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
End of brick parapet
End of stone parapet
(brick wall below)
Ranelagh Gardens
Royal Hospital South Grounds
End of listed wall
(stone wall and
parapet)
for pedestrians
Traffic island
cast iron lampstands
Regular stone piers with
outfall
protection) to
Apron (scour
Bus stop
gates
"Bull Ring"
central reservation
Raised grassed
to river wall
Brick parapet
Memorial Obelisk
Royal Hospital Axis shown
Entrances to Royal Hospital Grounds
College stairs
east and west of Grosvenor
with a stone parapet above
River wall constructed of brick
setting to historic park and gardens
to Royal Hospital perimeter forms
Brick dwarf wall with railings above
South Grounds
Gardens and Royal Hospital
Boundary between Ranelagh
Car parking located in Bull ring
up to Chelsea Bridge
Earth embankment
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR INFORMATION
As existing
Site features plan
DCO-PP-12X-CHEEF-140002
January 2013
Book of plans - section 14
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
(Army Pensioners)
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Royal Hospital
Boro Con
st, GL As
ly Const &
LB Bdy
CCLW
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Ap
pedestrian crossing
Existing signalised
and deliveries
stopped up for site access
Highway to be temporarily
Low Level Sewer No.1
a connection to the existing
utilities and construction of
stopped up for diversion of
Highway to be temporarily
Thames Path
Authorised channel
Thames Path
Mean low water
Permament foreshore structure
Existing public right of way
temporarily stopped up
Area of highway to be
Ap
or used (LLAU)
Limits of land to be acquired
of right of way
Route of temporary diversion
temporarily stopped up
Existing right of way
Key:
Access to permanent works
Ac Access to construction works
Ac
Ac
Notes:
1.This plan does not show stopping up and
diversions of limited duration (eg hoarding
erection, minor utility diversions and minor
highway works).
2. Only rights of way in or close to worksites
are shown. The full extents of rights of way
are not shown where they cease to be
relevant to the project.
3.The point of the construction site access
would be moved from time to time within
this length of frontage to enable construction
of development.
phases 1 and 2 only )
Bridge Road ( Construction
signalised crossing at Chelsea
Rejoins Thames path at existing
access would be located
Highway frontage within which
( Construction phase 3 only )
crossing on diversion
Signalised temporary pedestrian
of highway frontage (see note 3)
be located within this length
Construction site access would
location to be confirmed )
highway frontage (Precise
located within this length of
Permanent access would be
of public rights of navigation
Area of permanent extinguishment
of public rights of navigation
Area of temporary suspension
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR APPROVAL
Access plan
DCO-PP-12X-CHEEF-140003
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 14
Mean
High W
ater
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Chelsea Em
bankme
nt
River T
hames
standards
3 No. Ornamental lamp
Mean low water
Authorised channel
Sheet 1
Sheet 2
Key:
or used (LLAU)
Limits of land to be acquired
Trees to be removed
Trees to be pruned
to be removed
Above ground structures
relocated or reinstated
Structure to be removed and
where possible
re-used elsewhere on site
Stone parapet materials to be
proposed position)
(Refer to landscaping plan for
completion of works.
permanent pedestrian refuge on
Traffic island to be replaced with
to be removed or infilled
Below ground structures
Notes:
vegetation not shown.
stripping of topsoil and clearance of minor
removal of hardstanding and foundations,
2. General activities of site clearance such as
bollards etc.) are not shown.
1. Minor items to be removed (e.g. barriers,
N
Sheet Layout
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR APPROVAL
Demolition and site clearance
Sheet 1 of 2
DCO-PP-12X-CHEEF-140004
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 14
Matc
hline: Sheet 2
construction
construction and reinstated post
brick facing to be stored during
Stone parapet and section of river wall
construction
construction and reinstated post
wall brick facing to be stored during
Stone parapet and section of river
outfall apron
Brick and concrete
Shingle
4.3mBorehole
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Chelsea Em
bankme
nt
River T
hames
Ranelagh Gardens
Mean low water
of works to match existing
and reinstated on completion
railings to be dismantled
Brick boundary wall with
Sheet 1
Sheet 2
Key:
Matc
hline: Sheet 1
relocated or reinstated
Structure to be removed and
Trees to be removed
Trees to be pruned
or used (LLAU)
Limits of land to be acquired
to be removed
Above ground structures
N
vegetation not shown.
stripping of topsoil and clearance of minor
removal of hardstanding and foundations,
2. General activities of site clearance such as
bollards etc.) are not shown.
1. Minor items to be removed (e.g. barriers,
Notes:
Sheet Layout
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR APPROVAL
Demolition and site clearance
Sheet 2 of 2
DCO-PP-12X-CHEEF-140005
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 14
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Boro Con
st, GL As
ly Const &
LB Bdy
CCLW
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
would be located
Zone within which Work No. 12a
Mean lo
w water
1.5m
6.0m
8.0m (4.0m)
(Minimum heights are in brackets where applicable)
Maximum height above finished ground level
Table 1
Electrical and control kiosk(s)
and overflow weir chambers
Ventilation column(s) serving interception
Ventilation column(s) serving the shaft
Above ground permanent structure
Typical Section A
(Not to scale)
structure
Foreshore
Varies
105.45m minimum
106.00m maximum
Top of river/parapet wall
intertidal terracing
Maximum extent of
Intertidal terrace
(See Typical Section A)
intertidal terrace
Maximum extent of
(level varies)
River foreshore
terracing
Maximum extent of intertidal
Key:
would be located
Zone within which the shaft
landscaping would be located
Zone within which required
site structures would be located
Zone within which all permanent
or used (LLAU)
Limits of land to be acquired
located (those listed in Table 1)
above ground structures would be
Zone within which permanent
would be located
and ventilation column(s) serving the shaft
Zone within which electrical and control kiosk(s)
chamber would be located
and ventilation column(s) serving the interception
Zone within which electrical and control kiosk(s)
weir chamber(s) would be located
column(s) serving the overflow
Zone within which ventilation
to be acquired or used.
provided they are located within the Limits of land
works may be located within or outside this zone
under-reaming. Shaft construction temporary
construction tolerances) and if applicable
walls (including appropriate allowances for
would include all permanent works including shaft
The zone within which the shaft would be located3.
each zone independently.
The Site Works Parameter Key Plan identifies2.
1. All dimensions and levels are approximate.
Notes:
works platform
Maximum extent of temporary
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR APPROVAL
Site works parameter plan
DCO-PP-12X-CHEEF-140006
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 14
MHW
Monument
Chelsea Reach
Shingle
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Boro Con
st, GL As
ly Const &
LB Bdy
MHW
Monument
Chelsea Reach
Shingle
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Boro Con
st, GL As
ly Const &
LB Bdy
MHW
Monument
Chelsea Reach
Shingle
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Boro Con
st, GL As
ly Const &
LB Bdy
MHW
Monument
Chelsea Reach
Shingle
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Boro Con
st, GL As
ly Const &
LB Bdy
MHW
Monument
Chelsea Reach
Shingle
Shingle
CHELS
EA EM
BANKM
ENT
River Th
ames
Chelsea Rea
ch
War Memorial
Mean
High W
ater
Boro Con
st, GL As
ly Const &
LB Bdy
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
would be located
Zone within which Work No. 12a
Mean low w
ater
Mean low w
ater
Mean low w
ater
Mean low w
ater
Mean low w
ater
terracing
Maximum extent of intertidal
Key:
would be located
Zone within which the shaft
landscaping would be located
Zone within which required
site structures would be located
Zone within which all permanent
or used (LLAU)
Limits of land to be acquired
would be located
serving the overflow weir chamber(s)
Zone within which ventilation column(s)
the shaft would be located
kiosk(s) and ventilation column(s) serving
Zone within which electrical and control
chamber would be located
and ventilation column(s) serving the interception
Zone within which electrical and control kiosk(s)
located
above ground structures would be
Zone within which permanent
to be acquired or used.
provided they are located within the Limits of land
works may be located within or outside this zone
under-reaming. Shaft construction temporary
construction tolerances) and if applicable
walls (including appropriate allowances for
would include all permanent works including shaft
The zone within which the shaft would be located3.
to those shown on the Site works parameter plans.
each zone independently. The zones are identical
The Site Works Parameter Key Plan identifies2.
1. All dimensions and levels are approximate.
Notes:
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
FOR INFORMATION
Site works parameter key plan
DCO-PP-12X-CHEEF-140007
January 2013
10m 0 100m
1:2500 if reproduced at A3
Scale 1:1250 at A1
This drawing
Book of plans - section 14
Mean
High W
ater
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
River wall
Ranelagh CSO
Chelsea Em
bankme
nt
Authorised channel
Matc
hline: Sheet 2
104.40
104.95
104.40
106.05
column, 6m high
0.225m internal dia ventilation
Sewer No. 1
Existing northern Low Level
No. 1 overflow weir chamber
northern Low Level Sewer
Connection culvert from
Existing Ranelagh Sewer (Main line)
Storm Relief Sewer
Kings Scholars Pond
Existing Ranelagh and
Existing Sloane Street Sewer
culvert
Ranelagh connection
Mean low water
over connection culvert
Inter-tidal terraceProposed access cover
or used (LLAU)
Limits of land to be acquired
Existing sewers
104.50above tunnel datum)
Proposed level (shown in metres
would be located
Zone within which the shaft
and/or Proposed site features plan.
are shown on the Proposed landscape plan
only. Landscaping hard works and soft works
This drawing shows permanent site structures3.
in the preparation of this drawing.
survey base, both of which have been used
Ordnance Survey base and topographical
drawings are due to differences between the
structures and the parameters marked on the
Any discrepancy between the location of2.
All dimensions and levels are approximate.1.
Notes:
Key:
site structures would be located
Zone within which all permanent
be located
above ground structures would
Zone within which permanent
Sheet 1
Sheet 2
Sheet Layout
N
would be located
serving the interception chamber
control kiosk and ventilation column
Zone within which electrical and
match opposite side
Inter-tidal terrace to
Existing sewer access
landscaping plans
landscaping refer to proposed
Traffic island to be modified. For
Scour protection area
Scour protection area
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Permanent works layout
Sheet 1 of 2
DCO-PP-12X-CHEEF-140008
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 14
and valve chamber
Interception chamber
Ventilation duct
Parapet wall
stairs
To Grosvenor College
Bull Ring
de-aeration chamber
4.8m internal dia
of 4m minimum to 8m maximum height
2 No. 0.9m internal dia ventilation columns
Cremorne Wharf
main tunnel to
7.2m internal dia
Work No. 1b.
Kirtling Street
main tunnel to
7.2m internal dia
Work No. 1b.
proposed landscape plans.
For landscaping refer to
To be modified.
connection tunnel
4m internal dia
Work No. 12b.
would be located
kiosk serving the shaft
the electrical and control
ventilation columns and
Zone within which the
chamber
Air treatment
(12m Internal dia)
CSO drop shaft
Work No. 12a.
shaft
recirculation vent to
Horizontal de-aeration
5.5m x 2.5m x 1.5m high
Electrical and control kiosk
with mountable kerbs
Access for maintenance vehicles
6m x 2m x 1.5m high
Electrical and control kiosk
Outfall apron
would be located
Work No. 12a
Zone within which
CSO overflow
4.3m
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Chelsea Em
bankme
nt
Ranelagh Gardens
Matc
hline: Sheet 1
culvert to interception chamber
2.5m internal dia. connection
106.45
Low Lev
el Sewe
r No. 1
Existing norther
n
column, 6m high
0.225m internal dia. ventilation
Mean low water
Proposed access cover
or used (LLAU)
Limits of land to be acquired
Existing sewers
104.50above tunnel datum)
Proposed level (shown in metres
and/or Proposed site features plan.
are shown on the Proposed landscape plan
only. Landscaping hard works and soft works
This drawing shows permanent site structures3.
in the preparation of this drawing.
survey base, both of which have been used
Ordnance Survey base and topographical
drawings are due to differences between the
structures and the parameters marked on the
Any discrepancy between the location of2.
All dimensions and levels are approximate.1.
Notes:
Key:
site structures would be located
Zone within which all permanent
be located
above ground structures would
Zone within which permanent
would be located
ventilation column
Zone within which
overflow weir chamber
northern Low Level Sewer No. 1
diverted gas main
maintenance access to
Gate for utility company
N
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Permanent works layout
Sheet 2 of 2
DCO-PP-12X-CHEEF-140009
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 14
Sheet 1
Sheet 2
Sheet Layout
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Chelsea Em
bankme
nt
N
CSO
Ranelagh
104.40
104.90
106.00
105.45
104.90
+ 105.60m
+ 104.67m
+ 104.54m
+ 104.52m
+ 104.77m
+ 104.65m
+ 104.65m
+ 104.72m
+ 104.43m
+ 104.28m
+ 104.28m+ 104.24m
+ 104.34m+ 104.28m
+ 104.53m
+ 104.63m
104.40
Notes:
Sheet Layout:
Sheet 1
Sheet 2
AA
Landscape key:
Reed bed planting
Proposed trees
Approximate position of CSO outlet
(LLAU)
Limits of land to be acquired or used
ground structures would be located
Zone within which permanent above
(shown in metres above tunnel datum)
Existing levels
(shown in metres above tunnel datum)
Proposed levels
+ 105.40m
105.40
would be located
Zone within which required landscaping
Listed buildings/structures
Key:
(trunk sizes vary)
Existing trees within surveyed area
Maximum extent of foreshore structure
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
and cream granite sets
Floral motif pattern in grey
pimple paving)
match existing (concrete slab /
Surface of footway reinstated to
extent of access covers required.
the Permanent works layout for an indication of the
4. Access covers not shown on this drawing. Refer to
works parameter plan.
statement are those listed in table 1 on the Site
scale of above ground structures which is indicative"
3. The above ground structures in the "Save for the
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
Royal Hospital Axis shown
Boundary enscribed in stone parapet
New parish boundary marker stone.
4m minimum to 8m maximum height
2 No. signature ventilation columns of
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Proposed
Landscape plan sheet 1 of 2
DCO-PP-12X-CHEEF-140010
January 2013
Book of plans - section 14
Save for the scale of above ground structures
which is indicative
of space without impeding views
Simple stone bench marks end
"Bull Ring" gates
with surrounding finish
Paving flush at junction
Royal Hospital South Grounds
portable platform)
(to be used in conjunction with
terrace for periodic maintenance
Fixed ladder access to intertidal
raised
paving slightly
Sculptured
portable platform)
(to be used in conjunction with
periodic maintenance to terraces
Fixed ladder access to terrace for
of pavement edge
wall reinstated along the back
Exsiting stone parapet to river
island relocated east
Existing pedestrian
Start of new river wall
Start of new river wall
bus stop and car parking spaces
Brass studs or a flush kerb to define
new structure into river wall
create inter-tidal terrace and blend
Brick facing to wall peels out to
into existing space
to tie foreshore structure
continues into "Bull Ring"
Paving treatment
to agreement with TfL
realigned to define shape better. All subject
Kerbs to junction with Chelsea Embankment
6m high
Ventilation column
interception structure
Inter-tidal terrace above Ranelagh
in existing parapet wall
kiosk 1.5m high marks intervention
Stone clad electrical and control
Mea
n low water
structure
embankment and foreshore
Inter-tidal terrace between
in existing parapet wall
kiosk 1.5m high marks intervention
Stone clad electrical and control
stop retained
Existing bus
Monum
ent Walk
kerb alignment
Lamp post and bollards relocated to suit
Stone parapet wall
mark historic axis
Grooves in scuptured paving
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
existing
Road surface to be reinstated as
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Proposed
Landscape plan sheet 2 of 2
DCO-PP-12X-CHEEF-140011
January 2013
Save for the scale of above ground structures
which is indicative
Book of plans - section 14
Ranelagh Gardens
Chelsea Em
bankme
nt
around the works
Tree positions reconfigured
Planting around works to reinstate
green screening to road
Wall and railing reinstated after
construction to match existing
+ 107.31m
+ 105.90m
+ 104.18m
for construction
replacing trees removed
planted on embankment
Semi mature London planes
106.30
to diverted utilities
Gates for maintenance access
Landscape key:
Root barrier
Chelsea Embankment Gardens
N
Ventilation column 6m high
Proposed trees
(LLAU)
Limits of land to be acquired or used
ground structures would be located
Zone within which permanent above
(shown in metres above tunnel datum)
Existing levels
(shown in metres above tunnel datum)
Proposed levels
+ 105.40m
105.40
would be located
Zone within which required landscaping
Listed buildings/structures
Key:
(trunk sizes vary)
Existing trees within surveyed area
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Sheet 1
Sheet 2
extent of access covers required.
the Permanent works layout for an indication of the
4. Access covers not shown on this drawing. Refer to
works parameter plan.
statement are those listed in table 1 on the Site
scale of above ground structures which is indicative"
3. The above ground structures in the "Save for the
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
Notes:
Sheet Layout:
Native shrub tree planting
match existing
Paving stone reinstated to
construction site
Grass seeding to
weir chamber
adjacent to new overflow
Lamp post repositioned
around utility diversions
Extent of root barrier
Mean low water
green screening to road
Planting around works to reinstate
to new overflow weir chamber
Lamp post repositioned adjacent
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Section AA
Inter-tidal terrace
6m high
Ventilation column
to match existing
Curved brick wall
to match existing
Curved brick wall
and parapet
lamp column
Reinstated
and parapet
lamp column
Reinstated
Notes:
the below ground infrastructure to be provided.
2. The purpose of this section is to show the scale of
1. All dimensions and levels are approximate.
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
N
A
terrace
Inter-tidal
CSO drop shaft
area
"Bull Ring"
New tree to
struture
foreshore
New tree on
parapet
stone
Curved
A
1.5m high
control kiosk
electrical and
Stone clad
control kiosk 1.5m high
Stone clad electrical and
gates
"Bull Ring"
Valve chamber
with coir matting
Sediment anchored
Ranelagh connection culvert
with coir matting
Sediment anchored
8m maximum height
columns of 4m minimum to
2 No. signature ventilation
impeding views
end of space without
Stone bench marks
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Section AA
DCO-PP-12X-CHEEF-140012
January 2013
Book of plans - section 14
2020 flood defence level 105.41m ATD
Mean high water springs 103.91m ATD
Mean low water springs 97.81m ATD
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
As existing South (river) elevation
Proposed South (river) elevation
Royal Hospital South Grounds Ranelagh Gardens
1. All dimensions and levels are approximate.
bridge ramp
Planted slope retaining
brick wall
Curved
parapet
stone
Curved
kiosk 1.5m high
Electrical and control
kiosk 1.5m high
Electrical and control
terrace
Inter-tidal
ramping up to Chelsea Bridge
Railings at back of pavement Brick river wall
Notes:
6m high
Ventilation column
maximum height (behind tree)
columns of 4m minimum to 8m
2 No. signature ventilation
CSO outfall
Ranelagh
CSO outfall
Ranelagh
6m high (behind tree)
Ventilation column
Foreshore structure
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
N
South (rive
r) eleva
tion
2020 flood defence level 105.41m ATD
Mean high water springs 103.91m ATD
Mean low water springs 97.81m ATD
2020 flood defence level 105.41m ATD
Mean high water springs 103.91m ATD
Mean low water springs 97.81m ATD
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
As existing and proposed
South (river) elevation
DCO-PP-12X-CHEEF-140013
January 2013
Book of plans - section 14
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Proposed West elevation
Stone parapet
As existing West elevation
of South Gardens
Treelines to perimeter
Station beyond
Western Pumping
Gardens perimeter
above to Royal Hospital
Brick upstand with railings
kiosks 1.5m high
Electrical and control
Inter-tidal terrace
(behind tree)
columns 6m high
2 No. ventilation
to 8m maximum height
columns of 4m minimum
2 No. signature ventilation
Royal Hospital South Gardens Chelsea Embankment"Bull Ring"
Notes:
1. All dimensions and levels are approximate.
Foreshore structure
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
N
West ele
vatio
n
Brick wall
Chelsea Bridge
Grade II listed
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
As existing and proposed
West elevation
DCO-PP-12X-CHEEF-140014
January 2013
Book of plans - section 14
2020 flood defence level 105.41m ATD
Mean high water springs 103.91m ATD
Mean low water springs 97.81m ATD
2020 flood defence level 105.41m ATD
Mean high water springs 103.91m ATD
Mean low water springs 97.81m ATD
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Ring"
South Gardens and "Bull
Treelines to perimeter of
Inter-tidal terrace
6m high
Ventilation column
1.5m high
Electrical and control kiosks
8m maximum height
columns, 4m minimum to
2 No. signature ventilation Ranelagh CSO outfall
parapet
Curved stone
Notes:
1. All dimensions and levels are approximate.
Foreshore structure
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
N
East ele
vation
East elevation
foreshore structure
2 No. new trees on
match existing
Brick wall to
Chelsea Embankment
2020 flood defence level 105.41m ATD
Mean high water springs 103.91m ATD
Mean low water springs 97.81m ATD
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Proposed
East elevation
DCO-PP-12X-CHEEF-140015
January 2013
Book of plans - section 14
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
North elevation
and parapet
lamp column
Reinstated
and parapet
lamp column
Reinstated
high
Ventilation column 6m
Notes:
1. All dimensions and levels are approximate.
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
N
North eleva
tion
of space without impeding views
Simple stone bench marks end
Curved stone parapet
parapet
incorporated into stone
control kiosk 1.5m high
Stone clad electrical and
parapet
into stone
incorporated
1.5m high
control kiosk
electrical and
Stone clad
wall on historic axis
Line inscribed on
8m maximum height
columns of 4m minimum to
2 No. signature ventilation
foreshore struture
2No. new trees on
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Proposed
North elevation
DCO-PP-12X-CHEEF-140016
January 2013
Book of plans - section 14
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
1. All dimensions and levels are approximate.
Notes:
104.90
N
104.90
104.40 104.40
01m 4m
1:100 if reproduced at A3
Scale 1:50 at A1
This drawing
N
Scale 1:50
Scale 1:50
Scale 1:50
Scale 1:50
West kiosk East elevation
Stone parapet wall
incorporate kiosk
Top of wall raised to
West kiosk West elevation
Stone parapet wall
incorporate kiosk
Top of wall raised to
incorporate kiosk
Top of wall raised to Stone parapet wall
Scale 1:50
East kiosk West elevation
Scale 1:50
East kiosk East elevation
Scale 1:50
East kiosk sectionWest kiosk section
incorporate kiosk
Top of wall raised to Stone parapet wall
incorporate kiosk
Top of wall raised to Stone parapet wall
incorporate kiosk
Top of wall raised to Stone parapet wall
Scale 1:50
East kiosk planWest kiosk plan
louvres as required
with architectural
PPC metal panel doors
louvres as required
with architectural
PPC metal panel doors
East Ele
vation
West Ele
vatio
n
West Elevatio
n
East Elevatio
n
terrace below
Inter-tidal
terrace below
Inter-tidal
against integral kiosk
reinstated and terminates
Existing stone parapet wall
against integral kiosk
reinstated and terminates
Existing stone parapet wall
equipment
control
electrical and
accomodate
wall thickens to
Stone parapet
equipment
control
electrical and
accomodate
wall thickens to
Stone parapet
roof to shed water
Slight fall on stone
roof to shed water
Slight fall on stone
West
East
architectural louvres
Metal panel doors with
architectural louvres
Metal panel doors with
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Kiosk design intent
DCO-PP-12X-CHEEF-140017
January 2013
Save for the scale of the kiosk
which is indicative
Book of plans - section 14
Sect. Sect.
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Notes:
1. All dimensions and levels are approximate.
This drawing
01m 4m
1:100 if reproduced at A3
Scale 1:50 at A1
N
Scale 1:50
Detail section Isometric
NTSScale 1:50
South elevation
Scale 1:50
existing
Brick wall to match
wall
to prevent uneven staining of
habitat from below and extend
Metal pipes to flood inter-tidal
Granite paving
106.00m ATD
104.60m ATD
106.00m ATD
104.90m ATD
prevent uneven staining of wall
habitat from below and extend to
Metal pipes to flood inter-tidal
with coir matting
Sediment anchored
Brick wall to match existing
106.00m ATD
104.90m ATD
South ele
vation
North elev
ation
MHW 103.91m ATD
MLW 97.81m ATD MLW 97.81m ATD
MHW 103.91m ATD
Rip-rap as required
Rip-rap as required
existing
stone to match
Parapet in natural
North elevation
104.60m ATD
Sect.
wall
to prevent uneven staining of
habitat from below and extend
Metal pipes to flood inter-tidal
Reed bed planting
Substructure shown notionallySubstructure shown notionally
of existing brick wall
Height to match top
Brick coping.
match existing
Brick wall to
paving
Granite
notionally
Substructure shown
planting
Reed bed
coir matting
Sediment anchored with
brick wall
top of existing
Height to match
Brick coping.
of existing brick wall
Height to match top
Brick coping.
planting
Reed bed
Varies
existing
stone to match
Parapet in natural
Rip-rap as required
to match existing
Parapet in natural stone
to match existing
Parapet in natural stone
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Typical river wall design intent
DCO-PP-12X-CHEEF-140018
January 2013
Book of plans - section 14
River Th
ames
(Army Pensioners)
Chelsea Rea
ch
War Memorial
Royal Hospital
GV
UTT
GV
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
traffic island
Removal of lane closure
Intermittent
operations
servicing piling
Jack up barge
Piling rig
Existing pedestrian crossing
Barge on campshed
works
traffic maintained throughout
One lane closed but two way
Thames Path
throughout the works
two way traffic maintained
Intermittent lane closure
works
traffic maintained throughout
One lane closed but two way
Authorised channel
Chelsea Em
bankmen
t
Traffic barriers
left turn out
Construction access,
left turn in
Construction access,
Temporary working area
at all times.
6. Existing flood defence levels to be maintained
5. Gate position to alter to suit construction progress.
on this drawing.
barriers may be required but is not shown
4. Additional noise mitigation including noise
would be agreed with the relevant utility company.
3. Utility supplies for the construction of the works
arrangements are shown.
appropriate, outline traffic management
appropriate authority for approval. Where
phases of the work would be submitted to the
2. Traffic management plans for construction
submission and approval process.
on layout imposed through the planning
construction methods subject to any controls
construction depending on their preferred
may choose to lay sites out differently during
the principal construction phases. Contractors
prepared to illustrate possible site layouts for
1. These construction phasing plans have been
Notes :
in river to reduce scour impact
Rounded edge to cofferdam
Permanent river wall
Cofferdam
in river to reduce scour impact
Rounded edge to cofferdam
construction
overflow weir chamber
undertaken in advance of
Utility diversion works to be
N
Authorised channel
Bridge Road
signalised crossing at Chelsea
Rejoins Thames path at existing
Sheet piles
Existing public right of way
Key:
Access / haul route
Maximum extent of working area
Site access
Existing sewers
Hoarding
or used (LLAU)
Limits of land to be acquired
of right of way
Route of temporary diversion
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Construction phases - phase 1
Site setup
DCO-PP-12X-CHEEF-140019
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 14
River Th
ames
(Army Pensioners)
Chelsea Rea
ch
War Memorial
Royal Hospital
CL 105.49
UTT
Pit IL 104.49
Oil Valve Pit
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Crane Crane
closure
Intermittent lane
Segment storage
Existing pedestrian crossing
Barge on campshed
Thames Path
works
traffic maintained throughout
One lane closed but two way
Authorised channel
Chelsea Em
bankmen
t
tunnel.
jack up barge during construction of connection
Working area allows for ground treatment from
Offices/welfare building
and handling area
Excavated material storage
Shaft
Workshop buildings
Security office
Storage (open area or containerised)
aggregate storage area
Concrete batching plant and
Permanent river wall
left turn out
Construction access,
Site power structure
left turn in
Construction access,
at all times.
6. Existing flood defence levels to be maintained
5. Gate position to alter to suit construction progress.
on this drawing.
barriers may be required but is not shown
4. Additional noise mitigation including noise
would be agreed with the relevant utility company.
3. Utility supplies for the construction of the works
arrangements are shown.
appropriate, outline traffic management
appropriate authority for approval. Where
phases of the work would be submitted to the
2. Traffic management plans for construction
submission and approval process.
on layout imposed through the planning
construction methods subject to any controls
construction depending on their preferred
may choose to lay sites out differently during
the principal construction phases. Contractors
prepared to illustrate possible site layouts for
1. These construction phasing plans have been
Notes :
in river to reduce scour impact
Rounded edge to cofferdam
in river to reduce scour impact
Rounded edge to cofferdam
Authorised channel
Main tunnel
Connection tunnel
Cofferdam
Bridge Road
signalised crossing at Chelsea
Rejoins Thames path at existing
Sheet piles
Existing public right of way
Key:
Access / haul route
Maximum extent of working area
Site access
Existing sewers
Hoarding
or used (LLAU)
Limits of land to be acquired
of right of way
Route of temporary diversion
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Construction phases - phase 2
Shaft construction & tunnelling
DCO-PP-12X-CHEEF-140020
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 14
River Th
ames
(Army Pensioners)
Chelsea Rea
ch
War Memorial
Royal Hospital
GV
CL 105.49
UTT
Pit IL 104.49
Oil Valve Pit
UTT
GV
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Crane
Crane
closure
Intermittent lane
Piling rig
Existing pedestrian crossing
works
traffic maintained throughout
One lane closed but two way
Authorised channel
works
traffic maintained throughout
One lane closed but two way
Thames Path
Chelsea Em
bankmen
t
crossing on diversion
Signalised temporary pedestrian
throughout works
way traffic maintained
weir chambers but two
construction of overflow
Lane closure during
Barge on campshed
Offices/welfare building
and handling area
Excavated material storage
Shaft
left turn in, left turn out
to suit construction,
gate position can alter
Construction access,
Site power structure
Security office
Workshop buildings
Storage (open area or containerised)
Permanent river wall
at all times.
6. Existing flood defence levels to be maintained
5. Gate position to alter to suit construction progress.
on this drawing.
barriers may be required but is not shown
4. Additional noise mitigation including noise
would be agreed with the relevant utility company.
3. Utility supplies for the construction of the works
arrangements are shown.
appropriate, outline traffic management
appropriate authority for approval. Where
phases of the work would be submitted to the
2. Traffic management plans for construction
submission and approval process.
on layout imposed through the planning
construction methods subject to any controls
construction depending on their preferred
may choose to lay sites out differently during
the principal construction phases. Contractors
prepared to illustrate possible site layouts for
1. These construction phasing plans have been
Notes :
in river to reduce scour impact
Rounded edge to cofferdam
Connection tunnel
Authorised channel
in river to reduce scour impact
Rounded edge to cofferdam
Cofferdam Main tunnel
Connection culvert
weir chamber
Construction of overflow
Sheet piles
Existing public right of way
Key:
Access / haul route
Maximum extent of working area
Site access
Existing sewers
Hoarding
or used (LLAU)
Limits of land to be acquired
of right of way
Route of temporary diversion
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Construction phases - phase 3
Construction of other structures
DCO-PP-12X-CHEEF-140021
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 14
River Th
ames
(Army Pensioners)
Chelsea Rea
ch
War Memorial
Royal Hospital
Borehole
103.64
104.22
Borehole
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Authorised channel
Chelsea Em
bankmen
t
Shaft
restrictions removed
Temporary traffic
and foreshore reinstated
cofferdam piling and fill removed
Construction facilities removed,
Mean low water
foreshore reinstated
Campshed removed and
Hoarding removed
Park reinstated
reinstatement
prior to foreshore
Outfall apron constructed
prior to foreshore reinstatement
Scour protection constructed
Permanent river wall
Authorised channel
removed
Thames Path diversion
wall brick facing reinstated
Stone parapet and river
wall brick facing reinstated
Stone parapet and river
removed
Hoarding
Sheet piles
Existing public right of way
Key:
Maximum extent of working area
Site access
Existing sewers
Hoarding
or used (LLAU)
Limits of land to be acquired
Royal Borough of Kensington & Chelsea
Chelsea Embankment Foreshore
ILLUSTRATIVE
Construction phases - phase 4
Site demobilisation
DCO-PP-12X-CHEEF-140022
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 14
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
CHEEF_C01
c Thames Water Utilities Ltd 2008
Keyplan:
Mapping reproduced by permission of Ordnance
Database right 2012. All rights reserved. Ordance
Survey licence number 100019345
N
Application for Development Consent
Location
Document Information
Coordinates are to be Ordance Survey Datum
OSGB36. All levels are in metres and relate to the
Tunnel Datum which is 100 metres below Ordnance
Datum Newlyn.
Proposed highway layout during construction
Existing highway layout
This drawing
KeyExisting
On street parkingBus stop / standPedestrian crossing
CHEEF_C00 See schedule of works
Revised
Traffic barrierSite access point
L.L.A.U.
DCO-PP-12X-CHEEF-140027
(Utility diversion phase)
Highway layout during construction
ILLUSTRATIVE
Chelsea Embankment Foreshore
RB Kensington and Chelsea
January 2013
Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the
parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.
N
On street parking
Cycle lanebarclays cycle superhighwaysmon - fri 7.00am - 7.00pmcycle lane mon - fri 8.00am -6.30pm
Permit holdersresident permit holders onlymon - fri 8.30am - 10.00pmsat 8.30am - 1.30pm
StageConstruction phases - utility diversion10m 0 40m
Scale 1:500 at A1
1:1000 if reproduced at A3
Standards
Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
CHEEF_C04CHEEF_C02
CHEEF_C03
Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm
Proposed highway layout during construction
Existing highway layout
c Thames Water Utilities Ltd 2008
Keyplan:
Mapping reproduced by permission of Ordnance
Database right 2012. All rights reserved. Ordance
Survey licence number 100019345
N
Application for Development Consent
Location
Document Information
Coordinates are to be Ordance Survey Datum
OSGB36. All levels are in metres and relate to the
Tunnel Datum which is 100 metres below Ordnance
Datum Newlyn.
DCO-PP-12X-CHEEF-140028
Phase 1 - 2
Highway layout during construction
ILLUSTRATIVE
Chelsea Embankment Foreshore
RB Kensington and Chelsea
January 2013
Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the
parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.
N
KeyExisting
On street parkingBus stop / standPedestrian crossing
CHEEF_C00 See schedule of works
Revised
Traffic barrierSite access point
L.L.A.U.
On street parking
StageConstruction phases10m 0 40m
Scale 1:500 at A1
1:1000 if reproduced at A3
Site hoarding
Standards
Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006
This drawing
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
CHEEF_C06
CHEEF_C05
Proposed highway layout during construction
Existing highway layout
This drawing
KeyExisting
CHEEF_C00 See schedule of works
Revised
On street parkingBus stop / standPedestrian crossing
Traffic barrierSite access point
Illustrative on-site manoeuvring zoneTemporary pedestrian crossing
L.L.A.U.
c Thames Water Utilities Ltd 2008
Keyplan:
Mapping reproduced by permission of Ordnance
Database right 2012. All rights reserved. Ordance
Survey licence number 100019345
N
Application for Development Consent
Location
Document Information
Coordinates are to be Ordance Survey Datum
OSGB36. All levels are in metres and relate to the
Tunnel Datum which is 100 metres below Ordnance
Datum Newlyn.
Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the
parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.
N
DCO-PP-12X-CHEEF-140029
Phase 3
Highway layout during construction
ILLUSTRATIVE
Chelsea Embankment Foreshore
RB Kensington and Chelsea
January 2013
StageConstruction phases10m 0 40m
Scale 1:500 at A1
1:1000 if reproduced at A3
Site hoarding
Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm
On street parking
Standards
Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006
Monument
Ranelagh
Gardens
M
hw
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
CHEEF_C07
CHEEF_C08
CHEEF_C09
CHEEF_C10
Monument
Ranelagh
Gardens
M
h
w
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
Ranelagh gardens
Shingle
C
h
e
ls
e
a
e
m
b
a
n
k
m
e
n
t
M
e
a
n
h
ig
h
w
a
te
r
Proposed highway layout during construction
Existing highway layout
This drawing
KeyExisting
On street parkingBus stop / standPedestrian crossing
CHEEF_C00 See schedule of works
Revised
Traffic barrierSite access point
Temporary pedestrian crossing
L.L.A.U.
Temporary parking restrictionTemporary bus stop restriction
c Thames Water Utilities Ltd 2008
Keyplan:
Mapping reproduced by permission of Ordnance
Database right 2012. All rights reserved. Ordance
Survey licence number 100019345
N
Application for Development Consent
Location
Document Information
Coordinates are to be Ordance Survey Datum
OSGB36. All levels are in metres and relate to the
Tunnel Datum which is 100 metres below Ordnance
Datum Newlyn.
Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the
parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.
N
DCO-PP-12X-CHEEF-140030
Bullring resurfacing
Highway layout during construction
ILLUSTRATIVE
Chelsea Embankment Foreshore
RB Kensington and Chelsea
January 2013
StageConstruction phases10m 0 40m
Scale 1:500 at A1
1:1000 if reproduced at A3
Removed pedestrian crossing
Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm
On street parking
Standards
Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006
Monument
Ranelagh
Gardens
M
H
W
Shingle
C
H
E
L
S
E
A
E
M
B
A
N
K
M
E
N
T
Ranelagh Gardens
Shingle
C
H
E
L
S
E
A
E
M
B
A
N
K
M
E
N
T
4.9m
5.4m
7.5m
4.3m
M
e
a
n
H
ig
h
W
a
te
r
CHEEF_P02
CHEEF_P03
CHEEF_P01
Monument
Ranelagh
Gardens
M
H
W
Shingle
C
H
E
L
S
E
A
E
M
B
A
N
K
M
E
N
T
Ranelagh Gardens
Shingle
C
H
E
L
S
E
A
E
M
B
A
N
K
M
E
N
T
4.9m
5.4m
7.5m
4.3m
M
e
a
n
H
ig
h
W
a
te
r
Proposed highway layout during construction
Existing highway layout
KeyExisting
On street parkingBus stop / standPedestrian crossing
CHEEF_C00 See schedule of worksRevised
Pedestrian refuge
c Thames Water Utilities Ltd 2008
Keyplan:
Mapping reproduced by permission of Ordnance
Database right 2012. All rights reserved. Ordance
Survey licence number 100019345
N
Application for Development Consent
Location
Document Information
Coordinates are to be Ordance Survey Datum
OSGB36. All levels are in metres and relate to the
Tunnel Datum which is 100 metres below Ordnance
Datum Newlyn.
Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the
parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.
N
DCO-PP-12X-CHEEF-140031
Permanent highway layout
ILLUSTRATIVE
Chelsea Embankment Foreshore
RB Kensington and Chelsea
January 2013
This drawing
StagePermanent phase10m 0 40m
Scale 1:500 at A1
1:1000 if reproduced at A3
Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm
On street parking
Standards
Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006
Strengthen footway / vehicle crossover area
Copyright notice Copyright Thames Water Utilities Limited January 2013. All rights reserved. Any plans, drawings, designs and materials (materials) submitted by Thames Water Utilities Limited (Thames Water) as part of this application for Development Consent to the Planning Inspectorate are protected by copyright. You may only use this material (including making copies of it) in order to (a) inspect those plans, drawings, designs and materials at a more convenient time or place; or (b) to facilitate the exercise of a right to participate in the pre-examination or examination stages of the application which is available under the Planning Act 2008 and related regulations. Use for any other purpose is prohibited and further copies must not be made without the prior written consent of Thames Water. Thames Water Utilities LimitedClearwater Court, Vastern Road, Reading RG1 8DB The Thames Water logo and Thames Tideway Tunnel logo are Thames Water Utilities Limited. All rights reserved. DCO-DT-000-ZZZZZ-021400