CHAPTER FIVE Runoff Engineering Hydrology (ECIV 4323) Overland flow interflow Saturated overland flow Base flow 1 Instructors: Dr. Yunes Mogheir Dr. Said Ghabayen

CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

  • Upload
    others

  • View
    4

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

CHAPTER FIVE Runoff

Engineering Hydrology (ECIV 4323)

Overland flow

interflow Saturated overland flow

Base flow

1

Instructors:

Dr. Yunes MogheirDr. Said Ghabayen

Page 2: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

5.1 Introduction To Runoff

2

Page 3: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Runoff Parts - Runoff normally applies to flow over a surface

- Overland flow: is the surface runoff from tracts of land (or sheet flow) before it reaches a defined channel .

- Stream flow is used to describe the drainage after it reaches a defined channel

Drainage basins, watersheds, sub-basins, catchments:Defined by the total area contributing to a specific point. This point varies with the objectives of the project.

3

Page 4: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Stream Flow Components:

Overland flow

interflowSaturated overland flow

Base flow

-Direct precipitation on the channel (typically incorporated into total basin area)-Overland flow: when soil moisture storage and depression storage are filled “excess” rainfall generates overland flow. -Interflow: all rainfall that infiltrates does not reach saturated zone (ground water). Under certain conditions infiltrated moisture can travel through shallow soil horizons. Usually only significant for highly permeable soils. -Baseflow: contribution to stream flow from groundwater

4

Page 5: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

5.2 Hydrograph

- Streamflow in terms of discharge vs time is represented by the hydrograph.

- Hydrograph components thus become,1. surface runoff2. interflow3. baseflow4. direct precipitation

- Direct Runoff: all moisture that reaches the stream channel without first entering zone of saturation (overland flow + interflow)

- Streamflow = direct runoff + baseflow5

Page 6: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

5.3 Runoff characteristics of streams-Perennial Stream (Fig 5.2)

A stream which always carries some flow. It is always fed from groundwater base flow. Even during dry seasons the water table will be above the bed of the stream.

-An intermittent stream (Fig 5.3)Stream is fed from groundwater base only in the wet season. During the wet season the water table is above the stream bed. During dry seasons the water table drops to a level lower than that of the stream bed; and therefore the stream dries up.

-An ephemeral steam (Fig 5.4)No contribution from groundwater (base flow) to the stream (most rivers in arid zones)

6

Page 7: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

7

Water YearIn annual runoff studies it is advantageous to consider a water year beginning from the time when the precipitation exceeds the average evaporation losses.

Page 8: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

8

Stream is always fed from groundwater base flow

Page 9: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

9

Stream is fed from Groundwater base only in the wet season

Page 10: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

10

No contribution from groundwater (base flow) to the stream (most rivers in arid zones)

Page 11: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

5.5 Flow-Duration curve

- Is a plot of discharge against the percentage of time the flow was equaled or exceeded (Discharge-Frequency curve)

-Step of construction the curveStream flow discharge is arranged in decreasing order.Use class interval if we have very large number of records (example 5.4)Use plotting position to compute the probability of equal or exceeded.

-m= order number of discharge (class value)-N= number of data-Pp= percentage probability -Plot the discharge Q against Pp (Fig 5.6)-Or semi-log or log-log paper (Fig 5.8)11

Page 12: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

5.5 Flow-Duration curve

- The flow duration curve represents the cumulative frequency distribution

-The percentage probability of time that flow magnitude in average year is equal or greater

Q50 = 100 m3/s

-Example 5.4

12

Page 13: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Example 5.4

13

The daily flows of a river for three consecutive years are shown in the table below. For convenience the discharges are shown in class intervals and the number of days the flow belonged to the class is shown.

Calculate the 50 and 75% dependable flows for the river

Page 14: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

14

Page 15: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

15

Page 16: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

16 Flow-Duration Curve for different river types

Page 17: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

17

Page 18: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

5.6 Flow mass curve

- The flow-mass curve is a plot of cumulative discharge against time plotted in sequential order

-The flow-mass curve integral curve (summation curve) of the hydrograph

- See figure 5.9

18

Page 19: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Flow mass curve (Fig. 5.9)

19

Check the excel example in class web page for more details on this figure

Page 20: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

… Flow mass curve

- Unit is volume million m3 or m3/s day, cm over a catchment area

-Slope of the mass curve =dv/dt =Q = flow rate

-Average flow rate in the time between tm and tn

-Slope of line AB is the average over whole period records

20

Page 21: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Calculation of storage volume-Assume there is a reservoir on a stream where FM curve is shown in Fig 5.9 and it is full at the beginning of a dry period, i.e. when the inflow rate is less than the withdrawal (demand) rate, the storage (S) of the reservoir

VD =demand volume (withdrawal)VS = supply volume (Inflow)

The storage “S” is the maximum cumulative deficiency in any dry season. It is obtained as the maximum difference in the ordinate between mass curves of supply & demand.If there are two dry periods, the minimum storage volume required is the largest of S1 and S2 (Fig. 5.9)

21

( )∑∑ −= SD VVS of maximum

Page 22: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

… Calculation of storage volume- i.e. The minimum storage volume required by a reservoir is the largest value of S

Refer to Figure 5.9CD is drawn tangential to the first part of curve Qd slope of CD is a constant rate of withdrawal from the reservoir The lowest capacity is reached at E where EF is tangential at ES1: the water volume needed as storage to meet the maximum demand (reservoir is full)S2: is for C’D’Then the minimum reservoir storage required is the largest storage S2>S1

22

Page 23: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Example 5.5

23

The following table gives the mean monthly flows in a river during 1981. Calculate the minimum storage required to maintain a demand rate of 40 m3/s.

DecNovOctSeptAugJulyJuneMayAprMarFebJanMonth

7080901058050221525354560Mean Flow

(m3/s)

Page 24: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

… example 5.5

24 The actual number of days in the month are used in calculating the monthly flow volume. Volumes are calculated in units of cumec. day (= 8.64×104 m3)

Page 25: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

… Example 5.5

25

Page 26: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Refer to Example 5.5Compute the monthly flow volume by using the actual days in each month

Compute the accumulated volume in (cumec – day) or in m3.

Plot the flow mass curve (accumulated flow volume and time)

Draw a tangential line with slope of 40 m3/s

Slope = y/x y=x(slope)y= 60.8 days x 40 =2432 cumec-dayTo draw the demand line, the number of days in a month can be taken as 30.4 days.26

Page 27: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Calculation of storage volume

Refer to Example 5.5-Flow mass curve (Figure 5.10)

-Draw parallel line to AB in the valley point A’B’

-Vertical value S1 is the storage required to maintain the demand

-From figure 5.10 2100 m3/s.day

-Solve Example 5.6

27

Page 28: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Example 5.6

28

Work out the example 5.5 through arithmetic calculation without the use of the mass curve

DecNovOctSeptAugJulyJuneMayAprMarFebJanMonth

7080901058050221525354560Mean Flow

(m3/s)

Page 29: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

… Example 5.6

29

Page 30: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Calculation of maintainable demand- The storage volume is given. Your job is now to determine the maximum demand that can be maintained by this given storage volume.- Fig. 5.11:

-Tangents are drawn from the ridges and valleys of the mass curves at various slopes (since we still don’t know the demand!).-The demand line that requires just the given storage is the proper demand that can be sustained by the reservoir in that dry period.-Similar demand lines are drawn at other valleys.-The smallest of the various demand rates thus is the maximum solid demand that can be sustained by the given storage

- Check points 1 & 2 of page 16230

Page 31: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Variable demand

-In practice the demand rate varies with time to meet various end uses (such as irrigation, power and water supply needs, etc.)-A mass curve of demand is prepared and superposed on the flow-mass curve.

31

Page 32: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Mass curve of Flow and Mass curve of Variable Demand

32

Page 33: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

-In the analysis of problems related to reservoirs it is necessary to account for evaporation, leakage, and other losses from the reservoir.-These losses can either be included in demand rates or deducted from inflow rates. If you used the second method, the mass curve may have negative slopes at some points.

-Solve Example 5.8

33

Page 34: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

Example 5.8

34

-For a proposed reservoir the following data were calculated. The prior water rights required the release of natural flow or 5 m3/s, whichever is less. Assuming an average reservoir area of 20 km2 , estimate the storage required to meet these demands. (Assume the runoff coefficient of the area submerged by the reservoir = 0.5.)

Page 35: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

35

Page 36: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

36

Page 37: CHAPTER FIVE Runoff - الصفحات الشخصيةsite.iugaza.edu.ps/sghabayen/files/2013/02/Ch5-Runoff-07-02-2013.pdf · 5.5 Flow-Duration curve-Is a plot of discharge against the

- HW is 5.6, 5.8, 5.10

37