Checklist for Estimation of Cable Qty for Ordering Status Revision Remarks 1 Layout Drawings Overall Plant Layout Available R0 Process Building Drawings Available Load Centre Layouts Available A Latest layout reuired CCR Layouts Available B Latest CCR layout reuired Conveyor Layout Drawings !ot Avaliable Any "ui#ment Layout Drawing$Rooms at %&' Building&Coalmill "tc( !ot Avaliable 'or ) rans*er tower+some o* dam#ers in C, - Tray Layout Drawings Overall Cable tray Drawings !ot Avaliable Process Building )ray Drawings !ot Avaliable Loadcentre Cable tray Drawings !ot Avaliable Conveyor ) ray Layout Drawings !ot Avaliable . Conceptual Drawings Cable conce#ts Available 0-/0/1 Power P2iloso2y $3PS and !on 3PS Distribution( !ot Avaliable  4B P2iloso#2y !ot Avaliable 'ollow as #er 5O)67  ) y#e o* Cables !ot Avaliable 'ollow as #er 5O)67 S#are P2iloso2#y !ot Avaliable 'ollow as #er 5O)67 Pull Cords&Belt Sway 7nter*ace !ot Avaliable 'ollow as #er 5O)67 ,otorised Actuator inter*ace Avaliable R0 Basic Inputs Instrument List Available " Area81 Area8- Area8. Area8 Area89 Area8: Area8; Area8< Area8 Area810 !ID Available D Area81 Area8- Area8. Area8 Area89 Area8: Area8; Area8< Area8 Area810 System Arc2itecture !ot Avaliable Location 7O Panels !ot Avaliable Location o* SCS Systems !ot Avaliable List o* Subcontrol Systems area wise Avaliable R. Packing #lant SCS List $i* any( area not available SCS Cables considered as #er Drawings = es 9 Ensure ower"#$%&on #$' Cables considered for (ollowing 7O Panel = es Controller Panel = es Server Panel = es Control Desk = es Subcontrol Systems = es ,CC Panels = es&!o 5) *eeders = es&!o 'ield 7nstruments = es !etworking Panel = es System arc2itecture reuired  ) ele#2one ">c2ange = es&!o CC)? = es&!o 'irealm System = es&!o PA System = es&!o @iln 5)CC)? = es&!o Cooler 5)CC)? = es&!o @iln S2ell Scanner = es&!o 5ooters = es&!o Packer Sli# Ring$'or Control System( = es&!o Packing Bag Printer ,ac2ine = es&!o Any ot2er item as #er ?endor Drawings&7nst List = es&!o : Ensure Control ! $ignal Cables considered for (ollowing SCS As #er SCS List$Panel to its instruments and Panel to 7O Panels( = es 'ield 7nstruments as #er 7nst List = es  )2ermocou#le Cables = es&!o Baglter Loo# Cables = es&!o Conveyor Pull Cord&BDS&SS Cables = es Packer LPB Cables $Packer Panel to LPB( = es&!o PA System Cables = es&!o

Checklist - Cable Estimation

Embed Size (px)

DESCRIPTION

CHECK LIST- CABLE ESTIMATION

Citation preview

Page 1: Checklist - Cable Estimation

7/18/2019 Checklist - Cable Estimation

http://slidepdf.com/reader/full/checklist-cable-estimation 1/3

Checklist for Estimation of Cable Qty for Ordering

Status Revision Remarks

Layout Drawings

Overall Plant Layout Available R0

Process Building Drawings Available

Load Centre Layouts Available A Latest layout reuired

CCR Layouts Available B Latest CCR layout reuired

Conveyor Layout Drawings !ot Avaliable

Any "ui#ment Layout Drawing$Rooms at %&' Building&Coalmill "tc( !ot Avaliable 'or )rans*er tower+some o* dam#ers in C,

Tray Layout Drawings

Overall Cable tray Drawings !ot Avaliable

Process Building )ray Drawings !ot Avaliable

Loadcentre Cable tray Drawings !ot Avaliable

Conveyor )ray Layout Drawings !ot Avaliable

Conceptual Drawings

Cable conce#ts Available 0-/0/1

Power P2iloso2y $3PS and !on 3PS Distribution( !ot Avaliable

 4B P2iloso#2y !ot Avaliable 'ollow as #er 5O)67

 )y#e o* Cables !ot Avaliable 'ollow as #er 5O)67

S#are P2iloso2#y !ot Avaliable 'ollow as #er 5O)67

Pull Cords&Belt Sway 7nter*ace !ot Avaliable 'ollow as #er 5O)67

,otorised Actuator inter*ace Avaliable R0

Basic Inputs

Instrument List Available "

Area81

Area8-

Area8.

Area8

Area89Area8:

Area8;

Area8<

Area8

Area810

!ID Available D

Area81

Area8-

Area8.

Area8

Area89

Area8:

Area8;

Area8<

Area8

Area810

System Arc2itecture !ot Avaliable

Location 7O Panels !ot Avaliable

Location o* SCS Systems !ot Avaliable

List o* Subcontrol Systems area wise Avaliable R. Packing #lant SCS List $i* any( area not available

SCS Cables considered as #er Drawings =es

Ensure ower"#$%&on #$' Cables considered for (ollowing

7O Panel =es

Controller Panel =es

Server Panel =es

Control Desk =es

Subcontrol Systems =es

,CC Panels =es&!o

5) *eeders =es&!o

'ield 7nstruments =es

!etworking Panel =es System arc2itecture reuired

 )ele#2one ">c2ange =es&!o

CC)? =es&!o

'irealm System =es&!o

PA System =es&!o

@iln 5)CC)? =es&!o

Cooler 5)CC)? =es&!o

@iln S2ell Scanner =es&!o

5ooters =es&!o

Packer Sli# Ring$'or Control System( =es&!o

Packing Bag Printer ,ac2ine =es&!o

Any ot2er item as #er ?endor Drawings&7nst List =es&!o

Ensure Control ! $ignal Cables considered for (ollowing

SCS As #er SCS List$Panel to its instruments and Panel to 7O Panels( =es

'ield 7nstruments as #er 7nst List =es )2ermocou#le Cables =es&!o

Baglter Loo# Cables =es&!o

Conveyor Pull Cord&BDS&SS Cables =es

Packer LPB Cables $Packer Panel to LPB( =es&!o

PA System Cables =es&!o

Page 2: Checklist - Cable Estimation

7/18/2019 Checklist - Cable Estimation

http://slidepdf.com/reader/full/checklist-cable-estimation 2/3

CC)? Cables =es&!o

'AS Cables =es&!o

 )ele#2one ">c2ange Cables =es&!o

Page 3: Checklist - Cable Estimation

7/18/2019 Checklist - Cable Estimation

http://slidepdf.com/reader/full/checklist-cable-estimation 3/3

(ollowings points considered accurately

Distance between Load Centre and Process Buldings =es&!o

Building "levations =es&!o

Conveyor Lengt2s =es&!o

Branc2 cables lengt2 =es&!o

Cable lengt2 inside #anels&7nstruments&4B&PDB =es&!o

 )ray Bends and Raiser Lengt2s Considered =es&!o

All areas Considered

B' Loo# cables s2ould be -c>1/9 3n armoured 'le>ible =es&!o

B' Loo# cable avg distance to be considered as mtrs =es&!o

B' )imer Panel Location at Bottom o* Baglter and '4B ke#t near Solenoids =es&!o

SCS locations considered as #er Customer #2iloso#2y =es&!o

R7O Panel Locations considered as #er System Arc2itecture =es&!o

)eneral oints

Lengt2 Calculation P2iloso#2y to be submitted

List o* eui#ments *or w2ic2 documents are not availabe and assumed on ">#erience to be submitted

Distance between various buildings&Loadcentres&Building "levation ">cel S2eet ready r to be submitted

Any #oint to be 2ig2lig2ted to be submitted

 =es&!o

Power Cables

Pair Cables

Load cell Cables

 )riad Cables

 )2ermocou#le Cable

PA System Cables

CC)? Cables

'AS Cables

 )ele#2one ">c2ange Cables

)land Calculation

"nsure *ollowing Cables Considered =es&!o

Power Cables =es&!o

Pair Cables =es&!o

Load cell Cables =es&!o

 )riad Cables =es&!o

 )2ermocou#le Cable =es&!o

PA System Cables =es&!o

CC)? Cables =es&!o

'AS Cables =es&!o

 )ele#2one ">c2ange Cables =es&!o

Bag 'ilter Cables$)o be se#arate line item( =es&!o

Ensure total Estimated Qty is *utomated and all Type of CablesConsidered"Including CCT+%(*$%* $ystem'