NO. ITEM CHECK POINTS SATISFACTORY
1 Operate satisfactorily. Yes No
Safety devices function properly. Yes No
Water level at Expansion Tank Yes No
Condition of the V - Belt Yes No
Measure deflection of the V - Belt ( 10 mm ) Yes No
Condition of the Impeller water pump 400 Yes No
Condition The Oil and Level Oil ( Full mark ) Yes No
Lubricating Oil Filter Yes No
Color of exhaust smoke Yes No
Sea water discharging volume Yes No
Air Filter Yes No
2000 Yes No
Condition of the Viscous Damper 2000 Yes No
Yes No
Yes No
Operate satisfactorily. Yes No
Abnormal vibration Yes No
Synchronasation system Yes No
Output voltage Yes No
2 Operate satisfactorily. Yes No
Check condition and level the Engine Oil Yes No
Water level at expansion tank Yes No
Yes No
Oil filter element Yes No
Fuel filter element Yes No
1000 Yes No
Yes No
Remote control function properly. Yes No
Sea water discharging volume Yes No
Abnormal noise and vibrate Yes No
Exhaust color of smoke Yes No
CARGO SYSTEM Cargo Pump operate satisfactorily. Yes No
Running hours
GENERATOR ENGINES (YANMAR 4TNE 106T)
The Valve tip Clearance ( inlet 0.2 mm and exhaust 0.45 mm )
Lubricating Oil Pressure ( 280 kN/m2 / 2.5 kgf/cm2 )Fuel injection nozzle opening pressure ( Mpa / kgf/cm2 )
ALTERNATOR ( STAMFORD UCM274E1 )
ENGINE CARGO PORTSIDE ( MITSUBISHI 6D16 )
Condition of the V- Belt and tension of the V- belt ( 10 -15 mm )
Clearance Valve ( inlet 0.2 mm and exhaust 0.3 mm )The Nozzle pressure and Spray ( 22 Mpa / 224 Kg/cm2 )
NO. ITEM CHECK POINTS SATISFACTORYRunning hours
2
CARGO SYSTEM
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Emergency stop ECP operating satisfactorily Yes No
Piping in good order. Yes No
3 Operate satisfactorily. Yes No
Check condition and level the Engine Oil Yes No
Water level at expansion tank Yes No
Yes No
Oil filter element Yes No
Fuel filter element Yes No
1000 Yes No
Yes No
Remote control function properly. Yes No
Sea water discharging volume Yes No
Abnormal noise and vibrate Yes No
Exhaust color of smoke Yes No
CARGO SYSTEM Cargo Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Emergency stop ECP operating satisfactorily Yes No
Piping in good order. Yes No
4 Operate satisfactorily. Yes No
Sea water discharging volume Yes No
Abnormal noise and vibrate Yes No
5 FIRE PUMP Operate satisfactorily. Yes No
Abnormal noise and vibrate Yes No
leakage from the pump casing Yes No
Greasing Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
6 Bilge & GS Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
ENGINE CARGO PORTSIDE ( MITSUBISHI 6D16 )
Condition of the V- Belt and tension of the V- belt ( 10 -15 mm )
Clearance Valve ( inlet 0.2 mm and exhaust 0.3 mm )The Nozzle pressure and Spray ( 22 Mpa / 224 Kg/cm2 )
FIRE FIGHTING ENGINE DRIVEN ( electromotor )
BILGE & GS SYSTEM
NO. ITEM CHECK POINTS SATISFACTORYRunning hours
6
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
7 Sea water cooling Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
8 FUEL OIL SYSTEM Fuel oil Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Emergency stop operating satisfactorily Yes No
9 Stripping Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
10 DIRTY OIL SYSTEM Dirty oil Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
11 Operate satisfactorily. Yes No
Remote and control function properly. Yes No
Meters and gauges in good order. Yes No
12 PIPING No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
13 BLOWER P/R Operate satisfactorily. Yes No
Emergency stop operating satisfactorily Yes No
14 BLOWER E/R Operate satisfactorily. Yes No15 CLEANLINESS of E/R
Must be clean without rubbish or waste oil. Yes No
16Protection covers and/or guards in good order. Yes No
BILGE & GS SYSTEM
SEA WATER COOLING SYSTEM
STRIPPING SYSTEM
OILY WATER SEPARATOR
GUARDS AND FENCING
NO. ITEM CHECK POINTS SATISFACTORYRunning hours
Chief EngineersDate :
REMAKS
REMAKS
REMAKS
REMAKS
Technical SuperintendentDate :
NO ITEM CHECK POINTS SATISFACTORY
1 Lighting in E/RAll lights in good order. Yes No
Protection covers or guards in good order Yes No
2 Lighting in Acc. SpacesAll lights in good order. Yes No
Protection covers or guards in good order Yes No
3All lights in good order. Yes No
Protection covers or guards in good order Yes No
4 Emergency cables Yes No
5 Emergency lights All lights in good order, no broken lights. Yes No
6 Yes No
7 Yes No
8
Main Switch BoardYes No
Yes No
Unusual smell Yes No
All cable conncetion and bus Yes No
9
Gas detector at P.R Yes No
Fire detector Yes No
Sensor CO2 Yes No
Bilges at Engine Room Yes No
Bilges at Pump Room Yes No
Bilges at Steering Room Yes No
10
Daily Oil Tank Yes No
Fuel Oil Tank Yes No
Sewage tank Yes No
Chief EngineersDate :
Lighting in working room, steering room and other spaces
Condition in good order, no exposed wire, heavy corrosion, especially on weather deck.
Anti-explosion lights in dangerous spaces, pump room, battery room, paint locker etc.
All lights in good order, no broken covers and guards, tightening handles available on board.
Insulating mats around MSB
Available on board or insulation cement permanently laid up on the floor.All gauges and indicating light are functioningThe surface of panel for excessive warmness
Alarms operate satisfactorily
Level high / low alarm operate satisfactorily
REMAKS
Technical SuperintendentDate :