    VESSEL : TB LSBL IX

    LOCATION : KELANIS

    PIC : 2 MEI 2015

    NO. ITEM CHECK POINTS Running

    hours REMAKS

    Operate satisfactorily. Yes No

    Safety devices function properly. Yes No

    Remote control function properly. Yes No

    Check the alarm lamp operation Yes No

    Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5

    kgf/cm2 ( during operation )Yes No

    Oil pressure 0.2 to 0.29 mpa / 2 to 3kgf/cm2 ( standard pressure / no load ) Yes No

    Coolant temperature gauge 70 to 80C

    ( during operation )Yes No

    Water level at expansion tank Yes No

    Check condition and level the Engine Oil Yes No

    The oil filter and by pass oil filter Yes No

    Condition of The Zinc Rods 500 Yes No

    Condition of the V- Belt 250 Yes No

    Measure Deflection of The V-Belt

    ( 10 to 15 mm)250 Yes No

    The primary and secondary of fuel filter 500 Yes No

    Fuel injection nozzle opening pressure

    ( 34.3 Mpa / 350 kgf/cm2 )1000 Yes No

    Injection timing ( BTDC 18) 1000 Yes No

    Valve Clearance

    ( inlet : 0.6 mm, exhaust : 0.8 mm )1000 Yes No

    Damper vibration 2000 Yes No

    Color of exhaust smoke Yes No

    Sea water discharging volume Yes No

    Tightening torque of bolts Yes No

    Operate satisfactorily. Yes No

    Oil pressure 4.0 to 5.0 bar

    ( Clutch disengaged )Yes No

    Oil pressure appr. 22 bar

    ( Clutch engaged)Yes No

    Oil level ( between " Min " and " Max" )

    and condition of The Oil2000 Yes No

    Oil temperature from the Thermometer

    ( 30 to 60 C and max 70 C )Yes No

    Check the Contamination indicator for the

    oil filter standard

    ( indicator red = filter contamination )

    2000 Yes No

    The contamination indicator for the oil filter

    / duplex filter2000 Yes No

    The Oil cooler Anodes Yes No

    Leakage Yes No

    Abnormal running Yes No

    Abnormal opeating noises Yes No

    Tightening torque of bolts 5000 Yes No

    Operate satisfactorily. Yes No

    Safety devices function properly. Yes No

    Remote control function properly. Yes No

    Check the alarm lamp operation Yes No

    PMS CHECKLIST

    2 MAIN ENGINE

    STARBOARD

    (CUMMINS KTA 38 -

    M2)

    1

    SATISFACTORY

    MAIN ENGINE

    PORTSIDE

    (CUMMINS KTA 38 -

    M2)

    GEARBOX PORT

    (TWIN DISC MGX

    5321 DC)

  • 7/24/2019 Checklist Pms tugboat 2

    2/5

    NO. ITEM CHECK POINTS Running

    hours REMAKSSATISFACTORY

    Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5

    kgf/cm2 ( during operation )Yes No

    Oil pressure 0.2 to 0.29 mpa / 2 to 3

    kgf/cm2 ( standard pressure / no load )Yes No

    Coolant temperature gauge 70 to 80C

    ( during operation )Yes No

    Water level at expansion tank Yes No

    Check condition and level the Engine Oil Yes No

    The oil filter and by pass oil filter Yes No

    Condition of The Zinc Rods 500 Yes No

    Condition of the V- Belt 250 Yes No

    Measure Deflection of The V-Belt

    (10 to 15 mm)250 Yes No

    The primary and secondary of fuel filter 500 Yes No

    Fuel injection nozzle opening pressure

    (34.3 Mpa / 350 kgf/cm2 )1000 Yes No

    Injection timing ( BTDC 18) 1000 Yes No

    Valve Clearance

    ( inlet : 0.6 mm, exhaust : 0.8 mm )1000 Yes No

    Damper vibration 2000 Yes No

    Color of exhaust smoke Yes No

    Sea water discharging volume Yes No

    Tightening torque of bolts Yes No

    Operate satisfactorily. Yes No

    Oil pressure 4.0 to 5.0 bar

    ( Clutch disengaged )Yes No

    Oil pressure appr. 22 bar

    ( Clutch engaged)Yes No

    Oil level ( between " Min " and " Max" )

    and condition of The Oil2000 Yes No

    Oil temperature from the Thermometer (

    30 to 60 C and max 70 C )Yes No

    Check the Contamination indicator for the

    oil filter standard

    ( indicator red = filter contamination )

    2000 Yes No

    The contamination indicator for the oil filter/ duplex filter

    2000 Yes No

    The Oil cooler Anodes Yes No

    Leakage Yes No

    Abnormal running Yes No

    Abnormal opeating noises Yes No

    Tightening torque of bolts 5000 Yes No

    Operate satisfactorily. Yes No

    Safety devices function properly. Yes No

    Water level at Expansion Tank Yes No

    Condition of the V - Belt Yes No

    Measure deflection of the V - Belt

    (10 mm )Yes No

    Condition of the Impeller water pump 400 Yes No

    Condition The Oil and Level Oil

    ( Full mark )Yes No

    Lubricating Oil Filter Yes No

    Color of exhaust smoke Yes No

    3

    GEARBOX PORT

    (TWIN DISC MGX

    5321 DC)

    GENERATOR

    ENGINES

    PORTSIDE (

    CUMMINS 6 BT5-9-

    GM.83 )

  • 7/24/2019 Checklist Pms tugboat 2

    3/5

    NO. ITEM CHECK POINTS Running

    hours REMAKSSATISFACTORY

    Sea water discharging volume Yes No

    Air Filter Yes No

    The Valve tip Clearance

    ( inlet 0.2 mm and exhaust 0.45 mm )2000 Yes No

    Condition of the Viscous Damper 2000 Yes No

    Lubricating Oil Pressure

    ( 280 kN/m2 / 2.5 kgf/cm2 )Yes No

    Fuel injection nozzle opening pressure

    (Mpa / kgf/cm2 )Yes No

    Operate satisfactorily. Yes No

    Abnormal vibration Yes No

    Synchronasation system Yes No

    Output voltage Yes No

    Operate satisfactorily. Yes No

    Safety devices function properly. Yes No

    Water level at Expansion Tank Yes No

    Condition of the V - Belt Yes No

    Measure deflection of the V - Belt

    (10 mm )Yes No

    Condition of the Impeller water pump 400 Yes No

    Condition The Oil and Level Oil

    ( Full mark )Yes No

    Lubricating Oil Filter Yes No

    Color of exhaust smoke Yes No

    Sea water discharging volume Yes No

    Air Filter Yes No

    The Valve tip Clearance

    ( inlet 0.2 mm and exhaust 0.45 mm )2000 Yes No

    Condition of the Viscous Damper 2000 Yes No

    Lubricating Oil Pressure( 280 kN/m2 / 2.5 kgf/cm2 ) Yes No

    Fuel injection nozzle opening pressure

    ( Mpa / kgf/cm2 )Yes No

    Operate satisfactorily. Yes No

    Abnormal vibration Yes No

    Synchronasation system Yes No

    Output voltage Yes No

    Operate satisfactorily. Yes No

    Check condition and level the Engine Oil Yes No

    Water level at expansion tank Yes No

    Condition of the V- Belt and tension of the

    V- belt ( 10 -15 mm )Yes No

    Oil filter element Yes No

    Fuel filter element Yes No

    Sea water discharging volume Yes No

    Abnormal noise and vibrate Yes No

    Exhaust color of smoke Yes No

    Operate satisfactorily. Yes No

    6

    4

    GENERATOR

    ENGINES

    STARBOARD (

    CUMMINS 6 BT5-9-

    GM.83 )

    ALTERNATOR

    (MAGNAPLUS MPH

    754)

    5

    ALTERNATOR

    (MAGNAPLUS MPH

    754)

    FIRE SISTEM

  • 7/24/2019 Checklist Pms tugboat 2

    4/5

    NO. ITEM CHECK POINTS Running

    hours REMAKSSATISFACTORY

    Abnormal noise and vibrate Yes No

    leakage from the pump casing Yes No

    Greasing Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Operate satisfactorily. Yes No

    leakage from the pump casing Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Ballast pump Operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Bilge & GS Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Sea water cooling Pump operate

    satisfactorily.Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Fuel oil Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Emergency stop operating satisfactorily Yes No

    Dirty oil Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Operate satisfactorily. Yes No

    Remote and control function properly. Yes No

    Meters and gauges in good order. Yes No

    Operate satisfactorily. Yes No

    Remote and control function properly. Yes No

    Meters and gauges in good order. Yes No

    Operate satisfactorily. Yes No

    Remote and control function properly. Yes No

    Meters and gauges in good order. Yes No

    12

    8

    13

    SEWAGE

    TREATMENTPLANT

    14OILY WATER

    SEPARATOR

    10

    11

    15

    HYDRAULIC

    POWER PACK AND

    CONTROL

    9

    FIRE PUMP

    FUEL OIL SYSTEM

    DIRTY OIL SYSTEM

    EMERGENCY FIRE

    PUMP7

    BALLAST SYSTEM

    PORT & STBD

    BILGE & GS

    SYSTEM

    SEA WATER

    COOLING SYSTEM

  • 7/24/2019 Checklist Pms tugboat 2

    5/5

    NO. ITEM CHECK POINTS Running

    hours REMAKSSATISFACTORY

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    17 BLOWER E/R Operate satisfactorily. Yes No

    18EMERGENCY

    STEERINGOperate satisfactorily. Yes No

    19CONTROL

    CONSOLOperate satisfactorily. Yes No

    20COMMUNICATION

    SYSTEMOperate satisfactorily. Yes No

    21CLEANLINESS of

    E/RMust be clean without rubbish or waste oil. Yes No

    22 GUARDS ANDFENCING

    Protection covers and/or guards in goodorder.

    Yes No

    Operate satisfactorily. Yes No

    All valves operate satisfactorily. Yes No

    All lights in good order. Yes No

    Protection covers or guards in good order Yes No

    All lights in good order. Yes No

    Protection covers or guards in good order Yes No

    All lights in good order. Yes No

    Protection covers or guards in good order Yes No

    27 Emergency cables

    Condition in good order, no exposed wire,

    heavy corrosion, especially on weather

    deck.

    Yes No

    28 Emergency lights All lights in good order, no broken lights. Yes No

    29

    Anti-explosion lights

    in dangerous

    spaces, pump room,

    battery room, paint

    locker etc.

    All lights in good order, no broken covers

    and guards, tightening handles available

    on board.

    Yes No

    30Insulating mats

    around MSB

    Available on board or insulation cement

    permanently laid up on the floor.Yes No

    All gauges and indicating light are

    functioningYes No

    The surface of panel for excessive

    warmnessYes No

    Unusual smell Yes No

    All cable conncetion and bus Yes No

    Gas detector at P.R Yes No

    Fire detector Yes No

    Sensor CO2 Yes No

    Bilges at Engine Room Yes No

    Bilges at Pump Room Yes No

    Bilges at Steering Room Yes No

    Daily Oil Tank Yes No

    Fuel Oil Tank Yes No

    Sewage tank Yes No

    Bena Sopan R. Dede Mulyana

    Chief Engineers Technical Superintendent

    Date : 02 Mei 2015 Date : 02 Mei 2015

    33

    Level high / low

    alarm operate

    satisfactorily

    26

    Lighting in working

    room, steering room

    and other spaces

    31 Main Switch Board

    32Alarms operate

    satisfactorily

    25Lighting in Acc.

    Spaces

    24 Lighting in E/R

    23

    16 PIPING

    QUICK CLOSING

    VALVE