CHARLES COUNTY GOVERNMENT yy
INTEROFFICEMEMORANDUMyg
Equal Opportunity Employer on
To: Board of County Commissioners
THRU: Reuben B. Collins, II, Esq., PresidentBoard of County Commission s
t 1? THRU: Mark Belton, County Admini ra 1
R v I.ie U L• f}v6e
Rd lOffice of the County Administrat
4\\1I e
THRU: Jenifer Ellin, Director rar
Department of Fiscal and Administraiv
I
ices 1" orTHRU: Bill Shreve, Director CPI(4
Department of Public WorksfFROM: John H. Stevens, Chief of Capital Services
Department of Public Works
SUBJECT: Mattawoman Waste Water Treatment Plant( MWWTP)
Closed Loop Project( FS# 7063)Change Order# 14& Change Order# 15 Approval
DATE: April 4, 2019
Please find attached Change Orders # 14 and # 15 for your signature for the MWWTP Closed Loop Improvementproject in the amounts of $297, 152.99 and $ 242,200.00. Change Order # 14 covers the rental, operations, and
maintenance of a bypass system while Change Order# 15 covers the anticipated fuel costs. These change orders are
necessary to protect newly installed pumps from debris entering the plant due to historically high rainfall amountsoverwhelming treatment plant processes.
In accordance with the Budget Policies and Delegated Authorities (March 11, 2014), the commissioner President isi
authorized to sign Change Orders exceeding $ 150.000 for construction, upon Majority Board approval. Onceapproved, please sign on the designated line of the attached Change Order form and return to Capital Services.
If you have any questions, please contact me at ext. 2847.
JHS/ BH/ db
Attachment: Change Order# 14
Change Order# 15
cc: Charles Strawberry, Program Manager; Britta Hutting, Project Manager; Jennifer Suite, PAS; Shanna Reese, Chief ofPurchasing; Vaffa Seiden, Asst. Chiefof Purchasing; Samantha Chiriaco, Budget Analyst l; Project File
ntriF:\ CS\ CIP\ PROJECTS\ 2- W&s PROJECTS\ Reclaimed Wtr- edStorage-Closed Loop( 7063A_Closed Loop\ 02- Construction\ Correspondence\ Memo\ M_ BCCfrm JHS MWWTP Closed Loop_CO# 14&# 15_04-04-19. docx
RECEIVEDs
AFR 1 G 2u19
DEPT OF FISCAL & ADMIN SVCS
American Contracting & Environmental Services, Inc. 10330 Old Columbia Road, Suite 102
Columbia, MD 21046APR - 4 2019
Phone: ( 301) 490- 9100 Fax: ( 301) 490-9101
Capital Services - W/SCHANGE ORDER NO. 14
Page I of I
FS #: 7063 PGM PROJECT NO.: VC] 14 - 0034 DATE 412/2019
NAME OF PROJECT: 17 -26 Mattawoman Wastewater Treatment Plant (MWWTP)
CONTRACTOR: American Contracting & Environmental Services, Inc.
THE FOLLOWING CHANGE( S) ARE HEREBY MADE TO THE CONTRACT: This change order covers the cost for the continued rental, operation (excluding fuel), and maintenance of the temporary Effluent BypassSystem from January 30, 2019 through May 22, 2019 for a' Not to Exceed' amount of $297, 152. 99. Additional effluent bypassing became, andcontinues to be, necessary due to continued historic rain fall events overwhelming the initial plant screening, influent pumping and treatmentprocesses causing debris to reach and clog newly installed effluent pumps. Thus, continuation of the bypass system is necessary until effluentscreens can be installed to protect the pumps.
THIS CHANGE ORDER: 297, 152. 99
Approved CHANGE ORDERS: ( List each Change Order)
Change Order # I: RFQ 2, 4, 5, 6, 9, 10, 12, 13, 14, 16, and CPE allowance credit. 30,282. 95
516,080.46Change Order #2: RFQ # 15 and RFI # 21. 18, 709.55
Change Order 43: RFQ # 13.
Change Order 94: RFQ #7, PCO # 11, RFQ # 11, PCO # 18, and RFI #26. Change Order 45: RFQ # 18 and PCO # 22
35, 136. 93
2, 815. 87
S49,869. 27) Change Order #6: RFQ # 3A Credit
Change Order #7: Effluent Pump #5 Special Filler Flange 10,302. 15
43, 932.96Change Order #8: Temp. Pump Setup & 1 Months Rental for Influent Operations2, 194. 41Change Order #9: Flowable Fill for Abandoned Pipe Section
14, 392.73Change Order # 10: Temp. Sub. Pump Maintenance through 02/ 15/ 19 and access. 37, 528.04Change Order # 11: Temp. Influent Pumps Rental & Maintenance through 04/ 10/ 19. 26,493.25Change Order # 12: Screens (d Post Aeration Cascades
526, 663.98Change Order 413: Effluent Bypass 72" Plug
ORIGINAL CONTRACT: 15, 519,600.00
16,031, 417.00REVISED CONTRACT AMOUNT:
CONTRACT START DATE: 12/ 18/ 2017
ORIGINAL COMPLETION DATE: 1: 17/ 2020
ADDED TIME DUE TO PREVIOUS CHANGE ORDERS: 0 days
ADDED TIME DUE TO THIS CHANGE ORDER: 0 days
NEW COMPLETION DATE: 1/ 17/ 2020
EXECUTION OF THIS CHANGE ORDER SIGNIFIES FULL ACCEPTANCE AND SATISFACTION FORALL COST: DIRECT, INDIRECT AND IMPACT, IN CONSIDERATION OF INCREASEIDECREASEOF THE CONTRA T WAIVES ANY CLAIM FOR IMPACT OR DELAY COST RELATIVE TO WORKPERFORMED UN THIS MOD ION.
ACCEPTED BY: APPROVED BY:
AMERIC CONTRA TING ENViRONM . NTAL SERVICES, INC. CHARLES COUNTY GOVERNMENT
SIGNATURE ames T. SIGNATURE Reuben B. Collins, 11, Esq.
President President - Charles County CommissionersTITLE TITLE
DATE DATE
ACE0*%yk
MNftft_-__
ftft.-
Building to Last I ENvRoN,E,' -rL̀saA«.s &Nc.
February 22, 2018
Britta -Maria HerdingCharles County Government DPW1001 Radio Station Rd.
La Plata, MD 20646
Ref: Mattawoman WWTP Closed Loop ProjectSubject: PCO -26 — Extended Effluent Bypass Pumping
Dear Britta:
Please find enclosed a copy of the detailed price estimate for the costs associated with the PCO -26 scoperegarding the extended effluent bypass pumping. Included in the scope are:
Retention of the full temporary effluent bypass system on site and operationalLabor, material and equipment to maintain and monitor the bypass system
Service and inspection performed by Thompson Pump bi- monthlyDoes not include fuel- Fuel to be paid for under separate change order
All labor, material, equipment, taxes and insurance to complete the scope.
Please note that bid day wage rates were used for this proposal, so that future Change Orders for the wage rateadjustment will not be double billed. Accounting for those costs should also be less complicated.
The total cost for this work is $297,152.99. If the work is desired, please issue a contract modification at yourearliest convenience.
Please feel free to contact me if there are any questions.
Sincerely,
Wendy BarryProject Manager
American Contracting & Environmental Services, Inc.
T 301 - 490 -9100 F 301 - 490 -9101 110330 Old Columbia Road, Suite 102, Columbia, MD 21046 1 www.aceservinc.com
PROPOSED CHANGE ORDER
DEPARTMENT OF PUBLIC WORKS CHARLES COUNTY, MARYLAND
ENVIRONMENTAL SERVICES
Project: Mattawoman Closed LoopPROPOSED CHANGE ORDER NO.: 26 - Extended Effluent Bypass No Fuel
REVISION DATE: February 22, 2019Contract No.: 17 -26
From: American Contracting & Environmental Services, Inc. 10330 Old Columbia Road Columbia, MD 21046
TO: Britta -Maria HertlingCharles County Government DPW1001 Radio Station Rd
La Plata, MD 20646
REFERENCES: FO RFP _ CCD_
TO OWNER: CONTRACTOR hereby submits this request for a change order in the Contract Sum and /or the ContractTime to perform all Work associated with the above referenced Field Order or to perform or delete Work in responseto the above - referenced Request
1) The estimated direct and indirec costs, with applicable mark -ups for the performanceof the proposed part of the work is as follows:
297, 152. 99 ( Detailed Estimate Attached)
2) The increase in the Contract Time or extensions of Contract Milestone Dates requestedfor this proposed Change, supported by the scheduling analysis required by the ContractDocuments for such requested time extensions, is as follows:
0 Calendar Days - Contract Completion ( Details Attached)
0 Calendar Days - Milestone:
Substantial Completion Date)
The Contractor understands and certifies that the proposal stated herein represents all estimated direct andindirect costs and applicable mark -ups allowed by the Contract Documents and /or additional time ofperformance of the Work associated with this proposed Change. The Contractor further certifies that to thebest of his knowledge and belief the cost and pricing data and scheduling analysis submitted hereinregarding the performance fo the proposed Change in the Work or the deletion of a part of the Work iscomplete, accurate, and current. The Contractor will perform the proposed Change in the Work as directedby the Owner or A/ E.
CONTRACTOR: American Contracting & Environmental Services Inc.
ME
Wendy Barry 2/ 22/ 2019
U)
LLI
R ®§ R§- @§
g
@ G
LU
oo
C' 4
U)
LLI
g
oo
LL
Z
2§( cm IL
0
L
co
IL
w]| o
06z
CD
6\0COQ q \ ®
L ,
CO \ { < o
4U) 0
2) b
z= m "qE
vim°« Em
b WUW
iU
qWCOVJ tLD 3
Q N NQm O Elu
O)
OU O j ,ECNco
E N CH O w
ltal
L -- j
lz kI
k\ f;
2
a
k
UZ
72s 7
EmU,2
ACE SERVICES
8242 Baltimore - Annapolis Blvd.
Pasadena, MD 21122
410. 255 -2793 Phone
410 - 255 -3427 Fax
MATTAWOMAN WWTP CLOSED LOOP
5310 HAWTHORNE ROAD
La Plata, MD 20646
Ordered By: WENDY BARRY 301 - 337 -5669
Job Descr: Quote
Status: QuoteQuote #: q72
Quote To: Wed 2l 6/ 2019 2: OOPM
Operator: Kody VanFleetTerms: On Account
Quote valid for 30 days.
Quote
This is a contract. The back of this contract contains important terms and conditions including lessor' s disclaimer from all liabilityfor injury or damage and details of customers obligations, These terms and conditions are a part of this contract - READ THEM,
If equipment does not function properly notify lessor within 30 minutes of occurrence or no refund or allowance will be made. If thisis a reservation, a reservation cancellation fee up to 1/ 2 of the total amount may be charged if reservation is cancelled within 72hours of the scheduled " time and dale out ".
I certify that I have read and agree to all terms of this contract
Signature:
MATTAWOMAN WWTP CLOSED LOOP
Monday thru Friday 6: 00am to 3: 00pmPrinted On Wed 216/ 2019 1: 10: 28PM Software by Point - of- Rental Software www. point- cf- rentaLCom
i
Rental:
I
100. 001,,
Subtotal: 100. 00
Qty Key Items Part# Status I Quote Date Replacement Cost
1 TP -539 TESTPLUG 48 " -72" MULTI -SIZE PL 130 -272 -4 Rental I Thu 2/ 7/ 2019 2:OOPM 13,593. 38 each
1 day $ 100. 00 f
Quote valid for 30 days.
Quote
This is a contract. The back of this contract contains important terms and conditions including lessor' s disclaimer from all liabilityfor injury or damage and details of customers obligations, These terms and conditions are a part of this contract - READ THEM,
If equipment does not function properly notify lessor within 30 minutes of occurrence or no refund or allowance will be made. If thisis a reservation, a reservation cancellation fee up to 1/ 2 of the total amount may be charged if reservation is cancelled within 72
hours of the scheduled " time and dale out ".
I certify that I have read and agree to all terms of this contract
Signature:
MATTAWOMAN WWTP CLOSED LOOP
Monday thru Friday 6: 00am to 3: 00pmPrinted On Wed 216/ 2019 1: 10: 28PM Software by Point - of- Rental Software www. point- cf- rentaLCom
i
Rental:
I
100. 001,,
Subtotal: 100. 00
Total: 100. 00
Paid: 0. 00
Amount Due: 100. 00
Modification # 1
Conrad- Params rpt (1)
wC
Dear Ms. BarryOctober 3, 2018
Thank you for the opportunity to provide you a revised proposal for the equipment and set -up support for the Mlartawoman WWTP projectconducted by American Contracting & Environmental Services, Inc.
For over 45 years, Microbac has delivered reliable service to the environmental analytical marketplace. Our resume includes strongpartnerships with industry, consulting firms, and government agencies alike. We are qualified to work in over 40 states and our network of30 locations assist in providing needed capacity with local courier and sampling services in many areas. While having extensive chemical andphysical testing capabilities, Microbac can also support microbiological, radiological, and toxicological analysis. For a more thoroughdescription of our experience, qualifications, certifications and capabilities, we can provide you our Statement of Qualifications ( SOQ) package at your request.
Microbac believes quality is paramount and our laboratories are heavily audited. We participate in an array of third -party quality assessments, and are consistently rated by the American Council of Independent Laboratories ( ACIL) in the Top Five laboratories nationwide for dataquality, responsiveness, and service excellence.
Our product is our data, and Microbac employs a variety of technological innovations to enable client satisfaction. These include, but notlimited to:
Automated instrument uploads to deliver fast, accurate data reporting.
Flexible data delivery in any media and across multiple user interfaces. 24/ 7 data access via our AXISTM Web Platform.
Communication with clients is critical to effective performance. To that end, we have identified Jake Mason to serve as your Project Manager. Jake will provide continual oversight of this Mattawoman project as needed. Our Field Manager, Jeff Duszynski will install all equipmentand ensure proper working condition before leaving the site on Day- 1
SERVICE
Option 1 — Provide Daily composite sampling on a flow proportional basis, one side only from 2 existing 4 -20 MAMP enclosed pipetransducers
Model 5800 ISCO Composite Sampler, refrigerated
SPA — 2 input 4 -20 milliamp adder / subtractor module ( outputs single averaged 4 -20 mllliamp from 2 locations)
Set -Up fee - $ 4100.00 ( to include purchase of SPA 2 -40 acid and subtract flow module and initial equipment set up)
Monthly Charge per Unit for Glacier Refrigerated Unit - $790.00 **
Monthly Charge per Unit for 4 -20 flow connection - $ 35. 00 * **
Each additional visit for equipment service ( as needed) - $ 250. 00 / visit
Estimated to start with 2 units and then down to 1 unit after SPA module arrives
Estimated to start with 2 units and return both once the SPA module arrives
Paget
Britta M. Hertling
From: Wendy Barry < [email protected]> Sent: Monday, February 4, 2019 12:32 PMTo: Britta M. HertlingCc: Charles StrawberrySubject: RE: CL97 - Effluent Bypass & Pumps
Attachments: PCO -26 - Extended Effluent Bypass Pump No Fuel Spreadsheet.pdf; MattawomanClosed Loop Proposal Summary Revised. pdf; PCO -26 - Extended Effluent Bypass PumpInd Fuel Spreadsheet.pdf
Britta- Here are the rates that we were discussing earlier. This is daily rates for ACE' S involvement and then the ratesheet for Thompson Pump showing the monthly, weekly and daily rate. As you can see, the longer the system is in usethe cheaper it is.
Charles- I still need to get us covered for the machine and operator time for installing the temp influent wet well pumps
that we pulled out of PCO 25.
I will also need to get the plug reinstallation cost covered but that isn' t a daily rate so it isn' t included in the attached. Should I do a separate PCO to get those two costs covered? How do you guys want to handle this?
Wendy BarryProject Manager
ACEOWWWR Buildingtot,aSt easmusnar, < srwm sr. iv.
C 301 - 337 -5669
E wendy.barry(o)aceservinc.comwww.aceservinc.com
5 f in
From: Britta M. Hertling <HertlingB @charlescountymd. gov>
Sent: Monday, February 4, 2019 10: 43 AMTo: Wendy Barry <[email protected]> Cc: Charles Strawberry <StrawbeC @charlescountymd. gov >; Deborah Bays < BaysD @charlescountymd. gov >; ChuckBurgess < Charles. Burgess @ghd. com>; Stephen DeSesa < stephen. desesa @ghd. com> Subject: CL97 - Effluent Bypass & Pumps
Wendy,
Please see the meeting minutes I distributed a few minutes ago. Do you need any additional documentation from us atthis time?
Britta M Hertling
From: Wendy Barry < wendy.barry@aceservinc. com> Sent: Wednesday, February 6, 2019 1: 30 PMTo: Britta M. Hertling
Cc: Charles Strawberry
Subject: RE: CL97 - Effluent Bypass & Pumps
Attachments: ACE. 100318. docx; Plug Quote.pdf
Britta- Each of the bypass pumps that have not run in a 24 hour period must be started and run for approximately 30minutes in order to maintain battery. This is especially true for cold weather months as cold weather will sap a batteryand freeze the volute and vacuum priming chamber if left too long without running. So every day that the system is notonline all 6 pumps must be started up, primed and run. We also have a sheet that gets filled out during working hours, once first thing in the morning and once at night to review things like, fuel level, battery level, coolant level. We checkthings such as looking for leaking air releases or piping, cleaning of transducers.
The monitoring cost is a level cost per day and would cover if we had to come in at night and address a problem, brokendown pump etc. You would not get charged a separate cost for those items.
Sampler and plug rental back up attached.
The fuel rate listed is based on the OPIS average plus the fuel suppliers handling fee. It does not include tax.
Regarding only utilizing half of the bypass system, I am not sure if that is a good idea. The purpose behind having it onsite would be for failures at the new PS or if the new pump station needed to come off line for additional cleaning in thewet well. If you only have half of the system and the plant is putting out more flow then that half can handle, you wouldbe in real trouble. I will ask Thompson for a half system rental rate though.
Wendy BarryProject Manager
A11 t ^.IF1 S6 TYIh IM -V
Buiding to I
C 301 - 337 -5669
E wendy barry(d)aceservinc. comwww.aceservinc.com
From: Britta M. Hertling <HertlingB @charlescountymd. gov> Sent: Wednesday, February 6, 2019 7: 13 AMTo: Wendy Barry <wendy.barry @aceservinc. com> Cc: Charles Strawberry <StrawbeC @charlescountymd. gov> Subject: Re: CL97 - Effluent Bypass & Pumps
Wendy,
I have a few questions in regards to the ' Bypass Monitoring PCOs':
Non -Fuel Option:
The PCOs lists 3 total man hours each day to monitor the system although the system isn' t running. Isthat a carryover from the other PCO? If not, please clarify in further detail what this monitoringconsists of. Did you have somebody come out last Saturday and Sunday to perform this monitoring?
Please provide back -up for the plug rental and sampler.
Fuel Option:
Is your unit cost for the fuel pre -tax or already taxed? Please provide back -up for the plug rental and sampler. The PCO lists a total of 4.5 man hours to monitor and maintain the system. Is this an average number
to cover days that require more maintenance than others and off -hours maintenance? Do you monitor
the system only during regular working hours?
I am not able to come to todays meeting but Charles will be there. I had a good conversation with Stephen
yesterday and he suggested a few cost savings options to the County in regards to the water quality and pumpperformance issue. He suggested to keep only half of the bypass pumps at this time (our Utilities group wouldhave to agree to that first). In the meantime, could you ask Thompson for a rate sheet if we utilized only half
of the existing bypass?
Thank you,
Britta
From: Wendy Barry <wendy. barry @aceservinc.com> Sent: Monday, February 4, 2019 12: 32 PM
To: Britta M. Hertling
4