DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
S. No.
CHAPTER 3 ENVIRONMENTAL COMPLIANCE STATUS
Name of the project: Group Housing Project at Sector 77, Gurgaon, Haryana
EC letter no.: SEIAA/HR/2012/257 Dated 30th August, 2012
Period of Compliance report: April 2015 to September 2015
Conditions Status of Compliance
PART A - Specific Conditions: Construction Phase:-
I. “Consent for Establishment” shall
be obtained from Haryana State
Pollution Control Board under Air
and Water Act and a copy shall be
submitted to the SEIAA, Haryana
before the start of any construction
work at site.
Consent to Establish has been
obtained and copy of the same
is attached as Annexure-II.
II. A first aid room as proposed in the
project report shall be provided both
during construction and operation
phase of the project.
During construction phase, a
first aid room has been provided
on site for the workers. A doctor
has been appointed temporarily
on site to deal with the workers.
MOU has been signed with Shri
Radhey Hospital and Trauma
Centre for emergency situations.
Copy of the MoU has been
attached as Annexure III. The
same will be followed during
operation phase.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
III. Adequate drinking water and
sanitary facilities should be
provided for construction workers at
the site. Provision should be made
for mobile toilets. Open defecation
by the labours is strictly prohibited.
The safe disposal of waste water and
solid wastes generated during the
construction phase should be
ensured.
Drinking water facility for
workers is being provided by
private water tankers from
HUDA. Bills for the same are
attached as Annexure-IV.
Sufficient arrangements for
toilets and bathing have been
provided on site. Mobile toilets
are available for workers on site.
Wastewater is disposed through
soak pit.
IV. All the top soil excavated during
construction activities should be
stored for use in
horticulture/landscape development
within the project site.
Excavated muck is being stored
at an isolated place within the
campus and will be utilized in
Greenbelt development and
leveling.
V. Disposal of muck during
construction phase should not
create any adverse effect on the
neighboring communities and be
disposed off taking the necessary
precautions for general safety and
health aspects of people, only in
approved sites with the approval of
competent authority.
The construction material is
stored within the project area.
No excavated muck has been
disposed off outside the project
premises and is stored at an
assigned location within the site
boundary. No Human
settlement is present nearby
Regular water sprinkling is
being done to avoid any such
problem.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
VI. Construction spoils, including
bituminous material and other
hazardous materials, must not be
allowed to contaminate
watercourses and the dump sites for
such material must be secured so
that they should not leach into the
ground water and any hazardous
waste generated during
construction phase, should be
disposed off as per applicable rules
and norms with necessary approval
of the Haryana State Pollution
Control Board.
Construction spoils including
bituminous material and other
hazardous material is being
kept at secured place. Proper
provision for dumping of waste
is ensured. All the hazardous
waste like spent oils and used
oil etc. are being sold to the
waste oil recycler authorized by
Haryana State Pollution Control
Board.
VII. The diesel generator sets to be used
during construction phase should
be low sulphur diesel type and
should conform to Environment
(Protection) Rules prescribed for air
and noise emission standards.
DG sets are being used for the
event of power failure only and
are running on low Sulphur
diesel and are conforming to
Environment (Protection) Rules
prescribed for air and noise
emission standards.
VIII. The diesel required for operating DG
sets shall be stored in underground
tanks and if required, clearance
from Chief Controller of Explosives
shall be taken.
As DG set is being used at the
time of power failure so diesel is
being purchased daily on
consumption basis. In operation
phase diesel generators will be
used having ample capacity. If
required permission from Chief
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
Controller of Explosives will be
obtained.
IX. Ambient noise levels should
conform to residential standards
both during day and night.
Incremental pollution loads on the
ambient air and noise quality
should be closely monitored during
construction phase. Adequate
measures should be taken to reduce
ambient air and noise level during
construction phase, so as to
conform to the stipulated residential
standards.
Ambient noise and air
standards were closely
monitored and all results are
found below the standards
specified by CPCB. Reports are
attached as Annexure-V and
Monitoring Analysis is
incorporated in Chapter 4.
Measures to reduce ambient air
and noise level during
construction phase are being
followed as per the proposal
submitted to SEIAA, Haryana.
Water sprinkling is being done
twice using 24 KLD water.
X. Fly ash should be used as building
material in the construction as per
the provisions of Fly Ash
Notification of September, 1999 and
amended as on 27th
Agreed. Fly ash bricks and CLC
blocks are being used in
construction as per the
provisions of fly ash notification
of September, 1999 and as
amended on 27
August, 2003 th August, 2003.
XI. Ready mixed concrete must be used
in building construction.
Agreed. Ready mixed concrete is
being used in building
construction. RMC plant has
been installed on site.
XII. Storm water control and its re-use
as per CGWB and BIS standards for
Agreed. Storm water control and
its reuse will be maintained as
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
various applications should be
ensured.
per Central Ground Water
Board and BIS standards for
various applications.
XIII Water demand during construction
should be reduced by use of pre-
mixed concrete, curing agents and
other best practices as referred.
Water demand during
construction phase is being
reduced by using premixed
concrete and curing agents.
XIII. In view of the severe constraints in
water supply augmentation in the
region and sustainability of water
resource the developer will submit
NOC from CGWA specifying water
extraction quantities and assurance
from HUDA/ utility provider
indicating source of water-potable
and non-potable. Assurance is
required for both construction and
operation stages separately. It shall
be submitted to SEIAA/ R.O. MOEF
Chandigarh before the start of
construction
No ground water extraction is
being done during construction
phase and the same will be
followed during operation phase.
Water for construction is being
taken from STP of HSIIDC. For
drinking and other domestic
purpose, water is being supplied
by HUDA. Copy of challan from
HSIIDC STP is attached as
Annexure VI.
XV Roof should meet prescriptive
requirement as per Energy
Conservation Building Code by
using appropriate thermal
insulation material to fulfill
requirement.
Agreed. Building is being
designed & constructed as per
the National Building Code &
Energy Conservation building
Code.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
XVI Opaque wall should meet
prescriptive requirement as per
Energy Conservation Building Code
which is proposed to be mandatory
for all air conditioned spaces while
it is inspirational for non-air-
conditioned spaces by use of
appropriate thermal insulation
material to fulfill requirement.
Agreed. Opaque wall will meet
prescriptive requirement as per
Energy Conservation Building
Code for all air conditioned
spaces while it is aspirational
for non-air conditioned spaces
by use of appropriate thermal
insulation to fulfill requirement.
XVII The approval of the competent
authority shall be obtained for
structural safety of the building on
account of earthquake, adequacy of
firefighting equipment, etc. as per
National Building Code including
protection measures from lightening
etc. If any forestland is involved in
the proposed site, clearance under
Forest Conservation Act shall be
taken from the competent Authority.
a) To deal with any fire related
accident, firefighting facility of
single handed hydrant valve,
long hose reel, and portable fire
extinguisher is being provided.
b) The project falls under
seismic active Zone IV
indicating high damage risk
zone. The buildings are being
designed as earthquake
resistant and comply with the
required IS specifications.
Structural safety of the building
due to earthquake, adequacy of
firefighting equipment, etc. as
per the National Building Code
2005 including protection
measures from lightening etc.
c) No forest land is involved in
the project site.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
XVIII. Overexploited groundwater and
impending severe shortage of water
supply in the region requires the
developer to redraw the water and
energy conservation plan. Developer
shall submit details of good
practices that have been included in
the project to reduce the overall
footprint of the proposed
development including detailed
water balance along with source
and quantities of potable and non-
potable water requirement
(including water requirement during
construction phase) incorporating
water efficiency/ saving measures
as well as water reuse/ recycling
within 3 months to the SEIAA,
Haryana and R.O. MOEF, GOI,
Chandigarh before the start of
construction.
Water efficient fixtures will be
used to reduce daily water
requirement. Water efficiency/
saving measures along with
water balance diagram have
already been submitted to
SEIAA, Haryana.
XIX. The project proponent shall
construct 16 nos. rain water
harvesting pits for recharging the
ground water within the project
premises. Rain water harvesting pits
shall be designed to make
provisions for silting chamber and
removal of floating matter before
a) 16 rain water harvesting
pits (i.e. 1 pit/acre) have
been proposed for
artificial recharging the
ground water within the
project premises. 8 Rain
water harvesting pits have
already been constructed.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
entering harvesting pit.
Maintenance budget and persons
responsible for maintenance must
be provided. Care shall also be
taken care that contaminated water
do not enter any RWH pit.
b) Persons have been hired
for maintenance of rain
water harvesting pits.
c) Care is being taken so
that contaminated water
does not enter any RWH
pit.
XX. The project proponent shall provide
minimum one hydraulic ladder of
sufficient length for escape of people
in case of fire.
This will be followed.
XXI The project proponent shall submit
assurance from DHBVN for supply
of 5658 KW of power supply before
the start of construction. In no case
project will be operational solely on
generators without any power
supply from any external power
utility.
Agreed. Power requirement is
being supplied by DHBVN.
Application regarding the
intimation of required power
load has been given to DHBVN.
XXII Detail calculation of power load and
ultimate power load of the project
shall be submitted to DHBVN under
intimation to SEIAA, Haryana before
the start of construction. Provisions
shall be made for electrical
infrastructure in the licensed area.
Agreed. Detailed calculation
regarding power load and
ultimate power has already been
submitted to DHBVN under
intimation to SEIAA, Haryana
before the start of construction.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
XXIII The project proponent shall obtain
NOC from nearest fire station before
the start of construction.
Fire Scheme has been approved
and is attached as Annexure
VII.
XXIV The project proponent shall not
raise any construction in the
natural land
depression/Nallah/water course
and shall ensure that the natural
flow from the nallah/water course is
not obstructed.
There is no natural land
depression/ Nallah/ water
course in the project site.
Natural flow during rainy
season will not be obstructed as
weep holes are being provided to
avoid any such obstruction.
XXV The project proponent shall keep
the plinth level of the building
blocks sufficiently above the level of
the approach road to the Group
Housing project as per the
prescribed by-laws. Levels of the
other areas in the Group Housing
Projects shall also be kept suitably
so as to avoid flooding.
Plinth level of the building
blocks has been made
sufficiently above the level of the
approach road. Level of the
other areas will be kept suitably
above the approach road level to
avoid flooding.
XXVI Construction shall be carried out so
that density of population does not
exceed as approved by Directorate
General Town and Country Planning
Department, Haryana.
Agreed. Construction is being
carried out as per plans
approved by DTCP, Haryana
XXVII The project proponent shall submit
an affidavit that with the declaration
that ground water will not be used
No ground water is being
utilized in the construction
work. Only treated water is
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
for construction and only treated
water should be used for
construction.
being used. Affidavit regarding
the same has already been
submitted along with previous
compliance report.
XXVIII The project proponent shall design
the water supply system @135 lpcd
instead of 86 lpcd including savings
due to use of treated water.
Accordingly the requirement of
water supply and water balance
diagram be prepared and submitted
to SEIAA Haryana before start of
construction. Sewage and STP
capacity shall be suitably increased
accordingly
Water calculations have been
done using daily water
requirement for residents as
135 lpcd instead of 86 lpcd.
Water Balance Diagram showing
the same has already been
submitted to SEIAA along with
Form –I, Form-IA, Conceptual
plan and other supporting
documents as prescribed by
SEIAA, Haryana.
XXIX That the project proponent shall
provide water bodies of size of 5% of
the net project areas as stipulated
and ordered by Ministry of
Environment and Forests,
Government of India
This will be followed.
PART A- SPECIFIC CONDITIONS : Operation Phase
I The Sewage Treatment Plant (STP)
shall be installed for the treatment
of the sewage to the prescribed
standards including odor and
treated effluent will be recycled to
a) STP of capacity 500 KLD is
being installed at the site for
treatment of waste water of 387
KLD.
b) Trained and skillful persons
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
achieve zero exit discharge. The
installation of the STP should be
certified by an independent expert
and a report in this regard shall be
submitted to the SEIAA, Haryana
before the project is commissioned
for operation. Tertiary treatment of
waste water is mandatory.
Discharge of treated sewage shall
conform to the norms and
standards of HSPCB, Panchkula.
will be deputed for handling and
management of STP.
c) Treated effluent will be reused
in flushing, horticulture and DG
cooling etc. Dual plumbing plan
will be adopted for the same.
II Separation of the grey and black
water should be done by the use of
dual plumbing line. Treatment of
100% grey water by decentralized
treatment should be done ensuring
that the re-circulated water should
have BOD maximum upto 10 ppm
and the recycled water will be used
for flushing, gardening and DG set
cooling and running of foundation
in the water body to achieve zero
exit discharge.
Dual Plumbing line will be
provided for the separation of
the grey and black water
generated from site. Dual
plumbing plan has already been
submitted to SEIAA, Haryana.
Waste water generated during
operation phase will be treated
in STP and treated water from
STP will be recycled to
maximum extent, through dual
plumbing piping system and will
be used for flushing, gardening
and DG set cooling.
III For disinfection of the treated
wastewater ultra violet radiation or
ozonization process should be used.
Ultraviolet technology is
proposed for tertiary treatment.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
IV The solid waste generated should be
properly collected and segregated.
Bio-degradable waste will be
decomposed at site and dry/ inert
solid waste should be disposed off to
be approved sites for land filling
after recovering recyclable material.
During the operational phase,
2491.40 kg/day of solid waste
will be generated and collected
in colored bins (green, blue and
dark grey) separate for bio-
degradable and non-
biodegradable are proposed to
be provided at the strategic
locations within the site and will
be done according to solid waste
management plan submitted
earlier.
a) Biodegradable waste will be
composted by using organic
waste converter at the site
earmarked within the project
area.
b) Dry/inert solid waste will be
disposed off to the approved
sites for land filling after
recovering recyclable material.
V Diesel power generating sets
proposed as source of backup power
for lifts, common area illumination
and for domestic use should be of
enclosed type and conform to rules
made under the Environment
a) DG Sets will be used as
backup power and mainly
lift, common area and for
domestic use area. DG
sets are proposed for STP
so that it may run in the
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
(Protection) Act, 1986. The location
of the DG sets should be in the
basement as promised by the
project proponent with appropriate
stack height i.e. above the roof level
as per CPCB norms. The diesel used
for DG sets should be of low
sulphurcontents (maximum upto
0.25%)
condition of power failure
also.
b) The height of DG Stacks
will be raised at least 6m
above the roof level within
the project site.
c) To avoid noise pollution
acoustic enclosure over
the DG Set will be placed
as per rules made under
the Environment
(Protection) Act, 1986.
d) The diesel used for DG
sets will be taken from
filling station for high
speed diesel.
VI Ambient Noise Level should be
controlled to ensure that it does not
exceed the prescribed standards
both within and at the boundary of
the proposed Group Housing
Complex.
Agreed. Ambient noise level will
be controlled by regular
maintenance of vehicles and
green belt development.
VII The project proponent should
maintain at least 23% as green
cover area for tree plantation
especially all around the periphery
of the project and on the road sides
preferably with local species so as to
Agreed. 38.27% green cover area
has been proposed for green belt
development (23% for tree
plantation all around the
periphery of the project & on the
road sides, and 15.3% for
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
provide protection against
particulates and noise.The 15.3%
open spaces inside the plot should
be preferably landscaped and
covered with vegetation/grass,
herbs and shrubs. Only locally
available plant species shall be
used.
organized green spaces inside
the plot). The open spaces
inside the plot will be preferably
landscaped and covered with
vegetation/grass, herbs and
shrubs. Only locally available
plant species will be used.
Landscape plan has been
submitted with previous
compliance report.
VIII Weep holes in the compound front
walls shall be provided to ensure
natural drainage of rain water in the
catchments area during the
monsoon period.
Agreed.
IX Rainwater harvesting for roof run-
off and surface run-off, as per plan
submitted should be implemented.
Before recharging the surface run-
off, pre-treatment through
sedimentation tanks must be done
to remove suspended matter, oil and
grease. The bore well for rainwater
recharging should be kept at least 5
mts above the highest ground water
table. Care should be taken that the
contaminated water does not enter
Rainwater harvesting as per
plan for roof run-off and surface
run-off will be implemented.
Suspended matter, oil and
grease will be removed by
treatment before recharging
with surface run-off. The bore
well for recharge will be kept at
least 5 mts above the highest
ground water table.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
any RWH pit.
X The ground water level and its
quality should be monitored
regularly in consultation with
Central Ground Water Authority.
No ground water extraction will
be done.
XI There should be no traffic
congestion near the entry and exist
points from the roads adjoining the
proposed project site. Parking
should be fully internalized and no
public space should be utilized.
Parking will be completely
internalized and no public space
will be utilized. Bell shaped
entry and exit points will be
provided to minimize traffic
congestion.
XII A report on the energy conservation
measures conforming to energy
conservation norms finalize by
Bureau of Energy Efficiency should
be prepared incorporating details
about building materials &
technology; R & U factors etc. and
submit to the SEIAA in three
months time.
Report on energy conservation
measure conforming to energy
conservation norms finalized by
BEE which will include details
of building materials and
technology, R & U factors etc
has already been submitted to
SEIAA.
XIII Energy conservation measures like
installation of CFLs/TFLs for
lighting the areas outside the
building should be integral part of
the project design and should be in
place before project commissioning,
used CFLs and TFLs should be
properly collected and disposed
a) LEDs & CFLs will be used at
most of the locations inside the
project & near boundary wall as
a measure of energy
conservation.
b) Solar lights are proposed for
open spaces, common area and
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
off/sent for recycling as per the
prevailing guidelines/rules of the
regulatory authority to avoid
mercury contamination. Use of solar
panels must be adapted to the
maximum extent possible for energy
conservation.
landscape area.
c) Used CFLs and TFLs will be
properly collected and disposed
off by giving this waste to the
recyclers authorized by Haryana
State Pollution Control Board,
an agreement will be signed
with the recycler for the same
XIV The solid waste generated should be
properly collected and segregated as
per the requirement of the MSW
Rules, 2000 and as amended from
time to time. The bio-degradable
waste should be composted by
vermin-composting at the site
earmarked within the project area
and dry/inert solid waste should be
disposed off to the approved sites
for land filling after recovering
recyclable material.
a) The solid waste generated will
be collected and segregated as
per the requirement of the MSW
Rules, 2000.
b) Bio-degradable waste will be
composted by using organic
waste converter at the site
earmarked within the project
area.
c) Dry/inert solid waste will be
disposed off to the approved
sites for land filling after
recovering recyclable material.
XV The provision of the solar water
heating system shall be as per
norms specified by HAREDA and
shall be made operational in each
building block.
Solar water heating system will
be provided in each tower as per
HAREDA norms.
XVI The project proponent shall use the There is no bore well on the site
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
water from already existing tube
wells for domestic purposes only
and that too after getting prior
permission from CGWA.
and water will be taken from
HUDA only.
XVII The traffic plan and parking plan
proposed by the PP should be
adhered to meticulously with
further scope of additional parking
for further requirement. There
should be no traffic congestion near
the entry and exit points from the
roads adjoining the proposed project
site. Parking should be fully
internalized and no public space
should be used.
Agreed. There will be no traffic
congestion near the entry and
exit points from the roads
adjoining the proposed project
site. Bell shaped entry and exit
points will be provided. Parking
will be fully internalized and no
public space should be used.
Traffic circulation cum Parking
plan is enclosed as Annexure-
VIII.
XVIII The project shall be operationalized
only once HUDA will provide
domestic water supply system in the
area.
This will be followed.
XIX Operation and maintenance of STP,
solid waste management and
Electrical Infrastructure shall be
ensured even after the completion of
sell.
Agreed. Operation and
maintenance of STP, solid waste
management and electrical
infrastructure, and pollution
control measures will be
ensured for lifetime as contract
will be done by various agencies
and all these conditions will be
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
mentioned in the MoU signed
with RWA at the time of handing
over the project.
XX Different types of Wastes should be
disposed off as per the provisions of
Municipal Solid Waste, biochemical
waste, Hazardous waste, e- waste,
batteries and plastic rules made
under Environment Protection Act,
1986.
a) Different type of solid waste
will be collected in colored bins
(green, blue and dark grey)
separate for bio-degradable and
non-biodegradable are proposed
to be provided at the strategic
locations within the site and will
be done according to solid waste
management plan submitted too
SEIAA, Haryana.
b) Biodegradable waste will be
subjected to composting. The
inert solid waste will be
transported to a local Solid
Waste dumping site.
c) E-waste and battery waste
will be disposed of as per
existing E-waste Management
Rules 2011 and Batteries
Management Rules 2001.
XXI Standards for discharge of
Environmental pollutants as
enshrined in various schedules of
rule 3 of Environment Protection
Rule 1986 shall be strictly complied
Air Pollution: Only source of
air pollution will be DG Set.
Stack height will be kept 6m
above the highest roof level for
better dispersion of pollutant
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
with generated from DG sets.
Noise Pollution: Only source of
noise pollution will be DG Set,
enclosure and silencers will be
provided on the DG Set to
reduce the noise to impact the
surroundings. Further use of
horns with jarring sounds, and
noisy trucks with damaged
exhaust pipes to be banned.
Soil Pollution: Landscaping will
be done properly.
Water Pollution: STP of
capacity 500 KLD is being
installed in first phase and
treated effluent will be reused in
horticulture and flushing
through dual plumbing lines
and as per requirement it will be
used in Construction of second
phase also.
PART-B GENERAL CONDITIONS
I The project Proponent shall ensure
the commitments made in Form -1,
Form- 1A, EIA/ EMP and other
documents submitted to SEIAA for
the protection of environment and
proposed environmental safeguards
Agreed.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
are complied with in letter and
spirit.
II Six monthly compliance reports
should be submitted to the Haryana
State Pollution Control Board and
Regional Office, MOEF, GOI,
Northern Region, Chandigarh and a
copy to the SEIAA Panchkula,
Haryana.
Agreed. Six monthly compliance
reports are being regularly
submitted to Haryana State
Pollution Control Board and
Regional Office, MOEF, GOI,
Northern Region, Chandigarh
and a copy to the Regulatory
Authority of Haryana.
III The SEIAA, Haryana reserves the
right to add additional safeguard
measure subsequently, if found
necessary. Environmental Clearance
granted will be revoked if it is found
that false information has been
given for getting approval of this
project. SEIAA reserves the right to
revoke the clearance if conditions
stipulated are not implemented to
the satisfaction of SEIAA/ MoEF.
Agreed. The SEIAA Haryana
reserves the right to add
additional safeguard measure
subsequently, if found
necessary.
IV Under the provisions of
Environment (Protection) Act, 1986,
legal action shall be initiated
against the Project Proponent if it
was found that construction of the
project has been started before
obtaining Environment Clearance.
Agreed.
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
V The project Proponent shall not
violate any judicial orders/
pronouncements issued by the
Hon’ble Supreme Court/ High
Courts.
Agreed.
VI All other statutory clearances such
as the approvals for storage of diesel
from Chief Controller of Explosives,
Fire Department, Civil Aviation
Department, Forest Conservation
Act, 1980 and Wildlife (Protection)
Act, 1972, PLPA, 1900, Forest Act,
1927 etc. shall be obtained, as
applicable by project proponents
from the respective authorities prior
to construction of the project
Agreed.
a) Approval of firefighting
scheme from Municipal
Corporation has been
granted and is attached
as Annexure VII.
b) Aravali NOC from DC has
been obtained and is
attached Annexure IX.
c) NOC from Airport
authority of India is
attached as Annexure X.
VII The project proponent shall obtain
NOC under Aravali Notification from
CEC of Hon’ble Supreme court
regarding coverage under Aravali
Notification.
NOC under Aravali Notification
via DC is enclosed Annexure
IX.
VIII The project Proponent should
inform the public that the project
has been accorded Environment
Clearance by the SEIAA and copies
of the clearance letter are available
Advertisement has been
published in the newspaper
stating that project has
accorded Environmental
Clearance and same has been
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
with State Pollution Control Board
and SEIAA. This should be
advertised within 7 days from the
date of issue of the Environment
Clearance Letter at least in 2 local
newspapers that are widely
circulated in the region and the
copy of the same should be
forwarded to SEIAA Haryana. A
copy of Environment Clearance
conditions shall also be put on
project proponent’s website for
public awareness.
forwarded to SEIAA, Haryana
and submitted with previous
compliance report.
IX Any appeal against this
Environment Clearance shall lie
with the National Green Tribunal, if
preferred, within a period of 30 days
as prescribed under section 16 of
the National Green Tribunal Act,
2010.
Agreed.
X The project Proponent shall put in
place Corporate Environment Policy
as mentioned in MoEF, GoI OM No.
J-11013/41/2006-IA II (I) dated
26.4.2012 within 3 months period.
This will be followed.
XI If later found that build-up area as
defined in MOEF letter F.No. 19-
Agreed
DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]
M/s JANPRIYA BUILDESTATE PVT. LTD.
127/2011-IA-III dated 02.04.2012 is
more than stated area, EC shall be
revoked