1 © 2008 OSIsoft, Inc. – Japan Seminar 2008 Chasing Value is a Chasing Value is a continuous process. continuous process.

Chasing Value is a continuous process

  • Upload
    kalare

  • View
    44

  • Download
    0

Embed Size (px)

DESCRIPTION

Chasing Value is a continuous process. Abitibi Consolidated Energy Management System. ACI/ E nergy M anagement S ystem a guided tour. LPM Graphs. TOTAL NET LOAD. TOTAL LOAD. LOAD BY SECTOR. GENERATION. Load. AGGREGATE. IF (Demand). MONTHLY CALENDAR PEAK. MONTHLY PEAK ON PEAK. - PowerPoint PPT Presentation

Citation preview

Page 1: Chasing Value is a continuous process

1© 2008 OSIsoft, Inc. – Japan Seminar 2008

Chasing Value is a continuous Chasing Value is a continuous process.process.

Page 2: Chasing Value is a continuous process

2© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Abitibi Consolidated Energy Management System

Page 3: Chasing Value is a continuous process

3© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

MONTREALFORT FRANCES

KENORA

THOROLD IROQUOIS FALLS

FORT WILLIAM

IMO connection

APIPI APIPI Hub

Env. Canada

E-Notification

ACI/Energy Management Systema guided tour

Page 4: Chasing Value is a continuous process

4© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

LPM Graphs

TOTAL NET LOAD

TOTAL LOADGENERATION

LOAD BY SECTOR

Page 5: Chasing Value is a continuous process

5© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Load

AGGREGATE

Page 6: Chasing Value is a continuous process

6© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

IF (Demand)

MONTHLY CALENDAR PEAK MONTHLY PEAK ON PEAK

Page 7: Chasing Value is a continuous process

7© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

TOR (Weather)

Page 8: Chasing Value is a continuous process

8© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

IF (Actual VS Plan)

LOAD PLAN

7 DAYS LOAD PLAN

GENERATION

Page 9: Chasing Value is a continuous process

9© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Market Demand

MONTHLY PEAK

Page 10: Chasing Value is a continuous process

10© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

IMO Pricing

Page 11: Chasing Value is a continuous process

11© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

IMO Pricing - Alarm

Page 12: Chasing Value is a continuous process

12© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

IMO Triggers

Page 13: Chasing Value is a continuous process

13© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Natural Gas

Page 14: Chasing Value is a continuous process

14© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Crude Oil

Page 15: Chasing Value is a continuous process

15© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

NG & CO Summary

Page 16: Chasing Value is a continuous process

16© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Future

Page 17: Chasing Value is a continuous process

17© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

• Abitibi was able to build this system with internal resources, at a cost of $77,000

• The system was eventually used to determine when to make power (and sell to the grid) vs when to make paper.

• Savings from the system were in excess of $1,000,000 in the first year of operation.

Page 18: Chasing Value is a continuous process

18© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Real Time Costing at Weyerhaeuser

( Leads to Overall Performance Measurement )

Page 19: Chasing Value is a continuous process

19© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Monticello Price Forecaster #2

19

GRAND TOTAL DIRECT COST PER CW TON- APRIL ESTIMATIONS -

$89.13 $95.64 $102.10 $104.89

$15.57$16.69

$17.73 $18.39$21.00

$21.00$21.00 $21.00

$5.00$5.00$5.00

$5.00

$0

$20

$40

$60

$80

$100

$120

$140

$160

$180

75% Std. (2366) 90% Std (2840) Std (3155) Record (3300)

Total Paper Production, CW Tons

Fiber Energy Chemicals Other

$130.70

$149.28$145.83$138.33

                                                                                                                                                                                                                 

Page 20: Chasing Value is a continuous process

20© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Real Time Performance Direct cost is just one source of input data

As machine speed increases –

a) There are more maintenance problems

b) There are more quality problems

c) There are more operational problems

The PI System can help gather all of the relevant data for analysis and performance improvement

Page 21: Chasing Value is a continuous process

21© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Determination of Paper Machine Sweet Spot

Page 22: Chasing Value is a continuous process

22© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Use of PI at CEMEX

Page 23: Chasing Value is a continuous process

23© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

• Operations in 50 countries across four continents.• Annual production capacity of more than 93 million metric

tons of cement • Annual production levels of approximately 74 million

cubic meters of ready-mix concrete and 166 million metric tons of aggregates.

• 66 wholly owned cement plants• minority participation in 11 cement plants• more than 1,900 ready-mix concrete facilities, • 394 aggregate quarries• 258 land-distribution centers• 80 marine terminals

CEMEX is a growing global building-solutions company that produces, distributes, and markets cement, ready-mix concrete, aggregates, and related building materials …

Page 24: Chasing Value is a continuous process

24© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Eliminate Automation risks due to

obsolescence?

Preserve AutomationAssets and extend

their lifetime?

Reduce capital requirements?

The industry’s accelerating rate of change affects the Automation assets; additionally, global competition demands the optimization of the operations using Automation and Control Systems …

Eliminate information barriers?

Empower personnel?

Create a collaborative environment?

Comply with regulations?

Maximize operationaleffectiveness?

Increase asset utilization?

Reduce cost and increase profits?

Be open yet secure?

How To?

Page 25: Chasing Value is a continuous process

25© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

The CSAP Initiative covers the two bottom levels (Process Control and Real-Time Information) of the typical pyramid describing the information flow …

PROCESS CONTROL LEVEL

REAL TIME INFORMATION LEVEL

ENTERPRISELEVEL

MANAGEMENT LEVEL

CEMEX Strategic CEMEX Strategic Automation PlanAutomation Plan

Process Control Systems (PCS)

Plantwide Information Management System (PIMS)

Advanced Process Control (APC)

Cyber-Security

Page 26: Chasing Value is a continuous process

26© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

CEMEX Model

Maintenance ProcurementMarketing

&Sales

Logistic

Quarry &Crushing

RawMilling

Pyroprocessing

CementMilling Packing

PIMS

ERP

Advanced ProcessControl

Statistical ProcessControl

Advanced ProcessControl

Statistical ProcessControl

Maintenance HumanResources

Quality, Operations and

Production Applications

Quality, Operations and

Production Applications

PIMS

Process Areas

Page 27: Chasing Value is a continuous process

27© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

The added value is a better knowledge of our operations by transforming data into information, and information into Knowledge …

Information KnowledgeData

Flows Temperatures Pressures Powers Feeds Emissions Physical and chemical

analysis

Receipts Consumptions Productions Sales Costs Product quality

Productions Energy consumptions Energy and material

balances Operation & Quality

reports Preventive maintenance Environmental control Shutdown analysis

Key performance indicators

Production reports (daily, monthly, yearly), by:

Plant Region Country

Better process knowledge

New operation practices Decrease energy

consumptions Shutdowns reduction Increase equipment

availability

Operation margins

Strategic planning

Benchmarking between business units

Transfers better operation practices

Page 28: Chasing Value is a continuous process

28© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Benefits from the use of the PIMS System are appearing, as long as we move forward with the implementation; we expect more benefits as soon as more people are trained to use the system …

Less time to collect info: 20% of the time to obtain information and 80% for analysis and conclusions.

Key Performance Indicators in Real Time. Improved process knowledge. Ability to convert one of the most powerful corporate

assets – data – into knowledge. Common language for staff and technical employees. Improved communication across the organization. Prepare our facilities to integrate Plant Data with

Enterprise and Institutional Systems.

Page 29: Chasing Value is a continuous process

29© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

In conclusion, global companies must be committed to the use and the further development of Industrial IT Technologies; and the PI System is a valuable tool to achieve this objective …

PIMS System in CEMEX, based on the PI System, contributes to:

Eliminating the barriers between process control system, people, and institutional systems.

Integrating information from many sources.

Providing a common structure to encapsulate business rules.

Empowering people through valuable process and operation information.

Documented savings after first year operations $5 million

Page 30: Chasing Value is a continuous process

30© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Six Sigma Study on Chip Qualityat Irving Forest Products

Page 31: Chasing Value is a continuous process

31© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

The Opportunity Reported Problem

– Dirt in chip supply– Six Sigma Quality Improvement initiative started

Related problems

– Material availability impacting production schedules at the mills

– Transportation scheduling problems related to chip pick-up from sawmills

Page 32: Chasing Value is a continuous process

32© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Solution Ultrasonic sensors installed in chip silos and fed to central

PI System

Pertinent data brought to one central system– Chip inventories at the sawmills– Production schedules at all mills– Location and status of transportation

Using the new system one person took over the coordination of operations (in place of a dozen people)

All problems solved

Page 33: Chasing Value is a continuous process

33© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Quality Improvement at Applied Extrusion Technologies

Page 34: Chasing Value is a continuous process

34© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Applied Extrusion Technologies Largest Supplier of OPP in North America Sales in excess of $275 Million Over 500 customers Over 80 different product groups

Page 35: Chasing Value is a continuous process

35© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Business Challenges Improve Profitability

– Over capacity in the market place. – Falling Prices – Rising energy cost. – Record high raw material costs.– Work force reductions.– Increased customer performance demands

Page 36: Chasing Value is a continuous process

36© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Improvement Strategy Use Sigma principles to improve quality and

reduce cost within manufacturing.

DMAIC – Define – Measure – Analyze – Improve – Control

Page 37: Chasing Value is a continuous process

37© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Identify Financial Opportunities Pareto analysis identified film profile to be

the largest improvement opportunity. – #1 Customer Complaint Category– #1 Internal Quality Reject Issue– #1 Yield Loss– Significant FFU requirement

Page 38: Chasing Value is a continuous process

38© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Analysis Applications Real Time Profile Quality Report (RTPQR)

– Real time feedback to operator.– Trigger corrective action.

Enterprise Profile Quality Report (EPQR)– Summarized by mill roll lot.– Customer Fitness-For-Use.– Slitter operator decision support

Process Book Displays– Process monitoring.

PI Profile – Detailed scan by scan analysis

Page 39: Chasing Value is a continuous process

39© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

EPQR Web Application

Page 40: Chasing Value is a continuous process

40© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Real Time Report

Page 41: Chasing Value is a continuous process

41© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Pi Profile View

Page 42: Chasing Value is a continuous process

42© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Measure Floating Profile

Page 43: Chasing Value is a continuous process

43© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Identify Process Variability

Page 44: Chasing Value is a continuous process

44© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Project Results Elimination of root causes for variation. New insights into interaction between HVAC

control and process control. Losses for profile flatness were reduced by 70%

with annual savings of over $300,000 on one line. Customer complaints isolated to small individual

roll occurrences. Record low Return Rate of .11%

Page 45: Chasing Value is a continuous process

45© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Overall Results PI and F.L.A.T system have now been installed on

six lines accounting for over 75% of our production capacity.

Through improvement projects we have driven down internal flatness losses by an average of 50%.

Increased production rates due to the reduction in variability.

Customer complaints and return rates at record lows.

Annual benefits in excess of $5 million

Page 46: Chasing Value is a continuous process

46© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Input Cost Reduction at Cascades

Page 47: Chasing Value is a continuous process

47© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Energy Inputs Numbers at CascadesEnergy Inputs Numbers at Cascades

Big Total: 36 MGJ - Big Cost: $500 MillionBig Total: 36 MGJ - Big Cost: $500 Million

Steam6%

Steam Residues

15%#6 Oil

6%

Wood31%

Electricity16% Natural Gas

26%

Page 48: Chasing Value is a continuous process

48© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Results from using PI

Page 49: Chasing Value is a continuous process

49© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

The Bottom LineThe Bottom Line

• The PI System was deployed to monitor The PI System was deployed to monitor all inputs in real time.all inputs in real time.

• Once deployed Cascades expected to Once deployed Cascades expected to reduce input costs by 2%reduce input costs by 2%

• They achieved 3% within one year and They achieved 3% within one year and now the target is 10% within 5 yearsnow the target is 10% within 5 years

• With input costs of $500 Million per year With input costs of $500 Million per year the annual savings are enormous.the annual savings are enormous.

Page 50: Chasing Value is a continuous process

50© 2008 OSIsoft, Inc. – Company ConfidentialJapan Seminar 2008

Summary There are 1000’s of ways to derive value with the

PI System. As outlined earlier, results can be enhanced if you

follow the examples set by our successful customers.

Stakeholders Vision Framework Infrastructure Small projects Publicize results Enterprise Agreement

Page 51: Chasing Value is a continuous process

51© 2008 OSIsoft, Inc. – Japan Seminar 2008

The EndThe End