Project Name : WORTEL FIELD DEVELOPMENT PROJECT
Customer : SANTOS (Sampang) Pty. Ltd.
Drawing Reff. / Rev : System / Sub No. :
Single Line No. / Rev : System Desc. :
Location / Area : E/I Building Area Sub System Desc. :
Notes :
Print Name
Date
Company
Signature
ELECTRICAL
MECHANICAL COMPLETION CHECK SHEETS
ELECTRICAL SUPPORT
Description Performed by Witnessed / Approved by Witnessed / Approved by
No. Inspection Check List
Tag No.
9 8 2 0 - N L D B - 0 0 2
9 8 2 0 - N L D B - 0 0 1
9 8 2 0 - N L D B - 1 0 1
9 8 2 0 - E L D B - 0 0 1
9 8 2 0 - E L D B - 1 0 1
2 Check support design accordance with design drawing
1 Check support support material have correct specifiction and size
4 Check that support have completed fabrication work
3 Check support have correct dimension accordance to design drawing
6Check support installation are level, correct elevation and adequate for
electrical installation
5 Check that support location refer to layout
8 Check that support are tight installed
7 Check welding visualy inspected where applicable
9 Check that support have completed finishing work
11
12
10
E24MC
SANTOS (SAMPANG ) PTY LTD
8/13/2019 Check List Electrical_new
http://slidepdf.com/reader/full/check-list-electricalnew 2/3
Project Name : WORTEL FIELD DEVELOPMENT PROJECT
Customer : SANTOS (Sampang) Pty. Ltd.
Drawing Reff. / Rev : System / Sub No. :
Single Line No. / Rev : System Desc. :
Location / Area : E/I Building Area Sub System Desc. :
Notes :
E24MC
12
10
11
9 Check that support have completed finishing work
8 Check that support are tight installed
7 Check welding visualy inspected where applicable
6Check support installation are level, correct elevation and adequate for
electrical installation
5 Check that support location refer to layout
4 Check that support have completed fabrication work
3 Check support have correct dimension accordance to design drawing
2 Check support design accordance with design drawing
1 Check support support material have correct specifiction and size
Inspection Check List
Tag No.
9 8 2 0 - I S - 2 5 0 / 2 6 0
Description Performed by Witnessed / Approved by Witnessed / Approved by
ELECTRICAL
MECHANICAL COMPLETION CHECK SHEETS
ELECTRICAL SUPPORT
No.
Signature
Company
Date
Print Name
SANTOS (SAMPANG ) PTY LTD
8/13/2019 Check List Electrical_new
http://slidepdf.com/reader/full/check-list-electricalnew 3/3
Project Name : WORTEL FIELD DEVELOPMENT PROJECT
Customer : SANTOS (Sampang) Pty. Ltd.
Drawing Reff. / Rev : System / Sub No. :
Single Line No. / Rev : System Desc. :
Location / Area : E/I Building Area Sub System Desc. :
Notes :
Print Name
Date
Company
Signature
ELECTRICAL
MECHANICAL COMPLETION CHECK SHEETS
ELECTRICAL SUPPORT
Description Performed by Witnessed / Approved by Witnessed / Approved by
No. Inspection Check List
Tag No.
9 8 2 0 - U P S D B - 0 0 1
9 8 2 0 - U P S D B - 0 0 2
2 Check support design accordance with design drawing
1 Check support support material have correct specifiction and size
4 Check that support have completed fabrication work
3 Check support have correct dimension accordance to design drawing
6Check support installation are level, correct elevation and adequate for
electrical installation
5 Check that support location refer to layout
8 Check that support are tight installed
7 Check welding visualy inspected where applicable
9 Check that support have completed finishing work
11
12
10
E24MC
SANTOS (SAMPANG ) PTY LTD