135
N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant Pioneer Enviro 1-1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd. CHAPTER – I INTRODUCTION 1.1 PREAMBLE India is on a threshold of a steel revolution. The National Steel Policy envisages production of 110 million ton per annum (MTPA) of steel in India by the year 2020. This implies that the country, which produces 40 MTPA of steel currently, will have to add around 70 MTPA of new steel making capacity in the next 13 to 14 years. This translates into addition of more than 5 MTPA of steel making capacity every year till 2020. On a national level, a multi-pronged strategy has been formulated for attaining this goal. The demand for steel will increase through rapid infrastructural development and a quantum increase in rural steel consumption. Keeping pace with the demand, domestic steel production will be enhanced through creation of additional capacity. The expansion plans of existing steel producers and entry of new players are all indicative of a very bright future for steel industry. The National Steel Policy has set a long-term goal that India should have a modern and efficient steel industry of world standards, catering to diversified steel demand. The focus of the policy is to achieve global competitiveness not only in terms of cost, quality and product-mix but also in terms of global benchmarks of efficiency and productivity. In view of the above M/s N.R. Ispat & Power Private Limited has proposed to establish an Integrated Steel Plant to produce steel and also products that aid in making steel. 1

CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

Embed Size (px)

Citation preview

Page 1: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – I

INTRODUCTION

1.1 PREAMBLE

India is on a threshold of a steel revolution. The National Steel Policy envisages

production of 110 million ton per annum (MTPA) of steel in India by the year 2020.

This implies that the country, which produces 40 MTPA of steel currently, will have

to add around 70 MTPA of new steel making capacity in the next 13 to 14 years. This

translates into addition of more than 5 MTPA of steel making capacity every year till

2020. On a national level, a multi-pronged strategy has been formulated for attaining

this goal. The demand for steel will increase through rapid infrastructural

development and a quantum increase in rural steel consumption. Keeping pace with

the demand, domestic steel production will be enhanced through creation of

additional capacity. The expansion plans of existing steel producers and entry of

new players are all indicative of a very bright future for steel industry. The National

Steel Policy has set a long-term goal that India should have a modern and efficient

steel industry of world standards, catering to diversified steel demand. The focus of

the policy is to achieve global competitiveness not only in terms of cost, quality and

product-mix but also in terms of global benchmarks of efficiency and productivity.

In view of the above M/s N.R. Ispat & Power Private Limited has proposed to

establish an Integrated Steel Plant to produce steel and also products that aid in

making steel.

1

Page 2: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

1.2 PURPOSE OF THE REPORT

As per the Ministry of Environment & Forests, New Delhi notification, dated 14th

September, 2006 all Primary metallurgical processing industries are classified under

Category ‘A’.

In order to obtain Environmental Clearance for the proposed Integrated Steel plant

Form -I, proposed draft TOR along with Pre-Feasibility Report were submitted to

the Honourable Ministry. A presentation was made before the Expert Appraisal

Committee of MOEF on 11th June, 2008 for the approval of TOR for EIA study. The

Draft EIA report has been prepared in accordance with the Terms of Reference

(TOR) issued by the Ministry vide letter no. J-11011/225/2008-IA II (I) dated 3rd

July, 2008.

This report furnishes the details of location of Site, Description of the project,

prevailing baseline status w.r.t Air Environment, Water Environment, Noise

Environment; land Environment, Flora & Fauna and Socio-economic environment.

This report also helps in identification of environmental impacts and suggesting

mitigation measures to be followed during Construction and Operation of the

project as a part of Environmental Management Plan. This report also acts as

guidance manual for the proponent for following the Environmental Management

Plan (EMP) and for adopting post project Environmental Monitoring Program as per

statutory norms.

1.3 IDENTIFICATION OF PROJECT & PROJECT PROPONENT

M/s N.R. Ispat & Power Private Limited (NRIPL) has been promoted by well

established entrepreneur belongs to Raigarh in Chhattisgarh state and already

established in the field of manufacturing and trading of Finished/ semi finished

Steels at Village: Gourmudi, Tehsil: Tamnar, District Raigarh (C.G.).

Page 3: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

NRIPL already purchased land admeasures about 53 acres, which is quite sufficient

for the installation.

M/s NRIPL propose to generate Power by installing 1 x 10 MW FBC based and also

install 2 x 2 MW WHRB based power plant aggregating generation capacity to 14

MW for captive consumption only.

To meet the annual coal requirement for Sponge iron manufacturing as well as

Power generation will be meet through either Captive mining or Long term Coal

Linkage with South Eastern Coalfields Ltd. (SECL) mines.

The project cost estimate for installation of the proposed plant works out to Rs. 95.00

Crores. This is inclusive of equipment cost as erected including civil and structural

works, taxes & duties and contingencies. It is proposed to achieve synchronization

and commercial operation within 24 months, which is to be reckoned from the

date of financial closure.

Financial analysis has been carried out for the project considering that the fund

requirement will be met on a debt equity ratio of 63:37.

The following is the list of some of the important people in the organization:

i. Shri Sanjay Kumar Agrawal ii. Shri Rajesh Kumar Agrawal

Name of Directors :

iii. Shri Vijay Kumar Agrawal

Steel being a basic commodity for all industrial activities, quantum of its

consumption is considered an index of industrial prosperity. Since independence,

there has been a substantial growth in the steel sector in India from 1.5 Million Tons

in 1950-51 to about 31 Million Tons at present. Additional steelmaking capacity of

about 8 to 10 Million Tons /year exists in the secondary steel sector.

Page 4: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Despite the above growth in the steel sector, the per capita steel consumption

continues to remain at a level of about 27 kg only, compared to about 350 to 450 kg

in the developed countries and 40 to 100 kg in some of the developing countries.

Further, with nearly 20% of the world population, India’s contribution is only of the

order of 3.4% of world steel production. Hence, short-term and long-term strategies

are necessary in planning the development of the steel industry in the country to

improve the level of per capita steel consumption.

It is expected that with the measures taken by Govt. of India for promotion

consumption of iron and steel and expected growth of Indian economy the

requirement of steel will significantly increase and accordingly the domestic

manufacturing capacity needs to be increase.

Considering the potential of iron and steel in India and the experience gained by the

group in this sector, M/s N.R. Ispat & Power Private Limited (NRIPL) propose to

install the following units at Village: Gourmudi, Near Gerwani, Tehsil: Tamnar

District: Raigarh in the state of Chhattisgarh.

1.4 BRIEF DESCRIPTION

1.4.1 NATURE

The proposed Integrated Steel Plant involves manufacturing of following products

Sponge iron : using Iron Ore, Coal and Dolomite as raw materials Ingots / Billets : Using DRI, MS scrap as raw materials in Induction

Furnace TMT bars : Using Ingots as raw materials in Rolling mill for

producing TMT bars Power generation : By utilizing waste hot gases from DRI in WHRB and

using Dolochar (generated from DRI) as fuel in AFBC boiler

Page 5: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

1.4.2 SIZE OF THE PROJECT

The proposed Integrated Steel Plant envisages manufacturing the following

products

TABLE 1.1 PRODUCTS AND CAPACITIES PROPOSED

Sr. No. Details Plant Configuration Install Capacity

1. Sponge Iron Unit 2x 100 TPD 60000 2. Induction Furnace with

Concast 2 x 10 MT/ Heat 60000

3. Rolling Mill 1 x 200 TPD 60000 4. Power Plant (WHRB Based) 2 x 2 MW 4 MW 5. Power Plant (FBC) 1 x 10 MW 10 MW

The capital investment of the proposed project is Rs. 95 Crores.

1.4.3 LOCATION OF THE PROJECT

M/s. N.R. Ispat & Power Private Limited is proposed to establish an Integrated steel

plant in Village: Gourmudi, Near Gerwani, Tehsil: Tamnar District: Raigarh,

Chhattisgarh. The following factors have been considered for location of project.

a. Availability of suitable and adequate facilities.

b. Availability of water.

c. Availability of raw materials.

d. Availability of man power.

e. Availability of infrastructural facilities

f. Suitability of land from geological and topographical aspects.

g. The following Environmental aspects (TOR # 3 & 4)

h. There are no national parks / wild life sanctuaries within 10 Km radius of

the proposed area. While following are the Reserved forest in the vicinity:

Page 6: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Sr. No. Name of Reserved Forest Distance from Site Direction 1. Taraimal RF 3.0 KM NE 2. Rabo RF 8.0 KM NW 3. Urdana RF 5.0 KM SW

i. However, we have filled an application has been filled to the State Forest

Department regarding impact of the proposed unit on the Taraimal RF,

which is under process.

j. Nearest habitation is at a distance of about 1 km. from the site.

k. No forest land is involved in the site.

Based on the above guidelines the site has been chosen for the proposed

Integrated Steel Plant. The proposed site is in accordance with MOEF

guidelines, The topographical map showing the location of the plant is shown

in Fig. 1.1.

Page 7: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TOPOGRAPHICAL MAP SHOWING LOCATION OF PROJECT Fig No.1.1

Page 8: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

1.4.4 IMPORTANCE OF PROJECT

Steel has been regarded as the most useful product for mankind. It reaches every

home, and has a wide range of applications from a small pin to the manufacture of

automobiles, building of the railway systems, ships, big construction projects,

housing, oil rigs, nuclear power stations an so on. Steel is also eco-friendly.

Steel products are categorised into broad segments : Non-flat (popularly known as

Long products) and Flat products. Finished steel Non-flat products include rounds,

bars including re-enforcement bars, wire rods, structural such as angles, channels,

joist / beams and railway materials in the shape of rails, wheels and axles. All these

products play a key role in the growth of a country's more important sectors like

construction, power, oil and gas, engineering, railway and road transportation, port,

irrigation etc.

INDIAN STEEL SCENARIO

Indian steel industry is undergoing a period of restructuring, improving its ranking

among global steel producers from the 9th place to the 7th place. In the last 5 years,

the production and consumption of steel has grown at exceeding rates of 9% per

annum. The pace of growth has further accelerated in the current year to over 10%.

As per the latest CRISIL report a stable trend in the domestic steel industry’s

operating margin in 2007-08 as compared with that of 2006-07, is predicted. The firm

steel prices will keep the rise in input cost under check. The global demand-capacity

ratio, which figured at around 89 percent in 2006, is expected to remain the same

during 2007, which will maintain the similar price range as registered in the

preceding year. Domestic prices are expected to follow the international prices

trend.

The CRISIL report also predicts buoyancy in the domestic steel demand. With

healthy activity in pipes and tubes, automobiles and the construction segment, the

demand for steel products is all set to scale. The report predicts a double-digit

Page 9: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 - 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

growth in demand for flat products with 11 percent to 21 Mn Tons during 2007-08,

where as demand for long products is expected to grow by 7.6 percent to 19 Mn

Tons.

The Eleventh Five Year Plan projects a 9% average annual growth in our GDP.

Higher expectations to see a massive increase in investment in infrastructure is

probable. Consequently, massive growth in demand for steel in the next few

decades is also credible – perhaps to levels never visualized before.

BENEFIT TO THE REGION

With the establishment of the proposed plant, there will be a lot of employment

opportunities to the local people during construction and operation of the plant.

During construction it creates employment to about 350 persons and during

operation it creates employment to about 100 persons. Priority will be given to locals

in employment. There will be upliftment of the socio-economic status of the people

in the area due to the proposed project.

In the light of the above scenario, M/s. N.R. Ispat & Power Private Limited has

proposed to establish an Integrated steel plant in Village: Gourmudi, Near Tamnar,

Tehsil: Tamnar District: Raigarh, Chhattisgarh.

1.5. SCOPE OF THE STUDY

The scope of work includes a detailed characterization of the environment in an area

of 10 km. radius of the plant for various environmental parameters like air, water,

noise, land, biological and social-economic aspects and preparation of Draft EIA

report incorporating all TOR issued by MOEF.

Page 10: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – II

PROJECT DESCRIPTION

2.1 TYPE OF PROJECT

The proposed Integrated Steel plant involves following activities

Ø Manufacturing of Sponge iron through DRI kiln using iron ore, Coal and Dolomite as

raw materials

Ø Manufacturing of Steel ingots / Billets using Sponge iron / Pig Iron and Scrap as raw

materials

Ø Manufacturing of TMT bars through Rolling Mill using Ingots / Billets as raw

materials.

Ø Generation of Power using waste hot gases from sponge iron kiln through WHRB

boilers and using Dolochar as raw material in FBC boiler.

2.2 NEED FOR THE PROJECT

Indian steel industry is undergoing a period of restructuring, improving its ranking among

global steel producers from the 9th place to the 7th place. In the last 5 years, the production

and consumption of steel has grown at exceeding rates of 9% per annum. The pace of growth

has further accelerated in the current year to over 10%.

As per the latest CRISIL report a stable trend in the domestic steel industry’s operating

margin in 2007-08 as compared with that of 2006-07, is predicted. The firm steel prices will

keep the rise in input cost under check. The global demand-capacity ratio, which figured at

around 89 percent in 2006, is expected to remain the same during 2007, which will maintain

2

Page 11: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

the similar price range as registered in the preceding year. Domestic prices are expected to

follow the international prices trend.

The CRISIL report also predicts buoyancy in the domestic steel demand. With healthy

activity in pipes and tubes, automobiles and the construction segment, the demand for steel

products is all set to scale. The report predicts a double-digit growth in demand for flat

products with 11 percent to 21 Mn Tons during 2007-08, where as demand for long products

is expected to grow by 7.6 percent to 19 Mn Tons.

The Eleventh Five Year Plan projects a 9% average annual growth in our GDP. Higher

expectations to see a massive increase in investment in infrastructure is probable.

Consequently, massive growth in demand for steel in the next few decades is also credible –

perhaps to levels never visualized before.

In view of the above M/s. N.R. Ispat Private Limited has proposed establish a mini

Integrated Steel Plant in Raigarh District.

2.3 LOCATION

The proposed Integrated Steel Plant will be established at Gourmudi Village, Temnar Tehsil,

Raigarh District, Chhattisgarh.

The proponents have taken due care while selecting the site for this industry.

The site is well in accordance with the guidelines issued by MOEF. The following are the

salient features of the site proposed.

Ø Nearest habitation is at a distance of about 1.2 Kms. from the site

Ø There are no National Parks, Wild life Sanctuaries and Bird Sanctuaries within 10 Km

radius. (TOR # 1)

The following are the Reserved forests exist in the vicinity:

Sr. No. Name of Reserved Forest Distance from Site Direction 1. Taraimal RF 3.0 KM NE 2. Rabo RF 8.0 KM NW 3. Urdana RF 5.0 KM SW

Page 12: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Ø We have submitted a letter to the State Forest Department regarding impact of the

proposed unit on the Taraimal RF. (TOR # 4)

Ø Topography of the land is more or less flat without many undulations.

Ø No clearance of vegetation is required thus there will not any Soil erosion

Ø No habitations with in the site. Hence rehabilitation & resettlement are not involved.

Ø No forest land is involved in the site acquired.

Ø The following industries are situated in 25 Km radius (TOR # 5)

TABLE 2.1

INDUSTRIES WITHIN 25 KM RADIUS S.NO NAME OF THE INDUSTRY TYPE 1 M/s. Nalwa Sponge Iron Ltd Steel Plant 2 M/s. Ind Agro Limited Steel Plant 3 M/s. MSP Steels Pvt. Ltd Steel Plant 4. M/s. Singhal Enterprises pvt. Ltd. Steel Plant 5. M/s. Seleno Steels Ltd. Steel Plant 6. M/s. Ambica Sponge Iron ltd. Steel Plant 7. M/s. Shyam Steel Pvt Ltd. Steel Plant 8. M/s. Anjani Steels (P) Ltd. Steel Plant 9. M/s. Navadurga Fuels(P) Ltd. Steel Plant 10. M/s. Salasar Sponge Iron & Power Ltd. Steel Plant 11. M/s. Raigarh Ispat Ltd. Steel Plant 12. M/s. B.S. Sponge Pvt Ltd. Steel Plant 13. M/s. Raigarh Iron Industries Ltd. Steel Plant 14. M/s. Siddhi Vinayak Sponge Iron Pvt Ltd. Steel Plant 15. M/s. Jindal Industrial Park. Steel Plant

Page 13: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Ø 52.65 Acres of land is acquired for the proposed project. The following is the land use

statement.

LAND USE STATEMENT

Item Area in Acres Built up area 10.00 Internal roads 3.20 Storage yard 6.00 Greenbelt 20.00 Open area 13.45 Total land 52.65

The general location of the proposed site is shown in fig. 2.1. The topographical map

showing the location of the proposed site is shown in fig. 2.2.

Page 14: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

LOCATION OF THE PROJECT IN THE STATE

N.R. ISPAT (P) LTD

GENERAL LOCATION OF THE PROPOSED SITE

Fig 2.1

Page 15: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TOPOGRAPHICAL MAP Fig 2.2

Page 16: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

2.4 SIZE / MAGNITUDE OF OPERATION

The following are the proposed units and production capacities of the proposed project.

Sr. No.

Details Plant Configuration Production Capacity

1. Sponge Iron Unit 2x 100 TPD 60,000 TPA 2. Induction Furnace with Concast 2 x 10 MT/ Heat 60,000 TPA 3. Rolling Mill 1 x 200 TPD 60,000 TPA 4. Power plant WHRB Based 2 x 2 MW 4 MW FBC based 1 x 10 MW 10 MW Total power generation 14 MW

The total capital investment of the proposed project is 95.0 Crores.

2.5 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION

The project will be implemented in 12 months from the date of issue of Environmental

Clearance.

2.6 TECHNOLOGY AND PROCESS DESCRIPTION

2.6.1 RAW MATERIALS (TOR # 6)

The following will be the raw material requirement for the proposed project.

Item Quantity (TPA)

Source Method of Transportation

Iron ore 96,000 NMDC – Bailadila By Rail/ Road (in covered trucks)

Coal 1,17,000 SECL, Chhattisgarh

By Rail/ Road (in covered trucks)

Dolomite 2,400 Local areas By Road (in covered trucks)

Scrap 4,950 Local areas By road (in covered trucks)

Ferro alloys 300 Local areas By road (in covered trucks)

Page 17: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

2.6.2 RAW MATERIAL TRANSPORT, STORAGE & HANDLING

Most of the raw materials will be transported through rail up to the nearest Railway station

and from there they will be transported in covered trucks. Raw materials received will be

transferred through loaders and conveyors to both open pile and enclosed storage sheds.

2.6.3 METHOD OF TRANSPORTATION

Most of the raw materials will be transported by Rail to the nearest railway station. All the

trucks used for transportation will be covered. Pucca road exist upto the site. The existing

road is capable of absorbing this additional truck movement. Hence there will not be adverse

impact due to the increased vehicular traffic due to the proposed project.

2.6.4 MATERIAL BALANCE

The following is the material balance for the proposed plant

1. SPONGE IRON (60,000 TPA) INPUTS OUTPUTS

S. No. Item Quantity (TPA) Item Quantity (TPA) 1 Iron Ore 96,000 Sponge Iron 60,000 2 Washed Coal 78,000 Dolochar 18,000 3 Dolomite 2,400 Gases 77100 Ash / Dust 18000 Wet Scraper sludge 2760 Accretion slag 540 Total 1,76,400 Total 1,76,400 Gases 77100 Gases 77100 Electricity (WHRB) 2 X 2 = 4 MW

2) INDUCTION FURNACE (SMS - Billets: 60,000 TPA)

INPUTS OUTPUTS S. No. Item Quantity (TPA) Item Quantity (TPA) 1 Sponge Iron (Own.Gen) 60,000 Billets 60,000 2 Scrap 8,700 Slag 6,000 3 Ferro Alloys 300 Gases including

dust 3,000

Total 69,000 Total 69,000

Page 18: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3) ROLLING MILL (60,000 TPA)

INPUTS OUTPUTS S. No. Item Quantity (TPA) Item Quantity (TPA) 1 Billets 63,330

(Own gen. -60000 Ext. purchase-3330)

TMT bars 60,000

Mill scales 3000 Gases 330 Total 63,330 Total 63,330

4) POWER PLANT (10 MW FBC Based Power Plant)

INPUTS OUTPUTS S. No. Item Quantity (TPA) Item Quantity (TPA) 1 Dolochar 18,000 Ash 28,350 2 Coal 39,000 Gases 28,650 Total 57,000 Total 57,000

ENERGY BALANCES (TOR # 21)

2.6.5 MANUFACTURING PROCESS (TOR # 7)

2.6.5.1 PRODUCTION OF SPONGE IRON (DRI)

A refractory lined rotary kiln will be used for reduction of Iron ore in solid state. A central

Burner located at the discharge end will be used for initial heating of the kiln. Sized Iron ore

Total Captive Power Generation

14 MW

DRI including Auxiliary consumption in WHRB

SMS

Rolling Mill

FBC Power Plant Auxiliary consumption

0.75 MW

10 MW

1.5 MW

1.75 MW

Page 19: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

will be continuously fed into the kiln along with coal which has dual role of fuel as well as

reductant. Dolomite will be added to scavenge the Sulphur from the coal. A number of air

tubes will be provided along the length of the kiln.

The desired temperature profile will be maintained by controlling the volume of the

combustion air through these tubes. The Carbon monoxide generated due to the combustion

of coal, reduces the iron ore and convert it into sponge iron. The rotary kiln is primarily

divided into two zones viz. the pre heating zone and the reduction zone. The preheating

zone extends over 30 to 50 % of the length of the kiln and in this the moisture in the charge

will be driven off and the volatile matter in the coal will be burnt with the combustion air

supplied through the air tubes. Heat from the combustion rises the temperature of the lining

and the bed surface. As the kiln rotates, the lining transfers the heat to the charge. Charge

material, pre-heated to about 1000oC enters the reduction zone. Temperature of the order of

1050oC will be maintained in the reduction zone, which is the appropriate temperature for

solid state reduction of iron oxide to metallic iron. This hot material will be transferred to

rotary cooler. In rotary cooler the material will cool from 1000oC to 100oC in cooler by

spraying water. The cooler discharge material consists of sponge iron lumps, sponge iron

fines and char. Magnetic and non-magnetic material will be separated through magnetic

separators and stored in separate bins.

2.6.5.2 STEEL MELTING SHOP

2.6.5.5.1 Induction furnaces

Initially scrap & other metallics such as pig Iron will be charged into the induction furnace.

After scrap & other metallics are fully melted, the temperature of the melt reaches above

1600oC, then DRI will be continuously charged into the furnace. As soon as the charge is

melted, bath samples will be taken and temperature will be measured. There will be 2 nos.

of induction furnaces in the SMS plant each of 10T capacity.

Page 20: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

2.6.5.5.2 Concast Machine

Billets will be produced in concast machine

2.6.5.3 ROLLING MILL (Manufacturing of TMT Bars)

The company has proposed to establish a rolling mill with a capacity of 60,000 TPA. Furnace

oil will be used as fuel in the reheating furnace.

2.6.5.4 POWER GENERATION (TOR # 20)

Waste Heat Recovery Boilers will be installed behind the DRI kiln in bypass configuration.

Electricity generation in the proposed power plant is characterized by the main source of

heat generation being firing of coal, char and waste heat of DRI kilns. The waste gases from

the DRI kilns will pass through WHRB’s to generate Power. Steam is produced in a boiler,

and it drives a turbine connected to an alternator. Heat energy is converted to electric energy

within the so-called steam cycle. The flue gases after ABC will be taken to unifired furnace

chamber and then flow over banks of super heater, convective evaporator and economizer

before being discharged to atmosphere through ESP, ID fan and stack. In the Fluidized Bed

Combustion boiler envisaged, combustion of fuel particles is achieved in suspension with an

inert aggregate i.e. sand. Combustion air will be fed through air nozzles from underneath

into the sand fuel bed. Oil burner will be provided for start up and low load flame

stabilization. The fuels proposed in FBC Boiler are coal & dolochar. The flue gases will pass

over various heat transfer surfaces to ESP and then finally discharged into chimney by ID

fan. The condensate after condenser of STG will be pumped to a common deaerator by

condensate extraction pumps. Feed water from the deaerator will be pumped to the waste

heat recovery boiler as well as FBC boiler by boiler feed pumps.

The steam generated from both the WHRB and FBC boilers will drive the steam turbine

through a common steam header.

Page 21: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

2.6.5.5 FLUE GAS UTILIZATION (TOR # 20)

From DRI Kilns:

The hot gases from DRI kilns will be taken to WHRB and after heat recovery it will be used

for Power Generation. A total of 4 MW will be generated through flue gases from DRI.

2.6.5.6 CARBON CREDIT PROJECT (TOR # 26)

CDM initiatives will be considered in due course.

2.7 ENVIRONMENTAL MITIGATION MEASURES

1. AIR POLLUTION CONTROL

(A) Sponge Iron (DRI)

Ø After Burning Chamber will be provided to eliminate the CO emissions.

Ø In the proposed plant the exhaust gases from the rotary kiln will pass through a Waste

Heat Recovery Boiler (WHRB) and after heat recovery the gases will pass through a

state-of-the-art Electro Static Precipitator to bring down the particulate matter in the

exhaust gases to less than 50 mg/Nm3. Then the treated gases will be let out through

a combined stack (with twin flues) of 60 m height for effective dispersion of emissions

into the atmosphere.

Ø Dust extraction system with Bagfilters will be provided at material transfer points,

crusher area, cooler discharge, product separation area, etc. to control dust emission.

All the material handling systems will be connected with de dusting system. All the

discharge points and feed points wherever the possibility of dust generation is there a

de dusting suction point will be provided to collect the dust.

Ø Water sprinklers will be provided for dust suppression during unloading of raw

materials.

Ø All conveyors will be covered with GI sheets to prevent the fugitive dust.

Ø All internal roads will be asphalted to prevent the fugitive dust due to vehicular

transport.

Page 22: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

(E) Steel Melting Shop

Ø The Fugitive emissions from the Induction furnace will be sucked through hoods and

will pass through a fume extraction system with bag filters and then let out through a

combined stack of 30m height. The outlet dust emission in the exhaust gases will be

less than 50 mg/Nm3. The dust will be pneumatically carried to covered bins.

(F) Rolling Mill

Ø The flue gases from the Rolling Mill will be let out through a stack of 40 m height for

effective dispersion of emissions into the atmosphere. The stack height is designed as

per CPCB norms.

(G) Power Generation

Ø The flue gases from the boiler will be treated in a state-of-the-art Electro Static

Precipitator to bring down the particulate emission to less than 50 mg/Nm3 and will

be let out through a stack of 50 m height for effective dispersion of emissions into the

atmosphere.

(H) Internal Roads

Ø All internal roads will be asphalted to prevent fugitive emissions due to vehicular

movement.

2. WATER POLLUTION

Ø There will not be any process waste water (or) cooling blowdown generation from

the DRI Kilns, SMS and Rolling mill plants as closed circuit cooling system will be

followed.

Ø Boiler blowdown, CT Blow down & DM Plant regeneration will be the sources of

effluent generation from the power plant. This effluent will be treated in

Neutralisation tank and utilized for dust suppression and for greenbelt

development. Zero effluent discharge will be maintained in the premises.

Ø Sanitary waste water will be treated in septic tank followed by soak pit.

Page 23: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3. NOISE POLLUTION

Ø Acoustic enclosures will be provided to Turbines.

Ø All turbines & other machinery will be manufactured to comply with MOEF

standards on Noise Levels.

Ø The noise levels will be confined to the working zones of the plant.

Ø Ear plugs will be provided to all employees who will enter into the noise prone

areas.

Ø The ambient Noise levels will be in accordance with MoEF notification dated 14-

02-2000 i.e. noise levels will be < 75 dBA during daytime and < 70 dBA during

night time.

4. SOLID WASTE (TOR # 19)

Ø Dolochar from DRI units will be completely utilized in FBC boiler to generate

power.

Ø Slag from SMS will be used as sub base material in road construction or for back

filling material.

Ø Mill scales will be used in SMS.

Ø Ash will be given to Cement Plants / given to Brick Manufacturers.

Hence there will not be any adverse impact on land environment due to the solid waste

generation.

5. GREEN BELT

Ø 15 m wide greenbelt will be developed all round the plant.

6. INTERNAL ROADS

Ø All Internal roads will be asphalted to prevent the fugitive dust emission due to

vehicular movement.

Page 24: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 2 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 2 - 1 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

2.8 ASSESSMENT OF NEW & UNTESTED TECHNOLOGY FOR THE RISK OF

TECHNOLOGICAL FAILURE

Manufacturing technologies of all the units proposed in this project are well proven

technologies all over the world. Hence there will not be any risk of technological failure from

this plant.

Page 25: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – III

DESCRIPTION OF ENVIRONMENT

(BASELINE ENVIRONMENTAL STATUS)

This chapter gives an idea and description of environmental status of the study area with

reference to the prominent environmental attributes. The general study area covers 10 Km.

radius of the steel plant.

The impact identification always commences with the collection of baseline data such as

ambient air quality, ground water quality, noise levels, land environment, land use pattern, flora

& fauna and socio economic aspects with in the study zone of 10 Km. radius.

3.1 AIR ENVIRONMENT

3.1.1 METEOROLOGY (TOR # 8)

Meteorology of the study area plays an important role in the air pollution studies. The

prevailing micro meteorological conditions at the Steel plant site will regulate the dispersion

and dilution of air pollutants in the atmosphere. The predominant wind directions and the wind

speed will decide the direction and distance of the most affected zone from the proposed

activity. The meteorological data collected during the monitoring period is very useful in

interpretation of baseline data as input for dispersion models for predicting the Ground Level

Concentrations (GLC).

Rainfall

The average annual rainfall based in 10 years data collected from the nearest meteorological

center is found to be 1143 mm.

3

Page 26: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Meteorological data recorded at site

WIND PATTERN AT SITE

Summer season (March ’08 – May ’08)

The predominant winds from NW direction were observed for 20.4 % of the total time, with

wind speeds (with % frequencies) in the range of 1-5 kmph (12.0 %), 6-11 kmph (3.0%), 12-19

kmph (3.0 %) and >19 kmph (2.4 %). The winds from SE direction were observed from 16.0 % of

the total time, with wind speeds (with % frequencies) in the range of 1-5 kmph (6.0 %), 6-11

kmph (4.0%), 12-19 kmph (4.0 %) and >19 kmph (2.0 %). The winds from NE direction were

observed from 14.5% of the total time, with wind speeds (with % frequencies) in the range of 1-5

kmph (6.5 %), 6-11 kmph (3.0 %), 12-19 kmph (3.0 %) and >19 kmph (2.0 %). N, NEE, E, SEE, S,

SSW, SW, SWW, W, NWW and NNW directions were observed for 3.0 %, 2.0 %, 1.0 %, 0 %,

2.0%, 1.0 %, 2.0 %, 1.0, 2.0, 4.0 & 2.0 % of the total time respectively. Calm conditions prevailed

for 29.1 % of the total time.

A Temporary Weather Monitoring Station was installed at the site and temperature, relative

humidity, wind direction, wind speed, and rainfall were recorded for one season (summer).

Temperature

The maximum temperature recorded was 45.9 0C and the minimum temperature was 22.9 0C at

the Project site.

Wind direction and speed are recorded at site every hour.

The wind rose diagram of the site is shown in fig 3.1

3.1.3 COMPARISON WITH IMD DATA

The wind rose plotted at site is compared with IMD wind rose. The wind rose at site is more or

less consistent with regional meteorology.

Page 27: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

WINDROSE AT SITE

CALM 29.1 %

1-5 6-12 12-19 < 19

SCALE

SCALE: 1 CM = 3 %

Page 28: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.1.4 AIR QUALITY (TOR # 9)

The ambient air quality with respect to the study zone of 10 Km. radius around the plant site

forms the baseline information. The study area represents mostly rural environment. The

various sources of air pollution in the region are vehicular traffic, dust arising from unpaved

village roads. The Prime objective of baseline air quality survey is to assess the existing air

quality of the area. This will also be useful is assessing the conformity to standards of the

ambient air quality during the plant operation.

3.1.4.1 SELECTION OF SAMPLING STATIONS

The base line status of the ambient air quality can be assessed through scientifically designed

Ambient Air Quality Monitoring Network.

The selection of sampling locations in the air quality surveillance programme is based on the

following.

(a) Representation of project site.

(b) Representation of down wind direction.

(c) Representation of cross sectional distribution in the down wind direction.

(d) Representation of residential areas.

(e) Representation of regional background levels.

Eight nos. of Ambient Air Quality Monitoring Stations were established with in the study zone

of the plant in accordance with CPCB guidelines. One AAQMS was located in Taraimal RF area.

The sampling locations and their distances are shown in Table 3.1.1 and in fig 3.2 The Max.,

Min., Avg., and 98th percentile values for all the sampling locations for RSPM, SPM, SO2 and

NOX are shown in Table 3.1.2 to 3.1.9.

Page 29: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.1.4.2 PARAMETERS MONITORED (TOR # 15)

At each Monitoring Station Respirable Suspended Particulate Matter (RSPM), Suspended

Particulate Matter (SPM), SO2, & NOX are monitored. The sampling was carried out for 2 days in

a week for three months (March-2008 to May- 2008) to assess the existing status of air pollution

and pollution dispersion pattern over the whole air basin of plant. RSPM, SPM, SO2, and NOX

are sampled as per MOEF guidelines.

3.1.4.3 SAMPLING & ANALYTICAL TECHNIQUES INSTRUMENTS USED FOR

SAMPLING

Envirotech RDS dust sampler is used for monitoring RSPM, SPM, SO2 and NOx. RSPM & SPM

are estimated by gravimetric method West & Gaeke method (IS –5182, part III 1969) has been

adopted for estimation of SO2, Jacob – Hochheiser method (IS –5182, part IV, 1975) has been

adopted for estimation of NOx.

Suspended Particulate Matter (SPM) was analyzed for Poly-aromatic Hydro Carbons (PAH).

(TOR # 10) Calibration

Calibration charts have been prepared for all gaseous pollutants. The Calibration is carried out

when new absorbing solutions are prepared.

TABLE 3.1.1

AMBIENT AIR QUALITY MONITORING STATIONS

S.NO STATION DIRECTION DISTANCE IN KMS. 1 Project Site ---- ---- 2 Gaurmudi W 1.2 3 Dilari SE 2.0 4 Saraipali W 4.0 5 Punjipathara NNE 5.0 6 Taraimal NE 4.0 7 Gerwani SSE 4.0 8 Jamdbari NW 3.75

Page 30: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

AMBIENT AIR QUALITY MONITORING STATIONS Monitoring Stations

PROJECT SITE

Saraipali

Jamdabri

Punji Patra

Taraimal

Gerwani

Delari

Gourmudii

Page 31: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE - 3.1.2

Sampling Location: Project Site Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile

RSPM* 49.8 41.1 44.9 49.7 SPM 149.8 123.5 133.6 149.7 SO2 11.4 9.5 10.4 11.3 NOx 14.1 12.5 13.3 14.3

* PAH in SPM was BDL

TABLE - 3.1. 3

Sampling Location: Gaurmudi Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile

RSPM* 47.2 38.6 42.9 47.1 SPM 144.6 117.4 131.0 144.5 SO2 10.4 8.0 9.0 10.3 NOx 13.2 10.1 11.6 13.1

* PAH in SPM was BDL

TABLE – 3.1. 4

Sampling Location: Dilari Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile RSPM* 45.0 36.1 40.1 44.9 SPM 139.1 110.2 124.2 139.0 SO2 9.7 7.5 8.6 9.6 NOx 11.6 9.7 10.7 11.5

* PAH in SPM was BDL

Page 32: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE - 3 .1 . 5

Sampling Location: Saraipali Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile RSPM* 43.6 35.9 39.7 43.6 SPM 131.4 109.7 120.3 131.3 SO2 9.8 7.3 8.5 9.7 NOx 11.7 9.6 10.5 11.6

* PAH in SPM was BDL

TABLE - 3.1. 6

Sampling Location: Punjipathara Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile RPM 44.4 35.6 40.2 44.3 SPM 133.5 107.3 120.4 133.4 SO2 12.3 8.1 10.1 12.2 NOx 13.7 10.7 12.1 13.6

* PAH in SPM was BDL

TABLE - 3 .1. 7

Sampling Location: Taraimal Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile

RSPM* 40.2 28.2 33.4 40.1 SPM 127.8 99.8 106.9 127.7 SO2 11.4 8.8 9.7 11.3 NOx 12.7 9.7 11.6 12.6

* PAH in SPM was BDL

Page 33: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE - 3 .1. 8

Sampling Location: Gerwani Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile

RSPM* 38.9 31.2 35.0 38.8 SPM 126.2 99.6 112.4 126.1 SO2 10.9 8.5 9.6 10.8 NOx 13.4 8.9 11.1 13.3

* PAH in SPM was BDL

TABLE - 3.1. 9

Sampling Location: Jamdbari Sampling period: Mar -May 2008 Unit : µg/m3

Parameter Maximum Minimum Average 98th percentile RSPM* 41.6 35.4 38.1 40.5 SPM 127.8 105.9 115.4 127.7 SO2 9.4 7.5 8.2 9.3 NOx 11.0 9.6 10.1 10.9

* PAH in SPM was BDL

The avg. SPM concentration at the Project site is 133.6 µg/m3. The avg. RPM concentration at the

Project site is 44.9 µg/m3. The avg. SO2 & NOx concentrations recorded at the Project site are

10.4 & 13.3 µg/m3 respectively.

The maximum average RPM concentration was recorded at near Project site with a value of 44.9

µg/m3.

The maximum average SPM concentration was recorded at Patrapali with a value of 133.6

µg/m3.

The maximum average SO2 concentration was recorded at Patrapali with a value of 10.4 µg/m3.

The maximum average NOx concentration was recorded at Kotarlia with a value of 13.3 µg/m3.

PAH at all the monitoring stations is Below Detectable Level (BDL). (TOR # 10)

Page 34: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.2 NOISE ENVIRONMENT

The physical description of sound concerns its loudness as a function of frequency. Noise in

general is sound, which is composed of many frequency components of various loudness

distributed over the audible frequency range. Various noise scales have been introduced to

describe, in a single number, the response of an average human being to a complex sound made

up various frequencies at different loudness levels. The most common and heavily favored of

those scales is the weighted decibel (dBA). This is more suitable for audible range of 20 to 20,000

Hertz. The scale has been designed to weigh various components of noise according to the

response of a human ear.

The impact of noise sources on surrounding community depends on

− Characteristics of noise sources (instantaneous, intermittent or continuous in nature). It is

well known that steady noise is not as annoying as one that is continuously varying in

loudness.

− The time, at which noise occurs, for example loud noise levels at night in residential areas are

not acceptable because of sleep disturbance.

− The location of the noise source, with respect to noise sensitive area, which determines the

loudness and period of noise exposure.

The environmental impact of noise can have several effects varying from Noise Induced Hearing

Loss (NIHL) to annoyance depending on loudness of Noise levels.

The environmental impact assessment of noise from the plant can be carried out by taking into

consideration of various factors: potential damage to hearing, potential physiological responses,

annoyance and general community responses.

The main objective of noise level monitoring is to assess the background noise levels in different

zones viz., industrial, commercial, residential and silence zones within the study area.

Page 35: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

The basic studies conducted were

a. Assessment of background noise levels.

b. Identification and monitoring the major noise generating sources in the study area.

c. Impact of noise on general population in the study zone of 10 Km. radius.

3. 2. 1 RECONNAISSANCE

Noise levels were measured at different locations within 10 Km. radius of the plant such as

villages, bus stands etc.

3.2.1.1 BACKGROUND NOISE

Baseline noise data has been measured at different locations using A-weighted sound pressure

level meter. The equivalent day-night noise levels in the study zone are ranging from 44.70 dBA

to 48.45 dBA.

3.2.1.2 SOURCES OF NOISE

Typical considerations in environmental noise assessment can be divided into two categories,

one is related to noise sources and the other related to potential receiver.

Two quantities are needed to describe completely the strength of the source. They are sound

power level and directivity. Sound power levels measures the total sound power radiated by the

source in all directions where as directivity is a measure of difference in radiation with direction.

This concept of sound power level and directivity index makes it possible to calculate the sound

pressure level created by the source.

3.2.2 COMMUNITY NOISE

The ambient noise level is characterized by significant variations above a base or a residual noise

level. The residual noise level is that level below which the ambient noise does not seem to drop

during a given time interval and is generally caused by the unidentified distant sources. It

differs in rural and urban areas. At night, its level is low due to lesser elements of noise. The

Page 36: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

annoyance that people experience depends upon the number of noise elements that produce

noise concurrently at a given time that occur during a time interval.

The noise rating developed by EPA for specification of community noise from all sources is the

day night sound level, Ldn. It is similar to a 24 hour equivalent sound level except that during

the night period, which extends from 10.00 p.m. to 7.00 a.m. A 10 dBA weighing penalty is

added to the account for the fact that noise at night when people are trying to sleep is judged

more annoying than the same noise during the day time.

The Ldn for a given location in a community is calculated from an hourly equivalent sound level

given be the following equation.

Ldn =10 log (1/24 [15 (10(Ld/10) + 9 (10(Ln+10)/10 )] )

Where Ld is the equivalent noise level during day time (7A .M. to 10 P.M.)

Ln is the equivalent noise level during night time (10 P.M. to 7 A.M.)

3.2.2.1 OCCUPATIONAL EXPOSURE

To assess the magnitude of impact due to noise sources, it is essential to know the following.

a. The duration of sound.

b. Distribution through the working day.

c. Overall noise levels.

d. It’s composition including frequency and intensity at various intervals of time.

Other factors regarding receiver include

a. The age of the individual.

b. The sensitivity of the individual.

c. The efficiency of the protective devices used.

After characterizing the noise sources noise at receiver’s location, the impact must be assessed.

The environmental impact of noise can lead to the following effects.

Page 37: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

a. Damages the hearing capacity.

b. Interference in communication.

c. Interference with work.

d. Interference with sleep.

e. Causes annoyance

3. 2. 3. NOISE LEVEL OBSERVATIONS IN THE STUDY AREA

Baseline noise levels have been monitored at different locations within the study zone of the

plant. Eight nos. of stations have been selected for measurement of noise levels and their

distances with respect to site are shown in table 3. 2.1.

TABLE 3. 2 .1 NOISE LEVEL MONITORING STATIONS

S.NO STATION DIRECTION DISTANCE IN KMS. 1 Project Site ---- ---- 2 Gaurmudi W 1.2 3 Dilari SE 2.0 4 Saraipali W 4.0 5 Punjipathara NNE 5.0 6 Taraimal NE 4.0 7 Gerwani SSE 4.0 8 Jamdbari NW 3.75

TABLE 3. 2 .2 EQUIVALENT DAY NIGHT NOISE LEVEL

EQUIVALENT NOISE LEVELS (dBA) S.No. LOCATION DAY NIGHT DAY-NIGHT

1 Project Site 47 34 46.60 2 Gaurmudi 48 36 47.55 3 Dilari 49 34 48.40 4 Saraipali 49 31 48.45 5 Punjipathara 48 32 47.30 6 Taraimal 46 34 45.49 7 Gerwani 47 32 46.60 8 Jamdbari 45 34 44.70

Page 38: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.3 WATER QUALITY IMPACTS

3.3.1 Surface water Quality (TOR # 16)

The water required for the plant will draw from Delari Jharna Nallah which is situated at a

distance of 1.5 kms. from the proposed site by laying a dedicated pipe line. The water analysis of

the Sapnai river is given in Table no.3.3.1.

TABLE NO. 3.3.1

SURFACE WATER QUALITY ANALYSIS

Station : Delari Jharma Nallah (60m upstream)

S. NO. PARAMETER UNIT RESULTS PHYSICAL CHARACTERISTICS

1. Colour ----- 2. pH 7.3 3. Turbidity NTU 2 4. Electrical Conductivity ms/cm 169 5. Total Dissolved Solids mg/l 113 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 68 7. Calcium Hardness mg/l 36 8. Magnesium Hardness mg/l 32 9. Alkalinity mg/l 58

10. Sulphates mg/l 26 11. Chlorides mg/l 32 12. Nitrates as NO3 mg/l 2.8 13. Fluoride as F mg/l 0.20 14. Sodium as Na mg/l 15 15. COD mg/l 2 16. Residual chlorine mg/l <0.01 17. Cyanides as CN- mg/l <0.01 18. Phenols as C6H5OH mg/l Absent 19. Hexavalent chromium as Cr mg/l <0.01 20. Iron as Fe mg/l 0.05 21. Copper as Cu mg/l <0.01 22. Arsenic as As mg/l <0.01 23. Selenium mg/l <0.01 24. Cadmium as cd mg/l <0.01 25. Boron as B mg/l <0.01 26. Mercury as Mg mg/l <0.001 27. Lead as Pb mg/l <0.01 28. Silica as SiO2 mg/l 3.0 29. Mineral oil mg/l <0.01 30. Total coliforms (MPN/100 ml) 12

Page 39: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE NO. 3.3.2 SURFACE WATER QUALITY ANALYSIS

Station : Delari Jharma Nallah (60m down stream)

S. NO. PARAMETER UNIT RESULTS PHYSICAL CHARACTERISTICS

1. Colour ----- 2. pH 7.1 3. Turbidity NTU 1 4. Electrical Conductivity ms/cm 165 5. Total Dissolved Solids mg/l 110 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 76 7. Calcium Hardness mg/l 40 8. Magnesium Hardness mg/l 36 9. Alkalinity mg/l 51 10. Sulphates mg/l 24 11. Chlorides mg/l 27 12. Nitrates as NO3 mg/l 2.5 13. Fluoride as F mg/l 0.25 14. Sodium as Na mg/l 12 15. COD mg/l 3 16. Residual chlorine mg/l <0.01 17. Cyanides as CN- mg/l <0.01 18. Phenols as C6H5OH mg/l Absent 19. Hexavalent chromium as Cr mg/l <0.01 20. Iron as Fe mg/l 0.05 21. Copper as Cu mg/l <0.01 22. Arsenic as As mg/l <0.01 23. Selenium mg/l <0.01 24. Cadmium as cd mg/l <0.01 25. Boron as B mg/l <0.01 26. Mercury as Mg mg/l <0.001 27. Lead as Pb mg/l <0.01 28. Silica as SiO 2 mg/l 2.0 29. Mineral oil mg/l <0.01 30. Total coliforms (MPN/100 ml) 16

Page 40: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

SURFACE WATER QUALITY ANALYSIS

Station : at other surface drains

S. NO. PARAMETER UNIT SAMPLE I SAMPLE II SAMPLE III SAMPLE IV PHYSICAL CHARACTERISTICS

1. Colour ----- ----- ----- ----- 2. pH 7.2 7.6 7.1 7.7 3. Turbidity NTU 2 1 2 2 4. Electrical Conductivity ms/cm 132 139 130 125 5. Total Dissolved Solids mg/l 97 100 91 87

CHEMICAL CHARACTERISTICS 6. Total Hardness mg/l 81 76 75 77 7. Calcium Hardness mg/l 46 40 40 42 8. Magnesium Hardness mg/l 35 36 35 35 9. Alkalinity mg/l 43 52 44 50 10. Sulphates mg/l 18 20 17 21 11. Chlorides mg/l 25 32 27 29 12. Nitrates as NO3 mg/l 3.2 3.4 3.2 2.9 13. Fluoride as F mg/l 0.16 0.17 0.14 0.13 14. Sodium as Na mg/l 12 14 11 13 15. COD mg/l 2 2 1 3 16. Residual chlorine mg/l <0.01 <0.01 <0.01 <0.01 17. Cyanides as CN- mg/l <0.01 <0.01 <0.01 <0.01 18. Phenols as C6H5OH mg/l Absent Absent Absent Absent 19. Hexavalent chromium as Cr mg/l <0.01 <0.01 <0.01 <0.01 20. Iron as Fe mg/l 0.04 0.05 0.04 0.05 21. Copper as Cu mg/l <0.01 <0.01 <0.01 <0.01 22. Arsenic as As mg/l <0.01 <0.01 <0.01 <0.01

Page 41: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

23. Selenium mg/l <0.01 <0.01 <0.01 <0.01 24. Cadmium as cd mg/l <0.01 <0.01 <0.01 <0.01 25. Boron as B mg/l <0.01 <0.01 <0.01 <0.01 26. Mercury as Mg mg/l <0.001 <0.001 <0.001 <0.001 27. Lead as Pb mg/l <0.01 <0.01 <0.01 <0.01 28. Silica as SiO2 mg/l 2.5 2.2 2.6 2.4 29. Mineral oil mg/l <0.01 <0.01 <0.01 <0.01 30. Total coliforms (MPN/100 ml) 12 10 9 13

SURFACE WATER QUALITY ANALYSIS

Station : at other surface drains

S. NO. PARAMETER UNIT SAMPLE V SAMPLE VI SAMPLE VII SAMPLE VIII PHYSICAL CHARACTERISTICS

1. Colour ----- ----- ----- ----- 2. pH 7.6 7.3 7.1 7.8 3. Turbidity NTU 2 1 1 1 4. Electrical Conductivity ms/cm 142 139 144 132 5. Total Dissolved Solids mg/l 92 100 94 83

CHEMICAL CHARACTERISTICS 6. Total Hardness mg/l 72 84 75 74 7. Calcium Hardness mg/l 51 44 40 42 8. Magnesium Hardness mg/l 21 40 35 32 9. Alkalinity mg/l 45 47 50 49 10. Sulphates mg/l 17 16 19 15 11. Chlorides mg/l 28 31 31 34 12. Nitrates as NO3 mg/l 3.2 3.4 3.0 2.9 13. Fluoride as F mg/l 0.04 0.06 0.05 0.04

Page 42: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

14. Sodium as Na mg/l 9 8 10 12 15. COD mg/l 3 2 4 3 16. Residual chlorine mg/l <0.01 <0.01 <0.01 <0.01 17. Cyanides as CN- mg/l <0.01 <0.01 <0.01 <0.01 18. Phenols as C6H5OH mg/l Absent Absent Absent Absent 19. Hexavalent chromium as Cr mg/l <0.01 <0.01 <0.01 <0.01 20. Iron as Fe mg/l 0.02 0.03 0.03 0.02 21. Copper as Cu mg/l <0.01 <0.01 <0.01 <0.01 22. Arsenic as As mg/l <0.01 <0.01 <0.01 <0.01 23. Selenium mg/l <0.01 <0.01 <0.01 <0.01 24. Cadmium as cd mg/l <0.01 <0.01 <0.01 <0.01 25. Boron as B mg/l <0.01 <0.01 <0.01 <0.01 26. Mercury as Mg mg/l <0.001 <0.001 <0.001 <0.001 27. Lead as Pb mg/l <0.01 <0.01 <0.01 <0.01 28. Silica as SiO2 mg/l 2.0 2.4 2.1 2.4 29. Mineral oil mg/l <0.01 <0.01 <0.01 <0.01 30. Total coliforms (MPN/100 ml) 10 14 16 13

Page 43: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 1 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.3.2 GROUND WATER QUALITY ASSESSMENT (TOR # 18)

The ground water samples have to be collected and analyzed for various parameters like pH,

Suspended Solids, Total Dissolved Solids, Temperature, Total Hardness, Calcium Hardness,

Magnesium hardness, Alkalinity, Fluoride, Chloride, Sulphates, Nitrates, Chemical Oxygen

Demand (COD) and for various heavy metals and is compared with the standards to know the

water quality. Selection of sampling locations will be generally done based on the following

factors:

i) Proximity of the industries to the site.

ii) Residential areas.

iii) Representation of project site.

Eight numbers of ground water samples from open wells / bore wells were collected from the

near by villages to assess ground water quality impacts. The ground water sampling locations

and their distances from the plant were shown in table 3.3.2. The water quality sampling

stations are shown in fig. 3.4. The ground water characteristics were shown in table Nos. 3.3.3 to

3.3.10.

All the water samples collected shows that they are suitable for potable purpose.

TABLE 3. 3. 2

GROUND WATER QUALITY MONITORING STATIONS

S.NO STATION DIRECTION DISTANCE IN KMS. 1 Project Site ---- ---- 2 Gaurmudi W 1.2 3 Dilari SE 2.0 4 Saraipali W 4.0 5 Punjipathara NNE 5.0 6 Taraimal NE 4.0 7 Gerwani SSE 4.0 8 Jamdbari NW 3.75

Page 44: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

GROUND WATER QUALITY MONITORING STATIONS

Monitoring Stations

PROJECT SITE

Saraipali

Jamdabri

Punji Patra

Taraimal

Gerwani

Delari

Gourmudii

Page 45: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3. 3 .3 GROUND WATER QUALITY ANALYSIS

Station: Near the project site Month: March 2008 S. NO. PARAMETER UNIT SAMPLE

PHYSICAL CHARACTERISTICS 1. Colour --- 2. ph 7.2 3. Turbidity NTU 1 4. Electrical Conductivity µs/cm 550 5. Total Dissolved Solids mg/l 370

CHEMICAL CHARACTERISTICS 6. Total Hardness mg/l 215 7. Calcium Hardness mg/l 165 8. Magnesium Hardness mg/l 50 9. Alkalinity mg/l 192 10. Sulphates mg/l 60 11. Chlorides mg/l 115 12. Nitrates as NO3 mg/l 2.2 13. Fluoride as F mg/l 0.50 14. Sodium as Na mg/l 94 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.018 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 2.2 28. Manganese as Mn Mg/l <0.01 29. Mineral oil Mg/l <0.01 30. Anionic detergents as MBAS Mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 46: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3. 3 .4 GROUND WATER QUALITY ANALYSIS

Station: Gaurmudi Month: March 2008 S. NO. PARAMETER UNIT SAMPLE

PHYSICAL CHARACTERISTICS 1. Colour --- 2. pH 7.2 3. Turbidity NTU 1 4. Electrical Conductivity µs/cm 621 5. Total Dissolved Solids mg/l 414

CHEMICAL CHARACTERISTICS 6. Total Hardness mg/l 211 7. Calcium Hardness mg/l 162 8. Magnesium Hardness mg/l 49 9. Alkalinity mg/l 190 10. Sulphates mg/l 59 11. Chlorides mg/l 110 12. Nitrates as NO3 mg/l 2.5 13. Fluoride as F mg/l 0.51 14. Sodium as Na mg/l 83 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.022 21. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 3.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 47: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 3 .5 GROUND WATER QUALITY ANALYSIS

Station : Dilari Month : March’ 2008

S. NO. PARAMETER UNIT SAMPLE PHYSICAL CHARACTERISTICS

1. Colour --- 2. pH 7.3 3. Turbidity NTU 1 4. Electrical Conductivity µs/cm 615 5. Total Dissolved Solids mg/l 408

CHEMICAL CHARACTERISTICS 6. Total Hardness mg/l 204 7. Calcium Hardness mg/l 157 8. Magnesium Hardness mg/l 47 9. Alkalinity mg/l 189 10. Sulphates mg/l 55 11. Chlorides mg/l 110 12. Nitrates as NO3 mg/l 2.4 13. Fluoride as F mg/l 0.50 14. Sodium as Na mg/l 89 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.021 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 3.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 48: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 3 .6 GROUND WATER QUALITY ANALYSIS

Station: Saraipali Month: March 2008 S. NO. PARAMETER UNIT SAMPLE PHYSICAL CHARACTERISTICS

1. Colour --- 2. pH 7.2 3. Turbidity NTU 1 4. Electrical Conductivity µs/cm 621 5. Total Dissolved Solids mg/l 396 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 202 7. Calcium Hardness mg/l 155 8. Magnesium Hardness mg/l 47 9. Alkalinity mg/l 184 10. Sulphates mg/l 56 11. Chlorides mg/l 109 12. Nitrates as NO3 mg/l 2.3 13. Fluoride as F mg/l 0.50 14. Sodium as Na mg/l 80 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.020 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 3.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 49: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 3 .7 GROUND WATER QUALITY ANALYSIS

Station: Punjipathara Month: March 2008 S. NO. PARAMETER UNIT SAMPLE PHYSICAL CHARACTERISTICS

1. Colour --- 2. pH 7.5 3. Turbidity NTU 2 4. Electrical Conductivity µs/cm 755 5. Total Dissolved Solids mg/l 499 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 249 7. Calcium Hardness mg/l 162 8. Magnesium Hardness mg/l 87 9. Alkalinity mg/l 225 10. Sulphates mg/l 74 11. Chlorides mg/l 125 12. Nitrates as NO3 mg/l 3.1 13. Fluoride as F mg/l 0.54 14. Sodium as Na mg/l 98 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.019 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 4.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 50: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 3 .8

GROUND WATER QUALITY ANALYSIS

Station: Taraimal Month : March 2008

S. NO. PARAMETER UNIT SAMPLE PHYSICAL CHARACTERISTICS

1. Colour --- 2. pH 7.2 3. Turbidity NTU 1 4. Electrical Conductivity µs/cm 630 5. Total Dissolved Solids mg/l 399 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 204 7. Calcium Hardness mg/l 159 8. Magnesium Hardness mg/l 45 9. Alkalinity mg/l 187 10. Sulphates mg/l 55 11. Chlorides mg/l 105 12. Nitrates as NO3 mg/l 2.1 13. Fluoride as F mg/l 0.50 14. Sodium as Na mg/l 79 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.018 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 3.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 51: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3. 3 .9 GROUND WATER QUALITY ANALYSIS

Station : Gerwani Month : March 2008 S. NO. PARAMETER UNIT SAMPLE PHYSICAL CHARACTERISTICS

1. Colour --- 2. pH 7.4 3. Turbidity NTU 1 4. Electrical Conductivity µs/cm 611 5. Total Dissolved Solids mg/l 389 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 207 7. Calcium Hardness mg/l 137 8. Magnesium Hardness mg/l 70 9. Alkalinity mg/l 188 10. Sulphates mg/l 61 11. Chlorides mg/l 98 12. Nitrates as NO3 mg/l 2.0 13. Fluoride as F mg/l 0.41 14. Sodium as Na mg/l 85 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.018 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 2.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 52: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 3 .10 GROUND WATER QUALITY ANALYSIS

Station: Jamdbari Month : March 2008 S. NO. PARAMETER UNIT SAMPLE PHYSICAL CHARACTERISTICS

1. Colour --- 2. pH 7.4 3. Turbidity NTU 2 4. Electrical Conductivity µs/cm 675 5. Total Dissolved Solids mg/l 442 CHEMICAL CHARACTERISTICS

6. Total Hardness mg/l 232 7. Calcium Hardness mg/l 167 8. Magnesium Hardness mg/l 65 9. Alkalinity mg/l 209 10. Sulphates mg/l 60 11. Chlorides mg/l 117 12. Nitrates as NO3 mg/l 2.7 13. Fluoride as F mg/l 0.54 14. Sodium as Na mg/l 88 15. Residual chlorine mg/l <0.01 16. Cyanides as CN- mg/l <0.01 17. Phenols as C6H5OH mg/l Absent 18. Total chromium as Cr mg/l <0.01 19. Iron as Fe mg/l 0.024 20. Copper as Cu mg/l <0.01 21. Arsenic as As mg/l <0.01 22. Selenium as Se mg/l <0.01 23. Cadmium as cd mg/l <0.01 24. Boron as B mg/l <0.01 25. Mercury as Hg mg/l <0.001 26. Lead as Pb mg/l <0.01 27. Silica as SiO2 mg/l 3.0 28. Manganese as Mn mg/l <0.01 29. Mineral oil mg/l <0.01 30. Anionic detergents as MBAS mg/l <0.01 31. Total coliforms (MPN/100 ml) Absent

Page 53: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 2 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.3.3 WATER REQUIREMENT

Water requirement for the plant will be met from abundantly available River Kelo or

Chhuikansa Nallah. The maximum net water requirement for the proposed Plant is 3800

cum/day.

3.3.4 WASTE WATER

The total wastewater generation from the proposed plant is will be 181 cum/day.

3.4 LAND ENVIRONMENT

3.4.1 LAND USE PATTERN (TOR # 1)

The following is the land use pattern within 10 Km radius of the plant.

Land use pattern

Irrigated Area : 19.5 %

Forest Area : 28.0 %

Un Irrigated Area : 31.8 %

Built up Area : 10.0%

Open & Waste land : 10.7 %

3.4.2 MINERAL RESERVES

There are no mineral reserves in the study area.

3.4.3 SEISMIC EFFECT

The project site falls in zone-II of seismic zone classification of India.

3.4.4 SOIL

Eight soil samples were collected and for analyzed for various parameters like texture,

infiltration rate, bulk density, pH, Ca, Mg, Na, K, Zn, Mn etc. The soil characteristics are shown

in Table No. 3 .4.1 to 3.4.5 and soil sample monitoring stations shown in fig: 3.5

Page 54: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

SOIL QUALITY MONITORING STATIONS

Monitoring Stations

PROJECT SITE

Saraipali

Jamdabri

Punji Patra

Taraimal

Gerwani

Delari

Gourmudii

Page 55: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3. 4. 1

SOIL CHARACTERISTICS

Station : Project Site Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density g / cc 1.79

2. Infiltration rate Cm/hr 1.71 3. pH -- 7.3

4. Soil type -- Sandy loam 5. Calcium mg/100 gm 924

6. Magnesium mg/100 gm 58 7. Sodium mg/100 gm 66

8. Potassium mg/100 gm 41

9. P2O5 mg/100 gm 25 10. Mn mg/100 gm <0.001

11. Zn mg/100 gm <0.001 12. Pb mg/100 gm <0.001

TABLE - 3. 4. 2

SOIL CHARACTERSTIC

Station : : Gaurmudi Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density g / cc 1.80 2. Infiltration rate cm/hr 2.13

3. pH -- 7.3 4. Soil type -- Sandy loam

5. Calcium mg/100 gm 897 6. Magnesium mg/100 gm 74

7. Sodium mg/100 gm 69

8. Potassium mg/100 gm 42 9. P2O5 mg/100 gm 30

10. Mn mg/100 gm <0.001 11. Zn mg/100 gm <0.001

12. Pb mg/100 gm <0.001

Page 56: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 4 . 3

SOIL CHARACTERISTICS

Station : Dilari Month : March 2008 S. No. Parameter Unit Value

1. Bulk Density g / cc 1.74

2. Infiltration rate cm/hr 1.95 3. pH -- 7.4

4. Soil type -- Clay loam 5. Calcium mg/100 gm 872

6. Magnesium mg/100 gm 60 7. Sodium mg/100 gm 58

8. Potassium mg/100 gm 41

9. P2O5 mg/100 gm 32 10. Mn mg/100 gm <0.001

11. Zn mg/100 gm <0.001 12. Pb mg/100 gm <0.001

TABLE 3. 4 . 4

SOIL CHARACTERSTICS

Station : Saraipali Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density g / cc 1.65

2. Infiltration rate cm/hr 1.72 3. pH -- 7.6

4. Soil type -- Clay loam 5. Calcium Mg/100 gm 798

6. Magnesium Mg/100 gm 55

7. Sodium Mg/100 gm 72 8. Potassium Mg/100 gm 26

9. P2O5 Mg/100 gm 20 10. Mn Mg/100 gm <0.001

11. Zn Mg/100 gm <0.001 12. Pb Mg/100 gm <0.001

Page 57: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3. 4. 5

SOIL CHARACTERISTICS

Station : Punjipathara Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density G / cc 1.90

2. Infiltration rate cm/hr 2.09 3. pH -- 7.6

4. Soil type -- Loamy

5. Calcium Mg/100 gm 968 6. Magnesium Mg/100 gm 74

7. Sodium Mg/100 gm 69 8. Potassium Mg/100 gm 45

9. P2O5 Mg/100 gm 21 10. Mn Mg/100 gm <0.001

11. Zn Mg/100 gm <0.001 12. Pb Mg/100 gm <0.001

TABLE 3 . 4 . 6

SOIL CHARACTERSTICS

Station : Taraimal Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density G / cc 1.71 2. Infiltration rate cm/hr 1.96

3. PH -- 7.6 4. Soil type -- Sandy loam

5. Calcium Mg/100 gm 965 6. Magnesium Mg/100 gm 67

7. Sodium Mg/100 gm 60 8. Potassium Mg/100 gm 41

9. P2O5 Mg/100 gm 24 10. Mn Mg/100 gm <0.001

11. Zn Mg/100 gm <0.001

12. Pb Mg/100 gm <0.001

Page 58: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 3 . 4 . 7

SOIL CHARACTERSTICS

Station : Gerwani Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density g / cc 1.72

2. Infiltration rate cm/hr 1.91

3. pH -- 7.5 4. Soil type -- Sandy loam

5. Calcium Mg/100 gm 890 6. Magnesium Mg/100 gm 68

7. Sodium Mg/100 gm 72 8. Potassium Mg/100 gm 40

9. P2O5 Mg/100 gm 26 10. Mn Mg/100 gm <0.001

11. Zn Mg/100 gm <0.001 12. Pb Mg/100 gm <0.001

TABLE 3 . 4 . 8

SOIL CHARACTERSTICS

Station: Jamdbari Month : March 2008

S. No. Parameter Unit Value 1. Bulk Density g / cc 1.85 2. Infiltration rate cm/hr 2.02

3. pH -- 7.2

4. Soil type -- Sandy loam 5. Calcium Mg/100 gm 902

6. Magnesium Mg/100 gm 70 7. Sodium Mg/100 gm 63

8. Potassium Mg/100 gm 44 9. P2O5 Mg/100 gm 30

10. Mn Mg/100 gm <0.001 11. Zn Mg/100 gm <0.001

12. Pb Mg/100 gm <0.001

Page 59: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

3.5 BIOLOGICAL ENVIRONMENT

The Flora and Fauna in the study area is shown in Table 3.5.

Flora

Albazia lebbeck Anogeissus latifolia Bauhinia malabarica Madhuca Latifolia Gardenia latifolia Cordia dichotoma Cassia fistula Ficus glomerata Holarrhena antifycenterica Magnifera Indica Pongamia glabra Dalbergia Latifolia Peltocorpus mersupium Diospyros melanoxylon Bauhinia variegate Dillenia pentagyna Lagerstroemia perviflora Scheichera trijuge Salmalia melabarica Greqia tiliaefolia Oogeniaoogenensis Lannea grandis Semicarpus anacardium Mitragyna Parviflora Delbergia paniculate Terminalia bellerica Emblica officinalis Tamarindus indica Shorea robusta Ficus relisiosa Wrightia tinctoria Soymida fabrifuga Xylia Xylocarpa Emblica officinalis Careya arborea Cleitanthes collinus Dendrocalamus strictusautus Anthocephalus cadamba Aegle marmelos Terminalia arjun Randia dumatorum Terminalia chebula Hymenodictylon excelsum Plants of economic value Allium sativum Hibiscus Cannabinus Allium cepa Spinacia oleracea Colocacia esculenta Amaranthus viridis Trigonella foenum – graceum Phaseolus sp. Dolichos liflorites Pisum sativum Cajanus cajin Dolichos liflorites Phaseolus radiatus Cicer aerietinum Phaseolus mungo Pennisetum typhoideum Oryza sativa

Page 60: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Zea mays Eleusine coracana Eleucine coracana DISCRIPTION OF FAUNA

BIRDS IN THE STUDY AREA

S. No Technical Name English Name

1 Anninga melanogaster Darter 2 Astur badius Shikra 3 Columbus livibus Rock Pigeon 4 Oriolus oriolus Indian Oriole 5 Microtus affinis House swift 6 Pycnonotus jokokus White Bulbul 7 Turdoides striatus White neaded babler 8 Uroloncha striata Spotted munia 9 Ardeola gravii Pond Heron 10 Corvus splendens House crow 11 Milyus migrans Parian kite 12 Milyus migrans Common kite 13 Temenuchus pagodarum Brahmny Myna 14 Aoridotheres tristicus Common myna 15 Aythya feroma White eyed Pochard 16 Babulcus ibis Cattle Egret 17 Caprimulgus asiaticus Common indian jar 18 Centropus sinensis Crow Pheasant 19 Passer domisticus House Sparrow 20 Saxicoloides fulicata Indian robin 21 Targos calvus King vulture 22 Aloedo atthis Common Kingfisher 23 Aegithina tiphia Iora 24 Egretta garzetta Little Egret 25 Cinnyris asiatica Purple Sunbird 26 Merops orinetalis Common Bee Eater 27 Black Headed Onole Oriolus xanthornus 28 Bubo bubo Indian great horned Owl 29 Cinnyris lotensis Loten's sunbird 30 Ploceus Philippines Weaver bird 31 Psittacula Krammeri Rose ringed parakeet 32 Copsychus saularis Magpie Robin

Page 61: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

33 Corvus corvus Jungle crow 34 Coracias benghalensis Indian Roller

AQUATIC FAUNA IN THE STUDY AREA

S. No. Name of the Species

1 Dendrocygna javanica 2 Labeo rohita 3 Channa striatus 4 Nepa sp 5 Notpterus notopterus 6 Phalacrocorax carbo 7 Ardea cinerea 8 Dytiscus sp 9 Esomus darnucus 10 Clarias batrachus 11 Cirrhinus mrigula 12 Egretta garzetta

PLANKTONIC FLORA AND FAUNA IN THE STYDY AREA

Sl. No PHYTOPLANKTON 1 Ankistrodesmus sp 2 Euglena sp 3 Navicula sphaerophora 4 Navicula rhyncocephala 5 Chrococcus sp 6 Anabaena sp 7 Microcystis sp 8 Cosmarium sp 9 Synedrazulna 10 Gomphonema sp 11 Scenedesmus bijuga 12 Oscillatoria sp 13 Crucigenia sp 14 Pediastrum sp 15 Clostrium sp

Page 62: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

AMPHIBIANS AND REPTILES IN THE STUDY AREA

Sl.No Zoological Name Common Name Amphibians

1 Rana tigriana Common frog 2 Buto melanosticus Toad 3 Hylagoeldii Tree frog

Reptiles 1 Lycodon spp. Wolf snake 2 Chamaleon zeylanicus Indian chamaeleon 3 Varanus benegalensis Monitor lizard 4 Python molurus Phython 5 Calotes virsicolor Common garden lizard 6 Vibera spp. Russels viper 7 Naja naja Indian Cobra 8 Bangarus spp. Krait 9 Boiga spp. Cat snake

2.6 SOCIO - ECONOMIC ASPECTS The demographic features with socioeconomic status of the area were conducted based

on the district census record 2001 and ground level information through survey. The

following features were observed, as per table 4.2

> Population: Total population within the study area is 87651 persons among this male

constituent 50.15% (28912) and female 49.85% (28739) respectively.

> Literacy: 70.60% (40702) of the total population belong to literate category. Among this

male constitute 79.45% (22971) and female 61. 69% (17731) respectively.

> Employment Status: Three categories of workers have been classified. They are main

workers, marginal workers and non-workers. In all 62 villages in impact zone details of

Page 63: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 3 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

these workers village-wise is given in table –4.2. It is observed that 52.75% (15251) of the

population are main male workers fully employed, while 39.98% (11491) are female main

workers. Similarly marginally employed male workers are 24.91% (7201) and female are

36.94% (10650). 22.34 % (6464) male and 23.83 % female are found to be non-workers and

unemployed. Agriculture and cultivation (91.22 % of main worker) form the prime

occupation of the rural population. Rests are employed in construction, transport &

trade, commerce and industrial activity.

> Sex Ratio: The sex ratio (female per 1000 male) over study site was 994

> Population Density: In the impact zone it is 184 persons per squire kilometer no urban

area falls in the study area of 10 km radius.

> Educational Facility: Fairly good education facilities are available in the study area.

Mostly all villages have primary school; about 60 % villages have middle school and 48 %

village have high school and higher secondary school. Degree College is situated at

Mauhapalli village and at Raigarh (which is the nearest town and a number of

educational institutions such as primary, secondary and higher secondary school

polytechnic college, Degree College, art and science college, technology institute etc. are

available).

> Medical Facility: In the study area the medical facility available is one primary health

center, which is located at ‘Loing’ village. Beside, private medical practitioners and

ayurvedic aushadhalay providing medical treatment to villager in several villages are

available these are recognized by the govt. Raigarh town have district hospital and

number of private hospital, nursing home and dispensary.

Page 64: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 3

Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 3 - 4 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

> Availability of Drinking Water: In most of villages the drinking water facility is provided

by local authority (i.e. Gram Panchayat) by means hand pump, open dug well as well as

bore well based centralized water tank.

> Market Facility: It is observed that about 60% villages have village bazaar once a weak.

> Approach: About 60% villages in the study area are approached by pucca road (metal).

Remaining village connected with kachha road (non metal).

> Power Supply: Mostly all villages have providing electric power supply through

Chhattishgarh State Electricity Board (i.e. CSEB).

> Human Health: It is observed that health status of the people in the study area is fairly

good. According to the primary health center, ‘Loing village’ indicate that the most

prevalent diseases among the residents are diarrhea, amoebosis, malaria, nutritional

deficiency and diseases of upper respiratory system. Other disease such as tuberculosis,

jaundice and joint pain have also been observed in the study area.

> Animal Health: In the study area the animal health status is fair. According to veterinary

hospital record situated at village Loing the prevalent disease are fever, cough and

dermatological disease. The infectious diseases are normally not seen. The local

veterinary Doctor has indicated that the immunization program is continuing. The other

health problems are hormonal deficiency that result conception problem in the animal.

Page 65: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – IV

ANTICIPATED ENVIRONMENTAL

IMPACTS & MITIGATION MEASURES

4.0 INTRODUCTION

Impact prediction is a very important phenomenon in evaluating the environmentally

potential adverse impacts for any proposed industrial project. The impact prediction is

always carried out under worst possible conditions so as to mitigate or to eliminate the

environmental hazards. These predictions thus calculated are superimposed over the

baseline data to calculate the net impact on the environment after the proposed plant

comes into production.

4.1 AIR ENVIRONMENT

It is possible that increase in the background concentration of even a minor constituent of

the atmosphere may lead to significant changes in the atmospheric properties. So these

changes are essential in understanding potential climatic changes due to air pollutants.

For example under strongly stable condition, disturbances are highly damped and

mixing of pollutants is strongly suppressed. It is under such conditions that the worst air

pollution episodes have occurred.

Prediction of impacts is the most important component in the environmental impact

assessment studies. Several scientific techniques and methodologies are available to

predict impacts of developmental activities on physico, ecological and socioeconomic

environments. Such predictions are superimposed over the baseline (pre project) status

of environmental quality to derive the ultimate (post project) scenario of environmental

conditions. The prediction of impacts helps to identify the environmental management

plan required to be executed during and after commissioning the proposed plant to

minimize the adverse impacts on environmental quality.

4

Page 66: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

The mathematical models are the best tools to quantitatively describe cause -effect

relationships between sources of pollution and different components of environment. In

case, mathematical models are not available or it is not possible to identify / validate

through models for particular situation, prediction could be arrived at through available

scientific knowledge and judgments.

The mathematical model used for predictions in the present study include, steady state

Gaussian Plume dispersion model designed for multiple point sources for air quality,

Wave divergence and Federal Highway Administration (FHWA) models for noise levels.

In case of water, land, biological and socio-economic environments the prediction have

been made based on available scientific knowledge and judgments.

4.1.1 IMPACT ON TOPOGRAPHY AND CLIMATE

4.1.1.1 IMPACT ON TOPOGRAPHY

The major envisaged topographical changes would be limited to the immediate vicinity

of the plant. The change in topography will be only due to man made structures like

Industrial complex and Administrative building. Similarly, it will invite positive benefi ts

in the form of land leveling and green belt development in the plant vicinity.

4.1.1.2 IMPACTS ON CLIMATE

As the temperature of the effluent gases will not be high, generally this will not cause any

thermal imbalance as extensive greenbelt will be developed within the plant premises.

However, there will be natural dispersion of heat due to unstable conditions during day

and as such there would be no significant micro / macro climatologically changes of any

consequence.

4.1.2 PREDICTION OF IMPACTS ON AIR ENVIRONMENT

It is absolutely essential to study the impacts of air pollution on its environs due to the

proposed Plant. These impacts are predicted with the help of Gaussian Mathematical

model. These models stimulate the relationship between air pollutant emissions from the

stack and the resultant impact on the air quality within the study zone. The pollutants

Page 67: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

emitted into the atmosphere get diluted immediately and is transported and mixed with

the surrounding air. The basic purposes of these mathematical models are to represent

these processes mathematically. Computer models are used for predicting the Ground

Level Concentrations (GLC) for spatial variations.

In the present case, computation of 24 hour average Ground Level Concentrations are

carried out using ATDM (All Terrain Dispersion Model). This model is based on the

algorithms of two USEPA dispersion models, ISCST2 and COMPLEX 1 and also

incorporates the procedure used in POSTIT post processor to calculate the concentrations

in intermediate terrain.

ATDM is based on Guassian dispersion, which incorporates the Pasquill Gifford

dispersion parameters for estimating the horizontal cross wind and vertical dispersion.

ALL TERRAIN DISPERSION MODEL (TOR # 12)

The All Terrain Dispersion Model (ATDM) is a Gaussian Dispersion model that calculates

the concentration from point, area and volume source emissions in simple, intermediate

and complex terrain.

v For receptors located in simple terrain (terrain below stack top) ATDM uses the

dispersion algorithms from ISCST2 model.

v For receptors located in complex terrain (terrain above plume centre line). ATDM

uses the dispersion algorithm from the COMPLEX 1 model.

v For receptors located in intermediate terrain, ATDM uses both ISCST2 and

COMPLEX1 algorithms to estimate the 24 hourly average concentrations at each

receptor location and reports the larger of the two values as the calculated

concentration.

ATDM calculates the plume rise and plume and plume centre line elevation for a given

source to determine whether a receptor is located in a simple terrain, complex terrain or

in intermediate terrain w.r.t. source. Depending upon the terrain regime of the receptor,

Page 68: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

the model then uses on of the three approaches described below to calculate the one -hour

average concentration at that receptor resulting from the emissions from the sources.

Simple Terrain

For receptors located in simple terrain (terrain below stack top), ATDM uses the

dispersion algorithms form the ISCST2 model. The ISCST2 model is a Gaussian

dispersion model that calculates concentrations using the Pasquill – Gifford dispersion

coefficients (Rural mode) and the Briggs urban dispersion coefficients (Urban mode). As

in ISCST2, ATDM accounts for the effects of building down wash.

User specified terrain stack base elevations are used in the ISCST2 dispersion calculations

according to EPA recommended approach for simple terrain. In this approach, the final

plume rise is calculated to determine the plume centerline elevation above the sea level

and this elevation is used for all downwind distances from the stack. Therefore, the

plume centerline remains parallel to sea level without regard to changes in the

underlying terrain.

Complex terrain

For receptors located in complex terrain (above plume centerline), ATDM uses the

dispersion algorithm from the COMPLEX1model. This algorithm is similar to that of the

ISCST2 model in that it uses the same Gaussian dispersion equation and plume rise

equations.

Intermediate Terrain

A receptor is said to be located in intermediate terrain if its elevation is greater that the

stack top elevation but less than that plume centreline elevation. For such receptors, EPA

recommends that both the ISCST 2 and COMPLEX dispersion algorithms be used to

estimate the 24 hourly average concentration at the receptor location and the larger of the

two values be used as the calculated concentration.

Page 69: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Multiple sources

When modeling multiple sources, ATDM sums the calculated one hour average

concentrations from each source to estimate the total concentration at a given receptor

location.

Model Input

Emissions

The emission data from the stacks is shown in Table 4.1.3

Receptor Locations

The software is capable of generating a polar receptor grid at every 10 radial angles

at specified distances (in Kms).

Meteorological data

For the prediction of rise in Ground Level concentrations of pollutants, the actual

meteorological data recorded at the site during the study period (March 2008 – May

2008) is used

For each hour the following meteorological information required

- Wind direction

- Wind speed

- Ambient Temperature

- Stability class

- Mixing Height

Predictions have been carried out for these emissions considering the following points.

- Predictions have been carried out for 100% load where the maximum emissions are

emitted and which would be the worst environmental scenario.

- Predictions have been carried out for SPM, SO 2 and NOx.

• Pasquill Stability Class Through Sigma Theta Method

Hourly meteorological data recorded hourly, at the continuous weather monitoring

station on wind speed and direction, has been used for calculating the stability by using

Page 70: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Sigma Theta method (Ref: On site meteorological program guidance for regulatory

modeling applications, US-EPA).

Calculation of standard deviation of wind direction:

Hourly wind direction has been recorded. The one hourly wind direction data (standard

deviation; σA) in degrees has been used for determining the hourly stability.

Lateral Turbulence (σA) and Wind Speed or Sigma Theta Method:

The hourly σA values calculated by the data logger are used for arriving at the hourly

stability's by the following procedure:

The following section describes the method of estimating stability categories in terms of

standard deviation of the lateral wind direction fluctuations (σA) and the scalar mean

wind speed (us). The lateral wind direction turbulence criteria for initial estimate of PG

stability category are given in Table - 4.1.1. The wind speed adjustments for determining

final estimate of PG stability category from σA is given in Table - 4.1.2. The criteria laid

down in the tables below are for the data collected at 10m and roughness length of 15 cm.

Night time is defined as the period from one hour before sunset to one hour after sunrise.

The method specifies that the data need to be collected at 10 m height. The relationship

employed in the estimation methods assumes conditions are of steady state.

TABLE - 4.1.1 (TOR # 11)

LATERAL TURBULENCE CRITERIA FOR INITIAL ESTIMATE OF STABILITY

Initial estimate of Pasquill Stability

Category

Standard deviation of horizontal wind

direction fluctuations, σA, in degrees

A 22.5 = σA

B 17.5 = σA < 22.5

C 12.5 = σA < 17.5

D 7.5 = σA < 12.5

E 3.8 = σA < 7.5

F σA < 3.8

Page 71: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE - 4.1.2

WIND SPEED ADJUSTMENTS FOR DETERMINING FINAL ESTIMATE OF PG

STABILITY CATEGORY FROM σA

Initial Estimated Category

10 m Scalar Wind Speed (US) (m/s)

Final Estimate of Stability Category

Day time A US<3 3<US<4 4<US<6

6<US

A B C D

B US<4 4<US<6

6<US

B C D

C US<6 6<US

C D

D, E or F ANY D Night time A US<2.9

2.9<US<3.6 3.6<US

F E D

B US<2.4 2.4<US<3.0

3.0<US

F E D

C US<2.4 2.4<US

E D

D ANY D E US<5.0

5.0<US E D

F US<3.0 3.0<US<5.0

5.0<US

F E D

As site specific mixing heights are not available, the following mixing heights are

assumed.

STABILITY CLASS MIXING HEIGHT (M)

A 1300

B & C 900

D 750

E & F 400

Page 72: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Model Output

The output is same as that of ISCST2 model. The output contains the first through sixth

highest concentration values at each receptor, Maximum concentration tables and daily

concentration tables for each averaging period.

Sources of Air Emissions:

The main sources of fugitive emissions are raw material unloading, raw material

handling, cooler discharge area, product separation in sponge iron plant and primary and

secondary fugitive emissions from SMS, Blast furnace. Dust generated from raw material

unloading areas is controlled by providing dust suppression system. In other areas

specified above dust extraction system with bag filters will be provided to control the

particulate emission. The gases from FBC boiler will be treated in a high efficiency ESP

and will be discharged into the atmosphere through a stack of 50 m height which will be

in accordance with CPCB norms.

4.1.3 STACK HEIGHT CALCULATION

A) Stack height calculation for 2 x 100 TPD DRI Kilns attached to WHRB

Total coal consumption for 2 kilns : 260 TPD

Max. sulphur content in coal : 0.5% (by mass max.)

Total sulphur dioxide Emission : 260 x 1000 x 0.5 x 2 / 24 x 100

: 108.33 kg / hour

Stack height H : 14 (Q)0.3

: 14 (108.33)0.3

: 57.09 m

Hence a common stack (with twin flues) of 60 m height will be provided for effective

dispersion of pollutants into the atmosphere.

B) Stack Height calculation (Rolling mill)

FO Consumption per Rolling mill : 6.6 TPD

Sulphur content in FO : 4% (by mass, Max.)

Page 73: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

SO2 emission : 6.6 X 1000 X 0.04 X 2/24

: 22 Kg/hr

Stack Height H : 14 (Q)0.3

: 14 (22)0.3 = 35.38 m

Hence a stack of 36 m height will be provided for effective dispersion of emissions into

the atmosphere.

C) Stack Height calculation (POWERPLANT- AFBC 10 MW)

No. of Boilers : 1 No. (40 TPH)

Entire dolochar generated from the plant i.e. 60 TPD will be used as fuel in FBC boiler.

The following will be the fuel requirement which represents the worst environmental

scenario.

Consumption of coal : 160 TPD

Sulphur content in coal : 0.5 % (by mass, Max.)

SO2 emission : 160 X 1000x.005 x2/24

: 66.66 Kg/hr

Stack Height, H : 14(Q)0.3

: 14 (66.66)0.3 = 49.35 m

Hence a stack of 50 m height will be provided to the FBC boiler of capacity 40 TPH for

effective dispersion of emissions into the atmosphere.

The hot waste flue gases from the DRI kilns will pass through Waste Heat Recovery

Boilers and after heat recovery the gases will be treated in state-of-the-art ESPs to bring

down the particulate emission in the exhaust gases to below 50 mg/Nm3.

The Exhaust emissions of FBC Boiler will pass through Electrostatic Precipitators (ESP) to

bring down the particulate matter to less than 50 mg/Nm3 and will be discharged into the

atmosphere through a stack of 50 m height. The stack details are shown in Table 4.1.3.

Page 74: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

In Reheating Furnace the fuel proposed to be used is FO. A stack of 36 m height will be

provided for effective dispersion of SO2 into the atmosphere.

The primary & secondary fugitive emissions from Induction furnaces will be treated in

Fume extraction & cleaning system comprising of suction hoods, bag filters etc. The

outlet dust emissions in the exhaust gases in all these units will be less than 50 mg/Nm3.

The treated gases will be discharged into the atmosphere through a combined stack of 30

m height from Induction Furnaces.

The emissions from the other industries in the area are also considered in the prediction of GLCs . The fugitive e missions from the proposed plant activities are also considered in the prediction of Ground Level Concentrations. The predicted max. incremental SPM concentrations (24 hourly) due to NRIL will be 0.8

µg/m3 at a distance of 975 m from the origin stack in the down wind direction over the

baseline concentrations.

The predicted max. incremental SO2 concentrations (24 hourly) due to NRIL will be 7.6

µg/m3 at a distance of 975 m from the origin stack in the down wind direction over the

baseline concentrations.

The predicted max. incremental NOx concentrations (24 hourly) due to NRIL will be 5.7

µg/m3 at a distance of 975m from the origin stack in the down wind direction over the

baseline concentrations.

The net resultant concentrations (Maximum baseline conc. + predicted incremental rise in

conc.) of SPM, SO2 and NOX are shown in Table No. 4.1.4. The net resultant

concentrations of SPM, SO2 and NO X are well within the National Ambient Air Quality

Standards (NAAQS) when the plant commences the operation. Hence there will not be

any adverse impact on air environment due to the proposed project.

Page 75: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 4.1.3

STACK EMISSIONS

S. No. Stack attached to Dia (m)

Height (m)

Temp. of flue

gas (0C)

Velocity of flue

gas (m/sec)

SPM (g/s)

SO2 (g/s)

NOX (g/s)

1. DRI kilns with WHRBs (combined stack)

1.2 (per flue) 60 180 17.0 0.6

(per flue)

15.1 (per flue)

6.0 (per flue)

2. Induction Furnaces (Combined stack with twin flues)

0.7 (per flue)

30 (combined) 100 15.0 0.3

(per flue) -- --

3. Rolling Mill 0.8 36 180 15.0 0.5 -- -- 4. FBC Boiler 1.4 50 180 15.0 2.4 18.6 24.0

TABLE 4.1.4 (TOR # 8)

NET RESULTANT MAXIMUM CONCENTRATIONS DUE TO THE PROJECT

SPM (µg/m3) SO2 (µg/m3) NOX (µg/m3) Maximum baseline conc. in the study area

149.8 11.4 14.1

Maximum predicted incremental rise in concentration due to NRIL

0.8

7.6

5.7

Maximum predicted incremental rise in concentrations due to other industries in the area

1.0 12.1 5.3

Net resultant concentrations during operation of the plant

151.6 31.1 25.1

National Ambient Air Quality Standards

200 80 80

4.2 PREDICTION OF IMPACTS ON WATER ENVIRONMENT

4.2.1 WATER REQUIREMENT (TOR # 16)

The proposed project requires about 966 cum/day of water. This includes Make-up

water for DRI, Induction Furnace, Rolling Mill and Domestic water. The water

requirement for the proposed project will be sourced from Delari Jharna Nallah river

which is about 1.5 kms. from the proposed project site. Necessary permission from

the water resources department, govt. of Chhattisgarh is under process. There will be

Page 76: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

no effluent generation in the DRI plant, Rolling Mill and Induction Furnace , as

closed circuit cooling system will be adopted. Sanitary waste water will be treated in

septic tank followed by soak pit. The details of total water consumption, it's breakup

and total waste water generation and it's breakup are show in Table 4.2.1. & 4.2.2.

Characteristics of waste are shown in Tables 4.2.3 to 4.2.6. The sanitary waste water

will be treated in septic tank followed by soak pit. Rain water Harvesting pits have

been proposed to recharge the precious ground water in consultation with State

Ground Water Board (SGWB). The depth of ground water table will certainly

increase due to these measures. Hence there will not be any adverse impact on water

environment due to the proposed project.

TABLE 4.2.1

WATER REQUIREMENT (cum/day)

S.No Unit Water Consumption (KL/Day)

1. Cooling water Make-up for DRI plant 30 2. Cooling water make-up for SMS plant 30 3. Cooling water make-up for Rolling Mill 40 3. POWER PLANT(WHRB) a) Cooling Tower Make-up 800 b) Boilers make-up 48 c) D.M. plant regeneration water 8 4. Domestic 10 Total 966

4.2.2 WASTE WATER

There will not be any process waste water (or) cooling water blowdown from the DRI

Plant, Rolling Mill, SMS, as closed circuit cooling system will be adopted. Boiler

blowdown, CT Blowdown & DM Plant regeneration will be the sources of effluent

generation from the power plant.

Page 77: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TABLE 4.2.2 WASTE WATER GENERATION (cum/day)

Unit Wastewater Generation

(KL/Day) 1. POWER PLANT a) Cooling Tower Blowdown 150 b) Boilers blowdown 15 c) D.M. plant regeneration water 8

2. Domestic 8 Total 181

TABLE 4.2.3 CHARACTERISTICS OF SANITARY WASTE WATER (Untreated)

PARAMETER CONCENTRATION

pH 7.0 – 8.5 BOD 200 – 250 mg/l COD 300 – 400 mg/l TDS 800 – 900 mg/l

TABLE 4.2.4

CHARACTERISTICS OF BOILER BLOWDOWN

PARAMETER CONCENTRATION pH 9.5 – 10.5

TDS 1000 mg/l

TABLE 4.2.5 CHARACTERISTICS OF DM PLANT REGENERATION

PARAMETER CONCENTRATION

pH 5 – 10 TDS 5000 – 6000 mg/l

TABLE 4.2.6 CHARACTERISTICS OF CT BLOWDOWN

PARAMETER CONCENTRATION

pH 7.0 – 8.0 TDS 1000 mg/l

Page 78: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

4.3 PREDICTION OF IMPACTS DUE TO NOISE

4.3.1 PREDICTION OF IMPACT DUE TO THE PROPOSED ACTIVITY

The sound pressure level generated by noise source decreases with increasing

distance from the source due to wave divergence.

An additional decrease in sound pressure level with distance from the source is

expected, due to atmospheric effect or its interaction with objects in the path of

transmission. For hemispherical sound wave propagation through homogeneous loss

free medium, one can estimate noise levels at various locations, due to different

sources using model based on first principle, as per the following equation:

Lp2 = Lp1 – 20 Log (r2/r1) - Ael.2

Where Lp1 and Lp2 are sound pressure levels at points located at distance r1 and r2

from the source and Ae1.2 is the excess attenuation due to environmental conditions.

Combined affect of all the sources then can be determined at various locations by

logarithmic addition.

It is first approximation one can assume that for all general population in the villages,

every noise source in the plane is a point source. The average equivalent sound power

level of such a point source can be estimated for different distances and directions

from hypothetical source by applying following equation:

Lp = Lw - 20 Log r – Ae – 8

Where Lw is the sound power level of the source, Lp is sound pressure level at a

distance r and Ae is environmental attenuation factor. A combined noise level Lp

(total) of all the sources at a particular place is given by:

Lp(total) = 10 Log (10Lp1/10) + 10(Lp2/10) + ---------)

Major noise generating sources were identified from the proposed activity for

prediction purposes. The major noise generating sources are turbines, boilers,

compressors, DG set. The predictions have been made to represent the worst case.

The noise levels at various distances were calculated using wave divergence model.

Page 79: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

The model was run for ascertaining the areas where we could get the noise levels of 35,

45, 50,55,60,65, and considering the other noise generating sources from the plant.

Acoustic enclosures will be provided to turbines. Silencers will be provided to the

DG Set. All machinery will be manufactured keeping in view of the MOEF/OSHA

standards on Noise levels. The Ambient Noise levels will be within the standards

prescribed by MOE&F, GOI vide Notification dated 14-02-2000 under the Noise

pollution (regulation & control) Rules, 2000 i.e noise levels will be < 75 dBA during

day time & 70 dBA during night time.

4.3.2. PREDICTION OF IMPACTS ON COMMUNITY

Day and Night sound pressure levels, Ldn are often used to describe the community

noise exposure which includes 10 dBA night time penalties. As the nearest human

settlement is 1.2 Km. from the site, the impact of noise on general population would be

insignificant.

As per the WHO recommendation, there is no identified risk and damage of hearing due

to the noise levels (Leq = 8 hours) less than 75 dBA. Most of the international damage

risk criteria for hearing loss permit (Leq = 12 hours) upto 87 dBA. Further, WHO

recommendation on community noise annoyance, permits day time out door noise levels

of 55 dBA. Leq and night time outdoor noise level of 45 dBA leq to meet sleep criteria i.e.

Leq (24 hours) = 52.2. dBA and Ldn = 5.5 dBA.

4.3.3. PREDICTION OF IMPACT ON OCCUPATIONAL HEALTH

The damage risk criteria as enforced by OSHA (Occupation Safety and Health

Administration) to reduce hearing loss, stipulates that noise level upto 85 dBA are

acceptable for 8 hour working shift per day. Plant authorities will provide ear plugs to

the employees and will be enforced to be used by the employees.

Page 80: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

4.4 PREDICTION OF IMPACTS ON LAND ENVIRONMENT

52.65 acres of land is proposed to be acquired for the proposed project. As there are no

endangered species in the vicinity of the proposed activity, there will not be any concern

for the loss of important germoplasm that needs conservation.

To control the fugitive emissions dust extraction system and dust suppression system

will be installed at all the possible dust emanating areas. All required pollution control

systems will be installed and operated to comply with the norms. Hence there will not be

any impact on nearby top soil.

There will not be any process waste water as closed circuit cooling system is

implemented in proposed plant. Hence there will not be any adverse impact on land

environment due to the proposed plant.

Solid waste generated from the plant will be disposed /utilized as per the norms. Hence

there will not be any adverse impact on land environment due to the proposed plant.

The land use pattern of the study area will certainly improve due to the proposed

activity. Land price in the area will increase and will benefit the local people. This

industry may attract some ancillary works also which will also help in improving the

land use pattern of the area.

Greenbelt is considered essential for maintaining the stability of the environment of the

area. 20 Acres of extensive greenbelt will be developed in the proposed plant.

4.5 PREDICTION OF IMPACTS DUE TO VEHICULAR MOVEMENT (TOR # 13)

All the major raw materials will be transported by railway rakes followed by covered

trucks by road. Hence there will not be much fugitive dust generation during

transportation of raw materials. Pucca road exist upto the site. The existing road is

capable of absorbing this additional truck movement. Hence there will not be generation

Page 81: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 4 Village: Gourmudi, Tehsil: Tamnar District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 4 - 1 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

of fugitive dust during transportation of raw materials and products. Hence there will

not be any adverse impact on vehicular traffic due to the proposed plant.

4.6 PREDICTION OF IMPACTS ON SOCIO ECONOMIC ENVIRONMENT

The local areas will be benefited by way of generation of employment opportunities,

increased demand for local products and services. There will be an overall improvement

in the income level of the local people.

The project creates employment to about 100 persons once the plant is commissioned and

for 350 persons during construction stage. Priority will be given to locals for Semi-Skilled

and Unskilled jobs. With the development of this Plant there will be lot of scope for more

industrial investments which in turn will benefit the nation.

There will be a certain enhancement of educational and medical standards of people in

the study area. There will be generally positive and beneficial impacts by way of

economic impro vements, transportation, aesthetic environment and business generation.

There will be an overall upliftment of socio-economic status of people in the area. Regular

health checkups will be conducted.

Page 82: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 5 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 5 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – V

ANALYSIS OF ALTERNATIVES

(TECHNOLOGY & SITE)

5.1 ALTERNATIVE TECHNOLOGIES

Sponge Iron, SMS with continuous casting to produce M.S. Billets / ingots and Rolling Mill to

produce TMT bars and power generation through Waste heat recovery means and by FBC

boiler are well proven technologies all over the world. Hence no technological failures are

anticipated. Hence no alternative technologies are considered.

5.2 ALTERNATIVE SITES EXAMINED FOR SETTINGUP OF MINI INTEGRATED

STEEL PLANT BY M/s. N.R. ISPAT & POWER PRIVATE LIMITED.

M/s. N.R. Ispat & Power Private Limited is proposed to establish a Mini Integrated steel plant

to manufacture Sponge Iron (DRI Kiln) of 60,000 TPA capacity, Two no. of Induction Furnaces

with Concast to produce 60,000 TPA of Steel Billets/ Ingots, a rolling mill with a capacity of

60,000 TPA, & Two Waste Heat Recovery Boilers for the generation of 2 x 2 MW Power and

also proposed to install 10 MW FBC Boiler, aggregating the power generation up to 14 MW.

The proposed plant site is in accordance with MOEF guidelines.

Ø There are no National Parks/Sanctuaries within 10 Km. radius.

Ø There are no historical places/places of tourist importance within 10 Km. radius

Ø There is no forest land involved at the site.

As the site is in accordance with MOEF guidelines, no alternate sites are considered.

5

Page 83: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 6 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 6 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – VI

ENVIRONMENTAL MONITORING PROGRAM

6.1 TECHNICAL ASPECTS

6.1.1 METHODOLOGIES

To know the effectiveness of environmental mitigation measures post project environmental

monitoring program will be strictly followed as per statutory requirement.

• The hot waste flue gases from the DRI kilns will pass through Waste Heat Recovery

Boilers and after heat recovery the gases will be treated in state-of-the-art ESPs and then

discharged into the atmosphere through a combined stack 60 m height to bring down the

particulate emission in the exhaust gases to below 50 mg/Nm3.

• The Exhaust emissions of FBC Boiler will pass through an Electrostatic Precipitator (ESP)

to bring down the particulate matter to less than 50 mg/Nm3 and will be discharged into

the atmosphere through a stack of 50 m height.

• Fumes will be evacuated directly from the Induction Furnaces through a swiveling type

of hoods with an air-cooled ducting. The fumes from LRF will be collected through a

water cooled hood and duct work. The duct carrying fumes from the Induction furnaces

will be led to the bag House by means of an ID fan. Clean gases having less than 50

mg/Nm3 of particulates will be discharged through a combined stack (with twin flues) of

30 m height for both the Induction Furnaces for effective dispersion of the emissions.

6

Page 84: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 6 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 6 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

• In Reheating Furnace the fuel proposed to be used is FO. A stack of 36 m height will be

provided for effective dispersion of SO2 into the atmosphere.

• Energy meters will be provided to all air pollution control systems to ensure effective

operation of the control systems.

• Fugitive emissions will be monitored and CPCB regulation in this regard will be

followed.

• All air pollution control systems will be taken-up for maintenance as per prescribed dates

and always ensure compliance with norms.

• CECB will also carry out stack monitoring and Ambient air quality at regular intervals.

This will also help in cross checking the performance of Pollution control systems

implemented in the plant.

6.1.2 FREQUENCY & LOCATIONS OF ENVIRONMENTAL MONITORING

A comprehensive monitoring programme is given under. This environmental monitoring will

be entrusted to a third party.

MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS

S. No. Particulars Frequency of Monitoring

Duration of sampling

Parameters required to be monitored

1. Water quality Water quality in the

area Once in a month except for heavy metals which will be monitored on quarterly basis.

Composite sampling

(24 hourly)

As per IS: 10500

Waste water quality Effluent at the outlet

of the ETP Twice in a month Composite

sampling As per EPA Rules,

1996

Page 85: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 6 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 6 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

(24 hourly)

Sanitary waste water Twice in a month Composite sampling

(24 hourly)

As per EPA Rules1996

2. Air Quality Online monitoring (for WHRB & FBC Boiler stacks) SPM

A. Stack Monitoring

Once in a month SO2 & NOx B. Ambient Air quality Twice a week 24 hours

continuously RSPM, SPM, SO2 &

NOx C. Fugitive emissions Once in a Month 8 hours PM 3. Meteorological Data Meteorological data to

be monitored at the proposed project site.

Daily Continuous monitoring

Temperature, Relative Humidity,

rainfall, wind direction & wind

speed. 4 Noise level

monitoring

Ambient Noise levels Twice in a year Continuous for 24 hours with 1 hour

interval

6.1.3 DATA ANALYSIS

All the parameters will be analyzed as per IS procedures specified for those parameters. All

water samples will be analyzed for various parameters as per IS: 10500 with the specified

procedures.

The methodology adopted for monitoring & analysis of RSPM & SPM is as per IS: 5182 Part IV

SO2 & NOx as per IS: 5182 Part II & Part VI respectively. Samples were analyzed for SO2 using

improved West-Gaeke method for air samples using a spectrophotometer at a wavelength of 560

nm.

Page 86: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 6 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 6 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Samples were analyzed for NOx using Jacob and Hocheiser modified (Na-As) method, for Air

samples using a spectrophotometer at wavelength of 540 nm.

CO is analyzed by GC.

RSPM & SPM in ambient air are found by using Respirable Dust Sampler (RDS).

6.1.4 REPORTING SCHEDULE

After completion of analysis, copies of all the analysis reports will be sent to the Ministry and

CECB on monthly basis. Copies of the reports will be maintained in the plant and will be made

available to the concerned inspecting authorities.

6.1.5 EMERGENCY PROCEDURES

Whenever the ESP fails to comply with the norms, then interlocking system will immediately

cut-off the supply of raw materials to the kiln. The kiln will be shut down as per the procedure

to have least environmental impact.

6.1.6 DETAILED BUDGET & PROCUREMENT SCHEDULES

The budgetary allocation for Environmental monitoring is Rs. 20 Lakhs/Annum. A third party

will be engaged to monitor all the environmental parameters as per CPCB/CECB norms.

Page 87: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – VII

ADDITIONAL STUDIES

7.1 RISK ASSESSMENT (TOR # 22)

7.1.1 INTRODUCTION

Risk analysis deals with the identification and quantification of risks, the plant equivalent and

personnel are exposed to, due to accidents resulting from the hazards present in the factory.

Hazard analysis involves the identification and quantification of the various hazards that are

likely to occur in the industry.

Both hazard and risk analysis very extensive studies, and require a very detailed design and

engineering information.

The various hazard analysis techniques that may be applied are Hazard and Operability

(HAZOP) studies, Fault - Tree Analysis (FTA), event –tree analysis and, failure and effects mode

analysis.

Risk analysis follows an extensive hazard analysis. It involves the identification and assessment of

risks the neighboring populations are exposed to as result of hazard present. This requires a

through knowledge of failure probability, credible accident scenario, vulnerability of populations

etc. Much of this information is difficult to get or generate. Consequently, the risk analysis is often

confined to maximum creditable accident studies.

7.1.2 SCOPE OF THE STUDY

The scope of study includes the study of proposed operations, storage and handling of raw

materials with respect to Hazard Identification. Risk Assessment and preparation of Disaster

Management plan. Based on the Hazard Identification and analysis, the major disaster scenarios

7

Page 88: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

would be worked out to estimate the consequence of failure. A Disaster Management Plan (DMP)

would also be evolved to meet the emergency situation including the occupational health and

safety.

7.1.3 FIRE PROTECTION SYSTEM

The following Fire Protection system will be provided in the plant.

- Hydrant system covering the entire plant including all important auxiliaries and buildings. The

system will be complete with piping, valves instrumentation, hoses, nozzles and hydrants,

valves etc.

− Sprinkler system for cable galleries / vaults / spreader room etc.

− Portable extinguisher such as pressurized water type, carbon dioxide type and foam type will

be located at strategic locations through out the plant.

− Modular type carbon dioxide panel injection fire extinguishing system will be provided in

control equipment room, cable space below control room and at other unmanned electrical

and electronic equipment room.

The following pumps will be provided in the fire protection system.

Fire water pumps.

(Fire water reservoir is part of the main water reservoir)

a) AC motor driven fire water pumps for hydrant, medium velocity water spray system and

foam system.

b) AC motor driven fire water pumps for high velocity water spray system.

c) Diesel engine driven pump as stand by for the above.

d) Jackey pump 1 no. (AC motor driven) for maintaining pressure.

Suitable number of electric motor driven and diesel engine operated hydrant and spray pumps

with automatic starting will be provided for the above systems. The fire water pumps will take

suction from the fire water reservoir to be created in the plant area.

Page 89: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.1.4 METHODOLOGY OF MCA ANALYSIS

The MCA Analysis involved ordering and ranking of various sections in terms of potential

vulnerability. The following steps were involved in MCA Analysis.

• Preparation of an inventory of major storages and rank them on the basis of their hazard

properties.

• Identification of potentially hazardous storage sections and representative failure cases from

the vessels and the pipelines.

• Visualization of chemical release scenarios.

• Effect and damage calculation from the release cases through mathematical modeling.

• Inventory Analysis and Fire & Explosion and Toxicity Index (FETI) are the two techniques

employed for hazard identification process.

7.1.5 FIRE & EXPLOSION AND TOXICITY INDEX

The role of Fire & Explosion Index (FEI) aids quantitative hazard identification. The FEI is

calculated by evaluating the loss potential of all the units in the storage area and the hazardous

areas were classified accordingly. The role of FEI is

• Identification of the equipment/areas that could likely contribute to the creation or escalation

of incident and relatively rank the incidents.

• Quantification of the expected damage of potential fire and explosion incidents.

• Preparation of guidelines for mitigating fire hazards.

The loss potential which could actually be experienced under the most adverse operating

conditions is quantitatively evaluated. The FEI is used for any operation in which a flammable,

combustible or reactive material is stored, handled or processed.

FEI = MF * GPH * SPH

Where MF : Material factor

GPH : General Process Hazard

SPH : Special Process Hazard

Page 90: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

TOXICITY INDEX

The Toxicity Index is calculated using the Nh, Ts, GPH and SPH. TI is calculated by the following

formula.

(Nh + Ts) * (1 + GPH + SPH)

TI = -------------------------------------------

100

7.1.6 ASSESSMENT OF RISK AT M/s.NRIPPL

Based on the storage inventory the following areas are identified as potential safety risk areas are

shown in table 7.1

TABLE 7.1

POSSIBLE RISKS FROM THE MINI INTEGRATED STEEL PLANT

S. No. Area Hazards identified

1. Steam turbine generator building

Fires in a) Lube oil system b) Short circuit in control room / switch

gears c) Cable galleries d) Fire in oil drum storage

2. Transformer Explosion & fire

3. Boilers Fire (mainly near oil burners) steam explosion, fuel explosion

4. Coal handling plant Fire and or dust explosion

5. Coal storage Fire, spontaneous combustion

6. FO tank farms Fire

Coal Handling Plant - Dust Explosion

Coal dust when dispersed in air and ignited will explode. Crusher houses and conveyor systems

are most susceptible to this hazard. The minimum of explosive concentration of coal dust (33%

volatiles) is 50 grams/m3. Failure of dust extraction & suppression systems may lead to abnormal

conditions and increasing the concentration of coal dust to the explosive limits. The sources of

Page 91: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

ignition are incandescent bulbs, electric equipment & cables, friction & spontaneous combustion

in accumulated dust. Dust explosion may occur without any warning with maximum explosion

pressure upto 6.4 bars. Another dangerous characteristic of dust explosions is that it sets off

secondary explosions after the occurrence of initial dust explosion.

Stock pile area shall be provided with automatic garden type sprinklers for dust suppression as

well as to reduce spontaneous ignition of coal stock piles, necessary water distribution net work

will be provided for distributing water at all transfer points, crusher house, control room, etc.

A centralised control room with microprocessor based control system has been envisaged for

operation of the coal handling plant. Except locally controlled equipment like travelling tripper,

dust extraction / dust suppression / ventilation equipment, sump pumps, water distribution

system all other in line equipment will have provision for local control as well. All necessary inter

local control panels will be provided for safe and reliable operation of the Coal handling plant.

Control Measures for Coal Storage Yard

The entire quantity of coal will be stored in separate stack piles, with proper drains around to

collect washouts during the monsoon. Water sprinkling system will be installed on stocks of pile

to prevent spontaneous combustion and consequent fire hazards. The stack geometry will be

adopted to maintain minimum exposure of stock pile areas towards predominant wind direction

temperature will be monitored in the stock piles regularly to detect any at normal rise in

temperature inside the stock pile to be enabled to control the same.

7.1.7 RISK & CONSEQUENCE ANALYSIS OF FIRE

The principle objective of this study is to identify the potential hazards estimate the effects of

hazards to people both with in and outside the plant premises.

− Identification of possible failure cases of the facilities which might affect the population and

property within the plant boundary.

Page 92: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

− Assessment of consequential effect on surrounding population, property etc., due to onset of

such failures.

− Suggest recommendations based on consequence analysis relevant to the situations.

7.1.7.1 METHODOLOGY

The hazards expected from this plant include the pool fire situation due to the leakage of FO from

the storage tank. There will be two nos. of FO storage tanks each of 20 KL capacity. The tank will

be made of Mild steel and will be provided with dyke around the tanks. The most credible failure

is due to the rupture of the pipe connecting the storage tank. The worst case can be assumed as

when the entire contents leak out into the dyke forming a pool, which may catch fire on finding

source of ignition.

FO STORAGE TANK - POOL FIRE SCENARIO

The maximum quantity of FO stored at site will be 2 x 20 m3 capacity. In the event of tank spilling

its contents through a small leakage or due to rupture of pipeline connecting the tank and on

ignition fire will ensue. As the tanks are provided with dyke, the fire will be confined within the

dyke. Threshold limit for first degree burns is 4.5 kw/m2. Based on these results it may be

concluded that the vulnerable zone in which the thermal fluxes above the threshold limit for first

degree burns (4.5 kw/m2) is restricted to 12 m.

The hazard distances for various radiation intensities are shown in table 7.2

TABLE 7.2

HAZARD DISTANCES (Two Tanks on fire - scenario)

FO Quantity: 2 x 20 m3

Radiation intensity Hazard Distances

37.5 kw/m2 (100% lethality) 2 m

25.0 kw/m2 (50% lethality) 4m

12.5 kw/m2 (1% lethality) 7 m

4.5 kw/m2 (1st degree burns) 12 m

Page 93: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

The hazard distances for Thermal radiation are confined to the plant premises only. Hence there

will not be any thermal radiation impact on outside the population due to the pool fire scenario.

The thick green belt to be developed will help to further mitigate the radiation intensity level

outside plant boundary.

7.2 DISASTER MANAGEMENT PLAN

7.2.1 DISASTERS

A disaster is catastrophic situation in which suddenly, people are plunged into helplessness and

suffering and as a result, need protection, clothing, shelter, medical and social care and other

necessities of life.

Disasters can be divided into two main groups. In the first, are Disasters resulting from natural

phenomena like earthquakes, volcanic eruptions, cyclones, tropical storms, floods, avalanches,

landslides etc. The second group includes disastrous events occasioned by man, or by man's

impact upon the environment. Examples are industrial accidents, radiation accidents, factory fires,

explosions and escape of toxic gases or chemical substances, river pollution, mining or other

structural collapses, air, sea, rail and road transport accidents and can reach catastrophic

dimensions in terms of human loss.

There can be no set criteria for assessing the gravity of a disaster in the abstract it depends to a

large extent on the physical, economic and social environment in which it occurs. What would be

considered a major disaster in developing country, will be equipped to cope with the problems

involved, may not mean more than temporary emergency elsewhere. However all disasters bring

in their wake similar consequences that call for immediate action, whether at the local, national or

international level, for the rescue and relief of the victims. This includes the search for the dead

and injured, medical and social care, removal of the debris, the provision of temporary shelter for

the homeless food, clothing and medical supplies, and the rapid reestablishment of essential

services.

Page 94: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.2.2 OBJECTIVES OF DISASTER MANAGEMENT OF PLAN

The disaster Management Plan is aimed to ensure safety of life, protection of environment,

protection of installation, restoration of production and salvage operations in this same order of

priorities. For effective implementation of Disaster Management Plan, it will be widely circulated

and personnel training through rehearsals.

The Disaster Management Plan would reflect the probable consequential severity of undesired

event due to deteriorating conditions or through knock on effects. Further the management

should be able to demonstrate that their assessment of the consequences uses good supporting

evidence and based on currently available and reliable information, incident data from internal

and external sources and if necessary the reports of out side agencies.

To tackle the consequences of a major emergency inside the factory or immediate vicinity of the

factory, a Disaster Management Plan has to be formulated and this planned emergency is called

Disaster Management Plan.

The objective of the Industrial Disaster Management Plan is to make use of the combined

resources of the Plant and the outside services to achieve the following:

− Pool fire scenario due to FO storage

− Minimise damage to property and the environment.

− Effect the rescue and medical treatment of causalities.

− Provide for the needs of relatives.

− Provide authoritative information to news media.

− Secure the safe rehabilitation of affected areas.

− Safeguard other people.

Initially contain and then ultimately bring the situation under the control.

Page 95: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Preserve subsequent records and equipment for subsequent enquiry the cause and circumstances

leading to emergency.

7.2.3 EMERGENCIES

7.2.3 1 GENERAL, INDUSTRIAL, EMERGENCIES

The emergencies that could be envisaged in the Plant are as follows:

− Pool fire scenario at FO storage tank

− Contamination of food / water.

− Sabotage / social disorder.

− Structural failures.

− Slow isolated fires.

7.2.3.2 SPECIFIC EMERGENCIES ANTICIPATED

During the study of risk assessment, the probability of occurrence of hazards are worked out

along with the nature of damage. This is the reason why one should study risk assessment in

conjunction with DMP.

7.2.3. 3 EMERGENCY ORGANISATION

It is recommended to setup an Emergency Organization. A senior executive who has control over

the affairs of the Plant would be heading the Emergency Organization. He would be designated as

Site Controller. In the case of stores, utilities, open areas which are the not under the control of

production heads, executive responsible for maintenance of utilities would be designated as

Incident Controller. All the Incident Controllers would be reporting to the site controller.

Each Incident Controller, for himself, organizes a team responsible for controlling the incident

with the personnel under his control. Shift in-charge would be the reporting Officer, who would

bring the incident to the notice of the Incident Controller and the Site Controller.

Page 96: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Emergency Coordinators would be appointed who would undertake the responsibilities like fire

fighting, rescue, rehabilitation, transport and support services. For this purposes, Security in-

charge, Personal Department, Essential services personnel would be engaged. All these personnel

would be designated as key personnel.

In each shift, electrical supervisor, electrical fitters, pump house incharge and other maintenance

staff would be drafted for emergency operations. In the event of Power communication system

failure, some of staff members in the office/ Plant offices would be drafted and their services

would be utilised as messengers for quick passing of communications. All these personnel would

be declared as essential personnel.

7.2.3.4 EMERGENCY COMMUNICATION

Whoever notices an emergency situation such as fire, growth of fire, leakage etc. would inform his

immediate superior and Emergency Control Center. The person on duty in the Emergency

Control Centre would appraise the site controller. Site controller verifies the situation from the

Incident Controller of that area or the shift incharge and takes a decision about implementing on

Site Emergency. This would be communicated to all the Incident Controllers, Emergency

Coordinators. Simultaneously, the emergency warning system would be activated on the

instructions of the Site Controller.

7.2.3.5. EMERGENCY RESPONSIBILITIES

The responsibilities of the key personnel are appended below

7.2.3.5.1 SITE CONTROLLER

On receiving information about emergency he would rush to Emergency Control Centre and take

charge of ECC and the situation and assesses the magnitude of the situation on the advice of

incident controller and decides.

• Whether affected area needs to be evacuated.

• Whether personnel who are at assembly points need to be evacuated.

Page 97: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

• Declares Emergency and orders for operation of emergency siren.

• Organizes announcement by public address system about location of emergency.

• Assesses which areas are likely to be affected, or need to be evacuated or to be altered.

• Maintains a continuous review of possible development and assesses the situation in

consultation with Incident Controller and other key personnel whether shutting down

the Plant or any section of the Plant required and if evacuation of persons is required.

• Directs personnel of rescue, rehabilitation, transport, fire brigade, medical and other

designated mutual support systems locally available for meeting emergencies.

• Controls evacuation of affected areas, if the situation is likely to go out of control or

effects are likely to go beyond the premises of the factory, informs to District Emergency

Authority, Police, and Hospital and seeks their intervention and help.

• Informs Inspector of factories, Deputy Chief Inspector of factories, CECB and other

statutory authorities.

• Gives public statement if necessary.

• Keeps record of chronological events and prepares an investigation report and

preserves evidences.

On completion of on site Emergency and restoration of normalcy, declares all clear and orders for

all clear signal.

7.2.3.5.2 INCIDENT CONTROLLER

− Assembles the incident control team.

− Directs operations within the affected areas with the priorities for safety to personnel,

minimize damage to the Plant, property and environment and minimize the loss of

materials.

− Directs the shutting down and evacuation of Plant and areas likely to be adversely

affected by the emergency.

− Ensures that all-key personnel help is sought.

Page 98: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

− Provides advice and information to the Fire and Security officer and the local Fire

Services as and when they arrive.

− Ensures that all non-essential workers / staff of the effected areas evacuated to the

appropriate assembly points and the areas are searched for causalities.

− Has regard to the need for preservation of evidence so as to facilitate any enquiry into

the cause and circumstances, which caused or escalated the emergency.

− Coordination on with emergency services at the site.

− Provides tools and safety equipments to the team members.

− Keeps in touch with the team and advise them regarding the method of control to be

used.

− Keep the site Controller of Emergency informed of the progress being made.

7.2.3.5.3 EMERGENCY COORDINATOR - RESCUE, FIRE FIGHTING

− On knowing about emergency, rushes to Emergency Control Centre.

− Helps the incident controller in containment of the emergency.

− Ensure fire pumps in operating conditions and instructs pump house operator to be

ready for any emergency.

− Guides the fire fighting crew i.e. Firemen trained Plant personnel and security staff.

− Organizes shifting the fire fighting facilities to the emergency site, if required.

− Takes guidance of the Incident Controller for fire fighting as well as assesses the

requirements of outside help.

− Arranges to control the traffic at the gate and the incident area / Directs the security

staff to the incident site to take part in the emergency operations under his guidance

and supervision.

− Evacuates the people in the Plant or in the near by areas as advised by site controller.

− Searches for casualties and arranges proper aid for them.

− Assembles search and evacuation team.

Page 99: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

− Decides which paths the evacuated workers should follow.

− Maintains law and order in the area, and if necessary seeks the help of police.

− Arranges for safety equipments for the members of his team.

7.2.3.5.4 EMERGENCY COORDINATOR - MEDICAL, MUTUAL AID,

REHABILITATION, TRANSPORT AND COMMUNICATION

− The event of failure of electric supply and there by internal telephone, sets up

communication point and establishes contact with the Emergency Control Center

(ECC).

− Organizes medical treatment to the injured and if necessary will shift the injured to near

by hospitals.

− Mobilizes extra medical help from outside, if necessary

− Keeps a list of qualified first aiders of the factory and seek their assistance.

− Maintains first aid and medical emergency requirements.

− Makes sure that all safety equipment are made available to the emergency team.

− Assists Site Controller with necessary data and to coordinate the emergency activities.

− Assists Site Controller in updating emergency plan.

− Maintains liaison with Civil Administration.

− Ensure availability of canteen facilities and maintenance of rehabilitation centre.

− He will be in liaison with Site Controller / Incident Controller.

− Ensures availability of necessary cash for rescue / rehabilitation and emergency

expenditure.

− Controls rehabilitation of affected areas on discontinuation of emergency.

− Makes available diesel petrol for transport vehicles engaged in emergency operation.

Page 100: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.2.3.5.5 EMERGENCY COORDINATOR – ESSENTIAL SERVICES

He would assist Site Controller and Incident Controller

− Maintains essential services like Diesel Generator, Water, Fire Water, Compressed Air /

Instrument Air, Power Supply for lighting.

− He would plan alternate facilities in the event of Power failure, to maintain essential

services such as lighting, etc.

− He would organize separate electrical connections for all utiliti es and during emergency

be coordinates that the essential services and utilities are not effected.

− Gives necessary instructions regarding emergency electrical supply, isolation of certain

sections etc to shift incharge and electricians.

− Ensure availability of adequate quantities of protective equipment and other emergency

materials, spares etc.

7.2.3.5.6 GENERAL RESPONSIBILITIES OF EMPLOYEES DURING AN EMERGENCY

During an emergency, it becomes more enhanced and pronounced when an emergency warning

is raised, the workers if they are incharge of process equipment should adopt safe and emergency

shut down and attend any prescribed duty as an essential employee. If no such responsibility is

assigned, he should adopt a safe course to assembly point and await instructions. He should not

resort to spread panic. On the other hand, he must assist emergency personnel towards objectives

of DMP.

7.2. 3.6. EMERGENCY FACILITIES

7.2.3.6.1 EMERGENCY CONTROL CENTRE

For the time being office block is identified as Emergency control centre. It would have external

Telephone, Fax, facility. All the Incident controller officers, senior personnel would be located

here.

Page 101: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

The following information and equipment are to be provided at the Emergency control centre

(ECC).

- Intercom, telephone

- P&T telephone

- Fire suit / gas tight goggles / gloves / helmets

- Factory layout, site plan

- Emergency lamp / torchlight

- Plan indicating locations of hazard inventories, Plant control room, sources of safety

equipment, work road plan, assembly points, rescue location vulnerable zones, escape

routes.

- Hazard chart

- Safe contained breathing apparatus

- Hand tools, wind direction, wind velocity indications

- Public Address Megaphone, Hand bell, Telephone directories (Internal,

P&T).

− Address with telephone numbers and key personnel, Emergency coordinator.

− Important addresses, telephone numbers such as experts from outside, government

agencies neighboring industries etc.

− Emergency shut down procedures.

− Nominal roll of employees.

7.2.3.6.2 EMERGENCY POWER SUPPLY

Plant facilities would be connected to Diesel Generator and would be placed in auto mode.

7.2.3.6.3 FIRE FIGHTING FACILITIES

First Aid Fire Fighting equipment suitable for emergency should be maintained as per statutory

requirements per TAC Regulations. Fire hydrant line converting major areas would be laid. It

would be maintained as 6 kg / sq.cm. pressure.

Page 102: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.2.3.6.4 LOCATION OF WIND SOCK

On the top of production block and on the top of administrative block wind socks would be

installed to indicate direction of wind during emergency period.

7.2.3.6.5 EMERGENCY MEDICAL FACILITIES

Gas masks and general first aid materials for dealing with chemical burns, fire burns etc. would

be maintained in the medical centre as well as in the emergency control room. Private medical

practitioners help would be sought. Government hospital would be approached for emergency

help.

Apart from Plant first aid facilities, external facilities would be augmented. Names of Medical

Personnel, Medical facilities in Raigarh town would be prepared and updated. Necessary specific

medicines for emergency treatment of Burns patients and for those affected by toxicity would be

maintained.

Breathing apparatus and other emergency medical equipment would be provided and

maintained. The help of near by industrial managements in this regard would be taken on mutual

support basis.

7.2.3.7 EMERGENCY ACTIONS

7.2.3.7.1 EMERGENCY WARNING

Communication of emergency would be made familiar to the personnel inside the plant and

people outside. An emergency warning system would be established.

7.2.3.7.2 EMERGENCY SHUTDOWN

There are number of facilities which can be provided to help in dealing with hazard conditions.

The suggested arrangements are

# Stop feed

# Deluge contents

Page 103: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

# Remove heat

# Transfer contents

Methods of removing additional heat include removal the normal cooling arrangements or use of

an emergency cooling system. Cooling facilities which is vaporizing liquid may be particularly

effective, since a large increase in vaporization can be obtained by dropping pressure.

7.2.3.7.3 EVACUATION OF PERSONNEL

The area would have adequate number of exits and staircases. In the event of an emergency,

unconnected personnel have to escape to assembly point. Operators have to take emergency

shutdown procedure and escape. Time office maintains a copy of deployment of employees in

each shift at Emergency Communication Centre. If necessary, persons can be evacuated by rescue

teams.

7.2.3.7.4 ALL CLEAR SIGNAL

At the end of emergency, after discussing with Incident Controllers and Emergency Coordinators,

the site controller orders an all clear signal.

7.3 OCCUPATIONAL HEALTH AND SURVEILLANCE

Large industries where multifarious activities are involved during construction, erection, testing,

commissioning, operation and maintenance, the men, materials and machines are the basic inputs.

Along with the booms, the industrialization generally brings several problems like occupational

health and safety.

7.3.1 OCCUPATIONAL HEALTH

Occupational health needs attention both during construction and operation phases. However the

problem varies both in magnitude and variety in the above phases.

Page 104: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.3.2 CONSTRUCTION & ERECTION

The occupational health problems envisaged at this stage can mainly be due to constructional and

noise.

To overcome these hazards, in addition to arrangements required to reduce it within TLV'S,

personnel protective equipments should also be supplied to workers.

7.3.3 OPERATION & MAINTENANCE

The working personnel should be given the following appropriate personnel protective

equipments.

• Industrial Safety helmets

• Crash helmets

• Face shield with replacement acrylic vision

• Zero power plain goggles with cut type filters on both ends

• Zero power goggles with cut type filters on both sides and blue co lour glasses

• Welders equipment for eye and face protection

• Cylindrical type earplug

• Ear plugs

• Canister gas masks

• Self contained breathing apparatus

• Leather apron

• Boiler suit

• Safety belt / line man's safety belt

• Leather hand gloves

• Asbestos hand gloves

• Canvas cum leather hand gloves with leather palm

• Industrial safety shoes with steel toe

• Electrical safety shoes without steel toe and gum boots

Page 105: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 1 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.3.4 OCCUPATIONAL HEALTH (TOR # 23)

Pre employment medical examination shall be conducted. Full fledged hospital facilities shall be

made available round the clock for attending emergency arising out of accidents, if any. All

workers shall be medically tested once in a year and at the end of his term of employment.

Medical records of all employees will be maintained.

7.4 SAFETY PLAN

Safety of both men and materials during construction and operation phases is of concern. The

preparedness of an industry for the occurrence of possible disasters is known as emergency plan.

The disaster in Project is possible due to collapse of structures and fire / explosion etc. The details

of fire fighting equipments to be installed are given below.

• Carbon dioxide

• Foam type

• DCP

• Soda acid type

• Fire buckets

• Fire hydrants

Keeping in view the safety requirement during construction, operation and maintenance phases,

M/s. N.R. Ispat & Power (P) Ltd has formulated safety policy with the following regulations.

− To take steps to ensure that all known safety factors are taken into account in the

design, construction, operation and maintenance of Plants, machinery and equipment.

− To allocate sufficient resources to maintain safe and healthy conditions of work.

− To ensure that adequate safety instructions are given to all employees.

− To provide where ever necessary protective equipment, safety appliances and clothing

and to ensure their proper use.

− To inform employees about materials, equipments or processes used in the their work

which are known to be potentially hazardous to health and safety.

Page 106: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 2 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

− To keep all operations and methods of work under regular review for making necessary

changes from the safety point of view in the light of experience and up to date

knowledge.

− To provide appropriate facilities for first aid and prompt treatment of injuries and

illness at work.

− To provide appropriate instructions, training and supervision to employees health and

safety, first aid and to ensure that adequate publicity is given to these matters.

− To ensure proper implementation of fire preventive methods and an appropriate fire

fighting service along with training facilities for personnel involved in this service.

− To publish / notify regulations, instructions and notices in the common language

employees.

− To prepare separate safety rules for each type of process involved.

− To ensure regular safety inspection by a competent person at suitable intervals of all

buildings, equipments, work places and operations.

7.4.1 SAFETY ORGANISATION

7.4.1.1 CONSTRUCTION AND ERECTION PHASE

A highly qualified and experienced safety officer will be appointed. The responsibilities of the

safety officers include identification of the hazardous conditions and unsafe acts of workers and

advice on corrective actions, conduct safety audit, organize training programmes and provide

professional expert advice on various issues related to occupational safety and health.

In addition to employment of safety officer, every contractor, who employees more than 250

workers, should also employ one safety officer to ensure safety of the workers in accordance with

the conditions of the contract.

7.4.1.2 OPERATION & MAINTENANCE PHASE

When the construction is completed the posting of safety officers should be in accordance with the

requirement of factories act and their duties and responsibilities should be as defined there of.

Page 107: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 2 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

7.4.1.3 SAFETY CIRCLE

In order to fully develop the capabilities of the employees in identification of hazardous processes

and improving safety and health, safety circles would be constituted in each area of work. The

circle would consist of 5-6 employees from that area. The circle normally should meet for about an

hour every week.

7.4.2 SAFETY TRAINING

A full fledged training centre will be established at M/s. N.R. Ispat & Power (P) Ltd. Safety

training will be provided by the safety officers with the assistance of faculty members called from

professional safety institutions and universities. In addition to regular employees, limited

contractor labours will also given safety training.

To create safety awareness safety films will be shown to workers and leaflets etc. will be

distributed.

7.4.3 HEALTH AND SAFETY MONITORING PLAN

All the potential occupational hazardous work places will be monitored regularly. The health of

employees working in these areas will be monitored once in a year

7.5 SOCIAL IMPACT ASSESSMENT

The local areas will be benefited by way of generation of employment opportunities, increased

demand for local products and services. There will be an overall improvement in the income level

of the local people.

The project creates employment to about 100 persons once the plant is commissioned and for 350

persons during construction stage. Priority will be given to locals for Semi-Skilled and Unskilled

workers. Regular health check-ups will be conducted. With the development of this Plant there

will be lot of scope for more industrial investments which in turn will benefit the nation.

Page 108: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 7 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 7 - 2 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

There will be a certain enhancement of educational and medical standards of people in the study

area. There will be generally positive and beneficial impacts by way of economic improvements,

transportation, aesthetic environment and business generation. There will be an overall

upliftment of socio-economic status of people in the area.

7.6 R & R ACTION PLAN (TOR # 2)

The total land required for the proposed project is 52.65 Acres, which is under acquisition of the

management. There is no habitation in the proposed site. Hence no Rehabilitation & Resettlement

Action Plan will be required. The R& R Plan of the proposed project will be as per rules and

regulation of the State Govt. and will be in line with the R&R Policy 2006 of Govt. of Chhattisgarh.

Page 109: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 8 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 8 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER – VIII

PROJECT BENEFITS

The proposed plant will benefit the local area in the following ways.

8.1 PHYSICAL INFRASTRUCTURE

Once the proposed activity is commissioned, the socio-economic status of the local people will

improve and there by infrastructure facilities like communication systems will improve.

8.2 SOCIAL INFRASTRUCTURE (TOR # 25)

With the implementation of the proposed plant, the socio-economic status of the local people will

improve substantially. The land rates in the area will improve in the nearby areas due to the

proposed activity. This will help in upliftment of the social status of the people in the area.

Educational institutions will also come-up and will lead to improvement of educational status of

the people in the area. Primary health the medical facilities will certainly improve due to the

proposed plant.

8.3 EMPLOYMENT POTENTIAL

The proposed plant creates employment to 350 people during construction and 100 people during

operation of the proposed plant.

8.3.1 SKILLED

Total skilled employment in the proposed plant will be 22.

8

Page 110: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 8 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 8 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

8.3.2 SEMI-SKILLED

Total Semi-skilled employment in the proposed plant will be 36. Priority will be given to local

people for semi-skilled jobs.

8.3.3 UNSKILLED

Total Unskilled employment in the proposed plant will 42. Top priority will be given to local

people for unskilled jobs.

8.4 OTHER TANGIBLE BENEFITS

The following are the other benefits to the area due to the proposed plant.

• Educational status will improve in the area

• Medical standards will improve due to the proposed project.

• Overall economic upliftment of socio-economic status of people in the area.

• Ancillary developmental activities will be created due to the establishment of the proposed

unit.

• Merit scholarships to school children.

• Providing furniture to schools.

• Regular medical check-ups

Page 111: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 9 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Integrated Steel Plant

P I O N E E R E N V I R O 9 - 1 Environmental Impact Assessment Report

Laboratories & Consultants Pvt. Ltd.

CHAPTER – IX

ENVIRONMENTAL COST BENEFIT ANALYSIS

In the proposed plant manufacturing of Sponge Iron, manufacturing of Steel Ingot/ Billets, a

Rolled Products, Power generation have well proven technologies at affordable cost All required

pollution control systems will be implemented . Rs. 7.0 Crores is envisaged towards capital cost

for Environment protection.

9

Page 112: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

CHAPTER –X

ENVIRONMENTAL MANAGEMENT PLAN

10.0 INTRODUCTION

The major objective and benefit of utilising Environmental Impact Assessment in project planning

stage itself, is to prevent avoidable losses of environmental resources and values as a result of

Environmental Management. Environmental Management includes protection / mitigation /

enhancement measures as well as suggesting post project monitoring programme. Environmental

management may suggest revision of project site or operation to avoid adverse impacts or more

often additional project operations may have to be incorporated in the conventional operation.

The industrial development in the study area needs to be intertwined with judicious utilization of

non-renewable resources of the study area and with in the limits of permissible assimilative

capacity. The assimilative capacity of the study area is the maximum amount of pollution load

that can be discharged in the environment without affecting the designated use and is governed

by dilution, dispersion, and removal due to physico-chemical and biological processes. The

Environment Management Plant (EMP) is required to ensure sustainable development in the

study area of the proposed plant site, hence it needs to be an all encompassive plan for which the

proposed industry, Government, Regulating agencies like Pollution Control Board working in the

region and more importantly the affected population of the study area need to extend their

cooperation and contribution. It has been evaluated that the study area has not been affected

adversely and is likely to get new economical fillip.

10

Page 113: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

The affected environmental attributes in the region are air quality, water quality, soil, land use,

ecology and public health.

The Management Action Plan aims at controlling pollution at the source level to the possible

extent with the available and affordable technology followed by treatment measures before they

are discharged.

Environmental Management aims at the preservation of ecosystem by considering the pollution

abatement facilities at the plant inception. In the upcoming modern steel plants, pollution

abatement has become an integral part of planning and design along with Techno economic

factors.

10.1 MANAGEMENT DURING CONSTRUCTION PHASE

Environmental pollution is inevitable during the construction phase. The project proponent

should take appropriate steps to control pollution during construction phase. The following are

the factors requiring control during construction phase.

10.1.1 SITE PREPARATION

At the time of construction there will be some quantity of soil and debris and produce unstable

material. The disturbed slopes shall be well stabilized before the on set of the monsoon. The

leveling operation will also involve piling up of backfill materials. Use of dust suppressant

spraying to minimize fugitive dust during construction activities is recommended.

10.1.2 WATER SUPPLY AND SANITATION

The employees at the plant shall be provided with water for their requirement and for the

construction activities. The proposed plant shall be provided with sufficient and suitable toilet

facilities to allow proper standards of hygiene. These facilities would preferably be connected to a

septic tank and shall be maintained properly to have least environmental impact.

Page 114: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

10.1.3 NOISE

Noise pollution is anticipated during the construction phase due to the usage of various

construction equipment such as mechanical vibrator, mixers etc. The noise effect on the nearest

habitations due to construction activity will be negligible. However, it is advisable that onsite

workers working near the noise generating equipment shall be provided with noise protection

devices like earplugs.

10.1.4 MAINTENANCE OF VEHICLES

One should be very careful in selecting the site for vehicle maintenance, so as to prevent the

ground water contamination due to the spillage of oil. Both diesel and petrol engine vehicles shall

be maintained properly. Un authorized dumping of waste oil should be prohibited. Wastes

should be disposed off to the CECB approved vendors.

10.1.5 WASTE

The solid waste shall be collected and disposed off as per norms.

10.1.6 STORAGE OF HAZARDOUS MATERIAL

The following hazardous materials need to be stored at the site during construction.

a. Gas for welding purpose

b. LDO

c. Painting materials

All these materials would be stored as per international safety standards.

10.1.7 LAND ENVIRONMENT

The proposed plant will not create any major impact on land environment. As soon as the

construction activity is over the surplus earth will be utilized to fill up low lying areas, the rubbish

will be cleared and all in built surfaces will be reinstated. Appropriate vegetation will be planned

Page 115: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

and all such areas shall be landscaped. 20 acres of extensive greenbelt will be developed within

the premises.

10.2 POST CONSTRUCTION PHASE (TOR # 12) 10.2.1 AIR EMISSION MANAGEMENT

The following pollution control systems are proposed.

S. No. Source Control Equipment Guaranteed Outlet Dust Emission

1. DRI kilns with WHRBs Electro Static Precipitators (ESP) < 50 mg/Nm3 2. Induction Furnace Fume Extraction & cleaning

system with bag filters < 50 mg/Nm3

3. FBC Boiler Electro Static Precipitator < 50 mg/Nm3 The hot waste flue gases from the DRI kilns will pass through Waste Heat Recovery Boilers and

after heat recovery the gases will be treated in state-of-the-art ESPs to bring down the particulate

emission in the exhaust gases to below 50 mg/Nm3 to comply with CREP recommendations and

will be discharged in to the atmosphere through a combined stack(with twin flues) of 60 m

height.

The Fugitive emissions from the SMS will be treated in a fume extraction & cleaning system

comprising of suction hoods, bag filters and then discharged into the atmosphere through

Combined stack (With twin flues) of 30m height for 2 x 10 MT Induction Furnaces. The dust will

be pneumatically carried to covered bins. The outlet dust emission will be less than 50 mg/Nm3.

The flue gases from the Rolling Mill will be discharged into the atmosphere trough a stack of 40 m

height for effective dispersion of emissions into the atmosphere.

The flue gases from the FBC boiler will be treated in a state-of-the-art Electro Static Precipitator to

bring down the particulate emission to less than 50 mg/Nm3 and will be let out through a stack of

50 m height for effective dispersion of emissions into the atmosphere.

Page 116: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

All the CREP recommendations will be implemented & followed strictly.

Good House keeping: Good house keeping practices will be maintained in all sections of the

plant.

The following are the details of dust extraction system & dust suppression system proposed in the

plant.

10.2.1.1 DUST EXTRACTION AND DUST SUPPRESSION SYSTEM

S. No Location Pollution control system proposed 1 Ø Coal screen House

Ø Crusher House Ø Junction houses and surge

hopper Ø Iron ore screen house and

bins Ø Product discharge Ø Junction House & SMS bins

These areas will be provided with Dust extraction systems - each comprising of pulse jet type bag filter, centrifuged fan and motor, duct work including suction hoods, duct supports, stack, dust hopper rotary air lock valves etc.

2 Junction houses and truck hoppers

Dust suppression system with plain water - comprising of spray nozzles, piping network, valves, pumps, instrumentation & controls, water tank etc.

3 Stock piles in DR route Dust suppression system with plain water - comprising piping network, valves pumps, instrumentation & control, water tank etc.

10.2.1.2 TECHNICAL SPECIFICATIONS OF CONTROL SYSTEMS

10.2.1.2.1 TECHNICAL SPECIFICATIONS OF ELECTROSTATIC PRECIPITATOR

A. for Waste Heat Recovery Boilers (WHRB)

No. of ESP’s attached to WHRB’s in the project : 2

Gas flow rate, m3/hour : 70,000 m3/hr

Flue gas temperature (0C) : 180

Inlet dust concentration, gm/Nm3 : 21

Guaranteed outlet dust

Page 117: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Concentration, mg/Nm3 : < 50

Design pressure, mm wc : +/- 300

Number of fields : Three

Pressure drop across the

ESP, mm wg : 25 (max)

Collection efficiency : 99.76 %

B. For AFBC Boiler

Gas flow rate, m3/hr : 83,200

Flue gas temperature (0C) : 180

Inlet dust concentration, gm/nm3 : 35

Guaranteed outlet dust

Concentration, mg/nm3 : < 50 (at max. flow conditions)

Design pressure, mm wg : 300

Number of fields : Three

Pressure drop across the

ESP, mm wg : 25 (max)

Collection efficiency : 99.95 %

10.2.1.2.1 SPECIFICATIONS OF FUME EXTRACTION SYSTEM FOR INDUCTION

FURNACES

Volumetric Flow rate : 20781 m3/hr

Inlet dust load : 10 gms/Nm3

Guaranteed outlet dust emission : < 50 mg/Nm3

Type of bag filters : Pulse jet

Pressure drop across bag filters : 25 mm wg

Note: Pressure drop measuring system across bag filters will be installed.

Page 118: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

SOURCES OF AIR POLLUTION (DRI Kilns)

Sl.No AREA OF AIR POLLUTION MEASURES ADOPTED FOR CONTROL

1.

RAW MATERIAL HANDLING

1. All vibrating screens will be totally covered, to prevent the leakages of dust. 2.Through out the length, the conveyor is covered with G.I.Sheets to prevent the dust pollution 3. All the material handling systems will be connected with de dusting system. All the discharge points and feed points wherever the possibility of dust generation is there a de dusting suction point will be provided to collect the dust. 4. DUST SUPPRESSION SYSTEM- It is the most effective and successful system to prevent the fly-off of dust. Dust suppression system will be adopted to control the fugitive dust emanated during raw material unloading operations.

2. RAW MATERIAL STORAGE SYSTEM

1. All conveyors will be covered with G.I.Sheets to control the dust. 2. All bins will be totally packed and covered, so that there will not be any chance of dust leakage. i) Weigh feeders will be kept below the hopper and used to feed the known quantity of raw material per hour; it also seals the discharge area. ii) All discharge and feed points wherever the possibility of dust generation is there, will be provided with dust suppression system. iii) All material transfer points will be connected with dust suppression water nozzles to avoid the fugitive dust emission.

3. KILN FEED SYSTEM

The raw material will be fed into the kiln through a double pendulum valve, which seals the false air entry into the rotary kiln and gas leakage from the kiln. The chute will be sealed with a double pendulum flap.

4. MAIN PROCESSING SYSTEM KILN

Sealed system to avoid false air entry as well as exit. So that the desired quality can be produced. Hence no dust escape outside.

Page 119: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

5. KILN COOLER TRANSFER BUILDING -

The transfer point between kiln to coolers is completely sealed to avoid the false air entry and gas leakages.

6. ROTARY COOLER

1. The water will be circulated again and again. Hence there will not be any water pollution problem

2. There will be slip seals at cooler inlet & cooler outlet.The

seals are also being lubricated to avoid falls air entry and gas leakages.

3. Cooler discharge and feed points wherever the possibility

of dust generation is there will be provided with de dusting system will be provided.

7. WASTE GAS CLEANING SYSTEM

AFTER BURNING CHAMBER Then the gas passes through the after burning chamber in which the combustion of carbon monoxide and unburnt carbon takes place by supplying required air .The basic purpose of after burning chamber is to reduce the carbon monoxide content in waste flue gases. ELECTRO STATIC PRECIPITATOR Then the flue gas from DRI kilns after heat recovery will pass through an electro static precipitator in which the gases will be cleaned to achieve < 50 mg/Nm3 of particulate emission in the exhaust gas. The clean gas will be discharged into the atmosphere through a combined stack (with twin flues) of 60 m height based on CPCB guidelines.

8. PRODUCT SEPARATION SYSTEM:

1. All conveyors will be covered with G.I.Sheets, to control the dust emission.

2. All bins will be totally packed and covered. so that there will not be any chance for dust leakage.

3. Telescopic chutes will be provided below the hopper to discharge the product directly into the truck for dispatch to avoid the pollution.

4. All the above material handling system will be connected with de-dusting system

5. All discharge points and feed points wherever the possibility of dust generation is there, a de-dusting suction point will be provided to collect the dust.

6. The collected dust will be taken by pneumatic conveying

Page 120: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

system and stored in a dust storage bin. 7. Bag housing system In the bag house the dry dust will be collected in an enclosed housing containing fabric filter bags which are suspended inside the unit. The dust ladden air will pass through bag filters forming a dust cake to separate the particulate from the clean air. The collected dust will be taken by a pneumatic conveying system and stored in a dust storage bin.

10.2.2 ACTION PLAN FOR CONTROL AND MONITORING OF FUGITIVE EMISSIONS

(TOR # 14)

10.2.2.1 Control of Secondary Fugitive Emissions (Induction Furnace)

The secondary emissions from the Induction furnaces, continuous casting machine area will be

extracted and treated in a fume extraction systems. Fumes will be evacuated directly from

induction furnaces through hoods with swiveling mechanism and ducting .The duct carrying

fumes from Induction furnaces will be led to the bag house by means of ID fan. Clean gases

having less than 50 mg/Nm3 of dust content will be exhausted through a stack of 30 m height. A

line diagram showing the fume extraction system is as follows.

A line diagram showing the fume extraction system is enclosed as Fig.10.1

10.2.2.2 CREP Recommendations for Sponge Iron Plant (TOR # 30)

CCM

Page 121: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Fugitive dust emissions are likely in the unloading areas, material transfer point, cooler discharge

area, product separation area, etc. Fugitive emission in the material unloading area can be

avoided by providing dust suppression system. More over the raw material will be stored in

covered sheds. Fugitive emission from material unloading operations, material transfer points

will be controlled fully with total enclosure and all the transfer emission will be connected with

extractor inlet point and will pass through a high efficiency Bag Filter before discharging into the

atmosphere. All internal roads will be asphalted. Fugitive emissions will be regularly monitored

in the plant area as per CPCB stipulation.

10.2.2.3 Monitoring of secondary fugitive emissions

Sponge Iron plant

The fugitive emissions of particulate matter should not exceed 2000 µg/M3 at a distance of 10 m

from the sources identified and mentioned below in table, where fugitive dust emissions are

anticipated.

S. No Area Monitoring Location 1. Raw material

handling area Wagon tippler, Screen area, Transfer Points, Stock Bin area

2. Crusher area Crushing plant, vibrating screen, transfer points 3. Raw material feed

area Feeder area, Mixing area, transfer points

4. Cooler discharge area

Over size discharge area, Transfer Points

5. Product processing area

Intermediate stock bin area. Screening plant, Magnetic Separation unit, Transfer Points, Over size discharge area, Product separation area, Bagging area

6. Other areas Areas as specified by State Pollution Control Board

Fugitive emission will be monitored at aforementioned locations as above and the reports will

be submitted to MoEF & CECB regularly.

Page 122: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 1 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

10.2.2.4 DUST SUPPRESSION SYSTEM

Water sprinklers will be provided at the unloading areas of the raw materials for dust

suppression. Dust suppression system with plain water - comprising piping network, valves

pumps, instrumentation & control, water tank etc. will be provided.

10.2.2.5 INTERNAL ROADS

All internal roads will be asphalted to prevent the fugitive dust emission due to vehicular

movement.

10.2.3 COMPLIANCE ON CREP RECOMMENDATIONS

All the CREP recommendations will be implemented & followed strictly. The following will be

the compliance of CREP recommendations.

Ø Energy meters will be installed for all the pollution control systems.

Ø Rain water harvesting will be implemented in consultation with SGWB officials Recommendations

a) The proposed air pollution control equipment will be installed prior to commissioning the

plant.

b) Pressure drop measuring system will be installed to measure the pressure drop across the

bag filters.

c) All the internal roads shall be asphalted to reduce the fugitive dust due to truck

movement.

102.4 WATER POLLUTION MANAGEMENT (TOR # 16)

Ø There will not be any process waste water (or) cooling blowdown generation from the

DRI Kilns, SMS & Rolling mill plants as closed circuit cooling system will be followed.

Ø The effluent generated will be in the form of Cooling tower blowdown, Boiler blowdown,

D.M. Plant regeneration water from the power plant and sanitary water.

Ø Sanitary waste water will be treated in septic tank followed by soak pit.

Page 123: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 2 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Effluent Treatment Plant: pH of the boiler blowdown will be between 9.5 to 10.5. Hence a neutralization tank will be

constructed for neutralizing the boiler blow down. DM plant regeneration water will be

neutralized in a neutralization tank. After neutralization these two effluent streams will be mixed

with Cooling Tower blowdown in a Central Monitoring Basin (CMB). The treated effluent will be

utilized for dust suppression, ash conditioning and for Green belt development. No effluent will

be discharged out of the plant premises. Hence Zero discharge will be implemented in the

proposed plant. Sanitary waste water will be treated in Septic tank followed by soak pit.

The following will be treated combined effluent characteristics.

pH - 6.5 - 8.5

TSS - < 100 mg/l Oil & Grease - < 10 mg/l Free available chlorine - < 1.0 mg/l Copper - <1.0 mg/l Iron - < 1.0 mg/l Zinc - < 1.0 mg/l Chromium - < 0.2 mg/l Phosphates - < 5.0 mg/l TREATED EFFLUENT DISPOSAL (TOR # 13)

Total effluent generation from project : 173 m3/day

(Excluding sanitary waste)

Effluent qty. to be used for ash conditioning : 20 m3/day

Effluent to be used for dust suppression : 50 m3/day

Balance effluent to be used for onland for irrigation : 102 m3/day

Hence a greenbelt of 20 acres will be developed within the plant premises by using the treated

effluent. A dedicated pipe distribution network will be provided for using the treated effluent for

greenbelt development. The characteristics of the treated effluent will comply with the CECB

Standards for on-land irrigation. Hence there will not be any adverse impact on ground water /

surface water due to the proposed project.

Page 124: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 3 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Effluent Treatment Plant Flow Chart

Neutralization

Tank

Boiler Blowdown

Neutralization Tank

DM Plant regeneration

CT Blowdown

CMB

Treated effluent will be used for dust suppression, ash conditioning and for greenbelt Greenbelt

Hence Zero discharge will be implemented.

Septic Tank

Sanitary Wastewater Soak

Pit

Page 125: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 4 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

10.2.5 SOLID WASTE GENERATION & DISPOSAL (TOR # 18)

The following will be the solid waste generation & proposed method of disposal.

S. No Solid Waste Quantity (TPD)

Method of Disposal

1 Dolochar 60 Will be captively used in FBC boiler.

2 Ash & Dust from Bag filters

131 Will be given to brick manufactures / Cement plants

3 Accretion slag 2.0 Will be used in road construction

4. Wet Scraper sludge

4.0 Will be given to brick manufactures

5 Slag from SMS

20 Will be used in road construction after removal of Iron Contents

6 Mill scales 10 Reused in to the SMS

Ash utilization will be in accordance with Fly ash notification issued by MoEF. Copies of MOU

regarding utilization of ash will be submitted in due course.

Identification and details of land to be used for Slag disposal (TOR # 19)

SMS Slag will be used in road construction.

10.2.6 NOISE LEVEL MANAGEMENT

The major noise generating sources in the plant are Turbines, Boilers, DG set & Compressors. All

equipments will be of internationally reputed make and will be manufactured as per OSHA &

other international guidelines. Acoustic enclosure will be provided to Turbines. Silencers will be

provided to DG set. The major noise levels will be confined to the working zones of the plant. The

Leq of eight hours will be within the prescribed standards. Community noise levels are not likely

to be effected due to the proposed thick green belt and attenuation due to the physical barriers.

The ambient noise levels will be less than 75 dBA during day time & less than 70 dBA during

night time. So there will not be any adverse impact on habitations due to the proposed activities.

Page 126: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 5 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Recommendations

a) Acoustic enclosures to turbines.

b) The impact can reduced by adopting shock absorbing techniques.

c) The Noise absorption will improve by using hollow concrete blocks in the construction of

the proposed Plant.

d) Ear plugs shall be provided to the workers and this shall be enforced strictly.

e) Extensive greenbelt shall be developed for further attenuating the noise levels.

10.2.7 LAND ENVIRONMENT

All the required Air pollution Control systems will be provided in the proposed plant. The treated

effluent will confirm to the Chhattisgarh Environment Conservation Board’s standards for onland

for irrigation. Hence there will not be any impact on land environment due to the proposed plant.

The solid waste generated from the project will be reused/disposed as per norms. Hence there

will not be any adverse impact on land environment due to the solid waste generated from the

proposed activities. Extensive greenbelt development will have positive impact on land

environment. Land prices in the area will increase due to the proposed plant.

Recommendations

a) Land scaping can be done around the Administrative building, raw material storage sheds

etc. This will help in preserving the ecological conditions.

10.2.8. MEASURES FOR IMPROVEMENT OF ECOLOGY

There are no National Parks, Wild life sanctuaries, Bird sanctuaries within 10 Km. radius of the

plant. There is no rare and endangered species in the area. Hence there will not be any adverse

impact on flora & fauna due to the proposed plant.

Page 127: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 6 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Recommendations

Plantation programme should be undertaken at several areas. They should include plantation,

along the internal and external roads and along the administrative buildings and the stacking

yards. People should be educated and trained in social forestry activities by local governmental

and non-governmental organizations.

10.2.8.1 GREEN BELT DEVELOPMENT (TOR # 24)

The greenbelt shall be developed simultaneously with the plant construction. This will further

mitigate the pollution impacts. 15m wide greenbelt will be developed all around the plant. A

detailed greenbelt plan will be developed in as per CPCB guidelines in consultation with local

DFO.

Greenbelt plantation

Greenbelt will be developed in a set of rows of trees planted in such a way that they form an

effective barrier between the plant and the surroundings. The main purpose of greenbelt

development is to contribute to the following factors.

• To maintain the ecological homeostatus.

• To attenuate the air emissions from the kiln and the fugitive dust emissions.

• To prevent the soil erosion.

• To attenuate the noise levels.

Plantation of grass, flowers, bushes and trees will be taken up to reduce the generation of dust

from the bare earth and to enhance the aesthetic value.

Plantation species

Plantation species will be considered based on the following.

• Suitable to the Geo-climatic conditions of the area.

• Mix of round, spreading, oblong and conical canopies.

• Ever green trees.

• Different heights ranging from 4m to 20m.

Page 128: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 7 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Plantation for Arresting dust

Trees particularly having compact branching closely arranged leaves of simple elliptical and hairy

structure, shiny or waxy leaves and hairy twigs are efficient filters of dust. The following species

are suggested to arrest the dust

Alstonia Scholaris Bauhinia purpurea Cassia siamea Peltoferrum ferrugineum Butea monosperma Tamarindus indica Azadirachta indica Plantation to absorb SO2 emissions

The following plants are suggested for plantation to absorb SO2 in the air.

Azadirachta indica Albizia lebbeck Alstonia scholaris Lagerstroemia flosregineae Melia azedarach Minusops elangi Poloyalthia longifloia Plantation to reduce noise pollution

Trees having thick and flushy leaves with petioles are suitable. Heavier branches and trunks of

trees also deflect the sound waves. The following plant species are suggested to reduce noise

pollution.

Alstonia scholaris Azadirachta indica Melia monosperma Grevillea peridifolia Tamarindus indica Greavillea robusta

Plantation along the roads (Avenue plantation)

Page 129: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 8 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Alstonia scholaris Cassia fistula Bauhinia purpurea Mimusops elangi Pongamia pinnata Polyalthia longifolia Poluferrum ferrugineum Lagerstroemia flosreginea Cassia siamea. Greenbelt development plan

• Local DFO will be consulted in developing the green belt.

• A greenbelt of 20 acres will be developed in the plant premises. A 15 m wide greenbelt will

be developed all around the plant.

• The tree species to be selected for the plantation are pollutant tolerant, fast growing, wind

firm, deep rooted. A three tier plantation is proposed comprising of an outer most belt of

taller trees which will act as barrier, middle core acting as air cleaner and the innermost

core which may be termed as absorptive layer consisting of trees which are known to be

particularly tolerant to pollutants.

• Greenbelt will be developed simultaneously with the construction of the plant as per CPCB

guidelines.

• 600 plants will be planted per acre as per CPCB norms.

10.2.9. RAINWATER HARVESTING

Rainwater harvesting structures will be constructed to harvest the run-off water from roof tops by

laying a separate storm water drainage system for recharging of ground water.

5 nos. of rain water harvesting structures each of size 10m x 10m will be provided in the plant to

recharge the precious ground water. Rain harvesting will be taken-up in consultation with

Central Ground Water Board.

Page 130: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 1 9 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

10.3 POST PROJECT MONITORING STRATEGY

The monitoring of various environmental parameters is necessary which part of the

environmental protection measures is. Monitoring is an important feature because the efficiency

of control measures can only be determined by monitoring. A comprehensive monitoring

programme is given under. Locations and frequency of monitoring as per the guidelines of CECB

and MOEF are tabulated below.

MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS

S. No. Particulars Frequency of Monitoring

Duration of sampling

Parameters required to be monitored

1. Water quality Water quality in the

area Once in a month except for heavy

metals which will be monitored on

quarterly basis.

Composite sampling

(24 hourly)

As per IS: 10500

Waste water quality Effluent at the outlet

of the ETP Twice in a month Composite

sampling (24 hourly)

As per EPA Rules, 1996

Sanitary waste water Twice in a month Composite sampling (24 hourly)

As per EPA Rules1996

2. Air Quality A. Stack Monitoring Online monitoring (for all major stacks) SPM

Once in a month SO2 & NOx B. Ambient Air quality Twice a week 24 hours

continuously RSPM, SPM ,SO2 &

NOx C. Fugitive emissions Once in a Month 8 hours PM 3. Meteorological Data Meteorological data to

be monitored at the proposed project site.

daily Continuous monitoring

Temperature, Relative Humidity, rainfall, wind direction & wind speed.

4 Noise level monitoring Ambient Noise levels Twice in a year Continuous for 24

hours with 1 hour interval

Page 131: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

N.R. ISPAT & POWER PRIVATE LIMITED Chapter – 10 Village: Gourmudi, Tehsil: Tamnar, District: Raigarh, Chhattisgarh REIA Report for the Proposed Mini Integrated Steel Plant

P i o n e e r E n v i r o 1 0 - 2 0 Environmental Impact Assessment Report Laboratories & Consultants Pvt. Ltd.

Infrastructure for Environmental Protection

Man Power

The project proponent shall provide a fully equipped laboratory to carry out the analysis. The

following manpower shall be provided on regular basis.

1. Environmental Engineer / Safety Officer

He should be a graduate engineer with adequate experience. He will be responsible for

implementing and monitoring the environmental impacts and all the safety aspects. He should be

a liasioning officer between the proposed plant and with regulatory agencies like CECB, CPCB

etc.

2. Chemist

He should be a qualified chemist to carry out the analysis of various samples.

3. Monitoring equipment and Consumables

Environmental monitoring during the operation phase of the plant will be entrusted to a third

party. Monitoring will be carried out as per CPCB/CECB norms. A budgetary allocation of Rs 20

Lakhs has been earmarked for Environmental monitoring.

Noise levels

A sound level meter shall be purchased to record noise levels in different scales like A, B and C

with slow and fast response options at various generating source from D.G set which will be used

only when there is an interruption in the power supply of CSEB.

10.4 COST FOR ENVIRONMENTAL PROTECTION (TOR # 27)

Capital Cost for Environment Protection for proposed plant: Rs. 7.0 Crores

Recurring Cost for Environmental protection: Rs.50 Lakhs

Page 132: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

TOR COMPLIANCE

Compliance made on TOR issued by Ministry of Environment and Forest (MOEF)

Vide letter No. J-11011/365/2008- IA II (I) dated 2nd July, 2008.

S. No TOR Page No.

1. Present land use should be prepared based on satellite imagery.

Attachment -1 & 3-28

2. Actual land requirement, classification of land, acquisition status, rehabilitation and resettlement as per the policy of the Govt. of Chhattisgarh, if any, should be incorporated.

The total land acquired for the proposed project is 52.65 Acres. Details are furnished in Page 7-22 of Chapter – 7. No R & R is involved.

3. Location of national parks / wildlife sanctuary within 10 km. radius should specifically be mentioned.

No National Parks / Wildlife sanctuary/Bird santuary are located within 10 km radius, page 1-5 of Chapter – 1& page 2-2 of Chapter - 2 of EIA report.

4. Permission and recommendations of the State Fore Department regarding impact of the proposed unit on the Taraimal RF and mitigation measures proposed should be included.

Request has been submitted to State Forest Department and is under process. Details are shown in page 1-5 of Chapter – 1& page 2-2 of Chapter - 2 of EIA report.

5. A list of industries containing name and type in 25 km radius should be incorporated.

List of Industries and Type Is Shown in Page 2-3 of Chapter – 2

6. List of Raw material required and Source should be included Source & Quantity of Raw Materials required are Shown in Page 2-7 Of Chapter – 2 of EIA Report.

7. Manufacturing process details should be included Manufacturing Process Details are shown in page 2-9 to 2-11 of Chapter – 2 of EIA report.

8. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be collected.

The Average Micro-Meteorological Data Collected at site is shown In Page 3-1 of Chapter – 3 of EIA Report

Page 133: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

S. No TOR Page No.

9. Ambient air quality at 8 locations within the study area of 10 km., aerial coverage from project site with one AAQMS in downwind direction should be carried out. One AAQMS should be located in Taraimal RF area.

Ambient Air quality data is shown in page 3-2 to 3-9 of Chapter- 3 of EIA report.

10. The suspended particulate matter present in the ambient air must be analyzed for the presence of poly-aromatic hydrocarbons (PAH), i.e. Benzene soluble fraction. Chemical characterization of RSPM and incorporating of RSPM data.

SPM was analyzed for PAH, chemical characterization of RSPM has been carried out for all the samples collected during the monitoring period. The data is shown in page 3-5 to 3-8 of chapter – 3 of EIA report.

11. Determination of atmospheric inversion level at the project site and assessment of ground level concentration of pollutants from the stack emission based on site-specific meteorological features.

We have determined the atmospheric inversion level at the project site and assessment of ground level concentration of pollutants from the stack emission based on site-specific meteorological features & details are furnished in page 4-7 of Chapter – 4 of EIA report

12. Air quality modelling for Sponge and other plants proposed for specific pollutants needs to be done. APCS for the control of emissions from the kiln and WHRB should also be included.

Air quality model details, Stack emission details, APCS for kiln and WHRB are shown in page 4-3 to 4 – 11 of chapter – 4 of EIA report.

13. Impact of the transport of the raw materials and end products on the surrounding environment should be assessed and provided.

Details of Impact of the transport of the raw materials and end products on the surrounding environment is shown in page 4-16 of Chapter- 4 of EIA report.

14. An action plan to control and monitor secondary fugitive emissions as per CPCB guidelines should be included.

An Action Plan to Control & Monitor Secondary Fugitive Emissions from All the Sources as per CPCB Guidelines is shown in Page 10-9To 10-11 of EIA report.

15. One season data for gaseous emissions other than monsoon season is necessary.

Ambient air quality data at 8 locations for One season (March 2008 to May 2008) is shown in Page – 3-5 to 3-9 of Chapter – 3 of EIA report.

Page 134: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

S. No TOR Page No.

16. Permission for the drawl of 300 m3/day water from Delari Jharna Nallah from the concerned department and water balance data including quantity of effluent generated, recycled and reused and discharged is to be provided. Methods adopted/to be adopted for the water conservation.

The total water required for the project will be 966 Cum/day and Permission for drawl of water from aforesaid source is under process. The water drwl permission from Water Resource Department, Government of Chhattisgarh, Raipur is under process. A copy of the clearance will be submitted in due course. Water balance data including quantity of effluent generated is shown in page 4-11 to 4-13 of Chapter – 4 of EIA report. Details of quantity of effluent generated, recycled and reused and discharged are furnished in page 10-12 to 10-14 of Chapter- 10 of EIA report.

17. Surface water quality of nearby river (60 m upstream and downstream) and other surface drains at eight locations must be ascertained.

Surface water quality of nearby river (60 m upstream and downstream) has been analyzed & details are shown in page 3-14 of Chapter- 3 of EIA report.

18. Ground water monitoring minimum at 8 locations and near solid waste dump zone, Geological features and Geo-hydrological status of the study area are essential as also. Ecological status (Terrestrial and Aquatic) is vital.

Ground water monitoring minimum at 8 locations has been carried out & details are shown in page 3-19 to 3-28 of Chapter – 3 of EIA report.

19. Action plan for solid/hazardous waste generation, storage, utilization and disposal particularly use of Char in FBC boiler should be included.

Details of Action plan for solid/hazardous waste generation, storage, utilization and disposal particularly use of Char in FBC boiler are shown in page 2-14 of Chapter – 2 of EIA report.

20. A plan for the utilization of gases in the WHRB for generating power should be incorporated.

A plan for the utilization of gases in the WHRB for generating power is furnished in page 2-10 & 2-11 of Chapter – 2 of EIA report.

21. Energy balance for all the proposed plants should be included.

Details are furnished in page 2-9 of Chapter – 2 of EIA report.

Page 135: CHAPTER – I INTRODUCTION - India Environment Portal ISPAT-EIA.pdfusing Dolochar (generated from DRI) as fuel in AFBC boiler . N.R. ISPAT & POWER PRIVATE LIMITED Chapter - 1

S. No TOR Page No.

22. Risk assessment and damage control needs to be addressed.

Page 7-1 of Chapter – 7 of EIA report.

23. Occupational health of the workers needs elaboration. Page 7-19 of Chapter – 7 of EIA report.

24. Green belt development plan in 33 % area and a scheme for rainwater harvesting have to be put in place.

Details are furnished in page 10-18 to 10-21 of Chapter 10 of EIA report.

25. Socio-economic development activities need to be elaborated upon.

Page 8-1 & 8-2 of Chapter – 8 of EIA report.

26. A note on identification and implementation of Carbon Credit Project

Page 2-11 of Chapter – 2 of EIA report.

27. Total capital cost and recurring cost / annum for environmental pollution control measures should also be included.

Page 10-23 of Chapter – 10 of EIA report.

28. A tabular chart for the issues raised and addressed during public hearing / public consultation should be provided.

Will be prepared and incorporated after Public Hearing

29. Any litigation / court case pending against the proposal should also be included.

Not Applicable as there is no litigation / court case pending against the proposal.

30. Action Plan for the implementation of the recommendations made for the Sponge Plants in the CREP guidelines must be prepared.