  • NO. ITEM CHECK POINTS SATISFACTORY

    1 Operate satisfactorily. Yes No

    Safety devices function properly. Yes No

    Water level at Expansion Tank Yes No

    Condition of the V - Belt Yes No

    Measure deflection of the V - Belt ( 10 mm ) Yes No

    Condition of the Impeller water pump 400 Yes No

    Condition The Oil and Level Oil ( Full mark ) Yes No

    Lubricating Oil Filter Yes No

    Color of exhaust smoke Yes No

    Sea water discharging volume Yes No

    Air Filter Yes No

    2000 Yes No

    Condition of the Viscous Damper 2000 Yes No

    Yes No

    Yes No

    Operate satisfactorily. Yes No

    Abnormal vibration Yes No

    Synchronasation system Yes No

    Output voltage Yes No

    2 Operate satisfactorily. Yes No

    Check condition and level the Engine Oil Yes No

    Water level at expansion tank Yes No

    Yes No

    Oil filter element Yes No

    Fuel filter element Yes No

    1000 Yes No

    Yes No

    Remote control function properly. Yes No

    Sea water discharging volume Yes No

    Abnormal noise and vibrate Yes No

    Exhaust color of smoke Yes No

    CARGO SYSTEM Cargo Pump operate satisfactorily. Yes No

    Running hours

    GENERATOR ENGINES (YANMAR 4TNE 106T)

    The Valve tip Clearance ( inlet 0.2 mm and exhaust 0.45 mm )

    Lubricating Oil Pressure ( 280 kN/m2 / 2.5 kgf/cm2 )Fuel injection nozzle opening pressure ( Mpa / kgf/cm2 )

    ALTERNATOR ( STAMFORD UCM274E1 )

    ENGINE CARGO PORTSIDE ( MITSUBISHI 6D16 )

    Condition of the V- Belt and tension of the V- belt ( 10 -15 mm )

    Clearance Valve ( inlet 0.2 mm and exhaust 0.3 mm )The Nozzle pressure and Spray ( 22 Mpa / 224 Kg/cm2 )

  • NO. ITEM CHECK POINTS SATISFACTORYRunning hours

    2

    CARGO SYSTEM

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Emergency stop ECP operating satisfactorily Yes No

    Piping in good order. Yes No

    3 Operate satisfactorily. Yes No

    Check condition and level the Engine Oil Yes No

    Water level at expansion tank Yes No

    Yes No

    Oil filter element Yes No

    Fuel filter element Yes No

    1000 Yes No

    Yes No

    Remote control function properly. Yes No

    Sea water discharging volume Yes No

    Abnormal noise and vibrate Yes No

    Exhaust color of smoke Yes No

    CARGO SYSTEM Cargo Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Emergency stop ECP operating satisfactorily Yes No

    Piping in good order. Yes No

    4 Operate satisfactorily. Yes No

    Sea water discharging volume Yes No

    Abnormal noise and vibrate Yes No

    5 FIRE PUMP Operate satisfactorily. Yes No

    Abnormal noise and vibrate Yes No

    leakage from the pump casing Yes No

    Greasing Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    6 Bilge & GS Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    ENGINE CARGO PORTSIDE ( MITSUBISHI 6D16 )

    Condition of the V- Belt and tension of the V- belt ( 10 -15 mm )

    Clearance Valve ( inlet 0.2 mm and exhaust 0.3 mm )The Nozzle pressure and Spray ( 22 Mpa / 224 Kg/cm2 )

    FIRE FIGHTING ENGINE DRIVEN ( electromotor )

    BILGE & GS SYSTEM

  • NO. ITEM CHECK POINTS SATISFACTORYRunning hours

    6

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    7 Sea water cooling Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    8 FUEL OIL SYSTEM Fuel oil Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    Emergency stop operating satisfactorily Yes No

    9 Stripping Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    10 DIRTY OIL SYSTEM Dirty oil Pump operate satisfactorily. Yes No

    No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    Piping in good order. Yes No

    11 Operate satisfactorily. Yes No

    Remote and control function properly. Yes No

    Meters and gauges in good order. Yes No

    12 PIPING No heavy corrosion and leakage. Yes No

    All valves operate satisfactorily. Yes No

    13 BLOWER P/R Operate satisfactorily. Yes No

    Emergency stop operating satisfactorily Yes No

    14 BLOWER E/R Operate satisfactorily. Yes No15 CLEANLINESS of E/R

    Must be clean without rubbish or waste oil. Yes No

    16Protection covers and/or guards in good order. Yes No

    BILGE & GS SYSTEM

    SEA WATER COOLING SYSTEM

    STRIPPING SYSTEM

    OILY WATER SEPARATOR

    GUARDS AND FENCING

  • NO. ITEM CHECK POINTS SATISFACTORYRunning hours

    Chief EngineersDate :

  • REMAKS

  • REMAKS

  • REMAKS

  • REMAKS

    Technical SuperintendentDate :

  • NO ITEM CHECK POINTS SATISFACTORY

    1 Lighting in E/RAll lights in good order. Yes No

    Protection covers or guards in good order Yes No

    2 Lighting in Acc. SpacesAll lights in good order. Yes No

    Protection covers or guards in good order Yes No

    3All lights in good order. Yes No

    Protection covers or guards in good order Yes No

    4 Emergency cables Yes No

    5 Emergency lights All lights in good order, no broken lights. Yes No

    6 Yes No

    7 Yes No

    8

    Main Switch BoardYes No

    Yes No

    Unusual smell Yes No

    All cable conncetion and bus Yes No

    9

    Gas detector at P.R Yes No

    Fire detector Yes No

    Sensor CO2 Yes No

    Bilges at Engine Room Yes No

    Bilges at Pump Room Yes No

    Bilges at Steering Room Yes No

    10

    Daily Oil Tank Yes No

    Fuel Oil Tank Yes No

    Sewage tank Yes No

    Chief EngineersDate :

    Lighting in working room, steering room and other spaces

    Condition in good order, no exposed wire, heavy corrosion, especially on weather deck.

    Anti-explosion lights in dangerous spaces, pump room, battery room, paint locker etc.

    All lights in good order, no broken covers and guards, tightening handles available on board.

    Insulating mats around MSB

    Available on board or insulation cement permanently laid up on the floor.All gauges and indicating light are functioningThe surface of panel for excessive warmness

    Alarms operate satisfactorily

    Level high / low alarm operate satisfactorily